Top Banner
(APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED) Sr. Quality cum Material Expert – Nirmal Kumar Sinha PROPOSED POSITION : SENIOR QUALITY CUM MATERIAL EXPERT NAME OF THE FIRM : RODIC CONSULTANTS PVT. LTD. NAME OF THE STAFF CONTACT NO : Nirmal Kumar Sinha 08713839108/ 07051200574 PROFESSION : Civil Engineering DATE OF BIRTH : 4 th May 1963 YEARS WITH FIRM/ENTITY 6 YEAR 11 Month FATHER NAME Late - K.K.SRIVASTAVA NATIONALITY: Indian MEMBERSHIP OF PROFESSIONAL SOCIETIES: Member, Indian Roads Congress DETAILED TASKS ASSIGNED : Organize laboratory Review material sources Review Mix Designs Review Mix Design for concrete mix Prepare testing program Organize administration and introduce reporting and recording system materials as well as concreting works of major and Minor Bridges and Culverts as per Indian Standards. His spectrum of experience in includes field and laboratory testing for Embankment, G.S.B., W.M.M., D.B.M. B.C., D.L.C. & P.Q.C. etc. He is well conversant with various National and international construction standards like IRC, MORTH, AASHTO and has obtained in-depth and extensive experience on bituminous and non-bituminous mix designs. He has also been involved in setting up of field quality control laboratories, and has been responsible for the monitoring and calibration of hot mix plant, batching plant and other construction equipment and instruments, selection of borrow pit sites for the construction of embankment and subgrade and job mix formula for the bituminous works. He is also well versed in preparation of concrete mix design of all Grade of concrete. He has Associated with Quality Assurance Programme in Tunnel Projects in Construction Supervision using Modern Technology. Some of his Relevant Projects are: Construction Supervision of Improvement/Upgradation of Roads in Uttara khand (USRIP Project-2); Package-1, length: 274.10 Km 2-lane Roads in the Districts of Almora, Bageshwar, Pithoragarh, Champawat, Nainital and Udhamsingh Nagar, Funded by ADB. Page | 1
10

Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert

Apr 15, 2017

Download

Documents

Sinha Sab
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert

(APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED) Sr. Quality cum Material Expert – Nirmal Kumar SinhaPROPOSED POSITION : SENIOR QUALITY CUM MATERIAL EXPERT

NAME OF THE FIRM : RODIC CONSULTANTS PVT. LTD.

NAME OF THE STAFFCONTACT NO : Nirmal Kumar Sinha 08713839108/ 07051200574

PROFESSION : Civil Engineering

DATE OF BIRTH : 4th May 1963

YEARS WITH FIRM/ENTITY 6 YEAR 11 Month FATHER NAME Late - K.K.SRIVASTAVA NATIONALITY: Indian

MEMBERSHIP OF PROFESSIONAL SOCIETIES: Member, Indian Roads Congress

DETAILED TASKS ASSIGNED : Organize laboratory Review material sources Review Mix Designs Review Mix Design for concrete mix Prepare testing program Organize administration and introduce reporting and recording system

materials as well as concreting works of major and Minor Bridges and Culverts as per Indian Standards. His spectrum of experience in includes field and laboratory testing for Embankment, G.S.B., W.M.M., D.B.M. B.C., D.L.C. & P.Q.C. etc. He is well conversant with various National and international construction standards like IRC, MORTH, AASHTO and has obtained in-depth and extensive experience on bituminous and non-bituminous mix designs. He has also been involved in setting up of field quality control laboratories, and has been responsible for the monitoring and calibration of hot mix plant, batching plant and other construction equipment and instruments, selection of borrow pit sites for the construction of embankment and subgrade and job mix formula for the bituminous works. He is also well versed in preparation of concrete mix design of all Grade of concrete. He has Associated with Quality Assurance Programme in Tunnel Projects in Construction Supervision using Modern Technology.Some of his Relevant Projects are: Construction Supervision of Improvement/Upgradation of Roads in Uttara khand (USRIP Project-2); Package-1, length: 274.10

Km 2-lane Roads in the Districts of Almora, Bageshwar, Pithoragarh, Champawat, Nainital and Udhamsingh Nagar, Funded by ADB.

Construction Supervision for 2 /4 laning of Gujrat state road Project total length 65 Km.

Construction of Tehri Dam Project, Tunnel Length: 3.48 Km, (13.4mt dia to 8.64mt finished dia) and 723 mts deep surge shaft. Inspection shafts of Diversion Tunnels at Tehri Dam Project, Hilly Terrain Project.

Construction and Supervision of Nathpa Jhakri Power Project. It includes construction of 67.5M High Concrete Gravity Dam on River Sutlej at Nathpa an underground Desilting arrangement (525MX27MX17M), Head Race Tunnel length: 27 Km, 10.15m dia on the Left Bank of River Sutlej and underground Power House at Jhakri with an installed capacity of 1500MW(6X250MW). Hilly Terrain Project.

Rehabilitation and Up gradation of 4-laning and strengthening of the existing two lanes of Matura to Agra Section of NH-2 in Uttar Pradesh (OECF Funded under FIDIC Conditions).

Widening and Strengthening of 2-laning of Chainpur – Pathgacha road project in Gumla, length: 35 Km in the state of Bihar. Funded by: World Bank.

EMPLOYMENT RECORD:July 2011 to Till DatePvt. Ltd., Chennai, India. QSE

SMEC INDIA PVT. LTD. & RODIC CONSULTANTS PVT. LTD.

Project Names Rehabilitation, Strengthening and Four Laning of Quazigund to Banihal Section From Km 189.350 to Km 204.700 of N,H1A , Including 2-Tunnels (2-Lane) of 0.69 Km & 8.45 Km Length on NH-1A, on DBFOT( Annuity) basis, in the State of Jammu & Kashmir

Page | 1

Page 2: Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert

(APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED) Sr. Quality cum Material Expert – Nirmal Kumar SinhaLocation Jammu & Kashmir

Duration March 2012 onwards

Client NHAI

Position SR. QUALITY CUM MATERIAL EXPERT

Activities Performed Checking and verifying the Safety Plan of the Tunnel construction as submitted by Concessionaire Implementation of the Safety Plan during construction Monitoring the safety related works during the construction period. Conducting safety audit of tunnel and highways. Attending Safety meeting with client and concessionaire. Investigating and reporting all the incident/accident. Preparing weekly and monthly safety report. Liasoning with clients, concessionaire and number of subcontractors to ensure seamless

operations

Dec 2009 to till date RODIC CONSULTANTS PVT. LTD. Sr. Quality cum Material Expert

Project Name : Consultancy Services for Construction Supervision of Improvement / Upgradation of Roads in Uttarakhand (USRIP Project-2); Package-1, length: 274.10 Km 2-lane Roads in the Districts of Almora, Bageshwar, Pithoragarh, Champawat, Nainital and Udhamsingh Nagar; Hilly Terrain Project; Funded by ADB. (Dec 2009 to 30 jun 2011 )

Location : Uttarakhand

Duration : 1 Year 4 Months

Client : PWD, Govt. of Uttarakhand

Main Project Features : Total Length: 274.10 Km, Lane: 2; Project Cost: Rs. 215 CroresPosition : Senior Quality cum Material Expert

Activities Performed : Check adequacy and suitability of plants, equipment and operations and check field and laboratory equipment provision for quality control of Material and Mix design of Asphalt, Concrete and WMM, GSB and Earth Works. Assist Team Leader on quality certification. Approval of Materials from borrows area and scheduling of test.

Study of contractor's Work Programme, develop quality Control manual and Quality Control Programme and responsible for Quality control during Construction. Responsible for Quality Control aspect during Construction work including inspection of the field laboratories of Contractors and Supervision of setting up of WMM Plant and Bituminous mixing Plants of the Contractor so as to ensure that specified requirements for such equipments are fully met.

Responsible for overall functioning of Material Testing Laboratory. Review the test results of bore holes, query and borrow area material to find out

their strength characteristics and suitability for using them in Construction Association with Quality Control Program in using Modern Technology.

Nov 2006 to Dec 2009 Feedback Ventures Pvt. Ltd. Sr. Quality cum Material Expert

Project Name : Construction Supervision for 2 /4 laning of Gujrat state road Project total length 65 Km.

Location : Gujrat

Duration : 3 Years 2 Months

Client : PWD State Gujrat

Main Project Features : Tunnel Length: 65 Km Lane 2/4Position : Sr. Quality cum Material Expert

Activities Performed : Check adequacy and suitability of plants, equipment and operations and check field and laboratory equipment provision for quality control of Material and Mix design of Asphalt, Concrete and WMM, GSB and Earth Works. Assist Team Leader on quality certification. Approval of Materials from borrows area and scheduling of test.

Study of contractor's Work Programme, develop quality control manual and Quality Control Programme and responsible for Quality Assurance during

Page | 2

Page 3: Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert

(APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED) Sr. Quality cum Material Expert – Nirmal Kumar Sinha

Construction. Responsible for Quality Control aspect during Construction work including inspection of the field laboratories of Contractors and Supervision of setting up of WMM Plant and Bituminous mixing Plants of the Contractor so as to ensure that specified requirements for such equipments are fully met.

Responsible for overall functioning of Material Testing Laboratory. Review the test results of bore holes, query and borrow area material to find out

their strength characteristics and suitability for using them in Construction Association with Quality Control Program in using Modern Technology.

Sept. 2002 to Nov 2006 Jai Prakash Industries Ltd. Sr. Quality cum Material Expert

Project Name : Construction and Supervision of Tehri Dam Project, Tunnel Length: 3.48 Km, (13.4mt dia to 8.64mt finished dia) and 723 mts deep surge shaft. Inspection shafts of Diversion Tunnels at Tehri Dam Project, Hilly Terrain Project.

Location : Uttarakhand

Duration : 4 Years 2 Months

Client : Tehri Hydro Development Corporation

Main Project Features : Total Length of Tunnel: 3.48 Km, 13.4mt dia to 8.64mt finished dia) and 723 mts deep surge shaft.

Position : Sr. Quality cum Material Expert

Activities Performed : Installation of laboratory at site and ensure that suitable testing equipment is available at laboratory, calibration of equipments and monitoring their performance regularly.

Selections of suitable borrow areas for construction of embankment and sub-grade. Review the Material Testing result at laboratory and oversee the Quality of work

executed at site. Monitoring of concrete and bituminous works at site and calibration of hot mix plant. Checking the suitability of construction Material, conducting various test at different

stage of the project as per requirement and specifications. Reviewing the Designing Job mix formula for G.S.B, W.M.M., D.B.M., BC, etc as per

specification. Preparation of Quality Control and Quality Control Report and assist in preparing

monthly progress report. Associated with Quality Control Program in using Modern Technology.

April 1997 to Aug 2002 Continental Construction Ltd. Senior Quality cum Material Expert

Project Name : Construction and Supervision of Nathpa Jhakri Power Project. It includes construction of 67.5M High Concrete Gravity Dam on River Sutlej at Nathpa an underground Desilting arrangement (525MX27MX17M), Head Race Tunnel length: 27 Km, 10.15m dia on the Left Bank of River Sutlej and underground Power House at Jhakri with an installed capacity of 1500MW(6X250MW). Hilly Terrain Project.

Location : Shimla and Kinnaur

Duration : 5 Years 4 Months

Client : Nathpa-Jhakri Power Project Ltd.

Main Project Features : 67.5M High Concrete Gravity Dam on River Sutlej at Nathpa an underground Desilting arrangement (525MX27MX17M), Head Race Tunnel length: 27 Km, 10.15m dia on the Left Bank of River Sutlej and underground Power House at Jhakri.

Position : Senior Quality cum Material Expert

Activities Performed : Installation of laboratory at site and ensure that suitable testing equipment is available at laboratory, calibration of equipments and monitoring their performance regularly.

Selections of suitable borrow areas for construction of embankment and sub-grade. Review the Material Testing result at laboratory and oversee the Quality of work

executed at site. Monitoring of concrete and bituminous works at site and calibration of hot mix plant. Checking the suitability of construction Material, conducting various test at different

Page | 3

Page 4: Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert

(APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED) Sr. Quality cum Material Expert – Nirmal Kumar Sinha

stage of the project as per requirement and specifications. Reviewing the Designing Job mix formula for G.S.B, W.M.M., D.B.M., BC, etc as per

specification. Preparation of Quality Control and Quality Control Report and assist in preparing

monthly progress report. Associated with Quality Control Program in using Modern Technology.

Jun 1993 to Mar 1997 Progressive Constructions Ltd. Quality cum Material Engineer

Project Name : Rehabilitation and Upgradation of 4-laning and strengthening of the existing two lanes of Matura to Agra Section of NH-2 in Uttar Pradesh (OECF Funded under FIDIC Conditions)

Location : Uttar Pradesh

Duration : 3 Year 9 Months

Client : PWD, Govt. of Uttar Pradesh

Main Project Features : Total Length: 61 Km, Lane: 4Position : Quality cum Material Engineer

Activities Performed : Installation of laboratory at site and ensure that suitable testing equipment is available at laboratory, calibration of equipments and monitoring their performance regularly.

Selections of suitable borrow areas for construction of embankment and sub-grade. Review the Material Testing result at laboratory and oversee the Quality of work

executed at site. Monitoring of concrete and bituminous works at site and calibration of hot mix plant. Checking the suitability of construction Material, conducting various test at different

stage of the project as per requirement and specifications. Reviewing the Designing Job mix formula for G.S.B, W.M.M., D.B.M., BC, etc as per

specification. Preparation of Quality Control Report and assist in preparing monthly progress report. Associated with Quality Control Program in using Modern Technology

Jan 1991 to Jun 1993 Vijeta Construction Ltd. Quality cum Material Engineer

Project Name : Widening and Strengthening of 2-laning of Chainpur – Pathgacha road project in Gumla, length: 35 Km in the state of Bihar. Funded by: World Bank.

Location : Bihar

Duration : 2 Years 5 Months

Client : PWD, Govt. of Bihar

Main Project Features : Length: 35 Km, Lane: 2; Position : Quality cum Material Engineer

Activities Performed : Responsible for Installation of laboratory at site, and checking laboratory equipments. Selections of borrow area for construction of embankment and sub-grade. Reviewing the material and approving them. Monitoring the quality control & quality assurance and checking at site, arrangement of reinforcement. Also responsible for site testing activities like soil, aggregate, cement, Bitumen, steel, etc as per IRC and MORT&H specifications. Preparation of mix design as per requirement, Job mix of B.M, S.D.B.C, and overall quality control of the road & Bridge. Preparing Quality Control test reports.

LANGUAGES : Speaking Reading Writing

English Excellent Excellent ExcellentHindi Excellent Excellent Excellent

Page | 4

Page 5: Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert

(APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED) Sr. Quality cum Material Expert – Nirmal Kumar Sinha

Summary of Qualification & Experience vis-à-vis the requirements as per TOR

Requirements as per TOR (Enclosure-B)

Possessed by the Staff

Member

Break-up of experienceBrief Description of Project Man-months

providedGraduate in Civil Engineering B.Sc. (Civil

Engineering) Construction Supervision of Improvement / Upgradation of Roads in Uttarakhand (USRIP Project-2); Package-1, length: 274.10 Km 2-lane Roads in the Districts of Almora, Bageshwar, Pithoragarh, Champawat, Nainital and Udhamsingh Nagar - Funded by ADB. (Dec 2009 to till Date)

1 Year 4 Months

Post Graduation in Geotechnical Engineering / Soil Machanics & Foundation Engineering (Preferred :)

NA Construction Supervision for 2 /4 laning of Gujrat state road Project total length 65 Km.

3 Years 2 Months

Exp. in Similar Capacity (at least 7 years)

13 Years 10 Months

Construction of Tehri Dam Project, Tunnel Length: 3.48 Km, (13.4mt dia to 8.64mt finished dia) and 723 mts deep surge shaft. Inspection shafts of Diversion Tunnels at Tehri Dam Project, Hilly Terrain Project.

4 Years 2 Months

Experience in Similar capacity for major Tunnel Projects

2 Nos. Construction and Supervision of Nathpa Jhakri Power Project. It includes construction of 67.5M High Concrete Gravity Dam on River Sutlej at Nathpa an underground Desilting arrangement (525MX27MX17M), Head Race Tunnel length: 27 Km, 10.15m dia on the Left Bank of River Sutlej and underground Power House at Jhakri with an installed capacity of 1500MW(6X250MW). Hilly Terrain Project.

5 Years 4 Months

Association to quality assurance programmes in using modern technology.

17 Years 7 Months

Rehabilitation and Upgradation of 4-laning and strengthening of the existing two lanes of Matura to Agra Section of NH-2 in Uttar Pradesh (OECF Funded under FIDIC Conditions).

3 Years 9 Months

Widening and Strengthening of 2-laning of Chainpur – Pathgacha road project in Gumla, length: 35 Km in the state of Bihar. Funded by: World Bank.

2 Years 5 Months

CERTIFICATION BY THE CONDIDATE :

I, the undersigned (Nirmal Kumar Sinha, Rodic Consultants Pvt. Ltd., H-78, 1st Floor, Sector-63, Noida-201307, Tel: 0120-4615500) undertake that this CV correctly describes myself, my qualifications and my experience and NHAI would be at liberty to debar me if any information given in the CV, in particular the Summary of Qualification & Experience vis-à-vis the requirements as per TOR is found incorrect. I further undertake that I have neither been debarred by NHAI nor left any assignment with the consultants engaged by NHAI/contracting firm (Rodic Consultants Pvt. Ltd.), for any continuing work of NHAI without completing my assignment. I will be available for the entire duration of the current project “Independent Engineer Services for 4 laning of Quazigund to Banihal section from Km 189.350 to km 204.700 of NH 1A including 2 tunnels (2 lane) of 0.69 km and 8.45 km length on NH-1A on BOT (Annuity) basis in the State of Jammu & Kashmir. Package no. IE/NHDP- Phase-II/BOT/II/J&K)”. if I leave this assignment in the middle of the work, NHAI would be at liberty to debar me from taking any assignment in any of the NHAI works for an appropriate period of time to be decided by NHAI. I have no objection if my services are extended by NHAI for this work in future.

For Key Personnel intermittent inputs, add the following:

I further certify that I am associated with the following assignments as on date (as on 7 days prior to due date for submission of proposals) including those for which LOA has been received by the firm and the inputs in these assignments shall not affect the work of the current assignment.

Name of Assignment

Client Date of LOA Likely start(Month/ Year)

Likely end(Month/ Year)

Total input of the person (man-months)

NA

Page | 5

Page 6: Nirmal_Kumar_Sinha - Sr. Quality cum Material Expert

(APPENDIX B-5) N.H.A.I –APPROVED C.V ( 90%+PRESENT PROJECT DURATION COMPLETED) Sr. Quality cum Material Expert – Nirmal Kumar SinhaNOTE: CVs of Key Personnel having intermittent inputs will be considered only if the assignments on hand as on 7 days before due date of proposal including those for which LOA has been received from the Client do not exceed 3 (three).

______________________________________________________ Date: 27 .11.2013 Day/Month/Year

CERTIFICATION BY THE FIRM:

The undersigned on behalf of (Rodic Consultants Pvt. Ltd. certify that Nirmal Kumar, H-78, 1st Floor, Sector-63, Noida-201307, Tel: 0120-4615500) to the best of our knowledge has neither been debarred by NHAI nor left his assignment with any other consulting firm engaged by NHAI / contracting firm (firm to be supervised now) for the ongoing projects. We understand that if the information about leaving the past assignment is know to NHAI, NHAI would be at liberty to remove the personnel from the present assignment and debar him for an appropriate period to be decided by NHAI.

____Nirmal kumar sinha__________________________________________________ Date: 03 / 01 / 2017Signature of Staff Member and Authorized Representative of the firm]

Page | 6