Page 1: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.

NHMFL-PFF Strategic Plans:

Achieving 100 T

Chuck MielkeDirector of the NHMFL-PFF

Page 2: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.

Where are we today• 85 T Operations user program

– World Leading and Unique User Environment– Currently executing our second call of proposals

• Set World Record for non-destructive high field (89 Tesla)• Have the Worlds largest (electrical) Pulsed Power System

– 1.4 GVA Has Enabled the Only Reliable Fields > 80T• +600 MJ pulse capacity • use 140 MJ for the 85 T magnet outsert

• Have established a world leading competency in Fermi Surface Topology using all NHMFL magnets (especially the 85 T)

Page 3: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.
Page 4: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.

Where are we going?

• 100 T • (Operational System Verification)

• Acceptable risk field for user operations– Based on analysis of mechanics at peak field.

(Primarily determined by outsert) • 100 T user operations

Page 5: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.

How?

• By reducing bore from 15 to 10 mm – Insert delivers 61.3 T by itself– Outsert delivers (37.0 – 3.3) T = 33.7 T

• Same risk to outsert as current 85 T operations

• To reach 100 T outsert must deliver 5 T more• Assess risk of 42 T outsert field

Page 6: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.

When? (Major Milestones)• 10 mm Insert Cad Design (Done Aug 2011)• 42T outsert Eng. Risk Assessment Nov 30th 2010• 10 mm insert completed by Jan 30th 2011• Test to 95 T or higher (Mar – Apr 2011) • 100 T user operations analysis (June 2011)• Upgrade for 100 T user ops … (2012 – 2014)

– Upgraded outsert and spares (coils 1-4 of the outsert)

Page 7: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.

Timeline details

20072006 2008 2009

2010 2011

Jul Sep Jan Mar-AprJune 2012 - 2014

Com

mis

sion

ed to

89

T

Firs

t Cal

l Use

r ops

to 8

5 T

Seco

nd C

all U

ser o

ps to

85

T

Repa

ired

Coils

2 &

3 o

n O

utse

rt

ERA

for 4

2T O

utse

rt O

ps

ARRA

Pro

ject

Com

plet

ed

10 m

m T

oolin

g D

esig

n Co

mpl

ete

10 m

m T

oolin

g Co

mpl

ete

10 m

m A

ssem

bly

Com

plet

e

Test

to 9

5 T

+10

0T O

ps A

naly

sis

100

T U

ser O

ps

Inst

all &

Hi-P

ot 1

0 m

m A

ssem

bly

FebAugNov

Oct Dec

Scie

ntist

Hire

EE H

ire

Page 8: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.

100T Users Call #1

Micro-ca

ntilever m

agnetometry

[quantum m

agnets]

Micro-ca

ntilever m

agnetometry

&

contactl

ess co

nductivit

y [Hg h

igh-T c]

dHvA &

contactl

ess co

nductivit

y

[U-base

d heavy f

ermions]

Magneto-tr

ansport

measurements

LSCO Q

uantum O

scilla

tions

Micro-ca

ntilever m

agnetometry

Quantum O

scilla

tions in doped pnicti

des

Transp

ort in

pnictide su

perconducto

r

measurement o

f upper c

ritica

l fields

HTC Contactl

ess Conducti

vity

Sebasti

an et al. P

NAS

HTC Contactl

ess Conducti

vity

Single

ton et al. P

RL

Page 9: NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF.

Performance of 100T Magnet Systems