Top Banner
Iain Perry
12

NextGen 2011 Workshop Iain Perry UTSIKT

Jul 14, 2015

Download

Business

ceobroadband
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NextGen 2011 Workshop Iain Perry UTSIKT

Iain  Perry  

Page 2: NextGen 2011 Workshop Iain Perry UTSIKT

Tekniska  Verken  •  Local  &  council  owned  and  driven  •  Waste  disposal  /  Management  •  Electricity  infrastructure  •  District  underground  heaBng  •  Industrial  cooling  systems  •  Biogas  •  Water  •  Broadband  Infrastructure  (ASP)      

•  280,000  private  and  corporate  clients  who  benefit  from  our  products    

Page 3: NextGen 2011 Workshop Iain Perry UTSIKT

Electrical  power  Electricity  sales  with  local  presence  

Broadband  A  simple  way  to  meet  the  communica7ons  requirements  of  a  property  

District  hea7ng  Problem-­‐free  and  affordable  hea7ng  for  the  property  

District  cooling  Comfortable  indoor  climate  in  summer  

Recycling/waste  Environmentally-­‐appropriate  processing  of    all  types  of  waste.  

Energy  services  Monitoring  the  property’s  energy  consump7on  

Water  Drinking  water  supplied  and  waste  water  processed  

Electricity  distribu7on  Extremely  reliable  electricity  supply  

Contrac7ng  work  Broad  and  cuIng-­‐edge  exper7se  in  infrastrucutre,  energy  and  management  engineering  

Biogas  Part  of  the  natural  cycle,    locally-­‐produced  vehicle  fuel  Ligh7ng  

Total  outdoor  ligh7ng  solu7ons  

Page 4: NextGen 2011 Workshop Iain Perry UTSIKT

District  hea7ng  Problem-­‐free  and  affordable  hea7ng  of  the  property!  

Electricity  distribu7on  Extremely  reliable  elec7ricty  supply!  

Broadband  A  simple  way  to  meet  the  communica7ons  requirements  of  a  property!  

Electrical  power  Electricity  sales  with  local  presence!  

Electricty  network/Ligh7ng  Total  outdoor  ligh7ng  solu7ons!    

Recycling/waste  Environmentally-­‐appropriate  processing  of    all  types  of  waste.  .  

Biogas  Part  of  the  natural  cycle,    locally-­‐produced  vehicle  fuel!  

Energy  services  Monitoring  the  property’s  energy  consump7on.  .  

Water/waste  Drinking  water  supplied  and  waste  water  processed!    

Page 5: NextGen 2011 Workshop Iain Perry UTSIKT

•   3  towns  based  in  2  regions  •   Connected  to  several  other  towns    

 

Page 6: NextGen 2011 Workshop Iain Perry UTSIKT

Utsikt  operates  and  maintains  the  city  broadband  networks  in  Linköping  och  Katrineholm.    

City  broadband  network  

1  access  point  leads  to  all  our  customers    

Utsikt  operates  and  maintains  its  networks  in  Linköping,  Mjölby    och  Katrineholm  and  in  all  

the  surrounding  villages.  

Page 7: NextGen 2011 Workshop Iain Perry UTSIKT

Broadband  network  •  Our  network  is  open,  creaBng  compeBBveness  •  Affordable  

•  Internet  (9  ISP’s)  •  3  TV  distributers  (  Digital,  HD,  IP-­‐Tv)  •  P2P  connec7ons  LAN-­‐LAN  •  Dark  fibre  •  WDM  •  LAN  par7es  for  youngsters  •  Hospitals  /  Doctors  surgeries  /  Healthcare  

centres  •  4  Local  council  contracts  •  Alarms  •  Telephone  services  •  Mul7-­‐apartment  blocks  services    ven7la7on  /  

read  electricity  meter  /  hea7ng  systems  •  Order  medicine  directly  on  line  •  Doctors  online  /  answers  directly  

Page 8: NextGen 2011 Workshop Iain Perry UTSIKT

How  did  it  begin  ?  •  Telecoms  de-­‐regulated  1992/3    •  Our  city  broadband  network  started  in  1995  as  one  of  the  

first  city  networks  in  Sweden.  

•  Local  councils  and  u7lity  companies  enter  the  fibre  infrastructure  business  –  commercial  foresight  

•  1  of  the  first  mul7  operator  networks  offering  OPEN  access    

•  Gradual  uptake  ini7ally  /companies  –  early  adopters    •  2001/2  fastest  network  in  Sweden  –  2Mbit/s  

•  Government  goal:    40%          100Mbit/s  2015    

•  New  target:                          90  %        100Mbit/s    2020  

•  2010  European  funding  

•  2011  up  to  1Gig  available  

•  Constantly  uppgrading  our  network/infrastructure  

 

Page 9: NextGen 2011 Workshop Iain Perry UTSIKT

•  4th  biggest  network  in  Sweden  

 •   Available  to  almost  9  out  of  10  customers    •  Approximately  50  %  penetra7on.  

•  A  separate  student  network,  within  our  network,  for  more  than  4000  students,  with  about  90%  penetra7on.  

•  15  000  council  flats  connected  via  a  seperate  unique  Swedish  collabora7on.        5  000  council  flats  just  connected  in  Norrköping  

•  9  rural  backbone  legs  2013  where  3  200  houses,  530  businesses      -­‐            Can  get  fibre  by  digging  a  lot  of  the  work……..themselves!    

•  £1.5M  EU  grant  almost  sealed  for  redundancy.    

Today    

Page 10: NextGen 2011 Workshop Iain Perry UTSIKT

Fiber…….Why  ?  

 What  should  I  be  thinking  about  ?  

Today,  a  lot  of  us  choose  an  infrastructure  and  a  supplier  at  the  same  7me.    Prac%cal  !  But  is  it  smart?      Today  you  can  download  movies  and  music,  you  can  play  online  and  most  people  can  watch  TV  and  make  calls  over  the  same  network.  Is  it  sensible  to  think  wider  than  broadband?  Is  my  property  ready  for  the  next  genera%on  of  services?    It  is  actually  becoming  more  important  to  select  a  network  offering  as  many  alterna7ves  as  possible,  with  high  reliability  and  with  service  as  close  as  possible  –  what,  if  something  s7ll  goes  wrong.  Is  it  be?er  to  choose  an  infrastructure  first  and  your  service  provider  later?    Utsikt  offer  one  thing,  connec7vity  ,  via  our  city  network,  and  we  do  it  in  several  towns.  You  choose  which  one  of  our  suppliers  to  use,  without  being  stuck  in  long  contracts.  Is  it  not  more  important  to  have  more  op%ons  and  quality  in  your  choice  of  network  infrastructure?  

Page 11: NextGen 2011 Workshop Iain Perry UTSIKT

Long  term  investment  

•  Infrastructure  cannot  be  rushed  •  Return  on  investment  is  gradual  •  Industrial  revolu7on  took  years  •  Technological  revolu7on  will  also  take  7me!  •  Mindset  needs  to  be  right.    •  Quick  buck  for  the  diggers  but  not  for  the  owners  

Page 12: NextGen 2011 Workshop Iain Perry UTSIKT

Priority  for  today’s  customer    

power  cut    

no  Internet  !!!