Arrow: A Rapidly Growing Uranium Discovery | June 2015

Page 2: NexGen Arrow Presentation

Disclaimer Information Contained In This Presentation

This presentation is a summary description of NexGen Energy Ltd. (“NexGen” or the

“Company”) and its business and does not purport to be complete. This presentation is

not, and in no circumstances is it to be construed as, a prospectus, an advertisement,

or a public offering of securities. No securities regulatory authority or similar authority

has reviewed or in any way passed upon the document or the merits of the Company’s

securities and any representation to the contrary is an offence.

Except where otherwise indicated, the information contained in this presentation has

been prepared by NexGen and there is no representation or warranty by NexGen or

any other person as to the accuracy or completeness of the information set forth

herein. This presentation includes information on adjacent properties that was

obtained from various publicly available sources referred to herein and the accuracy

and completeness of such information has not been verified by NexGen. Except as

otherwise stated, information included in this presentation is given as of the date

hereof. Neither the delivery of this presentation nor any sale made under the terms

described herein shall imply that the information herein is correct as of any date after

the date hereof.

All dollar amounts referenced herein, unless otherwise indicated, are expressed in

Canadian dollars.

Cautionary Note Regarding Forward-looking Information

Statements contained in this presentation that are not current or historical factual

statements may constitute “forward-looking information” within the meaning of

applicable securities laws including statements with respect to the properties, a

concurrent financing, our plans for exploration and development of our properties and

our financial condition, operations and prospects. The forward-looking information

reflects current expectations regarding future results, performance or achievements

and speaks only as of the date of this presentation. When used in this presentation,

forward-looking information can be identified by such words as “may”, “will”, “expect”,

“believe”, “plan”, “project”, “anticipate”, “intend”, “estimate” and other similar

terminology. Such forward-looking information involves known and unknown risks,

uncertainties and other factors that may cause the actual results, performance or

achievements of the Company to be materially different from any future results,

performance or achievements expressed in or implied by such information. Such risks,

uncertainties and other factors include, but are not limited in any manner to those risks

set forth in this presentation under the heading “Risk Factors”, including, the risk that

no mineralization will be identified on the Radio and Rook I properties; the Company’s

dependence on third party financing; the Company’s limited operating history; risks

inherent in exploration activities; environmental and safety risks including increased

regulatory burdens; unexpected geological or hydrological conditions; a possible

deterioration in political support for nuclear energy; changes in government regulations

and policies, including trade laws and policies; demand for nuclear power; failure to

obtain necessary permits and approvals from government authorities; weather and

other natural phenomena; and other exploration, development, operating, financial

market and regulatory risks. The foregoing list of factors is not exhaustive.

The forward-looking information contained in this presentation requires management to

make certain assumptions including with respect to the financing and its ability to

successfully develop its properties. Although management of the Company believes

that the assumptions underlying, and the expectations reflected in, the forward-looking

information are reasonable, significant risks and uncertainties are involved in such

information. Management can give no assurances that its assumptions, estimates and

expectations will prove to have been correct. Forward-looking information should not

be read as guarantees of future performance or results, and will not necessarily be

accurate indications of whether or not or the times at or by which such performance or

results will be achieved. Many factors that are beyond the Company’s control could

cause actual results to differ materially from the results discussed in the forward-

looking statements.

2

Page 3: NexGen Arrow Presentation

3 Uranium Market (Demand) A Story of Stable Demand Growth and Uncertain Supply

Nuclear Electricity Growth • 930 GW needed by 2050 to support existing global decarbonisation mandates • Will represent 17% of the global energy supply • Equates to a 2.3 times increase in nuclear energy demand in just 35 years

Uranium Demand • Average demand growth estimated at 4% per year to 2024

Source: International Energy Agency (2015)

Page 4: NexGen Arrow Presentation

4 Uranium Market (Demand) Investment and Reactor Builds

• Currently 437 nuclear reactors in operation globally • As of April 2015, 65 nuclear reactors are under construction

• China: 26 currently, 23 under construction, 187 in planning/proposal phase • China Nuclear Power Corp. “looking to invest in Canada in the near future” (Dec. 2014)

• Another 496 reactors are in the planning/proposal phase 1.) Graph: International Energy Agency (2015) 2.) World Nuclear Association (2015)

1

2

Page 5: NexGen Arrow Presentation

5 Uranium Market (Supply) Lack of Economic Deposits

• In 2014 world uranium

consumption was 155Mlbs while mine supply accounted for 147Mlbs

• +20Mlbs from HEU agreement (now over)

• Estimated supply gap of

nearly 100Mlbs per year by 2030

• 11 of top 15 uranium

mines are in unstable jurisdictions (Russia, Kazakhstan, Niger)

End of HEU agreement in 2013 removed the equivalent of McArthur River’s annual production from supply

1.) World Nuclear Association (2015) 2.) World Nuclear Association estimate of 97,450tU demand and 53,000 tU supply in 2030

1

2

Page 6: NexGen Arrow Presentation

6 The Athabasca Basin The Source of Future Supply

1.) World Nuclear Association (2015) 2.) Cameco Corp. 3.) Based on US$45/lb U & US$1,300/oz Au

Remember: 1.00% U3O8 = 23.50 g/t gold!

• Global average

resource grades ~0.10% U3O8

• Athabasca Basin mines produce at over 100X global average resource grade

• McArthur River produced 18.6Mlbs at 14.87% U3O8 in 2014

1

2

3

Page 7: NexGen Arrow Presentation

7 Project Overview Focus: High-tonnage, high-grade, technically superior assets in shallow sections of the Athabasca Basin

Portfolio Characteristics

• Straddles the edge and inside of the Athabasca Basin

• Enables NexGen to find basement-hosted, unconformity-hosted and sandstone-hosted mineralization

• Hosts the land-based Arrow discovery

Page 8: NexGen Arrow Presentation

8 Arrow Discovery Rook I Project Location & Conductor Corridors

• Most dominant land position in the Southwest Athabasca Basin

• Arrow discovered Feb 2014 with 1st drill hole and hit 44 of 46 holes since

• Land-based discovery

located straddling and inside the Athabasca Basin boundary

• Basement-hosted high-grade mineralization that grows all directions and at depth

Rook I hosts all the known uranium bearing conductor corridors in the region

Page 9: NexGen Arrow Presentation

9 Successful Drilling at Arrow 44 of 46 Drill Holes Intersected High-grade Uranium Mineralization

NexGen’s Drilling Methodology:

1. Wide step-outs 2. Angled Holes: 90% of

holes drilled are angled 3. Efficient capital

allocation: 8:1 $ in the ground to $ to G&A

4. Incredible hit rate: 96% of holes hit mineralization

Results: Current Area of Mineralization:

• Length x width 515 m x 215 m

• Depth 100 m to 920 m

Page 10: NexGen Arrow Presentation

10 Arrow: A2 & A3 Shears Plan view of Arrow

Page 11: NexGen Arrow Presentation

11 A2: Continues to Expand

• AR-15-44b (angled):

• 56.5m at 11.55% U3O8

including 20m at 20.68%

U3O8 and 1.00m at 70%

U3O8 • Total composite GT (Grade X

Thickness) of 853.55

• AR-15-41 (angled):

• 57.0m at 2.31% U3O8,

including 16.5m at 7.43%

U3O8

• AR-15-39 (angled):

• 27.0m at 2.82% U3O8

• AR-15-34b (angled):

• 70.0m at 2.2% U3O8 including

11.0m at 8.95% U3O8

Page 12: NexGen Arrow Presentation

12 A3: New High-grade Shear Developing • February 24, 2015 discovery of new

high-grade mineralized shear zone;

A3

• AR-15-41 (angled):

• 20.5m at 4.30% U3O8

• AR-15-39 (angled):

• 29.5m at 2.27% U3O8

• AR-15-45b (angled):

• Longest total composite

mineralization with 226m,

including 9.80m off-scale

radioactivity (>10,000 to

54,000cps) - Assays pending

• Holes to date in A3 shear show it

to have significantly larger

dimensions than A2

Page 13: NexGen Arrow Presentation

13 Arrow: A2 & A3 Cross-Section

• Both A2 and A3

Zones remain

open in every

direction

• NE extent of Arrow

opened up with

AR-15-40b (11.5m

at 0.99% U3O8)

A2 Dimensions:

• 88m strike length

• 340m vertical extent

• 11-27.5m true width

A3 Dimensions:

• 73m strike length

• 420m vertical extent

• 30-78.6m true width

2 High-grade shear zones now identified at Arrow

Page 14: NexGen Arrow Presentation

14

Athabasca Basin Setting

Page 15: NexGen Arrow Presentation

15 The Eagle Point Analogy Eagle Point is an underground mine operated by Cameco

- Eagle Point current mineral reserves: 15.2Mlbs at 0.61% U3O8. 2014 annual production of 4.2Mlbs

- Underground mine using longhole stoping in the competent basement rock

- Eagle Point deposits are located on the eastern edge of the Athabasca Basin, and are part of the Rabbit Lake Uranium district which also includes the Rabbit Lake and Collins Bay deposits.

- Rabbit Lake District produced +198Mlbs of uranium concentrates since production began in 1975

1.) Cameco Corp.

1

1

Page 16: NexGen Arrow Presentation

16 Dravite Breccia – McArthur River & Arrow

1.) Cameco Corp.

Arrow: AR-14-15 422.25m Dravite associated (or proximal) to mineralization

McArthur River: Dravite-Chlorite-filled Breccias associated with high-grade

mineralization 1

Page 17: NexGen Arrow Presentation

17

Bow: New Discovery 3.7km NE of Arrow

BO-15-10:

• 2.5m total

composite

mineralization

including 0.10m

off-scale

(>10,000cps to

>10,200cps)

• 66m step-out to

east of BO-15-

02

• Now identified a

350m strike

length of

anomalous

radioactivity at

Bow

Page 18: NexGen Arrow Presentation

18

BO-15-10: Visible Pitchblende

Page 19: NexGen Arrow Presentation

19 Patterson Conductor Corridor Multiple targets along 7kms of conductor corridor

BO-15-10, -02

drilled into a

gravity low

anomaly with

coincident

VTEM

conductor

and radon in

lake water

anomaly with

peak reading

of 36.0pCi/L

Page 20: NexGen Arrow Presentation

20 On Land Gravity Low: Summer 2015

Page 21: NexGen Arrow Presentation

21 Summer Drill Targeting – Bow, Derkson

• Multiple high

priority targets

based on the

same

geophysical

signature as

Arrow

• Land-based

• Regional

summer drill

program to

further define

Bow and drill

first holes in

Derkson

conductor

corridor

Page 22: NexGen Arrow Presentation

22

Eastern Athabasca Basin Portfolio

High Quality Portfolio:

1. Radio: located directly adjacent to and long strike of Roughrider, Rio Tinto acquired for $654M in February 2012.

2. Thorburn Lake: 9 of 15 drill holes have intersected uranium mineralization.

3. Madison and 2Z Lake: contain shallow (<100m thick) sandstone-hosted uranium mineralization, and is along strike from U-mineralized conductors. Represent good potential for discovery of new basement-hosted uranium deposits.

Page 23: NexGen Arrow Presentation

23

NexGen Summary • Arrow, a world-class uranium discovery

• 44 of 46 holes hit mineralization (~96% hit rate)

• Aggressive and deliberate drilling methodology

• Area of mineralization 515 m x 215 m, vertical extent commencing from 100 m down to 920 m

• Two high-grade shear zones; A2 & A3 identified with broad intercepts of high-grade uranium encountered

• Expansion of A2 high-grade shear and discovery of A3 which looks significantly larger than A2

• A brand new discovery made 3.7km northeast of Arrow called “Bow”

• Recently closed C$27.3M bought-deal financing

• Aggressive 5 rig, 25,000m summer 2015 program to start in early June

Page 24: NexGen Arrow Presentation

24

Arrow: Perspective on Size The Empire State Building next to Arrow

Empire State Building Total height: 443m

(~54% of Arrow’s height)

Arrow Total height: 820m

(starting from 100m of

surface)

Image made via Leapfrog software using latest drill data from Arrow zone. No NI 43-101 has been published for the Arrow zone to date.

Page 25: NexGen Arrow Presentation

25

APPENDICIES

Page 26: NexGen Arrow Presentation

26

NexGen Outperforming Peers

* 3-month share price returns in Canadian Dollars as of June 12, 2015

Page 27: NexGen Arrow Presentation

27

Executive, Board & Technical Team

Executive

Leigh Curyer Chief Executive Officer

Garrett Ainsworth VP Exploration & Development

Grace Marosits Chief Financial Officer

Travis McPherson Corporate Development Manager

Board

Chris McFadden Chairman

Richard Patricio

Trevor Thiele

Craig Parry

Gerry Feldman

James Currie Directors

Technical Team

Garrett Ainsworth VP Exploration & Development

Adam Engdahl Project Manager - Saskatchewan

Galen McNamara Project Manager - Geology

Technical Advisory

Andrew Browne former VP Exploration & Development

Craig Parry Director

Strong team with a successful track record in uranium exploration and

development.

Page 28: NexGen Arrow Presentation

28

Capital Structure

Shares Issued & Outstanding 251,928,896

Warrants ($0.425 - $0.65) 20,839,796

Options ($0.30 - $0.46) 22,360,637

Fully Diluted 295,129,329

Cash ~C$30M

Ownership Management/Directors

Tigers Realm Minerals & Associates

Mega Uranium

~6%

~14%

~9%

1.) As of June 1, 2015 2.) Company recently closed C$27.3M financing

1

2

Page 29: NexGen Arrow Presentation

29 The Éléonore Example Putting Arrow’s depth extent in context

Goldcorp’s Newest Mine:

Mine Plan • 1,145m depth (starting at 55m

from surface)

Average Gold Grade • 6.34g/t Au (equivalent to 0.27%

U3O8)

Development Capex • US$1.8 billion

1.) Goldcorp 2.) Based on US$45/lb U & US$1,300/oz Au

1

1

2

1

1

Page 30: NexGen Arrow Presentation

30 Arrow: No Freezing

• Arrow is basement-hosted which means NO freezing would be required

• Unlike McArthur River and Cigar Lake which have 600 and 480m of sandstone on top of the ore bodies, respectively - Arrow only has 10-20m of sandstone within 80m of surface

• Cigar Lake is world-class in size and grade, but faces significant challenges due to fact ore is sandstone-hosted and requires futuristic mining methods

Page 31: NexGen Arrow Presentation

31

Analyst Coverage

Mike Kozak - Cormark

Securities Inc. (416) 943 6749 BUY C$1.10

Rob Chang – Cantor

Fitzgerald Canada (416) 849 5008 BUY N/A

Andrew Mikitchook–

Edgecrest Capital (416) 687 6613 BUY C$0.85

David Talbot – Dundee

Capital Markets (416) 350 3082 BUY N/A