Top Banner
News from IceMOS 11/12/12 GTK Collaboration meeting 1 Alessandro Mapelli CERN PH-DT baseline frame
6

News from IceMOS

Feb 06, 2016

Download

Documents

Step

News from IceMOS. Alessandro Mapelli CERN PH-DT. frame. baseline. Schedule update December 3 rd. today. Done.. First wafers sent to CERN. Bulk Si vs SOI flows. Silicon Etching. Etch measurements from the first 9 bulk silicon wafers. Channels etch 70um +/- 7um. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: News from  IceMOS

GTK Collaboration meeting 1

News from IceMOS

11/12/12

Alessandro MapelliCERN PH-DT

baseline

frame

Page 2: News from  IceMOS

GTK Collaboration meeting 2

Schedule update December 3rd

11/12/12

CERN NA62 Project ScheduleWeek 1241 1242 1243 1244 1245 1246 1247 1248 1249 1250 1251 1252 1301 1302 1303 1304 1305Date week ending 12/10/12 19/10/12 26/10/12 02/11/12 09/11/12 16/11/12 23/11/12 30/11/12 07/12/12 14/12/12 21/12/12 28/12/12 04/01/13 11/01/13 18/01/13 25/01/13 01/02/13Project weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17                        Christmas          Project plan & schedule          

Mask design and procurementGDS received from customer 23/10/12

Masks arrived 12/11/12    

Raw material Procurement        BOM build        Development of fluid channel & Via etch in combination          Cavity Bonding          Photo & Etch development of front and back side port opening          Photo & Etch of via opening               Bulk option versus SOI for wafer stability                                  Bulk lot 1

A  B C D E F  

Bulk lot 2   B C D E F  SOI lot 1

A  B C D E F G  

SOI lot 2   B C D E F G  SOI lot 3   B C D   E F GDevices for cavity join                                  

Tests

Poly/Oxide etch test           completeChannels etch test           completeCombined etch test           completeDS Photo test           in progress, first results due this week

Bulk lot 1 on schedule Issue with bow/warp on devices, trying to rectify this with rework, handles @ channels & manifolds etch, running few more test wafers before product, potential bow /warp issue with handles at join 

Bulk lot 2 ahead of schedule Issue with bow/warp on devices, trying to rectify this with rework, handles trying different option to reduce potential for bow issue at join, wafers @ photo before channels & manifold etch 

SOI lot 1all batches in oxidation before poly then Channels and manifolds photo, 1st lot approx 1 week behind

SOI lot 2SOI lot 3

today

Done.. First wafers sent to CERN

Page 3: News from  IceMOS

GTK Collaboration meeting 3

Bulk Si vs SOI flows

11/12/12

Bulk flow     Device    weeks    Handle & AM manufacture 2 1 week AFluid photo & etch, Via photo 1   BVia etch 1   CBond 1   DPhoto & etch Ports 1   EPhoto & etch Via opening 1    F

SOI flow     Device    weeks    SOI & AM manufacture 3 1 week AFluid photo & etch, Via photo 1   BVia etch 1   CBond 1   DPhoto& etch transfer AM & FS Port 1   EHandle removal 1   FPhoto & etch BS Port & Via opening 1    G

Page 4: News from  IceMOS

GTK Collaboration meeting 4

Silicon Etching

• Etch measurements from the first 9 bulk silicon wafers

11/12/12

  Fluid Channels

Scribe T M B L R AVE

1211-092672.9

0 70.08 72.90 73.73 75.8373.0

9

1211-091073.7

6 71.12 75.01 75.65 75.6274.2

3

1211-092567.4

6 65.25 68.44 70.28 68.4967.9

8

1211-091368.3

3 65.99 68.29 70.69 70.7768.8

1

1211-091968.3

0 65.54 69.14 72.08 69.7268.9

6

1211-092468.8

9 67.02 70.95 72.77 71.2070.1

7

1211-092367.7

8 65.98 69.01 69.69 71.4868.7

9

1211-091768.4

4 66.70 70.16 70.42 72.1469.5

7

1211-092169.3

0 66.86 68.83 69.97 71.9569.3

8 IceMOS CONFIDENTIAL

  Top Manifold Bottom Manifold

Scribe L M R AVE L M R AVE

1211-0926285.4

0 274.51 285.48 281.80290.7

3283.7

3283.8

1 286.09

1211-0910294.1

9 283.35 292.81 290.12303.4

3290.4

1297.9

7 297.27

1211-0925288.5

0 283.21 286.42 286.04300.0

4290.6

0293.5

0 294.71

1211-0913288.0

7 277.53 275.05 280.22296.8

3286.1

0290.8

6 291.26

1211-0919280.3

7 274.04 281.57 278.66289.4

0277.5

9282.8

8 283.29

1211-0924286.0

6 279.60 287.86 284.51296.9

1285.6

2288.4

3 290.32

1211-0923278.0

7 271.69 279.27 276.34287.1

6278.5

9280.6

0 282.12

1211-0917281.2

2 275.00 281.53 279.25290.1

4279.1

7282.5

0 283.94

1211-0921291.3

2 288.50 295.48 291.77302.7

8293.0

6295.6

2 297.15

Channels etch 70um +/- 7um Manifolds etch – total depth 285um +/- 25um

Page 5: News from  IceMOS

GTK Collaboration meeting 5

Silicon Etching

11/12/12

IceMOS CONFIDENTIAL

Page 6: News from  IceMOS

GTK Collaboration meeting 6

First wafers have been shipped..

• 3 bulk silicon wafers have been shipped on December 10th from IceMOS to CERN.

• These wafers will be used to validate the last step of the fabrication process at EPFL with wafers from IceMOS.

• It consists of the silicon etching with KOH to thin the acceptance area of the cooling plate.

11/12/12