NEW YORK STATE DEPARTMENT OF TRANSPORTATION
Superstructure (4) and Bridge (3) Replacements
At Various Locations in Region 9
PIN 9806.82, Contract No. D900020
Broome, Tioga and Delaware Counties
Draft Request for Proposals
RFP Informational Meeting
August 13, 2014
Peter RussellAttn: Superstructure and Bridge
Replacements in R9 Design-Build ProjectOffice of Contract ManagementNew York State Department of
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020) Rules of Contact
2
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020) Agenda
Project Overview Department’s Goals & Project Requirements Scope of Work Status of: ROW and Utilities General Contract Information Alternative Technical Concepts Procurement Schedule One-on-One Meetings RFP Content Quality Control & Quality Assurance Evaluation and Selection Additional Information and Submission Guidelines Questions and Answers
3
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)General Location
4
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)General Location
5
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)General Location
6
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)General Location
7
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)General Location
8
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)General Location
9
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Goals
10
Replace superstructure of four bridges in Region 9 (Base Project)
Replace three CBOW bridges in Region 9 (Option) Ensure the safety of the traveling public Ensure coordination with all utility owners, third
parties, and the surrounding residential community
Ensure a long-service life for all Project elements to satisfy long term preservation goals
Ensure compliance with the Project’s environmental commitments
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Goals (Continued)
11
Maximize the beneficial impact of the public investment in the Project by Providing cost-effective solutions that maximize
value over the lifespan of the Bridges; Sequencing construction to minimize effects on
and business communities Deliver Project Safely, On Schedule, On Budget,
and Environmentally Compliant. Provide best value to the Department
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)General Scope of WorkBase Project:
Superstructure replacement for four bridges in Broome and Tioga Counties
Removal of existing superstructure Modifications of substructures as necessary to accommodate new
superstructure
Option:Complete replacement of three bridges over Pea Brook and Pea Brook Tributary on NYS Route 97 in Delaware County (Option)
Removal of existing substructure and superstructure Construction of new bridges, including new foundations Development of single SWPPP for all replacements (if required) Remediation and disposal of Asbestos Containing Materials
(ACMs)
12
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)General Scope of Work (Continued)Base Project and Option:Reconstruction of approach roadways as necessary to connect to the new structures, including correction of superelevation ratesDevelopment of WZTC Plan for each siteCoordination with and/or preservation of existing utilitiesDesign and installation of new guide railing / bridge railing.Avoid existing environmental constraints
Threatened and endangered species Farmlands Wetlands
13
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Right-of-Way The Department owns all Right-of-Way for the existing
structures. No additional Right-of-Way acquisitions or temporary
easements are anticipated to be required for this project. Any Right-of-Way fencing damaged or removed by the
Design-Builder during construction shall be replaced with new Right-of-Way fencing meeting current Department standards.
14
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Utility Coordination – Existing Utilities
In accordance with Part 4 – Utility Requirements, Design-Builder is responsible for:
Verifying utility facility locations; Identifying & resolving any conflicts not yet
documented; Coordinating with utility owners for utility relocations; Providing stakeout and final layout of utility
relocations; Protecting existing utilities; Cost to repair damages to utilities caused by Design-
Builder; Informing the Department of all
meetings/correspondence with utility owners.
15
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Utility Coordination – Existing Utilities Base Project :– No utility impacts are anticipated in connection with
any of the superstructure replacements contained in the Base Project
Option: Verizon:
– Verizon shall be responsible for any necessary relocations of their aerial facilities due to construction of wing walls of the new bridges
NYSEG:– NYSEG shall be responsible for any necessary
relocations of their aerial facilities due to construction of wing walls of the new bridges
16
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Contract Information Lump Sum Design-Build Contract; Best Value Selection Process (50% Price, 50% Quality); Project Completion Date shall be the earlier of:
November 31, 2016; or The number of days past NTP proposed by the successful
Proposer on Form SCD (ITP Appendix E) There is a Payment Schedule provided in the RFP; Stipend to Unsuccessful Proposers (50% of Qualified
Costs, $75K max.); Must satisfy criteria in ITP General Instructions;
Liquidated Damages will be imposed for not meeting the Project Completion date and for Impacts to Traffic in excess of the number of calendar days indicated on Form SCD;
Escrow Submission of Bid Documents for Successful Proposer.
17
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Contract Information (Continued) There is a Buy America Clause There is an Iran Divestment Act Clause There is a DBE Participation Goal of 11% All ROW owned by NYSDOT Any additional Environmental and Construction
Related Permits by Design-Builder
18
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)ATCs
Alternate Technical Concepts (ATCs) are proposals from the Proposer to design and construct the Project in a manner that is different than the RFP requirements, and which: are submitted to the Department for review and
consideration prior to Proposal submittal; have significant savings in time, reduction of traffic
impacts, community disruption, project costs, environmental impacts, and/or other beneficial impacts to Project parameters;
in the Department’s judgment offer an equal or superior Project.
19
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)ATCs (Continued)
Proposers may submit, on a confidential basis, up to five (5) proposed alternatives to the RFP requirements for the Department’s pre-approval;
The proposed end product of each alternative must, in the Department’s judgment, be equal to or better than the Work product described in the RFP Documents;
The Design-Builder is solely responsible for obtaining approvals from any local municipality, public agency or permit issuing agency for ATC concepts which would affect their facilities, operations or issued permit
Form ATC to be submitted with each proposed ATC.
20
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Anticipated Procurement Schedule
Activity Due Date
Draft RFP Info Meeting August 13, 2014
Final RFP to Shortlisted Firms August 27, 2014
Date Proposers may start submitting ATCs for review August 28, 2014
Final Date for Requests for Changes to Proposer’s Organization and Personnel September 22, 2014
Proposal period one-on-one meetings with all Proposers September 24, 2014
Final date for Proposers to submit ATCs for review October 1, 2014
Final date for Department’s responses to ATCs submitted for review October 8, 2014
Final Date for receipt of Proposer Questions October 8, 2014
Issue Date for Final Addendum and/or Answers to Proposer Questions October 15, 2014
Final Date for Proposer to respond to conditional approval of ATCs October 17, 2014
Proposal Due October 22, 2014
Post Proposal Meetings (if required) TBD
Selection of Best Value November, 2014
Contract Award January, 2014
Notice to Proceed January. 2014
21
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)One-On-One Meetings
If One-On-One Meetings are held, at least one meeting will be held with each Proposer;
One-On-One Meetings will be recorded; Department reserves the right to disclose to all
Proposers any issues raised during the meetings that may materially affect the Project;
Department will not disclose information pertaining to an individual Proposer’s technical concepts, proposal or ATCs;
Additional One-On-One Meetings may be held if required to review ATCs or if the Department believes it is warranted.
22
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Request for Proposals (RFP) Documents RFP Documents:
Instructions to Proposers Part 1: D-B Agreement Part 2: General Provisions, Section DB 100 and Appendices Part 3: Project Requirements (Scope of Work) Part 4: Utility Requirements Part 5: Special Provisions Part 6: RFP Plans Part 7: Engineering Data Part 8: Special Specifications (Including New DB Specifications) Part 9: The Design-Builder’s Proposal Part 10: RFP Addenda (If Any)
Reference Documents: On Department’s web site (Not Part of the Contract Documents)
23
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020) Request for Proposals (RFP) Documents (Continued) RFP Documents:
Instructions to Proposers• General Instructions• Appendix A – Project Information• Appendix B – Administrative Submittal Requirements• Appendix C – Technical Submittal Requirements (Three
(Base Project plus the Option)• Appendix E – Forms• Appendix F – Conflicts of Interest Policy• Appendix G – Abbreviations and Definitions
24
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020) Request for Proposals (RFP) Documents (Continued) Instructions to Proposers:
Appendix C• Volume 2 (Applicable to Base Project Plus the Option)
• Section 1 – Key Personnel and Firm Experience• Section 2 – Management Approach• Section 4 – Project Support
• Appendix 2A (Applicable to the Base Project)• Section 2 – Management Approach (cont.)• Section 3 – Technical Solutions Narratives• Attachment A – Technical Solutions (Drawings)• Attachment B – Technical Solutions (Project Schedules)
• Appendix 2B – (Applicable to the Base Project plus the Option)
• Sections same as Appendix 2A
25
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Quality Control (QC)
QC is Design-Builder’s Responsibility Design-Builder shall appoint a QC Manager responsible for
QC Plan for both Design and Construction Design QC shall be performed by the Designer in
accordance with the QC Plan Construction Inspection shall be performed by an
Independent Engineering Firm (Hired by the Design-Builder) Materials Testing shall be performed by an Independent
Materials Testing Firm or Laboratory (Hired by the Design-Builder)
The Materials Testing Firm shall report to the Construction Inspection Firm
Offsite Plant Quality Control shall be performed by the Department
26
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Quality Assurance (QA) Design and Construction QA is the Department’s
Responsibility The Department may perform QA on any of the
Design-Builder’s Design and Construction activities The Department will utilize an independent
Consultant to perform QA of the Design-Builder’s Designs
Construction QA will be performed by Department staff
Offsite Plant Quality Assurance will be performed by the Department
27
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)RFP Evaluation and SelectionPass/Fail Evaluation Factors
Overall Design-Build Team Organization (8 points) Design Management Plan (7 points) Construction Management Plan (7 points) Quality Control Plan (8 points)
Project Support (5 points) Proposal Format(5 points)
Price (50%)
Design-Builder must obtain a
minimum score of 60 points on
Quality Evaluation factors
28
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Additional Information – Submission Guidelines
All proposals must be self-contained.• Proposals should not have links to external web
sites.• Proposals should contain all information needed
for evaluation. Do not “assume the Department knows” your firm
and it’s experience/qualifications.
29
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Additional Information – Submission Guidelines Submit ALL Forms required.
Do not alter any Form unless indicated on the Form.
Do not add any appendices or attachments to the Forms.
Do not include photographs or illustrations unless specifically indicated.
Do not submit Form SA (Stipend Agreement) Form BDEA (Bid Document Escrow Agreement) PAB (Payment Bond (Labor and Material Bond)) PEB (Performance Bond (Faithful Performance Bond))
30
Superstructure and Bridge Replacements in Region 9Design-Build Project (PIN 9806.82; D900020)Additional Information
Responses to Proposer Questions will be posted on the Department’s Project Web Site
Reference Documents are Posted on the Department’s Project Web Site: