Top Banner
less water use lower temperatures lower operating costs PUBLICATIONS MAIL AGREEMENT NO. 40069240 NewTechnology June 2011 • the first word on oilpatch innovation Production Boost New stimulation technique holds promise for under-achievers in mature carbonates Sky High A new exploration technology hopes to uncover untapped resources AOSC starts what may be the first test of electric heaters in bitumen carbonates with its TAGD process plugged in
48

New Technology Magazine - June 2011

Feb 21, 2016

Download

Documents

AOSC starts what may be the first test of electric heaters in bitumen carbonates with its TAGD process.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: New Technology Magazine - June 2011

less water use

lower temperatures

lower operating costs

PUBL

ICAT

ION

S M

AIL

AGR

EEM

ENT

NO

. 400

6924

0

NewTechnologyJune 2011

• the first word on oilpatch innovation

Production Boost

New stimulation technique holds promise for under-achievers in mature carbonates

Sky HighA new exploration technology hopes to uncover untapped resources

AOSC starts what may be the first test of electric heaters in bitumen carbonates with its TAGD process

plugged in

Page 2: New Technology Magazine - June 2011

IFC - full page795307-14

Departure Energy Services or Arrival)

You’ll profit from our experience – from start

to finish – throughout the life of Your well

this is the point of Departure

contact us today to start writing your chapter.

calgarY sales office: 877.233.3940 toll free, 403.266.3940 local | leDuc operations: 780.980.3900

www.departureenergy.com

Page 3: New Technology Magazine - June 2011

Page 1 - full page457698-133

Entero Corporation

     

with

Reclaim your time

Better ProductivityHigher SpeedTrusted InformationSuperior Insight

Expect More. Accomplish More. Learn More at www.entero.com/mosaic

Entero Mosaic gives you the tools to quickly and con dently move through data entry – providing

more time to run scenarios and tune your perspective of value for bidding. Find out why 1 in 3 top

Canadian producers have already selected Mosaic as their partner of choice.

Trend and review 1000 wells in an hour

Quickly rank & rene top 80%

Run price, cost, and volume scenarios with ease

Data condence for management presentation

Page 4: New Technology Magazine - June 2011

in this issueJune 2011 | vol.17 | no.05

editor’s viewThe Long Shots 4

vanguardNews. Trends. Innovators. 7

greensceneSolar-Powered EOR 15New technology not quite ready for Canada yet

new techProduction Boost 39New stimulation technique holds promise for under-achievers in mature carbonates

Efficient, Accurate, Green 42NASA-inspired technology applied to the humble oilfield pump

Sky High 43A new exploration technology hopes to uncover untapped resources

FEATURES

departments

26

2 new technology magazine | June 2011

18 PluggedIn AOSCstartswhatmaybe

thefirsttestofelectricheatersinbitumencarbonateswithitsTAGDprocess

30 AnalyzeThat Tightoilproducers

gettingmethodicalaboutmultistagefracking

advertisersBaker Hughes Canada Company IBCBear den 4 Haul 16Calfrac Well services Ltd. 5Canadian association

of petroleum producers (Capp) insertCathedral energy services Ltd. 37departure energy services IFC

dmg events 41entero Corporation 1expro Group Canada Inc. 6Halliburton 29JuneWarren-nickle's energy Group 14, 36Kenwood electronics Canada Inc. 12, 13London Business Conferences 40

momentive specialty Chemicals Inc. 17Oil sands and Heavy Oil technologies 38packers plus energy services Inc. 9, 11pure energy services Ltd. 35schlumberger Canada Limited 3telus World of science 33Weatherford Canada partnership OBC

43

AmAziNG WEllS23 WellStaged Newtechnologyfrom

PackersPlusacceleratesmultistageopenholefracking

24 GoingLong Recordscontinuetotumbleas

Sakhalin-1targetssecondfield

25 FullSpeedAhead Advanceddownholemotors

settingthepaceinshalegas

26 SettingThePace Modifiedtools,teamwork

enablefirmtodrillrecordhorizontalintheMontney

26 EastCoastTreasure Satelliteoffshorefieldsprompt

innovativedrillingsolutions

28 TheFixer Longerhorizontals

callingforeverlengthierinterventionservices

Page 5: New Technology Magazine - June 2011

Page 3 - full page534367-553

Schlumberger Canada

(ad may be a SLB division, or a SLB owned company, i.e. Pathfinder, MI Swaco)

high build rate rss

PowerDrive Archer

PowerDrive Archer is the RSS that delivers high build rate well profiles previously only possible with motors—yet with the ROP and wellbore quality of a fully rotating RSS.

403-509-4300 www.slb.com/archer

Global Expertise | Innovative Technology | Measurable impact

Pow

erDr

ive A

rche

r and

Mea

sura

ble

Impa

ct a

re m

arks

of S

chlu

mbe

rger

. ©

201

1 Sc

hlum

berg

er.

11-

DR-0

248

...Game-changing technology...”—William “Bill” Lloyd, Cirque Resources

“the Powerdrive archer tool is a definite game-changing technology that will dramatically improve drilling efficiencies.” —William “Bill” Lloyd, Cirque Resources, VP Operations, North America.

Page 6: New Technology Magazine - June 2011

NewTechnologyMagazinewww.newtechmagazine.com

editorialandproductionpublisher | Stephen Marsters [email protected] | Maurice Smith [email protected] director/lead design | Andrew Brien [email protected] traffic coordinator | Denise McKay writers | Jim Bentein, Godfrey Budd, Gord Cope, Lynda Harrison, Pat Roche, R.P. Stastny, Paul Wellssalessales manager – magazines | Maurya Sokolon [email protected] account executive | Tony Poblete [email protected] | Nick Drinkwater, Diana Signorilesales administrator | Craig Cosens

circulationcirculation manager | Donna Rideout [email protected]/advertising | Tracy Wavrecan [email protected]

PUBLICATIONS MAIL AGREEMENT NO. 40069240RETURN UNDELIVERABLE CANADIAN ADDRESSES TO OUR CIRCULATION DEPARTMENT816 - 55 AVE NE, 2ND FLR, CALGARy, AB T2E 6y4

you may also send information on address changes by Email to [email protected]. Please quote the code that begins with the prefix Ntm. For members of the Society of Petroleum Engineers, please contact the SPE office directly with your address change.

subscriptioninformationDan Cole, (403) 209-3533Toll Free 1-800-387-2446

ISSN 1480-2147

New Technology Magazine is published 10 times a year by JuneWarren-Nickle’s Energy Group, a subsidiary of Glacier Media Inc., a leading Canadian information company with interests in daily and community newspapers and business-to-business information services.

JuneWarren-Nickle'sEnergyGroup2nd Floor, 816 - 55 Avenue NECalgary, Alberta, Canada T2E 6y4T: (403) 209-3500F: (403) 245-8666Toll Free: 1-800-387-2446

president & CEO | Bill Whitelawgroup publisher | Agnes Zalewskisales director | Rob Pentneygroup art director | Ken Bessiepublications manager | Audrey Sprinkle

editor’s viewthe long shotsThe firsT Time i came across General fusion, a Tiny BurnaBy-based company attempting to single-handedly conquer one of the greatest energy chal-lenges of our time — nuclear fusion — i was skeptical.

here was an outfit not much removed from a garage inventor seriously chasing the holy grail of power, an almost limitless, clean source based on the reaction that fuels the stars. huge potential, sure, but it’s also the power source that has been tagged as being a decade or two away from reality for several decades.

still, the tantalizing possibilities have managed to keep massive government-funded projects alive throughout those decades. The biggest current project — the international Thermonuclear experimental reactor (iTer) funded by the u.s., the eu, china, Japan, russia, india and south Korea — is investing some $21 billion to build a demonstration reactor scheduled for completion in 2018. assuming it works, a full-fledged commercial facility could be another couple decades and many more billions away.

General fusion hopes to complete in years what iTer plans over decades: to pilot “net gain” — producing more energy than it consumes, something never done before — in two years and be commercial by the end of this decade. (its innovative concept, a thermonu-clear diesel engine of sorts, would use 200, 220-pound pistons firing simultaneously against a sphere containing plasma of the isotopes tritium and deuterium, creating a shock wave powerful enough to compress the hydrogen atoms to fuse them into helium atoms — and release a colossal amount of energy in the process.)

What has that got to do with the oil and gas industry? Well, in the oilsands at least, it takes a tremendous amount of energy to produce energy, usually meaning lots of natural gas to produce the bitumen. Though fusion might remain a pie-in-the-sky concept to many, major oilsands producer cenovus energy inc., for one, has decided to take it seri-ously, with a $4 million investment in General fusion announced in may.

“cenovus is impressed by General fusion’s innovative, pragmatic approach,” Judy fairburn, executive vice-president, environment and strategic Planning, said in a press release. The com-pany’s environmental opportunity fund finances environmental innovations in energy and technology. “This technology has the potential to revolutionize energy production,” she stated.

To a cynic, the investment might appear to be nothing more than greenwashing — an attempt to portray itself as being serious about making major cuts in emissions with little or no real chance of doing so for the foreseeable future. nuclear fusion, after all, is a major long shot, and $4 million is a drop in the bucket for a company that clears billions every quarter. But we have to start somewhere, and to a minnow like General fusion, swimming among the whales of megaprojects like iTer, investments like this can keep it in the run-ning and further the technology, no matter how long the odds.

it’s also important because, sometimes, long shots pay off. There will be failures along the way, but there will be major advances, too, sometimes where they are least expected. in this issue, we profile a new oilfield pumping technology that had its origins in another long shot research project, the concept of a space elevator.

Popularized by science fiction writer arthur c. clarke in the 1980s, the space elevator — also referred to as space lifts, space ladders or even beanstalks — could lift objects and people into orbit along a cable stretching from the planet’s surface, held taut by a counter-weight orbiting above. a “climber” would provide lift up a high-strength cable made, per-haps, of carbon nanotube material.

researchers at the university of saskatchewan had great success competing in a nasa-sponsored project to develop climber technologies, including wirelessly powering a robotic prototype to three first place finishes and setting new records in areas such as the most power wirelessly beamed and fastest power beamed climbs. The space elevator may remain a long shot, but chasing the dream has not been without benefit, as the new and much improved oilfield technology can attest.

in a world often limited to quarter-to-quarter thinking, we too often neglect early-stage research that may not lead to breakthroughs for 10, 20 or 30 years. it can be hit-and-miss, but with such big potential benefits, not to mention the likelihood of spinoffs we haven’t even considered, it’s worth the risk. • maurice Smith

4 new technology magazine | June 2011

Page 7: New Technology Magazine - June 2011

Page 5 - full page429365-108

Calfrac Well Services

Our recent performance in the Horn River Basin will be tough to beat. Extensive planning between the operator and Calfrac’s team resulted in an unprecedented average of 3.5 fracs/day – a significant advance over industry’s previous record. With just 1.5 hours between stages and zero screenouts, we completed the operation in 41 days – significantly exceeding expectations. All executed with a flawless safety record.

Calfrac. We’re breaking new ground... every day.

For more information, contact:

Gary Rokosh P.Eng. Vice-President, Sales, Marketing & Engineering 403-218-7483

Chad Leier P.Eng. Manager, Sales & Marketing 403-218-8180

www.calfrac.com

In the Horn River Basin, every hour counts. But shaving 23 days off the budgeted 64 day delivery is nothing short of amazing.

Page 8: New Technology Magazine - June 2011

Page 6 - (opposite start of Vanguard)Expro Group462063-80 full page

Page 9: New Technology Magazine - June 2011

News. TreNds. INNovaTors.vanguard

new technology magazine | June 2011 7

12,950 The Petroleum services associa-tion of canada has raised its drill-ing forecast for this year, which is

now expected to reach 12,950 wells drilled (rig released) across can-ada, representing a 5.7 per cent increase in total wells drilled. The number is up from Psac’s initial release of the canadian Drilling activity forecast, released last november. Psac is basing its updated 2011 forecast on average natural gas prices of c$3.85 per mcf (aeco) and crude oil prices of us$100 per barrel (WTi).

“It is one of the most productive sweet gas provinces on the planet. The unique geologic setting offers multiple stacked opportunities in a concentrated geographic area.”

— mike rose, president and CeO of tourmaline Oil Corp., on the potential of alberta’s deep Basin

2012Sasol Limited and partner Talis-man Energy Inc. will make a key investment decision in the second half of next year regarding a possible gas-to-liquids (GTL) plant in Western Canada. “I think it would be the first of a series of investment decisions. But it would certainly be a very impor-tant milestone for us,” Talisman president John Manzoni told reporters after the company’s annual meeting.

Driving innovation and technological development was identi-fied as a common theme in a report issued mid-April by the Canada West Foundation titled Finding Common Ground: The Next Step in Developing a Canadian Energy Strategy. The Canada West researchers note the reports they reviewed

“returned time and time again to the need for policy tools to foster and incentivize innovation through greater investment in infrastructure, human capital, science, research and develop-ment, and commercialization.” The study cites concerns that Canada is not moving fast enough on innovative performance and investment levels when compared internationally.

Q1 Encana Corporation was the busiest explorer in both Alberta and British Columbia during the first quarter, completing 38,809 metres of exploratory hole in the former province and 35,096 metres in the latter province. Crescent Point Energy Corp. was the busiest explorer in Saskatchewan with 42,088 metres of hole finished.

“This is an inflection

point in our history.”

— Brenda Kenny, president and chief executive officer of the Canadian Energy Pipelines Association, told the Insight Information Ltd. North American pipeline forum. Canadian pipelines, which once operated virtually under the radar, are now seen as the centre point of a more controversial value chain and as a result face increasing environmental assessment requirements in applications for new projects.

Phot

os c

ourte

sy o

f Jun

eWar

ren-

Nic

kle'

s En

ergy

Gro

up

Page 10: New Technology Magazine - June 2011

8 newtechmagazine.com

a carBon DioxiDe emitters group has released a series of recommendations on how to analyze the cost of co2 capture technologies.

The integrated co2 net-work (ico2n) released the recommendations in mid april in a 14-page report titled Per-spectiveonConductingCostAnal-ysesofCO2CaptureTechnologies. members of the six-year-old ico2n group include oilsands and coal producers who are promoting carbon capture and storage (ccs) for climate change mitigation.

vanguard

ENVIRONMENT

ClearCostingICO2N tackles challenges of carbon capture cost analysis

Phot

o so

urce

: Pho

tos.

com

ico2n defines co2 capture costs as all the financial impacts of capturing co2 that other-wise would be released to the atmosphere — including the cost of purifying, dehydrating and compressing the captured co2 for transportation to storage sites.

it said co2 capture costs typically don’t include the cost of co2 transport, storage or disposal; potential revenue associated with the possible sale of co2; or costs avoided by complying with regulatory requirements.

The report says the first step is deciding what costs to include. ico2n has only included in its studies the costs directly attributable to co2 capture processes and not the costs associated with different types of plants. it assumes the decision to build a plant is made independently of the decision to capture co2.

it says capital costs should include all direct, indirect and

owner-operator costs that would be capitalized dur-

ing construction, opera-tion and retirement.

This list of costs would include, for example,

interest during construction,

insurance, legal, regulatory/

permitting, project develop-ment and

land.operating costs

should include all direct, indirect and owner/operator costs — including costs associated with lost productive capacity from the base facility due to capture opera-tions, the report says.

cost estimates need to be adjusted for facility location. ico2n notes construction costs in some parts of alberta may be 140-160 per cent higher than on the u.s. Gulf coast.

The report says the most significant challenge with most co2 capture studies is obtain-ing reasonable designs and relatively accurate cost esti-mates at the early stage of the ccs project development — in other words, pre-feeD (front end engineering design) studies. The cost of a full feeD study for a large facility can exceed $30 million.

“ultimately, cost estimates — whether for the host facility or the capture process — can only be established when there are contractual commitments to supply facilities or services within the costs projected,” the report says.

however, the report notes there are several comparative analyses that can be done to ensure capture cost estimating is as robust as possible — including cost comparisons to recent builds and cost compari-sons to recent feeD studies. also, the report says it needs to be made clear whether the estimates are for first-of-a-kind plants to be built now or repli-cas to be built later.

ico2n stresses the need to clearly define how co2 volumes are calculated. it says a core question is whether to count just captured volumes or abated volumes (net physical volumes after accounting for the impact of capturing co2).

The report says abated vol-umes provide a more robust assessment of the net co2 reduction. “With abated vol-umes it is important to clarify what on-site and ex-site ele-ments have been included.”

it says elements that should be considered include the “energy penalty” associated with ccs operations — in other words, the increased co2 emissions due to having to build a bigger facility to pro-vide the extra energy needed for co2 capture.

The report recommends expressing capture costs as the cost per unit of the commodity produced (for example, the cost per megawatt hour of electric-ity generated, or the cost per unit of hydrogen produced) as well as cost per tonne of co2 captured.

“This will allow for the broadest analysis of the implica-tions of co2 capture at a plant,” the report says. “for instance, while some facilities may appear to have relatively low capture costs when viewed on a cost per tonne of co2 captured, it is important to also portray costs relative to the underlying com-modity being produced by the host facility. This allows for a more complete analysis of the overall economic impact.” •

Pat Roche

Page 11: New Technology Magazine - June 2011

Page 9 (Vanguard section)

514037-160Packers Plus 1/3 pg vertad 1 of 2

new technology magazine | June 2011 9

vanguard

suncor enerGy inc. Was calleD to task by a shareholder at the company’s annual meeting in may for its use of food to produce energy and its investments in wind power.

The shareholder questioned rick George, president and chief executive officer, during the meeting’s question and answer period as to how those sources of energy fit in with suncor’s commitment to social responsibil-ity and how wind power, which needs to be subsidized, can be economic.

using grain to produce fuel is not a long-term solution but the federal government mandates that a percentage of ethanol be blended into gasoline and currently the only viable source is grain, said George.

suncor, industry and almost every uni-versity in north america is working on developing another source such as biomass but a solution appears to be a long way off, he said.

suncor has canada’s largest ethanol plant by volume, in sarnia, ontario, where current capacity of 200 million litres per year doubled to 400 million litres per year when an expan-sion was completed in January. according to the company’s website, the plant displaces the

equivalent of 300,000 tonnes of carbon diox-ide per year and uses 40 million bushels of corn annually, approximately 20 per cent of ontario’s annual corn crop.

The type of corn used as feedstock has traditionally been used to feed livestock. once the starches are extracted from the corn to make ethanol, the remaining ele-ments are used to make premium cattle feed.

Wind is suncor’s lowest-return business but the company is taking a long-term view of wind power, George told the meeting, adding the company is investing in its sixth such project.

suncor plans to spend $500 million over five years developing wind energy and biofuels. The renewable energy projects create partial offsets for its greenhouse gas emissions. By the end of 2011, suncor expects its renewable energy projects will displace a total of nearly one million tonnes of carbon dioxide annually.

The company’s renewable energy assets contributed operating earnings of $15 mil-lion in the first quarter of 2011, which was comparable to operating earnings of $14 million in the first quarter of 2010. •

lynda Harrison

RENEWABLES

GreenDrummingSuncor defends renewables investments

Suncor’s Magrath wind power project in southern Alberta

Phot

o co

urte

sy o

f Sun

cor E

nerg

y In

c.

Packers Plus increases well production.

Packers Plus StackFRAC®

multi-stage fracturing system

allows production contribution

from the open hole lateral and

eliminates the cost and risk of

cementing and perforating.

Montney Assets Maximized

Page 12: New Technology Magazine - June 2011

10 newtechmagazine.com

vanguard

a $1.5 Billion ProJecT designed to use in situ coal gasification (iscG) to convert non-mineable coal into clean, low-carbon synthesis gas (syngas) needs further funding but expects to file for regulatory approval sometime this year.

swan hills synfuels l.P. is targeting a construction start in late 2012 or early 2013 for the swan hills iscG/sagitawah Power project, with an onstream date in late 2015.

The first phase of develop-ment will consist of 18 to 20 well pairs, consisting of an in situ coal gasification facility, power generation, carbon diox-ide transportation and seques-tration and a syngas pipeline.

swan hills synfuels is in the process of raising $100 million that will get the project to the start of construction, Douglas shaigec, president of the cal-gary-based company, told the canadian energy research institute 2011 oil conference in calgary.

To date, investors have been high-net-worth individuals, with some participation from institu-tional investors, and similar sources are being tapped for fur-ther funding, said shaigec.

The cost of the gas plant and well pairs is pegged at $600 million, which will be financed separately from the power plant’s estimated cost of about $500 million. That price tag depends on final project component siting and configuration decisions.

The power plant will be in the Whitecourt-swan hills region of alberta but the com-pany has not yet pinpointed the exact location of the power plant and is in negotiations with stakeholders.

about $70 million has been raised within the organization so far and largely been spent on

the demonstration project and first phase of the commercial project, he said.

The demonstration project was completed in July 2009 at a cost of about $30 million, of which $8.83 million was pro-vided by the province of alberta through the alberta energy research institute.

shaigec’s company estimates two billion barrels of oil equiva-lent can be manufactured from its secured coal resource base using iscG. The supply cost is less than $3 per gigajoule, he told the conference.

The company’s proposed commercial-scale project will manufacture clean fuel for a new 300-megawatt power generation facility near Whitecourt while capturing more than one million tonnes per year of carbon diox-ide for sale to nearby enhanced oil recovery customers.

“i can’t give you the exact

number [of producers who will use the gas] but the interest in the co2 exceeds the available supply,” he said.

The coal seam is 1,400 metres deep at nearly 2,000 pounds of pressure per square inch, and thus not economical to mine, he said.

The demonstration project has one well pair: one horizon-tal well that injects oxygen and saline water while the vertical well brings the raw syngas to the surface where a conven-tional gas plant removes the carbon dioxide, resulting in a syngas that can be used as a fuel for power generation or further converted to liquid fuel.

The use of saline water virtu-ally eliminates the need for fresh water, said shaigec.

a series of chemical processes convert the coal to syngas,

shaigec told the conference. The oxygen supports a limited and controlled amount of com-bustion, raising the temperature of the coal and boiling the water to generate steam. The naturally existing deep underground pressure, along with the elevated coal temperature and the pres-ence of steam, together form the right conditions to gasify the coal. char and ash, which are remnants of the original coal, remain deep underground.

although the company is not doing anything differently with its demonstration plant than what’s been done with the tech-nology in its 80-year history worldwide, until that plant was operating skeptics suggested the process would not work, he said.

But it absolutely does work, he insisted. “in fact we were looking forward to getting the demo operating because it is actually the deepest in situ coal gasification that’s ever been done in the world,” he said. The company is seeing the benefits of syngas in both its quality and how clean it is, he added.

“it certainly seems to support the theory and the past practice that being in the deeper coals in that high-pressure environment is definitely beneficial to the process,” said shaigec.

The province of alberta has committed $285 million in grant funding to support the first phase of the project, under alberta’s $2 billion carbon capture and storage funding program.

swan hills synfuels has entered into an agreement with Pcl industrial management inc. to construct the clean synthetic gas processing facility on a fixed-price, schedule-cer-tain basis.

shaigec said the area’s trans-mission system will be able to accommodate the interconnec-tion of the power plant without the need for any substantive system upgrades.

The land footprint of the first commercial phase will use no more than five sections worth of land, he said. • lynda Harrison

SYNGAS

FuelForThoughtSwan Hills syngas plant moving ahead

COAL SEAM

INJECTIONWELL

PRODUCTIONWELL

1400 m

2800 m

0 m

200 m

400 m

600 m

800 m

1000 m

1200 m

DEPTH LIMIT OFFRESH GROUNDWATER

SALINE WATER + OXYGEN

RAW SYNGAS

COAL + COMBUSTION + PRESSURE + STEAM

IN SITUGASIFICATION

OF COAL

CLEAN SYNGAS TOPOWER GENERATION

CO2 TO CONTAINED OIL POOL FOR EOR/SEQUESTRATION

CO2 TO CONTAINED OIL POOL EOR/SEQUESTRATION

Illus

tratio

n: J

uneW

arre

n-N

ickl

e's

Ener

gy G

roup

sta

ff

POWER FROM BELOWSwan Hills Synfuels’ ISCG/Sagitawah power project will use in situ coal gasification to tap deep, unmineable coal to produce syngas. The syngas will be pipe-lined to a combined cycle power generation station to produce low emission electricity. The captured CO2 will be sold to EOR custom-ers in the region.

Page 13: New Technology Magazine - June 2011

Page 11 (Vanguard section)

514037-170Packers Plus 1/3 pg vertad 2 of 2

new technology magazine | June 2011 11

vanguard

DesPiTe a moDesT PreDicTion for nearly 13,000 wells this year, industry is spending a lot more time drilling much more expensive and complex wells and finding experienced staff is again becoming a major issue.

The Petroleum services association of canada raised its 2011 drilling activity fore-cast by 700 wells in late april to 12,950 wells drilled, but the modest increase belies signifi-cant underlying changes in activity favouring longer, deeper wells, oil drilling and uncon-ventional resources, all of which are redefin-ing the oilfield service market in canada.

“We’re forecasting that horizontal wells will account for 44 per cent of all wells by the end of 2011. That’s triple the 2007 level of 14 per cent,” said mark salkeld, president of Psac, at its mid-year Drilling activity forecast update luncheon.

Psac noted the number of rig operating days has doubled in just three years because of the increased time required to drill and complete longer and deeper wells in uncon-ventional formations. The average number of days it takes to drill a well has climbed to 11.5 in 2011 from 5.7 in 2008.

“Well depth and reach is 33 per cent more than it was just five years ago,” salkeld said. “To put that into perspective, well depths on average are almost 600 metres deeper than they were in 2008.”

citing arc financial research compar-ing costs of a typical horizontal well in the Pembina region in 2010 to a vertical well in the same area in 2000, salkeld said total well costs have climbed to $2.7 million for the average horizontal well versus $325,000 for a vertical well in the Pembina region.

The highest cost component of a typical horizontal well is by far the completions and testing, representing 54 per cent of the total well cost versus 17 per cent in 2000.

so even modest increases in well drilling activity today leverage the money spent, the total metres drilled and the labour required to carry out the work — all of which bodes well for drillers provided they are agile, prepared to change with their customers and embrace the step-changes in technol-ogy offered by mobile compression and fluid chemistry advances, according to scott Treadwell, a macquarie equities research analyst speaking at the Psac event.

macquarie expects new capital expendi-ture announcements for the horn river Basin by the middle of 2012 as producers prepare to send 1.5 bcf per day of gas to Kitimat for lnG exports.

“you need two million horsepower to service that incremental demand, half a mil-lion of that going to the horn river. so that’s a fundamental huge step in demand,” he said. • R.P. Stastny

DRILLING

NewWellProfileModest rise in well count belies major changes in well costs and complexity

Phot

o: J

uneW

arre

n-N

ickl

e's

Ener

gy G

roup

Packers Plus increases well production.

Packers Plus StackFRAC®

multi-stage fracturing system

allows production contribution

from the open hole lateral and

eliminates the cost and risk of

cementing and perforating.

Cardium Assets Maximized

Page 14: New Technology Magazine - June 2011

page 12 and 13spreadKenwood574772-26

1-80

0-77

5-01

48 e

xt.3

20AD

S#23

111

*CSA

IS a

ppro

ved

by C

SA a

s int

rinsic

ally

safe

for u

sein

Cla

sses

I, II

& II

I, Di

v. 1,

Gro

ups A

,B,C

, D, E

, F, G

.

A &

B, I

.S.

CSA

cer

tifi

cati

on

fo

r C

lass

I: D

ivis

ion

1: G

rou

p A

, B, C

& D

.N

EXED

GE®

off

ers

you

th

e sa

fety

an

d r

elia

bili

ty n

eces

sary

in d

eman

din

g a

nd

haz

ard

ou

s si

tuat

ion

s.

Adv

ance

d fe

atur

es, e

xten

ded

cove

rage

, str

ong

secu

rity

and

12.5

/ 6.

25 k

Hz

com

patib

ility

with

a m

inim

um o

f 2

wat

ts a

re ju

st s

ome

of t

he b

enef

its o

fad

optin

g N

EXED

GE®

for

adva

nced

dig

ital c

omm

unic

atio

ns.

®

1131

5 A

lask

a Rd

, For

t St

. Joh

n, B

C(2

50) 7

85-3

333

801-

104

Ave

nue,

Daw

son

Cre

ek, B

C(2

50) 7

82-3

333

5103

- 4

8 A

venu

e, F

ort

Nel

son,

BC

(250

) 774

-777

7

1001

7 Q

ueen

St.

, For

t M

cMur

ray,

AB

(780

) 791

-100

2

4004

- 5

0th

Ave

. Ath

abas

ca, A

B(7

80) 6

75-3

938

5919

-91

Stre

et, E

dmon

ton,

AB

(780

) 436

-556

674

34 5

0 A

venu

e, R

ed D

eer,

AB

(403

) 347

-077

7

#8, 3

601-

19 S

tree

t, N

.E. C

alga

ry, A

B(4

03) 2

50-9

433

1121

3-97

Ave

nue,

Gra

nde

Prai

rie, A

B(7

80) 5

32-2

555

Page 15: New Technology Magazine - June 2011

page 12 and 13spreadKenwood574772-26

1-80

0-77

5-01

48 e

xt.3

20AD

S#23

111

*CSA

IS a

ppro

ved

by C

SA a

s int

rinsic

ally

safe

for u

sein

Cla

sses

I, II

& II

I, Di

v. 1,

Gro

ups A

,B,C

, D, E

, F, G

.

A &

B, I

.S.

CSA

cer

tifi

cati

on

fo

r C

lass

I: D

ivis

ion

1: G

rou

p A

, B, C

& D

.N

EXED

GE®

off

ers

you

th

e sa

fety

an

d r

elia

bili

ty n

eces

sary

in d

eman

din

g a

nd

haz

ard

ou

s si

tuat

ion

s.

Adv

ance

d fe

atur

es, e

xten

ded

cove

rage

, str

ong

secu

rity

and

12.5

/ 6.

25 k

Hz

com

patib

ility

with

a m

inim

um o

f 2

wat

ts a

re ju

st s

ome

of t

he b

enef

its o

fad

optin

g N

EXED

GE®

for

adva

nced

dig

ital c

omm

unic

atio

ns.

®

1131

5 A

lask

a Rd

, For

t St

. Joh

n, B

C(2

50) 7

85-3

333

801-

104

Ave

nue,

Daw

son

Cre

ek, B

C(2

50) 7

82-3

333

5103

- 4

8 A

venu

e, F

ort

Nel

son,

BC

(250

) 774

-777

7

1001

7 Q

ueen

St.

, For

t M

cMur

ray,

AB

(780

) 791

-100

2

4004

- 5

0th

Ave

. Ath

abas

ca, A

B(7

80) 6

75-3

938

5919

-91

Stre

et, E

dmon

ton,

AB

(780

) 436

-556

674

34 5

0 A

venu

e, R

ed D

eer,

AB

(403

) 347

-077

7

#8, 3

601-

19 S

tree

t, N

.E. C

alga

ry, A

B(4

03) 2

50-9

433

1121

3-97

Ave

nue,

Gra

nde

Prai

rie, A

B(7

80) 5

32-2

555

Page 16: New Technology Magazine - June 2011

opposite greenscene487551-4782JWN In-house

full page

The first patent for a spring-loaded mousetrap was issued in 1894. Since then, more than 4,400 patents for better” mousetraps have been granted in the U.S. alone.

Nominations are now open

Did you build a better mousetrap? Want to be recognized for the products, inventions, gadgets or gizmos you’ve created?

The only Technology Stars competition in Canada is returning for its second year! New Technology Magazine and

Oil & Gas Inquirer have teamed up to recognize innovative stars in the oil and gas industry. If you’ve developed an interesting

or groundbreaking new product, either in your grandmother’s basement or in a high-tech lab, we’re looking for you!

Nominate yourself or a buddy. Go online to find out more!

GeT your nomInaTIons In now! CompeTITIon Closes sepTember 1, 2011. To be elIGIble, a Company musT operaTe In Canada, wITh ITs produCT or servICe deployed here.

★ Best Exploration Technology ★ Best Drilling Technology

Best Pro

ductio

n Te

chno

logy

★ B

est H

SE Te

chnology

www.newtechnologystars.com

The first patent for a spring-loaded mousetrap was issued in 1894. Since then, more than 4,400 patents for better” mousetraps have been granted in the U.S. alone.

Nominations are now open

Did you build a better mousetrap? Want to be recognized for the products, inventions, gadgets or gizmos you’ve created?

The only Technology Stars competition in Canada is returning for its second year! New Technology Magazine and

Oil & Gas Inquirer have teamed up to recognize innovative stars in the oil and gas industry. If you’ve developed an interesting

or groundbreaking new product, either in your grandmother’s basement or in a high-tech lab, we’re looking for you!

Nominate yourself or a buddy. Go online to find out more!

GeT your nomInaTIons In now! CompeTITIon Closes sepTember 1, 2011. To be elIGIble, a Company musT operaTe In Canada, wITh ITs produCT or servICe deployed here.

★ Best Exploration Technology ★ Best Drilling Technology

Best Pro

ductio

n Te

chno

logy

★ B

est H

SE Te

chnology

www.newtechnologystars.com

The first patent for a spring-loaded mousetrap was issued in 1894. Since then, more than 4,400 patents for better” mousetraps have been granted in the U.S. alone.

Nominations are now open

Did you build a better mousetrap? Want to be recognized for the products, inventions, gadgets or gizmos you’ve created?

The only Technology Stars competition in Canada is returning for its second year! New Technology Magazine and

Oil & Gas Inquirer have teamed up to recognize innovative stars in the oil and gas industry. If you’ve developed an interesting

or groundbreaking new product, either in your grandmother’s basement or in a high-tech lab, we’re looking for you!

Nominate yourself or a buddy. Go online to find out more!

GeT your nomInaTIons In now! CompeTITIon Closes sepTember 1, 2011. To be elIGIble, a Company musT operaTe In Canada, wITh ITs produCT or servICe deployed here.

★ Best Exploration Technology ★ Best Drilling Technology

Best Pro

ductio

n Te

chno

logy

★ B

est H

SE Te

chnology

www.newtechnologystars.com

Page 17: New Technology Magazine - June 2011

new technology magazine | June 2011 15

SOLAR ASSISTArtists rendering of a four-acre GlassPoint solar power system. GlassPoint recently launched the world’s first con-centrated solar power facility built to provide steam to feed a heavy oil EOR project.

eNvIroNmeNTal TechNologygreenscene

enhanceD oil recovery usinG concentrated solar power is being tested in california, where steam is forced deep underground to liquefy and release thick oil deposits, and will be studied for use in northern alberta.

GlassPoint, inc. introduced the world’s first commercial solar enhanced oil recovery (eor) project in february at Berry Petroleum com-pany’s 21Z lease in mcKittrick, california.

GlassPoint says its solar steam generators pro-duce steam at a lower cost than steam produced from gas-fired steam generators, making it practi-cal to replace up to 80 per cent of the gas used for eor in sunny locations.

The pilot project has been in daily operation most of the time since startup and is moving toward full automation.

“The unit’s performing, it’s interconnected and it’s producing energy every day,” says John o’Donnell, GlassPoint’s vice-president of business development.

Designed to deliver about a million British thermal units per hour for eight hours a day dur-ing the summer, the Kern county 21Z solar Project is operating as expected, o’Donnell tells NewTechnologyMagazine on his cell phone from muscat, oman, where GlassPoint is investigating setting up solar steam generation projects.

using the GlassPoint solar array to directly generate steam for injection into wells reduces gas use. During sunny hours, solar steam is injected and during dark hours, gas-generated steam is injected. control systems automatically adjust the gas-firing rate so that constant rate steam injec-tion is maintained.

The company says the secrets to its success are its software and sensing systems. multiple sensors track the sun’s position in the sky and the energy is delivered to the receiver in real-time. The tracking system adjusts the mirror position rela-tive to the structure so that it remains optically aligned at all times, while older systems have to be manually aligned individually.

PRODUCTION

Solar-PoweredEORNew technology not quite ready for Canada yet

Ren

derin

g co

urte

sy o

f Gla

ssPo

int,

Inc.

Page 18: New Technology Magazine - June 2011

Bear Den 4 Haul829782-6

half-page horz

16 newtechmagazine.com

greenscene

another key element is the protected glasshouse structure, notes Katie struble, a spokes-person. By isolating the mirrors from outdoor elements — wind, dust and sand — the system can operate in harsh oilfield envi-ronments. it also allows the use of an automated robotic washing system that eliminates the need for manual cleaning and mini-mizes water use, says struble.

Western Canada use?specifically designed for rug-

ged oilfield environments, the technology has applications in regions with heavy oil and sun-shine such as california, Texas, venezuela and north africa.

What about northern alberta and its steam assisted gravity drainage projects? not so much, says o’Donnell, although his company has received intense interest from canada and is con-ducting a feasibility study. results should be ready in a month.

it’s certainly feasible, but he questions whether solar-assisted

eor is economical for alberta, especially when natural gas prices are depressed, he says. he estimates it would deliver only about half as much energy in alberta as california.

There are three challenges, he says: the latitude, which puts the sun lower in the sky, the presence of snow and cold, and clouds. of those, the snow and environmental conditions are the least problematic because of the greenhouses. “The big issue is sunny hours.”

according to GlassPoint, integrating solar heat into a thermal eor project by using its solar array to pre-heat feed-water for conventional gas-fired steam generators reduces gas consumption by up to 10 per cent. although hot water is only produced when the sun is shin-ing, it’s relatively easy to store in an insulated tank, so solar heated water can be supplied to steam generators even when it’s dark, the company says.

oakland, california-based

Brightsource energy, inc. is building concentrated solar power technology at a chevron corporation oilfield in coal-inga, california, to create steam injected into a heavy oil reserve. Thousands of mirrors, called heliostats, point to the sun, directing its energy toward a water boiler. The steam gener-ated by the boiler is injected into wells to heat up heavy oil, thereby making it easier to extract. The steam is then air-cooled and piped back into the

SELF-CLEANING Greenhouses allow the use of an automated robotic washing system that eliminates the need for manual cleaning and minimizes water use. Used daily by the agriculture industry for the past 20-plus years, the cleaning machines are widely deployed and proven to maintain optical efficiency of the system while significantly reducing O&M costs. No other solar steam pro-vider has figured out this piece of the puzzle yet, says GlassPoint.

Phot

o co

urte

sy o

f Gla

ssPo

int,

Inc.

Page 19: New Technology Magazine - June 2011

Momentive774217-36

half-page horz

new technology magazine | June 2011 17

greenscene

system in a closed-loop process. The system is slated to be in service this year.

curtis Berlinguette says he never likes to say something can’t be done, especially when it comes to solar because he is a huge proponent of using it in unconventional ways, but for now at least he doesn’t think northern alberta’s oilfields are necessarily suited for this spe-cific technology. “i think it should be explored but there are some serious hurdles for this type of solar thermal tech-nology to be implemented,” says the canada research chair in energy conversion and alberta ingenuity at the

university of calgary’s Depart-ment of chemistry.

These types of solar tech-nologies are better matched to an environment of intense sun-light, says Berlinguette, who is also a director of the centre for advanced solar materials and a fellow at the institute for sus-tainable energy, environment and economy at the u of c.

moreover, he has concerns about whether infrastructure could withstand the extreme tem-peratures in northern canada.

Berlinguette cautions that his expertise is in solar electricity — not solar thermal — and so he is not intimately familiar with GlassPoint’s undertaking

and its use of greenhouses. While he is optimistic that the greenhouses will improve the stability of the solar collectors, he speculates that about 15 per cent of incident sunlight will be lost due to reflective losses without even taking into account other issues with debris and precipitation.

Brightsource’s concentrators are designed to reach tempera-tures of more than 500 c, which require many mirrors and intense sunlight. consider-ing that the output of a desert installation plummets in cloudy conditions, it will be a challenge to get really high efficiencies during the winter in northern canada, he says. “on the other hand, the ready access to water would be a significant advantage for placing a concentrated solar installation in alberta. concen-trated solar thermal typically requires a lot of water.”

The centre for energy says canada has abundant solar energy resources, with the

largest resources being found in southern ontario, Quebec and the Prairies. up to now, it says, the main applications of solar energy technologies in canada have been for non-electricity active solar system applications for space heating, water heating, and drying crops and lumber.

according to the national research council of canada, inuvik, with an average 12.59 daylight hours per day, receives the highest average number of daylight hours in canada for solar power generation. During the summer, inuvik receives 24 hours of daylight per day, which compensates for 24 hours of darkness during the winter. however, calgary is not far behind, at an average 12.26 daylight hours per day, and Toronto receives an average 12.02. • lynda Harrison

CONTACT FOR MORE INFORMATIONJohn O’Donnell, GlassPoint,

Tel: 415-778-2800,

Email: [email protected]

“Ontheotherhand,thereadyaccesstowaterwouldbeasignificantadvantageforplacingaconcentratedsolarinstallationinAlberta.Concen-tratedsolarthermaltypicallyrequiresalotofwater.”

Momentive Specialty Chemicals Inc., Oilfield Technology Group, Calgary, AB, Canada +1 780 721 3807© 2011 Momentive Specialty Chemicals Inc. ®, ™ and denote trademarks owned by or licensed to Momentive Specialty Chemicals Inc.SM

Momentive’s Canadian AdvantageFort Saskatchewan Manufacturing Plant

Calgary Technical Sales Office

Page 20: New Technology Magazine - June 2011

less water use

lower temperatures

lower operating costs

AOSC starts what may be the first test of electric heaters in bitumen carbonates with its TAGD processBy Pat Roche

plugged in

Page 21: New Technology Magazine - June 2011

new technology magazine | June 2011 19

production

ike many prospective oilsands producers, Athabasca Oil Sands Corp. (AOSC) acquired conventional leases — bitumen in sand-stone McMurray and Wabiskaw reservoirs in northeast Alberta. In the normal course of business seismic lines were acquired to

place delineation wells.Leying one of the seismic lines, an aosc exploration geologist with many years of expe-

rience in the Western canadian sedimentary Basin spotted what looked like a reef beneath the target sands. To confirm this, aosc shot new seismic.

lo and behold, it clearly revealed a carbonate leduc reef beneath aosc’s Dover West oilsands asset. so over two years aosc quietly picked up acreage in crown land sales, drilled delineation wells and built up its position until it owned nearly 100 per cent of the reef in the Dover West area.

it was a light oil discovery in a leduc carbonate reef that launched alberta’s modern oil industry in central alberta in 1947. however, aosc’s leduc carbonates contain bitumen, not light oil. viscosities range from three million to five million centipoise — roughly the consistency of shortening or lard. at reservoir temperature this stuff isn’t going anywhere.

alberta government geologists estimate hundreds of billions of barrels of bitumen are locked in carbonate rock — a resource big enough to rival the conventional oilsands — but so far no one has figured out how to produce it commercially. according to published data, only a few pilots have been done, all using steam to melt the bitumen so it would flow to production wells.

What these tests showed is the bitumen will flow when heated. The trick is finding a way to economically raise the reservoir temperature. The presence of fractures and vugs (cavi-ties) may present challenges if using steam.

as an alternative, a number of companies have schemes that would use electricity (instead of a flow process such as steam) to heat the reservoir. NewTechnologyMagazine previously reported royal Dutch shell plc and e-T energy have already field-tested their respective electric heaters in the conventional oilsands.

But based on what has been publicly disclosed, aosc appears to be the first to start field-testing electric heaters in alberta’s bitumen carbonates.

The prize could be huge. aosc estimates it has 19 billion barrels of bitumen in place in the leduc carbonates, though at this point it’s impossible to know how much, if any, might be economically recoverable.

so for now, aosc is focusing most of its resources on its conventional oilsands assets at Dover and macKay. at both properties aosc’s 60 per cent partner is Petrochina, but the alberta company remains the sole owner of the Dover West asset where the leduc carbon-ates are located. aosc’s first commercial production as a company is expected to come from Dover in late 2014. (The company also has a stake in alberta’s Grosmont carbonates, but considers this a long-term opportunity and hasn’t prepared a development schedule.)

But at the same time aosc has taken the first concrete steps toward unlocking the vast bitumen wealth of its leduc carbonates.

Recovery processThermal assisted gravity drainage (TaGD) is the name the company coined for the

recovery process it is developing using a pattern of horizontal heating wells. it will use conduction heating. a straightforward way of delivering heat, conduction is how common electric stoves work. heat is conducted into a pot sitting atop an electric element.

in the TaGD application the electric heating element is a mineral insulated (mi) cable

Page 22: New Technology Magazine - June 2011

20 newtechmagazine.com

production

CO-DEVELOPMENT SYNERGIESSchematic shows production methods in the bitumen-bearing carbonate Leduc reef, left and centre, and conventional oilsands, right. Steam assisted gravity drainage and thermal assisted gravity drainage are proposed options for the Leduc carbonates. Use of TAGD in the carbonates and SAGD in the overlying oilsands could pres-ent the unique opportunity to use cogeneration to simultane-ously produce electricity for the former and steam for the latter.

The second component would be a demonstration project that would be the first step in commercializing TaGD, albeit at a smaller size than a full-scale commercial project.

no decision has been made yet on the size of each component, but they would have a combined capacity of less than 12,000 barrels a day and both would be covered by the same regulatory application.

Whether both components would be built at the same time has yet to be decided. if they’re done in parallel, the demo project would generate cash flow while the pilot would try to determine, for example, opti-mal well length and spacing.

“right now we have just 200 metres of heater,” says roberts. “We could envision in a commercial operation going much longer — 1,500 to 1,600 metres.”

TAGD’s benefitsWhile aosc believes TaGD currently

holds the most promise for extracting bitu-men from the carbonates, it isn’t writing off steam-based methods. in fact, it did a small steam test during the past winter.

The company drilled a slant well and injected a single slug of steam to see how the reservoir would respond. “it looked, to our analysis, like we were able to develop a good steam chamber, which suggested saGD can be viable,” says roberts. “if frac-tures were posing tremendous thief zones, one would expect that you couldn’t build up pressure in that steam chamber; the steam

Leduc SAGD

Leduc TAGDSAGD in oilsands

strapped to the tubing run into the horizontal wellbores. mi cable is a wire surrounded by mineral insulation to prevent short circuiting. like the elements on an electric stove, the wire turns red hot as power is cranked up.

mi cable is available from several manufacturers for heat tracing — wrapping around pipes at outdoor industrial plants such as refineries to prevent freezing. mi cable has never been used commercially in a bitumen reservoir. adapting an existing commercial product to this new application, aosc is in effect acting as its own technology provider.

in explaining the difference between TaGD and some of the other proposed bitumen recovery methods that use electricity, aosc chief reservoir engineer Bruce roberts lists what it’s not. it’s not just a near-wellbore stimulation process — the goal is reservoir-wide heating. unlike resistance-based heating methods, TaGD does not apply electrical current directly to the reservoir.

and it is not in situ upgrading, which shell proved technically possible in its electric heater experiments in the Peace river oilsands last decade. aosc is simply trying to make the bitumen flow, which requires much lower temperatures than the cracking process that converts bitumen to light crude. The lower the temperature required, the less energy that needs to go into the reservoir, which translates into lower operating costs.

aosc has embarked on a program to advance its understanding of TaGD to the point where it can make a decision on a commercial operation.

“We’ve done a fair bit of delineation drilling. We have quite a bit of core data. We have logs. We have a reasonably good understanding of the geology,” says roberts.

The company has been making extensive use of modelling, or reservoir simulators, to estimate results such as recovery factor. as of late april it had done about 75,000 simula-tions, many of them automatically generated.

But the real test is in the field, where the company recently started a two-well heater test.it drilled a pair of 220-metre horizontal wells with eight to 10 metres of vertical separa-

tion. The heating cables were installed in the wellbores and after a two-week test to define the thermal conductivity of the reservoir, the heaters will be turned up for about a year.

once the reservoir is sufficiently heated, the bitumen should flow with gravity to the lower heating well, which will also serve as a production well.

if that test is successful, aosc will file a regulatory application in late 2011 or early 2012 for the next step, which would be a combined pilot/demonstration project.

The application would be for production of up to 12,000 barrels a day. That project would have two components. The first would be a pilot designed to get field evidence of drainage rates and recovery factor at a larger scale than the two-well test’s eight- to 10-metre spacing.

Illus

tratio

n co

urte

sy o

f AO

SC

Page 23: New Technology Magazine - June 2011

new technology magazine | June 2011 21

production

would just escape…. But we were able to create a zone of pressure.”

so if steam might be a viable option, why focus on electrical heating?

aosc says two big attractions of con-ductive heating over steam processes are more uniform heat distribution and lower operating temperatures.

The company expects field tests will confirm it can mobilize the bitumen by heating the reservoir to 120 to 140 c. many steam-based processes operate at more than 200 c, which means higher operating costs.

as for heat distribution, a flow-based process such as steam takes the path of least resistance, channelling through fractures and stopping at shale layers. conduction heat, on the other hand, travels through fractures, shales, water and oil-bearing sands.

“This scheme provides for fairly uniform heating because it’s dictated by heat cap-acity and thermal conductivity,” says rob-erts. These can be affected by changes in mineralogy — for example, a carbonate has a somewhat different thermal conductivity than a sand.

While these may vary by 10 or 20 per cent, permeability can vary by an order of magnitude — for example, the difference between a heavily fractured zone and one which isn’t fractured. Differences in permeability can have a huge impact on the effectiveness of a flow process — such as steam — to heat the reservoir evenly, but would only slightly alter a con-ductive process, says roberts. “regardless of whether you have fractures or high-perme-ability zones or low- permeability zones, you achieve the same sort of uniform heating.”

another big advantage of TaGD is it requires essentially no water. “We really believe this is an important advantage,” says roberts. “Water is becom-ing a bit of a scarce substance for use in a saGD operation.”

Besides avoiding environmental and stakeholder headaches, eliminating the need for water has commercial benefits.

“it really does provide for a much simpli-fied processing facility,” says roberts. “We don’t have steam generation. We don’t have a lot of water handling, so that would be a less expensive facility which will have a very positive impact on the economics.”

TaGD won’t entirely avoid water hand-

ling, though, because relatively small amounts of water naturally present in the reservoir will be produced with the bitumen.

so where will the power come from?it will be generated on site from natural gas, either by an aosc-operated power plant or

one operated by an independent power producer, says Bryan Gould, the company’s vice-president of corporate development. he believes this would be cheaper in the long run than buying from the grid.

Cost savingsThe real saving in energy costs will occur if the company can develop its conventional

oilsands at Dover West simultaneously with its bitumen-bearing leduc carbonates. The carbonates lie directly underneath the sands.

if the company can do saGD and TaGD simultaneously at the same site, it would be a perfect application for co-generation, says Gould.

cogeneration — also called combined heat and power — is the simultaneous generation of electricity and steam from the same fuel. in this case, aosc would use on-site genera-tion to power its in situ electric heaters, and capture the heat from the gas turbines to boil water for saGD.

“it’s a perfect co-gen opportunity … because you have the steam host above and the electric usage below,” says Gould. “co-gen is the most efficient use of the natural gas mol-ecule. you’re really reaping as much benefit out of that natural gas molecule as you possibly can to deliver transportation fuel [bitumen] and energy [electricity].”

“so it’s like you get a two-for-one deal on your natural gas — steam and electricity out of the same molecule.”

improving the economics could be make-or-break for TaGD as the technical feasibility seems to be less of an issue than the economic question. in a more ambitious experiment that also involved in situ upgrading, shell proved in northwest alberta last decade that

it is technically possible to use electric heaters in a bitumen reservoir, albeit in the conventional oilsands (see “Game changer,” NewTechnologyMagazine,

June 2008).The use of electric heat in another type hydrocarbon resource dates

back even further.Gould believes in situ electric heaters were first used to extract oil

from kerogen-bearing shale in sweden as early as the 1940s. however, shale oil production in sweden ended because it couldn’t compete with cheaper conventional crude oil.

next unocal corporation picked up the thread of the technology, Gould says, and did an electric heating test in a two aPi oil in california

around 1960. he says the u.s. company was planning to bring the electric heaters to the athabasca oilsands in alberta but abandoned the research after the

economic conditions changed.in the late 1970s shell research scientists started experimenting with electric heat as a

way to extract oil from its massive kerogen-bearing shale deposit in colorado. in that case as well, shell reported technical success but has yet to launch a commercial project.

The big question aosc plans to answer is: how many kilowatt hours, or units of electri-city, will it take to produce a barrel of bitumen?

roberts says the company probably won’t have a good indication of how much electricity will be burned to produce a barrel of bitumen until it has at least completed the two-well heater test. “We’ve done the modelling work,” he says, “but we really need to calibrate our models before we come up with a more definitive answer.”

Gould says the physics are well understood, but suggests electric heat wasn’t commercial-ized as a recovery method because no one found the right reservoir for the technology.

“We’ve very optimistic that we now have the right combination of the right reservoir and the right technology,” he says. “We always say the geology dictates the technology. and we’re very hopeful that this [technology] unlocks the prize. and it’s a huge prize.” •

“Right now we have just 200 metres of heater. We could envision in a commercial operation going much longer — 1,500 to 1,600 metres.”

Page 24: New Technology Magazine - June 2011

amazing

wells

Page 25: New Technology Magazine - June 2011

new technology magazine | June 2011 23

amazingwells

wellsThe same month Packers Plus

energy services inc. announced that its new multi-stage completion

system called Quickfrac was commer-cially available, the system earned its spurs by helping to complete a 23-stage slickwater frac in just under 10 hours in the Pembina cardium in march.

using limited entry diversion tech-niques and other proprietary technol-ogy, the Quickfrac system enables the fracturing of as many as four or five isolated stages in a single treatment within an openhole.

“The limited entry system allows us to equally — or unequally — distribute fluid at each port, with the use of one ball [to activate flow ports] for, say, three intervals at the same time. The system allows the operator to pump 10 or 15 stages on surface, with 30 to 60 stages done downhole,” says Dan Themig, president of Packers Plus.

With Quickfrac, each multi-stage treatment zone includes several propri-etary QuickPorT sleeves, with packers on either side to create a series of iso-lated stages within a single treatment zone. “each treatment zone is activated by an actuation ball, which is available in multiple sizes, enabling several batch fracturing zones to be stimulated in succession with the biggest ball size at the top,” according to the company.

Themig argues that the evolving microdarcy shale oil and gas sector appears bound to require increasing numbers of fracture stages in extended laterals. his company has completed several wells with over 10,000 feet in horizontal displacement. But the move from gas to oil and high-liquid reser-voirs in microdarcy rock may require a doubling of the current stage numbers for long-reach laterals, he says. “if gas

well sTaged moving through shale rock has difficulty achieving depletion over

long periods [years], then oil will be worse.”he says that recent developments in reservoir modelling indicate

that even after 10 years of production using standard stage densities of 12 to 18 stages, there will be near original pressure between most fractures. But performing 100 fracture treatments, as one company did recently, he suggests, is not generally practical when the plug and perf method used takes 40 days to complete operations — as happened in the example he refers to.

compare this, says Themig, to the record time — less than 10 hours — in which 23 stages were fracked using the new Packers Plus technology. along with Quickfrac, the other key technol-ogy that made the record possible was the repeater port system. “our new ball and seat technology brought us from 10 to about 20 stages, but that was not enough. so we moved to a repeater port system in which one ball size can apply to up to six ports, that is, frac stages,” says Themig.

only two or three years ago, he says, doing completions of 10 to 12 stages “would have been viewed as huge. Then and earlier the attitude was, we’ll never get all the jewellery into the well.”

The challenge was that you might be able to drill a 4,000 metre horizontal, but you would not be able to frac it all the way to the toe.

Part of the solution lay in borrowing modelling techniques used in the drilling sector and applying them to packer-based completion systems. “This helped us design tools with low friction coefficients and centralizing devices that reduced friction — all on openhole

with packers. What that does is take a 40- to a 100-day job and allow us to do it in a couple of says. The sophistication of our mod-elling capability has made a lot of difference,” says Themig.

he points to another record, set in february, in the Williston Basin, in which 47 stages were stimulated in the longest horizontal completion ever done with an openhole multi-stage frac, using the Packers Plus stackfrac multistage completion system. “The horizontal was 4,300 metres. it more than tripled what is common in our industry for lateral length. These records set new bench-marks for our industry,” says Themig. • Godfrey Budd

new technology from Packers Plus accelerates multistage openhole fracking

RECORD PACEUsing its new QuickFRAC completion technology, which allows the fracking of four or five isolated stages in a single treatment, Packer’s Plus managed a record 23-stage slick-water frac in less than 10 hours. Each treatment zone includes several of the company’s proprietary QuickPORT sleeves with packers on either side.

Illus

tratio

n co

urte

sy o

f Pac

kers

Plu

s En

ergy

Ser

vices

Inc.

Page 26: New Technology Magazine - June 2011

24 newtechmagazine.com

amazingwells

For a project that routinely breaks world records, it must have been old hat for consortium personnel to have racked up another one in January, when they completed the longest

extended-reach well ever drilled.The fact the project dished out yet another in a long string of

firsts, however, doesn’t diminish the triumph — drilling to a total measured depth of 12,345 metres (40,502 feet or 7.67 miles). The odoptu oP-11 well in the offshore far east russia also set a world record with a horizontal reach of 11,475 metres (37,648 feet).

The consortium, operated by exxon neftegas limited (enl), a subsidiary of exxon mobil corporation, completed the record-setting well in only 60 days using exxonmobil’s fast Drill Process and integrated hole Quality technology to maximize performance in every foot of hole drilled.

six of the world’s 10 record-setting extended-reach drilling (erD) wells including the oP-11 have been drilled by the sakha-lin-1 project using exxonmobil drilling technologies, James Taylor, enl president, noting in announcing the well in January.

“The specially designed yastreb rig has been used throughout, setting multiple industry records for measured depth, rate of pen-etration and directional drilling. We reached this significant mile-stone while achieving excellent safety, health and environmental performance,” he stated.

in addition to odoptu, sakhalin-1 includes the chayvo field — developed with both the onshore yastreb rig and the offshore reinforced concrete orlan drilling platform, built to withstand ice ridges reaching the height of a six-story building — and the unde-veloped arkutun-Dagi field. Development of arkutun-Dagi and expanded gas production from the chayvo field are expected to sustain production until 2050.

going longRecords continue to tumble as sakhalin-1 targets second field

SAKHALIN SUCCESSESTop: The yastreb land-based drilling rig was custom designed for the Sakhalin-1 project. Above: The Orlan platform’s rein-forced concrete structure can withstand the assaults of ice flows 1.5 metres thick. Next page: The single point mooring facility, where double-hull tankers with 720,000-barrel capac-ity are loaded, is the world’s largest.

Chayvo fieldcustom-designed for the sakhalin-1

project and originally mobilized to develop the chayvo field, which began production in 2005, the 16-storey-tall yastreb rig is the most powerful onshore drilling rig in the industry. Targeting chayvo between 2003 and 2008, it drilled 12 of the 16 longest erD wells to date with distances exceeding 11 kilometres.

at chayvo a total of 20 erD wells were drilled, setting records in depth, horizontal reach and drilling speed before the yastreb rig was dismantled, modified and transported to the odoptu field in 2009. from the 50-metre tall orlan platform situated at 14 metre sea depth, another 21 erD wells were drilled, most in the 5.5-kilometre range, with the longest well drilled measuring 7.5 kilometres long.

Odoptu fieldThe odoptu field, located eight to 11

kilometres off the northeast coast of sakhalin island, began production in september. in June 2010, the field’s oP-9 well was completed at a total mea-sured depth of 11,036 metres — at that time the longest well drilled at odoptu

and the fifth longest reach well in the world. as of november, seven produc-tion wells had been completed.

By enabling drilling from the coast, beneath the seafloor to offshore reser-voirs, the yastreb greatly reduces the capital and operating expenses that would be required for large offshore facilities. it also reduces potentially adverse impacts on environmentally sensitive coastal areas in an area consid-ered to be one of the most challenging sub-arctic environments in the world.

Produced oil and gas is transported to

Sakh

alin

pho

tos

cour

tesy

of R

osne

ft

Page 27: New Technology Magazine - June 2011

new technology magazine | June 2011 25

amazingwells

when a race car takes the checkered flag, it’s usually due in no small part to what’s under the hood. likewise, when companies set a new pace with the drill bit, the downhole motor probably played a big role in the achievement.

at least mpact Downhole motors would like to think so. The Texas-based company has marked two field performance records in the Barnett shale of north Texas in recent months, with the longest single-run curve and lateral section drilled in just 125.5 hours and a daily footage record of 3,390 feet.

While using an mpact downhole motor drilling for Devon energy corporation on march 11, the downhole assembly was kicked off at 7,600 feet and drilled 7,392 feet through the curve and lateral to 14,992 total depth, for an average rate of penetration of 58.9 feet per hour.

“The unique thing about this particular record was that, in normal operations in Barnett shale applications, there will normally be a trip between the curve and lateral section of the well; this particular one they drilled the curve and the lateral in one run, and doing that in 125 hours was the unique aspect about this particular well — it was an outstanding run,” says David stuart, mpact vice-president.

The Denton county well, drilled with Patterson-uTi Drilling company rig 208 with halliburton sperry Directional Drilling as service provider, featured the mpact down-hole motor configured with the company’s proprietary 7864 performance power section and premium stator elastomer. an 8 5⁄8-inch kick pad was incorporated in the assembly, with a 1.6-degree fixed bent housing.

“That particular motor is exclusive to mpact, which we developed and have commer-cialized,” stuart says. “it’s the configuration and setup of the motor that can enable us to reach that record.”

Drilling for operator chesapeake energy corporation last sept. 3, mpact set its daily footage record of 3,390 feet with an average rotating and sliding rate of penetration of 167.95 feet per hour in Johnson county, using mpact motor model 7833 hTs. The motor was configured with a high torque, slow speed performance power section incorporating mpact’s premium stator elastomer and an 8 ½-inch bearing stabilizer attached to the lower assembly. The proprietary adjustable bearing housing was set at 1.83 degrees.

mpact maintains extensive in-house engineering capabilities to ensure ongoing devel-opment of leading-edge motor technology. “our positioning strategy is to try and differ-entiate ourselves through technology and in doing that, you have to invest in r&D,” stuart says.

he notes the independent downhole motor supplier is active in the Bakken shale play just south of the saskatchewan border and is beginning to sell into canada. “We offer a lot of motors in the Bakken shale and the Bakken extends up over the border. We don’t have a service facility north of the border — our closest facility is in Baker, montana. But future plans are to eventually have something in the nisku or edmonton area,” he says.

“The lateral sections that are drilled in the Bakken are slightly smaller diameter typi-cally than what’s in the Barnett; however we have had some excellent runs throughout the Bakken play as well and anticipate more as the trend continues to grow north of the border. We certainly anticipate more activity in canada.” • maurice Smith

Full sPeed aheadadvanced downhole motors setting the pace in shale gas

the onshore Production facility (oPf) where it is processed and stabilized. natu-ral gas is transported a short distance from the oPf to a network of pipelines owned and operated by other companies for sale to customers in the russian far east or injected back into the chayvo field to maintain reservoir pressure.

The oil is transported by a 24-inch, 226-kilometre pipeline across sakhalin island and under the Tartar strait to the russian mainland, where it is tem-porarily stored at the De-Kastri export terminal before transport by a six kilo-metre undersea pipeline to the world’s largest single Point mooring (sPm) tanker loading facility and onto spe-cially designed double-hulled aframax-class tankers, carrying up to 720,000 barrels of crude, for distribution to the global market.

Arkutun-Dagilocated some 25 kilometres off the

northeast coast of sakhalin in 35-metre water depth, the arkutun-Dagi field will be developed from a gravity-base drilling and production platform and topsides now under construction, which are expected to be the largest in the industry. The field is anticipated to begin producing in 2014 with peak production estimated at 33 million barrels per year.

over the life of the project, sakhalin-1 is expected to contribute over us$70 billion to russia’s economy in taxes, royalty payments and the state’s share of oil production. Potential recoverable resources are 2.3 billion barrels of oil and 17.1 trillion cubic feet of natural gas.

enl is sakhalin-1 project operator on behalf of the international consor-tium that includes affiliates of the rus-sian state company rosneft — rn-astra and sakhalinmorneftegas-shelf; the Japanese corporation soDeco; and the indian state oil company onGc videsh ltd. • maurice Smith

Page 28: New Technology Magazine - June 2011

26 newtechmagazine.com

amazingwells

satellite offshore fields prompt innovative drilling solutions

departure energy services inc., a directional drilling firm, recently drilled a hori-zontal in record time on a well located in the Dawson main pool in the montney formation of northeast B.c. The well, which received recognition as a Pacesetter,

was drilled for arc resources ltd.“arc designated it a Pacesetter, based on their benchmark system. it was the fastest

rate of penetration [roP] from spud-in to TD [total depth]. We achieved that bench-mark on three occasions for arc in the montney,” says Dan robson, director of strate-gic development at Departure.

The well was drilled to a depth of 3,890 metres and took only 11.42 days. “This is not the deepest they drill to but it was on the deep side. These wells average 14 to 17 days, depending on the depth. one of the keys to this performance was getting the well drilled with three bits versus the seven that they can take,” says robson.

modern cutter technology has made a big difference, he says. “as little as five years ago, there was almost no way you would use PDc [polycrystalline diamond compact] bits to this depth, but the cutter technology has improved so much. in the past, you wouldn’t use PDc bits in these kinds of formations. you would use a tricone.”

halliburton, which manufactures the drill bits that were used under the security brand, has featured this as a record well in its literature.

although launched barely five years ago, the firm saw a steady increase in activity through 2010, much of it in alberta’s northwest and in northeastern B.c., gaining recog-nition and attracting business from a range of clients. Departure has been on one rig for arc over the last year and will be on two rigs for the next year.

robson attributes the success of the firm and its record roP to a range of factors. making sure the power section is carefully matched with the formation that is being drilled was a critical one. another was using high quality mud motors. “in these wells, we were using hemis [for mud motors],” says robson. hemi is an informal term for national oilwell varco’s hemidril motors, high-performance mud motors designed for both directional and straight hole applications.

he says that power section technologies have also been developing rapidly in recent years, and the best and latest materials and systems configured optimally improve effi-ciencies. “Power sections can be configured in numerous different ways. We’ve been using hard rubber power sections, which the latest sections have. The elastomers that have been used previously deform under pressure, but the hard rubber ones do not. With deformation, efficiency decreases.”

another important part of the mix in Departure’s wells is the use of modified positive pulse mWD tools from Blue star Tools, a firm now owned by General electric, which sells the tools under another name. Departure has engineered some performance modifi-cations that increase the mean-time between failures. “We’ve also designed retrievability into the tool so that if the drill string is stuck, we can retrieve the tool,” says robson.

he also underlines that a combination of experience and teamwork played a part in the record wells. “There was an operations meeting once a week in which people from our offices met with the arc operations team.” • Godfrey Budd

easT CoasTTReasuRe

seTTing The PaCe

modified tools, teamwork enable firm to drill record horizontal in the montney

Page 29: New Technology Magazine - June 2011

new technology magazine | June 2011 27

amazingwells

TAPPING NEW POOLSAbove: The SeaRose FPSO at the White Rose field off Newfoundland is flanked by two drilling rigs. Husky is setting new records in its efforts to develop satellite fields. Below: the complexi-ties of the 5.5 kilometre E-18 10 well targeting the West White Rose satellite pool are apparent. Contain-ing a hairpin turn and multiple curves, it is the second longest ever drilled in the region.

0

400

800

1200

1600

2000

2400

2800

3200

3600

-1200

-800

-400

0

400

800

200016001200800400

0-400-800

East View

North View

LegendA Target 1B Target 2C Target 3D Target 4

* Central Drill CentreA

BC

D

*

pleted. husky plans to further assess the deeper hibernia sandstones underneath the main reservoir, where the presence of 55 metres of net oil bearing reservoir was confirmed by drilling in 2008.

West White RoseWith the north amethyst well

complete, the team turned to the even more complex e-18 10 well targeting the West White rose satellite pool. With a profile the company describes as “a little like a treasure map,” with a hairpin turn and multiple curves, the 5.5 kilometre pilot well is the second longest in the region.

its length was necessitated by the desire to drill from the existing infra-structure at the central Drill centre at White rose, at a significant cost saving for the company. The well’s configura-tion, in what husky calls a three-zone intelligent completion design, can be thought of as drilling and completing three wells in one, a design that will give the company a better understanding of the reservoir at less cost than drilling three separate wells. husky will use the knowledge gained to optimize its devel-opment strategy for West White rose.

located in the Jeanne d’arc Basin, about 50 kilometres from the hibernia and Terra nova offshore developments, the $2.35 billion White rose project (in which husky holds 72.5 per cent work-ing interest and suncor energy holds 27.5 per cent) began production in november 2005 from the floating pro-duction, storage and offloading (fPso) vessel, the searose.

more than 65 kilometres of flexible flowlines and risers connect the ice-strengthened double hulled searose to the subsurface reservoirs, while electri-cal and hydraulic umbilicals tied to the fPso control subsea manifold valves and wellheads situated in glory holes excavated into the ocean floor to protect against iceberg scour.

The region still possesses plenty of potential for husky, which holds explo-ration rights to 14 parcels of land and working interests in 23 significant dis-covery areas, including 16 in the Jeanne d’arc Basin. The company holds 35 per cent working interest in the 2009 deep-water mizzen o-16 discovery in the flemish Pass and has extended its agree-ment for the henry Goodrich offshore drilling rig until January 2013. •

maurice Smith

in efforts to grow its offshore east coast production, husky energy inc. is seeing more records fall as it drills ever more complex wells to reach satellite fields surrounding its existing

White rose field development 350 kilometres off st. John’s, new-foundland and labrador.

of the three additional pools discovered between 2003 and 2006 — north amethyst, West White rose and the south White rose extension — husky has targeted the first two for production.

North Amethystnorth amethyst became canada’s first subsea tieback when

production began in may 2010. and its second producer, G-25 3, entered the record book last fall as the first on the east coast to use inflow control device (icD) screens and as the world’s second longest string ever installed in this configuration.

icD screens aid the flow of oil into the well while creating an even pres-sure along its length, maximizing the amount of oil produced throughout the life of the well.

according to husky, its east coast operations team executed the drilling and lower completion stages of the “world class” well more than 11 days ahead of schedule, at significant savings to the company.

Producing from the same Ben nevis-avalon sandstones as the main White rose field, north amethyst contains an estimated 90 million bar-rels of reserves and is expected to add 37,000 barrels a day to White rose production when all wells are com-

Gra

phic

and

pho

to c

ourte

sy o

f Hus

ky E

nerg

y In

c.

Page 30: New Technology Magazine - June 2011

28 newtechmagazine.com

amazingwells

a fter spending millions of dollars boring into subsea reservoirs thousands of metres deep, there

must be few things as frustrating, and potentially costly, as dealing with an obstruction or access issue that could hamper or kill the ability to produce the well.

a Danish company that came up with a unique innovation to deal with such challenges, based on self-conveyed downhole tools with wheels, has been the saviour for many caught in such a predicament, setting and breaking its own records along the way.

one of Welltec’s most recent records was established off the east coast, when one of the company’s Well Tractors completed the longest cumulative dis-tance of 82,157 metres while completing the deepest well intervention the com-pany has ever recorded. another was across the pond, where Welltec com-pleted the first nipple milling operation for nexen inc. to get the calgary-based company out of a tough situation at its Buzzard field in the north sea.

nexen is operator and 43.2 per cent owner of Buzzard, the largest discovery in the u.K. north sea since 1990. located about 60 miles northeast of aberdeen in the outer moray firth, central north sea, in 317 feet of water, it was discovered in 2001 and came onstream in early 2007.

nexen required a nipple — a short piece of pipe or wall tubular with a machined internal surface that enables installation of flow-control devices — to be milled out of one of its wells in order for a straddle to be run into the lower completion and set at 10,000 feet. The nipple was located at 9,147 feet and needed to be milled out from 4.437 inches to 4.5 inches, says Welltec.

The initial plan was to perform a well kill, mill out the nipple on coiled tubing and then run the straddle in one piece. But the high loads and logistics associ-ated with coiled tubing operations raised several concerns, Welltec says, prompt-ing an assessment of possible alternative

The FixeRlonger horizontals calling for ever lengthier intervention services

CLEAR THE PATH Welltec’s Well Miller NPR (nipple profile removal) tool provides precision milling without mobilizing heavy surface equipment for circulating and handling fluids, eliminating risk of damaging the reservoir. In its inaugural job, the tool was used to mill out a nipple at 9,147 feet well depth at Nexen’s Buzzard North Sea field.

and lightweight solutions. When invited to provide a solution, Welltec recommended running one of its Well miller tools with a Well stroker to provide the necessary load on the milling bit. The combined assembly was run and after a positive tag on the nipple, milling was initiated and completed in about 90 minutes.

The Well miller is revolutionary in the sense that it enables milling without the need of a conduit pipe back to surface to enable fluid circulation, says Welltec. circulation needed to cool the cutting face and remove cuttings is generated by a built-in electric motor and pump system. The motor creates a rotational force that allows drilling at 20-2,000 revolutions per minute. The tool allows for precision milling without the risk of damag-ing the reservoir from circulating fluids, as well as eliminating the need to mobilize coiled tubing or heavy surface equipment for circulating and handling fluids.

The Well stroker can perform many of the jobs traditionally done with slick line or coiled tubing. it is designed to apply up to 33,000 pounds axial force downhole using a bi-directional hydraulic ram, which may be fitted with various shifting tools. The technology provides more precise depth and force control than conventional methods, according to Welltec.

a slick line run into the nexen well with a 4.480-inch drift confirmed the operation had been a success. This allowed the retrievable straddle system to be set in the well followed by perforation of the casing in the desired pay zone.

“The nipple milling operation was a first for us,” alastair skelly, completions and intervention team leader for nexen Petroleum u.K., said in January. “had the latter operation not been success-fully undertaken then the only alternative would have been a coil tubing operation. The nipple milling using [Welltec’s] tractor/mill was therefore critical to whether this intervention could proceed or not,” he said.

off the east coast, an unnamed operator that needed to convey logging and perforation equipment to as deep as 10,068 metres was find-ing that, using other methods, it could not get beyond 6,000

metres. Welltec was called in for a contingency plan that required a two-man crew with the company’s standard Well Tractor 318.

The Well Tractor uses an electric over hydraulic power unit that feeds the drive sections. Power to generate hydraulic pressure is supplied by attached cable or wireline, which is also used for con-trol and communication. Traction is provided by wheels pressed against the casing or borehole wall. each wheel has its own inde-pendent hydraulic motor, which drives the wheel and provides forward motion. The Well Tractor overcomes the limitations of traditional wireline operations by being able to reach the toe of a deviated or horizontal well and carry out operations throughout the entire length of the wellbore, the company says.

Twelve runs were completed last summer to conduct all neces-sary logging and perforation jobs all the way to the required 10,068 metres measured depth to establish the deepest ever well intervention by the tractor. and the cumulative distance driven with a tractor in the 12 runs, at 82,157 metres, also marked a new world record, the company said, while it also managed to cut the cost of people on deck, reduce operational time and increase operational efficiency. • maurice Smith

Phot

os c

ourte

sy o

f: N

exen

Inc.

(top

), W

ellte

c A/

S (b

otto

m)

Page 31: New Technology Magazine - June 2011

page ??full page advert

Halliburton474106-925

Introducing the DecisionSpace® Desktop unifi ed workspaceNow your entire asset team can collaborate in real time using one unifi ed workspace. Accelerate analysis and interpretation by sharing a common subsurface framework.

Reduce cycle time and improve accuracy by examining more scenarios faster. Improve your returns in the fi eld and in the offi ce with industry-leading science and

unmatched usability. Learn more at halliburton.com/decisionspacedesktop.

High Science Simplifi ed®

Need a solution that will take you to oil faster? Accelerate

© 2011 Halliburton. All rights reserved.

Page 32: New Technology Magazine - June 2011

30 newtechmagazine.com

tightoil

what's the optimum number of fracs for your tight oil play?

Phot

o co

urte

sy o

f Pho

tos.

com

Page 33: New Technology Magazine - June 2011

analyze thatTight oil producers getting methodical

about multistage frackingBy Maurice Smith

Page 34: New Technology Magazine - June 2011

32 newtechmagazine.com

tightoil

ntil recently the darling of the north american oil and gas industry, shale gas may be tempo-rarily falling out of favour as natural gas prices continue to lan-guish in the $4 per mmBtu range. But the magic that unlocked the massive shale gas prize — horizontal drilling and multistage fracking — has hardly skipped a beat as it jumps to a new

host and leads the resurgence of oil produc-tion in played out or “vintage” plays across the continent.

Just as the technology has had to be adapted to each new shale gas play to be a success, producers are finding adjustments to the techniques are necessary in emerging tight oil plays such as the Bakken and the viking of saskatchewan and the cardium of alberta. and as yet they are a little earlier along the learning curve as the technol-ogy migrates to light oil.

With little in the way of detailed analysis undertaken or historical evidence to draw on, many companies are relying as much on trial and error and imitation as on hard data and science to complete their wells, say some producers.

“in my opinion, a lot of what has happened is there has been a few companies [that] have done it, and maybe been quite successful at it, and then everybody else just looks over the

fence at what they are doing and follows them — they are doing it, but they don’t necessarily know why they are doing it,” says Dennis hahn, completions engineer advisor with enerplus resources fund.

“What i am saying is, you should be doing it with a certain element of technical work to know why you are doing what you are doing. We are trying to validate what our predictions are, calibrate them with some actual data and that way we are going to be able to optimize production.”

hahn’s primary role over the last year and a half has been to provide direction on both frac sizing and frac frequency. “i believe by doing the tech-nical work you can get to the end result quicker than drilling a bunch of wells, trying a bunch of things, and then hav-ing to wait a fairly long time in tight plays to see what your real results are.

“We are trying to build some capital efficiencies into what we do by combin-ing the technical aspects and then seeing what we see in the field results. it’s not so much a validation, it’s more a calibration, of your predictive tools. That’s the approach we are taking. and we have seen good results in our viking oil and our cardium oil.”

Despite their similarities in benefiting from horizontal drilling and multistage fracking, tight oil and shale gas need to be approached differently, hahn points out. “in the tight oil you spend a little more time trying to work with your frac fluids, and your jobs aren’t nearly as big. Their pays are much thinner, so you are working with a much more confined space within the rock deposition.”

The canadian Bakken, for instance, is a lot thinner and shallower than its ameri-can cousin and has neighbouring water zones the u.s. generally lacks, so multi-stage fracking has to be approached deli-cately. “To get good coverage and make it economic, you put more fracs in there but

UPh

oto:

Kar

en B

leie

r/AFP

/Get

ty Im

ages

Page 35: New Technology Magazine - June 2011

TELUS World of Science831289-39full page

Page 36: New Technology Magazine - June 2011

34 newtechmagazine.com

tightoil

they are a lot smaller and you pump them at much lower rates. extra volume makes your frac grow more upwards and you end up in water, and then you end up with a water well,” says hahn.

Understanding the reservoir murray reynolds, senior completions

technical advisor with Taqa north ltd., who once consulted with hahn, is on the same path. he believes there is too much of the attitude of “whatever the other guy is doing is what i will do” — an attitude that is costing producers unnecessarily.

“i think in general people are putting too many fracs into the ground, so they are spending too much capital,” he says. “over time, people have migrated to tighter and tighter spacing — i saw

CresCent pOInt enerGy COrp.’s VIeWFIeLd Bakken waterflood pilot programs are showing positive initial results and could encourage other producers to attempt secondary recovery on other tight oil plays.

the prize is a big one as many of Western Canada’s tight oil resource plays have large in-place volumes but relatively low recovery factors. secondary recovery has the poten-tial of boosting the amount of oil recovered from the reservoirs while slowing the high decline rate typically encountered with mul-tistage fracturing of tight oil formations.

travis Wood, an analyst with dundee securities Ltd., says that while Crescent point’s waterflood program is still in the early stages of development, the firm’s research indicates that “initial results support management’s expectations that recovery factors could materially improve.”

Wood notes that in a recent report, the firm highlighted the production and injection response, various completion techniques, lateral length, well spacing and the design (i.e. the number of producer and injector wells) of each pilot.

“We believe Crescent point currently has 11 waterflood pilots either running or constructed [eight in the Bakken and three in the Lower shaunavon]. Based on our estimates, there are a total of 17 injectors running on the first five pilots, which keeps them on schedule for 36 by the end of the year,” Wood says.

according to the dundee report, Crescent point’s first Bakken pilot, comprised of four horizontal producers and one injector, began injecting water in the fourth quarter of 2006, with production response identi-fied in the third quarter of 2008.

Wood says the first pilot saw a robust production response through the back part of 2008 and into much of 2009. since reach-ing peak production rates of about 550 bar-rels per day (up from 50 to 100 barrels per day pre-injection), production has declined about 25 per cent over the past two years.

“Impressively, production response is also identified on wells outside of the defined pilot, which would further improve daily rates, cumulative volumes and capital efficiencies,” Wood says.

according to the april 4 dundee report, the most recent production data indicates that the second pilot is producing about 125 barrels per day, down an estimated 42 per cent from peak rates of about 350 bar-rels per day. the second pilot is comprised of three injectors and two producers, which are staggered on a toe-to-heel basis.

Crescent point’s third Bakken water-flood pilot is also its largest to date and is comprised of six producers and five injector wells. Because water injection only began in the third quarter of last year, Wood says it is a bit early to com-pare production volumes with the earlier pilots, but management has indicated the

pilot is performing as expected.the lateral lengths and spacing are

similar to the second pilot (1,400 metres and 200 metres range, respectively). the five injector wells were completed using packers plus energy services Inc.'s technol-ogy, while the six producing wells included four completed (two packers plus and two cement liners) and two uncompleted.

pilot four also started water injection in the third quarter of 2010 and as a result information is limited. Wood says that pilots five through eight still appear to either be in the construction or planning phase.

“We believe that all the injector and producers will be completed using cement liners,” he says.

trent stangl, Crescent point’s vice- president of marketing and investor relations, says his company’s waterflood pilot results should help convince some skeptics who doubted the process could work in tight reservoirs.

He says that waterflood in the Viewfield Bakken looks like it could have a profound affect on recovery factors, noting that between 17 per cent and 19 per cent recov-ery is achievable from primary production based on eight wells per section.

“the data suggests that we could be well north of a 30 per cent recovery factor. that’s a massive increase. the area that we have initially targeted for waterflood is probably 1.5 to two billion barrels in place,” stangl says. “so, you can imagine a 10 per cent increase in recovery factor is upwards of 150 to 200 million barrels of potential incremental reserves if pilot one is right.” •

Paul Wells

some out there as close as 30- or 40-metre spacing.” Whether they are using coiled tubing, mongoose style fracs or plug and perf style, he notes, “every frac costs a significant amount of money.”

it is important to decide on optimum well length, fracture spacing and well spacing very early in the field development program, he says. “i think the key is to understand the reservoir, what is the reser-voir telling you, and do some modelling work to come up with an initial guesstimate, then go out into the field, complete the wells, review it in three to six months after you have got some production data and see if it still goes around.”

a good place to start is with some kind of analytical model, which are available from various vendors, he says. compared to numeri-cal reservoir models — which require a lot more

data inputs, are far more complex and can take weeks to provide answers — analytical models take mere hours and require inputs that are relatively simple: “just your typical height, net pay, porosity, permeability, water saturation, reservoir pressure, oil properties, what do you think you are getting for frac half lengths, that kind of thing,” reynolds says. “usually i do some 3D frac modelling work up front to try to figure out what the frac half lengths are.”

in a relatively short period of time, an operator can do a number of sensitivities, he says, on aspects like permeability, net pay, frac half length and number of fracs along the horizontal. “Then [the model] will pro-vide a forecast of initial production, a pro-duction versus time curve, production rate versus time and cumulative production recovery over time, so you can fairly quickly

Bakkenpilotsuccesscouldseewaterfloodtestedinothertightoilplays

Page 37: New Technology Magazine - June 2011

Pure Energy Services523587-160

full page

new technology magazine | June 2011 35

feature

• Cased Hole Wireline • • FraC FloWbaCk & TesTing •

• Fiber opTiC dynamiC Well proFiling •

Pure energy ServiceS Ltd.1000, 333-11th Ave, SWCalgary, AB, Canada T2R 1L9 Phone: 403.262.4000 | www.pure-energy.ca

BritiSh coLumBia | Fort St. John aLBerta | Medicine Hat, Taber, Brooks, Strathmore, Red Deer, Provost, Vegreville, Bonnyville, Whitecourt, Grande Prairie, Fairview, High Level SaSkatchewan | Estevan, Swift Current

Pure energy ServiceS (uSa), inc.9635 Maroon Circle, Suite 420Englewood, CO, USA, 80112Phone: 303.708.0200 | www.pure-energy.us

coLorado | Grand Junctionwyoming | Evanstonnorth dakota | Dickinson, MinotPennSyLvania | McMurray

* Pure Energy trades on the TSX under symbol PSV

dynamic production profiling

dynamic Frac/injection profiling

dynamic in-situ profiling

Page 38: New Technology Magazine - June 2011

487551-4711JWN In-househalf-page horz

36 newtechmagazine.com

tightoil

zoom in on what type of recovery you are going to get in, say, a 10-year period.”

Permeability is one of the key parameters, he notes. “if you have a higher perm reservoir you’ll need fewer fracs along the horizontal. in these types of tight oil environments where you have a range from maybe 0.05 to 0.5 millidarcy, if your average perm is 0.5 versus 0.05, it makes a big difference on the number of fracs, just because the oil can move more easily through the reservoir.”

in a study of society of Petroleum engineers (sPe) literature of the Bakken and cardium plays, reynolds found a wide range of conclusions on optimum number of fractures. anywhere from three to more than 40 frac stages have been pumped in cardium and Bakken horizontal wells, he notes, with little consistency, even within the same operator, as to optimum frac stages.

in four sPe papers reynolds highlights for an upcoming tight oil conference presen-tation, he found the optimum frac spacing range should be between 90 and 150 metres, with three of the four suggesting about 150 metres is the optimum. his own analytical

modelling came to a similar conclusion.“i did some fairly extensive work in the

Bakken, some less extensive work in the cardium, and they are both indicating the same thing. for the Bakken — not the deep, high pressure north Dakota Bakken but more like the viewfield saskatchewan Bakken — optimum spac-ing is between 100 and 150 metres,” he says. spacing may need to be tempered by the operator's view of heterogeneities in the reservoir, as well as future possibilities of waterflood and eor operations. This may support some tighter frac spacing. The next question operators will be addressing is: are we happy with only 10 to 15 per cent recovery factors from producing these expensive wells by primary production?”

his study concluded that at both 0.5 and 0.2 millidarcy permeability, there was no advantage to pumping more than 10 frac stages (155 metre spacing) and that at 0.05 millidarcy permeability, optimum iP and reserves recovery was at 20 stages (74 metre spacing). no cases showed an advantage to applying more than 20 stages (closer than 74 metres), while optimum spacing for all permeability ranges was between 75 and 150 metres.

Data analysishaving performed the modelling work and

collected data in a busy season of drilling, ener-plus is in the midst of evaluating its results, hahn says. “We are taking the data that we have and plugging it back into our predictive work and trying to make sure, or confirm, where we need to adjust our approach on a go-forward basis. you calibrate what you have and you see if you can do better, or better understand what changes you want to make as you go forward, be it increasing your density, be it increasing proppant size or whatever other changes will optimize production.”

The company has come to some conclu-sions already, such as determining that using foam rather than a gelled water style of frac has its advantages. “The beauty of foams is, of your total fluids volume that you are pumping down there, only 15 per cent of it is water, so you are not pumping near as much water. from the water management side, that’s a positive, because you don’t have to dispose of as much water.”

however using foam, which is generally 85 per cent nitrogen, results in a lot of com-pressibility, hahn says. “so to predict what your hydrostatic pressure and friction are is very, very difficult.” a key diagnostic tool

Here’s a sneak peek at what’s coming up in the June issue:

Enjoying your copy of New Technology Magazine? Looking to EvEn furthEr Expand your

oil and gas knowledge?

Reporting on the Canadian oilfield service and supply sector, this magazine keeps readers regionally informed, covering important developments from northeastern British Columbia to the East Coast of Canada. Feature articles track the vital issues and technologies that impact the service sector as a whole.

pick up your issuE by EmaiLing [email protected].

to subscribE or to viEw our digitaL Edition, visit www.oiLandgasinquirEr.com

oilandgasinquirer.com

pick up thE LatEst issuE of New TechNology MagaziNe’s sistEr pubLication,

With over $40 billion invested annually, Canada is the second-largest service and supply market in the world. But Canada’s service industry has outgrown its domestic boundaries. In late 2011, the Petroleum Services Association of Canada released as study showing 36 Canadian companies exported over $12 billion in equipment and services in 2009.

— Excerpt from “Global Conquest” by Darrell Stonehouse

This month’s Oil & Gas Inquirer looks at which markets Canadian service companies are expanding into, and how they are beating the competition.

Page 39: New Technology Magazine - June 2011

Cathedral763102-74

half-page horz

therefore is a downhole pressure gauge at the point of fracking to get a reading on frac geom-etry. “you use that pressure to actually deter-mine what’s happening at the bottom. That pressure signature tells you lots about how your frac is growing, how much height you have and how much lateral length you have.”

“We have had some real good well results where we haven’t seen damage issues, and we have got very good and quick cleanup — we got the water out that we pumped.”

fracture spacing, which hahn says is a function of rock permeability, has been about 60 metres in generally 600-metre laterals in the viking, where hole stability is more of an issue, and about 125 metres in 1,000- to 1,200-metre laterals in the cardium.

it has been suggested that boosting the number of fracs is sometimes used as a strategy to inflate initial production (iP) rates, at a long-term cost to overall production. reynolds and hahn say it could have that effect.

“more fracs will give you higher iP but probably no higher cumula-tive recovery,” reynolds says. “if you put more fracs in early, those additional fracs interfere with each other quicker, so you get a higher decline and ultimately you will get about the same recovery you would have had with a lot fewer fracs.”

“more is not necessarily better. it may give you good iPs, but is there

economics to it if it stabilizes out at the same rate or an even lower rate?” asks hahn.

“Quite often when you pump bigger jobs you are just getting more vertical growth, so you are not getting more lateral exposure of your rock and thus you are not gaining anything. so there again the bigger hammer is not necessar-ily better, if there is no economics to it. you have spent more money to get a similar result.”

involved in the oilpatch since 1970, hahn says he has seen a tendency for the industry to go in stages up the learning curve, a pattern now repeated in tight oil plays. “The first one is the drilling side. We can almost drill anything now, so that is well up the learning curve. Then comes the completions, and then comes production and reservoir management, where i think there are a lot of things that we still need to grasp.

“We need to think about how we manage our wells, how we isolate areas in the horizontal, and the whole production aspect. it’s about setting up our wellbores such that we can do something with them later on because a lot of what we have now, in order to do intervention work or to do any kind of selectively shutting off zones or selectively producing zones, is quite costly. as an industry we need to look at setting up our wells with the right hardware and capabilities to do it a little cheaper down the road,” he says.

The major service companies are developing tools that will allow operators to remotely activate downhole tools to perform tasks such as shutting off or opening different zones from surface, he says, some in the early pilot stage. “i think that is where we have to go in some of these plays.” •

new technology magazine | June 2011 37

tightoil

“I think in general people are putting too many fracs into the ground, so they are spending too much capital. Over time,

people have migrated to tighter and tighter spacing — I saw some out there as close as 30- or 40-metre spacing.”

n: a merging of diverse elements into a unified whole

FUSIONMWD SYSTEMS

FU.SIONMWD

NOW HIRING CathedralEnergyServices.com/content/careers

Cathedral’s modular FUSION MWD System has taken the industry to a new level by offering leading edge components and capabilities into a single system providing communication, navigating target trajectory and accuracy. While data is being stored to memory, this system provides reliable performance in today’s aggressive drilling environment. Drilling + Completions

Page 40: New Technology Magazine - June 2011

Oil Sands and Heavy Oil Technologies809073-45full page

CONFERENCE & EXHIBITION

every drop counts

Calgary TELUS Convention Centre Calgary, Alberta, Canada

July 19 – 21, 2011

Today’s Technology for Tomorrow’s OilDon’t miss these opportunities at Oil Sands and Heavy Oil Technologies Conference & Exhibition 2011.

LEARN about new technologies unlocking the potential of a huge and challenging hydrocarbon resource.

DISCOVER how innovations in the Canadian oil sands improve environmental performance of all petroleum operations, everywhere in the world.

NETWORK with leaders from companies working on the rapidly advancing frontier of energy supply.

SHARE your expertise and business acumen with decision-makers developing technology today for oil tomorrow.

The conference will cover the full spectrum of technologies crucial to production, processing, and environmental remediation, with plenary sessions on nontechnical issues and specific projects.

The exhibition will include key players in the industry displaying the latest technologies and products.

Register today at www.oilsandstechnologies.com

Want More? Register for the specialty forums on sulfur management, geophysics, and the basics of oil sands and heavy oil.

Owned & Produced by: Presented by:

Page 41: New Technology Magazine - June 2011

new technology magazine | June 2011 39

Tools aNd TechNIQUesnew tech

a neW sTimulaTion TechniQue for optimizing carbonate oil wells has been showing impressive results with previously under- performing wells in mississippian formations in southeast saskatchewan.

over the last few years, beginning in 2008, sanjel corporation’s new technique has been applied in the frobisher, frobisher-alida and midale forma-tions in older fields in the region, some of which first began producing in the mid-1950s.

“The technique is applicable to any carbonate formation that’s completed openhole. it hasn’t been tried yet specifically on gas wells but it’s applicable to them,” says chris medhurst, an engineering technologist and team leader for canadian acidizing at sanjel.

several companies have been using the tech-nique, called sanstim, on openhole horizontals. for one group of 15 wells, which received the sanstim treatment in 2008 and 2009, the average initial well production “increased about three times the normalized monthly production,” according to a paper by medhurst. The produc-

tion range of the wells improved from 200 to 500 barrels per month to 500 to 1,500 barrels per month post treatment.

“Better performing wells have shown the increased production rates stabilize over a five to six month post-treatment period,” stated the paper, which provided the basis for a PowerPoint presentation at the caDe/caoDc drilling conference in calgary in may. it also noted that, “The payout period of the treatment averaged two to three months, depending on commodity pricing and well response from the treatment.”

sanstim involves a process in which acid — typically 15 per cent hydrochloric acid — is pumped through nozzles on a tool at the end of a coiled tubing string.

The new technique combines key elements of two traditional treatment processes for stimulat-ing wells. one is matrix acidizing, used for stimu-lating oil wells. in this, hydrochloric acid is either placed at the formation face in order to soak it or is put under pressure in order to penetrate further into the formation.

POWERFUL COMBINATIONSanjel’s SanStim, which brings together matrix acidizing and abrasive jetting in one tool, has bolstered production in some wells up to three times over normalized monthly rates.

PRODUCTION

ProductionBoostNew stimulation technique holds promise for under-achievers in mature carbonates

Illus

tratio

n co

urte

sy o

f San

jel C

orpo

ratio

n

Page 42: New Technology Magazine - June 2011

London Business Conferences830311-21

half-page horz

40 newtechmagazine.com

in the other process, known as abrasive jetting, fluid carry-ing abrasive material such as sand is forced through nozzles, “jetting radially towards the casing or openhole. The kinetic energy of the sand particles induces erosion and penetration into the formation, bypassing near wellbore damage,” accord-ing to medhurst’s paper. recent applications of the sanstim process have omitted the use of abrasives, with the acid content acting to dissolve the carbonate formation.

The sanstim technology marks a refinement of a tech-nique first tried on two wells in southeastern saskatchewan in 2003. Data from those initial treatments suggested that too much acid had been pumped, resulting in excessive treatment costs and stimulation of unde-sirable zones.

The two wells, a and B, had pre-treatment water cuts of 75 and 96 per cent, respectively. Well a was suspended a month

after the treatment was per-formed, despite tripling produc-tion over the previous three months. Well B was put on production after completion and continued with a water cut in the 90-per-cent range. as medhurst’s paper notes, “Well B continued to produce from 300 to 500 barrels of oil per month with a continued

increase in water cut to 100 per cent by fall 2008.”

With one of the two wells shut in within a month, data was effectively limited to one well. But the technique looked prom-ising. it had shown that it could either erode or dissolve near-wellbore damage and result in 1.5 to two times the normalized production rates.

new tech

WELL REVIVALCoiled tubing equipment deploys Sanjel’s SanStim system into carbonate formations completed openhole. The technique has primarily been used in southern Saskatchewan, in formations such as the Frobisher, Frobisher-Alida and Midale where production dates back as far as the 1950s.

Phot

o co

urte

sy o

f San

jel C

orpo

ratio

n

TIGHT OILCardium, Viking, Bakken and Beyond

CANADA 2011June 22-23, 2011Calgary TELUS ConventionCentre, Calgary, Canada

Organized by 90% of

Attendees from

E&P Operators

Book Now

Register Now!Visit www.tight-oil-canada.com

Media Partner

Incorporating Best Practice Geological And DrillingMethodologies With

Cost-Effective Completions Strategies &Technologies For Maximizing RecoveryIn Canada’s Tight Oil Plays

Page 43: New Technology Magazine - June 2011

dmg events450403-405

half-page horz

JUNE 7-9, 2011 CALGARY, ALBERTA, CANADA

STAMPEDE PARK

GET CONNECTED WITH NORTH AMERICA’S OIL & GAS INDUSTRY ATCANADA’S LARGEST ENERGY EVENT OF THE YEAR

gasandoilexpo.com

THE EXHIBITIONIndustry professionals

attend free.• Indoorandoutdoordisplaysofthe

latesttechnology,equipment,productsandservicesfromover500companies

• Businessdevelopmentandtechnologypresentations

• Specializedexhibitareasincludingshalegas,oilsands,health&safetyandmore

THE CONFERENCEA flexible and value-packed program.

Rates start at $165.• OpeningPlenaryaddressingthecurrentdebateonenergy

policyreform—includedforallconferencedelegates

• Technicalandbusinesssessiontopicsincludinggasmarketoutlook,drilling&completions,NDT&inspection,cleanbitumenoperationsandmore

• Sharedpassesavailablefor3delegates

• Full,OneDayandHalfDaypassesavailable

Major Exposition Sponsor: Official Data Communications Sponsor: In Conjunction with: Official Media Partner:

REGISTER NOW FREEgasandoilexpo.com

Enter Promo Code G2N

Enhance your experience.Lunch & Keynote Presentation:EzraLevant,Ethical Oil.June7.Tickets$55each.

Networking: CasinoNightReception.June7.Tickets$50each.

Education: Shortcourses.June6.

Design tweaksabout five years later, med-

hurst began looking at the data on the 2003 treatment wells as interest in southeast saskatch-ewan was rebounding because of increasing commodity prices and the region’s high quality oil. also, he says, by 2009, capital was tight but companies wanted more production from their fields in the region. “There was a need to look at cost-effective ways to improve production without drilling or fracking,” he says.

he noticed that the openhole volume had increased by nearly 20 per cent as a result of the treatments. “This was mostly as a result of the fluid, not the acid. so if smaller nozzles had been used, the wells could have been washed out with less acid. There was still excess dissolving capac-ity because of the amount of acid that had been used,” he says. he concluded that the critical factor in improving production in the 2003 treat-ments was “the higher than

normal velocity” of the fluid jets.These observations led to

tweaking some key design concepts. The changes would ensure that fluid velocity was maintained but enable a reduc-tion in fluid volumes by as much as 60 per cent — and cut costs. also, says medhurst, “The jetting tool is designed to fit down the wellbore with very little stand-off from the rock face.”

for the next stage in a pro-gram to further develop and improve the technique, a dozen wells were selected for treat-ments in 2008. Two were excluded as outliers, leaving 10 wells. “all of the remaining 10 had been in production for

a minimum of two years,” says medhurst.

other key criteria for the candidate wells were water cuts below 65 per cent, highly solu-ble carbonate formation, under-performance and good forma-tion pressure.

results from the initial 10 wells have been good. They were located across three fields in the frobisher-alida and midale formations — and there’s now substantive post-treatment data. “averaged over two years, the 10 wells have had an 86-per-cent increase in pro-duction,” says medhurst.

Part of successfully imple-menting a sanstim treatment entails selecting the right inter-

vals of the horizontal leg. in addition, the annulus can be left open to observe reaction to the treatments so adjustments can be made on the fly.

nal resources limited has been using sanstim for about a year and has treated nine wells so far. “We’re getting increased oil and gas from the wells,” says Paul skoczylas, a production technologist at nal. “When you set out an expectation for each job, you have a number in mind, and this exceeded expec-tations, averaged out over the nine wells. my best case tripled oil production and doubled gas production. all the wells are in southeastern saskatchewan.”

nal wells have been treated with sanstim across seven fields and in three different forma-tions, skoczylas says. “so, we have a wide range of data.” •

Godfrey Budd

CONTACT FOR MORE INFORMATION

Ken Berg, Sanjel, Tel: 403-269-1420,

Email: [email protected]

new technology magazine | June 2011 41

new tech

“Thetechniqueisapplicabletoanycarbonateformationthat’scompletedopenhole.Ithasn’tbeentriedyetspecificallyongaswellsbutit’sappli-cabletothem.”

Page 44: New Technology Magazine - June 2011

42 newtechmagazine.com

new tech

The irony is noT losT on Jim Graham, associate professor emeritus, who spent 25 years at the university of calgary trying to promote the diversification of alberta’s economy away from overreli-ance on the oil and gas industry.

“i taught entrepreneurship and new ventures at the faculty of management and all of our funding was dependent upon diversification away from the oil and gas industry,” he says.

and now, 15 years after retir-ing from the u of c, Graham is product development manager for calgary-based Trido indus-tries inc., which is involved in that most basic of oil and gas related areas — pumps used in the upstream sector.

however, he’s quick to point out there is something transfor-mative about the technology that Trido has developed; it’s based on a solar-powered sys-tem developed for nasa.

“our primary product is the activator for the chemical injec-tion pumps used in the indus-try,” he says. “up to now solar-driven pumps have been unreliable and expensive to operate, but our system is both reliable and cost-efficient.”

Based on a technology licensed by calgary-based tech-nology firm General magnetic, headed by former calgary mayor al Duerr, it was devel-oped at the university of sas-katchewan for a futuristic space elevator project nasa sought proposals for. That project was based on a concept popularized by science fiction writer arthur c. clarke, who visualized a cable stretching to upper earth’s orbit as an alternative to rockets.

But it turns out the technol-ogy works on more practical applications as well, such as Trido’s solar-powered chemical injection pump. Thousands of pumps are used annually in the industry, particularly for natu-ral gas production, and the industry spends hundreds of millions a year on them.

in canada, various chemicals need to be pumped into the reservoir to prevent liquids-prone gas from freezing, while corrosion and other reservoir-plugging problems must also be prevented no matter where geographically the gas is being produced.

operators also need to pump emulsifiers into the reservoir to

prevent the gas, as it cools or as pressure drops, from plugging up the well.

Trido’s activators can be attached to any one of the doz-ens of conventional pumps used industry-wide. “We use any of the standard fluid ends,” Graham says. “The same com-panies that service any pumps

that are standard in the industry can service our units.”

But Trido’s solar-powered pumps certainly don’t operate like conventional systems, he says. While the activators start out being more costly than conventional systems — at $7,000 they’re perhaps 40 per cent more expensive — Graham says the lifecycle costs of the systems lead to substantial savings for producers.

for the most part, conven-

tional pumps are powered by fuel gas. “a diaphragm at the end of the pump takes gas from the well, under water pressure, using a valve system,” he says. “But the problem with those conventional systems is they’re unreliable. it’s difficult to get them to run or stop as fast as operators want.”

Wells often freeze up or seize up. conventional systems also release methane gas into the atmosphere, a major greenhouse gas (GhG), contributing about 15 per cent of the GhGs the canadian oil and gas industry produces. no methane is released with Trido’s systems.

upstream fuel gas-driven instruments vent three billion cubic metres of methane annu-ally, equivalent to about 6.5 million tonnes, and conven-tional chemical injection pumps account for 60 per cent of that.

“There are about 100,000 to 150,000 of these conventional pumps in the Western [cana-dian] sedimentary Basin at any one time,” says Graham. “i’ve been in areas where there have been as many as six pumps in one well.”

Efficiencies gainedin addition, the conventional

systems use perhaps 15 per cent of the gas from the well.

Trido’s solar technology provides reliability beyond any conventional systems and also, because the units don’t use gas from the well, there are major savings, since that gas can be marketed.

solar-powered systems have been used in the industry for many years, but they have not

PRODUCTION

Efficient,Accurate,GreenNASA-inspired technology applied to the humble oilfield pump

“Thereareabout100,000to150,000oftheseconventionalpumpsintheWestern[Canadian]SedimentaryBasinatanyonetime.I’vebeeninareaswheretherehavebeenasmanyassixpumpsinonewell.”

SPACE-AGE TECHNOLOGYTrido Industry’s solar-powered oilfield pumping system, left, is based on an activator, above, originally created as part of a NASA project to build a space elevator.

Page 45: New Technology Magazine - June 2011

new technology magazine | June 2011 43

new tech

The reTrofiTTeD plane looks, to put it bluntly, like an anteater. But inside the flying laboratory is the latest technology for high-grading undiscovered oil and gas deposits — at a fraction of the cost of conventional methods. “our technology is much less expensive than traditional exploration,” says russ Duncan, principal of calgary-based sky hunter exploration ltd. “running a 3D seismic survey over an area the size of a township can cost $8 million. a 2D survey can cost $1.2 million. it costs around $100,000 to do a skydrocarbon survey.”

skydrocarbon is an airplane-mounted hydrocarbon explora-tion system that measures molecular anomalies that form in the atmosphere directly above untapped oil and gas deposits. using the technol-ogy, petroleum companies can explore over large tracts of land quickly, efficiently and affordably.

The oilpatch, of course, has had more than its fair share of eccentric inventors promising pie-in-the-sky results from magic black boxes. The pro-moters of skydrocarbon, how-

ever, have long pedigrees in the sector. russ Duncan is a professional engineer with a degree from the university of alberta and has spent four decades working as a petro-leum engineer and executive at ocelot energy inc., Para-mount resources ltd. and newalta corporation. his partner at sky hunter, Ken-neth Bradley, is a professional geologist, also with a degree from the u of a. over the last three decades, he has served as a geologist and executive with Tenneco oil of canada ltd., Bonanza oil & Gas inc. and Prism Petroleum inc.

other companies have devised various versions of aerial molecular survey sys-tems in the past. several years ago, shell began to develop its own proprietary system called light Touch, which measures airborne methane.

The concept for skydrocar-bon emerged several decades ago, when an australian mining engineer (who asked not to be identified by name in the press) discovered that minute traces of hydrocarbons existed in the air. he developed a rudimentary airborne system as a hobby, but

never ran it as a business to detect hydrocarbon deposits. While in canada, he met Brad-ley, who was intrigued enough with the concept to co-found sky hunter with Duncan in the late 1990s in order to commer-cialize the idea.

How it worksThe theory behind skydro-

carbon is relatively simple. it has been known for over a decade that small amounts of hydrocarbons seep through the caps on conventional reservoirs. as they rise to surface, the molecules become negatively charged. The negatively-charged molecules emerge into the atmosphere at sufficient rate that, even with wind dispersal, a small, but measurable plume remains over the reservoir.

Working with richmond, B.c.-based macDonald Dettwiler & associates ltd. (the inventors of the can-adarm), sky hunter has devised a plane-mounted plasma unit that can detect and measure the negatively charged particles. flying at a height of 100 metres, the airplane scoops air samples once per second and feeds them into the unit,

been widely adopted because they, too, have not been reliable.

“That’s because the solar systems that have been used in the past start and stop a lot and use a lot of power,” Graham says. “But our motor, which draws less than three amps, uses less power and can be operated as part of a scaDa [supervi-sory control and data acquisi-tion] system, a computerized control system that allows for great accuracy.

“With our system you achieve more accuracy, substan-tially reduce the GhGs you release, use lower quantities of chemicals and you also have the gas to sell,” he says.

Three-year-old Trido has had a number of its units used in trials and recently shipped 15 of them. Because of that operating history, including one study of 300 wells, the company can provide statistics that prove the systems work, he adds.

conventional systems lead to about 60 per cent of the wells being over-injected and 40 per cent being under-injected, but Trido’s system virtually eliminates that inef-ficiency. “our system achieves about 94 per cent efficiency,” says Graham.

Trido’s technology is slowly being adopted but he says the industry needs to abandon its past negative experience with solar power. “The indus-try has heard the solar pitch before, but our technology is different.”

Privately-owned Trido is a family affair, with Graham’s son, russell, being president. Their partner is clint mason, a well-known oilfield service industry entrepreneur, who is partnered with russell in cal-gary-based axiom Well solu-tions inc., an innovative pro-vider of wireline and surface oilfield services. • Jim Bentein

CONTACT FOR MORE INFORMATION

Jim Graham, Trido,

Tel: 403-620-2919,

Email: [email protected]

EXPLORATION

SkyHighA new exploration technology hopes to uncover untapped resources

NOSE SCOOPSky Hunter Exploration’s Skydrocarbon hydrocarbon detection system uses an aircraft-fitted air intake device to scoop air samples that can be analyzed for molecular anomalies indica-tive of subsurface oil and gas deposits.

Page 46: New Technology Magazine - June 2011

44 newtechmagazine.com

new tech

which measures negatively-charged dry gas, propane and pentane molecules. By flying back and forth in a grid pattern, the plane collects a sizeable number of data points over the target area. The data points are compared as percentages of strength of signal to back-ground (around 14 parts per million in alberta); anomalies show up as contoured blips.

in 2006, sky hunter ran a test survey over the Peerless region of northern alberta, home to several Devonian Keg

river reef fields. oil wells sup-plied control points over known reefs that correlated to anoma-lies, but the survey also turned up several anomalies where no one had ever drilled before. “We ended up selling a set to a company that is now trying to raise money for an exploration project,” says Duncan.

There are minor constraints to running a skydrocarbon survey; skies must be clear

(moisture from rain and snow fouls the sensors) and calm (flying at 100 metres altitude in winds over 40 kilometres per hour is dangerous). other than that, the sky’s the limit. “We can fly any time of the year, and even run surveys over water,” says Duncan.

also, older reservoirs do not show up on surveys. as reser-voirs are produced, their pres-sures decrease to the point where there is insufficient dis-charge of negatively-charged molecules to form an atmo-

spheric plume; the technology only works on untapped reser-voirs. “When shell discovered the Tay river gas field west of rocky mountain house a few years ago, we flew a survey before they started producing, and it showed up,” says Duncan.

sky hunter is under confi-dentiality agreements and can-not divulge potential clientele or results of preliminary work in detail, but various indepen-

dent industry veterans have examined the system. Paul moller, a former geologist, is a director of cornerstone capital, a merchant bank based in Toronto. several years ago, he was asked by sky hunter for advice regarding commercializa-tion of the technology. “i cannot comment as an expert on the technology, but it certainly looked like it had a lot of merit,” he recalls. “i recommended to certain oil companies that i work with that they look at it and test to see what validity it has.”

skydrocarbon has also passed under the watchful eye of Petroleum Technology alliance canada (PTac), a not-for-profit association that facilitates collaborative research and development in the oilpatch, matching promising ideas to industry supporters.

Bruce Peachey is a profes-sional engineer contracted with PTac as a technical advisor to help evaluate new ideas. “our main role is to facilitate good ideas moving forward, to help develop them to commercializa-tion,” he notes. Peachey first learned of sky hunter’s system four years ago, when the com-pany contacted PTac with their concept. “When someone approaches us, we don’t have the budget to run lab tests, but we do conduct an assessment of the idea and the people.” Peachey liked what he saw. “The princi-pals at sky hunter had lots of experience in the oilpatch, a good reputation and a plan to develop their idea with all of the right people involved.”

PTac annually sets up a technical forum in which small to medium sized companies can make pitches of their ideas and products to larger oil firms. “We invited them to our show-case in march 2011,” says Peachey. “a number of produc-ers were interested.”

Why use it?not surprisingly, in a conser-

vative industry like o&G, sky-drocarbon has had few takers.

“for the first nine years, industry reception was cool,” admits Duncan. “But, now that we have applied for a patent, we can explain the technology and people under-stand what we’re doing.”

many different types of com-panies and plays can benefit from the technology. “let’s say you’re a large company with a five-township lease in an area with very little well control,” says Duncan. “you want to high-grade the land and find some sweet spots. skydrocarbon can show the presence of untapped reservoirs. you can then focus your seismic on those sweet spots.”

smaller companies often invest in areas where they have good well control, but want to know which way a trend of untapped reserves is going. “They may be looking for chan-nels, pinch-outs or structural trends; they can run a survey and match to what they know,” says Duncan.

all companies benefit in greater employee efficiency. “everybody is having a tougher time these days with people resources,” says Duncan. “When it comes to evaluating prospects, you don’t want peo-ple focusing on land with low likelihood of success.”

Duncan hopes to have pay-ing clients in the near future. “We will have a plane in the air by mid-summer,” says Duncan. “in the meantime, we are talking to different opera-tors, including a group that has a history of doing specula-tive surveys.”

But the proof, as they say, will be in the pudding. “The only way to really test it is in the field,” says Peachey. “The potential benefit is so huge that you can’t ignore it.” •

Gordon Cope

CONTACT FOR MORE INFORMATION

Russ Duncan,

Skydrocarbon,

Tel: 403-228-2175 ext 208,

Email: [email protected]

MICROSEEP DETECTIONMap shows oil and gas footprints detected by Sky Hunter Exploration’s Skydrocarbon technique, which the company says validates prospective areas.

Page 47: New Technology Magazine - June 2011

IBC - full page418451-812

Baker Hughes Canada Company

we are the people of Baker Hughes.

and we have solutions for optimizing your heavy oil production.

www.bakerhughes.com

Baker Hughes artificial lift solutions offer an expanded line of progressing

cavity pumping and electrical submersible progressing cavity pumping

systems specifically designed to provide longer run time, lower

intervention costs, and increased production in heavy oil wells.

Our specialty chemical programs further enhance heavy oil production

by improving fluid lift efficiency and minimizing production disruptions

downhole and at surface processing facilities. We have a wide range of

chemicals and additives that eliminates emulsions, scale, and corrosion;

reduces fluid viscosity; lifts sand and fluids; and allows you to manage

your assets with confidence.

To learn how we deliver the right lift

mechanisms and chemical programs to

maximize production and extend the life

of your wells, contact your Baker Hughes

representative or visit us at

www.bakerhughes.com/canada

© 2011 Baker Hughes Incorporated. All Rights Reserved. 32532

Page 48: New Technology Magazine - June 2011

OBC - full page561016-232

Weatherford Canada Partnership

The change will do you goodSM

weatherford.com

Weatherford is now renting PowerLineTM performance motors. High power. High torque. High Steerability. High ROP.

© 2

011

Wea

ther

ford

. All

right

s re

serv

ed. I

ncor

pora

tes

prop

rieta

ry a

nd p

aten

ted

Wea

ther

ford

tech

nolo

gy.

Change Your Power Source

PowerLine motors deliver almost double the operating torque and power output of standard motors thanks to our proprietary high-performance elastomer and proprietary high-torque-capacity bearing section.

Stalling is essentially eliminated under normal operating conditions.

Steerability and bit performance are superb.

High ROP and smoother boreholes are assured.

To ensure best performance every time, our motors are tested on the dynamometer before they are shipped. All PowerLine motors are equipped with a rotor catch to enable the motor to be retrieved if needed.

Weatherford has a solid track record of more than 12 years in the field with over 2,600 units deployed worldwide. We put our reputation on the line with every PowerLine motor we rent, so you can count on high-quality products and support—and high performance. Contact a Weatherford representative at 403.693.7653.

Drilling

Evaluation

Completion

Production

Intervention

• Directional & performance drilling - Adjustable gauge stabilizers - Coiled-tubing-drilling BHAs - Directional surveying & survey management - Steerable drilling motors - Well planning & engineering

• MWD• Rotary-steerable systems

Drilling Services