Top Banner
New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सस सस सस सस सस सस सससस सससस ससससस Cmpdi (A Miniratna company)
19

New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Dec 15, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

New Technology and Challenges for Underground Coal Mining

B.N. BasuDirector (CRD)

CMPDI

सी� एम पी� डी� आई एक मिमनि� रत्� क� पी��Cmpdi (A Miniratna company)

Page 2: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Coal Production from underground Coal Mines

Coal mining is carried out by Surface or ‘opencast’ mining Underground or ‘deep’ mining

Around 60% world coal production comes from underground mining

India emerged as the largest coal producer in the world after China and USA, producing about 9% of the total global production

From U/G China USA and India produce about 95%, 33% & 10% respectively

Page 3: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Trend Coal Production from CIL mines (1974-75 to 2011-12)

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

500.00

Year

Co

al P

rod

uct

ion

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

TOTAL OC Mines UG Mines

Page 4: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Different Mining Methods used in CIL UG mines

Conventional Bord & Pillar (B&P) system with manual loading of coal onto tubs.

Semi-mechanised B&P system with loading by Side Discharge Loaders (SDLs) or Load Haul Dumpers (LHDs) or mechanised drilling by Universal Drilling Machines (UDMs).

Mechanised Bord & Pillar/ Room & Pillar system with Continuous Miners (CMs).

Mechanised Powered Support Longwall (PSLW) mining system.

Methods with hydraulic stowing technology in conjunction with sand or alternative filling.

Special methods (i.e. site specific methods), like Blasting Gallery (BG) method, Cable bolting method, wide-stall method, steep mining methods, etc.

Page 5: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Technology-wise Underground Coal Production in CIL (2011-12)

32.31, 85%

3.54, 9%

1.79, 5%0.32, 1%

0.18, 0%

0.1, 0%

0.15, 0%

B&P Intermediate technology Roadheader (LW Dev.) PSLW Shortwall (in B&P)

Highwall Mining Continuous Miner Conventional B&P (& Others)

Page 6: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Application of Mass production Technologies

Continuous Miner Technology (Bord/Room & Pillar)

Powered Support Longwall Technology

Page 7: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Continuous Miner technology presently in operation in CIL mines

Jhanjra, ECL – Joy Continuous Miner Sarpi, SECL – Joy Continuous Miner Tandsi, WCL - Joy Continuous Miner Kumberkhani, WCL- Sandvik LCCM NCPH, Chirimiri, SECL- Joy Continuous Miner Sheetaldhara-Kurja, SECL- Bucyrus Continuous

Miner Pinoura, SECL- Bucyrus Continuous Miner Rani Atari- Sandvik LCCM

Page 8: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Continuous Miner technology proposed in CIL mines

Jhanjhra, ECL- MOU has been signed Tilaboni, ECL - Under tendering Kottadih, ECL- Under tendering Block-II, BCCL- LOA has been issued Lohapatti, BCCL- Bids under scrutiny Saoner-I,WCL- Under re-tendering Churcha, SECL- LOA has been issued for two sets

Page 9: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Continuous Miner

Page 10: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Shuttle Car & Quad Bolter

Page 11: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Proposed Power Support Longwall Technology (PSLW) in CIL mines

Jhanjhra, ECL- Agreement has been signed Moonidih seam XVI, BCCL- Bids under scrutiny Moonidih seam XV, BCCL- LOA has been

issued Muraidih, BCCL- Agreement has been signed

with L1 Kapuria, BCCL- LOA has been issued

Page 12: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Shearer working at Longwall face

Page 13: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Shearer Drum

Page 14: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Powered Roof Supports (Two Legged)

Page 15: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Challenges of Underground Mining in CIL mines

UG operations at shallow depth has given way to quarry or surface mining

Closure of number of underground mines due to exhaustion of coal reserve or losses

Reduction or stagnation in production due to attrition of workforce or natural retirement

Reduced production and productivity due to old, long & arduous mines Low technological, R&D or skill-development input in underground

mines A number of underground mining operations or processes involve

human effort or drudgery Low productivity of manpower Geological disposition and exploration of coal seams has also affected

indirectly

Page 16: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Other Constrains and challenges in U/G Mines

Size of the Mine / block Geological Complexities and Exploration Mine Approach & Development : high gestation period Technological Development & Implementation Absorption of Technology – Skill development Strata Management & Control Mechanization – Productivity Enhancement Needs Equipment Supply & Maintenance – Vendor Development Long & Arduous Travel / tramming routes – Man-riding /

Material Supply Mining hazards Technological Gap – Focus on Specific R&D

Page 17: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Renewed Focus on Underground Mining

Aiming from 10% to 30% coal production by 2030 Introduction of Mass-production Technology in

large scale Sharing of specific technology with other

countries Focusing on Specific R&D projects

Page 18: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A

Alternative Underground Coal Mining Technologies

Underground Coal Gasification Coal bed Methane

Page 19: New Technology and Challenges for Underground Coal Mining B.N. Basu Director (CRD) CMPDI सी एम पी डी आई एक मिनि रत्न कंपनी Cmpdi (A