- - - N Y NIAGARA hU MOHAWK Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Nine Mile Point Nuclear Power Station THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Prepared For Nine Mile Point Nuclear Power Station P.O. Box 63 Lycoming, New York 13093 Commercial Service Date: December 26,1969 NRC Docket Number: 50-220 Document Number: NMP1-lSI-003-10 Revision Number: 0 Date: October 15,1999 Prepared by: IJCd 7 CAMP1 - ISI Program Manager Approved by: / ie/ Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: - 6' /C 7 V Wilfiam Y7aeer - Bra ch Manager, Engineerin Serv es
289

New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

Oct 10, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

- - -

N Y NIAGARAhU MOHAWK

Niagara Mohawk Power Corporation300 Erie Boulevard West

Syracuse, New York 13202

Nine Mile Point Nuclear Power StationTHIRD INSERVICE INSPECTION INTERVAL

TEN-YEAR INSERVICE INSPECTIONPLAN AND SCHEDULE

Prepared For

Nine Mile Point Nuclear Power StationP.O. Box 63

Lycoming, New York 13093

Commercial Service Date: December 26,1969

NRC Docket Number: 50-220

Document Number: NMP1-lSI-003-10

Revision Number: 0 Date: October 15,1999

Prepared by: IJCd 7CAMP1 - ISI Program Manager

Approved by: / ie/Glenn R. erkins -Supervisor ASME Sectioh Xl Programs

Approved by: - 6' /C 7 VWilfiam Y7aeer - Bra ch Manager, Engineerin Serv es

Page 2: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N V NIAGARA NUCLEAR POWER STATIONn U MOHAWK_

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 2 of 40

TABLE OF CONTENTS

Table of Contents ............ 2

Record of Revision ............ 5

Abstract..................................................................... 6

1.0 Introduction. 7

1.1 Inspection Interval. 71.2 Inspection Periods. 71.3 Applicable Documents. 71.4 Applicable Code Edition and Addenda .10

2.0 Development of Inspection Plan .12

2.1 Class 1 Systems/Components .122.2 Class 2 Systems/Components .122.3 Class 3 Systems/Components .122.4 Class 1, 2, 3 Component Supports .122.5 Substitute Examinations .122.6 Nondestructive Examinations .122.7 Weld/Support Location Maps .132.8 Ultrasonic Calibration Blocks .132.9 Weld Identification .13

3.0 Records .16

3.1 General .. 163.1.1 Scheduled Examination Tables .163.1.1 Inspection Zones .163.1.3 Code Item Classification .163.1.4 Inspection/Examination Table Contents .16

3.2 Final Reports .. 173.3 ISI Summary Report .. 17

File: NMP1 ISIPL.wpd

Page 3: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N V NIAGARA NUCLEAR POWER STATIONNU MOHAWK I

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 3 of 40

TABLE OF CONTENTS - Continued

4.0 Class 1 Tables .......... 19

00.001.031.032.033.036.037.038.039.040.042.144.1

Reactor Pressure Vessel ......Main Steam .................Feedwater System ...........Reactor Recirculation SystemReactor Clean Up ...........Reactor Instrumentation .......Reactor Drain & Vent .........Reactor Shutdown Cooling .....Emergency Condenser SystemReactor Core Spray System ....Liquid Poison System .........Control Rod Drive System .....

... .. ..... 1 thru 83........ .84 thru 90........ .91 thru 97

.98thru 130

.131 thru 135

.136 thru 137

.138thru 143

.144 thru 147

.148 thru 156

.157 thru 171

.172 thru 173

.174 thru 177

5.0 Class 2 Tables ...........- 20

02.003.039.044.280.081.093.0

Main Steam System ................Main Steam System ................Emergency Condenser System .......Control Rod Drive System ...........Reactor Containment Spray System ...Reactor Core Spray System ..........Reactor Containment Spray System ...

..................... .177 thru 179..................... 180 thru 181..................... 182thru 196

..................... .197thru 198

..................... .199 thru 210

..................... .211 thru 222..................... 223 thru 225

6.0 Class 3 Tables .................. 21

38.039.054.057.070.072.093.0

Shutdown Cooling Water System ...............Emergency Condenser System ................Spent Fuel Pool Cooling System ...............Spent Fuel Pool Cooling System ...............Reactor Building Closed Loop Cooling System ....Emergency Service Water System ..............Reactor Containment Spray System ............

............ .226 thru 226

............ .227 thru 223............ 228 thru 235

............ .236 thru 236

............ .237 thru 242............ 243 thru 244............ 245 thru 248

APPENDICES

ABCDE

Acceptance Criteria ............................................Nondestructive Examination Procedure Listing ......................Ultrasonic Calibration Blocks .....................................Class 1, 2, and 3 Weld/Support Location Maps ......................ASME Code Cases ............................................

........ 22

........ 24

........ 26

........ 33

........ 38

File: NMP1 ISIPL.wpd

Page 4: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N v NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 4 of 40

TABLE OF CONTENTS - Continued

LIST OF FIGURES

2-12-22-33-1

Tee Weld ID ...................Elbow weld ID .................Reducer weld ID ...............Inservice Inspection Schedule .....

. .. .. .. .. .

. .. .. .. .. .

. .. .. .. .. .

........ 14

........ 14

........ 15

........ 18

LIST OF TABLES

1-2A-1A-2A-3A-4

NMP1 Inservice Inspection Periods .........Class 1 Acceptance Standards .............Class 2 Acceptance Standards .............Class 3 Acceptance Standards .............Component Support Acceptance Standards ...

. .. .. .. .. .

. .. .. .. .. .

. .. .. .. .. .

. .. .. .. .. .

. .. .. .. .. .

...........

...........

...........

........ 22

........ 23

........ 23

........ 23

File: NMP1 ISIPL.wpd

Page 5: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

v NIAGARA NUCLEAR POWER STATIONN U MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 5 of 40

0 October 15, 1999 EntireDocument

Ten-Year Inservice Inspection Plan andSchedule for the 3 RD Ten Year InserviceInspection Interval

File: NMP1 ISIPL.wpd

Page 6: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N T NIAGARA NUCLEAR POWER STATIONLAu MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paoe 6 of 40

ABSTRACT

This document provides the Third Interval Ten-Year Inservice Inspection Plan and Schedule for Nine MilePoint Nuclear Power Station, Unit 1.

The Schedule identifies those components and/or systems (including supports) which are classified QualityGroup A, B and C (ASME Code Class 1, 2, and 3, and have been selected for nondestructive examination,as set forth in the ASME Boiler and Pressure Vessel Code, Section Xl, 1989 Edition, no Addenda, to theextent practical within the limitations of design, geometry and materials of construction of the componentsas stated in 10 CFR 50.55a (b)(2).

Where an examination required by Section XI is determined to be impractical, the basis for thisdetermination is included in the Nine Mile Point Inservice Inspection Program, in the form of a Request forRelief.

Tables for each system subject to examination are included within this document, and provides Codeclassification, Code examination category, Code item number, component identification and description,examination method, and where within the Third Ten-Year Inspection Interval and period the componentis scheduled to be performed.

File: NMP1 ISIPL.wpd

Page 7: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

V NIAGARA NUCLEAR POWER STATION

NU MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 7 of 40

l

1.0 INTRODUCTION

This document details the Third Interval, Ten-Year Inservice Inspection Plan and schedule forselected components, welds, supports, bolting, pump casings, valve bodies, and reactor pressurevessel internals for the Nine Mile Point Nuclear Power Station, Unit 1.

Niagara Mohawk Power Corporation (NMPC), is the Owner of Record.

The Commercial Service Date for the Nine Mile Point Nuclear Power Station, Unit 1 is December26,1969.

1.1 Inspection Interval

The Third Inservice Inspection Interval becomes effective on December 26, 1999 and isscheduled to end on December 25, 2009.

1.2 Inspection Periods

The Third Inservice Inspection Interval is divided into three successive inspection periodsas determined by calendar years of plant service within the inspection interval. Identifiedbelow are the period dates for the third inspection interval as defined by Inspection Program'B".

In accordance with IWB-2412(b) the inspection period specified below may be decreasedor extended by as much as 1 year to enable inspection to coincide with NMP1's plantoutages.

TABLE 1-2NMP1 INSERVICE INSPECTION PERIODS

INSPECTION PERIOD START PERIOD END REFUEL REFUELPERIODS DATES DATES OUTAGE OUTAGE

YEAR

1 December 26, 1999 December 25, 2002 RFO-16 2001

2 December 25, 2002 December 26, 2006 RFO-17 2003RFO-18 2005

3 December 26, 2006 December 25, 2009 RFO-1 9 2007

* The plant operating license is currently scheduled to expire on August 22, 2009.

1.3 Applicable Documents

The Third Inservice Inspection Program for Quality Group A, B, and C (ASME Code Class 1,2 and 3), systems and components (including their supports) was developed after giving dueconsideration to the following documents and subject to the limitations and modifications listed

File: NMP1 ISIPL.wpd

Page 8: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

NV NIAGARA NUCLEAR POWER STATION

U MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 8 of 40

in 10 CFR 50.55a(b), and to the extent practical within the limitations of design, geometry andmaterials of construction. Specific areas within this document where these document are usedin the preparation of this program are addressed within the area affected.

- Code of Federal Regulations

10 CFR 50.55(a) Code of Federal Regulations;

Federal Register, Volume 64, Number 183, dated September 22,1999, amendmentto the regulation.

- ASME Code Editions and Addenda

ASME Boiler and Pressure Vessel Code, Sections V, 1989 Edition, "NondestructiveExamination"

ASME Boiler and Pressure Vessel Code, Section Xi, 1989 Edition, "Rules for InserviceInspection of Nuclear Power Plant Components"

ASME Boiler and Pressure Vessel Code, Section Xl, 1992 Edition through the 1992Addenda, "Rules for Inservice Inspection of Nuclear Power Plant Components",Subsections IWE and IWL.

USNRC Regulatory Guides

The following list of Regulatory Guides are applicable to the Nine Mile Point NuclearPower Station Third Inservice Inspection Program:

1.26 Quality Group Classifications and Standards for Water-Steam, andRadioactive-Waste-Containing Components of Nuclear Power Plants,Revision 2, June 1975.

1.65 Materials and Inspections for Reactor Vessel Closure Studs, dated October1973, Regulatory Position C.4.b.

1.84 Design and Fabrication Code Case Acceptability ASME Section 1II, Division1, Latest Revision.

1.85 Material Code Case Acceptability ASME Section 1II, Division 1, LatestRevision.

1.147 Inservice Inspection Code Case Acceptability ASME Section Xl, Division 1,Revision 12..

- NMP1 Specific Documents

Nine Mile Point Unit 1 Updated Final Safety Analysis Report, Sections 1, 5, 7, 9, 12

File: NMP1 ISIPL.wpd

Page 9: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

U V NIAGARA NUCLEAR POWER STATIONNEU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 9 of 40

and 16.

Nine Mile Point Unit 1 Technical Specifications, USNRC Docket number 50-220,Sections 3.6 and 4.6.

USNRC NUREGS/SRP's

USNRC NUREG 0313, Technical Report on Material Selection and ProcessingGuidelines for BWR Coolant Pressure Boundary Piping, Revision 2.

USNRC NUREG 0619, BWR Feedwater Nozzle and CRD Return Lines.

USNRC Bulletins

82-03 Stress Corrosion Cracking in Thick-Wall, Large-Diameter, Stainless Steel,Recirculation System Piping at BWR Plants, Revision 1, October 28,1982.

USNRC Generic Letters

88-01 USNRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, January25,1988.

88-01 NRC Position on intergranular Stress Corrosion Cracking (IGSCC) in BWRAustenitic Stainless Steel Piping, Supplement 1, February 4, 1992.

81-11 Feedwater and Control Rod Drive Nozzle Cracking,

90-05 Guidance for Performing Temporary Non-Code Repairs to ASME (ISI) CodeClass 1, 2 and 3 Piping and Components, June 15,1990.

90-09 Alternative Requirements for Snubber Visual Inspection Intervals andCorrective Actions, December 11, 1990.

94-03 Intergranular Stress Corrosion Cracking (IGSCC) of Core Shroud in BoilingWater Reactors, February 1, 1995.

98-05 Boiling Water Reactor Licensees Use of the BWRVIP 05 Report to RequestRelief rom Augmented Examination Requirements on Reactor PressureVessel Circumferential Shell Welds, December 10, 1998.

Additional References or Commitments

Requirements of the complete BWRVIP implementation criteria for the Third Ten YearInservice Inspection Interval is currently under development. Upon completion of thisprocess the applicable information will be incorporated within ISI Program. GeneralInformation pertaining to BWRVIPs implementation is contained in the ISI ProgramNMP1-lSI-003, Section 6.0 Titled Augmented Examinations.

File: NMP1 ISIPL.wpd

Page 10: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N V NIAGARA NUCL EAR POWER STATIONN ZMOHAWK l

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 10 of 40

- USNRC Informational Notices

89-79 Degraded Coatings and Corrosion of Steel Containment Vessels, December1,1989.

ASME Code Cases

Code Cases approved through Regulatory Guide 1.147 may be proposed for revisionto the inspection plan. Specific Code Cases used in the preparation of this documentare identified below.

N-460 Alternative Examination Coverage for Class 1 and Class 2 Welds,Section XI, Division 1. RG 1.147, Rev. 12

N-491 -1 Alternative Rules for Examination of Class 1, 2, 3 and MC ComponentSupports of Light Water Cooled Power Plants, Section Xl, Division 1.RG 1.147, Rev. 12.

N-509 Alternative Rules for the Selection and Examination of Class 1, 2 and3 Integrally Welded Attachments, Section Xl, Division 1. RG 1.147,Rev. 12.

N-524 Alternative Examination Requirements for Longitudinal Welds inClass 1 and 2 Piping Section Xl, Division 1. RG 1.147, Rev. 12.

Note: See Appendix E "Code Cases" of the 10 Year Inspection Plan for a completelisting applicable Code Cases.

1.4 Applicable Code Editions and Addenda

1.4.1 Third Inspection Interval

Pursuant to Title 10, Part 50, Section 55a(g)(4), of the Code of Federal Regulations,the Inservice Inspection requirements applicable to nondestructive examination andsystem pressure testing for the Third Inservice Inspection Interval are based on therules set forth in the 1989 Edition, no Addenda of Section Xl, that was endorsed twelvemonths prior to the start of the Third Inspection Interval.

1.4.2 Subsequent Code Editions and Addenda

As permitted by 10 CFR 50.55a(g)(4)(iv), the NMPC may elect to meet therequirements set forth in subsequent Editions and Addenda of Section XI that areincorporated by reference into 10 CFR 50.55a(b)(2), subject to the applicablelimitations and modification and subject to USNRC approval.

File: NMP1 ISIPL.wpd

Page 11: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N V NIAGARA NUCLEAR POWER STATIONn U MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 11 of 40

Portions of Editions and Addenda may also be used provided that all relatedrequirements to the respective Editions and Addenda are met. NMPC intends tocontinually evaluate and apply, as appropriate, changes in adopted Code Editions andAddenda which provide the continuing assurance of the quality and safety of pressureretaining components and systems.

File: NMP1 ISIPL.wpd

Page 12: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N v NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 12 of 40

2.0 DEVELOPMENT OF INSPECTION PLAN

This document provides the component schedule for inservice nondestructive examinations to beperformed over the Third Ten-Year Inservice Inspection Interval on Class 1, 2 and 3 components andtheir supports of the Niagara Mohawk Power Corporation (NMPC), Nine Mile Point Nuclear PowerStation (NMP1). Component and/or system selected for nondestructive examination are scheduled inaccordance with the requirements of Section Xl, to the extent practical.

2.1 CLASS 1 SYSTEMS/COMPONENTS

The Class 1 system boundaries subject to examination were developed based upon therequirements of 10 CFR 50.2(v) and NMPC NMP1-FSAR. The Class 1 components andsystems (including supports) selected for examination are identified in Section 4.0 of thisdocument.

2.2 CLASS 2 SYSTEMS/COMPONENTS

The Class 2 system boundaries subject to examination were developed based upon therequirements of Regulatory Guide 1.26 and the NMPC NMP1 -FSAR. The Class 2 componentsand systems (including supports) selected for examination are identified in Section 5.0 of thisdocument.

2.3 CLASS 3 SYSTEMS/COMPONENTS

The Class 3 system boundaries subject to examination were developed based upon therequirements of Regulatory Guide 1.26, and the NMPC NMP1-FSAR. The Class 3 componentsand systems (including supports) selected for examination are identified in Section 6.0 of thisdocument.

2.4 CLASS 1, CLASS 2 AND CLASS 3 COMPONENT SUPPORTS - IWF

Component supports selected for examination shall be the supports of those components thatare required to be examined under IWB, IWC and IWD, and are included within Sections 4.0,5.0 and 6.0 as applicable.

2.5 SUBSTITUTE EXAMINATIONS

NMPC may substitute components scheduled in this Document for others not previouslyscheduled when the original selection was part of the additional piping weld selection. Thissubstitution may be done due to such conditions as limited physical access, high radiationlevels, inaccessibility etc. Such changes will be noted in the Summary Report Submittal.Specific examinations that are required, and can not be completed within the period/intervalwill be identified within the Summary Report Submittal, and may be the subject of a requestfor relief.

2.6 NONDESTRUCTIVE EXAMINATIONS

Nondestructive examinations will be performed in accordance with established Niagara

File: NMP1 ISIPL.wpd

Page 13: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

v NIAGARA NUCLEAR POWER STATIONN U MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 13 of 40

Mohawk Power Corporation (NMPC) nondestructive examination procedures and/or NMPCapproved vendor procedures which conform to the requirements of the NMPC QualityAssurance Program and the applicable sections of the ASME Boiler and Pressure VesselCode. NMPC approved vendor NDE Procedures will be identified as required, (example,Automated UT of RPV).

2.7 WELD/SUPPORT LOCATION MAPS

Weld/Support location maps Listing indicating components, areas, weld locations, and otherinformation pertinent to the performance of the inservice Nondestructive examinations arecontained in Appendix C.

2.8 ULTRASONIC CALIBRATION BLOCKS

Ultrasonic calibration blocks for each component subject to volumetric examination aremaintained at the plant site. A listing of applicable ultrasonic calibration blocks is included inAppendix B.

2.9 WELD IDENTIFICATION

Longitudinal welds in Class 2 piping and pipe fittings do not receive unique identificationnumbers from the spool fabricators. All longitudinal pipe welds intersecting any of the selectedcircumferential welds will also be examined. As an alternate to Table IWB-2500-1, ASME CodeCase N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 PipingSection Xl, Division 1", shall be used as defined below:

(A) When only a surface examination is required, examination of longitudinal piping weldsis not required beyond those portions of the welds within the examination boundariesof intersecting circumferential welds.

(B) When both surface and volumetric examinations are required, examination oflongitudinal piping welds is not required beyond those portions of the welds within theexamination boundaries of intersecting circumferential welds providing the followingrequirements are met.

(1) Where longitudinal welds are specified and locations are known, examinationrequirements shall be met for both transverse and parallel flaws at theintersection of the welds and for that length of longitudinal weld within thecircumferential weld examination volume;

(2) Where longitudinal welds are specified but locations are unknown, or theexistence of longitudinal welds is uncertain, the examination requirementsshall be met for both transverse and parallel flaws within the entireexamination volume of intersecting circumferential welds.

File: NMP1 ISIPL.wpd

Page 14: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N NIAGARA NUCLEAR POWER STATIONN MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 14 of 40

Since Class 2 longitudinal welds are required to be examined from the intersectingcircumferential weld, they were given unique identification numbers as denoted below.

Fittings: Longitudinal welds in fittings are identified by adding letter A, B, or C, (1, 2, or3), as applicable, to the l.D. for the reference weld. The reference weld isdefined as the first circumferential weld encountered when entering the fittingon the direction of the flow.

The following figure shows the convention foridentifying which weld in a welded fitting receivesa particular letter designation.

Tee Case 1: Three welds located as shown in A

Figure 2-1. >

Tee Case 2: If only one weld Figure 2-1 TEE weld oww a

ID exists it is identified by the letter A or 1.

Figure 2-1 Tee Weld ID

Elbow Case 1: Two welds located as shown inFigure 2-2, one located on the inside radius andthe other on the outside radius. *

Elbow Case 2: If only one weld exists it is >identified by the letter A or 1.

I

Figure 2-2 Elbow weld ID

File: NMP1 ISIPL.wpd

Page 15: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N T NIAGARA NUCLEAR POWER STATIONLA MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 15 of 40

Elbow Case 3: If two welds exist in locations other than Case 1, Weld A or 1 is the first weldencountered when moving clockwise from the reference weld datum while looking in thedirection of flow. The other weld is identified by B or 2.

Reducer Case 1: If only one weld exists it isidentified by the letter A or 1.

Reducer Case 2: If two welds exist, weld A or 1 isthe first weld encountered when moving clockwise (from the reference weld datum while looking in the > ->

direction of flow. The other weld is identified by Bor 2. See Figure 2-3.

Figure 2-3 Reducer weld ID

Piping: Longitudinal piping welds are not assigned a specific weld identification number. Theyare identified by reference to the intersecting circumferential weld first encountered whenentering the seamed pipe in the direction of flow.

File: NMP1 ISIPL.wpd

Page 16: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N v NIAGARA NUCLEAR POWER STATIONN U MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 16 of 40

3.0 RECORDS

3.1 General

Records and Reports of Inservice Inspection activities (such as Programs, Plans, Schedules,calibration, examination procedures, examination results, reports, equipment and personnelcertifications, corrective actions taken or recommended will be developed and maintained inaccordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code, Section Xl.

3.1.1 SCHEDULED EXAMINATION TABLES

The Scheduled Examination Tables for Inservice examinations of major componentsof Niagara Mohawk Power Corporation, Nine Mile Point Nuclear Power Station will bein a format similar to Figure 3-1.

3.1.2 INSPECTION ZONES

Areas subject to examination have been divided into systems. Each system is definedby a weld/support location map which identifies and locates all welds, supports, andother examination areas subject to and/or selected for examination within eachsystem.

3.1.3 CODE ITEM CLASSIFICATION

For the sake of continuity and clarity, all items to which a Code Category and CodeItem Number can be applied are identified.

3.1.4 INSPECTION/EXAMINATION TABLE CONTENTS

The Inservice Inspection/Examination Tables provide the following information:

ASME SECTION XI ITEM NUMBER - Listed in this column is the appropriate itemnumber from Table IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, asapplicable, of the ASME Boiler & Pressure Vessel Code, Section XI.

COMPONENT IDENTIFICATION - The examination area identification is the uniquecomponent or weld identification number. This number also appears on the applicableISI Weld/Support Location Map.

COMPONENT DESCRIPTION - The examination area description is a briefdescription of the component or, in the case of a weld, the parts being joined.

CODE EXAMINATION CATEGORY - Listed in this column are the appropriateexamination categories from Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 orIWF-2500-1, as applicable, of the ASME Boiler & Pressure Vessel Code, Section Xl.

CODE EXAMINATION METHODS - Listed in this column are the appropriatenondestructive examination method(s) to be used for each component or item subject

File: NMP1ISIPL.wpd

Page 17: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N NIAGARA NUCLEAR POWER STATIONNZuMOHAWVK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 17 of 40

to examination, if applicable.

ISI INTERVAL - Identified in this column are numbers 1, 2, and 3. Each numbersignifying an inspection period. The current inspection interval relating to this Tableis number 3. Within each column a system of codes are entered to define the statusof each component or item. For the purpose of providing Tables of components orareas selected for examination during the interval an (X) will be placed on theapplicable row. Each row is defined by period, depending on where the (X) is placed,will determine when that item is scheduled to be examined within the interval andperiod. Additional codes are used to provide a status of examinations conductedduring a given period in time. Additional codes such as those identified in Figure 3-1may also be used.

REMARKS - This column identifies examination note(s) and/or instruction applicableto a particular item.

3.2 FINAL REPORTS

Following the completion of the Inservice Inspection Activity, NMPC shall prepare a InserviceInspection Final Report. The Final Report will be filed at the Nine Mile Point site DocumentControl Center. Final Examination Report Tables are included as part of the Final Reportalong with any additional records and reports in order to provide a documentation of thecomplete examination activity.

This report shall be made available for review by the Enforcement and Regulatory Authorityhaving jurisdiction at the plant side.

3.3 INSERVICE INSPECTION SUMMARY REPORT

Following the units return to service, NMPC shall prepare a Summary Report of the ISI activity.The Summary Report shall be filed with the Nuclear Regulatory Commission as required bySection Xl and/or Code Case N-532.

File: NMP1 ISIPL.wpd

Page 18: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

v NIAGARA NUCLEAR POWER STATIONNkA MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 18 of 40

DATE: (A)

Rev. (B)

Nine Mile Point Nuclear Plant Unit 1Inservice Inspection Long Term Plan

Class X Section Xi Scheduled Components

Page (C)

System (D)

Summary Examination AreaNumber Identification

INSPECTION INTERVALPLAN STATUSASMESec. XiCategyItem No

NDE First Second ThirdMeth Period Period Period

OUTAGE

1 234 1 234 1 234

Instructions** Calibration Blocks*

DRAWING NUMBER: (E), LINE NO. (F)

(G) (I) (J) (H) (K) (L)------- (K)(M)

(A) Denotes the date of the inspection plan table(B) Denotes the current revision number of the plan(C) Identifies the page number of the table(D) Identifies the System applicable to this table(E) Denotes the applicable Drawing number for this table(F) Identifies the applicable Line for this table(G) Denotes the Summary Number(I) Denotes the component or weld identification number(J) Denotes the ASME Code Category(H) Denotes the ASME Code Item Number(K) Denotes the NDE Method to be used for the examination(L) Shows when an item was examined or is scheduled to be examined. Any interval can be shown separately.

X - Scheduled P - PartialC - Completed E - Expanded ScopeA - Augmented B - Baseline

(M) Denotes specific instruction applicable to the item

FIGURE 3-1 Inservice Inspection Plan (also known as Long Term Plan)

File: NMP1 ISIPL.wpd

Page 19: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

- -

NINE MILE POINT NMP1-ISI-003-10

NV NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 19 of 40

4.0 CLASS 1 INSERVICE INSPECTION PLAN TABLES

This section contains the Long Term Ten-Year Inservice Inspection Examination Tables forexaminations of selected systems and components for the Second Inservice Inspection Interval.

nondestructive

00.0 Reactor Pressure Vessel ................................................ 1 thru 83

01.0

31.0

32.0

33.0

36.0

37.0

38.0

39.0

40.0

42.1

44.1

Main Steam ......................

Feedwater System ................

Reactor Recirculation System.

Reactor Clean Up ................

Reactor Instrumentation ............

Reactor Drain & Vent ..............

Reactor Shutdown Cooling ..........

Emergency Condenser System.

Reactor Core Spray System .........

Liquid Poison System ..............

Control Rod Drive System ..........

.........

.........

.. . ... ...

.........

.........

. .. .. . .. .

.........

.........

.........

.........

. .. ... .. .

.........

. ... .. .. .

.........

. . . . . . . . .

..........

..........

..........

..........

.. .. . ... . .

. . . . . . . . .

. 84 thru 90

. 91 thru 97

98 thru 130

131 thru 135

136 thru 137

138 thru 143

144 thru 147

148 thru 156

157 thru 171

172 thru 173

174 thru 177

File: NMP1 ISIPL.wpd

Page 20: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 1

CRDH J Welds

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME FIRST

SEC. XI PERIOD

SUMSARY EXAMINATION AREA CATEGY NDE -_ P - -R

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4

Control Rod Drive Housings (REF. DWG. NO. 28A)

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4 FPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

002610 DRV-44-XXXX(NC02)

CRDH Upper-J Weld &

Roll Area

NCTS

5037833 X - - - X X - - X - - -

002620 DRV-44-X)XXX(NC02) NCTS

CRDH to Upper-J Weld 503783

UT

Prior to and after each

Roll Repair. Drives to

be determined later

**LATER**

Examine (2) previously

roll-repaired CRDH, only

if made available thru

norm drive maint., 1"

above & below upper-J

weld, Drives to be

determined during each

outage **LATER**

3 X - - - X X - - X - - -

002630 DRV-44-XXXX(NC02)

CRDH Roll Repair

Region

NCTS

503783

UT

3 X - - - X X - - X - - -

Examine (2) previously

rolled areas to include

volume of base material

of 1" above & below roll

band, only if made

available thru norm

drive maint., Drives to

be determined during

**LATER**

Page 21: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 2

Closure Head Nuts

ZONE NUMBER: 00.0INSPECTION INTI

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

00.0 RPV (REF. DWG. NO. 28A)

ERVAL

NDE

METH _

FIRST SECOND THIRD

PERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PLAN STATUS

FPRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

002700 CH-01-N

Closure

Nuts

B-G-1

Bs.10

VT-i

Head Flange

002800 CH-02-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange3 X- - - - - - -

002900 CH-03-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange3 X- - - - - - -

003000 CH-04-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange

003100 CH-05-N

Closure

Nuts

B-G-1

B6 10

VT-1

Head Flange3 X - - - - - - - - -

003200 CH-06-N

Closure

Nuts

003300 CH-07-N

Closure

Nuts

Head Flange

Head Flange

B-G-1

B6. 10

B-G-1

B6. 10

VT-1 **N/A**

3 X- - - - - - - - -

VT-1

3 X- - - - - - - -

003400 CH-08-N

Closure

Nuts

B-G-1

B6. 10

VT-i **N/A**

Head Flange3 X - - - - - - - - -

Page 22: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 3

Closure Head Nuts

ZONE NUMBER: 00.0 INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

003500 CH-09-N

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6. 10

NDEMETH

VT-1

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

Closure

Nuts

Head Flange3 X - -

003600 CH-10-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange3 X - - -

003700 CH-11-N

Closure

Nuts

B-G-1

B6. 10

VT-1 **N/A**

Head Flange3 X - - - - - - - - -

003800 CH-12-N

Closure

Nuts

B-G-1

B6. 10

VT-1 **N/A**

Head Flange

003900 CH-13-N

Closure

Nuts

B-G-1

B6. 10

VT-1

Head Flange3 X - - - - - - - -

004000 CH-14-N

Closure

Nuts

Head Flange

B-G-1

B6. 10

B-G-1

B6. 10

VT-1 **N/A**

3 x - - - - - - - - -

004100 CH-15-N

Closure Head Flange

Nuts

VT-1 **N/A**

3X- - - - - - -

004200 CH-16-N

Closure Head Flange

Nuts

B-G-1

B6. 10

VT-1

3 X - - - - - - - - -

Page 23: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 4

Closure Head Nuts

ZONE NUMBER: 00.0INSP

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6.10

NDEMETH

VT-1

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

0 U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS*CALIBRATION BLOCK**

**N/A**004300 CH-17-N

Closure

Nuts

Head Flange3 X - -

004400 CH-18-N

Closure

Nuts

. . . 1 .. . . . . . . . . . . . . .. . . . . . ..

004500 CH-19-N

Closure

Nuts

Head Flange

Head....... F e . ..

Head Flange

B-G-1

B6.10

. .. . .... -...

B-G-1

B6.10

VT-1

3 X - - - - - - - - -

VT-1

3 X- - - - - - - - -

004600 CH-20-N

Closure

Nuts

004700 CH-21-N

Closure

Nuts

Head Flange

Head Flange

B-G-1

B6.10

B-G-1

B6.10

VT-1

3 X- - - - - - - - -

VT-1

3X - - - - - - - -

004800 CH-22-N

Closure

Nuts

B-G-1

B6E 10

VT-1 **N/A**

Head Flange3 X- - - - - - - - - -

004900 CH-23-N

Closure

Nuts

B-G-1

B6.10

VT-i **N/A**

Head Flange3- - - - X - - - - - - -

005000 CH-24-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange3- - - - X - - - - - - -

Page 24: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 5

Closure Head Nuts

ZONE NUMBER: 00.0INSP.

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6.10

NDEMETH

VT-1

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

r INSTRUCTIONSl **C LIBRATION BLOCK**

005100 CH-25-N

Closure

Nuts

Head Flange3 - - - X - - -

005200 CH-26-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange3 - - - - X - - - - - -

005300 CH-27-N

Closure

Nuts

005400 CH-28-N

Closure

Nuts

Head Flange

Head Flange

B-G-1

B6.10

B-G-1

B6.10

VT-i

3 - - - -

VT-1 **N/A**

3- - - - X - - - - - - -

005500 CH-29-N

Closure

Nuts

B-G-1

B6.10

VT-1 **N/A**

Head Flange3 - - - -

005600 CH-30-N

Closure

Nuts

B-G-1

B6.10

VT-i

Head Flange3 - - - - X - - _ _

005700 CH-31-N

Closure

Nuts

B-G-1

B6.10

VT-l

Head Flange3- - - - X - - - - - - -

005800 CH-32-N

Closure

Nuts

B-G-1

B6.10

VT-i **N/A**

Head Flange3 - - - -

Page 25: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 6

Closure Head Nuts

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

005900 CH-33-N

Closure Head Flange

Nuts

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6.10

NDE1

METH

VT-i

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4 FPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

**N/A**

3- - - - X -

006000 CH-34-N

Closure Head Flange

Nuts

B-G-1

B6.10

VT-i

3 - - - - X- _

006100 CH-35-N

Closure

Nuts

006200 CH-36-N

Closure

Nuts

Head Flange

Head Flange

B-G-1

B6.10

B-G-1

B6.10

VT-1

3- - - - X - - - - - - -

VT-1 **N/A**

3 - - - - X - - - - - - -

006300 CH-37-N

Closure

Nuts

006400 CH-38-N

Closure

Nuts

Head Flange

Head Flange

B-G-1

B6.10

B-G-1

BE6.10

VT-1

3- - - - X - - - - - - -

VT-i

3- - - - X - - - - - - -

006500 CH-39-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange3- - - - X - - - - - - -

006600 CH-40-N

Closure

Nuts

B-G-1

B6 10

VT-1

Head Flange3- - - - X - - - - - - -

Page 26: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 7

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Closure Head Nuts

ZONE NUMBER: 00.0 INSP:

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

006700 CH-41-N

Closure Head Flange

Nuts

006800 CH-42-N

Closure Head Flange

Nuts

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6 10

.........................

B-G-1

B6.10

METH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

VT-I1

3 - - - X _

VT-1

3 - - - - X - - -

006900 CH-43-N

Closure Head Flange

Nuts

B-G-1

B6. 10

VT-1

3 - - - - X - - -

007000 CH-44-N

Closure

Nuts

B-G-1

B6. 10

VT-1 **N/A**

Head Flange3 - - - … - - - - X - - -

007100 CH-45-N

Closure

Nuts

B-G-1

BE6.10

VT-1

Head Flange3- - - - - - - - X - - -

007200 CH-46-N

Closure

Nuts

B-G-1

B6. 10

VT-i

Head Flange3- - - - - - - - X - - -

007300 CH-47-N

Closure

Nuts

B-G-1

B6. 10

VT-1 **N/A**

Head Flange3- - - - - - - - X - - -

007400 CH-48-N

Closure

Nuts

B-G-1

B6. 10

VT-1

Head Flange 3- - - - - - - - X - - -

Page 27: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 8

Closure Head Nuts

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

007500 CH-49-N

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6.10

NDEMETH

VT-1

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**ALIBRATION BLOCK"*

Closure

Nuts

Head Flange3 - - - - - X - - -

**N/A**007600 CH-50-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange3 - - - - - - - X - - -

007700 CH-51-N

Closure

Nuts

007800 CH-52-N

Closure

Nuts

Head Flange

Head Flange

B-G-1

B6. 10

B-G-1

B6E 10

VT-1

3- - - - - - - - X - - -

VT-i **N/A**

3- - - - - - - - X - - -

007900 CH-53-N

Closure

Nuts

B-G-1

B6.10

VT-i

Head Flange3- - - - - - - - X - - -

008000 CH-54-N

Closure

Nuts

B-G-1

B6.10

VT-1 **N/A**

Head Flange3- - - - - - - - X - - -

008100 CH-55-N

Closure Head Flange

Nuts

008200 CH-56-N

Closure Head Flange

Nuts

B-G-1

B6. 10

B-G-1

B6.10

VIT-1

3- - - - - - - - X - - -

VT-i

3- - - - - - - - X - - -

Page 28: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 9

Closure Head Nuts

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

008300 CH-57-N

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6.10

NDEMETH

VT-1

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**ALIBRATION BLOCK**

**N/A**

Closure

Nuts

Head Flange3- - - - - - - - X - - -

008400 CH-58-N

Closure

Nuts

-- . I .- . .. . .............

008500 CH-59-N

Closure

Nuts

Head Flange

Head Flange

B-G-1

B6.10

B-G-1

B6.10

VT-1

3- - - - - - - - X - - -

VT-1 **N/A**

3- - - - - - - - X - - -

008600 CH-60-N

Closure

Nuts

B-G-1

B6. 10

VT-1

Head Flange3- - - - - - - - X - - -

008700 CH-61-N

Closure

Nuts

B-G-1

B6. 10

VT-1 **N/A**

Head Flange3-X - - -

008800 CH-62-N

Closure

Nuts

008900 CH-63-N

Closure

Nuts

Head Flange

Head Flange

B-G-1

B6.10

B-G-1

B6.10

VT-1

3- - - - - - - - X - - -

VT-1

3- - - - - - - - X - - -

009000 CH-64-N

Closure

Nuts

B-G-1

B6.10

VT-1

Head Flange3- - - - - - - - X - - -

Page 29: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 10

Closure Head Studs

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

00.0 RPV (REF. DWG. NO. 28A)

1FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E - - - - - -

1 2 3 4 1 2 3 4 FSPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

009100 CH-01-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange3 x- - - - - - - - - -

..... -.........................................................................................

3 X - - - - - - - - - - -

Reg. Guide 1.65, Surface

exam when removed

**6.25-RPV-STUD**

Reg. Guide 1.65, Surface

exam when removed

**6.25-RPV-STUD**

009200 CH-02-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

009300 CH-03-B

Closure

Studs

009400 CH-04-B

Closure

Studs

009500 CH-05-B

Closure

Studs

Head Flange

Head Flange

Head Flange

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

3 X - - - - - - - - -

. .I . 1 . - - . . . .

3 x- - - - - - - - -

3 X- - - - - - - - -

3 X - - - - - - - - - -

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65,Surface

exam when removed

**6.25-RPV-STUD**

Reg. Guide 1.65,Surface

exam when removed

**6.25-RPV-STUD**

Reg. Guide 1.65,Surface

exam when removed

**6.25-RPV-STUD**

009600 CH-06-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

009700 CH-07-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

Reg. Guide 1.65, Surface

exam when removed

**6.25-RPV-STUD**3 X- - - - - -

009800 CH-08-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT when

removed

**6.25-RPV-STUD**3 X- - - - - - - - -

Page 30: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 11

Closure Head Studs

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

009900 CH-09-B

'ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

0 U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CALIBRATION BLOCK**

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT when

removedX-**6.25-RPV-STUD**

Head Flange

010000 CH-10-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange3 X - - - - - - - - - - -

3 X - - - - - - - - - - -

Reg. Guide 1.65,MT when

removed

**NMP-6.25-RPV-STUD**

Reg. Guide 1.65, MT when

removed

**6.25-RPV-STUD**

010100 CH-11-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

010200 CH-12-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

Reg. Guide 1.65,MT exam

when removed

**6.25-RPV-STUD**

010300 CH-13-B

Closure

Studs

010400 CH-14-B

Closure

Studs

Head Flange

Head Flange

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

Reg. Guide 1.65,MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

010500 CH-15-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MTexam

when removed

**6.25-RPV-STUD**

Head Flange3 X - - - - - - - - -

010600 CH-16-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**3 x- - - - - - - - - -

Page 31: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 12

Closure Head Studs

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

SUMMARYNUMBER

010700

EXAMINATION AREA

IDENTIFICATION

CR-17-B

Closure Head Flange

Studs

ASNE

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

0 U T A G E -

1 2 3 4:

THIRDPERIOD

1 2 3 4 FPRESERVICE YEAR

INSTRUCTIONS**CLIBRATION BLOCK**

- -I-

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT eaxm

when removed

3 X - - - - - - - - - - - **6.25-RPV-STUD**

010800 CH-18-B

Closure Head Flange

Studs

...... .... - ~... ...... ......... .............. .............. ....................

010900 CH-19-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

3 X - - - - - - - - - - -

.. ... . - ..... .. . .... ...... ................ . . . .. .... ........... . . ............... ............ _. .... .............. .

3 X - - - - - - - - - - -

I -- - . . ... . . . ....... ... - .. ..... ... - -- - ... .... . . .. ... .....

3 X - - - - - - - - - - -

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65,MT exam

when removed

**NMP-6.25-RPV-STUD**

Reg. Guide 1.65,MT exam

when removed

**NMP-6.25-RPV-STUD**

011000 CH-20-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

011100 CH-21-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**Head Flange

011200 CH-22-B

Closure

Studs

011300 CH-23-B

Closure

Studs

Head Flange

Head Flange

B-G-1 UT

B6.20 MT

. .. ...... . .... -... .. 1. -

B-G-1 UT

B6.20 MT

3X ---- _ _ _

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65,MT exam

when removed

**NMP-6.25-RPV-STUD**3 -X - -- _

011400 CH-24-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**3- - - - X - - - - - - -

Page 32: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 13

Closure Head Studs

ZONE NUMBER: 00.0INSPECTION INTERVAL PRESERVICE YEARPLAN STATUS

SUMHARY EXAMINATION AREA

NUMBER IDENTIFICATION

011500 CH-25-B

Closure Head Flange

Studs

ASME

SEC. XI

CATEGYITEM NO

NDE1METH

FIRST

PERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

B-G-1 UT

B6.20 MT

Reg. Guide 1.65,MT exam

when removed

**NMP-6.25-RPV-STUD**3 - X -- - - - -

011600 CH-26-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT when

removed

3 - - - - X - - - - - - - **NMP-6.25-RPV-STUD**Head Flange

011700 CH-27-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**3- - - - X - - - - - - -

011800 CH-28-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**

Head Flange3- - - - X - - - - - - -

011900 CH-29-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Head Flange3 - - - -

012000 CH-30-B

Closure

Studs

012100 CH-31-B

Closure

Studs

Head Flange

Head Flange

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

3

3

- - - - X

-X - -- _

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

012200 CH-32-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**3- - - - X - - - - - - -

Page 33: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 14

Closure Head Studs

ZONE NUMBER: 00.0 INSP:

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

0 U T A G E -

1 2 3 4:

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

012300 CH-33-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

Reg. Guide 1.65, MT exam

when removedX -**6.25-RPV-STUD**3

012400 CH-34-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange3 - - -- X - - - - - - -

...... - ... -.. . .. ..........................-....... ............................. ....-......

3 - - - - X - - - - - - -

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

012500 CH-35-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

012600 CH-36-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65,MT exam

when removed

**6.25-RPV-STUD**

Head Flange3 -X - -- _

012700 CH-37-B

Closure Head Flange

Studs

B-G-1 UT

B6. 20 MT

Reg. Guide 1.65,MT exam

when removed

**6.25-RPV-STUD**3 - - - - X - - -

012800 CH-38-B

Closure Head Flange

Studs

012900 CH-39-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

3 - - -- X - - - - - - -

3 - - -- X - - - - - - -

Reg. Guide 1.65,MT exam

when removed

**6.25-RPV-STUD**

.. . I .. 1. . ~.. ............ . 1 . . .

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

013000 CH-40-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65,MT exam

when removed

**6.25-RPV-STUD**3 - - - -

Page 34: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 15

Closure Head Studs

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CALIBRATION BLOCK**

013100 CH-41-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**3 - - - - X - - -

013200 CH-42-B

Closure

Studs

013300 CH-43-B

Closure

Studs

. . .. . I . . . .

013400 CH-44-B

Closure

Studs

Head Flange

Head Flange

....... .... F..........g....

Head Flange

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

3 - - - - X - - - - - - -

3 - - - - X - - - - - - -

3 - - - - - - - - X - - -

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65,MT exam

when removed

**6.25-RPV-STUD**

013500 CH-45-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT3 - - - - - - - - X - - -

. -. . ........ . . . -. . .... . . .. . -.

3 - - - - - - - - X - - -

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

013600 CH-46-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

013700 CH-47-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65,MT exam

when removed

**6.25-RPV-STUD**3- - - - - - - - X - - -

013800 CH-48-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT

exam when removed

**6.25-RPV-STUD**3- - - - - - - - X - - -

Page 35: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 16

Closure Head Studs

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASHE

SEC. XI

EXAMINATION AREA CATEGY

IDENTIFICATION ITEM NO

NDE 1METH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

SUMMdARYNUMBER

013900 CH-49-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Head Flange3- - - - - - - - X - - -

014000 CH-50-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange3- - - - - - - - X -

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

014100 CH-51-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange3 - - - - - - - - X -

014200 CH-52-B

Closure

Studs

014300 CH-53-B

Closure

Studs

Head Flange

Head Flange

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

3 - - - - - - - - X - - -

3-I . .- . . . I . .... . .

3 - - - - - - - - X - - -

Reg. Guide 1.65, MT

exam when removed

**NMP-6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**

014400 CH-54-B

Closure

Studs

Head Flange

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

3 - - - - - - - - X - - -

3 - - - - - - - - X - - -

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**

- . . - . . . . . . . . . . . . . . . . .

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**

014500 CH-55-B

Closure Head Flange

Studs

014600 CH-56-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**3- - - - - - - - X - - -

Page 36: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 17

Closure Head Studs

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

PRESERVICE YEAR

THIRDPERIOD

1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

014700 CH-57-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

3 - - - - **NMP-6.25-RPV-STUD**Head Flange

014800 CH-58-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT

exam when removed

**NMP-6.25-RPV-STUD**Head Flange

3 - - - - - - - - X - - -

014900 CH-59-B

Closure

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**Head Flange

3 - - - - X - - -

015000 CH-60-B

Closure

Studs

015100 CH-61-B

Closure

Studs

015200 CH-62-B

Closure

Studs

Head Flange

Head Flange

Head Flange

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

B-G-1 UT

B6.20 MT

3 - - - F - - -

3 - - - -

3 - - - -

3 - - - -

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**

Reg. Guide 1.65, MT

exam when removed

**NMP-6.25-RPV-STUD**

Reg. Guide 1.65, MT exam

when removed

**NMP-6.25-RPV-STUD**

015300 CH-63-B

Closure

Studs

B-G-1 UT

B6.20 MTHead Flange

015400 CH-64-B

Closure Head Flange

Studs

B-G-1 UT

B6.20 MT

Reg. Guide 1.65, MT exam

when removed

**6.25-RPV-STUD**3-_ - - -

Page 37: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 18

Closure Head Studs

ZONE NUMBER: 00.0 INSPECTION INT]

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

ERVAL

NDE 1METH

PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 0 U T A G E- - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

015500 CH-XX-B

Closure Head Flange

Studs

B-G-1

B6.303 X - - - X - - - X - - -

Per RG 1.65, a minimum

of 4 studs will be

examined each period for

a total of 12. **N/A**

Page 38: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 19

Closure Head Washers

ZONE NUMBER: 00.0 INSPECTION INT]

ASME

SEC. XI

SUkMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

00.0 RPV (REF. DWG. NO- 28)

tOVt<:T>OUTts17 bestsERVAL PLAN STATUS -t..L LEAK

FIRST SECOND THIRDPERIOD PERIOD PERIOD

NDE - - - - - - OU T A G E - - -- - - INSTRUCTIONS

METH 1 2 3 4 1234 1 2 3 4 **CALIBRATION BLOCK**

015600 RV-01-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 x- - - - - - - - - - -

015700 RV-01-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3X - - - - - - - -

015800 RV-02-TA

Reactor Vessel Flange

Washer

015900 RV-02-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

................

B-G-1

B6.50

VT-1

3 X - - - - - - -

VT-1

3 X - - - - - - -

016000 RV-03-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3x - - - - - - - -

016100 RV-03-TB

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-i

3 X - - - - - -

016200 RV-04-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 X - - - - - - - - - -

016300 RV-04-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 X - - - - - - - - -

Page 39: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 20

Closure Head Washers

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

016400 RV-05-TA

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

B-G-1 VT-1

B6.50

1FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS* *CLIBRATION BLOCK**

Reactor Vessel Fla

Washer

nge3 X - - -

016500 RV-05-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 x - - -

016600 RV-06-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-i

3 X - - - - - - - - -

016700 RV-06-TB

Reactor Vessel Flange

Washer

016800 RV-07-TA

Reactor Vessel Flange

Washer

016900 RV-07-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

B-G-1

B6. 50

VT-1

3 X - - - - - - - - -

VT-i

VT-i

3X --- _ _ _ _

017000 RV-08-TA

Reactor Vessel Flange

B-G-1

B6.50

VT-i

Washer

. 1 . . .1 ........ . .. I ... .. . .

017100 RV-08-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

Page 40: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 21

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Closure Head Washers

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

017200 RV-09-TA

Reactor Vessel Flange

Washer

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

B-G-1 VT-l

B6.50

PLAN STATUS PRESERVICE YEAR

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

3 X - - - - - - - - -

017300 RV-09-TB

Reactor Vessel Flange

Washer

.. ... .... - ... ..... .. ... .... .. . ........ ....... .. .... . .......... ....... ..-...

017400 RV-10-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3 x - - - - - - - - -

VT-i

3 X - - - - - - - - -

017500 RV-10-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 X - - - - - - - - -

017600 RV-11-TA

Reactor Vessel Flange

Washer

B1-G-1

B6. 50

VT-1

3 x - - - - - - - -

017700 RV-11-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

017800 RV-12-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-l

3 x - - - - - - - - - -

017900 RV-12-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3 X - - - - - - - - - -

Page 41: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 22

Closure Head Washers

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

018000 RV-13-TA

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

B-G-1 VT-1

B6.50

1FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

Reactor Vessel Fla

Washer

nge3 x - - -

018100 RV-13-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

018200 RV-14-TA B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3 x- - - - - - - -

018300 RV-14-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 x- - - - - - - - - -

018400 RV-15-TA

Reactor Vessel Flange

Washer

018500 RV-15-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3 x- - - - - - - - -

VT-1

3 X- - - - - - - - -

018600 RV-16-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 X- - - - - - - -

018700 RV-16-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 X- - - - - - - - -

Page 42: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 23

Closure Head Washers

ZONE NUMBER: 00.0INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

018800 RV-17-TA

Reactor Vessel Flange

Washer

PECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6.50

NDEMETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**ALIBRATION BLOCK**

VT-1

3 X

018900 RV-17-TB

Reactor Vessel Flange

Washer

019000 RV-18-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3 X - - - - - - - - -

VT-1

3 X- - - - - - - -

019100 RV-18-TB

Reactor Vessel Flange

Washer

I I . . ... . . . . . . ... .. ....-

019200 RV-19-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3 x- - - - - - - - -

VT-1

3 X - - -

019300 RV-19-TB

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3 X - - - - - - - - -

019400 RV-20-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-i

3 X- - - - - - - - -

019500 RV-20-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-i

3 x - - - - - - - - -

Page 43: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 24

Closure Head Washers

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMB3ER IDENTIFICATION

019600 RV-21-TA

ECTION INTl

ASHE

SEC. XI

CATEGYITEM NO

B-G-1

B6.50

ERVAL PLAN STATUS PRESERVICE YEARr

FIRST SECONDPERIOD PERIOD

NDE - - - - - -O U T A G E -

METH 1 2 3 4 1 2 3 4

VT-1

THIRDPERIOD

_ - - - - INSTRUCTIONS

1 2 3 4 **CALIBRATION BLOCK**_ _

Reactor Vessel Fla

Washer

nqe

019700 RV-21-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 X - - -

019800 RV-22-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-i

3 x - - - - - - - - - -

019900 RV-22-TB

Reactor Vessel Flange

Washer

020000 RV-23-TA

Reactor Vessel Flange

Washer

B-G-1

B6. 50

B-G-1

B6.50

VT-l

3 x - - - - - - - - - -

VT-1

3- - - - X - - - - - - -

020100 RV-23-TB

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3- - - - X - - - - - - -

020200 RV-24-TA

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3- - - - X - - - - - - -

020300 RV-24-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3- - - - X - - - - - - -

Page 44: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 25

Closure Head Washers

ZONE NUMBER: 00.0INSPECTION INTERVAL

SUMMARYNUMBER

020400

EXAMINATION AREA

IDENTIFICATION

RV-25-TA

Reactor Vessel Flange

Washer

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6.50

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

VT-1

3 - - - - X - - -

020500 RV-25-TB

Reactor Vessel Flange

Washer

020600 RV-26-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3- - - - X

VT-1

3- - - - X - - - - - - -

020700 RV-26-TB

Reactor Vessel Flange

Washer

I . I - .. I . ..... .... - - - ...... ..... . . . ....

020800 RV-27-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

VT-1

3- - - - X - - - - - - -

020900 RV-27-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

021000 RV-28-TA

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-l

3- - - - X - - - - - - -

021100 RV-28-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 - - - -

Page 45: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 26

Closure Head Washers

ZONE NUMBER: 00.0 INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

021200 RV-29-TA

Reactor Vessel Flange

Washer

............. ......... ...................................... ................................ - ..........................

021300 RV-29-TB

Reactor Vessel Flange

Washer

ECTTON INTERVAL PRESERVICE YEAR

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

B-G-1

B6. 50

B-G-1

B6.50

VT-i

3 - - - - X- _

VT-1

3 - - - - X - - -

021400 RV-30-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-i

3 - - - - X - - - - - - -

021500 RV-30-TB

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3- - - - X - - - - - - -

021600 RV-31-TA

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3- -- - X - - - - - -

021700 RV-31-TB

Reactor Vessel Flange

Washer

021800 RV-32-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

VT-1

3- - - - X - - - - - - -

021900 RV-32-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-i

3- - - - X - - - - - - -

Page 46: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 27

Closure Head Washers

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

022000 RV-33-TA

Reactor Vessel Flange

Washer

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6.50

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

PRESERVICE YEAR

THIRDPERIOD

1 2 3 4

INSTRUCTIONS**ALIBRATION BLOCK**

VT-1

3- - - - X - - - - - - -

022100 RV-33-TB

Reactor Vessel Flange

Washer

022200 RV-34-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3 - - - - X - - -

VT-1

3- - - - X - - - - - - -

022300 RV-34-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

022400 RV-35-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - X -- - - _

022500 RV-35-TB

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3- - - - X - - - - - - -

022600 RV-36-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 - - - - X - -

022700 RV-36-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3- - - - X - - - - - - -

Page 47: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 28

Closure Head Washers

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

022800 RV-37-TA

Reactor Vessel Flange

Washer

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6. 50

NDEHETH

VT-1

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

0 U T A G E -

1 2 3 4

THIRD

PERIOD

1 2 3 4 -

1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS

**CALIBRATION BLOCK**

3 - - - - X - - - - - -

022900 RV-37-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 - - - - X - - - - _

023000 RV-38-TA

Reactor Vessel Flange

Washer

023100 RV-38-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6. 50

VT-1

3- - - - X - - - - - - -

VT-1

3- - - - X - - - - - - -

023200 RV-39-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

023300 RV-39-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

023400 RV-40-TA

Reactor Vessel Flange

B-G-1

B6. 50

VT-l

3- - - - X - - - - - - -Washer

1 . ~ . .- .. . .... ... .- . .. ..... .-

023500 RV-40-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3- - - - X - - - - - - -

Page 48: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 29

Closure Head Washers

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

023600 RV-41-TA B-G-1

Reactor Vessel Flange B6.50

Washer

NDEMETH

VT-1

_ r

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

3 - - - X - - - - - -

023700 RV-41-TB

Reactor Vessel Flange

Washer

023800 RV-42-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3- - - - X

VT-l

3 - - - - X - - -

023900 RV-42-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

024000 RV-43-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 - - - - X - - - - - -

024100 RV-43-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

024200 RV-44-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-i

3-X - - -

024300 RV-44-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3- - - - - - - - X - - -

Page 49: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 30

Closure Head Washers

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

024400 RV-45-TA

Reactor Vessel Flange

Washer

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-G-1

B6. 50

NDEMETH

VT-1

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS

**CALIBRATION BLOCK**

3 - - - - - - - - X - - -

024500 RV-45-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-i

3-_ - - -

024600 RV-46-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3-_ - - -

024700 RV-46-TB

Reactor Vessel Flange

Washer

024800 RV-47-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3- - - - - - - - X - - -

VT-i

3- - - - - - X - - -

024900 RV-47-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3-_ - - -

025000 RV-48-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3-_ - - -

025100 RV-48-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3-H - - -

Page 50: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 31

Closure Head Washers

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH ~11

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

025200 RV-49-TA B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3-_ - - -

025300 RV-49-TB B-G-l

Reactor Vessel Flange B6E50

Washer

VT-l

3 - - - - - - - X - - -

025400 RV-50-TA

Reactor Vessel

Washer

025500 RV-50-TB

Reactor Vessel

Washer

B-G-l

Flange B6.50

VT-l

3-_ - - -

B-G-l

Flange B6.50

VT-l

3 - - - -_ - - - -

025600 RV-51-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 - - - - - - - - X - - -

025700 RV-51-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3-_ - - -

025800 RV-52-TA

Reactor Vessel Flange

Washer

B-G-i

B6.50

VT-l **N/A**

3-_ - - -

025900 RV-52-TB

Reactor Vessel Flange

Washer

B-G-i

B6.50

VT-l

3- - _ - - -_ _ X - - -

Page 51: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 32

Closure Head Washers

ZONE NUMBER: 00.0 INSPJ

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

NDE1MIETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

THIRDPERIOD

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**2 3 4 1 2 3 4

**N/A**026000 RV-53-TA B-G-1

Reactor Vessel Flange B6.50

Washer

026100 RV-53-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3 - - _ - - - - X - - -

VT-1

3 - - X - - -

026200 RV-54-TA

Reactor Vessel Flange

Washer

--.. '. .. , . .- . ...... .... _.-...... ... .. .... . I---.

026300 RV-54-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-1

3 - - - - - - X - - -

VT-1

3-_ - - -

026400 RV-55-TA

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1 **N/A**

3- - - - - - - - H - - -

**N/A**026500 RV-55-TB

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3 X - - -

026600 RV-56-TA

Reactor Vessel Flange

Washer

026700 RV-56-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-i **N/A**

3 - - X - - -

VT-1 **N/A**

3-_ - - -

Page 52: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 33

Closure Head Washers

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

026800 RV-57-TA B-G-1

Reactor Vessel Flange B6.50

Washer

NDEMETH

VT-1

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4 -

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

**N/A**

3…- - - - - - -

026900 RV-57-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3 _ - -_- X - - -

027000 RV-58-TA

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1 **N/A**

3 - X - - -

027100 RV-58-TB

Reactor Vessel Flange

Washer

..... I ... ...... ....... ..............................

027200 RV-59-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-i

3- - - - - - - - X - - -

VT-1 **N/A**

3- - - - - - - - X - -

027300 RV-59-TB

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3- - - - - - - - X - - -

027400 RV-60-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - - - - - X - - -

027500 RV-60-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3- - - - - - - - X - - -

Page 53: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 34

Closure Head Washers

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS r

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METE

027600 RV-61-TA B-G-1 VT-1

1FIRST SECONDPERIOD PERIOD

- - - - - -O U T A G E -

1 2 3 4 1 2 3 4

THIRDPERIOD

. 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**II

Reactor Vessel Flange

Washer

B6.503 - - - - - - - X - - -

027700 RV-61-TB

Reactor Vessel Flange

Washer

......... ........ .................................................................

027800 RV-62-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

B-G-1

B6.50

VT-i

3…- - - - - - -

VT-l

3- - - - - - - - X - - -

027900 RV-62-TB

Reactor Vessel Flange

Washer

B-G-1

B6. 50

VT-1

3-X - - -

**N/A**028000 RV-63-TA

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-1

3 - - - - - - - - X - - -

**N/A**028100 RV-63-TB

Reactor Vessel Flange

Washer

B-G-1

B6.50

VT-l

3- - - - - - - - X - - -

028200 RV-64-TA B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1

3- - - - - - - - X - - -

028300 RV-64-TB B-G-1

Reactor Vessel Flange B6.50

Washer

VT-1 **N/A**

3- - - - - - - - X - - -

Page 54: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 35

Control Rod Drive Housings

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASHE

SEC. XI

SUMIARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

00.0 RPV (REF. DWG. NO. 28A)

1FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

FPRESERVICE YEARINSTRUCTIONS

**CALIBRATION BLOCK**�L. -I-_____________

041300 CED-XX-X

Capscrews (8) @ 1

B-G-2

B7. 80

VT-1

3 X - - - X X - - X - - -

Only when disassembled,

To be identified as

disassembled during each

outage **N/A**

041400 NCTS503783-1 AIISRDH

CRDH Exterior @ Rx

Bottom Head

NCTS

503783

VT-2

3 X - - X X - - X

All CRD Housings, CRD

pen. leakage req'd

during RFO & Maint &

Mid-cycle shutdown when

drywell De-inerted.

**N/A**

041500 RV-CRD-R1

CRD Housing-to-Flange

weld

B-O

B14.10

PT Examine outer 180

degrees of circuference

per RR-ISI-9 **N/A**3 - - - - - X -

041600 RV-CRD-R5

CRD Housing-to-Flange

weld

B-O

B14.10

PT Examine outer 180

degrees of circumference

per RR-ISI-9 **N/A**3

041700 RV-CRD-Sl

CRD Housing-to-Flange

weld

. . . - . -. ... . . - -. . ... .- . -. - - .. . . .I. .... .. . . .

041800 RV-CRD-S3

CRD Housing-to-Flange

weld

B-O

B14.10

B-O

B14.10

PT

3 X- - - - - - - - -

Examine outer 180

degrees of circumference

per RR-ISI-9 **N/A**

Examine outer 180

degrees of circumference

per RR-ISI-9 **N/A**

PT

3 - - - - X - -

041900 RV-CRD-T3

CRD Housing-to-Flange

weld

B-O

B14.10

PT Examine outer 180

degrees of circumference

per RR-ISI-9 **N/A**3-X - - -

Page 55: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 36

Control Rod Drive Housings

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

042000 RV-CRD-T7 B-O

CRD Housing-to-Flange B14.10

weld

NDEMETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

PT Examine outer 180

degrees of circumference

per RR-ISI-9 **N/A**3- - - - X -- - - - -

042100 RV-CRD-U2 B-O

CRD Housing-to-Flange B14.10

weld

PT Examine outer 180

degrees of circumference

per RR-ISI-9 **N/A**3 - - - - - - - - X - - -

042200 RV-CRD-U6 B-O

CRD Housing-to-Flange B14.10

weld

PT Examine outer 180

degrees of circumference

per RR-ISI-9 **N/A**3 x - - - - - - - - -

Page 56: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 37

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

00.0 RPV (REF. DWG. NO. 28)

042300 RV-01-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-l**

Only when disassembled.

**N/A**

042400 RV-O1-T

Reactor Vessel

Bushings in Flange

B-G-l

B6.50

VT-1

3 X

042500 RV-02-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**3 X - - -

042600 RV-02-T

Reactor Vessel

Bushings in Flange

B-G-1

B6. 50

VT-1 Only when disassembled.

**N/A**3 X - - -

042700 RV-03-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 x- - - - - - - - -

Only when disassembled.

**Pl-LF-1**

Only when disassembled.

**N/A**

042800 RV-03-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 X- - - - - - - - -

042900 RV-04-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**3 x - - - - - - - - -

043000 RV-04-T

Reactor Vessel

Bushings in Flange

B-G-1

B6. 50

VT-l Only when disassembled.

3 x - - -

Page 57: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 38

Reactor Vessel Flange

ZONE NUMBER: 00.0 INSPJ

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

043100 RV-05-L

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

B-G-1

NDE 1METH

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

THIRDPERIOD

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**1 2 3 4 1 2 3 4 1 2 3 4

UT Only when disassembled.

**P1-LF-1**Reactor Vessel Threads B6.40

in Flange3 X- - - - - - - -

043200 RV-05-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 X - - - - - - - -

Only when disassembled.

**N/A**

Only when disassembled.

**Pl-LF-l**043300 RV-06-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 x- - - - - - - - -

043400 RV-06-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

3 x - - -

043500 RV-07-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 x- - - - - - - - - -

Only when disassembled.

**Pl-LF-l**

. . y . . .... .... .. l . d .

Only when disassembled.

**N/A**043600 RV-07-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 X- - - - - - - - - -

043700 RV-08-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-l**3 X- - - - - - - -

043800 RV-08-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-l Only when disassembled.

3 X - -

Page 58: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

---

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 39

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASHE

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

043900 RV-09-L B-G-1

Reactor Vessel Threads B6.40

in Flange

NDEMETH

UT

PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - - 1 U T A G E - -

1 2 3 4 1 2 3 4 1

PRESERVICE YEAR

THIRDPERIOD

-_ _-- INSTRUCTIONS2 3 4 **CALIBRATION BLOCK**

3 X - - -

Only when disassembled.

**Pl-LF-1**

........................................ ..... .e ..........

Only when disassembled.

**N/A**044000 RV-09-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 X- - - - - - - - -

044100 RV-10-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

VT-1

Only when disassembled.

**Pl-LF-1**

...................................................... ...

Only when disassembled.044200 RV-10-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.503 x - - - - - - - -

044300 RV-11-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**

3X - - - -

044400 RV-11-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-l Only when disassembled.

**N/A**

044500 RV-12-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**3 X - - - - - - - - -

044600 RV-12-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-l Only when disassembled.

**N/A**3 X - - -

Page 59: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 40

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

044700 RV-13-L B-G-1

Reactor Vessel Threads B6.40

in Flange

FIRSTPERIO1

NDE - - - -

METH 1 2 3

UT

rSECOND)D PERIOD

- - -O U T A G E -

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**4 1 2 3 4

Only when disassembled.

**Pl-LF-1**

3 X- - - - - - - - -

044800 RV-13-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 X

044900 RV-14-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

Only when disassembled.

**N/A**

Only when disassembled.

**P1-LF-l**

.Oi.......................................... .. .........

Only when disassembled.

3 X

045000 RV-14-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 X - -

045100 RV-15-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-l**3 X - - -

045200 RV-15-T

Reactor Vessel

Bushings in Flange

B-G-i

B6.50

VT-1

..........

UT

Only when disassembled.

**N/A**

....... ... ....... ..... ........... .................. ....... I......

Only when disassembled.

**Pi-LF-1**045300 RV-16-L B-G-1

Reactor Vessel Threads B6.40

in Flange3 X - - - - - -

045400 RV-16-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3 X - - - - - - - -

Page 60: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 41

Reactor Vessel Flange

ZONE NUMBER: 00.0INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

045500 RV-17-L

,ECTION INTERVAL

ASHE

SEC. XI

CATEGY NDEITEM NO METH 1

PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**1 2 3 4 1 2 3 4 1 2 3 4

B-G-1 UT

Reactor Vessel Threads B6.40

in Flange

Only when disassembled.

**P1-LF-l**

3 x- - - - - - - - - -

045600 RV-17-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 X - - - - - - -

Only when disassembled.

**N/A**

............ ............................ .............. ...................... ..

Only when disassembled.

**P1-LF-1**045700 RV-18-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 X- - - - - - - - - -

045800 RV-18-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3 X

045900 RV-19-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

VT-1

Only when disassembled.

**P1-LF-1**

Only when disassembled.046000 RV-19-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.503 X- - - - - - - - -

046100 RV-20-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-1**3 X - - -

046200 RV-20-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

3 X - - -

Page 61: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 42

Reactor Vessel Flange

ZONE NUMBER: 00.0

SUMMARY EXAMINATION AREA

INSPECTION INTERVAL PLAN STATUS

ASHE

SEC. XICATEGY NDE1

METE

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

THIRDPERIOD

PRESERVICE YEAR

F INSTRUCTIONS.**CALIBRATION BLOCK**NUMBER IDENTIFICATION ITEM NO

046300 RV-21-L B-G-1

Reactor Vessel Threads B6.40

in Flange

1 2 3 4 1 2 3 4 1 2 3 4

UT Only when disassembled.

**P1-LF-1**3 X- - - - - - - -

046400 RV-21-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

3 X- - - - - - -

046500 RV-22-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 X- - - - - - - -

Only when disassembled.

**Pl-LF-1**

.......... ....when se....................................

Only when disassembled.

**N/A**

046600 RV-22-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 x- - - - - - - - -

046700 RV-23-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**3 - - - - X - -

046800 RV-23-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

3 - - - - X - _ -

046900 RV-24-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pi-LF-1**3- - - - X - - - - - - -

047000 RV-24-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-i Only when disassembled.

3- - - - X - - - - - - -

Page 62: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 4 3

Reactor Vessel Flange

ZONE NUMBER: 00. 0 INSPJ

SUMMIARY EXAMINATION AREA

NUMBER IDENTIFICATION

RrTTON TNTERVAL

A.SME

SEC. XI

CATEGYITEM NO

NDE1METH

FIRST

PERIOD

1234 --

PLAN STATUS

SECOND TH

PERIOD PE

O U TA GE- - -

1 2 34 1 2

I RD

RIOD

3 4

PRESERVICE YEARF INSTRUCTIONS**

tCALIBRATION BLOCK*"

047100 RV-25-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**

3 - - - - X--- - -

047200 RV-25-T

Reactor Vessel

Bushings in Flange

B-G-1

BE.50o

VT-i Only when disassembled.

3 - - - X--- - -

047300 RV-26-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-.l**

3- -- - X -

047400 RV-26-T

Reactor Vessel

Bushings in Flange

B-G-1

B6 .50

VT-i Only when disassembled.

3- -- -

047500 RV-27-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-1**

3 - - - - - - -

047600 RV-27-T

Reactor Vessel

Bushings in Flange

B-G-1

B6. 50

VT-i Only when disassembled.

3 - - - - X--- - -

047700 RV-28-L B-G-l

Reactor Vessel Threads B6.40

in Flange

UT only when disassembled.

**Pl-LF-1**

3- - -- X -------

047800 RV-28-T

Reactor Vessel

Bushings in Flange

B-G-1

B6. 50

VIT-1 Only when disassembled.

3 - ---

Page 63: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 44

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4 FPRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**__ _L_ __ _ _ _ _ _ _ _ _ _

047900 RV-29-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**3 - -- - X --

048000 RV-29-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

3- - - - X

048100 RV-30-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 - - - - X - -

Only when disassembled.

**Pl-LF-i**

................................................. .....

Only when disassembled.

**N/A**048200 RV-30-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 - - - - X - - - - - -

048300 RV-31-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-1**

3 - - - - X- _

048400 RV-31-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

Only when disassembled.

**N/A**

Only when disassembled.

**P1-LF-l**048500 RV-32-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 - - - - X - - - - - -

048600 RV-32-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3 - - - - X - - - - - -

Page 64: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 45

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

SEON TIR

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

ASME

SEC. XI

CATEGYITEM NO

FIRSTPERIOD

NDE - - - - -

METH 1 2 3 4

UT

_ r

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

048700 RV-33-L B-G-1

Reactor Vessel Threads B6.40

in Flange

Only when disassembled.

**P1-LF-1**

3 - - - - X - - - _ _

......................................................................................

048800 RV-33-T

Reactor Vessel

Bushings in Flange

B

B

-G-1

B6. 50

VT-l

3 - - - - X-

Only when disassembled.

**N/A**

Only when disassembled.

**Pl-LF-1**048900 RV-34-L B-G-l

Reactor Vessel Threads B6.40

in Flange

UT

3- - - - X - - - - - - -

049000 RV-34-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

Only when disassembled.

**N/A**

..... . ......... ...... ................... ............................. .

Only when disassembled.

**Pl-LF-1**049100 RV-35-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 - - - - X - -

049200 RV-35-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

3- - - - X - - - - - - -

Only when disassembled.

**N/A**

Only when disassembled.

**Pl-LF-1**049300 RV-36-L B-G-1

Reactor Vessel Threads B6.40

in Flange

049400 RV-36-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-l Only when disassembled.

**N/A**3 - - - - X - - - - - - -

Page 65: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 46

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

049500 RV-37-L B-G-1

Reactor Vessel Threads B6.40

in Flange

NDEMETH

FIRSTTHIRFIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

UT

3- - - - X

Only when disassembled.

**P1-LF-1**

............. .......... ... ... ........... ...... . .. ........ . ....

Only when disassembled.

**N/A**049600 RV-37-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3---- X - - -

049700 RV-38-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 - - - - X - - - - - - -

Only when disassembled.

**Pl-LF-l**

Only when disassembled.

**N/A**

049800 RV-38-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 - X - - -

049900 RV-39-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 - - - - X - - -

Only when disassembled.

**Pl-LF-l**

Only when disassembled.

**N/A**

050000 RV-39-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3- - - - X - - - - - - -

050100 RV-40-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-1**3 - - - - X -

050200 RV-40-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3- - - - X - - - - - - -

Page 66: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 47

Reactor Vessel Flange

ZONE NUMBER: 00.0

INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

050300 RV-41-L

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-G-1

NDEMETH

UT

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDTHIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Only when disassembled.

**Pl-LF-1**Reactor Vessel Threads B6.40

in Flange3 - - - - X--

050400 RV-41-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3- - - - X -- _ _

050500 RV-42-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 - - - - -

Only when disassembled.

**Pl-LF-l**

Only when disassembled.

**N/A**

050600 RV-42-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3- - - - X - -

050700 RV-43-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-l**3- - - -

050800 RV-43-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3- - - -

050900 RV-44-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**3- - - - - - - - 2 - - -

051000 RV-44-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3-_- - - -

Page 67: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 48

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

051100 RV-45-L B-G-1

Reactor Vessel Threads B6.40

in Flange

NDEMETE

UT

PLAN STATUS rFIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CLIBRATION BLOCK**

Only when disassembled.

**Pl-LF-1**3- - - - X

051200 RV-45-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3- - - - - - - - K - - -

051300 RV-46-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 - - - -_ - - -

Only when disassembled.

**P1-LF-1**

Only when disassembled.

**N/A**

051400 RV-46-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3- - - - - - - - X -

051500 RV-47-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3- - - - - - - - X -

Only when disassembled.

**P1-LF-1**

Only when disassembled.

**N/A**051600 RV-47-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3-N - - -

051700 RV-48-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**3 _ - -_ - - -

051800 RV-48-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-l Only when disassembled.

3-_ - - -

Page 68: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 49

Reactor Vessel Flange

ZONE NUMBER: 00.0 INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ZCTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

INSTRUCTIONS

C**CALIBRATION BLOCK**

051900 RV-49-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3- - - - - - - - X - - -

Only when disassembled.

**Pl-LF-l**

Only when disassembled.

**N/A**

052000 RV-49-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 - - - - - - - - X - - -

052100 RV-50-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3- - - - - X

Only when disassembled.

**P1-LF-l**

... ... .. ... .. . . ... . . . . . . . . .. . . . . . . . . .

Only when disassembled.

**N/A**

052200 RV-50-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-l

3- - - - - - - - X

052300 RV-51-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-l**3 - -- - - - - - X - - -

052400 RV-51-T

Reactor Vessel

Bushings in Flange

2-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3 X - - -

052500 RV-52-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-l**3 - - - - X - - -

052600 RV-52-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3- - - - - - - - X - - -

Page 69: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 50

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

052700 RV-53-L B-G-1

Reactor Vessel Threads B6.40

in Flange

NDEMETH

PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

PRESERVICE YEAR

THIRDPERIOD

- - - -_ INSTRUCTIONS

* 2 3 4 **CALIBRATION BLOCK**1 2 3 4 1 2 3 4 1

UT Only when disassembled.

**P1-LF-l**3- - - - - - - - X - - -

052800 RV-53-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3-X - - -

052900 RV-54-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-1**3 - - - - - - - X - - -

053000 RV-54-T

Reactor Vessel

B-G-1

B6. 50

VT-1 Only when disassembled.

**N/A**3 - - - -… - - - X - - -

Bushings in Flange

053100 RV-55-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pi-LF-i**3- - - - - X -

053200 RV-55-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3- - - - - - - - X - - -

053300 RV-56-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-1**

3- - - - - - - - X - - -

053400 RV-56-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1 Only when disassembled.

**N/A**3- - - - - - - - X - - -

Page 70: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 51

Reactor Vessel Flange

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

'ECTION INTERVAL

ASME .

SEC. XI

CATEGY NDEITEM NO METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

053500 RV-57-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**P1-LF-1**

3 - - - - - - - - X - - -

053600 RV-57-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-l Only when disassembled.

**N/A**3 - - - - -X - - -

053700 RV-58-L B-G-1

Reactor Vessel Threads B6.40

in Flange3- - - - - - - - X -

Only when disassembled.

**Pl-LF-1**

...........................................................

Only when disassembled.

**N/A**

053800 RV-58-T

Reactor Vessel

Bushings in Flange

B-G-l

B6.50

VT-1

3- - - X -

053900 RV-59-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3- - - - - - - - X - - -

Only when disassembled.

**Pl-LF-l**

Only when disassembled.

**N/A**

054000 RV-59-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-i

3 _ - - -X - - -

054100 RV-60-L B-G-i

Reactor Vessel Threads B6.40

in Flange

UT Only when disassembled.

**Pl-LF-1**3 - - - _ _ - X -

054200 RV-60-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-i Only when disassembled.

**NJA**3- - - - - - - - X -

Page 71: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 52

Reactor Vessel Flange

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI ___ 1PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

1 2 3 4 1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

054300 RV-61-L B-G-1 UT

Reactor Vessel Threads B6.40

in Flange

-IOnly when disassembled.

**Pl-LF-1**

3

054400 RV-61-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 - - - - X - - -

Only when disassembled.

**N/A**

Only when disassembled.

**Pl-LF-1**054500 RV-62-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3 - - - - X -

054600 RV-62-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3- - - - - - - - X - - -

Only when disassembled.

**N/A**

Only when disassembled.

**P1-LF-l**054700 RV-63-L B-G-1

Reactor Vessel Threads B6.40

in Flange

UT

3- - - - - - - - X - -

Only when disassembled.054800 RV-63-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-1

3 - - - … - - - - X - - -

054900 RV-64-L B-G-1

Reactor Vessel Threads B6.40

in Flange

Only when disassembled.

**Pl-LF-1**3- - - - - - - - X - - -

055000 RV-64-T

Reactor Vessel

Bushings in Flange

B-G-1

B6.50

VT-i Only when disassembled.

**N/A**3- - - - - - - - X - - -

Page 72: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 53

Reactor Vessel Interior

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

RPV (REF. DWG. NO. 28A)

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

056100 H8

Shroud Support Skirt

He Weld

B-N-2 EVIl

B13.40 VT-3

UT*3 X - - -

USNRC GL94-03, USNRC SER

3/24/99 RF016 scope to

be defined, EVTl top

surface & Locations of

prior indications; UT to

be determined. **LATER**

056200 H9

Shroud Support Skirt

H9 Weld

056300 H9

Shroud Support Skirt

H9 Weld

B-N-2

B13.40

B-N-2

B13.40

EVT1

3-_ - - -

Scope to be defined,

BWRVIP-38 Exam 0 to 180

degrees **N/A**

Scope to be defined,

BWRVIP-38 Exam 180 to

360 degrees **N/A**

EVT1

3- - - - _ _ X - - -

056400 H9-166

Shroud Support Skirt

H9 Weld Repair Anch

B-N-2 EVTl

B13.40 VT-33 X - - - - -

USNRC GL94-03, USNRC SER

3/24/99 RFO16 scope to

be defined, EVTl top

surface of shroud

support skirt to RPV H9

weld adjacent to

TIEROD-RXVE-166. for a

min. 26" adjacent to two

togg **N/A**

056500 H9-270

Shroud Support Skirt

H9 Weld Repair Anch

B-N-2

B13.40

EVT1

VT-33 X - - - - - -

USNRC GL94-03, USNRC SER

3/24/99 RFO16 scope to

be defined, EVTl top

surface of shroud

support skirt to RPV H9

weld adjacent to

TIEROD-RXVE-270 foe a

min. 26" adjacent to two

toggl **N/A**

Page 73: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 54

Reactor Vessel Interior

ZONE NUMBER: 00.0INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

056600 H9-350

Shroud Support Skirt

H9 Weld Repair Anch

ECTION INTERVAL PRESERVICE YEAR

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FI.

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

TI

B-N-2 EVT1

B13.40 VT-3

USNRC GL94-03, USNRC SER

3/24/99 RF016 scope to

3 X- - - - - - - - - - - be defined, EVTl top

surface of shroud

support skirt to RPV H9

weld adjacent to

TIEROD-RXVE-350 for 26"

adjacent to two

toggles.. **N/A**

056700 H9-90

Shroud Support Skirt

H9 Weld Repair Anch

B-N-2 EVT1

B13.40 VT-3

USNRC GL94-03, USNRC SER

3/24/99 RF016 scope to

be defined, EVTl of top

surface of shroud

support skirt to RPV H9

weld adjacent to

TIEROD-RXVE-90 for a

min. of 26" adjacent to

two **N/A**

056900 RV-01-I

Steam Dryer Drain

Cracking

SIL

474

VT-1 Once every inspection

period **N/A**3 X - - - X - - - X - - -

057000 RV-01-I

Steam Dryer

. . .1 .... - . . . . . . .. ..

057100 RV-02-I

Steam Separator

B-N-1

B13.10

B-N-1

B13.10

VT-3

3 X - - - X - - - X

Once every inspection

period **N/A**

- - . . . . . . - . - - . . . .

Once every inspection

period **N/A**

VT-3

3 X - - - X - - - X

057200 RV-05-I

Feedwater Sparger

NUREG

0619

VT-3

3- - - - - - - - X - - -

Exam required every four

outages, commencing in

RFO8, (1981) , Examine

flow holes & welds in

sparger arms & tees and

FW nozzle **N/A**

Page 74: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 55

Reactor Vessel Interior

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

FIRSTPERIOE1

NDE _

METH 1 2 3 4

SECOND THIR1PERIOD PERIC

O U T A G E - - - -

1 2 3 4 1 2 :

- - INSTRUCTIONS

3 4 **CALIBRATION BLOCK**

057300 RV-06-I

Core Spray Sparger

057400 RV-07-I

Core Spray Lines

BWRVIP VT-3

183 X - - - X X - - X - - -

BWRVIP VT-i

18

Examine per Memo

NMP1-M99-018. **N/A**

Examine per Memo

NMP1-M99-018. **N/A**

Examine once per

interval **N/A**

3 X - - - X X - - X - - -

057500 RV-08-I B-N-2

Dryer Support Brackets B13.20

(beltline)

VT-1

3 X - - - - -

057600 RV-09-I

Feedwater Sparger

Brackets (beltline)

- ..... . . ... ..... - .. ........ ....... .. . . .... ......

057700 RV-10-I

Guide Rod Support

Brackets (beltline)

B-N-2

B13.20

B-N-2

B13.20

VT-i

3 - - - - --

Examine once per

interval **N/A**

Examine once per

interval **N/A**

VT-1

3 - - - - X - - -

057800 RV-11-I

Upper Surviellance

Specimen Holder

.. .. - - ... .I - . .... .. ... .... ... . - -

057900 RV-12-I

Lower Surviellance

Specimen Holder

B-N-2

B13.20

...................

B-N-2

B13.20

VT-i

3 - - - - - - X - - -

beltline, Examine once

per interval **N/A**

- - ......................... ....................... ....... .. ... .... . - - -

beltline, Examine once

per interval **N/A**

VT-1

3 - - - - _ _ - - X - -

058000 RV-13-I

Upper Core Grid

B-N-2

B13.40

VT-3 Examine once per

Inspection Interval

**N/A**3 X- - - - - - - - -

058100 RV-13-I

Upper Core Grid

SIL

554

VT-3 RFO-16 scope to be

defined.. **N/A**3 X- - - - - - - - -

Page 75: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 56

Reactor Vessel Interior

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

058300 RV-14-I B-N-2

NDEMETH

VT-3

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

rPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Core Shroud B13.40

Examine accessible

surface's each interval.

**N/A**3…- - - - - - -

058400 RV-15-I

Core Shroud Support

Ring

B-N-2

B13.40

VT-3 Examine once per

Inspection Interval

**N/A**3- - - - X - - -

059000 SIL409-IDTC1245

IRM Incore Dry Tube

Assembly

SIL

409R1

EVT1 EVTl every other even

numbered outage **N/A**3 X

059900 SIL409-IDTC3645

IRM Incore Dry Tube

Assembly

SIL

409R1

EVT1 EVT1 every other even

numbered outage **N/A**

060100 Shroud Head Bolts B-N-2

Shroud Head Bolts (36) B13.40

VT-3

UT3 X

UT exams to be

identified later pending

final results of BWR

Owner's Group. **LATER**

060200 Skirt-166

Shroud Support Skirt

Surface

B-N-2

B13.40

EVT1

3 X - - - - - - - - - -

USNRC GL94-03, USNRC SER

3/24/99, EVTl top

surface of inconel srd.

sprt. skirt where

accessible around

interface of lower

stablizer sprt. pedestal

to conical sprt. e 166

deg tierod **N/A**

Page 76: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 57

Reactor Vessel Interior

ZONE NUMBER: 00.0INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

060300 Skirt-270

Shroud Support Skirt

Surface

WRCTION INT]

ASME

SEC. XI

CATEGYITEM NO

B-N-2

B13.40

ERVAL PLAN STATUS

FIRSTPERIOD

NDE - - - - - -METH 1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

EVT1

3 X - -

USNRC GL94-03, USNRC SER

3/24/99, EVTl top

surface of inconel srd.

sprt. skirt where

accessible around

interface of lower

stablizer suppt pedestal

to conical sprt e 270deg tierod **N/A**

060400 Skirt-350

Shroud Support Skirt

Surface

B-N-2

B13.40

EVTl

3 X - - - - - - -

USNRC GL94-03, USNRC SER

3/24/99, EVT1 top

surface of inconel srd.

sprt. skirt where

accessible around

interface of lower

stablizer supt. pedestal

to conical sprt e 350

deg tierod **N/A**

060500 Skirt-90

Shroud Support Skirt

Surface

B-N-2

B13.40

EVTl

3 X - - -

USNRC GL94-03, USNRC SER

3/24/99, EVT1 top

surface of inconel srd

sprt skirt when

accessible around

interface of lower

stablizer supt pedestal

to conical sprt 8 90 deg

tierod locat **N/A**

060600 Spacer-RXVE-168

Shroud Stabilizer

Assembly (Spacer)

B-N-2

B13.40

VT -3

3 X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommends exam of

shroud assembly core

plate clamp/spacer

assembly located between

ID of shroud & core

support plate e 168 deg.

**N/A**

Page 77: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 58

Reactor Vessel Interior

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

060700 Spacer-RXVE-276

Shroud Stabilizer

Assembly (Spacer)

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

B-N-2

B13.40

NDEMETH

PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - -O U T A G E -

1 2 3 4 1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

VT-3 USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

X - - - - - - - - - - - reccommends exam of

shroud assembly core

plate clamp/spacer

assembly located between

ID of shroud support

plate e 276 deg. **N/A**

060800 Spacer-RXVE-348

Shroud Stabilizer

Assembly (Spacer)

B-N-2

B13.40

VT-3

3 x - - - X - - - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommends exam of

shroud assembly core

plate clamp/specer

assembly located between

ID of shroud & core

support plate e 348 deg.

**N/A**

060900 Spacer-RXVE-96

Shroud Stabilizer

Assembly (Spacer)

B-N-2

B13.40

VT-3

3 X - - - X - _

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommends exam of

shroud assembly core

plate clamp/spacer

assembly located between

ID of shroud & core

support plate @96 deg.

**N/A**

*061000 Tierod-RXVE-166

Shroud Stabilizer

Assembly (Tie Rod)

. . .. .. I . ~ . .. 1 .I .. - . .. ...... ... ....... .............

061100 Tierod-RXVE-270

Shroud Stabilizer

Assembly (Tie Rod)

B-N-2

B13.40

VT-3

3 X - - - X - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended **N/A**

..................... ............... ................................... ......... .. ................................ ............. . -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended **N/A**

B-N-2

B13.40

VT-3

3 x - - - X - - -

Page 78: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 59

Reactor Vessel Interior

ZONE NUMBER: 00.0 INSP

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

061200 Tierod-RXVE-350

Shroud Stabilizer

Assembly (Tie Rod)

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

-I1

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -3 U T A G 4 - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

B-N-2

B13.40

VT-3 USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended **N/A**3 X - - - X - - - - -

061300 Tierod-RXVE-90

Shroud Stabilizer

Assembly (Tie Rod)

B-N-2

B13.40

VT-3 USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended **N/A**3 X - - - X - - - - -

061400 Vi

Core Shroud Vertical

Welds

E-N-2 EVT1

B13.40 UT3 X

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

X -reccommended EVT1 of

ID/OD, 25% of total

length, UT contgency

only, **LATER**

061500 V1O

Core Shroud Vertical

Welds

B-N-2 EVT1

B13.40 UT3 X - - - X - - - - -

USNRC GL94-03, USNRC SER

3/24/99, EVTI of ID/OD

25% of total length, UT

contgy only, BWRVIP

reccommended **LATER**

061600 Vii

Core Shroud Vertical

Welds

B-N-2 EVT1

B13.40 UT3 X - - - X - - _

3 ..... . ........ .................... ...... ..... ........ .........-... ......... .....

3 X - - - X - - - - - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

recommended EVTi of

ID/OD 25% of total

length, UT contgy only.

**LATER**

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended EVT1 of

ID/OD 25% of total

length, UT contgy only

**LATER**

061700 V12

Core Shroud Vertical

Welds

B-N-2 EVTl

B13.40 UT

Page 79: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 60

Reactor Vessel Interior

ZONE NUMBER: 00.0INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

061800 V13

Core Shroud Vertical

Welds

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

NDEMETE

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

B-N-2 EVT1

B13.40 UT3 x - - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended EVT1 of

ID/OD 25% of total

length, UT contgy only.

**LATER**

061900 V14

Core Shroud Vertical

Welds

B-N-2 EVT1

B13.40 UT3 X - - - - - - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended EVT1 of

ID/OD 25% of total

length, UT contgy only.

**LATER**

062000 V15

Core Shroud Vertical

Welds

B-N-2 EVT1

B13.40 UT3 X - - - - - - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended, EVT11 of

ID/OD 25% of total

length, UT contgy only.

**LATER**

062100 V16

Core Shroud Vertical

Welds

B-N-2 EVT1

B13.40 UT3 X - - - - - - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

recconmended, EVT1 of

ID/OD 25% of total

length, UT contgy only.

**LATER**

062200 V2 B-N-2

Core Shroud Vertical B13.40

Welds

EVT1

UT3 X - - - - - - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended, EVT1 of

ID/OD 225% of total

length, UT contgy only.

**LATER**

Page 80: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 61

Reactor Vessel Interior

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

062300 V3 B-N-2

FIRST SECONDPERIOD PERIOD

NDE - - - - - - O U T A G E -

METH 1 2 3 4 1 2 3 4

EVIT1

THIRD

PERIOD

1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CALIBRATION BLOCK**

Core Shroud Vertical

Welds

B13.40 UT3 X - - -

- - -..... ..... . ... . . .

3 X - - -

- - - X - - -

... .. . ....... ..... ......-...

- - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended EVT1 of

ID/OD 25% of total

length, UT contgy only.

**LATER**

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended, EVTl of

ID/OD 25% of total

length, UT contgy only.

**LATER**

062400 V4

Core Shroud Vertical

Welds

B-N-2 EVT1

B13.40 UT

062500 V5

Core Shroud Vertical

Welds-Ring Support

B-N-2

B13.40

EVTl

3 x - - - - - - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended, EVT1 of

ID/OD 25% of total

length, **N/A**

062600 V6

Core Shroud Vertical

Welds-Ring Support

B-N-2

B13.40

EVT1

3 X - - - - - - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended, EVT1 of

ID/OD 25% of total

length, **N/A**

062700 V7

Core Shroud Vertical

Welds

B-N-2 EVT1

B13.40 UT3 X- - - - - - - X - - -

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended, EVT1 of

ID/OD 25% of total

length, UT contgy only.

**LATER**

Page 81: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 62

Reactor Vessel Interior

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS* QLIBRATION BLOCK**

062800 V8

Core Shroud Vertical

Welds

.... .... .... I. ............................................................................ .. .

062900 V9

Core Shroud Vertical

Welds

B-N-2 EVT1

B13.40 UT

B-N-2 EVT1

B13.40 UT

3 X - - -

3 X - - -

- - - - X - - -

.. . . -1 . . .. . . .. . . .. . . .. . . . . . . . . . .

-- - - X

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended, EVTl of

ID/OD 25% of total

length, UT contgy only.

**LATER**

USNRC GL94-03, USNRC SER

3/24/99, BWRVIP

reccommended, EVT1 of

ID/OD 25% of total

length, UT contgy only.

**LATER**

Page 82: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 63

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

Instrument Nozzles (REF. DWG. NO. 14)

063000 SIL571-N12

RPV N12 Instr

Nozzle-to-Safe End

SIL

571

VT-2

3 X - - - X X - - X - - -

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

Safety Valve Nozzles (REF. DWG. NO. 28)

063100 CH-576-07A-B

Nozzle N7N Flange

Bolting

-........ - .. ...... ..... .. ........ ..... ....... .... ... ... . . .. . ..

063200 CH-576-07B-B

Nozzle N7P Flange

Bolting

B-G-2

B7.10

VT-1 R33 **N/A**

3 -- - - X - -

B-G-2

B7.10

VT-i R34 **N/A**

3 - - - - X - -

063300 CH-576-07C-B

Nozzle N7R Flange

Bolting

B-G-2

B7. 10

VT-1 Group R35 **N/A**

3 - - - - X--

063400 CH-576-07D-B

Nozzle N7S Flange

Bolting

063500 CH-576-07E-B

Nozzle N7T Flange

Bolting

.............. .......... .. ... ... .. ...... .... .. .......

063600 CH-576-07F-B

Nozzle N7U Flange

Bolting

B-G-2

B7.10

B-G-2

B7. 10

VT-1 Group R36 **N/A**

3-X - - -

VT-1 Group R37 **N/A**

3 - X - - -

B-G-2

B7.10

VT-1 Group R38 **N/A**

3-X - - -

Page 83: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 64

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

063700 CH-576-12A-B

Nozzle N7A Flange

Bolting

................ ............. ................. ............... . ..... ...... .... .........

063800 CH-576-12B-B

Nozzle N7B Flange

Bolting

. . . ............. ......... ...... .. ........ . . . . . . . . . . . . . . . .

063900 CH-576-12C-B

Nozzle N7C Flange

Bolting

064000 CH-576-12D-B

Nozzle N7D Flange

Bolting

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Group R21 **N/A**B-G-2

B7.10

B-G-2

B7.10

..... I..... .....

B-G-2

B7.10

B-G-2

B7.10

VT-1

3 X - - -

VT-1 Group R22 **N/A**

3 X- - - - - - - - -

VT-1 Group R23 **N/A**

3 x

VT-1 Group R24 **N/A**

3 x- - - - - - - - -

064100 CH-576-12E-B

Nozzle N7E Flange

Bolting

.. ..1 .... ............ ...-.......

064200 CH-576-12F-B

Nozzle N7F Flange

Bolting

B-G-2

B7.10

B-G-2

B7.10

VT-1 Group R25 **N/A**

3 X -

VT-1 Group R26 **N/A**

3- - - - X - - - - - - -

064300 CH-576-12G-B

Nozzle N7G Flange

Bolting

064400 CH-576-12H-B

Nozzle N7H Flange

Bolting

B-G-2

B7.10

B-G-2

B7.10

VT-1 Group R27 **N/A**

3 - - - X - -

VT-1 Group R28 **N/A**

3- - - - X

Page 84: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 65

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

FIRSTPERIOD

PLAN STATUS

SECONDPERIOD

PRESERVICE YEAR

THIRDPERIOD

- - - - - -O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

064500 CH-576-12J-B

Nozzle N7J Flange

Bolting

... ..................................................................

064600 CH-576-12K-B

Nozzle N7K Flange

Bolting

B-G-2

B7.10

VT-1 Group R29 **N/A**

3-X - - -

B-G-2

B7.10

VT-1 Group R30 **N/A**

3-X - - -

064700 CH-576-12L-B

Nozzle N7L Flange

Bolting

B-G-2

B7.10

VT-1 Group R31 **N/A**

3 _ - -_- X - - -

064800 CH-576-12M-B

Nozzle N7M Flange

Bolting

B-G-2

B7.10

VT-1 Group R32 **N/A**

3 _ - - - - - - - X

064900 RV-WD-011

Nozzle N7A-to-Flange

B-F UT

B5.10 PT

Group R21 **LATER**

3 X - - -

065000 RV-WD-011

Nozzle N7A-to-Flange

SIL

455R1S1

UT

3 X - - - - - - - - -

Group R21, Inconel 182

butter expansion from

nozzle side of weld.

**LATER**

065100 RV-WD-012

Closure Head-to N7A

Nozzle

B-D

B3.90

UT Group R21, **LATER**

3 X - - - - - - - - -

065200 RV-WD-012-IR

N7A Nozzle Inner

Radius Section

B-D

B3.100

UT Group R21, **LATER**

3 X - - - - - - - - -

Page 85: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 66

Reactor Vessel Nozzles

ZONE NUMBER: 00.0 INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

Z'CTION INT3

ASME

SEC. XI

CATEGYITEM NO

ERVAL

NDEMETH

PLAN STATUS_ _ _ _ _

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

PRESERVICE YEAR

. INSTRUCTIONS

**CALIBRATION BLOCK**1 2 3 4 1 2 3 4 1 2 3 4

UT065300 RV-WD-013 SIL

Nozzle N7B-to-Flange 455RlS13- - - - - - - - X - - -

Group R22, Inconel 182

butter expansion from

nozzle side of weld.

**LATER**

065400 RV-WD-013

Nozzle N7B-to-Flange

B-F

B5.10

UT

PT

Group R22 **LATER**

3 - - - - X - - -

065500 RV-WD-014 B-D

Closure Head-to-Nozzle B3.90

N7B

UT Group R22, **LATER**

3 X- - - - - - - - -

065600 RV-WD-014-IR

Nozzle N7B Inner

Radius Section

.. - . .. . . I. .......... ... . . . . . - . ...... ........ - -

065700 RV-WD-015

Nozzle N7C-to-Flange

B-D

B3.100

UT Group R22, **LATER**

3 X

B-F

B5.10

UT

PT

Group R23, **LATER**

3- - - - X - - - - - - -

065800 RV-WD-015

Nozzle N7C-to-Flange

SIL

455R15

UT

3 - - - - - - - - X - - -

Group R23, Inconel 182

butter expansion from

nozzle side of weld

**LATER**

065900 RV-WD-016 B-D

Closure Head-to-Nozzle B3.90

N7C

UT Group R23, **LATER**

3 X -

066000 RV-WD-016-IR

Nozzle N7C Inner

Radius Section

B-D

B3.100

UT Group R23, **LATER**

3 x - - -

Page 86: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 67

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSP)

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

066100 RV-WD-017

Nozzle N7D-to-Flange

ECTION INTERVAL PLAN STATUS

ASME

SEC. XICATEGYITEM NO

B-F

B5.10

NDEMETH

UT

PT

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**1 2 3 4 1 2 3 4

Group R24 **LATER**

3 - - - - - - - - X -

066200 RV-WD-017 SIL

Nozzle N7D-to-Flange 455R1S1

UT

3 - - - - - - - - X -

Group R24, Inconel 182

butter expansion from

nozzle side of weld

**LATER**

066300 RV-WD-018 B-D

Closure Head-to-Nozzle B3.90

N7D

UT Group R24, **LATER**

3 X - -

066400 RV-WD-018-IR

Nozzle N7D Inner

Radius Section

B-D

B3.100

UT Group R24, **LATER**

3 X - - - - - - - - -

066500 RV-WD-019

Nozzle N7E-to-Flange

B-F

B5.10

UT

PT

Group R25, **LATER**

3-_ - - -

066600 RV-WD-019 SIL

Nozzle N7E-to-Flange 455RlSl

UT

3 X - -

Group R25, Inconel 182

butter expansion from

nozzle side of weld.

**LATER**

Group R25, **LATER**066700 RV-WD-020 B-D UT

Closure Head-to-Nozzle B3.90

N7E

066800 RV-WD-020-IR

Nozzle N7E Inner

Radius Section

B-D

B3.100

UT Group R25, **LATER**

3 x - - - - -

Page 87: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 68

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

066900 RV-WD-021

Nozzle N7F-to-Flange

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

NDE1METH

FIRSTPERIOD

1 2 3 4

Or

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Group R26 **LATER**B-F

B5.10

UT

PT3 - - - … - - - X - - -

067000 RV-WD-021 SIL

Nozzle N7F-to-Flange 455R1S1

UT

3- - - - - - - - X - - -

Group R26, Inconel 182

butter expansion from

nozzle side of weld

**LATER**

067100 RV-WD-022 B-D

Closure Head-to-Nozzle B3.90

N7F

UT Group R26, **LATER**

3- - - - X - - - - - - -

067200 RV-WD-022-IR

Nozzle N7F Inner

Radius Section

B-D

B3.100

UT Group R26, **LATER**

3- - - - X - - - - - -

067300 RV-WD-023

Nozzle N7G-to-Flange

B-F

B5.10

UT

PT

Group R27 **LATER**

3- - - - - - - - X - -

067400 RV-WD-023

Nozzle N7G-to-Flange

SIL

455R1S1

UT

3- - - - - - - - X - -

Group R27, Inconel 182

butter expansion from

the nozzle side of weld

**LATER**

067500 RV-WD-024 B-D

Closure Head-to-Nozzle B3.90

N7G

UT Group R27, **LATER**

3- - - - - - - - X - - -

067600 RV-WD-024-IR

Nozzle N7G Inner

Radius Section

B-D

B3.100

UT Group R27, **LATER**

3- - - - - - - - X - - -

Page 88: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 69

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

067700 RV-WD-025 B-F

Nozzle N7H-to-Flange B5.10

067800 RV-WD-025 SIL

Nozzle N7H-to-Flange 455RlSl

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Group R28 **LATER**UT

PT

UT

3- - - - - - - - X - -

3 - - - _ _ - - X -

Group R28, Inconel 182

butter expansion from

nozzle side of weld

**LATER**

067900 RV-WD-026 B-D

Closure Head-to-Nozzle B3.90

N7H

UT Group R28, **LATER**

3 - - - - X

068000 RV-WD-026-IR

Nozzle N7H Inner

Radius Section

B-D

B3.100

UT Group R28, **LATER**

3 - - - - X - _

068100 RV-WD-027

Nozzle N7J-to-Flange

B-F

B5.10

UT Group R29 **LATER**

PT

068200 RV-WD-027

Nozzle N7J-to-Flange

SIL

455R1S1

UT

3 X- - - - - - - - -

Group R29, Inconel 182

butter expansion from

nozzle side of weld.

**LATER**

068300 RV-WD-028 B-D

Closure Head-to-Nozzle B3.90

N7J

UT Group R29, **LATER**

3-X - - -

068400 RV-WD-028-IR

Nozzle N7J Inner

Radius Section

B-D

B3.100

UT Group R29, **LATER**

3…- _ -_ _ _ _ X - - -

Page 89: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 70

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

068500 RV-WD-029

Nozzle N71-to-Flange

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

B-F UT

B5.10 PT

PLAN STATUS

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CLIBRATION BLOCK**

Group R30, **LATER**

3 X - - -

068600 RV-WD-029 SIL

Nozzle N7K-to-Flange 455R1S1

068700 RV-WD-030 B-D

Closure Head-to-Nozzle B3.90

N7K

UT

3 X - -

Group R30, Inconel 182

butter expansion from

nozzle side of weld.

**LATER**

..... ... .. . . . G ru............ .......................... ........ R .... .......... -

Group R30, **LAkTER**UT

3- - - - - - - - X

..... .. . . I ._ _ . . . . . . . . . . . . . . . . . . .. . . . . . . . . ..........

068800 RV-WD-030-IR

Nozzle N7K Inner

Radius Section

B-D

B3.100

UT Group R30, **LATER**

3-X - - -

068900 RV-WD-031

Nozzle N7M-to-Flange

069000 RV-WD-031

Nozzle N7M-to-Flange

B-F

B5.10

SIL

455RiS1

UT

PT

UT

UT

Group R32 **LATER**

3 X - - - - - - - - - - -

Group R32, Inconel

butter expansion from3X-the nozzle side of the

weld **LATER**

Group R32, **LATER**069100 RV-WD-032 B-D

Closure Head-to-Nozzle B3.90

N7M3-X - - -

069200 RV-WD-032-IR

Nozzle N7M Inner

Radius Section

B-D

B3.100

UT Group R32, **LATER**

3-X - - -

Page 90: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 71

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPECTION INT]

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

069300 RV-WD-033 B-F

Nozzle N7N-to-Flange B5.10

................................................................................................... -------

069400 RV-WD-033 SIL

Nozzle N7N-to-Flange 455RlS1

069500 RV-WD-034 B-D

Closure Head-to-Nozzle B3.90

N7N

'ERVAL

NDE 1METH

PLAN STATUSr

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**"LIBRATION BLOCK**

UT

PT

Group R33 **LATER**

3

UT

3 -

- - _X - - -

Group R33, Inconel 182

butter expansion fromX nozzle side of weld.

**LATER**

Group R33, **LATER**UT

3- - - - X

069600 RV-WD-034-IR

Nozzle N7N Inner

Radius Section

- - . . . .. .. ......1 ............ . .... ........ ..... ..

069700 RV-WD-035

Nozzle N7P-to-Flange

B-D

B3.100

B-F

B5 10

UT Group R33, **LATER**

3- - - - X - - - - - - -

UT

PT

Group R34 **LATER**

3- - - - X - - - - -

069800 RV-WD-035

Nozzle N7P-to-Flange

SIL

455R1S1

UT

3- - - - - - - - X - -

R34 , Inconel 182 butter

expansion from the

nozzle side of the weld.

**LATER**

069900 RV-WD-036 B-D

Closure Head-to-Nozzle B3.90

N7P

UT R34 **LATER**

3 - - - - -

070000 RV-WD-036-IR

Nozzle N7P Inner

Radius Section

B-D

B3.100

UT R34 **'LATER**

3- - - - X - - -

Page 91: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 72

Reactor Vessel Nozzles

ZONE NUMBER: 00.N0INSP)

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

070100 RV-WD-037

Nozzle N7R-to-Flange

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

NDE JMETH

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**1 2 3 4 1 2 3 4 1 2 3 4

B-F

B5.10

UT

PT

Group R35, **LATER**

3 - - - - X - - - - - - -

070200 RV-WD-037 SIL

Nozzle N7R-to-Flange 455RS1

UT

3 - - - - - - X - - -

Group R35, Inconel 182

butter expansion from

the nozzle side of the

weld. **LATER**

070300 RV-WD-038 B-D

Closure Head-to-Nozzle B3.90

N7R

UT Group R35, **LATER**

3- - - - X - - - - - - -

070400 RV-WD-038-IR

Nozzle N7R Inner

Radius Section

B-D

B3. 100

UT Group R35, **LATER**

3- - - - X

070500 RV-WD-039

Nozzle N7S-to-Flange

B-F UT

B5.10 PT

Group R36 **LATER**

3- - - - X-

070600 RV-WD-039

Nozzle N7S-to-Flange

SIL

455RISi

UT

3- - - - - - - - X

Group R36, Inconel 182

butter expansion from

the nozzle side of the

weld. **LATER**

070700 RV-WD-040 B-D

Closure Head-to-Nozzle B3.90

N7S

UT Group R36, **LATER**

3 - - - - - - - X - - -

070800 RV-WD-040-IR

Nozzle N7S Inner

Radius Section

B-D

B3.100

UT Group R36, **LATER**

3- - - - - - - - X - - -

Page 92: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 73

Reactor Vessel Nozzles

ZONE NUMBER: 00.0

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

INSPECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

r INSTRUCTIONS**CALIBRATION BLOCK**

070900 RV-WD-041

Nozzle N7T-to-Flange

B-F

B5.10

UT Group R37 **LATER**

PT

071000 RV-WD-041 SIL

Nozzle N7T-to-Flange 455RlSl

UT Group R37, Inconel

butter expansion from

the nozzle side of the

weld. **LATER**

3 x- - - - - - -

071100 RV-WD-042 B-D

Closure Head-to-Nozzle B3.90

N7T

UT Group R37, **LATER**

3 - - - -_ - - X - - -

071200 RV-WD-042-IR

Nozzle N7T Inner

Radius Section

. .- . 1 . . . ....

071300 RV-WD-043

Nozzle N7U-to-Flange

B-D

B3.100

B-F

B5.10

UT Group R37, **LATER**

3- - - - - X

UT

PT

Group R38 **LATER**

3 X - - -

071400 RV-WD-043 SIL

Nozzle N7U-to-Flange 455Rl11

UT Group R38, Inconel 182

butter expansion from

the nozzle side of the

weld. **LATER**

3 x- - - - - - - - - -

071500 RV-WD-044 B-D

Closure Head-to-Nozzle B3.90

N7U

UT Group R38 **LATER**

3 - - - X - - -

071600 RV-WD-044-IR

Nozzle N7U Inner

Radius Section

B-D

B3.100

UT Group R38 **LATER**

3- - - - - - - - X - - -

Page 93: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 74

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDE1METH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

1 -. 1

6.0" Safety Relief Valve (REF. DWG. NO. 28)

071700 V-BK-01-119A B-M-2

Safety Valve Interior B12.50

Surface

VT-3 V09, Examine when

disassembled **N/A**3 X - - -

Control Rod Drive Nozzles (REF. DWG. NO. 28A)

073500 CRD-NOZZLES

Partial Penetration

Welds

B-E

B4.12

VT-2

3 - - - - - X - - -

129 CRD Nozzles, 25% or

32 required, included in

system pressure test

program **N/A**

Instrumentation Nozzles (REF. DWG. NO. 28A)

073600 INST-NOZZLES B-E

Incore Flux Monitors B4.13

VT-2

3 - - - - - - - - X - - -

64 IFM's, 25% or 16

required, included in

system pressure test

program **N/A**

Instrument Nozzles (REF. DWG. NO. 8)

073900 SIL571-N13A

RPV N13A Instr

Nozzle-to-Safe End

SIL

571

VT-2

3 X - - - X X - - X - - -

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RF0. **N/A**

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

074000 SIL571-N13B

RPV N13B Instr

Nozzle-to-Safe End

SIL

571

VT-2

3 X - - - X X - - X - - -

Page 94: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 75

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUWARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

Instrument Nozzles (REF. DWG. NO. 8A)

074100 SIL571-N14A

RPV N14A Instr

Nozzle-to-Safe End

074200 SIL571-N14B

RPV N14B Instr

Nozzle-to-Safe End

SIL

571

SIL

571

VT-2

3 X - - - X X - - X - - -

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

VT-2

3 X - - - X X - - X - - -

Instrument Nozzles (REF. DOWG. NO. BB)

074300 SIL571-N15A

RPV N15A Instr

Nozzle-to-Safe End

074400 S1L571-N15B

RPV N15B Instr

Nozzle-to-Safe End

SIL

571

SIL

571

VT-2

3 X - - - X X - -

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

VT-2

3 X - - - X X - -

Page 95: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 76

Reactor Vessel Nozzles

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

_ r

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

Instrument Nozzles (REF. DWG. NO. 8C)

074500 SIL571-N16A

RPV N16A Instr

Nozzle-to-Safe End

.. ... .................................... ................................. ........

074600 SIL571-N16B

RPV N16B Instr

Nozzle-to-Safe End

SIL

571

SIL

571

VT-2

3 X - - - X X - - X - - -

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

... ... .. . ........................... ..... ....... ......

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

VT-2

3 x - - - X X - - X - - -

Instrument Nozzles (REF. DWG. NO. 8D)

074700 SIL571-N17A

RPV N17A Instr

Nozzle-to-Safe End

SIL

571

VT-2

3 x - - - X X - - X - - -

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

074800 SIL571-N17B

RPV N17B Instr

Nozzle-to-Safe End

SIL

571

VT -2

3 X - - - x x - -

VT-2 after vessel

flood-up (static

pressure, no hold time)

at start of each RFO &

during System Leakage

each RFO. **N/A**

Page 96: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 77

Reactor Vessel Supports

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

FIRSTPERIOD

PLAN STATUS

SECONDPERIOD

THIRDPERIOD

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

SUMMARY EXAMINATION AREA

NUMBER IDENTIFI CATION

CATEGY NDEITEM NO METE

I- - - - - - 3 U T A G 1- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4 I_ .

Stabilizers (REF. DWG. NO. 28)

074900 RV-SB-1A

RPV Stabilizer Strut

075000 RV-SB-1B

RPV Stabilizer Strut

F-A

F1.40

VT-3 Code Case N-491-1

**N/A**3 x- - - - - - - -

F-A

F1.40

VT-3 Code Case N-491-1

**N/A**3 x - - - - - - -

075100 RV-SB-2A

RPV Stabilizer Strut

075200 RV-SB-2B

RPV Stabilizer Strut

F-A

F1.40

,.. .. . . . . .

F-A

Fl.40

VT-3 Code Case N-491-1

**N/A**3 - X

VT-3 Code Case N-491-1

3 - - X

075300 RV-SB-3A

RPV Stabilizer Strut

075400 RV-SB-3B

RPV Stabilizer Strut

075500 RV-SB-4A

RPV Stabilizer Strut

. . .. ... . . . ........ .... . . .

075600 RV-SB-4B

RPV Stabilizer Strut

F-A

Fl.40

.... ....... .. I

F-A

Fl. 40

F-A

Fl. 40

.. ...... .......

F-A

Fl. 40

VT-3 Code Case N-491-1

3 - - - X- _

VT-3 Code Case N-491-1

3- - - - X - - - - - - -

VT-3

3 X - - -

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**

VT-3

3 X - - -

Integral Attachments (REF. DWG. NO. 28)

075700 RV-SBI-IA-371/372

Stabilizer Integral

Welded Lug 8 22.5

B-K

510.10

MT

3

WRA 50%, Examine

accessible length of

attachment weld., Code

Case N-509. **N/A**

X - - - --

Page 97: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 78

Reactor Vessel Supports

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

075800 RV-SB2-IA-373/374 B-K

Stabilizer Integral B10.10

Welded Lug 8 112.5

NDEMETH

MT

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

3- - - - - - - - X

WRA 50% , Examine

accessible length of

welded attachment, Code

Case N-509. **N/A**

Integral Attachments (REF. DWG. NO. 28A)

076200 RV-WD-356-OD B-K

Support Skirt Integral B10.10

Attachment Weld

PT 100% of attachment weld

length, Code Case N-509

**N/A**3 x- - - - - - - -

Support Skirt (REF. DWG. NO. N/A)

076300 RPV-NRO2 SKT/BLT F-A VT-3

Support Skirt F1.403- - - - - - - - X - - -

Page 98: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 79

Reactor Vessel Welds

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDE

METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 1 U T A G E - - - - - -

l 2 3 4 l 2 3 4 l 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Closure Head Welds (REF. DWG. NO. 28)

076500 RV-WD-00l B-A

Closure Head-to-Flange Bl.40

Weld

UT

MT3 X - - - X - - - X - - -

Examine 100% of weld

length, 1/3 each

inspection period

**LATER**

076600 RV-WD-002

Closure Head-

Circumferential Weld

B-A

Bl.21

UT

3 - - - -X

Removable steel

insulation platform, 50%

CRV achieved , Dollar

Plate) **LATER**

...... .. . ..... . ..... .. ... .. . .. ... .... ... ..................... ....--

Examine accessible

length of weld.

**LATER**

076700 RV-WD-003

Closure Head-

Meridional Weld

B-A

El.22

UT

3 X- - - - - - -

076800 RV-WD-004

Closure Head-

Meridional Weld

B-A

El.22

UT Examine accessible

length of weld.

**LATER**3 X - - -

076900 RV-WD-005

Closure Head-

Meridional Weld

B-A

El .22

UT Examine accessible

length of weld **LATER**3 - - - - X

077000 RV-WD-006

Closure Head-

Meridional Weld

B-A

Bl.22

UT Examine accessible

length of weld.

**LATER**3 - - - - X -

077100 RV-WD-007

Closure Head-

Meridional Weld

B-A

Bl.22

UT Examine accessible

length of weld.

**LATER**

Page 99: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 80

Reactor Vessel Welds

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

0 U T A G E -

1 2 3 4:

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

077200 RV-WD-008

Closure Head-

Meridional Weld

B-A

Bl. 22

UT Examine accessible

length of weld **LATER**3 X - - -- - - - - -

077300 RV-WD-009

Closure Head-

Meridional Weld

B-A

El.22

UT Examine accessible

length of weld.

**LATER**3 X - - -

077400 RV-WD-010

Closure Head-

Meridional Weld

B-A

Bl.22

Examine accessible

length of weld **LATER**3 X- - - - - - - - -

Shell Welds (REF. DWG. NO. 28)

077500 RV-WD-099 B-A

Shell-to-Flange weld B1.30

AUT 100% of weld length from

the shell side **LATER**3- - - - - - - - X - - -

077600 RV-WD-099 B-A

Shell-to-Flange weld B1.30

UT 100% of weld length from

the seal surface

**LATER**3 X - -

077900 RV-WD-130 B-A

Upper Shell Long Weld B1.12

@ 15

AUT

3 - - - - - - - - X - - -

100% of weld length, and

intersection of

circumferential weld

RV-WD-lOO **LATER**

078000 RV-WD-131

Upper Shell

@ 135

B-A

Long Weld B1.12

AUT 100% of weld length and

intersection of

RV-WD-100. **LATER**3 - - - - - - - - X - - -

078100 RV-WD-132

Upper Shell

8 255

B-A

Long Weld Bl.12

AUT

3

100% of weld length and

intersecting

circumferential weld

RV-WD-100. **LATER**

X - - -

Page 100: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 81

Reactor Vessel Welds

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

078200 RV-WD-133

Upper Intermediate

Shell Long Weld 8 90

B-A

Bl.12

AUT

3…- - - - - - - X

100% of weld length and

intersecting

circumferential weld

RV-WD-100 & RV-WD-101.

**LATER**

078300 RV-WD-134

Upper Intermediate

Shell Long Weld 8 210

B-A

Bl.12

AUT

3- - - - - - - - X -

100% of weld length and

intersecting

circumferential weld

RV-WD-100 £ RV-WD-101.

**LATER**

078400 RV-WD-135

Upper Intermediate

Shell Long Weld 8 330

- 1 . . I 1 . . . .. . I. . . . . . . . . . . . . . . .. . . .. . . . . . .. . -

078700 RV-WD-139

Lower Intermediate

Shell Long Weld 8 105

B-A

El .12

................

B-A

Bl.12

AUT

3 - - - - - - - - X - - -

100% of weld length and

intersecting

circumferential weld

RV-WD-100 & RV-WD-101.

**LATER**

100% of weld length and

intersecting

circumferential weld

RV-WD-101 & RV-WD-137.

**LATER**

AUT

3 - - - -_ - - -

078800 RV-WD-140

Lower Intermediate

Shell Long Weld 8 225

B-A

B1.12

AUT

3-X - - -

100% of weld length and

intersecting

circumferential weld

RV-WD-101 & RV-WD-137.

**LATER**

078900 RV-WD-141

Lower Intermediate

Shell Long Weld 8 345

B-A

B1.12

AUT

3 - - - - - - - - X - - -

100% of weld length and

intersecting

circumferential weld

RV-WD-101 & RV-WD-137.

**LATER**

Page 101: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 82

Reactor Vessel Welds

ZONE NUMBER: 00.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CALIBRATION BLOCK**

079000 RV-WD-142

Lower Shell

e 18

B-A

Long Weld Bl.12

AUT

3 - - - -

100% of weld length and

intersecting

X circumferential weld

RV-WD-101 & RV-WD-137.

**LATER**

079100 RV-WD-143

Lower Shell

8 138

B-A

Long Weld Bl.12

AUT

3- - - - - - - - X - - -

100% of weld length and

intersecting

circumferential weld

RV-WD-137 & RV-WD-138.

**LATER**

079200 RV-WD-144 B-A

Lower Shell Long Weld Bl.12

8 258

AUT

3-X - - -

100% of weld length and

intersecting

circumferential welds

RV-WD_137 & RV-WD-138.

**LATER**

Bottom Head Welds (REF. DWG. NO. 28A)

079300 RV-WD-147

Bottom Head Dollar

Plate Circ. Weld

079400 RV-WD-148

Bottom Head Meridional

Weld

B-A

Bl.21

B-A

B1.22

UT

3 - - - X - - -

Accessible length of

weld **LATER**

Accessible length of

weld **LATER**

UT

3 -- - - - - - - X

079500 RV-WD-149 B-A

Bottom Head Meridional B1.22

Weld

UT Accessible length of

weld **LATER**3-X - - -

079600 RV-WD-150 B-A

Bottom Head Meridional B1.22

Weld

UT Accessible length of

weld **LATER**3 - -_-_ - - - - X - - -

Page 102: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 83

Reactor Vessel Welds

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

079700 RV-WD-151 B-A

Bottom Head Meridional B1.22

Weld

.............................................................. ...................................................... ......................

079B00 RV-WD-152 B-A

Bottom Head Meridional B1.22

Weld

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS PRESERVICE YEAR

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 **CALIBRATION BLOC**_ __ _ _ _-

UT

3 - - -X - - -

Accessible length of

weld **LATER**

................................................ ...........................

Accessible length of

weld **LATER**

UT

3-X - - -

079900 RV-WD-153 B-A

Bottom Head Meridional B1.22

Weld

UT Accessible length of

weld **LATER**3 - - - - - - - - X - - -

080000 RV-WD-154 B-A

Bottom Head Meridional B1.22

Weld

UT Accessible length of

weld **LATER**3 - - - - - - - X - -

080100 RV-WD-155 B-A

Bottom Head Meridional B1.22

Weld

UT Accessible length of

weld **LATER**3 X - -

080200 RV-WD-156 B-A

Bottom Head Meridional B1.22

Weld

.................... ....... ... ... ................ ........... ........ ...................... ...

080300 RV-WD-157 B-A

Bottom Head Meridional B1.22

Weld

UT

3 - - - -_ - - - X - - -

Accessible length of

weld **LATER**

........................ ......................................... -... .

Accessible length of

weld **LATER**

UT

3- - - - - - - - X -

080400 RV-WD-158 B-A

Bottom Head Meridional B1.22

Weld

UT Accessible length of

weld **LATER**3-X - -

Page 103: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 84

Reactor Vessel Welds

ZONE NUMBER: 00.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGY NDENUMBER IDENTIFICATION ITEM NO METH

080500 RV-WD-159 B-A UT

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS*CALIBRATION BLOCK**

Bottom Head Meridional B1.22

Weld

.............................................. ............... .......... . ... ..... .. ..... .. .....

RV-WD-160 B-A

Bottom Head Meridional B1.22

Weld

3 - -- - X - -

Accessible length of

weld **LATER**

.. . . . ......... ........ .. . ...... ..... ...... . .....

Accessible length of

weld **LATER**

...................

080600 UT

3 - - - -_- X - -

080700 RV-WD-161 B-A

Bottom Head Meridional B1.22

Weld

UT Accessible length of

weld **LATER**3 - - - _ - - - X

080800 RV-WD-162

Bottom Head

Circumferential Weld

B-A

B1.21

UT Accessible length of

weld **LATER**3 - - … - - - - -

Page 104: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 85

Main Steam System

ZONE NUMBER: 01.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

24.0" MSB (REF. DWG. NO. 2)

NDEMETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4I.PRESERVICE YEARINSTRUCTIONS

**CALIBRATION BLOCK**

080900 01-01-VB

Globe Valve 01-01

Bolting

081000 01-01-VBY

Globe Valve 01-01

Interior Surface

B-G-2

B7. 70

VT-1

3- - - - X -

V01, Limited to valve

selected under B-M-2

**N/A**

.......... - -... .......... .......- - -. ....... ..... .. .... . .... . ..

V01, Only when

disassembled, one valve

in a group of valves.

B-M-2

B12.50

VT-3

3 - - - - X -

6.0" MSB Relief (REF. DWG. NO. 2)

081900 01-07-VB

Gate Valve 01-07

Bolting

B-G-2

B7. 70

VT-1 V02, Limited to valve

selected under B-M-2

**N/A**3 -- - - X - - - - _

082000 01-07-VBY

Gate Valve 01-07

Interior Surface

B-M-2

B12.50

VT-3

3 - - - - X - - - - _

V02, Only when

disassembled, one valve

in a group of valves.

**N/A**

6.0" MSB (REF. DWG. NO. 2)

082700 01-102-A-SVB

Relief SV 01-102A

Bolting

. .. . .. I . .- - - . . -.

082800 01-102-A-SVBY

Relief SV 01-102A

Interior Surface

B-G-2

B7.70

B-M-2

B12.50

VT-i

3 - - - - x -

V03, 12 Bolts, Limited

to valve selected under

B-M-2 **N/A**

V03, Only when

disassembled, one valve

in a group of valves

**N/A**

VT-3

3- - - - X - -

082900 01-102-A-WD-001

Relief SV 01-102A

Valve Body Weld

B-M-1

B12.40

UT V03, Limited to one

valve in a group of

valves. **LATER**3- - - -

Page 105: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 86

Main Steam System

ZONE NUMBER: 01.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -3 U T A 4 E - - - - - -1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

E

INSTRUCTIONS**CLIBRATION BLOCK**I_ _ .__ _ _-

2.0" MSA Vent Line (REF. DWG. NO. 2)

084900 01-120-VB

Valve 01-120 Bolting

B-G-2

B7. 70

VT-1 2 Bolts **N/A**

3 - - - - X - -

24.0" MSA (REF. DWG. NO. 2)

086600 01-MSH-21-WD-001

Integral Attachment

Lug 1

.. ... .... ....... - -.. ..... ......................... ...................... .........

086700 01-MSH-21-WD-002

Integral Attachment

Lug 2

B-K

B10.20

PT

3 - - - - X - - -

Code Case N-509, Welded

on 3 sides **N/A**

......... ..... ..... .. .... ....... .... ................ ............... ..

Code Case N-509, Welded

on 3 sides **N/A**

B-K

B10.20

PT

3 - - -- X - - -

086800 01-MSH-21-WD-003

Integral Attachment

Lug 3

086900 01-MSH-21-WD-004

Integral Attachment

Lug 4

B-K

B10.20

.. ... ....

B-K

BlO.20

PT

3- - - - X - - - - - - -

Code Case N-509, Welded

on 3 sides **N/A**

Code Case N-509, Welded

on 3 sides **N/A**

PT

3 - - - - X

087000 01-MSH-21A

Spring Hanger

F-A

F1. 10

VT-3 Code Case N-491-1, 4

Integrally Welded Lugs

**N/A**3 - - - - X - - -

087100 01-MSH-21B

Spring Hanger

F-A

Fl. 10

VT-3 Code Case N-491-1

**N/A**3 - - - - - - - - X - - -

Page 106: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 87

Main Steam System

ZONE NUMBER: 01.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

24.0" MSB (REF. DWG. NO. 2)

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 1 U T A G 1 2 - - - - -1 2 3 4 1 2 3 4 1 2 3 4 _:

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

T 1

087600 01-MSH-22A

Spring Hanger

F-A

F1.10

VT-3 Code Case N-491-1.

**N/A**3 X - -

24.0" MSA (REF. DWG. NO. 2)

087800 01-MSH-23

Pipe Stanchion

F-A

Fl. 10

VT-3 Code Case N-491-1

**N/A**3 - - - - - _ - - X - - -

32.0" MSA (REF. DWG. NO. 2)

088200 01-WD-001 B-D

Nozzle N3A-to-Vessel B3.90

UT Group R11, 87% CRV,

Limitation due toX - - - - - - - - - - -

adjacent nozzle and

Bioshield. **LATER**

088300 01-WD-001-IR

Nozzle N3A Inner

Radius Section

B-D

B3.100

UT

3 X - - -

Group Rll, 54% CRV,

Limitation due to

adjacent nozzle and

Bioshield. **LATER**

24.0" MSA (REF. DWG. NO. 2)

088400 01-WD-002

Nozzle N3A -to-Safe

End

B-J UT

B9.11 PTGroup R11, **LATER**

3 X- - - - - - - -

088500 01-WD-003

Nozzle N3A Safe

End-to-Elbow

B-J UT

B9.11 MTTerminal End , Examine

100% of weld length

**NMP1-24-080-CS**X - - - - - - - -

088700 01-WD-006

Branch Connection

(24"x2" WOL)

B-J

B9.32

MT To Vent Line, Examine

100% of weld length---- **N/A**

Page 107: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 88

Main Steam System

ZONE NUMBER: 01.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

089800 01-WD-016

Branch Connection

(24"X6" WOL)

ECTION INTERVAL

ASHE FIRST

SEC. XI PERIOD

CATEGY NDE T 2 3 4 - -

ITEM NO METH 1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

B-J UT

B9.31 MT

Examine 100% of weld

length **NMPl-24-080-CS,

NMP1-6-80-**3 X - -

090400 01-WD-019

Pipe-to-Valve 01-02

B-J UT

B9.11 MT3- - - - - - - -

Terminal End, High

Stress Weld, Examine

100% of weld length

**NMP1-24-080-CS**

090500 01-WD-020

Valve 01-02 -to-Pipe

B-J

B9.11

UT

MT

Terminal End, High

Stress Weld, Examine

3 - - - - X - - - - - - - 1004 of weld length.

**NMP1-24-080-CS**

32.0" MSB (REF. DWG. NO. 2)

090800 01-WD-033 B-D

Nozzle N3B-to-Vessel B3.90

UT

3- - - - - - - - X - - -

Group R12, 91% CRV

Limitation due to

adjacent nozzle and

Bioshield **LATER**

......-... .............. ......... - ............. ........... - . ~.. ..

Group R12, 78% CRV

Limitation due to

adjacent nozzle and

Bioshield **LATER**

090900 01-WD-033-IR

Nozzle N3B Inner

Radius Section

B-D

B3.100

UT

3- - - - - - - - X - - -

24.0" MSB (REF. DWG. NO. 2)

091000 01-WD-034 B-J

Nozzle N3B-to-Safe End B9.11

MT

UT

Group R12,

**PlR-1.475-1**3- - - - - - - - X - - -

091100 01-WD-035

Nozzle N3B Safe

End-to-Elbbow

B-J UT

B9.11 MT

Terminal End, Examine

100% of weld length.

**NHPl-24-080-CS**3- - - - - - - - X - - -

Page 108: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 89

Main Steam System

ZONE NUMBER: 01.0 TNPEC~PTION TNTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

2.5" MSB (REF. DWG. NO. 2)

NDE 1METH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

PRESERVICE YEARrTHIRDPERIOD

1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**1 1-

091600 01-WD-042

Reducer

(2.5"x2.0")-to-Pipe

B-J

B9.21

MT Cont. on sht. 2A,

Examine 100% of weld

length **N/A**3 - - - - X - - - - - -

6.0" MSB (REF. DWG. NO. 2)

092100 01-WD-046-A

Branch

Connection-to-Valve

01-08

B-J UT

B9.11 MT

Terminal End, High

Stress Weld, Examine

100% of weld length.

**NMP1-6-80-CS**

3- - - - - X -

24.0" MSB (REF. DWG. NO. 2)

092600 01-WD-048

Branch Connection

(24"x6" WOL)

B-J MT

B9.31 UT

Examine 100% of weld

length **PlR-1.219-1,

- - - - - -- 94-6007**3 x - - -

6.0" MSB (REF. DWG. NO. 2)

092700 01-WD-048-A

Branch

Connection-to-Valve

01-12

B-J UT

B9.11 MT3- - - - - - - - X - - -

Terminal End, High

Stress Weld, Examine

100% of weld length

**NMP1-6-80-CS**

................. ................ - .... ...... ... ..... ..... - 1

Terminal End, High

Stress Weld, Examine

100% of weld length

**NMPI-6-80-CS**

092800 01-WD-048-B

Valve 01-12 -Flange

01-102E

B-J UT

B9.11 MT3- - - - - - - - X - - -

24.0" MSB (REF. DWG. NO. 2)

092900 01-WD-050

Pipe-to-Valve 01-01

B-J UT

B9.11 MT

Terminal End, High

Stress Weld, Examine

X 100% of weld length

**NP1-24-080-CS**

3- - - -

Page 109: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 90

Main Steam System

ZONE NUMBER: 01.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

093000 01-WD-051

Valve 01-01-to-Pipe

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

B-J UT

B9.11 MT

I4-

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4 -

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

I

3 - - - - X

Terminal End, High

Stress Weld, Examine

100% of weld length.

**NMP1-24-080-CS,

PIR-1.219-**

2.0" MSA Vent Line (REF. DWG. NO. 2)

093300 01-WD-448

Sock-O-Let -to-Pipe

B-J

B9. 21

PT Examine 100% of weld

length **N/A**3 X- - - - - - - -

.. .......................................................................................................

093500 01-WD-450

Elbow-to-Pipe

B-J

B9.21

PT Examine 100% of weld

length **N/A**

3 X - - -

093800 01-WD-453 B-J

Pipe-to-Valve 01-120 B9.21

PT Examine 100% of weld

length. **N/A**

3 - - - - - - - - X

2.0" MSA Valve By-Pass Line (REF. DWG. NO. 2B)

094300 01-WD-454

Pipe-to-Coupling

B-J

B9.40

MT Examine 100% of weld

length. **N/A**

3- - - - X - - - - - - -

Page 110: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/26/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 91

Feedwater System

ZONE NUMBER: 31.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDETH

1ET

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

PRESERVICE YEAR

18.0" FWA (REF. DWG. NO. 5)

095900 31-OlR-FLG

Check Valve 31-0iR

Flange Surface

B-G-1

B6.220

VT-1 V04 , Limited to valve

selected under B-M-2

**N/A**3- - - - X - - -

096000 31-OlR-VB

Check Valve 31-01

Studs (18)

B-G-1

B6.210

UT Limited to valve

selected under B-M-2

**LATER**3- - - - X - - - - -

096100 31-OIR-VBY

Check Valve 31-OIR

Interior Surface

B-M-2

B12 .50

VT-3

3- -- -

V04, Only when

disassembled, one valve

among group of valves

**N/A**

096200 31-O1R-VNW

Check Valve 31-OIR

Nuts and Washers

........................................................................

096700 31-07-VB

Gate Valve 31-07

Bolting

B-G-1

B6.230

B-G-2

B7. 70

VT-1 V04 , Limited to valve

selected under B-M-2

**N/A**3 - - - - X --

VT-1 V05, Limited to valve

selected under B-M-2.

**N/A**3 X - - --

096800 31-07-VBY

Gate Valve 31-07

Interior Surface

B-M-2

B12.50

VT-3 V05, Only when

disassembled, Limited

one valve among group of

valves. **N/A**

18.0" FWD (REF. DWG. NO. 5)

098000 31-A2

Anchor

F-A

Fl.10

VT -3 Code Case N-491-1

**N/A**3 x- - - - - - - - -

Page 111: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 92DATE: 10/26/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Feedwater System

ZONE NUMBER: 31.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

10.0" FWC (REF. DWG. NO. 5)

NDE 1METH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

1 I

099900 31-H5-A

Spring Hanger

100000 31-H5-B

Spring Hanger

F-A

Fl. 10

F-A

F1.10

VT-3

3-_ - - -

4 Lugs welded 3 sides,

Code Case N-491-1.

**N/A**

.. ...... ... ....... .... ... _ _ .......... .. ........ .. - .....

4 lugs, welded 3 sides,

Code Case N-491-1.

**N/A**

VT-3

3-_ - - -

..1..............

100100 31-H5-WD-001

Integral Attachment

100200 31-H5-WD-002

Integral Attachment

..... .. ..... __..-. 1. .

100300 31-H5-WD-003

Integral Attachment

B-K

B10.20

.. ......

B-K

B10.20

B-K

B10.20

MT

3-_ - - -

3 - - -

CRA 90%, Code Case N-509

**N/A**

- - - X -

CRA 90%, Code Case N-S09

**N/A**

.................................... ............................................................. .....-- .. .... .... -

CRA 90%, 4 Lugs, pipe

clamp contacts one side

of lug. Code Case N-509

**N/A**

3 - - - - - - - - X -

100400 31-H5-WD-004

Integral Attachment

B-K

B10.20

MT CRA 90%, 4 Lugs, pipe

clamp contacts one side

of lug, Code Case N-509

**N/A**

3- - - - - - - - X - - -

10.0" FWD (REF. DWG. NO. 5)

100500 31-H6

Spring Support

Stanchion

F-A

Fl. 10

VT-3 Code Case N-491-1

**N/A**

3- - - - X -

Page 112: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 93DATE: 10/26/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Feedwater System

ZONE NUMBER: 31.0 TNSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

18.0" FWA (REF. DWG. NO. 5)

NDE 1METH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR.r

INSTRUCTIONS

**CALIBRATION BLOCK**__L

101300 31-HB

Spring Support

w/welded stanchion

F-A

F1. 10

VT-3 Code Case N-491-1

**N/A**

3 - - - - X - -

18.0" FWB (REF. DWG. NO. 5)

101900 31-WD-001 B-J

Valve 31-02R-to-Valve B9.11

Extension

MT

UT

Terminal End, High

Stress Weld, Examine

100% of weld length.

**PlR-1.156-1**

3- - - - - - X - - -

102500 31-WD-015

Pipe-to-Tee

B-J UT

B9.11 MT

Examine 100% of weld

length. **PlR-1.156-1**

3- - - - X - - - - - - -

10.0" FWB (REF. DWG. NO. 5)

103000 31-WD-019

Pipe-to-Nozzle N4B

Safe End

B-J UT

B9.11 MT

Terminal End, Examine

100% of weld length

**PlR-1.156-1**3- - - - - - - - X -

Group R14, **LATER**103100 31-WD-020 B-J

Safe End-to Nozzle N4B B9.11

UT

MT3- - - - - - - - X - - -

103300 31-WD-021 B-D

Nozzle N4B-to-Vessel B3.90

UT

3- - - - - - - - X -

Group R14, 78% CRV

Limitation due to

adjacent nozzle and

Bioshield **LATER**

103400 31-WD-021 NUREG

Nozzle N4B Bore (Zone 0619

3)

UT Group R14, Auto UT

Gene-Geris 2000 system

**LATER**3- - - - - - - - X - - -

Page 113: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/26/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 94

Feedwater System

ZONE NUMBER: 31.0INSP)

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METE

PLAN STATUS

1FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONSL **CALIBRATION BLOCK**

103500 31-WD-021-IR B-D

Noz. N4B Inner Radius B3.100

Section (zone 1/2)

UT

3 - -

Group R14, Auto UT

Gene-Geris 2000 system,

- - - - - - X - - - Frequency per NUREG

0619, 47% CRY Limitation

due to adjacent nozzle

and ioshield. **LATER**

10.0" FWA (REF. DWG. NO. 5)

104300 31-WD-028

Pipe-to-Nozzle N4A

Safe End

B-J UT

B9.11 MT

Terminal End **LATER**

3 - - - - - - - X - - -

104400 31-WD-029 B-J

Safe End-to-Nozzle N4A B9.11

104600 31-WD-030 B-D

N4A Nozzle-to-Vessel B3.90

UT

PT3 - - - - - - - - X - - -

Group R13, 99% CRV

Limitation due to

thermocouple lugs

**LATER**

Group R13, 94% CRV

Limitation due to

adjacent nozzle and

Bioshield, **LATER**

UT

3- - - - - - - - X - - -

104700 31-WD-030 NUREG

N4A Nozzle Bore (Zone 0619

3)

UT Group R13, Auto UT

Gene-Geris 2000 system- - - - - - X -- - **LATER**3

104800 31-WD-030-IR B-D

N4A Noz. Inner Radius B3.100

Section(zone 1/2)

UT

3- - - - - - - - X - - -

Group R13, 82% CRV,

Limitation due to

adjacent nozzle and

Bioshield, Auto UT

Gene-Geris 2000 system ,

Frequency by NUREG 0619

**LATER**

Page 114: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/26/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 95

Feedwater System

ZONE NUMBER: 31.0TNSPECTION INTERVAL PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

18.0" FWA (REF. DWG. NO. 5)

NDE |METH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

104900 31-WD-031

Valve 31-01-to-Valve

31-07 Extension

B-J

B9.11

MT

UT

Terminal End, High

Stress Weld, Examine

100% of weld length.

**PlR-1.156-1**

3- - - - - - - - X - - -

18.0" FWB (REF. DWG. NO. 5)

105500 31-WD-045

Pipe-to-Tee

B-J UT

B9.11 MT

Examine 100% of weld

length **PlR-1.156-l**3- - - - - - - - X - - -

10.0" FWC (REF. DWG. NO. 5)

106000 31-WD-049

Pipe-to-Nozzle N4C

Safe End

B-J MT

B9.11 UT

Terminal End, Examine

100% of weld length.

**PIR-.75-2**3- - - - - - - - X - - -

106100 31-WD-050 B-J

N4C Nozzle-to-Safe End B9.11

UT

MT

Group R15, 86% CRV, 99%

for UT **PlR-I.156-1**

3- - - - - - - - X - -

106300 31-WD-051 B-D

N4C Nozzle-to-Vessel B3.90

106400 31-WD-051 NUREG

N4C Nozzle Bore (Zone 0619

3)

UT

3-_ - - -

Group R15, 84% CRV.

Limitation due to

adjacent nozzle and

Bioshield **LATER**

.1 . -. .... - -.. .. I. . . . .......

Group R15, Frequency

per NUREG-0619 **LATER**

UT

3 - - _- - - - - -

106500 31-WD-051-IR B-D

N4C Noz. Inner Radius B3.100

Section (Zones 1/2

UT

3 - - - -_ - - - - -

Group R15, (Zone 1 & 2)

Frequency per

NUREG-0619, 86% CRV,

Limitation due to

adjacent nozzle and

Bioshield. **LATER**

Page 115: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 96DATE: 10/26/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Feedwater System

ZONE NUMBER: 31.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

NDE1METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**_ . _I

10.0' FWD (REF. DWG. NO. 5)

107300 31-WD-058

Pipe-to-Nozzle N4D

Safe End

B-J MT

B9.11 UT

Terminal End

**P1R-.75-2**

3 - - - - - - - - X - -

Group R16, **LATER**107400 31-WD-059 B-J

N4D Safe End-to-Nozzle B9.11

UT

MT3 - - - -_ - - - X

107600 31-WD-060 B-D

N4D Nozzle-to-Vessel B3.90

I ..... ...... ......................................................... .. ........................................

107700 31-WD-060 NUREG

N4D Nozzle Bore (Zone 0619

3)

UT Group Ri6, 82% CRV

Limitation due to

X - - - Bioshield **LATER**3- - - - - - - -

UTGroup R16, Frequency per

NUREG-0619 **N/A**

3- - - - - - - - X -

107800 31-WD-060-IR

N4D Noz. Inner radius

Section (zones 1/2

B-D

B3.100

UTGroup R16, Zone 1 & 2,

59% CRV Limitation due

to Bioshield, Frequency

by NUREG-0619 **LATER**

3 - - - - - - -

Page 116: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

Page 97Left Blank Intentionally

Page 117: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 98

Reactor Recirculation Discharge

ZONE NUMBER: 32.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDET|METH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

28.0" Discharge 12D (REF. DWG. NO. 7)

109200 32-12-H4A

Spring Hanger

109300 32-12-H4B

Spring Hanger

F-A

FP.10

F-A

F1. 10

VT-3

3 X- - - - - -

Removed verify, Code

Case N-491-1 **N/A**

Removed verify , Code

Case N-491-1 **N/A**

VT-3

3 X- - - - - - - - -

28.0" Discharge 13D (REF. DWG. NO. 7)

109600 32-13-H4-WD-001

Integral Attachment

Lug

B-K

B10.20

PT (32-13-H-4-A) Code Case

N-509 **N/A**3 X- - - - - - - -

109700 32-13-H4-WD-002

Integral Attachment

Lug

109800 32-13-H4-WD-003

Integral Attachment

Lug

B-K

B10.20

..................

B-K

Bl 0.20

PT

3 X

(32-13-H-4-A), Code Case

N-509 **N/A**

(32-13-H-4-B), Code Case

N-509 **N/A**

PT

3 X

109900 32-13-H4-WD-004

Integral Attachment

Lug

110000 32-13-H4A

Spring Hanger

B-K

B10.20

F-A

F1.10

PT

3 X- - - - - - - - -

(32-13-H-4-B), Code Case

N-509 **N/A**

C d. C s. N . 4. ............ ......... . . . .

Code Case N-491-1

**N/A**

VT-3

3- - - - X - - - - - - -

110100 32-13-H4B

Spring Hanger

F-A

Fl. 10

VT-3 Code Case N-491-1

**N/A**3 - - - - --

Page 118: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 9 9

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS0

Reactor Recirculation Discharge

ZOENMER 20INSPECTION INTERVAL PLAN STATUS flZvJa.*n"

A.SME 1 FIRST SECOND THIRDF

SEC. XI PERIOD PERIOD PERIOD

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CLIBR.ATION BLOCK**

28.0"1 Discharge 15D (REF. DWG. NO. 7)

112000 32-15-H4A F-A VT-3 Code Case 34-491-i

Spring Hanger Fl.10 * *N/A* *

3 -------- X - - -

112100 32-15-H4B F-A VT-S

Spring Hanger Fl.10

2.0" Discharge liD (REF. DWG. No. 7)

113900 32-385-VB B-G-2 VIT-i

Valve 32-385 Bolting 87.70 3

.............................................................................

Code Case N-491-1

**N/A**

- - - - - - - X -

2.0" Valve By-pass Line

**II/A**- - - - - - - - X -

................................... ................ _ ...... ...... ............................

2.0" Discharge 12D (REF. DWG. NO. 7)

114000 32-386-VB B-G-2 VT-1

Valve 32-386 Bolting B7.70

............................ ..... .. ...... ........ ............

2.01, Discharge 13D (REF. DWG. NO. 7)

114100 32-387-VB B-G-2 VIT-1

Valve 32-387 Bolting B7.70

...........................................................................................................................

2.011 Discharge 14D (REF. DWG. NO. 7)

114200 32-388-VB B-G-2 VIT-1

Valve 32-388 Bolting B7.70

...........................................................................................................................

2.011 Discharge 15D (REF. DWG. NO. 7)

114300 32-389-VB B-G-2 VTl

Valve 32-389 Bolting B7.70

2.011 Valve by-pass line

3- - - - - - - - X - -

2.0" Valve by-pass line

**N/A**

3- - - - X -

2.011 Valve by-pass line

**IqIA**

3- - - - X -

2.01, Valve by-pass line

**N/A**

3 x - - - - -

Page 119: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 100

Reactor Recirculation Discharge

ZONE NUMBER: 32.0 INSPECTION INTERVAL

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

28.0" Discharge 13D (REF. DWG. NO. 7)

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

115000 32-SB-6A

Sway Brace

F-A

Fl. 10

VT-3

3- - - - X - - - - - - -

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**115100 32-SB-6B

Sway Brace

F-A

F1. 10

VT-3

3---- - - -X

28.0" Discharge liD (REF. DWG. NO. 7)

115400 32-WD-017

Pump 11

Discharge-to-Elbow

115600 32-WD-017-D1

Elbow-Long Seam OR

B-J UT

B9.11 PT

B-J UT

B9.12 PT

3 - - - - X - - - - - - -

3.- . I . .. -- - .... ... - ........

3 - - - - X - - - - - - -

Terminal End, High

Stress Weld, Examine

106% of weld length.

**PBR-1.2**

Code Case N-524

**P8R-1.2**

115700 32-WD-017-D2

Elbow-Long Seam IR

B-J UT

B9.12 PT

...........................................................................................................................................................

Code Case N-524

**PBR-1.2**

3 - - -- X - - - - - - -

3.0" Discharge lD (REF. DWG. NO. 7)

115900 32-WD-020

Branch Connection

-Decon

.....................................................................

116000 32-WD-020-FB

llD Decon Flange

Bolting

B-J

B9.32

B-G-2

B7.50

PT

3 - - - - X -

VT-1 Examine

removed

**N/A**

in place, when

or disassembled.

3- - - - X - - - - - - -

Page 120: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 101DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Recirculation Discharge

ZONE NUMBER: 32.0 INS)?ECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDE]

MBTH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**-

28.0" Discharge liD (REF. DWG. NO. 7)

116600 32-WD-022

Pipe-to-Gate Valve

32-380

B-J UT

B9.11 PT

Terminal End, High

Stress Weld, Examine

3- - - - X- -- 100% of weld length.

**P8R-1.2**

**P8R-1.109-l**116700 32-WD-022

Pipe-to-Gate Valve

32-380

GL-A

88-01

UT

3 - - - X - - -

116800 32-WD-022-U

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.2**

3 - X - -

2.0" Discharge liD (REF. DWG. NO. 7)

116900 32-WD-023

Coupling-to-Pipe

B-J

B9.40

PT

3 - - - - X - - -

118000 32-WD-034

Pipe-to-Coupling

B-J

B9.40

PT

3 -- - - X - - -

28.0" Discharge 1lD (REF. DWG. NO. 7)

**P8R-1.2**118100 32-WD-035

Gate Valve

32-380-to-Pipe

B-J UT

B9.11 PT3-_ - - -

**P8R-1.109-1**118200 32-WD-035

Gate Valve

32-380-to-Pipe

GL-A

88-01

UT

3 - - - - - - - X - - -

119300 32-WD-040

Elbow-to-Pipe

GL-A

88-01

UT**P8R-1.109-1,

P8R-1 . 260**

3 - - - - X - -

Page 121: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 102

Reactor Recirculation Discharge

ZONE NUMBER: 32. 0 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

PLAN STATUS PRESERVICE YEAR

1FIRSTFIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

INSTRUCTIONS

**CALIBRATION BLOCK**- _J_

119800 32-WD-041

Pipe-to-Nozzle N2A

Safe End

B-J PT

B9.11 UT

Examine 100% of weld

length.

**P8R-1.655/1.150-1,P8R-

1.10**

3 - - - - X - - - - - - -

.................. ............... .............................. ...............

119900 32-WD-041

Pipe-to-Nozzle N2A

Safe End

**P8R-1.655/1.150**GL-A

88-01

UT

3- - - - X - - - - - - -

120000 32-WD-041-U

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.2**

3 - - - - X - - - - - - -

Group R06 **LATER**120100 32-WD-042 GL-A

N2A Nozzle-to-Safe End 88-01

........................................... ................................................... _ ....................... .... .

120200 32-WD-042 B-F

N2A Nozzle-to-Safe End B5.10

UT

3 - - - - X - - - - - -

Group R06, **LATER**UT

PT3 - - - - X - - - -

120300 32-WD-042 SIL

N2A Nozzle-to-Safe End 455R151

UT Group R06, Incolel 182

butter expansion from

nozzle side of weld

**LATER**

3 - - - - X - - - -

120400 32-WD-043 B-D

N2A Nozzle-to-Vessel B3.90

Group R06, 75% CRV

Limitation due to bottom

3- - - - X-headtaper of shell

thickness **N/A**

120500 32-WD-043-IR

N2A Nozzle Inner

Radius Section

B-D

B3.100

AUT Group R06, 60% CRV

Limitation due to bottom

head taper of shell

thickness **N/A**

3- - - - X - - - - - - -

Page 122: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 103

Reactor Recirculation Discharge

ZONE NUMBER: 32.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -1 U T A G E - - - - - -1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

28.0" Discharge 12D (REF. DWG. NO. 7)

120600 32-WD-057

Pump 12

Discharge-to-Elbow

B-J PT

B9.11 UT3 - - - - -- - - X - - -

Terminal End, High

Stress Weld, Examine

100% of weld length.

**P8R-1.260**

120800 32-WD-057-Dl

Elbow-Long Seam OR

B-J

B9.12

PT

UT

Code Case N-524

**PBR-1.260**3- - - - - - - X - - -

120900 32-WD-057-D2

Elbow-Long Seam IR

B-J PT

B9.12 UT

Code Case N-524

**P8R-1.260**3- - - - - -

3.0" Discharge 12D (REF. DWG. NO. 7)

121200 32-WD-060-FB

Decon Flange Bolting

B-G-2

B7.50

VT-1 Examine in place, when

removed or when

disassembled. **N/A**3 - - -- X - - - - - - -

28.0" Discharge 12D (REF. DWG. NO. 7)

121300 32-WD-061

Elbow-to-Pipe

GL-A

88-01

UT **P8R-1.109-1**

3 - - X - - -

121400 32-WD-061

Elbow- to- Pipe

B-J

B9.11

UT

PT3 - -- X - - -

121900 32-WD-062

Pipe-to-Gate Valve

32-381

GL-A

88-01

UT **P8R-1.109-1**

3 - - - - - - - - X - - -

Page 123: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 104

Reactor Recirculation Discharge

ZONE NUMBER: 32.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CALIBRATION BLOCK**

2.0" Discharge 12D (REF. DWG. NO. 7)

122100 32-WD-063

Coupling-to-Pipe

B-J

B9.40

PT Examine 100% of weld

length. **N/A**3…- - - - - - - X - - -

123200 32-WD-074

Pipe-to-Coupling

B-J

B9.40

PT Examine 100% of weld

length. **N/A**3- - - - - - - - X - - -

28.0" Discharge 12D (REF. DWG. NO. 7)

123300 32-WD-075

Gate Valve

32-381-to-Pipe

...... ........................... .................................. ..............

123500 32-WD-075-D

Pipe-Long Seam

B-J UT

B9.11 PT

B-J UT

B9.12 PT

3 -

- _ -- X - - -

Examine 100% of weld

length. **P8R-1.109-1**

..............................................................

Code Case N-524.

**P8R-l.109-1**3 -

124000 32-WD-079

Pipe-to-Elbow

GL-A

88-01

UT

**P8R-1.260/P8R-1.109-1*3- - - - - - - - X -

124800 32-WD-081

Pipe-to-Nozzle N2B

Safe End

B-J UT

B9.11 PT

..................................

B-J UT

B9.12 PT

3-_ - - -

..... - ..................... .................................................. - - ..........

3- - - - - - - - X - - -

Examine 100% of weld

length **P8R-1.109-1**

Code Case N-524

**P8R-1.109-1**125000 32-WD-081-U

Pipe-Long Weld

125100 32-WD-082 SIL

N2B Safe End-to-Nozzle 455R1S1

UT Group R07, Inconel 182

butter expansion from

3- - - - - - - - X - - - nozzle side of weld

**LATER**

Page 124: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 105

Reactor Recirculation Discharge

ZONE NUMBER: 32.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

125200 32-WD-082 B-F

N2B Safe End-to-Nozzle B5.10

.. ........................ -..---------------------------------------------- '--'-'---''''''''..............................................................................-''--

125300 32-WD-082 GL-A

N2B Safe End-to-Nozzle 88-01

NDETMETH|

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

UT

PT

Group R07 **LATER**

3 - - - - - - - - - - -

UT Group R07 **LATER**

3 - - - - -_ - - -

125400 32-WD-083 B-D

N2B Nozzle-to-Vessel B3.90

AUT

. .. .... ... ........ . . ... . .. . ............ ... _. . ' . ~.. . 1. I

Group R07, 75.4% CRV

Limitation due to bottom

head taper of shell

weld. **LATER**

3 - - - - - - - N - -

125500 32-WD-083-IR

N2B Nozzle Inner

radius Section

B-D

B3.100

AUT

3 - - - N -

Group R07, 60% CRV

Limitation due to bottom

head taper of shell

weld. **LATER**

28.0" Discharge 13D (REF. DWG. NO. 7)

125600 32-WD-097

Pump 13

Discharge-to-Elbow

. . ... .. . .................... ..... . . . . .. . . .. . . . . .. - - -

125800 32-WD-097-Dl

Elbow-Long Seam OR

125900 32-WD-097-D2

Elbow-Long Seam IR

B-J UT

B9.11 PT

B-J UT

B9.12 PT

B-J UT

B9.12 PT

3 X

Terminal End, High

Stress Weld, Examine

100% of weld length

**P8R-1.109-1**

.. . ... ..... .. ....... .... .. ... ..... ... . ... .. . .... . .......... .... ........ ... .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Formerly LW-032-A, Code

Case N-524

**P8R-1.109-1**

. . . . .. ..... ......... ...... .. . ..... ....... ...... .. ..... . . .... ... . . . _ ....... ..... ....

Formerly LW-032-B, Code

Case N-524

**P8R-l.109-l**

3 X

3 X -

Page 125: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 106

Reactor Recirculation Discharge

ZONE NUMBER: 32.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEM4ETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

2.5" Discharge 13D (REF. DWG. NO. 7)

126000 32-WD-099

Branch

Connection-Thermowell

B-J

B9.32

PT Examine 100% of weld

length **N/A**3 X -- - - - - - - -

3.0" Discharge 13D (REF. DWG. NO. 7)

126200 32-WD-100-FB

Decon Flange Bolting

B-G-2

B7.50

VT-1 Examine in place, when

removed or when3X-disassembled. **N/A**

28.0" Discharge 13D (REF. DWG. NO. 7)

126300 32-WD-101

Pipe-to-Pipe

GL-A

88-01

UT

**P8R-1.109-1,P8R-1.260*3 X - - - - - -

126800 32-WD-102

Pipe-to-Gate Valve

32-382

GL-A

88-01

UT **P8R-1.109-1**

3- - - - - - - X - - -

126900 32-WD-102

Pipe-to-Gate Valve

32-382

B-J UT

B9.11 PT3 X- - - - - - - -

Terminal End, High

Stress Weld, Limitation

58% CRV, Examine 100% of

weld length

**P8R-1.109-1**

127000 32-WD-102-U

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.109-1**3 X- - - - - - - - -

Page 126: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 107

Reactor Recirculation Discharge

ZONE NUMBER: 32.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

2.0" Discharge 13D (REF. DWG. NO. 7)

127200 32-WD-104

Pipe-to-Coupling

. ........ ...... . ......... ...... ..... ... . ...............

127400 32-WD-106

Pipe-to-Elbow

B-J

B9.40

-- .. .. .. .

B-J

B9.21

PT

3- - - - - - - - X - - -

Examine 100% of weld

length **N/A**

Examine 100% of weld

length **N/A**

PT

3 - - - X - - -

127900 32-WD-111

Elbow-to-Pipe

128200 32-WD-114

Pipe-to-Coupling

B-J

B9. 21

B-J

B9.40

PT

3 - - - X - - -

Examine 100% of weld

length **N/A**

. .. . . .......................... . .. . ..... . ...

Examine 100% of weld

length **N/A**

PT

3 - - - X - - -

28.0" Discharge 13D (REF. DWG. NO. 7)

128400 32-WD-115

Gate Valve

32-382-to-Pipe

B-J UT

B9.11 PT3 X- - - - - - - -

Terminal End, High

Stress Weld, Examine

100% of weld length

**P8R-1.109-1**

128500 32-WD-115-D

Pipe-Long Seam

- - . . - . . . .. . -. .. .... .... ............

129000 32-WD-119

Pipe-to-Elbow

B-J UT

B9.12 PT

- ..... I - . .... .. . .. .

B-J UT

B9.11 PT

Formerly LW-034, Code

Case N-524

**P8R-1.109-1**3 X - -

**P8R-1. 109-1**

3 X- - - - - - - -

129100 32-WD-119

Pipe-to-Elbow

GL-A

88-01

UT **P8R-1.109-1,

P8R-1.260**3 X- - - - - - -

129600 32-WD-120

Elbow-to-Pipe

GL-A

88-01

UT **P8R-1.109-1,

P8R-1.260**3 X- - - - - -

Page 127: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 108

DATE: 10/15/99

REVISION: 0

Reactor Recirculation Discharge

ZONE NUMBER: 32.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

130000 32-WD-121

Pipe-to-Nozzle N2C

Safe End

............ ............... ........................- ......................................................

130100 32-WD-121

Pipe-to-Nozzle N2C

Safe End

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

ECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

CATEGY NDE - - - - - -O U T A G E - - - - - - INSTRUCTIONS

ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

Exmn 00 fwl

B-J

B9.11

GL-A

88-01

UT

PT

UT

Examine 1004d of weld

length **PBR-1.109-1**

3 X - - - - - - -

. .. . ... .. .. .... .. ... ... .. I.... . . ................ .................... ..... .. ........... ...... .... ........................... ..............................................................

**PBR-1.109-i"

3 X - - - - - - -

............................ ................................... I.................

130200 32-WD-121-U

Pipe-Long Seam

... I......................... ...................... ......

B-J UT

B9.12 PT 3

..................................................................... ...... ............................................ ...... . . . . . . . . . . . . . . .

Code Case N-524

**PBR-1.109-1**-X -- - - - - - - - -

.......... ..........................U.

B-F UT

...............................................G.............

Group RO8, **LATER**

130300 32-1D-122

N2C Safe End-to-Nozzle B5.10 PT3X - - --

........ .. .. ... ..... .. .. ...... ... ... ...... ......... .... ....... .-.-

130400 32-WD-122 SIL

N2C Safe End-to-Nozzle 455RIS1

UTGroup ROB, Inconel 182

butter expansion from

nozzle side of weld,

**LATER**

3 X - - - - -

........................................................................................................ .............

130500 32-WD-122 GL-A UT

N2C Safe End-to-Nozzle 88-01

..........................................................

Group ROB **LA-TER**

3 X - - -

......................

130600

........................ .... ........ ................................... - .................. ...-.

Group ROB, 75.4% CRV

**LATER**32-WD-123 B-D

N2C Nozzle-to-Vessel B3.90

UT

3 X

.......................................................................................................................

130700 32-WD-123-IR B-D UT

N2C Nozzle Inner B3.100

Radius Section

.................................................

Group ROB, 82% CRV

**LATER**

3 X - -

Page 128: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 109DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Recirculation Discharge

ZONE NUMBER: 32.0 INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

?ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

NDETlMETH|

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**IIBRATION BLOCK**=

1

3.0" Discharge 14D (REF. DWG. NO. 7)

131400 32-WD-142-FB

14D Decon Flange

Bolting

B-G-2

B7.50

VT-1 Examine in place, when

removed or when

disassembled **N/A**3 X- - - - - - - - -

2.0" Discharge 14D (REF. DWG. NO. 7)

132300 32-WD-145

Coupling-to-Pipe

. - I. . .. .. ... - -. -.. .. .... .. .

133400 32-WD-156

Pipe-to-Coupling

B-J

B9.40

B-J

B9.40

PT

3 - - - - X - - -

Examine 100% of weld

length **N/A**

.....-.. .. .................. I................ ..................... .

Examine 100% of weld

length **N/A**PT

3 - - - - X - - -

28.0" Discharge 14D (REF. DWG. NO. 7)

**P8R-1.109-1**133500 32-WD-157

Valve 32-383-to-Pipe

GL-A

88-01

UT

3 _ - - -- - X

134900 32-WD-163

Pipe-to-Nozzle N2D

Safe End

.......................................................................

135100 32-WD-163-U

Pipe-Long Seam

B-J

B9.11

UT

PT

Examine 100% of weld

length **P8R-l.109-1**

3---- - - - -

B-J

B9.12

UT

PT

Code Case N-524

**P8R-1.109-1**

3 - - - -

135200 32-WD-164 B-F

N2D Safe End-to-Nozzle B5.10

UT

PT

Group R09 **LATER**

3 - - X -- - - - -

135300 32-WD-164 SIL

N2D Safe End-to-Nozzle 455RlS1

UT

3- - - -

Group RO9, Inconel 182

butter expansion from

nozzle side of weld

**LATER**

Page 129: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 110

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Recirculation Discharge

ZONE NUMBER: 32.0INSF

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

'ECTION INTERVAL PLAN STATUS

ASHE

SEC. XI

CATEGYITEM NO

NDEHJMETHl

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CALIBRATION BLOCK**

135400 32-WD-164 GL-a

N2D Safe End-to-Nozzle 88-C

135500 32-WD-165 B-D

N2D Nozzle-to-Vessel B3.9

11

UT Group R09, **LATER**

3- - - - X - - - - - - -

AUT Group R09, 75.4% CRV

'0 Limitation due to bottom3 - - - - X - - - - - - - hedtprosel

headitaper of*shell

thickness **LATER**

135600 32-WD-165-IR

N2D Nozzle Inner

Radius Section

B-D

B3.100

AUT

3- - - - X - - - - - - -

Group RO9, 82% CRV

Limitation due to bottom

head taper of shell

thickness **LATER**

28.0" Discharge 15D (REF. DWG. NO. 7)

135700 32-WD-181

Pump 15

Discharge-to-Elbow

135900 32-WD-181-D1

Elbow-Long Seam

136000 32-WD-181-D2

Elbow-Long Seam IR

B-J UT

B9.11 PT3 - - - -_- X - - -

B-J UT

B9.12 PT

B-J UT

B9.12 PT

Terminal End, High

Stress Weld, Examine

100% of weld length

**P8R-1.109-1**

Formerly LW-058-A, Code

Case N-524

**P8R-1.109-1**

Formerly LW-058-B, Code

Case N-524

**P8R-1.109-1**

3 -X - - -

3 -X - - -

3.0" Discharge 15D (REF. DWG. NO. 7)

136300 32-WD-184-FB

15D Decon Flange

Bolting

B-G-2

B7.50

VT-1 Examine in place, when

removed, or when

disassembled **N/A**3-X - - -

Page 130: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 111

Reactor Recirculation Discharge

ZONE NUMBER: 32.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH_

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

_ r

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

28.0" Discharge 15D (REF. DWG. NO. 7)

136700 32-WD-186

Pipe-to-Valve 32-384

B-J

B9.11

UT

PT3 -

Terminal End, High

Stress Weld, Examine

100% of weld length

**P8R-1.109-1**

- - - X - - -

136900 32-WD-186-U

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.109-1**3 - - - - - - - - X - - -

2.0" Discharge 15D (REF. DWG. NO. 7)

137000 32-WD-187

Coupling-to-Pipe

.- .- . -... .... .. . . - . ... .. .... . I. .......... ....... . -. -. ...-

137600 32-WD-193

Valve 32-389-to-Pipe

B-J

B9.40

..... . .. ..~B-J

B9 21

PT Examine 100% of weld

length **N/A**3 - - - X - -

PT Examine 100% of weld

length **N/A**3 - - - X - -

137700 32-WD-194

Pipe-to-Elbow

B-J

B9.21

PT Examine 100% of weld

length **N/A**3 -

137800 32-WD-195

Elbow-to-Pipe

B-J

B9.21

PT Examine 100% of weld

length **N/A**3 - - - - X - -

14.0" Discharge 15D (REF. DWG. NO. 7)

139700 32-WD-204-MT INPO

Mixing Tee-Base Metal 5-85

UT 100% of base material,

each RFO.

**P8R-2.055-1**3 X - - - X X - - X - - -

Page 131: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 112

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Recirculation Discharge

ZONE NUMBER: 32.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME FIRST SECOND THIRD FSEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - _ - U T A G E - - - - - - INSTRUCTIONS

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

28.0" Discharge 15D (REF. DWG. NO. 7)Examine 100% of weld

141400 32-WD-207

pipe-to-Nozzle N2E

Safe End

............................. I......................................

141500 32-WD-207-U

pipe-Long Weld

B-J

B9. 11

UT

PTlength

**P8R-1.655/I.I50-1**3- - - - -X - - -

........................................................ ..... _

former LW-064, Code Case

N-524 **P8R-1.109-1**B-J

B9.12

UT

PT3- - - - - - - - X - -

.................................. I......................................................................................_

141600 32-WD-208 B-F UTGroup R10 **LATER**

N2E Safe End-to-Nozzle B5.10PT

3 - - - - - - - X -

141700 32-WD-208 SIL

N2E Safe End-to-Nozzle 455R1S1

UTGroup Rio, Inconel 182

butter expansion from

nozzle side of weld

**LATER**

3- - - - - - - - X -

Group RIO, **LATER**

141800 32-WD-208 GL-A

N2E Safe End-to-Nozzle 88-01

UT

3…- - - - _ - - X - - -

141900 32-wD-209 B-D

N2E Nozzle-to-Vessel B3.90

AUTGroup RbO,

Limitation

head taper

thickness.

74.5% CRV

due to bottom

of shell

**LATER**

3- - - - - - - - X - - -

142000 32-WD-209-IR

N2E Nozzle Inner

Radius Section

B-D

B3.100

AUTGroup RiO, 82% CRV

Limitation due to bottom

head taper of shell

thickness. **LATER**

3- - - - - - - X -

Page 132: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 113

Reactor Recirculation Pump 11

ZONE NUMBER: 32.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDE 1METH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

32-187 (REF. DWG. NO. 7A)

142900 32-187

Pump 11 Support

F-A

Fl .40

VT-3 Code Case N-491-1

**N/A**3 X -- - - -

143000 32-187-PBB B-G-1

Pump 11 Busihings (1 B6.200

thru 16)

143100 32-187-PEN B-G-1

Pump 11 Nuts, (1 thru 36.200

16)

VT-1 One pump in a group of

pumps, only when

disassembled. **N/A**3 - X -

VT-1 Limited to pump selected

under B-L-2, One pump in

X--a group of pumps **N/A**3

143200 32-187-PBS B-G-1

Pump 11 Flange Studs B6.180

(1 thru 16)

UT

3 - - - -X

Limited to pump selected

under B-L-2, One pump in

a group of pumps.

**NMP1-2.75-RCP-STUD**

143300 32-187-PEW

Pump 11 Washers (1

thru 16)

..... ............... ............ ............................................

143400 32-187-PBY

Pump 11 Interior

Surface

B-G-1

B6.200

VT-1

3 - - - - X - - -

Limited to pump selected

under B-L-2, One pump

among a group of pumps

**N/A**

B-L-2

B12.20

VT-3 When disassembled, one

pump among a group of

pumps **N/A**3- - - - x - - - - - - -

143500 32-187-PFS B-G-1

Pump 11 Flange Surface B6.190

VT-1

3 - - - - X--

Limited to pump selected

under B-L-2, Examine 1

in. annular surface of

flange surrounding each

stud **N/A**

Page 133: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 114

Reactor Recirculation Pump 11

ZONE NUMBER: 32.0INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGY NDENUMBER IDENTIFICATION ITEM NO METH

PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - -- - - INSTRUCTIONS

1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

143700 32-187-SHEB B-G-2

Pump 11 Seal Housing B7.60

Bolting (I thru 16)

VT-1

3 - - - - X--

P01, Limited to pump

selected under B-L-2,

one pump among group of

pumps. **N/A**

Page 134: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 115

Reactor Recirculation Pump 15

ZONE NUMBER: 32.0INSPECTION INTERVAL PLAN STATUS

ASNE FIRST SECOND THIRDSEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - - - - - -0 U T A G E - - - - - -NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

32-191 (REF. DWG. NO. 7)

148900 32-15-Hi

Spring Hanger

F-A

Fl. 40

VT-3 Code Case N-491-1

**N/A**3- - -- x - - - - - - -

Page 135: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 116

Reactor Recirculation Suction

ZONE NUMBER: 32. 0 INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGY NDENUMBER IDENTIFICATION ITEM NO METH

28.0" Suction llS (REF. DWG. NO. 7)

151000 32-11-H3A F-A VT-3

Spring Hanger F1.10

1FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

Code Case N-491-1

**N/A**3 - - - - X - - - - - - -

151100 32-11-H3B

Spring Hanger

F-A

F1.10

VT-3 Code Case N-491-1

**N/A**3 - - - - X-

28.0" Suction 12S (REF. DWG. NO. 7)

151300 32-12-H3-WD-001

Integral Welded Lug

.. ... ... .. .... . .. . ..... .... . . . . . . . . . . .. . . . . . . . . . .

151400 32-12-H3-WD-002

Integral Welded Lug

B-K

B10.20

PT

3 - X - - -

(32-12-H-3-A), Code Case

N-509 **N/A**

.. . .. ............. .... . . ... . . . . . . . . . . . . . . .

(32-12-H-3-A), Code Case

N-509 **N/A**

B-K

B1O.20

PT

3 - X - - -

151500 32-12-H3-WD-003

Integral Welded Lug

B-K

B1O.20

PT (32-12-H-3-B), Code Case

N-509 **N/A**3 - - - - - X

. ... .... ..... ... ..... ... .. .... .. . . ... . . . . . . . . . . . . . . . .

151600 32-12-H3-WD-004

Integral Welded Lug

B-K

B10.20

PT (32-12-H-3-B), Code Case

N-509 **N/A**3 - X

28.0" Suction 14S (REF. DWG. NO.

153100 32-14-H3A F-A

Spring Hanger F1.10

7)

VT-3 Code Case N-491-1

**N/A**3- - - - - - - X

153200 32-14-H3B

Spring Hanger

F-A

F1. 10

VT-3 Code Case N-491-1

**N/A**3-_ - - -

Page 136: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 117

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COM4PONENTS

Reactor Recirculation Suction

ZONE NUMBER: 32.0 ItrSPECTION INT]

ASME

SEC. XI

EXAMINATION AREA CATEGY

IDENTIFICATION ITEM NO

ERVAL PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRD

PERIOD PERIOD PERIOD

NDE - - - - - -O U T A G E - - - - - - INSTRUCTIONS

METH 2 3 4 1 2 3 4 l 2 3 4 **CALIBRATION BLOCK**SUMMARYNUMBER

28.0" Suction 11S (REF. DWG. NO. 7)

155600 32-375-VB

Gate Valve 32-375

Bolting

B-G-2

B7.70

VT-1V06, Limited to valve

selected under B-M-2

**N/A**3- - - - X - - -

..................................... I................................

155700 32-375-VBY

Gate Valve 32-375

Interior Surface

B-M-2

B12.50

VT-3V06,Only when

disassembled, one valve

among group of valves

**N/A**

3- - - - X - -

.. I.................................I..................................................................................................I........................................................................................

.........................._

28.0" Suction 12S (REF. DWG. NO. 7) --ca '..a- -. - -

156800 32-SB-3A

Sway Brace

F-A

Fl. 10

VT-3**N/A**

3 - - _ _ _ - - X

156900 32-SB-3B

Sway Brace

F-A

F1. 10

VT-3

.......................................................................................

Code Case N-491-1

**N/A**

X - - -3…- - - - - - -

28.0" Suction 13S (REF. DWG. NO. 7)Code Case N-491-1

157000 32-SB-5A

Sway Brace

F-A

Fl.10

VT-3

....................

157100 32-SB-5B

Sway Brace

F-A

FP.10

VT-3Code Case N-491-1

**NIA**

3 X - - -

...........................................................................................................................................................................................................................

28.0" Suction l1S (REF. DWG. NO. 7)

157600 32-WD-001 B-D

N1A Nozzle-to-Vessel B3.90

AUTGroup ROI, 65% CRV

Limitation due to lug,

adjacent nozzle and

Bioshield **LATER**

3 - - - X - - - -

Page 137: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 118

Reactor Recirculation Suction

ZONE NUMBER: 32.0 INSPECTION INT

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

ERVAL PLAN STATUS

NDE 1METHL

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK***1 2 3 4 1 2 3 4

AUT157700 32-WD-001-IR

NiA Nozzle Inner

Radius Section

B-D

B3.100

Group R01, 73% CRV

Limitation due to lug,

adjacent nozzle and

Bioshield * *LATER* *

3 - - - - X -

157800 32-WD-002 GL-A

N1A Nozzle-to-Safe End 88-01

UT Group R01 **LATER**

3 - - - - X - - - - - - -

157900 32-WD-002 SIL

NIA Nozzle-to-Safe End 455RlS1

UT

3 - - - - X - - - - - -

Group RO0, Inconel 182

butter expansion from

nozzle side of weld

* *LATER* *

158000 32-WD-002 B-F

NIA Nozzle-to-Safe End B5.10

UT

PT

Group RO1 **LATER**

3 - - - - X --

158200 32-WD-003

Nozzle N1A Safe

End-to-Elbow

B-J UT

B9.11 PT

**P8R-1 .2**

3 - - - - X --

158300 32-WD-003-Dl

Elbow-OR Long Seam

158400 32-WD-003-D2

Elbow-IR Long Seam

B-J UT

B9.12 PT

.................................

B-J UT

B9.12 PT

3 - - - - X - - -

formerly LW-001-A, Code

Case N-524 **P8R-1.2**

formerly LW-001-B, Code

Case N-524 **P8R-1.2**3- - - - X-

12.00" Suction llS (REF. DWG. NO. 7)

159400 32-WD-004A-MT INPO

Mixing Tee -Base Metal 5-85

Exams

UT UT Only, every refueling

outage, 100% ase

Material **P8R-2 .055-1**3 X - - - X X - - X - - -

Page 138: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 119

Reactor Recirculation Suction

ZONE NUMBER: 32.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

FIRSTPERIOD

MDE - - - - - -METH 1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**1 2 3 4 1 2 3 4

28.0" Suction 11S (REF. DWG. NO. 7)

160800 32-WD-007

Branch Connection

B-J

B9.31

UT

PT

Examine 100% of weld

length. **P8R-1.2**3- - - - X - - - - - - -

161800 32-WD-009

Pipe-Valve 32-375

.-- . .................. . . . . . . . . . . . . .I . . . . . . . .

161900 32-WD-009-U

Pipe-Long Seam

B-J UT

B9.11 PT3 - - - X -- - - - -

Terminal End, High

Stress Weld, Examine

100% of weld length.

**LATER**

Formerly LW-004, Code

Case N-524 **LATER**

B-J UT

B9.12 PT3 - - - - X - - - - - - -

3.0" Suction 11S (REF. DWG. NO. 7)

162400 32-WD-011-FB

liS Decon Flange

Bolting

B-G-2

B7.50

VT-1 Examine in place, when

removed, or

_ _ _ - X - - - disassembled. **N/A**3 -

28.0" Suction 11S (REF. DWG. NO. 7)

162500 32-WD-012

Pipe-to-Elbow

B-J

B9.11

UT

PT

Examine 100% of weld

length. **P8R-1.2**3 - - - - X - - - - - -

162700 32-WD-012-Dl

Elbow-Long Seam OR

..............--.............................. .........................

162800 32-WD-012-D2

Elbow-Long Seam IR

B-J UT

B9.12 PT3 - - - - X --

Code Case N-524

**P8R-1.2**

.........................................

Code Case N-524

**P8R-1.2**

B-J UT

B9.12 PT3- - - - X - - - - - - -

162900 32-WD-012-U

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.2**3 - - - - X - - -

Page 139: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 120

Reactor Recirculation Suction

ZONE NUMBER: 32.0INSIP

SUMIARY EXAMINATION AREANUMBER IDENTIFICATION

163100 32-WD-015

Elbow-to-Elbow

'ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

B-J

B9.11

NDEMETH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

o U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

F SINSTRUCTIONS**QLIBRATION BLOCK**

UT

PT

Examine 100% of weld

length. **P8R-1.2**3- - - -

163500 32-WD-015-U1

Elbow-Long Seam OR

B-J

B9.12

UT

PT

Formally LW-006-A, Code

Case N-524. **P8R-1.2**3- - - -

163600 32-WD-015-U2

Elbow-Long Seam IR

B-J

B9.12

UT

PT

Formally LW-006-B, Code

Case N-524 **P8R-1.2**3 - - - - X -

28.0" Suction 12S (REF. DWG. NO. 7)

163700 32-WD-044 B-D

NiB Nozzle-to-Vessel B3.90

UT Group R02, 65% CRV

Limitation due to

Bioshield **LATER**3- - - - - - - - X - - -

163800 32-WD-044-IR

N1B Nozzle Inner

Radius Section

B-D

B3. 100

UT

3-X - -

Group R02, 73% CRV

Limitation due to

Bioshield

**NMP1-GE-7875**

....... ... ..... .. .... ....... .... ...........................................

Group R02, Inconel 182

butter expansion from

nozzle side **LATER**

163900 32-WD-045 SIL

NIB Nozzle-to-Safe End 455R1S1

UT

3- - - - - - - - X -

164000 32-WD-045 B-F

N1B Nozzle-to-Safe End B5.10

164100 32-WD-045 GL-A

NIB Nozzle-to-Safe End 88-01

UT Group R02, **LATER**

3 - - - - X -

UT Group R02, **LATER**

3 - - - - X -

164200 32-WD-046

Nozzle NiB Safe

End-to-Elbow

B-J UT

B9.11 PT

Examine 100% of weld

length, **P8R-1.2**3 _ - -_- X - -

Page 140: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 121

Reactor Recirculation Suction

ZONE NUMBER: 32.0INSP:

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

164300 32-WD-046

Nozzle NiB Safe

End-to-Elbow

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

N/A UT

N/A

PLAN STATUSSECOND

FIRSTPERIOD

l 3 4 - - -

l1 2 3 4

SECONDPERIOD

O U T A G E -

THIRDPERIOD

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**1 2 3 4 1 2 3 4

IWB-2420(b) Examine flaw

growth area next 3

periods. **P8R-1.2**3 X - - - X - - - - - -

164400 32-WD-046

Nozzle NiB Safe

End-to-Elbow

GL-F

88-01

UT Examine each refueling

outage flaw growth.

**P8R-1.260**3 X X X - - X - - -

164500 32-WD-046-Dl

Elbow-Long Seam OR

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.260**3- - - - - - - - X - - -

164600 32-WD-046-D2

Elbow-Long Seam IR

165500 32-WD-049

Pipe-to-Gate Valve

32-376

B-J UT

B9.12 PT

.... ... .........................

B-J UT

B9.11 PT

Code Case N-524

**P8R-1.260**3- - - - - - - X - - -

3 -

Terminal End, High

Stress Weld, Examine

X 100% of weld length

**P8R-1.2**

165700 32-WD-049-U

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**PAR-1 -2**3…- - - - - - - X - - -

165800 32-WD-050

Gate Valve

32-376-to-Pipe

.. .. 1. ~ ............. .. . ..... .. .... I... . ... .. ....

165900 32-WD-050

Gate Valve

32-376-to-Pipe

B-T

B9.11

N/A

N/A

UT

PT3- - - - - - - - X - - -

Terminal End, Limitation

58% CRV, **PBR-1.2**

. . . .... .- .... . .. ... .. -.. . .

Re-examine per

IWB-2420(b) Flaw growth

area next 3 periods,

acceptable USNRC TAC No.

MA5696. . **P8R-1.2**

UT

3 X - - - X - - - X - - -

Page 141: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 122

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Recirculation Suction

ZONE NUMBER: 32.0INSPECTION INTERVAL PLAN STATUS

ASHE

SEC. XISUMMARY EXAMINATION AREA CATEGY NDENUMBER IDENTIFICATION ITEM NO METE 1FIRST SECOND THIRD

PERIOD PERIOD PERIOD

- - - - - -O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

_ _

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

166100 32-WD-050-D

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.2**3-X - - -

166200 32-WD-051

Branch Connection

-Decon

B-J

B9.32

PT Examine 100% of weld

length. **N/A**3 _ - -_- X - - -

3.0" Suction 12S (REF. DWG. NO. 7)

166300 32-WD-051-FB B-G-2

Decon Flange Bolting B7.50

VT-1 Examine in place, when

removed or disassembled.

**N/A**3 - -- -

2.5" Suction 12S (REF. DWG. NO. 7)

166900 32-WD-053

Thermowell

B-J

B9.21

PT Examine 100% of weld

length **N/A**3 - - - - X - -

28.0" Suction 13S (REF. DWG. NO. 7)

167400 32-WD-084 B-D

NIC Nozzle-to-Vessel B3.90

UT

3 X - - - - - - -

Group R03, 65% CRV

Limitation due to lug,

adjacent nozzle and

bioshield **LATER**

167500 32-WD-084-IR

N1C Nozzle Inner

Radius Section

B-D

B3.100

UT

3 X- - - - - - - -

Group R03, 73% CRV

Limitation due to lug,

adjacent nozzle and

bioshield

**NMPl-GE-7875**

167600 32-WD-085 B-F

NIC Nozzle-to-Safe End B5.10

UT

PT

Group R03, **LATER**

3 X- - - - - - - - - -

Page 142: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 123

Reactor Recirculation Suction

ZONE NUMBER: 32. 0 INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

167700 32-WD-085 SIL

N1C Nozzle-to-Safe End 455R1S1

NDE]METH

UT

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

| INSTRUCTIONS

*CALIBRATION BLOCK**

Group R03, Inconel 182

butter expansion from

nozzle side of weld,

**LATER**

3 x - - -

Group R03 **LATER**167800 32-WD-085 GL-A

N1C Nozzle-to-Safe End 88-01

UT

3 x - - - - - - - - - -

167900 32-WD-086

Nozzle NIC Safe

End-to-Elbow

B-J UT

B9.11 PT

Examine 100% of weld

length , **P8R-1.109-1**3 X - - - - - -

168000 32-WD-086

Nozzle NIC Safe

End-to-Elbow

N/A

N/A

UT IWB-2420(b) Examine flaw

growth area next 3

periods. **P8R-1.109-1**3 X - - - X - - - X - - -

168100 32-WD-086

Nozzle NiC Safe

End-to-Elbow

GL-F

88-01

UT

3 x - - - X X - -

Examine each refueling

outage flaw growth.

**P8R-1.260,P8R-1.655/1.

150-**

168200 32-WD-086-D1

Elbow-Long Seam OR

B-J UT

B9.12 PT

Formerly LW-026-A, Code

Case N-524 **P8R-1.260**

3 X - - -

168300 32-WD-086-D2

Elbow-Long Seam IR

B-J UT

B9.12 PT

Formerly LW-026-A, Code

Case N-524 **P8R-1.260**

169300 32-WD-089 B-J UT

PTPipe-to-Valve 32-377 B9.11

Terminal End, High

Stress Weld, Examine

100% of weld length

**PeR-1.109-1**

3 X- - - - - - - - -

Page 143: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 124

Reactor Recirculation Suction

ZONE NUMBER: 32.0 IVISPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

FIRSTPERIOD

NDE - - - - - -

METH 1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDTHIRDPERIOD

1 2 3 4

.

_5-

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

169500 32-WD-089-U

Pipe-Long Seam

B-J UT

B9.12 PT

Formerly LW-028, Code

Case N-524

**P8R-1.109-1**3 x - - - - - - -

........................................................................ - ...................................... ..

169600 32-WD-090

Valve 32-377-to-Pipe

B-J

B9.11

UT

PT3 X - - - - - -

Terminal End, High

Stress Weld, Limitation

due to configuration 58%

CRV, Examine 100% of

weld length.

**P8R-1.109-1**

169800 32-WD-090-D

Pipe-Long Seam

B-J UT

B9.12 PT

Formally LW-029, Code

Case N-524

**P8R-1.109-1**3 x - - -

3.0" Suction 13S (REF. DWG. NO. 7)

170000 32-WD-091-FB

13S Decon Flange

Bolting

B-G-2

B7.50

VT-1 Examine in place, when

removed or when

disassembled. **N/A**3- - - - - - - - X -

28.0" Suction 13S (REF. DWG. NO. 7)

**P8R-1.109-1**170100 32-WD-092

Pipe-to-Elbow

B-J UT

B9.11 PT3 x - - -

170200 32-WD-092

Pipe-to-Elbow

GL-A

88-01

UT**P8R-1.109-l,P8R-1.260*

3 X - - - - - - - -

Page 144: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 125

Reactor Recirculation Suction

ZONE NUMBER: 32.0 IN

SUMMARY EXAMINATION AREA

rSPECTION INTERVAL

ASME

SEC. XICATEGY NDETl

METH

PLAN STATUS

FIRST SECONDPERIOD PERIOD

O- - - U T A G E -

THIRDPERIOD

PRESERVICE YEAR

L INSTRUCTIONS

**CALIBRATION BLOCK**NUMBER IDENTIFICATION ITEM NO 1 2 3 4 1 2 3 4 1 2 3 4

28.0" Suction 14S (REF. DWG. NO. 7)

171300 32-WD-124 B-D

NID Nozzle-to-Vessel B3.90

UT Group R04, 65% CRV

Limitation due to

3 - - - - - - - - X - - - Bioshield **LATER**

171400 32-WD-124-IR

N1D Nozzle Inner

radius Section

B-D

B3.100

UT Group R04, 73% CRV

Limitation due to

Bioshield

**NMPI-GE-7875**

3- - - - - - - - X - - -

171500 32-WD-125 SIL

N1D Nozzle-to-Safe End 455RlSl

UT Group R04, Inconel 182

butter expansion from

nozzle side of weld

**LATER**

3- - - - - - - - X - - -

171600 32-WD-125 B-F

N1D Nozzle-to-Safe End B5.10

171700 32-WD-125 GL-A

NID Nozzle-to-Safe End 88-01

UT

PT

. . ..

UT

Group R04 **LATER**

3 X -

Group R04 **LATER**

3 - - - - S - - -

171800 32-WD-126

Nozzle NID Safe

End-to-Elbow

B-J UT

B9.11 PT

Examine 100% of weld

length, **P8R-1.109-1**

3 - -- X - _ _

171900 32-WD-126

Nozzle N1D Safe

End-to-Elbow

N/A

N/A

UT IWB-2420(b) Examine flaw

growth area next 3

periods. **P8R-1.109-1**3 x - - - X - - - X - - -

172000 32-WD-126

Nozzle NID Safe

End-to-Elbow

GL-F

88-01

UT Examine each refueling

outage flaw growth.

**P8R-1.655/1.150-1**3 X - - - X X - - X - - -

Page 145: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 126DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Recirculation Suction

ZONE NUMBER: 32.0 IN[SPECTION INTERVAL PLAN STATUSSECOND

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

172100 32-WD-126-D1 B-J

Elbow-Long Seam OR B9.12

_FIRSTPERIOD

NDE - - - - - -

METH 1 2 3 4

SECONDPERIOD

O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

F INSTRUCTIONS

* *CLIBRATION BLOCK**1 2 3 4 1 2 3 4

UT

PT

Code Case N-524

**P8R-1.109-1**3 - - - - X-

172200 32-WD-126-D2

Elbow-Long Seam IR

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.109-1**

3 - X -- - - _

14.0" Suction 14S (REF. DWG. NO. 7)

173200 32-WD-128A

Pipe-to-Gate Valve

38-01

GL-A

88-01

UT Removable pipe clamp

**P8R-.935-1**

3 - - - - -

................

173300 32-WD-128A

Pipe-to-Gate Valve

38-01

B-J UT

B9.11 PT3 - - - - -

Terminal End, High

Stress Weld, Removable

pipe clamp, Examine 100%

of weld length.

**P8R-1.109-1**

173400 32-WD-128A-U

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.l09-l**

3- - - - X - - - - - - -

28.0" Suction 14S (REF. DWG. NO. 7)

174300 32-WD-131

Pipe-to-Valve 32-378

B-J

B9.11

UT

PT

Terminal End, High

Stress Weld, Examine

100% of weld length

**P8R-1.109-1**

3 - - - - -

174500 32-WD-131-U

Pipe-Long Seam

B-J UT

B9.12 PT

Removable pipe clamp,

Code Case N-524

**P8R-1.109-1**3 - - - - -

Page 146: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 127

Reactor Recirculation Suction

ZONE NUMBER: 32.0INSPECTION INTERVAL PLAN STATUS

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDENUMBER IDENTIFICATION ITEM NO METH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**ALIBRATION BLOCK**

3.0" Suction 14S (REF. DWG. NO. 7)

175000 32-WD-133-FB

Decon Flange Bolting

B-G-2

B7.50

VT-1 Examine in place, when

removed or when

disassembled. **N/A**3- - - - X - -- - _

2.5" Suction 14S (REF. DWG. NO. 7)

175600 32-WD-135

Branch Connection -

Thermowell

B-J

B9.32

PT Examine 100% of weld

length **N/A**3 - - - - X -

28.0" Suction 15S (REF. DWG. NO. 7)

176300 32-WD-166 B-D

NlE Nozzle-to-Vessel B3.90

AUT Group R05, 33.8% CRV

Limitation due to lug,

thermocouple and

bioshield **LATER**

176400 32-WD-166-IR

NlE Nozzle Inner

Radius Section

B-D

B3. 100

AUT

3 X- - - - - - - - -

Group R05, 73% CRV

Limitation due to lug,

thermocouple and

bioshield **LATER**

176500 32-WD-167 B-F

N1E Nozzle-to-Safe End B5.10

UT

PT

Group R05 **LATER**

3 X- - - - - - - - -

176600 32-WD-167 SIL

N1E Nozzle-to-Safe End 455R1S1

UT

3 X- - - - - - - - -

Group R05, Inconel 182

butter expansion from

nozzle side of weld

**LATER**

176700 32-WD-167 GL-A

NiE Nozzle-to-Safe End 88-01

UT Group R05 **LATER**

3 X

Page 147: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 128

Reactor Recirculation Suction

ZONE NUMBER: 32.0 INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

176800 32-WD-168

Nozzle N1E Safe

End-to-Elbow

ECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

CATEGYITEM NO

B-J

B9.11

METH

UT

PT

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

Examine 100% of weld

length, **P8R-1.260**3 - - - - - - - - X

176900 32-WD-168

Nozzle NiE Safe

End-to-Elbow

N/A

N/A

UT WB-2420(b) Examine flaw

growth area next 3

periods. **P8R-1.260**3 X - - - X - - - X - - -

177000 32-WD-168

Nozzle NlE Safe

End-to-Elbow

GL-F

88-01

UT

3 x - - - X X - - X

Examine each refueling

outage flaw growth.

**P8R-1.260,P8R-1.655/1.

15O-**

177100 32-WD-168-D1

Elbow-Long Seam OR

177200 32-WD-168-D2

Elbow-Long Seam IR

B-J UT

B9.12 PT

B-J UT

B9.12 PT

3 - - - - - - - - X

............................................................................

3 - - - - - - - - X

Formerly LW-051-A, Code

Case N-524 **P8R-1.260**

Formerly LW-051-B, Code

Case N-524 **P8R-1.260**

178600 32-WD-171-MT INPO

Mixing Tee Base Metal 5-85

UT Base metal scans

required each Refueling

Outage **P8R-1.109-1**3 X - - - X X - - X - - -

178800 32-WD-171A

Reducer-to-Pipe

B-J UT

B9.11 PT

Examine 100% of weld

length **P8R-l.1O9-1**3- - - - X - - - - - - -

179000 32-WD-171A-D

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**P8R-1.109-1**3 - - - - X - - - - - - -

Page 148: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 129

DATE: 10/15/99

REVISION: 0

Reactor Recirculation Suctic

ZONE NUMBER: 32.0

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

an

INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

CATEGY NDE O U T A G E- - - - - - INSTRUCTIONS

ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 __**CALIBRATION BLOCK**

10.0" Suction 15S (REF. DWG. NO. 7)

179200 32-WD-171BR GL-A

Valve 39-01-to-Reducer 88-01

UT

3- - - - - - - - X

179300 32-WD-171BR B-J

Valve 39-01-to-Reducer B9.11

UTPT

Terminal End, High

Stress Weld

**NMPl10-XXlSS**3…- - -

28.0" Suction 15S (REF. DWG. NO. 7)

179400 32-WD-172

Tee-to-Pipe

B-J UT

B9.11 PT3- - - - - - -

Limitation due to

fitting configuration,

X - - and material 58%

CRV.Examine 100% of weld

length. **P8R-l.109-1**

... ...................................... .......................................................... I...

(CW172,173), Code Case

N-524 **P8R-1.109-1**179700 32-WD-172-D

Pipe-Long Seam

B-J UT

B9.12 PT3 - - - - - - - - X

........1 .. .....

179800

...... .. . .. ...... ............................

Code Case N-524

**PeR-1.109-1**32-WD-172-U

Tee - Long Seam

B-J UT

B9.12 PT3 - - - - -_ X

180200 32-WD-174

Valve 32-379-to-Pipe

B-J

B9. 11

UT

PT

Terminal End, High

Stress Weld, Examine

1004 of weld length

**P8R-1.109-1**

3 - - - - - - - - X - -

..................

180400 32-WD-174-D

Pipe-Long Seam

B-J UT

B9.12 PT

Code Case N-524

**PSR-1.109-1**

3 - - - - - - - - X - - -

Page 149: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 130

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS0

Reactor Recirculation Suction

ZONE NUMBER: 32.0 IIrSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

- -1-

3.0" Suction 15S (REF. DWG. NO. 7)

180600 32-WD-175-FB

Decon Flange Bolting

B-G-2

B7.50

VT-1 Examine in place, when

removed or when

disassembled. **N/A**3- - - - X - - - - - - -

Page 150: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 131DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Clean Up

ZONE NUMBER: 33.0TNSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

6.0" Line (REF. DWG. NO. 20)

1B1900 33-O1R-VBY B-M-2

Valve 33-O1R Interior B12.50

Surface

MEH1FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**ALIBRATION BLOCK**

_--L1

VT-3

3 - - - - X - - - - - - -

V07, Onle when

disassenbled, one valve

among group of valves.

**N/A**

..................................... ......................... . ...... - ... ..

V13, Limited to valve

selected under B-M-2.

**N/A**

182300 33-03-VB

Valve 33-03 Bolting

B-G-2

B7. 70

VT-1

3- - - - X - - - - - - -

182400 33-03-VBY

Valve 33-03 Interior

Surface

......... ...... .......... .......... .................. ........................... .......-

182500 33-03-WD-001

Valve 33-03 Integral

Attachment

B-M-2

B12.50

VT-3

3- - - - X - - - - - - -

V13, Only when

disassembled, one valve

among group of valves.

**N/A**

............................. ...... ........................... .... . ... .. ... - ..

Code Case N-509, Examine

100% of weld length

**N/A**

B-K

B10.40

PT

3 - - - - - - - - X - - -

183700 33-WD-001

Branch Connection

B-J

B9.32

PT Examine 100% of weld

length. **N/A**

3 X - - - - -

183800 33-WD-002

Pipe-to-Valve 33-02

B-J UT

B9.11 PT3- - - - _ X - - -

Terminal End, High

Stress Weld, Limitation

due to fitting

configuration 62% CRV,

Examine 100% of weld

length. **LATER**

184000 33-WD-003

Valve 33-02R-to-Pipe

B-J

B9.11

UT

PT3- - - - - - - -

Terminal End, High

Stress Weld, Limitation

due to fitting

configuration 62% CRV,

Examine 100% of weld

length. **LATER**

Page 151: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 132

Reactor Clean Up

ZONE NUMBER: 33.0 NSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

184300 33-WD-004

Pipe-to-Pipe Bend

ECTION INTERVAL PLAN STATUS

ASME

SEC. XI

CATEGYITEM NO

GL-D

88-01

NDETlM4ETH|

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

THIRDPERIOD

-_ - _ _ _

PRESERVICE YEAR

L INSTRUCTIONS

L **CLIBRATION BLOCK**1 2 3 4 1 2 3 4-3-

UT **LATER**

3 x - - - _ X - - - - - -

184900 33-WD-014

Pipe-to-Pipe

........ ...... .- . - ....................... ................................ ... ..........

185100 33-WD-015

Pipe-to-Valve 33-04

GL-G

88-01

................

GL-A

88-01

VT-2

3 X - - - X X - - X - - -

Inaccessible, inside Pen

X-9, Visual VT-2 each

outage for evidence of

leakage. **N/A**

........................................................ ......

Inaccessible inside Pen

X-9. Visual VT-2 each

outage for evidence of

leakage. **N/A**

VT-2

3 x - - - X X - - X - - -

185500 33-WD-035

Valve 33-03-to-Pipe

. ................................................ .................................... ...........

185700 33-WD-036

Pipe-to-Elbow

GL-A

88-01

VT-2

3 X - - - X X - - X - - -

Inaccessible located

inside pen X-154, VT-2

Each Refueling Outage

for evidence of leakage

**N/A**

GL-G

88-01

VT-2

3 X - - - X X

Inaccessible located

inside pen X-154, VT-2

X Each Refueling Outage

for evidence of leakage

**N/A**

185900 33-WD-046

Pipe-to-Pipe

B-J UT

B9.11 PT

Bimettalic weld, Examine

100% of weld length.

**LATER**3- - - - X - - -

186000 33-WD-046

Pipe- to- Pipe

GL-D

88-01

Bimettalic weld

**LATER**

186300 33-WD-047C1

Pipe-to-Valve 33-OIRI

B-J UT

B9.11 PT

Examine 100% of weld

length **P8R-.432-2**3- - - - - - - - X - - -

Page 152: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 133

Reactor Clean Up

ZONE NUMBER: 33.0 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

186700 33-WD-048C1

Valve 33-0iR-to-Pipe

ASME

SEC. XI

CATEGY NDEITEM NO METH

B-J UT

B9.11 PT

1FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

FIRSTTHIRDPERIOD

1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

__1-

**P8R-.432-2**

3- - - - - - - - X - -

186900 33-WD-049

Pipe-to-Elbow

B-J

B9.11

UT

PT3- - - - X - - - - - -

BiMattalic weld, Limited

due to permn't hanger

attach. 90% CRV, 90%

CRA. Exam 100% of weld

length. **LATER**

...... ................. .................... ...........................................

187000 33-WD-049

Pipe-to-Elbow

GL-D

88-01

UT

3 X - - - - X - - - - - -

....1 ..............

187500

.. ....... ........

187600

33-WD-054

Pipe-to-Tee

33-WD-055

Tee-to-Reducer

B-J UT

B9.11 PT3- - - - - - - - X - - -

Examine 100% of weld

length **LATER**

................................................... -

Examine 100% of weld

length **LATER**B-J UT

B9.11 PT3 - - - - - - X - - -

4.0" Line (REF. DWG. NO. 20)

187700 33-WD-056

Reducer-to-Pipe

B-J UT

B9.11 PT

Examine 100% of weld

length. **LATER**

3- - - - - - - -

6.0" Line (REF. DWG. NO. 20)

188200 33-WD-061

Tee-to-Reducer

B-J UT

B9.11 PT

Examine 100% of weld

length **LATER**

3 - - - - - - - - X - - -

4.0" Line (REF. DWG. NO. 20)

188700 33-WD-066

Pipe-to-Reducer

B-J UT

B9.11 PT

Examine 100% of weld

length **LATER**

3 - - - - X - - - - - - -

Page 153: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 134

Reactor Clean Up

ZONE NUMBER: 33.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

6.0"1 Line (REF. DWG. NO. 20)

NDET|HETH|

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

I INSTRUCTIONS**CALIBRATION BLOCK**

189900 33.2-6-R5

Seismic Restraint

F-A

F1.10

VT-3 Code Case N-491-1, 4

Lugs **N/A**3- - - - - - - - X - -

190000 33.2-6-R5-WD-001

Integral Attachment

B-K

B10.20

PT Code Case N-509, Examine

100% of weld length3 - - -- …X - - - - - - -…

190100 33.2-6-R5-WD-004

Integral Attachment

B-K

B10.20

PT Code Case N-509, Examine

100% of weld length

**N/A**3- - - - X -- - - - -

6.0" Line Outside CIV (REF. DWG. NO. C26852-1)

190200 33-FW-22

Pipe-to-SS Nozzle

GL-E

88-01

UT

3- - - - X - - - X -

Outside CIV, 10% each

refueling, weld overlay,

Examine once every 2

RFO's. **SK-JAF-88-006**

190300 33-FW-22-R

Pipe-to-SS Nozzle

190800 33-FW-35

Elbow-to-Nozzle

GL-G

88-01

UT

3- - - - X - X - - -

Outside CIV, 10% each

refueling, weld overlay

**SK-JAF-88-006**

................................ ..................... . ... - .. -.... .....

Terminal End, Outside

CIV, 10% each refueling

**P8R-.432-2**

GL-S

88-01

UT

3 X - - - X X - X - - -

190900 33-FW-36

Nozzle-to-Elbow

GL-S

88-01

UT Terminal End, Outside

CIV, 10% each refueling

**P8R-.432-2**3 X - - - X X - - X - - -

191000 33-FW-37

Elbow-to-Nozzle

GL-S

88-01

UT Terminal End, Outside

CIV, 10% each refueling

**P8R-.432-2**3 X - - - x x - - X - - -

Page 154: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 135DATE: 10/15/99

REVISION: a

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Clean Up

ZONE NUMBER: 33.2 INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

6.0" Line (REF. DWG. NO. 20)

METH 1FIRSTPERIOD

1 2 3 4

PERIOD PERIOD

O U T A G E- - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 **CLIBRATION BLOCK**

FIRST

1 _-_-

Code Case N-491 **N/A**195100 33-S2

Pipe Stanchion

F-A

F1.10

VT-3

3 X - - - - - - - -

Page 155: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 136DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Instrumentation

ZONE NUMBER: 36.0 INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - - - - - - 0 U T A G E - - - - - -

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

2.0" Line (REF. DWG. NO. 28)

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Group R31, **LATER**195200 36-WD-1073

N7L Closure

Head-to-Nozzle

............ ........ . . ................. ....... ...............................

195300 36-WD-1073-IR

N7L Closure Head

Nozzle Inner Radiu

B-D

B3. 90

UT

3 - - - - _ _ - - X - - -

Group R31, **LATER**B-D

B3.100

UT

3- - - - _ _ - - x - -

.............4 ..

195400Group R31 **LATER**

36-WD-1074

N7L Closure Head

Nozzle-to-Flange

B-F UT

B5.10 PT3- - - - - - - - X - -

195500 36-WD-1074

N7L Closure Head

Nozzle-to-Flange

SIL

455RlSl

UT

3- - - - - - - - X - -

Group R31, Inconel 182

butter expansion from

nozzle side of weld.

**LATER**

.......................................... ................................ ......

Code Case N-491-1

**N/A**

2.0" Line (REF. DWG. NO. 8)

195800 36-R12-A

Spring Hanger

F-A

F1.10

VT-3

- - x - -

196000 36-WD-003

Nozzle N13A-to-Safe

End

B-F

B5.20

PT

3 - - - - - -

.. .. . . . .. .... - .. I ... .. .. ... . ..

3 - - - - _ _

- - X - - -

. -...-.... . ...... - ........ ......... .... .. .

- - X - - -

Group R42, Examine 100%

of weld length. **N/A**

................... ........ .................... .............. ... ~.. .. .-.

Group R42, Examine 100%

of weld length. **N/A**196050 36-WD-003

Nozzle N13A-to-Safe

End

SIL

571

PT

UT

..........1.......

196100 36-WD-004 B-J

Safe End-to-Coupling B9.21

PT Terminal End, Examine

100% of weld length.

**N/A**3- - - - - - X -

Page 156: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLANCLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 137

Reactor Instrumentation

ZONE NUMBER: 36.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASHE FIRST SECOND THIRD FSEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - - - - - - O U T A G E - - - - - - -ISRCINNUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 " ICALRTION BLOCK**

2.0" Line (REF. DWG. NO. 8C)

196500 36-WD-924

N16A Nozzle-to-Safe

End

. .... ... I . . ... I.... . -.. .. ........-... ... .. .. .__

196600 36-WD-924

N16A Nozzle-to-Safe

End

B-F

B5.20

SIL

571

PT Group R43, **N/A**

3 - - - - - - - - X - - -

UT

PT

Group R43, Determine if

Aug. Sur/Vol on nozzle

and safe end is

required, SIL 571 ?

**N/A**

196700

197300

36-WD-925 B-J

Safe End-to-Coupling B9.21

PT Terminal End Nozzle

N16A, Examine 100% ofweld length **N/A**

......................................................................................................

Examine 100% of weld36-WD-932

Elbow-to-Coupling

B-J

B9.40

PT

length **N/A**3 - - - - - - - - X - - -

Page 157: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 138

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS0

Reactor Drain

ZONE NUMBER: 37.0 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

2.0" Line (REF. DWG. NO. 9)

'1PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

1 2 3 4 1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CLIBRATION BLOCK**

I _ _ .

197600 37-WD-030

Pipe-to-Elbow

B-J

B9.21

PT Examine 100% of weld

length **N/A**

3- - - - X - - - - - - -

Page 158: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 139

Reactor Head Vent

ZONE NUMBER: 37.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

2.0" Line (REF. DWG. NO. 9)

NDET|METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

197800 37-01-VB

Valve 37-01 Bolting

.. . . . . . ................... .. ................. ............... ...

197900 37-02-VB

Valve 37-02 Bolting

198000 37-06-VB

Valve 37-06 Bolting

B-G-2

B7. 70

B-G-2

B7.70

B-G-2

E7.70

VT-1 **N/A**

3 X - - -

VT-1 **N/A**

3 X - -

VT-1

3 x - - - - - - - - - -

198200 37-RIl

Spring Hanger

. ............. ...... .....................................

198300 37-R12

Spring Hanger

F-A

F1. 10

VT-3

1. - ......... ..... .. ~ .......... .... ........... .... .. ... .. .................. .............................................................................

Code Case N-491-1

**N/A**3 X - - - - - - - - - - -

F-A

F1. 10

VT-3 Code Case N-491-1

**N/A**3 - - - - X-

4.0" Line (REF. DWG. NO. 9)

Group R39, **LATER**199100 37-WD-001

NB Nozzle-to-Head

B-D

B3. 90

UT

3 - - - X-

Group R39, **LATER**199200 37-WD-001-IR B-D

NB Nozzle Inner Radius B3.100

Section

UT

3 - - - - X - -

199300 37-WD-002

Nozzle N8-to-Flange

B-F UT

B5.10 PT

Group R39, Examine 100%

of weld length **LATER**

3 - - - X _

199400 37-WD-002

Nozzle N8-to-Flange

SIL

455RlSl

UT Inconel 182 Butter

Expansion from Nozzle

side. **LATER**3- - - - X - - -

Page 159: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 140

Reactor Head Vent

- TThm1fv *Va7 fl-- -. -. INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

199500 37-WD-002-FB B-G-2 VT-i

Flange Bolting B7.50

FIRSTPERIOD

I1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

1 U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

Examine in place, when

removed, or when

disassembled. **N/A**3 X - -

**4-A396-.337**199700 37-WD-003

Flange-to-Reducer

GL-D

88-01

UT

3- - - - X - - - X - - -

199710 37-WD-003

Flange-to-Reducer

N/A

N/A

VT-2 VT-2 each outage for

evidence of leakage

**4-A396-.337**3 X - - - X X - - X - - -

2.0" Line (REF. DWG. NO. 9)

199800 37-WD-004

Reducer-to-Pipe

200000 37-WD-006

Elbow-to-Pipe

... ....... ...... .......................................... ...............

200100 37-WD-007

Pipe-to-Flange

~~~~~. . .. . . .. . ....

200200 37-WD-007-FB

Refueling Platform

Flange Bolting

B-J

B9.40

. . .. 1. - . . .

B-J

B9.21

B-J

B9.40

B-G-2

B7.50

PT

3 x -

Examine 100% of weld

length **N/A**

......................... ......................................... .. . .....

Examine 100% of weld

length **N/A**PT

3 X -

PT Examine 100% of weld

length **N/A**

3 X -

VT-1 Examine in place, when

removed, or when

disassembled **N/A**

200500 37-WD-010

Tee-to-Pipe

B-J

B9.21

PT Examine 100% of weld

length **N/A**

3 X - - -

201000 37-WD-015

Pipe-to-Valve 37-01

B-J

B9.40

PT Terminal End, High

Stress Weld, Examine

100% of weld length

**N/A**

3 x - - -

Page 160: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 141

Reactor Head Vent

ZONE NUMBER: 37.0TWASrCTION TWTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEHMETH|

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

I _ _ _ I- _L_

201300 37-WD-018

Tee- to- Pipe

B-J

B9.21

PT Examine 100% of weld

length. **N/A**

3 X - - - - - - - - - -

201700 37-WD-022

Elbow-to-Pipe

...... .. ... . . . . . . . . . . . . . .. . . . . . . . . . . . . . .

202200 37-WD-027

Pipe-to-Valve 37-02

B-J

B9.21

B-J

B9.40

PT

3 x - - - - - - - - -

Examine 100% of weld

length **N/A**

........................................................

Terminal End, High

Stress Welds, Examine

100% of weld length

**N/A**

PT

3 X - - - - - - - - -

Page 161: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 142

Reactor Drain

ZONE NUMBER: 37.1INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

2.0" Line (REF. DWG. NO. 9)

-I1

PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

202700 37-Hi

Spring Hanger

........ ....... .......... ...................................

203100 37-SC-2

Box Restraint

F-A

Fl.10

VT-3

3 x - - - - - - - -

Code Case N-491-1

**Ce/A**

..............................................

Code Case N-491-1

**N/A**F-A

Fl.10

VT-3

3… - - - - - - X - - -

203300 37.1-07R-VB B-G-2

Valve 37-07R Bolting B7.70

VT-1 Examine in place, when

disassembled or when

removed. **N/A**3 - - - - X- _

203400 37.1-37-08R-VB

Valve 37-OSR Bolting

B-G-2

B7.70

VT-1 Examine in place, when

removed, or when

X - - - disassembled. **N/A**3 -

203500 37.1-37-10-VB

Valve 37-10 Bolting

. . .... I ..._ .I........ - -.. ......... ....................................

203600 37.1-37-11-VB

Valve 37-11 Bolting

B-G-2

B7. 70

VT-1

3- - - - - - - - X - - -

Examine in place, when

removed, or when

disassembled **N/A**

................................................... .... ...................... ....

Examine in place, when

removed or when

disassembled. **N/A**

B-G-2

B7.70

VT-i

3 - - - - X -

203900 37.1-WD-003

Pipe-to-Valve 37-10

B-J

B9.40

PT

3 - - - - - - - - X - - -

Terminal End, High

Stress Weld, Examine

100% of weld length

**N/A**

204500 37.1-WD-009 B-J

Pipe-to-Valve 37-07R B9.40

PT Terminal End, High

Stress Weld, Examine

100% of weld length

**N/A**

3- - - - X

Page 162: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 143

Reactor Drain

ZONE NUMBER: 37.1INSPECTION INTERVAL

ASME

SEC. XI

SUM4HARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDE|METH

PT

PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - -O U T A G E -

1 2 3 4 1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

204900 37.1-WD-013

Pipe-to-Coupling

B-J

B9.40

Examine 100% of weld

length **N/A**

3- - - - X - - - - - - -

205100 37.1-WD-015

Pipe-to-Valve 37-11

B-J

B9.40

PTTerminal End, High

Stress Weld, Examine

100% of weld length.

**N/A**

3 - - - - X - - - - - - -

205300 37.1-WD-017 B-J

Pipe-to-Valve 37-OBR B9.40

PT Terminal End, High

Stress Weld, Examine

100% of weld length.

**N/A**

3- - - - - - - - X - - -

Page 163: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 144

Reactor Shutdown Cooling

ZONE NUMBER: 38.0INSPECTION INTERVAL

ASHE

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

14.0" SDC Line (REF. DWG. NO. 10)

PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - -O U T A G E -

1 2 3 4 1 2 3 4

THIRD

PERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

205600 38-01-VB

Valve 38-01 Bolting

B-G-2

B7.70

VT-1 V07, Limited to valve

selected under B-M-23 - - - - - - - - X - - - **N/A**

205700 38-01-VBY

Valve 38-01 Interior

Surface

B-M-2

B12.50

VT-3 V07, Only when

disassembled, One valve

among a group of valves.

**NIA**

3-_ - - -

206100 38-12-FLG

Valve 38-12 Flange

Surface

B-G-1

B6.220

VT-1

3 - - - - - - - K - - -

V1O, When connection is

disassembled, Examine

1.0" annular surface of

flange surrounding each

stud. **N/A**

206200 38-12-NBW

Valve 38-12 Nuts,

Bushing, Washers

B-G-1

B6.230

VT-1 VlO, **N/A**

3- - - - - - - - X - - -

206300 38-12-VB

Valve 38-12 Bolting

B-G-1

B6.210

UT

3-_ - - -

V10, 16 studs, Examine

inplace, when

disassembled, or when

removed.

**NM1-2.50-B16-1**

206400 38-12-VBY

Valve 38-12 Interior

Surface

B-M-2

B12.50

VT-3

3- - - - - -

VIO, Only when

disassembled, One valve

among a group of valves

**N/A**

- - X - - -

Code Case N-509 **N/A**206500 38-12-WD-003 B-K

Valve 38-12 Integral B10.40

Attachment

PT

3-_ - - -

Page 164: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 145

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Shutdown Cooling

ZONE NUMBER: 38.0 INSPI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

207300 38-Hi

Spring Hanger

1ECTION INTI

ASME

SEC. XI

CATEGYITEM NO

F-A

Fl .10

MRVAL PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRD

PERIOD PERIOD PERIOD

NDEO U T A G E- - - - - - INSTRUCTIONS

METH 1 2 3 4 1234 1 2 3 4 CALIBRATION BLOCK**

VT-3Code Case N-491-1

**N/A**

3- - - - - X - - -

208100 38-WD-001

Valve 38-01-to-Pipe

....... ....... . ....... .. ... ...... _ ......... ... ..............................

208200 38-WD-001

Valve 38-01-to-Pipe

GL-D

88-01

UT

3 - - X - - - X -

Requires 38-H-1 Clamp to

be removed. **P8R-.760**

.............................................................. _

Support 38-Hi support

clamp is required to be

removed prior to

performance. **LATER**

B-J

B9.11

UT

PT3- - - - - - - - X

208300 38-WD-002

Pipe-to-Elbow

B-J UT

B9.11 PT

Examine 100% of weld

length **LATER**

3- - - - X - - - - - -

**LATER**208400 38-WD-002

Pipe-to-Elbow

GL-D

88-01

UT

3 X - - - X

208500 38-WD-002-D1

Elbow-Long Seams OR

B-J UT

B9_12 PT

Code Case N-524

**LATER**

3 - - -

208600 38-WD-002-D2

Elbow-Long Seams IR

B-J UT

B9.12 PT

Code Case N-524

**LATER**

**LATER**208800 38-WD-003

Elbow-to-Elbow

209400 38-WD-004

Elbow-to-Pipe

GL-D

88-01

...... ... ... ..

GL-D

88-01

UT

3 X - - - X - - - - -

**LATER**UT

3 X - - - X -

UT **P8R-.760**

209900 38-WD-005

Pipe-to-Elbow

GL-D

88-013 - - - - X - - - X - - -

Page 165: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 146

Reactor Shutdown Cooling

ZONE NUMBER: 38.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

210400 38-WD-006 GL-D

Elbow-to-Pipe 88-01

NDEMETH

FIRSTPERIOD

1 2 3 4

SECOND TEPERIOD PE

O U T A G E - --

1 2 3 4 1 2

1IRDRIOD

PRESERVICE YEAR

INSTRUCTIONS" *CALIBRATION BLOCK**3 4

UT **P8R-.760**

3 - - - - X - - - X - - -

210900 38-WD-007

Pipe-to-Pipe

- .. ... . . . ..... - .. .. .. ....... . -....... ...

211200 38-WD-008

Pipe-to-Valve 38-02

GL-G

88-01

GL-G

88-01

VT-2

X X - - X - - -

Inaccessible inside pen.

X-8, Examine area each

outage for evidence of

leakage. **N/A**

- -...-- ..... ............................................ ......

Inaccessible inside

penetration X-8, Examine

each outage for evidence

of leakage. **N/A**

VT-2

X X - - X - - -

211400 38-WD-087

Valve 38-12-to-Pipe

211500 38-WD-088

Pipee-to-Pipe

GL-G

88-01

GL-G

88-01

VT-2

3 X - - - X X X - - -

Inaccessible inside pen.

X-7. Examine area each

outage for evidence of

leakage. **N/A**

Inaccessible inside pen.

X-7. Examine area each

outage for evidence of

leakage. **N/A**

VT-2

3 X - - - X X - X - - -

211700 38-WD-089

Pipe-to-Elbow

B-J UT

B9.11 PT

Examine 100% of weld

length **LATER**3 X- - - - - - - -

211800 38-WD-089

Pipe-to-Elbow

. .. .-- - .... ...... ...... -.................

212200 38-WD-090

Elbow-to-Pipe

GL-D

88-01

...............

GL-D

88-01

UT

3 x--- - -

UT

3 X - - - - X - - - - - -

Page 166: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 147

Reactor Shutdown Cooling

ZONE NUMBER: 38.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CALIBRATION BLOCK**

_ ,

**P8R-.760**212700 38-WD-091

Pipe-to-Pipe

............ ............ .......................................

212800 38-WD-092

Pipe-to-Pipe

.. . . . ..................... .... - . ...................................

213100 38-WD-093

Pipe-to-Elbow

GL-D

88-01

UT

3 - - - - X - - - X - - -

GL-D

88-01

UT **P8R-.760**

3 X - - - X - - -

GL-D

88-01

UT

3 x - - - X -

213500 38-WD-094 GL-D

Elbow-to-Valve 3B-13 88-01

UT **P8R- 760**

3 - - - - X - - - X - - -

Page 167: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 148

Emergency Condenser Return

ZONE NUMBER: 39.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDEHETH

-

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

10.0" ECC Line (REF. DWG. NO. 11A)

213800 39-O1R-VB

Valve 39-01 Bolting

... ...... .. ..... . ..........................................................

213900 39-O1R-VBY

Valve 39-01 Interior

Surface

B-G-2

B7.70

B-M-2

B12.50

VT-1

3 X - - - _ _

V15, Limited to valve

selected under B-M-2.

**N/A**

V15, Only when

disassembled, One valve

among a group of valves.

**N/A**

VT-3

3 x - - - _ _

214200 39-03-VB

Valve 39-03 Bolting

............. .. . ... ....... .... ......................................... ......

214300 39-03-VBY

Valve 39-03 Interior

Surface

B-G-2

B7.70

VT-1

3 - - - - X -

V12, Limited to valve

selected under B-M-2.

**N/A**

................................................................

V12, Only when

disassembled, One valve

among a group of valves.

**N/A**

B-M-2

B12.50

VT-3

3- - - - X - - - - - - -

214600 39-05-VB

Valve 39-05 Bolting

B-G-2

B7. 70

VT-1 VO9, Limited to valve

selected under B-M-2

**N/A**

214700 39-05-VBY

Valve 39-05 Interior

Surface

B-M-2

B12.50

VT-3

3 X- - - - - - - - -

VO9, Only when

disassembled, One valve

among a group of valves.

**N/A**

215200 39-A2

Anchor

F-A

Fl. 10

VT-3 Code Case N-491-1

**N/A**3 x - - - - - -

Page 168: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 149

Emergency Condenser Return

ZONE NUMBER: 39.0INSP

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

215300 39-A2-WD-001

Anchor Integral

Attachment

PECTION INTERVAL PLAN STATUS

ASME

SEC. XICATEGYITEM NO

B-K

B10.20

NDE|

METH

PT

FIRST SEtPERIOD PE]

1 2 - - - -12U

1 2 3 4 1 2

CONDRIOD

V A G E -3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

Code Case N-509 **N/A**

3 X - - -

215400 39-A2-WD-002

Anchor Integral

Attachment

I I.- - ... I

215900 39-H16

Spring Hanger

B-K

B10.20

F-A

Fl. 10

PT Code Case N-509 **N/A**

3 x - - -

VT-3 Code Case N-491-1.

3-_ - - -

217200 39-H9

Spring Hanger

F-A

Fl. 10

VT-3 Code Case N-491-1.

**N/A**3 - - - - - - - K - - -

217700 39-WD-194

Valve 39-05-to-Pipe

GL-G

88-01

VT-2 Examine each outage for

evidence of leakage.

X - - **N/A**3 X - - - X X -

218000 39-WD-194A

Pipe-to-Pipe

GL-G

88-01

VT-2 Inaccessible inside

penetration X-5B,

X X - - X - - Examine each outage for

evidence of leakage

**N/A**

218400 39-WD-195

Pipe-to-Elbow

GL-D

88-01

UT **NMP-10-XXI-SS**

3 - - - - X - - -

218800 39-WD-196

Elbow-to-Pipe

GL-D

88-01

UT Removal of pipe support

clamp 39-HS-12 & 16

required.

**NMP-10-XX1-SS**

3 - - - - X - - - X - - -

Page 169: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 150

Emergency Condenser Return

ZONE NUMBER: 39.0

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

219200 39-WD-197

Pipe-to-Elbow

INSPECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRDFIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

GL-D

88-01

UT Remove Clamps on

39-HS-12 & 16.

**NMP-1*-XX1-SS**3 - - -- X - - - X - - -

**NMP-10-XX1-SS**219600 39-WD-198

Elbow-to-Pipe

GL-D

88-01

UT

3 - - - - X - - - X - - -

220000 39-WD-199

Pipe-to-Elbow

GL-D

88-01

UT **NM4P-10-XX1-SS**

3 - - - - X - - - X

220400 39-WD-200

Elbow-to-Pipe

. .. . - .1 .. . ....... . ... ... ..................

220800 39-WD-201

Pipe-to-Elbow

GL-D

88-01

GL-D

88-01

UT

3 - - - - X - - - X

UT exams every 2 RFO's.

**NMP-10-XXs -SS**

...........................................................

UT exams every 2 RFO's.

**LATER**

UT

3 x - - - - X

221100 39-WD-202

Elbow-to-Pipe

GL-D

88-01

UT UT exams evry 2 RFO's

**LATER**3 X - - - - X - -

221600 39-WD-203R

Pipe-to-Elbow

222000 39-WD-204A

Pipe-to-Pipe

.. . . .- .. .... . -....-..... .. .

222400 39-WD-204R

Elbow-to-Pipe

GL-D

88-01

GL-D

88-01

GL-D

88-01

**NMP-10-XX1-SS**

3 X - - - X - - -

Sensitized, UT exams

every 2 RFO's,

X - - - X - - **NMP-10-XX1-SS**

UT

3 -

UT Sensitized, UT exams

every 2 RFO's

**NMP-10-XX1-SS**3- - - - X - - - X - - -

Page 170: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 151

Emergency Condenser Return

ZONE NUMBER: 39.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

223200 39-WD-226 GL-G

FIRSTPERIOD

NDE - - - - - -

MZTH l 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

I INSTRUCTIONS**CALIBRATION BLOCK**

VT-2

Valve 39-06-to-Pipe 88-01

VT-2 exam each RFO for

evidence of leakage

**N/A**3 X - - X X - -

223400 39-WD-226A

Pipe-to-Pipe

GL-G

88-01

VT-2 Inaccessible inside pen.

X-5A, VT-2 exam each RFO

for evidence of leakage.3 X - - - X X - - X - - -

223900 39-WD-226B

Pipe-to-Pipe

GL-D

88-01

UT UT exam every 2 RFO's

**LATER**3 X - - - - X - - - -

224300 39-WD-227

Pipe-to-Elbow

GL-D

88-01

UT UT exam every 2 RFO's

**NMP-l0-BX1-SS**3- - - - X - - - X - - -

224500 39-WD-228

Pipe-to-Elbow

_ - - . . .. . . . . . . . . . - . - . . . . . ... 1 - .

225000 39-WD-229

Pipe-to-Elbow

GL-D

88-01

GL-D

88-01

UT UT exam every 2 RFO's

**LATZR**3 X - - - - X - -

UT

3 -

UT exam every 2 RFO's,

Remove clamps on support

- - - X - - - X - - 39-H9, HS-9 and 10.

**NHP-lO-XXl-SS**

225300 39-WD-230

Elbow-to-Pipe

GL-D

88-01

UT UT exam every 2 RFO's

**NHP-10-XX1-SS**3- -- - X - - - X - - -

225800 39-WD-231

Pipe-to-Pipe

GL-D

88-01

UT UT exam every 2 RFO's

**LATZR**

3 X -X - - - -

226200 39-WD-232

Pipe-to-Elbow

GL-D

88-01

UT UT exam every 2 RFO ' s

* *lP-1 0 -XX1 -SS* *

3 - - - - X - - - X - - -

Page 171: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 152

Emergency Condenser Return

ZONE NUMBER: 39.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

226500 39-WD-233 GL-D

Elbow-to-Pipe 88-01

NDEMETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

UT UT exams every 2 RFO's

**NMP-10-XX1-SS**3- -- - X - - - X - - -

226900 39-WD-233A

Pipe-to-Elbow

GL-D

88-01

UT Sensitized, UT exams

every 2 RFO's

**NMP-10-XX1-SS**3- - - - X - - - X - - -

227300 39-WD-234A

Pipe-to-Elbow

GL-D

88-01

UT Sensitized

**NMP-10-XX1-SS**3- - - - X - - - X - - -

227800 39-WD-235R

Elbow-to-Pipe

GL-D

88-01

UT Sensitized

**NMP-10-XXI-SS**3 - - - - X - - - X - - -

Page 172: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 153

Emergency Condenser Supply

ZONE NUMBER: 39.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

10.0" ECC Line (REF. DWG. NO. 11)

PLAN STATUS

1 FIRST SECONDPERIOD PERIOD

- - - - - -O U T A G E -

1 2 3 4 1 2 3 4

ITHIRDPERIOD

- - - - - INSTRUCTIONS

1 2 3 4 **CALIBRATION BLOCK**

PRESERVICE YEAR

. _

229800 39-07R-VB

Valve 39-07R Bolting

B-G-2

B7.70

VT-1 V16, Limited to valve

selected under B-M-2

**N/A**3 -

229900 39-07R-VBY B-M-2

Valve 39-07R Interior B12.50

Surface

VT-3

3

V16, Only when

disassembled, one valve

among a group of valves.

**N/A**

_ - -_ - - - - -

230500 39-09R-WD-001

Valve 39-09R

Body-to-Extension Weld

GL-G

88-01

VT-2 VT-2 exam each RFO for

evidence of leakage

3 x - - - X X - - X - - - **N/A**

230900 39-1OR-WD-001

Valve 39-IOR

Body-to-Extension

GL-G

88-01

VT-2 VT-2 exam each RFO for

evidence of leakageX - - - **N/A**3 X - - - X X - -

18.0" ECC Nozzles (REF. DWG. NO. 11)

231000 39-WD-001 B-D

N5A Nozzle-to-Vessel B3.90

231100 39-WD-0O1-IR B-D

N5A Nozzle Iner Radius B3.100

Section

UT

UT

Group R17, 65% CRV

Limitation due to

adjacent nozzle and

bioshield **LATER**

.. .. .... .I.. ... G. .p. ..... R..... ... i 5R.. ................... V... ... - .................... - - ...

Group R17, 55W CRV

3 x - - - - - - -Limitation due to

adjacent nozzle and

bioshield **LATER**

231200 39-WD-002 GL-A

N5A Nozzle-to-Safe End 88-01

UT Group R17, **LATER**

3 X - - - - - -

Page 173: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 154

Emergency Condenser Supply

ZONE NUMBER: 39.0 INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDE |METH|

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CLIBRATION BLOCK**

10.0" ECC Nozzles (REF. DWG. NO. 11)

Group R17, **LATER**231300 39-WD-002 B-F

N5A Nozzle-to-Safe End B5.10

PT

UT3 X- - - - - - - -

231400 39-WD-002 SIL

N5A Nozzle-to-Safe End 455R1S1

Inconel 182 Butter

Expansion from nozzle

side of weld. **LATER**3 x- - - - - - - - -

10.0" ECC Line (REF. DWG. NO. 11)

231500 39-WD-003

Nozzle N5A Safe

End-to-Pipe

B-J UT

B9.11 PT

Terminal End, High

Stress Weld **LATER**3 X - - -

231600 39-WD-003

Nozzle N5A Safe

End-to-Pipe

. . .- .. ........... .......................................

231900 39-WD-006

Pipe-to-Pipe

GL-A

88-01

UT

3 X - - - - -

**LATER**GL-A

88-01

UT

3 x- - - - - - - -

232700 39-WD-008

Pipe-to-Pipe

GL-A

88-01

UT

233100 39-WD-009

Pipe-to-Valve 39-09R

GL-A

88-01

VT-2

3 X - - - X X - - X - -

Inaccessible inside

penetration X-3A, VT-2

exam each RFO for

evidence of leakage,

233500 39-WD-011

Valve

39-07R-to-Reducer

B-J UT

B9.11 PT3 X - - -

Terminal End, High

Stress Weld, Examine

100% of weld length

**LATER**

Page 174: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 155DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Supply

ZONE NUMBER: 39.0 TISPECTION INTERVAL PLAN STATUS

ASHE FIRST SECOND

SEC. XI PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - - -. - - 0 U T A G E -

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4

18.0" ECC Nozzles (REF. DWG. NO. 11)

THIRDPERIOD

1 2 3 4 FPRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

233800 39-WD-089 B-D

N5B Nozzle-to-Vessel B3.90

UTGroup RIB, 73% CRV

Limitation due to

adjacent nozzle and

bioshield **LATER**

3 - - - - - - - - X -

233900 39-WD-089-IR

N5B Nozzle Inner

Radius Section

B-D

B3.100

UTGroup RIB, 75% CRV

Limitation due to

adjacent nozzle and

bioshield **LATER**

3…- - - - - - - X - - -

10.0" ECC Nozzles (REF. DWG. NO. 11)

234000 39-WD-090 B-F

N5B Nozzle-to-Safe End B5.10

UT

PT

Group RIB, 91.02% CRV

**LATER**

3 - - - - - - - - X - - -

234100 39-WD-090 GL-D

N5B Nozzle-to-Safe End 88-01

- . .... . . .. I... I . .. . .. . .. ... ... . . .. . ... ... ....... ... . .. ... ... .. .. . - . . .. . .......... .. ... . -....

234200 39-WD-090 SIL

N5B Nozzle-to-Safe End 455RIS1

UT

3 - - - - X - - - X -

Group R18, 91.02% CRV

**LATER**

......................... ..... .......... .............. ........--.......

Group RlB, Inconel 182

Butter Expansion from

nozzle side of weld

**LATER**

UT

3- - - - - - X

10.0" ECC Line (REF. DWG. NO. 11)

234300 39-WD-091

Nozzle N5B Safe

End-to-Pipe

B-J UT

B9.11 PT

Terminal End, High

Stress Weld, Examine

100% of weld length

**LATER**

3 X - - -

235500 39-WD-096

Elbow-to-Pipe

B-J UT

B9.11 PT

Examine 100% of weld

length **LATER**

3 X - - - - - - -

Page 175: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 156

Emergency Condenser Supply

ZONE NUMBER: 39.0 INSPJ

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

235900 39-WD-097

Pipe-to-Valve 39-IOR

ECTION INTERVAL

ASHE FIRST

SEC. XI PERIOD

ITEGY NDE 1 2 3 4 - -

ITEM NO METH 1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

VT-2 exam each EFO for

GL-A

88-01

VT-2 VT-2 exam each RFk for

evidence of leakage

**N/A**3 x - - - X X - - X - - -

236300 39-WD-099

Valve

39-08R-to-Reducer

B-J

B9.11

UT

PT

Terminal End, High

Stress Weld, Examine

100% of weld length

**LATER**

3 X- - - - - - -

Page 176: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 157DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Core Spray

ZONE NUMBER: 40.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

12.0" CSA (REF. DWG. NO. 12)

NDE 1METH

PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

1 2 3 4 1 2 3 4

THIRDPERIOD

1 3 4 - - -

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

236700 40-01-VB

Valve 40-01 Bolting

........................ ..................... ................ ............. ...........

236800 40-01-VBY

Valve 40-01 Interior

Surface

B-G-2

B7.70

VT-1

3 X - -

V14, Limited to valve

selected under B-M-2

- - - **H/A**

................................................................................ ..................................................... ........

V14, Only when

disassembled, one valve

among group of valves

**N/A**

B-M-2

B12.50

VT-3

3 X - -

237100 40-03-FLG

Valve 40-03 Flange

Surface

B-G-1

B6. 220

VT-1V11, Examine 1.0"

annular surface of

flange surrounding each

stud **N/A**

3 X - - - - - - - - -

237200 40-03-NBB

Valve 40-03 Bushings

B-G-1

B6. 230

VT-1 Vii, Only when

disassembled **N/A**

3 X- - - - - - -

237300 40-03-NBN

Valve 40-03 Nuts

B-G-1

B6.230

VT-1Vll, Examine inplace,

when removed or

disassembled **N/A**3 X - - - - - - - - -

....................

237400 40-03-NBW

Valve 40-03 Washers

B-G-1

B6.230

VT-iVil, Examine inplace,

when removed or

disassembled **N/A**3 x - - -

237500 40-03-VB

Valve 40-03 Bolting

B-G-1

B6.210

UT Vli, Limited to valve

selected under B-M-2

**LATER**

Page 177: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 158

Reactor Core Spray

ZONE NUMBER: 40.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

_ _ _ _ _ _ _ _ _ _ _ _ _ _ -

237600 40-03-VBY

Valve 40-03 Interior

Surface

B-M-2

B12.50

VT-3

3 X- - - - - - - -

Vll, Only when

disassembled, one valve

among group of valves

**N/A**

2.0" CSB (REF. DWG. NO. 12)

239500 40-20-VB

Valve 40-20 Bolting

B-G-2

B7. 70

VT-1 Examine in place, when

removed or when

disassembled. **N/A**3 X - - -

12.0" CSA (REF. DWG. NO. 12)

239600 40-Al

Anchor

F-A

Fl. 10

VT-3 Code Case N-491-1

**N/A**3 - X -- - - - -

12.0" CSB (REF. DWG. NO. 12)

240200 40-H17

Spring Hanger

F-A

F1.10

VT-3 Code Case N-491-1

**N/A**3- - - - X - - -

240600 40-H21-A F-A

Constant Spring Hanger F1.10

Code Case N-491-1

**N/A**3 - _ _ _ - - -

240700 40-H21-A-WD-001

Integral Attachment

B-K

B10.20

PT Code Case N-509 **N/A**

3-_ - - -

240800 40-H21-A-WD-004

Integral Attachment

B-K

B10.20

PT Code Case N-509 **N/A**

3 - … - - - - - K - - -

240900 40-H21-A-WD-007

Integral Attachment

B-K

B10.20

PT Code Case N-SO9 **N/A**

3-_ - - -

Page 178: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 159

DATE: 10/15/99

REVISION: 0

Reactor Core Spray

ZONE NUMBER: 40.0

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

241000 40-H21-A-WD-010

Integral Attachmer

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

tmvQCVDTrCR YEAR

INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

CATEGY NDE - - - - - - O U T A G E- - - - - - INSTRUCTIONS

ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

Cod CsN-O **/*

it

Code Case N-509 **N/A**B-K

B10.20

PT

3-- - - - X

......................... ............... I............................ .............................................................

241100 40-H21-B F-A VT-3

Constant Spring Hanger F1.10

Code Case N-491-1

**N/A**

3- - - - - - - X - - -

12.0" CSA (REF. DWG. NO. 12)

241700 40-H54

Spring Support

F-A

Fl.10

VT-3Code Case N-491-1

**N/A**

3 X - - - - - - - - -

243100 40-H57-B F-A

Constant Weight hanger F1.10

VT-3Code Case N-491-1

**N/A**

3 X - - -

................................................ .......... _........................

UT exams every 2 RFO's

**NHP-12-XX1-SS**245800 40-WD-001

Valve 40-03-to-Pipe

GL-D

88-01

UT

3 - - - - X - - - X - - -

2.0" CSA (REF. DWG. NO. 12)

245900 40-WD-002

Branch Connection

B-J

B9.32

PTExamine 100% of weld

length **N/A**

3 - - - - -

6.0" CSA (REF. DWG. NO. 12)

246100 40-WD-003

Branch Connection

GL-D

88-01

UTUT exams every 2 RFO's.

**P8R-1.5-2**

3 - - - - X - - - X - - -

246300 40-WD-004

Pipe-to-Elbow

GL-D

88-01

UTUT exams every 2 RFO's.

**P8R-.42-2**

3 - - - - X - - - X - - -

246500 40-WD-005

Elbow-to-Pipe

GL-D

88-01

UTUT exams every 2 RFO's ,

to the extent practical

**P8R-.432-2**3 - - - - X - - - X - _ _

Page 179: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 160

Reactor Core Spray

ZONE NUMBER: 40.0 INS0

SULOMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

246510 40-WD-005

Elbow-to-Pipe

PECTION INTERVAL

ASME

SEC. XICATEGY NDEITEM NO METH

N/A VT-2

N/A

1FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

0 U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

VT-2 each outage, for

evidence of leakage

**P8R-.432-2**3 X - - - X X - - X - - -

246700 40-WD-006

Pipe-to-Pipe

246710 40-WD-006

Pipe-to-Pipe

GL-D

88-01

N/A

N/A

UT

3 - - - - x - - - X - - -

UT exams every 2 RFO's.

**LATER**

VT-2 exam each outage

for evidence of leakage

**LATER**

VT-2

3 X - - - X X - - X - - -

246900 40-WD-007

Pipe-to-Valve 40-05

GL-D

88-01

UT UT exams every 2 RFO's.

**PBR-.432-2**3 - - - - X - - - X - -

12.0" CSA (REF. DWG. NO. 12)

247100 40-WD-008

Pipe-to-Elbow

.. ..... - .1. ... .. .......... . ...... ... .......... .... .. .. .

247300 40-WD-009

Elbow-to-Valve 40-02

GL-D

88-01

UT UT exams every 2 RFO's.

**NMP-12-XX1-SS**3 - - - - X - - - X - - -

GL-D

88-01

UT UT exams every 2 RFO's

**NMP-12-XXI-SS**3 - - - - X - - - X - -

247700 40-WD-O1OA

Valve 40-02-to-Pipe

248000 40-lWD-Ol

Pipe-to-Elbow

GL-G

88-01

VT-2

3 X - - - X X - - X - -

Inaccessible inside pen.

X-13A, VT-2 exam each

RFO for evidence of

leakage. **N/A**

GL-D

88-01

UT UT exams every 2 RFO's.

**NMP-12-XX1-SS**3 - - - - X - - - X - - -

248010 40-WD-011

Pipe-to-Elbow

N/A

N/A

VT-2 VT-2 each outage for

evidence of leakage

**NMP-12-XX1-SS**3 X - - - X X - - X - - -

Page 180: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 161

Reactor Core Spray

ZONE NUMBER: 40.0INSPECTION INTERVAL

ASME

SEC. XI

PLAN STATUS

I~~

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

THIRD

PERIOD

- _ - -_ _ INSTRUCTIONS

1 2 3 4 **CALIBRATION BLOCK**SUHMARYNUMBER

248300

EXAMINATION AREA

IDENTIFICATION

40-WD-012

Elbow-to-Pipe

CATEGY NDEITEM NO METH

GL-D

88-01

UT UT exams every 2 RFO's.

**NMP-12-XX3-SS**

3 - - - - X - - - X - - -

248600 40-WD-013

Pipe-to-Pipe

GL-D

88-01

UT exam every 2 RFO's.

**NMP-12-XX1-SS**

3- - - - X - - - X -

249000 40-WD-014

Pipe-to-Pipe

GL-D

88-01

UT UT exams every 2 RFO's.

**NMP-12-XX1-SS**

3 - - - - X - - - X - -

249400 40-WD-015

Pipe-to-Elbow

. . - . - . . I.. I. . .I.. .. ... . ......

249700 40-WD-016

Elbow-to-Pipe

.. - . . .... .. ... . .. .. .... .. - . . .... ..... ... ..

249900 40-WD-017

Pipe-to-Elbow

GL-D

88-01

GL-D

88-01

GL-D

88-01

UTUT exams every 2 RFO's.

**NMP-12-XX1-SS**

3 - - - - X - -

UTUT exams every 2 RFO's.

**NHP-12-XX1-SS**

3- - - - X - - X - - -

UTUT exams every 2 RFO's.

**NMP-12-XX1-SS**

3- - - - X - - - X -

250000 40-WD-018

Elbow-to-Pipe

.- . ...-..............................................

250400 40-WD-020

Pipe-to-Tee

250600 40-WD-021

Tee-to-Pipe

GL-D

88-01

UTUT exam every 2 RFO's.

**NMP-12-XX1-SS**

3 - - - - X- - - X - - -

GL-D

88-01

GL-D

88-01

UT UT exams every 2 RFO's.

**NMP-12-XX1-SS**

3 - - - - X - - - X - - -

UT UT exam every 2 RFO's.

**NMP-12-XX1-SS**

3- - - - X - - - x - - -

250900 40-WD-022

Pipe-to-Elbow

GL-D

88-01

UT UT exams every 2 RFO's.

**N)4P-12-XX1-SS**

3 - - - - X - - - X -

Page 181: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 162

Reactor Core Spray

ZONE NUMBER: 40.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

251200 40-WD-023

Elbow-to-Pipe

CATEGYITEM NO

GL-D

88-01

NDEMETH

UT

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**1 2 3 4 1 2 3 4 1 2 3 4

UT exams every 2 RFO's.

**NMP-12-XX1-SS**3 - - - - X - - - X - - -

251500 40-WD-024

Pipe-to-Valve 40-09

............................................................................

251800 40-WD-025

Valve 40-09-to-Elbow

GL-D

88-01

GL-D

88-01

UT

3 - - - - X - - - X - - -

UT exams every 2 RFO's.

**NMP-12-XX1-SS**

UT exams every 2 RFO's.

**NMP-12-XX1-SS**

UT

3 - - - - X - - - X - - -

252000 40-WD-026

Elbow-to-Pipe

252200 40-WD-027

Pipe-to-Tee

GL-D

88-01

GL-D

88-01

UT

3 - - - X - - - X - - -

UT exams every 2 RFO's.

**NMP-12-XX1-SS**

.................. ................. .......... ......... .... - ............. .

UT every 2 RF 0s

**NMP-12-XX1-SS**

UT

3 - - - - X - - - X - - -

252500 40-WD-028

Tee-to-Valve 40-01

252800 40-WD-029

Valve 40-01-to-Pipe

GL-D

88-01

GL-D

88-01

UT

3 - - - - X - - - X

UT exams every 2 RFO's.

**NMP-12-XX1-SS**

.U e e ver 2 . ...................... ......

UT exams every 2 RFO's.

**NMP-12-XX1-SS**

UT

3 - - - - X - - - X - - -

253100 40-WD-030

Pipe-to-Tee

GL-D

88-01

UT UT exams every 2 RF0's.

**NMP-12-XX1-SS**

3 - - - - X - - - X - - -

253400 40-WD-031

Tee-to-Pipe

GL-D

88-01

UT UT exams every 2 RFO's.

**NMP-12-XX1-SS**3---- x - - -X - - -

253800 40-WD-032

Pipe-to-Elbow

GL-D

88-01

UT UT every 2 RFO's

**NMP-12-XX1-SS**

3 - - - - X - - - X - _ _

Page 182: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 163

Reactor Core Spray

ZONE NUMBER: 40.0 INSP}

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

254100 40-WD-033

Elbow-to-Elbow

RCTION INTERVAL PLAN STATUS

ASME

SEC. XICATEGYITEM NO

GL-D

88-01

NDET|HETH

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

IF INSTRUCTIONS**CALIBRATION BLOCK**1 2 3 4 1 2 3 4 1 2 3 4

UT UT exams every 2 RFO's.

**NMP-12-XX1-SS**3 - - - - X - - - X - - -

254300 40-WD-034

Pipe-to-Elbow

GL-D

88-01

UT exams every 2 RFO's.

**WP-12-XXI-SS**3 - - -- X - - - X -

254400 40-WD-035

Elbow-to-Reducer

GL-D

88-01

UT UT exams every 2 RFO's.

**NMP-12--OC1-SS**3 - - - - X - - - X - - -

6.0" CSA (REF. DWG. NO. 12)

254600 40-WD-036

Reducer-to-Pipe

B-J UT

B9.11 PT

Examine 100% of weld

length **LATER**3 -

254700 40-WD-036

Reducer-to-Pipe

254800 40-WD-038

Nozzle N6A Outer Safe

End-to-Elbow

GL-D

88-01

UT

3 - - - - X - - - X - -

UT exams every 2 RFO's.

**P8R-.432-2**

- .... ................................... - ................

UT exam every 2 RPO's

**P8R-.75-3**GL-D

88-01

UT

3 - - - - X - - X - - -

254900 40-WD-038

Nozzle N6A Outer Safe

End-to-Elbow

.. . . - . .... - . ..... _ _ ...................................

255000 40-WD-038A

Nozzle N6A Inner Safe

End-to-Outer Safe

B-J

89.11

PT

UT

UT

PT

Terminal End,

**P8R-.75-3**3 _ - - X

B-J

B9.11

.................................................................................................................................................................... ...............................................................

Examine 100% of weld

length **LATER**3 x- - - - - - - - -

255100 40-WD-038A

Nozzle N6A Inner Safe

End-to-Outer Safe

GL-D

88-01

UT UT exams every 2 RFO's.

**LATER**3- - - - X - - - X - - -

Page 183: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 164DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Core Spray

ZONE NUMBER: 40.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

255200 40-WD-039

Nozzle N6A-to-Inner

Safe End

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

B-F UT

B5.10 PT

FIRSTPERIOD

- - - - - -

1 2 3 4

43412 _

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

rTHIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS** CALIBRATION BLOCK**

Group R19, UT 28.4% CRV

**LATER**

3 - - - - X - - -

255300 40-WD-039

Nozzle N6A-to-Inner

Safe End

255400 40-WD-039

Nozzle N6A-to-Inner

Safe End

SIL

455RI1S

GL-D

88-01

UT

3 - - - - -

Inconel 182 Butter

Expansion from nozzle

side of weld **N/A**

UT exams every 2 RFO's.

**N/A**UT

3 - - - - X - - - X - -

255500 40-WD-040

N6A Nozzle-to-Vessel

B-D

B3.90

B-D

B3.100

UT Group R19, 66% CRV

,Limitation due to

adjacent nozzle and

bioshield **LATER**

3- - - - X

255600 40-WD-040-IR

N6A Nozzle Inner

Radius Section

UT Group R19, 66% CRV

,Limitation due to

adjacent nozzle and

bioshield **LATER**

3 - - - - X

12.0" CSB (REF. DWG. NO. 12)

255800 40-WD-041

Valve 40-13-to-Pipe

GL-D

88-01

UT UT exams every 2 RFO's

**LATER**

3 X - - - _ X - - - - - -

6.0" CSB (REF. DWG. NO. 12)

256200 40-WD-043

Branch Connection

GL-D

88-01

UT UT exam every 2 RFO's.

**LATER**

3X - - - -

256400 40-WD-043A GL-D

Pipe-to-BR Stub Nozzle 88-01

UT UT exam every 2 RFO's

**LATER**

3 X - - - - X - -

Page 184: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 165

Reactor Core Spray

ZONE NUMBER: 40.0INSPECTION INTI

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

256600 40-WD-044 GL-D

:RVAL PLAN STATUS

FIRST SECONDPERIOD PERIOD

NDE - - - - - -0 U T A G E -

METH 1 2 3 4 1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

* *CALIBRATION BLOCK**_ _ _ _

UT UT exams every 2 RFO's.

**LATER**Pipe-to-Elbow 88-01

256800 40-WD-045

Elbow-to-Pipe

GL-D

88-01

UT UT exams every 2 RFO's.

**LATER**

3 X - - - - X - - - - - -

12.0" CSB (REF. DWG. NO. 12)

257100 40-WD-047

Pipe-to-Valve 40-06

GL-D

88-01

UT UT exams every 2 RFO's.

**LATER**

3 x - - - - X - - - -

257300 40-WD-048

Pipe-to-Elbow

. . .. . . . .. ... . .... ....... ... ................ -........ ...... ...

257600 40-WD-049

Elbow-to-Valve 40-12

GL-D

88-01

GL-D

88-01

UT

3 X - - - - X - -

UT exams every 2 RFO's

**LATER**

.............................................. ..........................................

UT exams every 2 RFO's

**LATER**UT

3 x - - - - X - -

257900 40-WD-050A

Valve 40-12-to-Pipe

GL-G

88-01

VT-2

.. .. .. . .... .. .. ........ ... .. ..... .. - ........... ....... .... ........ .............................................................................

VT-2 exam each RFO for

evidence of leakage.

3 X - - - X X - - X - - - **N/A**

258100 40-WD-051

Pipe-to-Elbow

GL-D

88-01

UT UT exams every 2 RFO's

**LATER**

3 x - - - - X - -

258110 40-WD-051

Pipe-to-Elbow

N/A

N/A

VT-2 VT-2 each outage for

evidence of leakage

**LATER**3 X - - - X X - - X -

258500 40-WD-052

Elbow-to-Pipe

GL-D

88-01

UT UT exams every 2 RF0's.

**LATER**

3 x - - - _ X - - - - - -

Page 185: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 166

Reactor Core Spray

ZONE NUMBER: 40.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

258800 40-WD-053

Pipe-to-Elbow

PECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

GL-D UT

88-01

PLAN STATUS

FIRSTPERIOD

1 3 4 - - -

l1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

- - - -_

PRESERVICE YEAR

F INSTRUCTIONS

"* CALIBRATION BLOCK"1 2 3 4

UT exams every 2 RFO's.

**LATER**

3 X - - - - X - - - -

259100 40-1WD-054

Elbow-to-Pipe

GL-D

88-01

UT UT exams every 2 RFO's.

**LATER**

3 X

259300 40-WD-055

Pipe-to-Elbow

GL-D

88-01

UT UT exam every 2 RFO's

**LATER**

3 X - - - - X

259700 40-WD-056

Elbow-to-Pipe

GL-D

88-01

UT UT exams every 2 RFO's.

**LATER**3 x - - - X

260200 40-WD-058

Pipe-to-Tee

260500 40-WD-059

Tee-to-Valve 40-10

GL-D

88-01

GL-D

88-01

UT

3 - X - -

UT exams every 2 RFO's.

**LATER**

.... .......................................................

UT exams every 2 RFO's.

**LATER**

UT

3 X - - - - X - -

260900 40-WD-060

Valve 40-10-to-Pipe

GL-D

88-01

UT UT exams every 2 RFO's.

**LATER**

3 X - X - - - -

261200 40-WD-061

Pipe-to-Elbow

261400 40-WD-062

Elbow-to-Pipe

GL-D

88-01

GL-D

88-01

UT

3 X - - - - X - - - -

UT every 2 RFO's.

**LATER**

.. . .. - .. .. ... ..... .. .

UT every 2 RFO's.

**LATER**

UT

3 X - X - - - -

261800 40-WD-063

Pipee-to-Elbow

GL-D

88-01

UT UT exams every 2 RFO's.

**LATER**

3 X X -K - _

Page 186: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 167

Reactor Core Spray

ZONE NUMBER: 40.0TNSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO HETHi

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

1 U T A G E- - - - - -

2 2 3 4 l 2 3 4

PRESERVICE YEAR

** INSTRUCTIONS

**CALIBRATION BLOCK"*

I e

262200 40-WD-064

Elbow-to-Pipe

I . . . 1 .I . 1 I . . I - ..

262500 40-WD-065

Pipe-to-Elbow

................................ ...........................

263000 40-WD-066

Elbow-to-Pipe

GL-D

88-01

GL-D

88-01

...............

GL-D

88-01

UTUT exams every 2 RFO's.

**LATER**

3 X - - - - X - - - - - -

UTUT exams every 2 RFO's.

**LATER**

3 X - - X- - - -

UTUT exams every 2 RFO's.

**LATER**- X- - - -

263400 40-WD-067

Pipe-to-Tee

GL-D

88-01

UTUT every 2 RFO's

**LATER**

3 X - - - - X - -

..................

263600 40-WD-068

Tee-to-Pipe

GL-D

88-01

UTUT exams every 2 RFO's.

**LATER**

3 X - - - - X - -

...............................................................

UT exams every 2 RFO's.

**LATER**264000 40-WD-069

Pipe-to-Valve 40-11

264300 40-WD-070

Valve 40-11-to-Pipe

GL-D

88-01

GL-D

88-01

UT

3 X - - - - X -

UTUT exams every 2 RFO's.

**LATER**

3 X - - - - X -

264600 40-WD-072

Elbow-to-Pipe

I. .. ..-...... .....................................

265000 40-WD-073

Pipe-to-Tee

. . . ... ...... .... .1. . .............-....

265400 40-WD-074

Tee-to-Pipe

GL-D

88-01

UTUT exams every 2 RFO's.

**LATER**

3 X - - - - X -

GL-D

88-01

UTUT exams every 2 RFO's.

**LATER**

3 X - - - - X -

GL-D

88-01

UTUT every 2 RFO's.

**LATER**

3 X - - - - X -

Page 187: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 168

Reactor Core Spray

ZONE NUMBER: 40.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

265800 40-WD-075

Pipe-to-Pipe

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

GL-D UT

88-01

PLAN STATUSSEOD.HR

1FIRSTPERIOD

- - - - - -

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**_ I 12 3 4

UT exams every 2 RFO's.

**LATER**- X -- -3 X - - -

266100 40-WD-076

Pipe-to-Reducer

(12'x6E")

,.. .. .. ..... . . . . . . . . . . . . . . . . . . . . . . . . . . .

266400 40-WD-077

Reducer

(12"x6") -to-Pipe

GL-D

88-01

UT UT exams every 2 RFO's.

**LATER**

3 x

GL-D

88-01

UT UT exams every 2 RFO's.

**L.ATER**X - - - - -

266500 40-WD-077

Reducer

(12"x6E")-to-Pipe

B-J UT

B9.11 PT

Examine 100% of weld

length **LATER**

3- - - - - X - -

6.0" CSB (REF. DWG. NO. 12)

Terminal End **LATER**266600 40-WD-079

Nozzle N6B Outer Safe

End-to-Elbow

B-J

B9.11

UT

PT3 X - - -

266700 40-WD-079 GL-D

Nozzle N6B Outer Safe 88-01

End-to-Elbow

UT Terminal End, UT exam

every 2 RFO's. **LATER**

3 X - - - - X

266800 40-WD-079A GL-D

Nozzle W6B Inner Safe 88-01

End-to-Outer Safe

UT UT exam every 2 RFO's

**LATER**

3 x - - - - X - -

266900 40-WD-079A B-J

Nozzle N6B Inner Safe B9.11

End-to-Outer Safe

UT

PT

Examine 100% of weld

length **LATER**

3 x - - - - - - - -

Page 188: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 169

Reactor Core Spray

ZONE NUMBER: 40.0 INSPJ

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

267000 40-WD-080

Nozzle N6B-to-Inner

Safe End

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

NDETMETH|

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

0 U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4 FPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK"*

_ I _ _ _

B-F UT

B5.10 PT

Group R20, Examine 100%

of weld length **LATER**

3 X - - -

267100 40-WD-080

Nozzle N6B-to-Inner

Safe End

SIL

455R1S1

UT

................... ................ .. . . . . . . . . . . . . . . . . . . .

182 Butter Expansion

from nozzle side of

weld. **LATER**3 X - - -

267200 40-ND-080

Nozzle N6B-to-Inner

Safe End

GL-D

88-01

UT UT exams every 2 RFO's

**LATER**

3 X - - - - X

267300 40-WD-081 B-D

N6B Nozzle-to-Vessel B3.90

UT

... . ... . . . . . . . . . . . . . . . . . . . ....... . ... . . . . ............ .. . .. .

Group R20, 56% CRV

,Limitation due to

adjacent nozzle and

bioshield

**NMPl-GE-7.B75**

3 X - - - - - -

267400 40-WD-081-IR

N6B Nozzle Inner

Radius Section

B-D

B3.100

UT

3 x - - - - - - - - -

Group R20, 54% CRV

,Limitation due to

adjacent nozzle and

bioshield

**NMPl-GE-7.875**

2.0" CSS (REF. DWG. NO. 12)

267500 40-23-VB

Valve 40-23 Bolting

B-G-2

B7.70

VT-1 Examine in place, when

removed or when

disassembled **N/A**3- - - - X -- - _

267600 40-24-VB

Valve 40-24 Bolting

B-G-2

B7.70

VT-1 Examine in place, when

removed or when

-X disassembled **N/A**3 - - … -

Page 189: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 170

Reactor Core Spray

ZONE NUMBER: 40.1 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

267700 40.1-25-VB B-G-2

Valve 40-25 B7.70

FIRSTPERIOD

NDE - - - - - -

METH 1 2 3 4

VT-1

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

FrPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Removed from schedule as

Class 2, and less than

- - - X - - - 2.0" diameter. **N/A**3- - - -

**N/A**267800 40.1-WD-001

Sock-O-let -to-Pipe

. .1 ....... .... ...... .. .. ..... .. ........ ....... . . . . . .

267900 40.1-WD-002

Pipe-to-Valve 40-19

B-J

B9.21

........ ... ......

B-J

B9.21

PT

3 X- - - - - - - -

Terminal End, **N/A**PT

3 X - - - - -

.2..6860......

268600Terminal End **N/A**

40.1-WD-009

Valve 40-22-to-Pipe

B-J

B9.21

B-J

B9.21

PT

PT

3- - - - X - - - - - - -

**N/A**268800 40.1-WD-011

Tee-to-Pipe3- - - - X - - - - - - -

Terminal End **N/A**268900 40.1-WD-012

Pipe-to-Valve 40-23

.I I . - I.. .... .... ........ .......... ............................. .................

270300 40.1-WD-026

Tee-to-Pipe

B-J

B9.21

................

B-J

B9.21

PT

3- --- X

**N/A**PT

3 - - - -- - X -

270400 40.1-WD-027

Pipe-to-Elbow

. . .......-........................................................

271200 40.1-WD-035

Pipe-to-Valve 40-20

B-J

39.21

PT

3 - - - -- - X -

Termnal End **N/A**B-J

B9.21

PT

3- - - - - - - - X

Page 190: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 171

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

Reactor Core Spray

ZONE NUMBER: 40.1INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

1.0" CSS (REF. DWG. NO. 12)

NDEH1METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4 FPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Terminal End **N/A**271400 40.1-WD-037

Pipe-to-Valve 40-24

B-J

B9.21

PT

3- - - - - - - - X - - -

Terminal End **N/A**271500 40.1-WD-038 B-J

Valve 40-24 -to-Pipe B9.21

PT

3-_ - - -

Page 191: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 172

Liquid Poison

ZONE NUMBER: 42.1TNSPECTTON INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

0 U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

. E

1.5" Liquid Poison Line (REF. DWG. NO. 14)

271700 42.1-02-VB B-G-2

Valve 42.1-02 Bolting B7.70

I - .. .................-... .... . . . . .

271800 42.1-03-VB B-G-2

Valve 42.1-02 Bolting B7.70

VT-i

3 x - - - - - - - - - -

VT-1

3 - - - - X - - - - - - -

271900 42.1-Ri-A

Spring Hanger

F-A

F1.10

VT-3 Code Case N-491-1

**N/A**

3 X - - - - - - - - -

272800 42.1-WD-005

Pipe-to-Elbow

B-J

B9.21

PT Examine 100% of weld

length **N/A**

3…- - - - - - - X - - -

272900 42.1-WD-006

Elbow-to-Pipe

B-J

B9.21

PT Examine 100% of weld

length **N/A**

3 X - - -

Terminal End **N/A**273500 42.1-WD-017

Valve

42.1-02-to-Reducer

B-J

B9.21

PT

3 X - - -

273800 42.1-WD-026

Valve 42.1-01-to-Pipe

. . . . I . . . . . - . . . . - . . .. - . . .~ . . . . .. . . .

274100 42.1-WD-029

Pipe-to-Elbow

B-J

B9.21

. .. .I ..- ..

B-J

B9. 21

PT Terminal End, Examine

100% of weld length

**N/A**3 X - - - - -

PT Examine 100% of weld

length **N/A**3 X - - - - - - - -

274600 42.1-WD-034 SIL

Safe End-to-Nozzle N12 571

UT

PT3- - - - - - - - X -

Augmenetd UT and PT to

determined **LATER**

Page 192: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 173

Liquid Poison

ZONE NUMBER: 42.1INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGY NDENUMBER IDENTIFICATION ITEM NO METH

274700 42.1-WD-034 B-F PT

Safe End-to-Nozzle N12 B5.20

IPLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

FPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

3 X- - - - - - - - -

Group R41, Terminal End

, Examine 100% of weld

length **N/A**

................. ..... ................................................

Code Case N-491-1

**N/A**

274800 X-131 Penetration

System Anchor Point

F-A VT-3

F1. 103 - - - - X--

Page 193: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 174

Control Rod Drive

ZONE NUMBER: 44.1 INSP:

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

PRESERVICE YEARECTION INTERVAL PLAN STATUS-r

ASME

SEC. XI

CATEGYITEM NO

NDE 1HETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

3.0" Control Rod Drive Line (REF. DWG. NO. 18)

275000 44.1-Hi

Spring Hanger

F-A

F1.10

VT-3 Code Case N-491-1

3- - - - X

275300 44.1-SC-1

Pipe Clamp

F-A

F1.10

VT-3 Code Case N-491-1

**N/A**3 X - - -

275500 44.1-WD-001 B-J

Valve 44-189 -to-Pipe B9.21

PT Terminal End, Examine

100% of weld length

**N/A**3 x- - - - - - - - - -

275600 44.1-WD-002

Pipe-to-Elbow

B-J

B9. 21

PT Examine 100% of weld

length **N/A**3 x - - -

275700 44.1-WD-003

Elbow-to-Pipe

B-J

B9.21

PT Examine 100% of weld

length. **N/A**

3 x - - -

275900 44.1-WD-005

Elbow-to-Pipe

276900 44.1-WD-015

Pipe-to-Elbow

B-J

B9. 21

B-J

B9.21

PT

3 X - - - - - - - - - -

Examine 100% of weld

length. **N/A**

Examine 100% of weld

length **N/A**

PT

3 X - - -

Terminal End **N/A**277000 44.1-WD-016 B-J

Elbow-to-Safe End (Ng) B9.21

PT

3 X - - -

277100 44.1-WD-017 B-F

N9 Safe End -to-Nozzle B5.20

PT

,....................................................... ......

Group R40, Examine 100%

of weld length **N/A**3 X - - - - - - - - -

277200 44.1-WD-017 NUREG

N9 Safe End -to-Nozzle 0619

UT Group R40 **LATER**

3 x- - - - - - - -

Page 194: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 175

Control Rod Drive

ZONE NUMBER: 44.1 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

277300 44.1-WD-017 SIL UT

N9 Safe End -to-Nozzle 455RlS1

FIRSTPERIOD

__1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

Group R40, Inconel 182

Butter Expansion from

nozzle side of weld.

**LATER**

3 X- - - - - - - - -

277400 44.1-WD-018

N9 Nozzle-to-Vessel

B-D

B3. 90

UT Group R40, 63% CRV

Limitation due to

bioshield **LATER**3 X - - - - - - - -

277500 44.1-WD-018-IR

N9 Nozzle-to-Vessel

NUREG

0619

UT

RUT

UT

Group R40, **LATER**

3 X - - - - - - - - - -

............................ ............................ .. .......................... ........................................................................................

Group R40, 48% CRV,

Limitation due to

3 x - - - - - - - - - - - bioshield **LATER**

277600 44.1-WD-018-IR B-D

N9 Nozzle Inner Radius B3.100

Section

3.0" Control Rod Drive Line (REF. DWG. NO. 19)

277800 44.3-12-VB B-G-2

Valve 44-3-12 Bolting B7.70

... . ... ...........-............................................................................

277900 44.3-13-VB B-G-2

Valve 44-3-13 Bolting B7.70

VT-1

3- - - - - - - - X -

10 Studs 20 Nuts,

Examine in place, when

removed or when

disassembled **N/A**

VT-1 Examine in place, when

removed or when

disassembled. **N/A**3 X - - -

278000 44.3-189-VB

Valve 44-189 Bolting

B-G-2

B7.70

VT-1

3- - - - - - - -

Examine 10 studs and 20

nuts, in place , when

removed or when

disassembled **N/A**

278100 44.3-WD-093 B-J

Pipe-to-Valve 44-3-12 B9.21

PT Terminal End **N/A**

3- - - - - - - - X - - -

Page 195: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 1 SECTION XI SCHEDULED COMPONENTS

PAGE: 176

Control Rod Drive

ZONE NUMBER: 44.3 INSPECTION INT

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

278200 44.3-WD-094 B-K

Valve 44.3-12 Integral B10.40

Attachment

ERVAL

NDE|

METH

PT

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR-r

INSTRUCTIONS

|**CALIBRATION BLOCK**

Code Case N-509 **NIA**

3- - - - X - - - - - - -

278500 44.3-WD-111 B-J

Valve 44.3-13 -to-Pipe B9.21

PTExamine 100% of weld

length **NIA**

3 x - - - - - - - - -

Page 196: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

NV NIAGARA NUCLEAR POWER STATION

NU MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999

PLAN AND SCHEDULE Paae 20 of 40

5.0 CLASS 2 INSERVICE INSPECTION PLAN TABLES

This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive

examinations of selected systems and components for the Second Inservice Inspection Interval.

02.0 Main Steam System . ................................................ 177 thru 179

03.0 Main Steam System . ................................................ 180 thru 181

39.0 Emergency Condenser System ........................................ 182 thru 196

44.2 Control Rod Drive System ............................................ 197 thru 198

80.0 Reactor Containment Spray System .................................... 199 thru 210

81.0 Reactor Core Spray System ........................................... 211 thru 222

93.0 Reactor Containment Spray System .................................... 223 thru 225

File: NMP1 ISIPL.wpd

Page 197: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 177

Main Steam System

ZONE NUMBER: 02.0INSPECTION INTERVAL PLAN STATUS

_ r

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

18.0" MSA (REF. DWG. NO. 3)

NDEHETH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK"*

284000 02-MS-H1O

Spring Hanger

F-A

F1.20

VT-3 Code Case N-491-1

**N/A**3 - - - - X - - - - - - -

284100 02-MS-H11

Spring Hanger

F-A

Fl. 20

VT-3 Code Case N-491-1

3- - - - X - - - - - - -

24.0" MSB (REF. DWG. NO. 3)

286400 02-SR-lA

Seismic Restraint

F-A

F1.20

VT-3 Code Case N-491-1

3 - - - - X - - - - - - -

286500 02-SR-1A-WD-001.1

Integral Attachment

C-C

C3.20

MT 1-1/4"x 14x1'-4" Lug ,

Code Case N-509 **N/A**3 - - - X --

286600 02-SR-lA-WD-001.11

Integral Attachment

........... ................................. ......................................................... .

286700 02-SR-lA-WD-001.13

Integral Attachment

. .I - - - ....... ... ... - -

286800 02-SR-1A-WD-001.15

Integral Attachment

286900 02-SR-lA-WD-001.3

Integral Attachment

. .. .... .... ... . ..... .. .. . . .

287000 02-SR-1A-WD-001.5

Integral Attachment

C-C

C3.20

MT Code Case N-509 **N/A**

3 - - - - X --

C-C

C3.20

C-C

C3.20

C-C

C3.20

C-C

C3.20

MT Code Case N-509 **N/A**

3 - - - - X - - - - - - -

MT Code case N-509 **N/A**

3 - - - - X - -

Code Case N-509 **N/A**

3 - - - - X - -

MT Code Case N-509 **N/A**

3 - - - - X--

Page 198: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 178

Main Steam System

ZONE NUMBER: 02.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

287100 02-SR-1A-WD-001.7

Integral Attachment

........ .... 1 . . 1 .. . ... ...... . . . . . . . . . . . . . .. ... . . - .

287200 02-SR-1A-WD-001.9

Integral Attachment

ECTION INTERVAL

ASME FIRST

SEC. XI PERIOD

CATEGY NDE -_ P - -R

ITEM NO METH 1 2 3 4

PRESERVICE YEARPLAN STATUS

SECONDPERIOD

O U T A G E -

THIRDTHIRDPERIOD

1 2 3 4

INSTRUCTIONS

**CALIBRATION BLOCK**1 2 3 4

Code Case N-509 **N/A**C-C

C3.20

MT

3 - - - - X - - - - - - -

Code Case N-509 **N/A**C-C

C3.20

MT

3 - - - - X - - -

24.0" MSA (REF. DWG. NO. 3)

**N/A**290800 02-WD-041

Branch Connection

(24"x18" Header)

C-F-2

C5.81

PT

3 - - - - X-

24.0" MSB (REF. DWG. NO. 3)

**NMP1-24-080-CS**293000 02-WD-073

Tee-to-Pipe

293400 02-WD-078

Pipe-to-Elbow

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

3 -- - X --

**NMP1-24-080-CS**

3 - - - - X-

18.0" MSA (REF. DWG. NO. 3)

294000 02-WD-182

Ret-to-Pipe

- . .. I . ...- ......... .... .... . .

294100 02-WD-190

Pipe-to-180 deg Ret

C-F-2

C5.51

C-F-2

C5. 51

UT

MT

UT

MT

**NMP1-18-.937-CS-106**

3- - - - - - - - X - - -

**NMP1-18-.937-CS-106**

3- - - - - - - X - - -

294500 02-WD-329

Pipe-to-Turbine Stop

Valve

C-F-2 UT Terminal End

**NMP1-18-.937-CS-106**C5.51 PT3 X - - -

Page 199: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 179

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Main Steam System

ZONE NUMBER: 02.0 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METE 1PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

294600 02-WD-330 C-F-2

Pipe-to-Turbine Stop C5.51

Valve

UT

PT

Terminal End

**NMP1-l8-.937-CS-106**3 X -- - - - - - - -

Page 200: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 180DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Main Steam

ZONE NUMBER: 03.0INSPECTION INTERVAL PLAN STATUS _r

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

16.0" MSS (REF. DWG. NO. 4)

HETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

294900 03-H1

Pipe Anchor

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**

3 X - - -

Code Case N-509 **N/A**295000 03-H1-WD-001.1

Integrally Welded

Attachment

295100 03-HK-WD-001.2

Integrally Welded

Attachment

295200 03-Hl-WD-001.3

Integrally Welded

Attachment

295300 03-H1-WD-001.4

Integrally Welded

Attachment

C-C

C3.20

C-C

C3.20

............. ....... .

C-C

C3.20

C-C

C3.20

MT

3 X - - -

Code Case N-509 **N/A**HT

... ...

MT

3 X - - -

Code Case N-509 **N/A**

3 X - - -

Code Case N-509 **N/A**MT

3 X - - - - - - -

295700 03-H3

Rod Hanger

F-A

F1.20

VT-3 Code Case N-491-1

**N/A**

3 X - - - - - - - - -

297800 03-WD-001

Tee-to-Pipe

C-F-2 UT

C5.51 MT

Examine 100% of weld

length **PlR-1.24-1**

3 - - - - X - - -

299400 03-WD-020

Pipe-to-Elbow

C-F-2 UT

C5.51 MT

Examine 100% of weld

length **PlR-1.24-1**3 x- - - - - - - - -

Page 201: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 181

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Main Steam

ZONE NUMBER: 03.0 TNSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

299700 03-WD-023 C-F-2

Tee-to-Valve Manifold C5.51

WDEMETH

MT

UT

PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - -3 U T A G E -

1 2 3 4 1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

I INSTRUCTIONS

* *CLIBRATION BLOCK**

Terminal End, Examine

100% of weld length

**NMP-lSW-1020-CS,PlR-1.

24-1**

3- - - - - - - - X - - -

300800 Valve Manifold 03-1

Valve Manifold 03-1

F-A

Fl. 40

VT-3 Turbine By-Pass

Manifold, Code Case

N-491-1 **N/A**3- - - - - - - - X - - -

Page 202: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 182

Emergency Condenser Heat Exchanger 122

ZONE NUMBER: 39.0 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -- U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

I

- __

_ _ _

EC Heat Exchanger 60-42 (REF. DWG. NO. 11)

303300 60-42-WD-001

Hx 60-42

Nozzle-to-Inlet Head

N/A

N/A

UT

PT

This weld was replaced

by 60-42-WD-001

**LATER**3 - - - - X - -

......................L.....

**LATER**303400 60-42-WD-OOlC1

Hx 60-42

Nozzle-to-Inlet Head

303600 60-42-WD-002C1

Hx 60-42 Inlet

Head-to-Tube Sheet

C-B

C2.21

C-A

C1.30

UT

PT

UT

3- - - - X - -

**LATER**

3 - - - - X - - - - - - -

...................................................... ...... I................

303800 60-42-WD-005C1

Hx 60-42 Tube

Sheet-to-Outlet Head

303900 60-42-WD-006C1

Hx 60-42 Outlet

Head-Nozzle

C-A

C1.30

C-B

C2.21

UT

3 X - - - - - - - -

UT **LATER**

PT3 x - - - - - - - - -

Page 203: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 183DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Return

ZONE NUMBER: 39.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

10.0' ECC Line (REF. DWG. NO. llA)

305500 39-H2

Spring Support

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**3- - - - - - - -

Code Case N-509 **N/A**305600 39-H2-WD-OO1C1

Integral Attachment

1 .1 . .1 1 ... . .I . . . ......... .. . . . .. .. .

305700 39-H2-WD-003C1

Integral Attachment

. . I - . ~. .. I - ........ . 1 . - 1 . 1

305800 39-H2-WD-005C1

Integral Attachment

C-C

C3.20

C-C

C3.20

C-C

C3.20

PT

3-_ - - -

Code Case N-509 **N/A**PT

PT

3-_ - - -

Code Case N-509 **N/A**

3 _ - - -_ - - - -

I . ... .... .... ..............................................................

305900 39-H2-WD-007C1 C-C

Integral Attachment C3.20

PT

...........................................................

Code Case N-509 **N/A**

3 X - - -

.. ........................... ........................................................

306000 39-H27

Spring Hanger

307300 39-H4

Spring Hanger

F-A

Fl. 20

F-A

Fl.20

VT-3

3 - - - X - - -

........................................ ...........................

Code Case N-491-1

**N/A**

C Case. N-4-l

Code Case N-491-1

**N/A**

VT-3

3-_ - - -

. ...... .................e .. .... ....

Code Case N-509 **N/A**307400 39-H4-WD-OOlC1

Integral Attachment

307500 39-H4-WD-004C1

Integral Attachment

307600 39-H4-WD-007C1

Integral Attachment

C-C

C3.20

C-C

C3.20

PT

3 - - - - - - - -

Code Case N-509 **N/A**PT

3-N - - -

................. ............................................................ . ..

Code Case N-509 **N/A**C-C

C3.20

PT

3- - - - - - -

Page 204: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 184

Emergency Condenser Return

ZONE NUMBER: 39.0 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

307700 39-H4-WD-010C1 C-C

NDE

METH

PT

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

Code Case N-509 **N/A**

Integral Attachment C3.203- - - - - - - - X -

313500 39-WD-178-D

Pipe-Long Seam

C-F-1

C5.12

UT Code Case N-524

**LATER**3 x - - - - - - - - -

313600 39-WD-178C1

Hx 60-46 Outlet

Nozzle-to-Pipe

. ... .. .... ........ . . . . . . . . . . . . . . . . . . . . . . .

313800 39-WD-179-D

Elbow-Long Seam (60

deg. LR)

313900 39-WD-179-U

Pipe-Long Seam

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3 X

C-F-1 UT

C5.12 PT

C-F-1 UT

CS.12 PT

Code Case N-524

**LATER**3 - - - - - - - - X - - -

. . .... .. . ... ..... ... ... .- ... . . - . . ... . ..-. ... . . . ... ... .. . . . . . . . . ....................... ..... ...... ...... . ... ....... . .. . .

Code Case N-524

**LATER**3 - - - - - - - - X - - -

**LATER**314000 39-WD-179C1

Pipe-to-Elbow

C-F-1

CS.11

UT

PT3- - - - - - - - X - - -

314500 39-WD-181

Pipe-to-Tee

. ---..... .. ................ ....... .. ..... .. ...

314600 39-WD-181-D

Pipe-Long Seam

.. . .... . ... . . . . . . . . . . . ............ . . ... . . .

314700 39-WD-181-U

Tee-Long Seam

C-F-1 UT

C5.11 PT

C-F-1 UT

C5.12 PT

Examine 100% of weld

length **LATER**3 X - - - - - - - -

x......

3 X - - - - - - - - - - -

.. . . . .... .. ......... ...... ... .. ...... ... .... ........ .... ... .... ............ .......... .....

3 X - - - - - - - - - - -

Code Case N-524

**LATER**

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

315200 39-WD-183-D

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3- - - - X - - - - - - -

Page 205: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 185

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS0

Emergency Condenser Return

ZONE NUMBER: 39.0

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

315300 39-WD-183-U

Elbow-Long Seam ((

deg LR)

.,nnt~ntrvT yuanINSPECTION INTERVAL PLAN STATUS -

ASME FIRST SECOND THIRD FSEC. XI PERIOD PERIOD PERIOD

CATEGY NDE - - - - - - 0 U T A G E- - - - - - INSTRUCTIONS

ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

Cod Cas N_-2

60

C-F-1

CS.12

UT

PT

Code Case N-524

**LATER**

3- - - - X - .- - _

315400 39-WD-183C1

Elbow-to-Pipe

C-F-1

C5.11

UT

PT

UT

PT

Examine 100% of weld

length **LATER**

3 - - - - X - - - - -

... ...............................................................

Code Case N-524

**LATER**315700 39-WD-184-D C-F-1

Elbow-Long Seam (60deg C5.12

LR)3 x- - - - - - -

315800 39-WD-184-U

Pipe-Long Seam

I..... ...... - ... .............................................

315900 39-WD-184C1

Pipe-to-Elbow

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3 x - -

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3 x - -

I..................................................................

Code Case N-524

**LATER**316100 39-WD-185-D

Pipe-Long Weld

C-F-1 UT

C5.12 PT3- - - - - - - - X

316200 39-WD-185Cl

Hx 60-45 Nozzle

Outlet-to-Pipe

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3…- - - - - - - X

319300 39-WD-211C1

Pipe-to-Elbow (60deg

LR)

GL-A

88-01

UTExamined 100% of weld

length **LATER**

3 - - - - X - - - - -

319900 39-WD-213

Pipe-to-Tee

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3 X - - -

Page 206: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 186DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Return

ZONE NUMBER: 39.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

320000 39-WD-213-D

Tee-Long Seam

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

C-F-1 UT

C5.12 PT

FIRSTPERIOD

PLAN STATUS

SECONDPERIOD

THIRDPERIOD

PRESERVICE YEAR

-[ INSTRUCTIONS

**CALIBRATION BLOCK**I

- - - - - - 3 U T A G E- - - - -

_ 2 3_

4

_ _ _

Code Case N-524

**LATER**

3 X - - -

320100 39-WD-213-U

Pipe-Long Seam

-. .... - . . .1 - . _ . . . ... . . . . . . .

321400 39-WD-217-D

Pipe-Long Seam

C-F-1 UT

C5.12 PT

......... . .......... ........... _.......

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3 X

Code Case N-524

**LATER**

3- - - - X - - - - - -

321500 39-WD-217Cl

Hx 60-42 Nozzle

Outlet-to-Pipe

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3 - - - - X - - -

323500 39-WD-224-D

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3 - - - - - - - - X - - -

323600 39-WD-224-U

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3- - - - - - - - X - -

Page 207: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 187DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Supply

ZONE NUMBER: 39.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDETlHETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 3 U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

L INSTRUCTIONS**CALIBRATION BLOCK**

12.0" ECC Line (REF. DWG. NO. 11)

323900 39-WD-012

Reducer-to-Pipe

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3 X - - -

324400 39-WD-014

Pipe-to-Pipe

- - . - . . .. .... .. ....

324700 39-WD-016

Pipe-to-Pipe

GL-D

88-01

GL-D

88-01

UT

3 X - - - - X - - - - -

UT

3 x - - - - X - - - - - -

325100 39-WD-017

Pipe-to-Pipe

GL-D

88-01

UT UT exam every 2 RFO's.

**LATER**

3 X - - - - X - - - -

325600 39-WD-020

Pipe-to-Pipe

GL-D

88-01

UT UT exam every 2 RFO's.

**LATER**

3 X - - - - X - -

325900 39-WD-021

Pipe-to-Tee

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3…- - - - - - X - - -

3 0 .. .......0....

326000 39-WD-021

Pipe-to-Tee

GL-D

88-01

UT UT exam every 2 RFO's

**NMP-12-XX1-SS**

3 - - - - X - - - X - - -

326100 39-WD-021-D

Tee-Long Seam

C-F-i

C5.12

UT

PT

Code Case N-524

**LATER**3 - - - - - - - X - - -

326200 39-WD-021-U

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3…- - - - - - X - - -

326300 39-WD-022

Tee-to-Pipe

C-F-i

C5.11

UT

PT

Examine 100% of weld

length **LATER**

3 - - - - X 3- - -

Page 208: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGZE: 188

Emergency Condenser Supply

ZONE NUMBER: 39.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

326400 39-WD-022 GL-D

Tee-to-Pipe 88-01

NDEMETH 1

FIRSTPERIOD

1 2 3 4

FIRSTSECOND THIRDPERIOD PERIOD

O U T A G E- - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**1 I

UT UT exam every 2 RFO's

**LATER**

3 x - - - - X - - -

326500 39-WD-022-D

Pipe-Long Seam

11 .. .. .. ... .. ... .. _........

326600 39-WD-022-U

Tee-Long Seam

.. ........... .. . ..... - ...

326700 39-WD-024

Tee-to-Pipe

C-F-1 UT

CS.12 PT

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3 - - - - X - - - - - - -

Code Case N-524

**LATER**

3 - - - - X - - -

................................................................................

Examine 100% of weld

length **LATER**C-F-1 UT

C5.11 PT3 - - X - - - -

326800 39-WD-024

Tee-to-Pipe

GL-D

88-01

UTUT exam every 2 RFO's

**LATER**

3 X - - - - X -

326900 39-WD-024-U

Tee-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3 - - - - X - - - - - - -

327000 39-WD-025

Elbow-to-Pipe

GL-D

88-01

UT UT exam every 2 RFO's

**LATER**

3 x - - - - X

327100 39-WD-025

Elbow-to-Pipe

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**3 - - - - X - - - - - - -

327200 39-WD-025-D

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3- - - - X - - - - - - -

327400 39-WD-026

Pipe-to-Pipe

GL-D

88-01

UT UT exam every 2 RFO's

**LATER**

3X - - - -

Page 209: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 189

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Supply

ZONE NUMBER: 39.0 INSP:

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

327800 39-WD-027

Pipe-to-Pipe

E?CTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME 1 FIRST SECOND THIRD FSEC. XI PERIOD PERIOD PERIOD

CATEGY NDE - - - - - - O U T A G E - - - - - - INSTRUCTIONS

ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

GL-D UT UT exam every 2 RFO's

88-01 **LATER**

3 X-__ _ X - - - - - -

328300 39-WD-029-D

Elbow-Long Seam

C-F-1

C5.12

UT

PT

I- ... .... .. ....... .... ....... ..... ..... - - .............................................................

Code Case N-524

**LATER**- - - - X - - -

3 -

328400 39-WD-029-U

Pipe-Long Seam

328500 39-WD-029C1

Pipe-to-Elbow

. .... ... .... . ...... ................................. .................

328800 39-WD-030

Elbow-to-Pipe

C-F-1

C5.12

C-F-1

C5.11

UT

PT

UT

PT

........... ....... ... ................_ ........................................................................................... ................................................................... .....

Code Case N-524

**LATER**_ _ - - X

3 - - -

Examine 100% of weld

length **LATER**

3…- - - - - - -

GL-D

88-01

UT exam every 2 RFO's

**LATER**

3 X - - - - X - -

329200 39-WD-033

Pipe-to-60-4 6 EC Hx

Nozzle Inlet

N/A

N/A

UT

......................................................................................................................

UT every 2 RFO's, This

weld no longer exists,

X - - - Therefore IGSCC Category

D no longer applicable.

**LATER**

3 - - - - X -

329700 39-WD-034

Pipe-to-Pipe

330000 39-wD-035

Pipe-to-Pipe

GL-D

88-01

GL-D

88-01

UTExamine every 2 RFO's

**LATER**

3 X - -

UT exam every 2 RFO's

**LATER**

3 X - - - - X - - - -

330500 39-WD-037

Pipe-to-Elbow

N/A

N/A

UTUT exam every 2 RFO's,

This weld no longer

exists **LATER**3 X - - - _ X - - - - - -

Page 210: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 190

Emergency Condenser Supply

ZONE NUMBER: 39.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NOWDEMETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CLIBRATION BLOCK**

330600 39-WD-037-D

Elbow-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3 - - -

330700 39-WD-037-U

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3 - - - _ - X

330800 39-WD-037C1

Pipe-to-Elbow

C-F-1

C5.11

UT Examine 100% of weld

length **LATER**3 - - - - - X - -

330900 39-WD-037C1

Pipe-to-Elbow

GL-A

88-01

UT

3 - - - - - X

331000 39-WD-038

Elbow-to-Pipe

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**3- - - - - X

331100 39-WD-038

Elbow-to-Pipe

GL-D

88-01

UT UT exam every 2 RFO's

**LATER**3 X - - - - X - - - - - -

331300 39-WD-038-U

Elbow-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3 -X

331400 39-WD-041

Pipe-to-Hx 60-45

Nozzle Inlet

N/A

N/A

UT

3 - - - - X - X - - -

UT exam every 2 RFO's,

This weld was cut out,

IGSCC Cat. D no longer

applies **LATER**

331500 39-WD-041

Pipe-to-Hx 60-45

Nozzle Inlet

N/A

N/A

UT

PT

This weld was cut out,

Replaced by 39-WD-041C1

**LATER**3- - _ - - -_ _ X - - -

Page 211: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 191DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Supply

RDDEUPVTC!R YEAR

ZONE NUMBER: J.V-U INSPECTION INTERVAL PLAN STATUS -

ASHE FIRST SECOND THIRD FSEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE O U T A G E - - - - - - INSTRUCTIONS

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

331700 39-WD-041C1 C-F-1 UT Examine 100% of weld-- +? .- ML?**

Pipe-to-Hx 60-45

Nozzle Inlet

C5.11 PT J.Wily-

3 - - - … … _ - - X - - -

**LATER**331800 39-WD-041C1

Pipe-to-Hx 60-45

Nozzle Inlet

GL-A

88-01

UT

3 - - - - - - - X - - -

331900 39-WD-100

Reducer-to-Pipe

C-F-1 UT

Cs.11 PT

Examine 100% of weld

length **LATER**

3 X - - - - -

. . ..

332000

* *LATER* *

39-WD-100

Reducer-to-Pipe

GL-A

88-01

UT

3X - - - -

UT exam every 2 RFO's

332400 39-WD-102

Pipe-to-Pipe

332800 39-WD-104

Pipe-to-Pipe

GL-D

88-01

GL-D

88-01

UT

3 x - - - - X -- - -

UTUT every 2 RFO's

**LATER**

3 X - - - - X - -

,................ ..................................................

UT exam every 2 RFO's

**LATER**333200 39-WD-105

Pipe-to-Pipe

GL-D

88-01

UT

3 X - - - X -- - -

..........................................................................

UT exam every 2 RFO's

**LATER**333600 39-WD-108

Pipe-to-Pipe

GL-D

88-01

UT

3 X - - - - X - -

334000 39 -WD-109

Pipe-to-Tee

GL-D

88-01

UT

.............................................. ............................................ ...................... .........................................

UT exam every 2 RFO's

**LATER**

- X - -3 x - - -

334300 39-WD-110

Tee-to-Pipe

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3 x - - - - -

Page 212: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 192

Emergency Condenser Supply

ZONE NUMBER: 39.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

334400 39-WD-110

Tee-to-Pipe

334500 39-WD-110-D

Pipe-Long Seam

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDE

ITEM NO METH

PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - OU T A G E - - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

UT exam every 2 RFO's

**LATER**GL-D UT

88-01

C-F-1 UT

C5.12 PT

3 X - - - _ X - - - - - -

Code Case N-524

**LATER**

3 x -

........................ ..................... ................

Code Case N-524

**LATER**334600 39-WD-110-U

Tee-Long Seam

C-F-1 UT

C5.12 PT3 X -

334800 39-WD-112

Tee-to-Elbow

GL-D

88-01

UT

- ............. ......... ........................................ ................................................................. ..................... .................... .. .........................................

UT exam every 2 RFO's

**LATER**

3 X - X - - - -

335100 39-WD-113

Elbow-to-Pipe

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**

3- - - - - X - -

335200 39-WD-113

Elbow-to-Pipe

GL-D

88-01

UTUT exam every 2 RFO's

**LATER**

3 x - - - _ X - - - - - -

335300 39-WD-113-D

Pipe-Long Seam

335400 39-WD-113-U

Elbow-Long Seam

C-F-1 UT

C5.12 PT

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3 - - - - - X -

Code Case N-524

**LATER**

3 - - - X

335600 39-WD-114

Pipe-to-Pipe

GL-D

88-01

UTUT exam every 2 RFO's

**LATER**

3 X - - - - X - --

336000 39-WD-115

Pipe-to-Elbow

GL-D

88-01

UTUT exam every 2 RFO's

**LATER**

3 X - - - - X

Page 213: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 193DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Supply

ZONE NUMBER: 39.0INSP.

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

336300 39-WD-117

Pipe-to-Elbow

ECTION INTERVAL

ASME FIRST

SEC. XI PERIOD

CAT.GY NDE -_ P -R

ITEM NO METH 1 2 3 4

PLAN STATUSSECOND

SECONDPERIOD

- O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCR**1 2 3 4 1 2 3 4

N/A

N/A

UT

PT

This weld was cut out,

Replaced by 39-WD-117C1

**LATER**3- - - - - - - - X - - -

336400 39-WD-117

Pipe-to-Elbow

N/A

N/A

UT

3 - - X - - - X -

UT exam every 2 RFO's.

This weld no longer

exists, IGSCC Cat. D no

longer applies **LATER**

336500 39-WD-117-D

Elbow-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3- - - - - - - - X - - -

336600 39-WD-117-U

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3- - - - - - - - X - -

336700 39-WD-117C1

Pipe-to-Elbow

C-F-1 UT

C5.11 PT3- - - - - - - -

**LATER**336800 39-WD-117C1

Pipe-to-Elbow

GL-A

88-01

UT

3

337000 39-ND-118

Elbow-to-Pipe

GL-D

88-01

UT UT every 2 RFO' s

**LATER**

3 X - - - - X

337500 39-WD-121-U

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3- - - - - - - - X - - -

337600 39-WD-121C1

Pipe-to-Hx 60-42

Nozzle Inlet

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**3- - - - - - - - X - - -

Page 214: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 194

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Supply

ZONE NUMBER: 39.0 INSPECTION INTR

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

337700 39-WD-121C1 GL-A

.RVAL PLAN STATUS PRESERVICE YEAR

PFIRST SECOND THIRD

PERIOD PERIOD PERIOD

NDE - - - - - -O U T A G E - - - - - - INSTRUCTIONS

METH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

UT **LATER**

Pipe-to-Hx 60-42

Nozzle Inlet

B8-013- - - - - X -

337800 39-WD-122

Pipe-to-Elbow

C-F-1

C5.11

UT

PT

Examine 100% of weld

length **LATER**

3- - - - - - - - X-

337900 39-WD-122

Pipe-to-Elbow

338300 39-WD-123

Pipe-to-Pipe

GL-D

88-01

UT

UT

UT exam every 2 RFO's

**LATER**

3 X - - - - X - - - -

GL-D

88-01

UT exam every 2 RFO's

**LATER**- X - -

338700 39-WD-124

Pipe-to-Elbow

GL-D

88-01

UTUT exams every 2 RFO's

**LATER**

3 X - - - - X - -

339000 39-WD-125

Elbow-to-Pipe

C-F-1

C5.11

Examine 100% of weld

length **LATER**PT

3 - - - - X -

339100 39-WD-125

Elbow-to-Pipe

GL-D UT

88-01 PT

UT every 2 RFO's

**NHP-12-XX1-SS**

3- -- - - - X - - -

339200 39-WD-125-D

Pipe-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3 - - - - X - - -

339300 39-WD-125-U

Elbow-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3- - - -

339600 39-WD-127-D

Elbow-Long Seam

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**

3 X - - -

Page 215: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 195

Emergency Condenser Supply

ZONE NUMBER: 39.0INSP:

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

339700 39-WD-127-U

Elbow-Long Seam

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

PRESERVICE YEAR

THIRD FPERIOD

- - - -_ INSTRUCTIONS2 3 4 **CALIBRATION BLOCK**1

C-F-1 UT

C5.12 PT

Code Case N-524

**LATER**3 X

339800 39-WD-127C1

Pipe-to-Elbow

C-F-1 UT

C5.11 PT

Examine 100% of weld

length **LATER**3 X - - - - - - - - - -

340100 39-WD-128

Elbow-to-Pipe

340500 39-WD-129

Pipe-to-Pipe

GL-D

88-01

GL-D

88-01

UT

3 X - - - _ X - - _ _ _

UT every 2 RFO's

**LATER**

UT exam every 2 RFO's

**LATER**

UT

3 X X

12.0" ECC Line (REF. DWG. NO. llA)

341700 39-H21

Spring Hanger

. .-. - . . . .. ................. ....................

341800 39-H22

Spring Hanger

F-A

F1.20

VT-3

3 X- - - - - - - - -

Code Case N-491-1

**N/A**

.................................... .............. -

Code Case N-491-1, 4

Lugs **N/A**

F-A

F1.20

VT-3

3 X- - - - - - - - -

341900 39-H22-WD-001

Integral Attachment

342000 39-H22-WD-004

Integral Attachment

342100 39-H22-WD-007

Integral Attachment

C-C

C3.20

C-C

C3.20

PT Code Case N-509 **N/A**

PT Code Case N-509 **N/A**

C-C

C3.20

PT Code Case N-509 **N/A**

342200 39-H22-WD-010

Integral Attachment

C-C

C3.20

PT Code Case N-509 **N/A**

3 X- - - - - - - -

Page 216: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 196

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Emergency Condenser Supply

ZONE NUMBER: 39.0INSP

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

342300 39-H25

Spring Hanger

PECTION INTERVAL

ASHEJ

SEC. XICATEGY NDEITEM NO METH

PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3 X - - - - - - - - -

Page 217: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 197

Control Rod Drive

ZONE NUMBER: 44.2INSPECTION INTERVAL

ASHE

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRD

PERIOD

1 2 3 4

_

._

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

10.0" CRD Line (REF. DWG. NO. 17)

346400 44.2-H2

Sway Brace

347000 44.2-H9

Spring Hanger

F-A

Fl. 20

F-A

Fl .20

VT-3 Code Case N-491-1

**N/A**3 X - - -

VT-3 Code case N-491-1

**N/A**3 X- - - - - - - - -

350200 44.2-SB-1

Sway Brace

350700 44.2-SB-6

Sway Brace

F-A

Fl. 20

F-A

Fl. 20

VT-3

3 x- - - - - - - - -

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**

VT-3

3 _ - - - - X - - -

6.0" CRD Line (REF. DWG. NO. 17)

352500 44.2-WD-045

Pipe-to-Cap

C-F-2 UT

Cs.51 PT

Examine 100% of weld

length **LATER**3 - - - X ---- -

10.0" CRD Line (REF. DWG. NO. 17)

353000 44.2-WD-085

Elbow-to-Reducer

C-F-2 MT

C5.51 UT3 -

Examine 100% of weld

length

**NMP-lSW-1020-CS, PR-.6

00-1**

353100 44.2-WD-086

Pipe-to-Elbow

353600 44.2-WD-092

Pipe-to-Tee

C-F-2 UT

C5.51 PT

C-F-2 MT

C5.51 UT

Examine 100% of weld

length **LATER**3 X - - - - - - -

3 - - - - - - - - X - - -

Examine 100% of weld

length

**NMP-lSW-1020-CS PlR-.6

00-1**

Page 218: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 198

Control Rod Drive

ZONE NUMBER: 44.2INSPECTION INTERVAL

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CLIBRATION BLOCK**

8.0" CRD Line (REF. DWG. NO. 17)

353900 44.2-WD-096

Reducer-to-Elbow

C-F-2

Cs.51

UT

PT

Examine 100% of weld

length **LATER**3 x- - - - - - - -

8.0" CRD Line (REF. DWG. NO. 17A)

357500 44.2-WD-432

Pipe-to-Elbow

C-F-2

C5.51

Examine 100% of weld

length **LATER**PT3- - - - X - - - - - - -

Page 219: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 199

Reactor Containment Spray

ZONE NUMBER: 80.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

16.0" RCS Line (REF. DWG. NO. 15)

NDEMETH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4INSTRUCTIONS

**CLIBRATION BLOCK**

358000 80-09

CTMT. Spray Suction

Strainer

IEB

96-03

VT-3 Examine strainer for

debris every outage.

**W/A**3 X - - - X X - X - - -

12.0" RCS Line (REF. DWG. NO. 15)

358600 80-H12

Seismic Restraint

F-A

Fl. 20

VT-3 Code Case N-491-1

**NA**

3 X- - - - - - - - - -

358700 80-H12-WD-001

Integral Attachment

358800 80-H12-WD-004

Integral Attachment

358900 80-H12-WD-007

Integral Attachment

359000 80-H12-WD-010

Integral Attachment

C-C

C3.20

C-C

C3.20

C-C

C3.20

C-C

C3. 20

MT Code Case N-509 **N/A**

3 X - - -

MT Code Case N-509 **N/A**

3 X - - -

Code Case N-509 **N/A**

3X - - - -

MT Code Case N-509 **N/A**

3 X- - - - - - - - - -

359100 80-H14

Spring Hanger

F-A

Fl. 20

VT-3 4 Lugs, Code Case

N-491-1 **N/A**3 X- - - - - - - -

359200 80-H14-WD-001

Integral Attachment

C-C

C3.20

Code Case N-509 **N/A**

3 X - - -

359300 80-H14-WD-004

Integral Attachment

C-C

C3. 20

MT Code Case N-509 **N/A**

Page 220: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 200

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Reactor Containment Spray

ZONE NUMBER: 80.0INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

359400 80-H14-WD-007

Integral Attachment

ECTION INTERVAL PLAN STATUS

ASME ' FIRST SECOND THIRD rSEC. XI PERIOD PERIOD PERIOD jCATEGY NDE - - - - - - O U T A G E - - - - - - |

ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

C-C MT

C3.203 X - - - - - - - -

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

Code Case N-509 **N/A**

359500 80-H14-WD-010

Integral Attachment

C-C

C3.20

MT Code Case N-509 **N/A**

3 X

359900 80-H20

Rod Hanger

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3 X - - - - - - - - -

360500 80-H46

Rod Hanger

F-A

Fl. 20

VT-3

C ..o . C .... -... .......... .. ....

Code Case N-491-1

**N/A**3 X

360600 80-H46-WD-001 C-C MT

Integral Attachment C3.20

Code Case N-509 **N/A**

3 X - - - - - - - -

362800 80-SC-14

Seismic Restraint

362900 80-SC-14-WD-001

Integrally Welded Lug

363000 80-SC-14-WD-002

Integrally Welded Lug

363100 80-SC-14-WD-003

Integrally Welded Lug

363200 80-SC-14-WD-004

Integrally Welded Lug

F-A

Fl. 20

C-C

C3.20

C-C

C3.20

C-C

C3.20

C-C

C3.20

VT-3 Code Case N-491-1

**N/A**3 - X - - -

Code Case N-509 **N/A**PT

3 - - - X - - -

Code Case N-509 **N/A**PT

3-X - - -

Code Case N-509 **N/A**PT

3-X - - -

PT Code Case N-509 **N/A**

3-X - - -

Page 221: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 201

Reactor Containment Spray

ZONE NUMBER: 80.0INSPECTION INTERVAL

ASHE

SEC. XISUMMARY EXAMINATION AREA CATEGY NDENUMBER IDENTIFICATION ITEM NO HETH

J FIRSTPERIOD

PLAN STATUS

SECONDPERIOD

_ r

PRESERVICE YEAR

THIRDPERIOD

I- - - - - - O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4INSTRUCTIONS

**CALIBRATION BLOCK**

363300 80-SC-14-WD-005 C-C

Integrally Welded Lug C3.20

363400 80-SC-14-WD-006 C-C

Integrally Welded Lug C3.20

. . . . .... . .. .... .. ... I... ......... ...... . ............ ........... .... ..... .. ....... .... .

363500 80-SC-14-WD-007 C-C

Integrally Welded Lug C3.20

363600 80-SC-14-WD-008 C-C

Integrally Welded Lug C3.20

PT Code Case N-509 **N/A**

3-X - - -

PT

PT

Code Case N-509 **N/A**

3- - - - - - - X -

Code Case N-509 **N/A**

3- - - - - - - - X -

PT Code Case N-509 **N/A**

3-X - - -

367000 80-SR-47 F-A

Seismic Pipe Restraint F1.20

VT-3 Code Case N-491-1

**N/A**3 x - - - _ _

367100 80-SS-l

Sway Strut

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**

367200 80-SS-2

Sway Strut

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3 X- - - - - - - -

367800 80-WD-008

Flange-to-Pipe

368300 80-WD-017

Pipe-to-Elbow

C-F-2 UT

C5.51 MT

......... .... I . .......... ....... -. .. .

C-F-2 UT

C5.51 MT

3 - X -- - - - -

Examine 100% of weld

length **LATER**

..... ......................... .............................. .........

Examine 100% of weld

length **LATER**3 - - - - S - - -

368400 80-WD-019

Pipe-to-Flange

C-F-2 UT

C5.51 MT

Examine 100% of weld

length **LATER**3 - - - - X -

Page 222: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 202

Reactor Containment Spray

ZONE NUMBER: 80.0INSPECTION INTERVAL PLAN STATUS

ASHE

SEC. XISUMMARY EXAMINATION AREA CATEGYNUMBER IDENTIFICATION ITEM NO

NDEMETE

FIRST __

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

0 U T A G B -

1 2 3 4

THIRDPERIOD

1 2 3 4 -

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

a...

369000 80-WD-026

Pipe-to-Elbow

370800 80-WD-046

FE-to-Pipe

372200 80-WD-062

Reducer-to-Nozzle

373700 80-WD-082

Pipe-to-Elbow

C-F-2 UT

C5.51 MT

.. .... . ..--.....................

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

3 -

..........

3 -

3 -

3 -

- - - X--- - -

........................................ .............................................

X - -- -_

.............. ............... .......... ....... ......................... ...................... ...... .......

X - - - -_

X - -- -_

Examine 100% of weld

length **LATER**

Examine 100% of weld

length **LATER**

Examine 100% of weld

length **LATER**

Examine 100% of weld

length **LATER**

16.0" RCS Line (REF. DWG. NO. 15A)

374300 80-30

CTMT. Spray Suction

Strainer

IEB

96-03

VT-3 Examine strainer each

outage for debris

**N/A**3 X - - - X X - - X - - -

12.0" RCS Line (REF. DWG. NO. 15A)

374900 80-H30

Spring Support

F-A

Fl. 20

VT-3 Code Case N-491-l

**N/A**3- - - - X

375000 80-H30-WD-001

Integral Attachment

375100 80-H30-WD-004

Integral Attachment

375200 80-H30-WD-007

Integral Attachment

C-C

C3. 20

C-C

C3.20

C-C

C3. 20

MT Code Case N-509 **N/A**

3- - - - X - - - - - - -

Code Case N-509 **N/A**

3- - - - X - - - - - - -

MT Code Case N-509 **N/A**

3 - - - - X

Page 223: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 203

Reactor Containment Spray

ZONE NUMBER: 80.0INSPECTION INTERVAL PLAN STATUS

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

375300 80-H30-WD-010

Integral Attachment

ASME

SEC. XI

CATEGYITEM NO

C-C

C3.20

NDENETH

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

- - - -2

1 2 3 4

PRESERVICE YEAR

LINSTRUCTIONS**CALIBRATION BLOCK**

Code Case N-509 **N/A**MT

3 - - - - X - - - - - - -

375600 80-H34

Spring Hanger

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**3 - - - - X - - - - - -

......... ... . .... ........ ...........................................

375700 80-H34-WD-001

Integral Attachment

375800 80-H34-WD-004

Integral Attachment

375900 80-H34-WD-007

Integral Attachment

376000 80-H34-WD-010

Integral Attachment

C-C

C3. 20

C-C

C3.20

C-C

C3.20

C-C

C3.20

Code Case N-509 **N/A**MT

3 - - - - X

Code Case N-509 **N/A**MT

-X -- _3

Code Case N-509 **N/A**MT

3 - - - - X - _

................................... ....................................................................................................................... ...................................................................

Code Case N-509 **N/A**

- - - X - _

MT

3

376100 80-H36

Spring Hanger

F-A

Fl 20

VT-3 Code Case N-491-1

**N/A**

3 X - - _

Code Case N-509 **N/A**376200 80-H36-WD-001

Integral Attachment

(West Side)

376300 80-H36-WD-002

Integral Attachment

(East Side)

376800 80-H59

Spring Hanger

C-C

C3. 20

C-C

C3.20

F-A

Fl. 20

MT

3 - - - X --

Code Case N-509 **N/A**MT

3- - - - X - - - - - - -

VT-3 Code Case N-491-1

**N/A**3- - - -

Page 224: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 204

Reactor Containment Spray

ZONE NUMBER: 80.0

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

INSPECTION INTERVAL p PLAN STATUS

ASHE FIRST SECOND

SEC. XI PERIOD PERIOD

CATEGY NDE - - - - - - 2 U T A G E -

ITEM NO METE 1 2 3 4 1 2 3 4

PRESERVICE YEAR

THIRDPERIOD

INSTRUCTIONS**CALIBRATION BLOCK**1 2 3 4

Code Case N-509 **N/A**376900 80-H59-WD-00l

Integral Attachment

C-C

C3.20

MT

3 - - - - X - - - - - - -

377000 80-H60

Spring Hanger

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3 - - - - X - - - - - - -

377100 80-H60-WD-001

Integral Attachment

C-C

C3.20

MT Code Case N-509 **N/A**

3 - - - - X - - - - - - -

388900 80-WD-144

Pipe-to-Reducer

391100 80-WD-169

Valve 80-31

-to-Reducer

I . ... . . . - . . . . . . .

391300 80-WD-171

Nozzle-to-Reducer

C-F-2 UT

C5.51 MT

C-F-2 MT

C5.51 UT

C-F-2 MT

C5.51 UT

3

3

- - - -_ - X

_ - -_ - - - X

Examine 100% of weld

length **PlR-.375-2**

Terminal End, Examine

100% of weld length

**NMP-lSW-1020-CS,

PlR-.375-**

.......................................................... ......................................................... ... .. ..

Terminal End, located

inside floor grating,

Examine 100% of weld

length

**NMP-lSW-1020-CSNMP2-2

0-.5**

3- - - - - - - - X

391400 80-WD-172

Reducer-to-Pipe

391800 80-WD-176

Pipe-to-Tee

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

3- - - - - - - - X - - -

located inside floor

grating, Examine 100% of

weld length

**P1R-.375-2**

Examine 100% of weld

length

**NMP-1SW-1020-CS,

PIR-.375-**

3 - - - - - - - X - - -

Page 225: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 205

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Reactor Containment Spray

ZONE NUMBER: 80.0INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

392000 80-WD-178

Pipe-to-Elbow

ECTION INTERVAL

ASME

SEC. XI

CATEGY NDEITEM NO METH

C-F-2 UT

C5.51 MT

1PLAN STATUS

FIRST SECONDPERIOD PERIOD

- - - - - -O U T A G E -

1 2 3 4 1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

Examine 100% of weld

length **P1R-.375-2,

X - - - NMP-ISW-1020-C**3 - -

393100 80-WD-194

Elbow-to-Pipe

C-F-2 MT

C5.51 UT

. . . ......... .. . ...... .... ..... . ... . . - - ...~Examine 100% of weld

length **P1R-.375-2**3- - - - - X

16.0" RCS Line (REF. DWG. NO. 15B)

393300 80-10

CTMT. Spray Suction

Strainer

IEB

96-03

VT-3 Examine strainer each

outage for debris

**N/A**3 X - - - X X - - X - - -

12.0", RCS Line (REF. DWG. NO. 15B)

400100 80-SC-20 F-A

Seismic Box Restraint F1.20

VT-3 2 Lugs , Code Case

N-491-1 **N/A**3- - - - X - - - - - - -

Code Case N-509 **N/A**400200 80-SC-20-WD-001

Integral Attachment

400300 80-SC-20-WD-004

Integral Attachment

400400 80-SC-20-WD-007

Integral Attachment

400500 80-SC-20-WD-011

Integral Attachment

C-C

C3.20

C-C

C3. 20

C-C

C3. 20

C-C

C3. 20

MT

3 - - X -- - - -

. d Ca. . 5 *............/.....................

Code Case N-509 **N/A**MT

3 - - X -- - - - -

MT Code Case N-509 **N/A**

3 - - X - - - - -

MT Code Case N-509 **N/A**

3- - - - X -- - - - -

400600 80-SC-20-WD-015

Integral Attachment

C-C

C3.20

MT Code Case N-509 **N/A**

3 - - - - X--

Page 226: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 206

Reactor Containment Spray

ZONE NUMBER: 80.0INSPECTION INTERVAL PLAN STATUS r

ASME

SEC.

SUMMARY EXAMINATION AREA CATEG

NUMBER IDENTIFICATION ITEM

405200 80-SR-50 F-A

Seismic Pipe Restraint F1.20

I FIl

XI PEN

XY NDENO METH 1 2

VT-3

:RST SECONDRIOD PERIOD

- - - -O U T A G E -

THIRD

PERIOD

2 - - - 4

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**3 4 1 2 3 4

Code Case N-491-1

**N/A**3 x- - - - - - - - -

406500 80-WD-233

Elbow-to-Pipe

407500 80-WD-245

Elbow-to-Pipe

408100 80-WD-251

Pipe-to-Reducer

410800 80-WD-281

Pipe-to-Tee

411400 80-WD-287

Tee-to-Pipe

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

3 x - - - - - - - - - -

.. .... . ...... .......... .............. .. ... ......................... .............................

3 X - - - - - - - - - -

3 X - - -- - - - - _

3 X - - - - - - - - - - -

3 - - - - - - - - X - - -

Examine 100% of weld

length **P1R-.375-2**

Examine 100% of weld

length .. PlR- ..375.2**

Examine 100% of weld

length **PlR-.375-2**

Examine 100% of weld

length **PlR-.375-2**

Examine 100% of weld

length **P1R-.375-2**

6.0" RCS Line (REF. DWG. NO. 15B)

411500 80-WD-290-A C-F-2 MT Examine 100% of weld

length **N/A**6.0" Branch Connection C5.813 X - - - - - - - - -

16.0' RCS Line (REF. DWG. NO. 15C)

*412700 80-29

CTMT. Spray Suction

Strainer

IEB

96-03

VT-3 Examine strainer Each

outage for debris

**N/A**3 X - - - X X - - X - - -

Page 227: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 207

Reactor Containment Spray

ZONE NUMBER: 80.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

12.0" RCS Line (REF. DWG. NO. 15C)

PLAN STATUS

1FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

413200 80-H28

Spring Support

F-A

Fl .20

VT-3 4 Lugs, Code Case

N-491-1 **N/A**3 _ - - - - - X - -

Code Case N-509 **N/A**413300 80-H28-WD-001

Integral Attachment

. -. . ..... . . .. . .. ... . . .... ... .................................

413400 80-H28-WD-004

Integral Attachment

.. . . . . .. 11..... ...... ... .........................................

413500 80-H28-WD-007

Integral Attachment

C-C

C3. 20

........ .......

C-C

C3.20

C-C

C3.20

MT

3- - - - - - - - X - -

Code Case N-509 **N/A**MT

3- - - - - - - - X - - -

MT Code Case N-509 **N/A**

3- - - - - X

413600 80-H28-WD-010

Integral Attachment

C-C

C3.20

MT Code Case N-509 **N/A**

3 - - - - _ _ - - X

419400 80-SS-3

Sway Strut

F-A

Fl. 20

VT-3 Code Case N-491-1

3- - - - - - - - X - - -

419900 80-WD-338

Pipe-to-Flange

. . - . . . .. . .... . . - - . . ....

422100 8p-WD-363

Pipe-to-Elbow

C-F-2 UT

C5.51 MT

Examine 100% of weld

length **P1R-.375-2**

C-F-2 UT

C5.51 MT

Examine 100% of weld

length **P1R-.375-2**

3 x - - -

12.0" RCS Line (REF. DWG. NO. 15D)

427600 80-HBS

Spring Support

F-A

Fl.20

VT-3 Code Case N-491-1

3- - - - - - - - X - - -

Page 228: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 208

Reactor Containment Spray

ZONE NUMBER: 80.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NONDEMETE

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONSX**CLIBRATION BLOCK**

6.0" RCS Line (REF. DWG. NO. 15D)

433400 80-SS-15

Sway Strut

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3 x - - - - - - - - - -

433600 80-SS-6

Sway Strut

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**3 x- - - - - - - - - -

433700 80-SS-7

Sway Strut

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**

3 X- - - - - - - - -

Page 229: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 209

Reactor Containment Spray Heat Exchanger 122

ZONE NUMBER: 80.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

ECTION INTERVAL- - - - - -

ASME

SEC. XI

CATEGYITEM NO

NDEMETE

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONSL **CALIBRATION BLOCK**

RCSHE 80-13 (REF. DWG. NO. l5A)

438500 80-13

Hx Support

F-A

Fl. 40

VT-3 Code Case N-491-1

**N/A**3 X - - - - - - -

438600 80-13-WD-001

Hx 80-13

Nozzle-to-Vessel

C-B

C2.11

H02 **N/A**

3 - - - -

438700 80-13-WD-002

Hx 80-13 Integral

Attachment Inlet

C-C

C3.10

MT H02, Code Case N-509

**N/A**3 - - - - - - - X - - -

H02 **N/A**438900 80-13-WD-004

Hx 80-13

Vessel-to-Nozzle

- .... .... - . - .... ... .... . .. .... .........................

439000 80-13-WD-005

Hx 80-13

Tubesheet-to-Shell

Inlet

C-B

C2.11

C-A

C1.30

MT

3 - - - - - - - X - - -

UT H02 **NMP2-24-.500-CS**

3 - - - - - - - X - -

H02 **NMP2-24-.500-CS**439100 80-13-WD-006

Hx 80-13

Tubesheet-to-Shell

Outlet

C-A

Cl -30

UT

3- - - - - - - - X - - -

Page 230: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 210

Reactor Containment Spray Pump 121

ZONE NUMBER: 80.0 INSPECTION INTERVAL

ASHE

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

RCSP 80-03 (REF. DWG. NO. 15)

PLAN STATUS

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

442600 80-03

Pump Support

F-A

Fl. 40

VT-3 Code Case N-491-1

**N/A**3 X- - - - - - - - -

442900 80-03-WD-003

Pipe-to-Casing

443100 80-03-WD-005

Upper Head-to-Shaft

Channel

C-F-2

C5.81

C-G

C6.10

MT Terminal End **N/A**

3- - - - - - - - X -

PT **N/A**

3 - - - -

**N/A**443200 80-03-WD-006 C-G

Shaft Channel-to-Shaft C6.10

Guide

PT

3 - -- - X - - - _ _

P03 **N/A**443300 80-03-WD-007 C-G

Upper Casing-to-Head C6.10

443400 80-03-WD-008 C-G

Upper Casing-to-Flange C6.10

443900 80-03-WD-013 C-G

Upper Casing Long Weld C6.10

MT

3 - - - X

P03 **N/A**MT

3 X P- - - - - - _ - -

MT P03 **N/A**

3 - -- X - - - - - - -

Page 231: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 211

Reactor Core Spray

ZONE NUMBER: 81.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

_ r

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

12.0" CS Line (REF. DWG. NO. 13)

NDEMETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

446000 58-SC-i

Pipe Restraint

F-A

Fl .20

VT-3 Code Case N-491-1

**N/A**

3 X - - -

446100 58-SC-l-WD-OOl

Integral Attachment

............................... ............................. ............................

446200 58-SC-l-WD-002

Integral Attachment

446300 58-SC-l-WD-003

Integral Attachment

446400 58-SC-l-WD-004

Integral Attachment

C-C

C3. 20

MT Code Case N-509 **N/A**

3X - - - -

C-C

C3.20

C-C

C3.20

C-C

C3.20

MT

MT

MT

Code Case N-509 **N/A**

3 X- - - - - - - - -

Code Case N-509 **N/A**

Code Case N-509 **N/A**

3 X - - - - -

16.0" CS Line (REF. DWG. NO. 13)

447000 81-05

Suction Strainer

. - .1 . - ...... . . - . . ..... . ......... ... -

447100 81-06

Suction Strainer

IEB

96-03

IEB

96-03

VT-3

3 X _ _

Examine strainer each

outage for debrisX X - - X - - - **N/A**

................ ... .... - .. ..... -...... - - -. ............ - ..... ............... ...... ...... ......... .. . ..... . ...... 1..... .

Examine strainer each

outage for debrisX X - - X - - - **N/A**

VT-3

3 X - - -

447200 81-24

Suction Strainer

IEB

96-03

VT-3 Examine strainer each

outage for debris

**N/A**3 X - - - X X - - X - - -

447300 81-25

Suction Strainer

IEB

96-03

VT-3 Examine strainer each

outage for debrisX - - - **N/A**3 X - - - X X - -

Page 232: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 212

Reactor Core Spray

ZONE NUMBER: 81.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

12.0" CS Line (REF. DWG. NO. 13)

NDEMETH

FIRST SECOND

PERIOD PERIOD

- - - - - - O U T A G E -

1 2 3 4 1 2 3 4

THIRD

PERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**.

. .

453900 81-H1O

Spring Hanger

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3 X- - - - - - -

Code Case N-509 **N/A**454000 81-H1O-WD-001 C-C

Spring Hanger Integral C3.20

Attachment

MT

3 x- - - - - - -

454300 81-H12

Pipe Stanchion

F-A

Fl .20

VT-3 Code Case N-491-1

**N/A**3- - - - - - - - X - - -

Code Case N-509 **N/A**454400 81-H12-WD-001

Pipe Stanchion

C-C

C3.20

MT

3 - - - - - - - - X - - -

454700 81-H14

Rod Hanger

F-A

F1 .20

VT'-3

3 - - - - - - - - X - - -

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**

454800 81-H15

Rod Hanger

F-A

Fl.20

VT-3

3 X - - - - - - - - - -

Code Case N-509 **N/A**455000 81-H15-WD-001

Rod Hanger Integral

Attachment

455100 81-H15-WD-002

Rod Hanger Integral

Attachment

C-C

C3.20

C-C

C3.20

MT

3 x

MT Code Case N-509 **N/A**

3 x - - -

455200 81-H15-WD-003

Rod Hanger Integral

Attachment

C-C

C3. 20

MT Code Case N-509 **N/A**

3 X- - - - - - - - -

Page 233: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 213

Reactor Core Spray

ZONE NUMBER: 81.0INSPECTION INTERVAL PLAN STATUS

SUMMARY EXAMINATION AREANUMBER IDENTIFICATION

455300 81-H15-WD-004

Rod Hanger Integral

Attachment

ASME

SEC. XI

CATEGYITEM NO

C-C

C3. 20

NDEHETH

MT

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

Code Case N-509 **N/A**

3 x -

455400 81-H15-WD-005

Rod Hanger Integral

Attachment

455500 81-H15-WD-006

Rod Hanger Integral

Attachment

C-C

C3.20

C-C

C3.20

MT Code Case N-509 **N/A**

3 X- - - - - - - - -

Code Case N-509 **N/A**MT

456200 81-H34

Pipe Stanchion

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**3 x- - - - - - - - - - -

Code Case N-509 **N/A**456700 81-H34-WD-001

Pipe Stanchion

C-C

C3.20

MT

3 X - - - - - - - -

458700 81-H37

Spring Hanger

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**3- - - - X - - - - - - -

Code Case N-509 **N/A**458800 81-H37-WD-001

Integral Attachment

C-C

C3. 20

MT

3 - - - - X _

458900 81-H38

Spring Hanger

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**3- - - - X - - - - - - -

459000 81-H38-WD-001

Integral Attachment

C-C

C3.20

MT Code Case N-509 **N/A**

3- - - - X - - - - - - -

Page 234: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 214

Reactor Core Spray

ZONE NUMBER: 81.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

460100 81-H5 F-A

NDE 1METH

VT-3

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECONDPERIOD

O U T A G E -

1 2 3 4

PRESERVICE YEARrTHIRDPERIOD

1 2 3 4

INSTRUCTIONS**CALIBRATION BLOCK**

Code Case N-491-1

Pipe Stanchion Fl .203- - - - - - X

460600 81-H5-WD-001

Pipe Stanchion

C-C

C3.20

MT Code Case N-509 **N/A**

3- - - - - - - - X - - -

6.0" CS Line (REF. DWG. NO. 13)

460700 81-H50

Rod Hanger

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**

3 - - - - X - - - - - - -

12.0" CS Line (REF. DWG. NO. 13)

461600 81-H7

Spring Hanger

F-A

Fl .20

VT-3 Code Case N-491-1

**N/A**3 - - - - - - - X - - -

. ..... ....... . ...... *.N./..A..*.*.... ...

Code Case N-509 **N/A**461700 81-H7-WD-001

Spring Hanger

Attachment

C-C

Integral C3.203 X - - -

461800 81-H7-WD-002

Spring Hanger Integral

C-C

C3. 20

MT Code Case N-509 **N/A**

3- - - - - - - - X - - -Attachment

461900 81-H7-WD-003 C-C

Spring Hanger Integral C3.20

Attachment -

Code Case N-509 **N/A**

3- - - - - - - - X - - -

Code Case N-509 **N/A**462000 81-H7-WD-004 C-C

Spring Hanger Integral C3.20

Attachment

MT

3-X - - -

Page 235: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 215

Reactor Core Spray

ZONE NUMBER: 81.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUtMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

FIRSTPERIOD

NDE 1 - - - - -

METH 1 2 3 4

MT

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK *

*

Code Case N-SO9 **N/A**462100 81-H7-WD-005

Spring Hanger

Attachment

C-C

Integral C3.203- - - - - - - - X - - -

Code Case N-509 **N/A**462200 81-H7-WD-006

Spring Hanger

Attachment

C-C

Integral C3.20

MT

3- - - - - - - - X - - -

Code Case N-509 **N/A**462300 81-H7-WD-007

Spring Hanger

Attachment

C-C

Integral C3.20

MT

3- - - - - - - - X - -

462500 81-HS

Spring Hanger

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**

3 - - - X - - -

Code Case N-509 **N/A**462600 81-H8-WD-001

Integral Attachment

C-C

C3.20

MT

3 X - -

471300 81-SC-21

Sway Brace

F-A

F1.20

VT-3 Code Case N-491-1

**N/A**3 X- - - - - - - -

6.0" CS Line (REF. DWG. NO. 13)

483200 81-SC-45

Seismic Restraint

483300 81-SC-46

Seismic Restraint

F-A

Fl. 20

F-A

F1.20

VT-3

3 - -- - - -X - -

Code Case N-491-1

**N/A**

- -. . . . . .............. . . .. - -.

Code Case N-491-1

**N/A**

VT-3

3 - - - - X - - -

483400 81-SC-47

Seismic Restraint

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3 - -- x -

Page 236: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 216

Reactor Core Spray

ZONE NUMBER: 81.0INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

12.0" CS Line (REF. DWG. NO. 13)

NDE 1METH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

484700 81-SC-51

Seismic Restraint

F-A

F1.20

VT-3 Code Case N-491-1

**N/A**3- - - - - - - - X - - -

6.0" CS Line (REF. DWG. NO. 13)

486100 81-SR-4

Seismic Restraint

F-A

F1.20

VT-3 Code Case N-491-1

**N/A**3 -X -- _

14.0" CS Line (REF. DWG. NO. 13)

487300 81-SS-1

Sway Strut

487400 81-SS-1-WD-001

Sway Strut Integral

Attachment

F-A

Fl .20

C-C

C3. 20

VT-3

3 - - - - - X - - -

Code Case N-491-1

**N/A**

...... ..... . . -.. ... .................... ......... . .... .... .....

Code Case N-509 **N/A**MT

3 - - - - - - - - X - - -

487700 81-SS-11

Sway Strut

F-A

F1.20

VT-3 Code Case N-491-1

**N/A**3 X - -

6.0"1 CS Line (REF. DWG. NO. 13)

487900 81-SS-13

Sway Strut

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3- - - - X - - - - - - -

14.0" CS Line (REF. DWG. NO. 13)

490400 81-SS-8

Sway Strut

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3 X - - - - - - - - - -

490500 81-SS-8-WD-001

Sway Strut Integral

Attachment

C-C

C3.20

Code Case N-509 **N/A**

3 X - - - - - - - - -

Page 237: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 217

Reactor Core Spray

ZONE NUMBER: 81.0INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

EXAMINATION AREA CATEGY

IDENTIFICATION ITEM NO

NDEMETH

FIRSTTHIRFIRSTPERIOD

1 2 3 4

SECONDPERIOD

O U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4SUMMARYNUMBER

491300

INSTRUCTIONS**CALIBRATION BLOCK**

81-WD-006

Valve 81-01-to-Pipe

C-F-2 UT

CB.51 MT

Terminal End, Examine

100% of weld length

-- -**NMP-1SW-1020-CS**

492000 81-WD-013

Pipe-to-Elbow

492200 81-WD-016

Pipe-to-Reducer

(14x12")

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3 x - - - - -

Examine 100% of weld

length-*- -*3 x - - -

12.0" CS Line (REF. DWG. NO. 13)

493000 81-WD-024

Elbow-to-Pipe

C-F-2 UT

Cs.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3 - - - -

16.0" CS Line (REF. DWG. NO. 13)

493300 81-WD-028.

81-05

STRT-to-Reducer(12" x16

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3- - - - X - - - - - - -

12.0" CS Line (REF. DWG. NO. 13)

494000 81-WD-035

Pipe-to-Reducer

(12"xlO")

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3- - - - - - - X - - -

494500 81-WD-040

Pipe-to-Reducer

(12"x14")

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3- - - - X - -

Page 238: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 218

Reactor Core Spray

ZONE NUMBER: 81.0TNSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

14.0" CS Line (REF. DWG. NO. 13)

NDE 1METH

FIRST SECONDPERIOD PERIOD

- - - - - - O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**1 2 3 4 1 2 3 4 1 2 3 4_ _

494900 81-WD-044

Pipe-to-Elbow

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3 x- - - - - - - -

12.0" CS Line (REF. DWG. NO. 13)

496200 81-WD-058

Pipe-to-Valve 81-37

496600 81-WD-065

Tee-to-Flange

C-F-2 UT

C5.51 MT

C-F-2 UT

C5.51 MT

3 - - - - X- _

Terminal End, Examine

100% of weld length

**NMP-lSW-1020-CS**

Examine 100% of weld

length

**NMP-lSW-1020-CS**3- - - - X - - - - - - -

500400 81-WD-125

Reducer-to-Flange

(14 x12')

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3 X - - - - - - - -

501200 81-WD-136

Pipe-to-Reducer

(12"x16")

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3 X - - - - -

502400 81-WD-149

Pipe-to-Elbow

C-F-2 UT

CS.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3 X

502600 81-WD-151 C-F-2

Reducer-to-Pump 81-50 C5.51

UT

MT

Terminal End, Examine

100% of weld length

**NMP-lSW-1020-CS**3- - - - X - - - - - - -

Page 239: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 219

Reactor Core Spray

ZONE NUMBER: 81.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

14.0" CS Line (REF. DWG. NO. 13)

NDEMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**- _L_

504200 81-WD-167

Elbow-to-Pipe

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3 - - - - X - - - - - - -

12.0" CS Line (REF. DWG. NO. 13)

504600 81-WD-172

Tee-to-Pipe

C-F-2

C5.51

UT

MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3 X - - - - - - - -

506000 81-WD-189

Pipe-to-Reducer

C-F-2

C5.51

UT

MT

Examine 100% of weld

length

**NMP-lSW-1020-CS**3- - - - - - - - X - - -

Page 240: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 220

Reactor Core Spray Pump 121

ZONE NUMBER: 81.0INSPECTION INTERVAL

ASHE

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

CSP 81-03 (REF. DWG. NO. 13)

I~~

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

I INSTRUCTIOl

**CALIBRATION BI'IS.LOCK**

511200 81-03-WD-005

Upper Head-to-Shaft

Channel

C-G

C6.10

MT P03 **N/A**

3- - - - - - - - X - - -

P03 **N/A**511300 81-03-WD-006 C-G

Shaft Channel-to-Shaft C6.10

Guide

MT

3 - - - - - - - X - - -

P03 **N/A**511500 81-03-WD-008 C-G

Upper Casing-to-Flange C6.10

MT

3- - - - - - - - X - - -

512000 81-03-WD-013 C-G

Lower Casing Long Weld C6.10

MT P03 **N/A**

3- - - - - - - - X - - -

Page 241: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 221

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Reactor Core Spray Topping Pump 111

ZONE NUMBER: 81.0 INSPECTION INTERVAL PLAN STATUS

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

CSTP 81-50 (REF. DWG. NO. 13)

NDEMETH

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

r INSTRUCTIONS**CALIBRATION BLOCK**

514100 81-50

Pump Support

F-A

F1.40

VT-3 Code Case N-491-1

3 X - - - - - - - - -

Page 242: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 222

Reactor Core Spray

ZONE NUMBER: 81.1INSPECTION INTERVAL PLAN STATUS _r

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

12.0" CS Line (REF. DWG. NO. 13)

NDEHETH

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

- _L_

516200 81.1-WD-023

Pipe-to-Flange

. . .I. . .. - .. I . - .. ...............

517000 81.1-WD-031

Elbow- to- Pipe

C-F-2

C5.51

C-F-2

C5.51

UT

MT

Examine 100% of weld

length

**NMP-ISW-1020-CS**3 - - - _ -- X - - -

UT

MT

Examine 100% of weld

length

**NMP-1SW-1020-CS**3 - - - - - - X - - -

518400 81.1-WD-047

Tee-to-Valve 81-30

C-F-2

C5.51

MT Terminal End, Examine

100% of weld length

**NMP-1SW-1020-CS**3- - - - - - X

519400 81.1-WD-059

Pipe-to-Tee

C-F-2

C5.51

UT

MT

Examine 100% of weld

length

**NHP-lSW-1020-CS**3- - - - - - - - X

Page 243: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

PAGE: 223

Reactor Containment Spray

ZONE NUMBER: 93.0 INSPECTION INTI

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

?RVAL

NDE|HETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**

12.0" Raw Water Line (REF. DWG. NO. 16)

521400 93-R23-A

Rod Hanger

F-A

F1.20

VT-3

3- - - - X - - - - - -

Code Case N-491-1

**N/A**

..... . .. . . . . . . . . . .. . . . . . .

Code Case N-491-1

**N/A**521800 93-R23-E

Rod Hanger

F-A

Fl .20

VT-3

3- - - - X

522000 93-R24-A

Anchor

F-A

Fl.20

VT-3 Code Case N-491-1

**N/A**

3 X - - -

529600 93-R27-F

Dead Weight Support

F-A

Fl. 20

VT-3

3 X - - - - -

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**529800 93-R30

Rod Hanger

F-A

Fl. 20

VT-3

3 X - - -

533400 93-SCR-9E

Seismic Box Restraint

F-A

Fl. 20

VT-3 Code Case N-491-1

**N/A**3- - - - - - - - X - - -

533500 93-SCR-9E-WD-001

Integral Attachment

533600 93-SCR-9E-WD-002

Integral Attachment

533700 93-SCR-9E-WD-003

Integral Attachment

. -. . . . . . ... . ... . ......... .... . .. ... . .. . ......

533800 93-SCR-9E-WD-004

Integral Attachment

C-C

C3.20

C-C

C3.20

C-C

C3.20

C-C

C3.20

Code Case N-509 **N/A**

3- - - - - - X

MT

MT

MT

Code Case N-509 **N/A**

3- - - - - X

Code Case N-509 **N/A**

3- - - - - X

Code Case N-509 **N/A**

3 - - - - X - - -

Page 244: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 224

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Reactor Containment Spray

ZONE NUMBER: 93.0 INSPECTION INTERVAL

SUMMARYNUMBER

533900

EXAMINATION AREA

IDENTIFICATION

93-SCR-9E-WD-005

Integral Attachment

ASME

SEC. XI

CATEGYITEM NO

C-C

C3. 20

NDET|METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

Code Case N-509 **N/A**MT

3 - -- - _- X - -

Code Case N-509 **N/A**534000 93-SCR-9E-WD-006

Integral Attachment

C-C

C3.20

MT

3 …- - - - - - X

.......................................................................................................................

Code Case N-509 **N/A**534100 93-SCR-9E-WD-007

Integral Attachment

534200 93-SCR-9E-WD-008

Integral Attachment

C-C

C3.20

C-C

C3.20

MT

3- - - - - - - - X - -

CN............./..................... ........ ............

Code Case N-509 **N/A**MT

3- - - - - - X

535200 93-SCR-9G

Seismic Box Restraint

F-A

Fl. 20

VT-3

............................................ .............

Code Case N-491-1

**N/A**

3 - - - - X - -

I ................................... . ..... ....

Code Case N-509 **N/A**535300 93-SCR-9G-WD-001

Integral Attachment

535400 93-SCR-9G-WD-002

Integral Attachment

535500 93-SCR-9G-WD-003

Integral Attachment

C-C

C3. 20

C-C

C3.20

C-C

C3.20

MT

3 - - - - X - - - - - - -

Code Case N-509 **N/A**

3- - - - X

Code Case N-509 **N/A**MT

3- - - - X - -

~ . I.. I .... .... ............................ ...........................

535600 93-SCR-9G-WD-004 C-C

Integral Attachment C3.20

............. ........ ................................ ................................ ...... ....

Code Case N-509 **N/A**MT

3 - - - - X - - - - - -

MT Code Case N-509 **N/A**535700 93-SCR-9G-WD-005

Integral Attachment

C-C

C3. 203 - - - - X-

Page 245: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 225DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 2 SECTION XI SCHEDULED COMPONENTS

Reactor Containment Spray

ZONE NUMBER: 93.0INSPECTION INTERVAL

ASMB

SEC. XI

PLAN STATUS _rl

1 FIRSTFIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK"*SUIMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

535800 93-SCR-9G-WD-006 C-C MT

_1 - _

Code Case N-509 **N/A**

Integral Attachment C3.203- - - - X - - - - - - -

Code Case N-509 **N/A**535900 93-SCR-9G-WD-007

Integral Attachment

536000 93-SCR-9G-WD-008

Integral Attachment

C-C

C3. 20

C-C

C3.20

MT

3- - - - X - - - - - - -

Code Case N-509 **N/A**MT

3- - - - X - - - - - - -

542200 93-WD-055

Valve 93-72 -to-Pipe

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

3 X - - - - - - - - - - - **NMP-1SW-1020-CS**

543200 93.1-WD-005

Elbow-to-Pipe

C-F-2 MT

CS.51 UT

Examine 100% of weld

length **PlRP.375-2**3- - - - - - - - X - - -

543900 93.1-WD-012

Pipe-to-Elbow

C-F-2 UT

C5.51 MT

Examine 100% of weld

length

3 - - - - X - - - - - - * PSW102CS**

544700 93.1-WD-020

Pipe-to-Elbow

C-F-2 MT

C5.51 UT

Examine 100% of weld

length **P1R-.375-2,

94-6007**3 - - - - - _ - X - - -

544900 93.1-WD-022

Elbow-to-Valve 93-52

C-F-2 MT

C5.51 UT3- - - - - - - - X - - -

Pipe restraint

interference, scan in

both directions to

achieve 100% CRV.

**94-6007,P1R-.375-2**

545200 93.1-WD-028

Pipe-to-Valve 93-71

C-F-2 UT

C5.51 MT

Examine 100% of weld

length **P1R-.375-2**

3- - _ -_ _ _ _ X - - -

Page 246: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

NT NIAGARA NUCLEAR POWER STATIONLU MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 21 of 40

6.0 CLASS 3 INSERVICE INSPECTION PLAN TABLES

This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructiveexaminations of selected systems and components for the Second Inservice Inspection Interval.

38.0

39.0

54.0

57.0

70.0

72.0

93.0

Shutdown Cooling Water System ...............

Emergency Condenser System ................

Spent Fuel Pool Cooling System ...............

Spent Fuel Pool Cooling System ...............

Reactor Building Closed Loop Cooling System ....

Emergency Service Water System ..............

Reactor Containment Spray System ............

226 thru 226

227 thru 227

228 thru 235

236 thru 236

237 thru 242

243 thru 244

245 thru 248

File: NMP1 ISIPL.wpd

Page 247: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 226

Shutdown Cooling Water Heat Exchanger 11

ZONE NUMBER: 38.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METE

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E- - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

E _ INSTRUCTIONS**CA.LIBRATION BLOCK* *

_ _ _ _ _

SDCW Hx 38-129 (REF. DWG. NO. C-26855-C7)

548000 38-129-WD-001 D-A

SDC Ex Front Support D1.10

VT-1

3 _ - _X - - -

Code Case N-509, Examine

100% of weld length

**N/A**

...................... ................................ - -.......... .... .. ... . -

Code case N-509, Examine

100% of weld length

**N/A**

548100 38-129-WD-002

SDC Hx Rear Support

D-A

Dl. 10

VT-1

3- - - - - - - - X - - -

SDCW HX 38-135 (REF. DWG. NO. C-26855-C7)

548200 38-SDC-HX-1l

SDC Heat Exchanger

Support

F-A

Fl. 40

VT-3 Code Case N-491-1

**N/A**3- - - - - - - - X - - -

Page 248: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 227

Emergency Condenser Heat Exchanger 122

ZONE NUMBER: 39. 0 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

ECHE 60-42 (REF. DWG. NO. 11A)

550100 60-42-WD-007 D-A

North Saddle-to-Shell D1.10

Weld

NDElMETH 1

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 l 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS

**CALIBRATION BLOCK**- -I-

Code Case N-509 **N/A**VT-1

3- - - - - - - - X - - -

Code Case N-509 **N/A**550200 60-42-WD-008 D-A

Center Saddle-to-Shell D1.10

Weld

550300 60-42-WD-009 D-A

South Saddle-to-Shell D1.10

Weld

VT-l

3…- - - - _

Code Case N-509 **N/A**VT-1

3- - - - - - - - X - - -

550400 HX-60-42 F-A

Heat Exchanger Support F1.40

VT-3 Code Case N-491-1

**N/A**3- - - - - - - - X - - -

Page 249: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 228DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

Spent Fuel Pool Cooling

ZONE NUMBER: 54.0INSPECTION INTI

ASME

SEC. XI

SUM4HARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

PRVAL

NDETlMETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

FPRESERVICE YEARINSTRUCTIONS**CALIBRATION BLOCK**

6.01 Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C)

551200 54-Ri-B

Rod Hanger

F-A

Fl. 30

VT-3 Code Case N-491-1

**N/A**

3- - - - X - - - - - - -

551600 54-Rl-D

Rod Hanger

F-A

Fl .30

VT-3

................................................ ...........................................................................

Code Case N-491-1

**N/A**

3 X -

552000 54-RI-H

Rod Hanger

F-A

Fl .30

VT-3 Code Case N-491-1

**N/A**

3- - - - X - - - - - - -

552900 54-Rll-A

Pipe Stanchion

F-A

Fl. 30

VT-3 Includes U-Bolt and

protection saddle, Code

3 - - - - - - - - X - - - Case N-491-1 **N/A**

554300 54-R13-A

Spring Hanger

F-A

Fl.30

VT-3 Code Case N-491-1

**N/A**3- - - - X - - - - - - -

Code Case N-491-1555000 54-R2-BA

Rod Hanger

F-A

Fl. 30

VT-3

3- - - - X

558100 54-SCR-lE F-A

Seismic Box Restraint F1.30

VT-3 Code Case N-491-1

**N/A**

3- - - - X - - - - - - -

Code Case N-509 **N/A**558200 54-SCR-lE-WD-001

Integrally Welded Lug

D-A

D1.20

VT-1

1 ... ...

558300 54-SCR-lE-WD-002 D-A

Integrally Welded Lug D1.20

2

3 - - - - X - - - - - - -

...... . ...... ....9

........... ...............*....... ....................................... ............................................................................ A ...... .

VIT-1 Code Case N-509 **N/A**

3 - - - - X - - - - - -

Page 250: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 229

Spent Fuel Pool Cooling

ZONE NUMBER: 54.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

558400 54-SCR-lE-WD-003

ECTION INTERVAL

ASME

SEC. XI

CATEGYITEM NO

D-A

NDE 1METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - O U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**- -I-

Code Case N-509 **N/A**VT-1

Integrally Welded Lug D1.20

33 - - - - X - - -

Code Case N-509 **N/A**558500 54-SCR-lE-WD-004 D-A

Integrally Welded Lug D1.20

4

VT-1

3- - - - X -

8.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C)

563700 54-SCR-IN F-A

Seismic Box Restraint F1.30

VT-3 Code Case N-491-1

**N/A**

3- - - - - - - - X - -

Code Case N-509 **N/A**563800 54-SCR-1N-WD-001 D-A

Integrally Welded Lug D1.20

1

563900 54-SCR-lN-WD-002 D-A

Integrally Welded Lug D1.20

2

VT-1

X - - -

Code Case N-509 **N/A**VT-1

3-_ - -

VT-i Code Case N-509 **N/A**564000 54-SCR-lN-WD-003 D-A

Integrally Welded Lug D1.20

33- - - - X - - -

VT-i Code Case N-509 **N/A**564100 54-SCR-1N-WD-004 D-A

Integrally Welded Lug D1.20

43 - - - - X - -

Page 251: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 230

Spent Fuel Pool Cooling

ZONE NUMBER: 54.0TWI.NPCTONW INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

6.0" Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C)

567100 54-SCR-3BA F-A

Seismic Box Restraint F1.30

VT-3 Code Case N-491-1

**N/A**

3- - - - X - - - - - - -

Code Case N-509 **N/A**567200 54-SCR-3BA-WD-001

Integrally Welded Lug

1

567300 54-SCR-3BA-WD-002

Integrally Welded Lug

2

D-A

DI. 20

D-A

D1.20

VT-I

3 - - - - X

Code Case N-509 **N/A**VT'-1

3 - - - - X - -

VT-i Code Case N-509 **N/A**567400 54-SCR-3EA-WD-003

Integrally Welded Lug

3

D-A

D1.203- - - - X - - -

Code Case N-509 **N/A**567500 54-SCR-3BA-WD-004

Integrally Welded Lug

4

D-A

DI. 20

VT-l

3- - - - X - - - - - - -

Code Case N-509 **N/A**567600 54-SCR-3BA-WD-005

Integrally Welded Lug

5

D-A

D1.20

VT-l

3 - - - -

Code Case N-509 **N/A**567700 54-SCR-3BA-WD-006 D-A

Integrally Welded Lug D1.20

6

567800 54-SCR-3BA-WD-007 D-A

Integrally Welded Lug D1.20

7

VT-1

3 - - - - X - - - - - - -

V CodeC. . a se..N- O .. * . ........ *............ . .. . .. ... .............................. ...... .. ..

VT-1 Code Case N-509 **N/A**

3 - - - - X - - - - - - -

Page 252: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 231

Spent Fuel Pool Cooling

ZONE NUMBER: 54.0 INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

567900 54-SCR-3BA-WD-008

ECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME

SEC. XI

CATEGY

ITEM NO

D-A

NDE|METHi

FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

FIRST

Coe ae -09*N/*

Code Case N-509 **N/A**VT-1

Integrally Welded Lug D1.20

83 - - - - X

8.0' Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27171-C)

Code Case N-491-1571500 54-SCIR-5F F-A

Seismic Box Restraint F1.30

571600 54-SCR-5F-WD-001 D-A

Integrally Welded Lug D1.20

1

571700 54-SCR-5F-WD-002 D-A

Integrally Welded Lug D1.20

2

VT-3

3 - - - X - - -

Code Case N-509 **N/A**VT-1

3 - - - X - - -

Code Case N-509 **N/A**VT-i

3 - - - - -

Code Case N-509 **N/A**571800 54-SCR-5F-WD-003 D-A

Integrally Welded Lug D1.20

3

571900 54-SCR-5F-WD-004 D-A

Integrally Welded Lug D1.20

4

VT-1

3 - - - - X - - - - - - -

V .. .i C. .. . ... N..-.S.. S . . A.....

VT-1 Code Case N-509 **N/A**

3- - - - X - - - - - - -

Page 253: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 232

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS0

Spent Fuel Pool Cooling Filter 11

ZONE NUMBER: 54.0 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDEMETH

PLAN STATUS PRESERVICE YEAR

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -O U T A G E - - - - - - INSTRUCTIONS

1 2 3 4 1 2 3 4 1 2 3 4 **CALIRATION LOCK**- _L_

SFPCF 54-03 (REF. DWG. NO. C-27171-C)

Code Case N-491-1574800 FP-54-03 F-A

FP Filter 11 Support F1.40

VT-3

3 - - - - X - - - - - - -

Page 254: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 233

Spent Fuel Pool Cooling Heat Exchanger 12

ZONE NUMBER: 54.0 TINQDCTION TNTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDEMETHi

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - - 1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4FPRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**- I1

SFPCHE 54-04 (REF. DWG. NO. C-27171-C)

575300 FP-54-04

FP Hx 12 Support

F-A

Fl.40

VT-3 Code Case N-491-1

**N/A**

3 - - - - X - - - - - - -

Code Case N-509 **N/A**575400 FP-54-04-WD-001

FP Hx 12 Front

Integral Attachment

D-A

D1.10

VT-1

3- - - - - - - - X - - -

Code Case N-509 **N/A**575500 FP-54-04-WD-002 D-A

FP Hx 12 Rear Integral D1.10

Attachment

VT-i

3-_ - - -

Page 255: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 234

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

Spent Fuel Pool Cooling Pump 11

ZONE NUMBER: 54.0INSPECTION INTI

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

'RVAL

NDEHETH

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- - - - - -3 U T A G 4 - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOaCK**

SFPCCP 54-01 (REF. DWG. NO. C-27171-C)

575600 FP-54-01

Pump Support

F-A

F1.40

VT-3 Code Case N-491-1

**N/A**3- - - - - - - - X - - -

Page 256: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 235

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

Spent Fuel Pool Cooling Surge Tank

6UNI4 IUl<K:Da.Z. . INSPECTION INTE

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

:RVAL

NDE JMETH|

FIRSTPERIOD

1 2 3 4

FIRST PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

FPRESERVICE YEARINSTRUCTIONS

** CLIBRATION BLOCK *

*

SFPCST 54-68 (REF. DWG. NO. C-27171-C)

575800 TK-54-68

Surge TX Support

F-A

F1.40

VT-3 Code Case N-491-1

**N/A**

3 - - - - X - - - - - - -

Page 257: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 236DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

Spent Fuel Pool Cooling System

ZONE NUMBER: 57.0 INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDETMETH|

PLAN STATUS

FIRST SECOND THIRDPERIOD PERIOD PERIOD

- U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

.

I

Spent Fuel Pool Cooling Line (REF. DWG. NO. C-27172-C)

576000 57-R3-C

Pipe Stanchion

F-A

Fl. 30

VT'-3U-Bolt, Code Case

N-491-1 **N/A**

3- - - - - - - - X - - -

Page 258: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 237DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

Reactor Building Closed Loop Cooling

ZONE NUMBER: 70.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDE HMETH|

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

F INSTRUCTIONS**CALIBRATION BLOCK**

- -I-

RBCLC Line (REF. DWG. NO. C-26855-C)

582900 70-R17-D

Rod Hanger

F-A

Fl.30

VT-3 Code Case N-491-1

**N/A**

3- - - - - - - - X -

583200 70-R17-I

Rod Hanger

F-A

Fl.30

VT-3 Code Case N-491-1

**N/A**3-_ - - -

583700 70-R17-N

Rod Hanger

F-A

Fl. 30

VT-3 Code Case N-491-1

**N/A**

3 - - - - - - - - X - - -

584000 70-R19-A

Pipe Stanchion

584100 70-R19-B

Pipe Stanchion

F-A

Fl.30

F-A

Fl. 30

VT-3

3-_ - - -

Code Case N-491-1

**N/A**

.............................................

Code Case N-491-1

**N/A**

VT-3

3-_ - - -

584200 70-R19-C

Pipe Stanchion

F-A

Fl. 30

VT-3

3- - - - - - - -

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**588400 70-R7-G

Rod Hanger

F-A

Fl.30

VT-3

3 - - … - - - - - X

588500 70-R7-H

Rod Hanger

F-A

Fl. 30

VT-3 Code Case N-491-1

**N/A**3-_ - - -

588600 70-R7-I

Rod Hanger

590700 70-R9-A

Pipe Stanchion

F-A

Fl. 30

F-A

Fl.30

VT-3 Code Case N-491-1

**N/A**

3-H - - -

VT-3 Code Case N-491-1

**N/A**

3 - - - - -

Page 259: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 238

Reactor Building Closed Loop Cooling

ZONE NUMBER: 70.0 INSPF

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

590800 70-R9-A-WD-001

Pipe Stanchion

fr.TTON INTERVAL PLAN STATUS

ASME 1SEC. XI

CATEGY NDE -

ITEM NO METH 1

FIRST SECOND

PERIOD PERIOD

- O U T A G E -

THIRDPERIOD

- - - - -

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**2 3 4 1 2 3 4 1 2 3 4

Code Case N-509 **N/A**D-A

Dl.20

VT-i

3 - - - - X -

591700 70-R9-F

Pipe Stanchion

F-A

Fl .30

VT-3Code Case N-491-1

**N/A**

3 - - - S - -

Code Case N-509 **N/A**591800 70-R9-F-WD-001

Pipe Stanchion

D-A

Dl. 20

VT-i

3- - - - X - - - - - - -

592300 70-S3

Pipe Stanchion

F-A

Fl .30

VT-3Code Case N-491-1

**N/A**

3-_ - - -

Code Case N-509 **N/A**592400 70-s3-WD-001

Pipe Stanchion

D-A

DI. 20

VT-i

3 - - - - - - - -

594500 70-SC-3

Seismic Box Restraint

F-A

Fl. 30

VT-3Code Case N-491-1

**N/A**

3- - - - - - - X - -

597200 70-SC-8

Seismic Box Restraint

F-A

F1. 30

VT-3 Code Case N-491-1

**N/A**

3- - - - X - - - - - - -

597300 70-SC-9 F-A

Seismic Pipe Restraint F. 30

VT-3Code Case N-491-1

**N/A**

3- - - - X - - - - - - -

599900 70-SCR-SA

Box Restraint

F-A

Fl. 30

VT-3Code Case N-491-1

**N/A**

3-_ - - -

VT-1 Code Case N-509 **N/A**600000 70-SCR-8A-WD-001

Integral Attachment

D-A

DI.203-_ - - -

Page 260: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 239

Reactor Building Closed Loop Cooling

ZONE NUMBER: 70.0INSPECTION INTERVAL PLAN STATUS r PRESERVICE YEAR

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

600100 70-SCR-SA-WD-002

Integral Attachment

ASME

SEC. XI

CATEGYITEM NO

D-A

DI. 20

MET-

VT -1

3

FIRSTPERIOD

1 2 3 4

SECONDPERIOD

0 U T A G E -

1 2 3 4

THIRDPERIOD

1 2 3 4

INSTRUCTIONS

**CALIBRATION BLOCK**

Code Case N-509 **N/A**

_ - - - - - X

. C ...... ......... ...... N./...A ....... ....

Code Case N-509 **N/A**600200 70-SCR-SA-WD-003

Integral Attachment

D-A

DI.20

VT-1

3- - - - - - - - X - - -

Code Case N-509 **N/A**600300 70-SCR-SA-WD-004

Integral Attachment

D-A

Dl. 20

VT-1

3- - - - - - - - X - - -

601800 70-SR-23 F-A

Seismic Box Restraint F1.30

601900 70-SR-24 F-A

Seismic Box Restraint Fl.30

VT-3 Code Case N-491-1

**N/A**3- - - - - - - - X - - -

VT-3

_....... ... ... .............. .......... ....... ..... ......... ....... ....... ..... ... ....... ...... . .... ..........

Code Case N-491-1

**N/A**- -- X - - -3 - - - -

602200 70-SR-27 F-A

Seismic Box Restraint F1.30

VT-3 Code Case N-491-1

**N/A**3- - - - - - - - X - - -

Page 261: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

PAGE: 240DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

Reactor Building Closed Loop Cooling Heat Exchange

ZONE NUMBER: 70.0 INSPECTION INTERVAL

ASHE.

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

RBCLCHE 70-13R (REF. DWG. NO. C-26855-C)

PLAN STATUS

FIRST SECOND THIRD

PERIOD PERIOD PERIOD

- - - - - - 1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 1 2 3 4

IPRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**_ _-

603400 70-13R

RBCLCHE Support

F-A

Fl. 40

VT-3 Code Case N-491-1

***N/A**

3 X - - - - - - - - - -

Code Case N-509 **N/A**603500 70-13R-WD-001 D-A

RBCLCHE Front Integral D1.10

Attachment

603600 70-13R-WD-002 D-A

RBCLCHE Rear Integral D1.10

Attachment

VT-1

3 XVd - - - -i Cd C N *

..... .. ... . . - . . . .- .

VT-1 Code Case N-509 **N/A**

3X - - - - - - - -

Page 262: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 241

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS0

Reactor Building Closed Loop Cooling MU Tank

ZONE NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - - - - - - OUTAGE- - - - - -

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

RBCLC M.U. Tank 71-126 (REF. DWG. NO. C-26855-C)

FPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

_ _

604300 71-126

CLC M.U. Tank

F-A

Fl. 40

VT-3Code Case N-491-1

**N/A**

3- - - - - - - - X - - -

Page 263: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1 PAGE: 242

0 INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

Reactor Building Closed Loop Cooling Pump

ZONE NUMBER: 70.0 INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND THIRD

SEC. XI PERIOD PERIOD PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - - - - - - O U T A G E - - - - - -

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

RBCLCP 70-01 (REF. DWG. NO. C-26855-C)

_~

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

604400 70-01

RBCLC Pump Support

F-A

Fl .40

VT-3Code Case N-491-1

**N/A**

3- - - -

Page 264: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION:

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 243

0

Emergency Service Water

ZONE NUMBER: 72.0 T iNSPECfTl INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY

NUMBER IDENTIFICATION ITEM NO

NDE|MBTH|

FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

1 U T A G E - - - - - -

1 2 3 4 1 2 3 4 FPRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

- I _ _ _ _ __

ESW Line (REF. DWG. NO. F-45235-C)

604700 72-Al

Pipe Stanchion

.1 .... .... .....................

604800 72-Al-WD-OOl

Pipe Stanchion

604900 72-A2

Pipe Stanchion

F-A

Fl.30

........... ...........

D-A

D1.20

F-A

Fl 30

VT-3 Code Case N-491-1

**N/A**

3- - - - - - - - X - - -

Code Case N-509 **N/A**VT-1

3 - - - - - - - - X - - -

VT-3Code Case N-491-1

**N/A**

3 - - - - _ _ - - X - - -

Code Case N-509 **N/A**605000 72-A2-WD-001

Pipe Stanchion

D-A

D1. 20

VT-1

3- - - - - - X

607200 72-H159

Rod Hanger

F-A

Fl.30

VT-3

VT-3

Code Case N-491-1

**N/A**

3 X

607600 72-H162

Rod Hanger

F-A

Fl.30

Code Case N-491-1

**N/A**

3 X

607700 72-H163

Rod Hanger

608700 72-SC-4

Seismic Restraint

F-A

Fl. 30

F-A

F1.30

VT -3

VT -3

Code Case N-491-1

**N/A**

3 x

Code Case N-491-1

**N/A**

3 - - - - X -

Page 265: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

Emergency Service Water Pump 11

O.~_ I

PAGE: 244

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK*

ZONE NUMB -lz.u INSPECTION INTERVAL PLAN STATUS

ASME FIRST SECOND THIRD FSEC. XI PERIOD PERIOD - PERIOD

SUMMARY EXAMINATION AREA CATEGY NDE - - - - - - O U T A G E - - - - - -

NUMBER IDENTIFICATION ITEM NO METH 1 2 3 4 1 2 3 4 1 2 3 4

ESWP 72-04 (REF. DWG. NO. F-45235-C)

613300 72-04

Pump Support

F-A

Fl. 40

VT-3Code Case N-491-1

**N/A**

3- - - X-

.............. ............................................................................................................................... ................ .....

4.

Page 266: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 245

Reactor Containment Spray

ZONE NUMBER: 93.0INSPECTION INTERVAL

ASME

SEC. XI

SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH 1FIRSTPERIOD

1 2 3 4

PLAN STATUS

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS**CALIBRATION BLOCK**

12.0" Raw Water Line (REF. DWG. NO. 16)

613700 93-H3

Gravity Support

613900 93-H5

Gravity Support

F-A

F1.30

VT -3

3 X - - - - - - - - -

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**

F-A

Fl .30

VT-3

3 X- - - - - - - - -

614100 93-H7

Gravity Support

615100 93-RIO-A

Rod Hanger

F-A

Fl. 30

F-A

Fl .30

VT-3

3 x- - - - - - - - -

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**

VT-3

3- - - - X - - - - - - -

615400 93-RI1-A2

Rod Hanger

F-A

Fl. 30

VT-3 Code Case N-491-1

**N/A**3 - - - X - - -

616400 93-R13-B

Rod Hanger

F-A

Fl. 30

VT-3 Code Case N-491-1

**N/A**3 - - - -

617500 93-R16-A

Pipe Stanchion

F-A

Fl.30

VT-3 Code Case N-491-1

**N/A**3 X- - - - - - - - -

617600 93-R16-A-WD-001

Pipe Stanchion

617700 93-R16-B

Pipe Stanchion

617900 93-R16-C

Pipe Stanchion

D-A

D1.20

F-A

Fl.30

VT-1 Code Case N-509 **N/A**

3 x- - - - - - - - - -

VT-3

VT-3

Code Case N-491-1

**N/A**

F-A

Fl.30

Code Case N-491-1

**N/A**3 X

Page 267: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 246

Reactor Containment Spray

ZONE NUMBER: 93.0INSP

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

618000 93-R16-C-WD-001

Pipe Stanchion

ECTION INTERVAL PLAN STATUS_ r

ASME

SEC. XICATEGYITEM NO

D-A

D1. 20

NDE 1-METH 1

VT-1

FIRSTPERIOD

2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**

Code Case N-509 **N/A**

3 x- - - - - - - - -

621000 93-R2-C

Spring Hanger

F-A

Fl .30

VT-3 Code Case N-491-1

**N/A**3 X- - - - - - - -

.. .1 . . . . ...... .... .................................................. .................

621100 93-R2-C-WD-001 D-A

Integral Attachment D1.20

...........................................................

Code Case N-509 **N/A**VT-1

3 x- - - - - - - - - -

628300 93-SCR-IOA

Seismic Restraint

628400 93-SCR-1OB

Seismaic Restraint

F-A

Fl .30

F-A

Fl. 30

VT-3

3 - - X - - - -

................................ ........................

Code Case N-491-1

**N/A**

Code Case N-491-1

**N/A**

VT-3

3- - - - X

637000 93-SCR-4A

Seismic Box Restraint

F-A

Fl. 30

VT-3

.... ................................C.....

Code Case N-491-1

**N/A**3 X - - -

............. ........... ............. ..............

Code Case N-509 **N/A**637100 93-SCR-4A-WD-001

Integral Attachment

637200 93-SCR-4A-WD-002

Integral Attachment

637300 93-SCR-4A-WD-003

Integral Attachment

637400 93-SCR-4A-WD-004

Integral Attachment

D-A

D1.20

D-A

D1.20

D-A

D1.20

D-A

D1.20

VT-1

3 X- - - - - - - - -

............................................. . .... .......

Code Case N-509 **N/A**VT-1

3 X- - - - - - - -

VT-1

............................................................................................... ...

Code Case N-509 **N/A**

3 X- - - - - - - - -

......................................... ..... ... .....

Code Case N-509 **N/A**VT-1

3 X- - - - - - - - -

Page 268: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 247

Reactor Containment Spray

ZONE NUMBER: 93.0INSPECTION INTERVAL

ASME

SEC. XI

PLAN STATUS I

1FIRSTPERIOD

1 2 3 4

SECOND THIRDPERIOD PERIOD

O U T A G E- - - - - -

1 2 3 4 1 2 3 4

PRESERVICE YEAR

INSTRUCTIONS

**CALIBRATION BLOCK**SUMMARY EXAMINATION AREA CATEGY NDE

NUMBER IDENTIFICATION ITEM NO METH

642000 93-SCR-7A1 F-A VT-3

__ _ _.__

Code Case N-491-1

**N/A**3 X - - - - - - - - - - -Seismic Box Restraint Fl .30

Code Case N-509 **N/A**642100 93-SCR-7A1-WD-001

Integral Attachment

I .. . ... .. .

642200 93-SCR-7A1-WD-002

Integral Attachment

D-A

Dl. 20

D-A

DI.20

VT-1

3 X -

Code Case N-509 **N/A**VT-I

3 X -

Code Case N-509 **N/A**642300 93-SCR-7A1-WD-003

Integral Attachment

. . . .... ... ................ ...............

642400 93-SCR-7A1-WD-004

Integral Attachment

D-A

DI. 20

VT-1

3 X - - - - - - - - - -

Code Case N-509 **N/A**D-A

Dl. 20

VT-i

3 x - - - - - - - - - -

648000 93-SCR-9A

Seismic Box Restraint

F-A

FI.30

VT-3 Code Case N-491-1

**N/A**3 X - - - - - - -

Code Case N-509 **N/A**648100 93-SCR-9A-WD-001

Integral Attachment

648200 93-SCR-9A-WD-002

Integral Attachment

648300 93-SCR-9A-WD-003

Integral Attachment

648400 93-SCR-9A-WD-004

Integral Attachment

D-A

D1.20

D-A

D1. 20

D-A

D1.20

D-A

D1.20

VT-I

3 x - - - - - - - - - -

Code Case N-509 **N/A**VT-i

3 X - - - - - - - - -

Code Case N-509 **N/A**VT-i

3 X- - - - - - - - -

Code Case N-509 **N/A**VT-1

3 X - - -

Page 269: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

DATE: 10/15/99

REVISION: 0

NINE MILE POINT NUCLEAR PLANT UNIT 1

INSERVICE INSPECTION TEN-YEAR PLAN

CLASS 3 SECTION XI SCHEDULED COMPONENTS

PAGE: 248

Reactor Containment Spray Raw Water Punp 111

ZONE NUMHER: 93.0

SUMMARY EXAMINATION AREA

NUMBER IDENTIFICATION

INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR

ASME FIRST SECOND THIRD _

SEC. XI PERIOD PERIOD PERIOD

CATEGY NDE - - - - - -N U T A G E - - - - - - INSTRUCTIONS

ITEM NO HETH 1 2 3 4 1 2 3 4 1 2 3 4 **CALIBRATION BLOCK**

RCSRWP 111 (REF. DWG. NO. 16)

649500 RWP-111

Pump Support

F-A

Fl. 40

VT-3 Code Case N-491-1

**N/A**3 - - - - X - - - - - - -

Page 270: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N V NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 22 of 40

APPENDIX AACCEPTANCE CRITERIA

Indications detected by inservice examinations, shall be compared against the acceptance criteria of Section Xl as definedin Tables A-1 through A-4.).

B-A Welds In Reactor Vessels IWB-3510

B-B Welds in Other Vessels IWB-3510

B-D Vessel Nozzle Welds IWB-3512

B-E Partial Penetration welds in Vessels IWB-3522

B-F, B-J Dissimilar and Similar Metal Welds In Piping IWB-3514

B-G-1 Bolting > 2" dia. IWB-3515/3517

B-G-2 Bolting_ 2" dia. IWB-3517

B-H, B-K-1 Integral Attachments for Piping, Valves, Pumps & Vessels IWB-3516

B-L-1, B-M-1 Welds in Pumps & Valves IWB-3518

B-L-2, B-M-2 Pump Casings & Valve Bodies IWB-3519

B-N-1 B-N-2 Interior Surfaces & Internal Components of Reactor Vessels IWB-3520.1B-N-3 IWB-3520.2

B-O Control Rod Drive Housing Welds IWB-3523

B-P Pressure Retaining Boundary IWB-3522

B-Q Steam Generator Tubing IWB-3521

File: NMP1 ISIPL.wpd

Page 271: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N v NIAGARA NUCLEAR POWER STATIONnU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 23 of 40

C-A Welds In Pressure Vessels IWC-351 0

C-B Nozzle Welds in Vessels IWC-3511

C-C Integral Attachments for Vessels, Piping, Pumps and Valves IWC-3512

C-D Bolting IWC-3513

C-F-1, C-F-2 Welds In Piping IWC-3514

C-G Welds in Pumps and Valves IWC-3515

C-H Pressure Retaining Components IWC-3516

r D-A Pressure Boundary (VT-2) ANo Leakage *Mfg. Code &Integral Attachments (VT-3) Applicable Standards

D-B Pressure Boundary (VT-2) ANo Leakage *Mfg. Code &Integral Attachments (VT-3) Applicable Standards

D-C Pressure Boundary (VT-2) IWA-5250 *Mfg. Code &l Integral Attachments (VT-3) Applicable Standards

* ASME Section Xl Acceptance Standard in course of preparation.

A Defined as no leakage from the pressure boundary, in excess of that which is expected and determined to be within acceptable limits,i.e., at valve packing, bolted connections, pump seals, etc.

11 F-A I Supports I IWF-3410 11

File: NMP1 ISIPL.wpd

Page 272: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 24 of 40

VT 2.01 Note 1 "ASME Xi Visual Examination Procedure"

PT 3.00 Note 1 "Liquid Penetrant Examination Procedure"

MT 4.00 Note 1 "Magnetic Particle Examination Procedure"

RT 5.00 Note 1 "Radiographic Examination"

UT 6.01 Note 1 "Ultrasonic Linearity Verification"

UT 6.04 Note 1 "Ultrasonic Examination of Bolts, Studs, Nuts and CylindricalComponents"

UT 6.05 Note 1 "Ultrasonic Thickness Measurement"

UT 6.06 Note 1 "Ultrasonic IGSCC Sizing Procedure" (Manual)

UT 6.07 Note 1 "Ultrasonic Examination of Nozzle Inner Radii"

UT 6.09 Note 1 "Ultrasonic Examination Procedure for RPV Flange Weld and StudHole Threads in the RPV Flange"

UT 6.10 Note 1 "System Performance Checks"

UT 6.13 Note 1 "Ultrasonic Examination of Bi-Metallic Piping Welds"

UT 6.15 Note 1 "Ultrasonic Examination to Determine Water Level"

UT 6.16 Note 1 "Ultrasonic Thickness Measurement Utilizing Digital Equipment"

UT 6.19 Note 1 "Freeze Seal Ultrasonic Examination Procedure for Ferritic Pipe andFittings"

UT 6.20 Note 1 "Ultrasonic Examination of Reactor CRD Housings"

UT 6.21 Note 1 "Ultrasonic Examination Procedure for Vessel Welds 2" Thick orLess and Associated Nozzle Inner Radius Areas"

UT 6.23 Note 1 "Ultrasonic Examination of Ferritic Pipe Welds"

UT 6.24 Note 1 "Ultrasonic Examination of Austenitic Pipe Welds"

UT 6.25 Note 1 "Straiqht Beam Ultrasonic Examination of Bolts and Studs"

File: NMP1 ISIPL.wpd

Page 273: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N Y NIAGARA NUCLEAR POWER STATIONNU MOHAWK I

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 25 of 40

SP 7.00 Note 1 "Standard Method for Etching Metals and Alloys"

SP 7.01 Note 1 "Hardness Testing of Metals"

SP 7.02 Note 1 "Visual Examination of Welding Operations"

SP 7.03 Note 1 "Visual Examination of Brazed Joints"

SP 7.04 Note 1 "Measuring Coating Thickness by Use of Eddy Current"

SP 7.05 Note 1 "Weld Detection by Use of Eddy Currents"

ET 8.00 Note 1 "Eddy Current Examination of Nonferromagnetic Heat ExchangeTubing"

Note 1: See controlled copy of NDE Procedures for latest approved revision.

File: NMP1 ISIPL.wpd

Page 274: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N7 NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 26 of 40

1-2 NMP1 -29-SE-1 1.655/1.1501.151.11

1-3 NMP1-28-2.00-SS 2.055

1-4 NMP-28-1.200-SS 1.109

1-6 NMP1 -24-SE-1 1.475

1-7 NMP1 -24-080-CS 1.219

1-8 NMP1 -20-1.500-CS 1.63

1-12 NMP1-18-1.375-CS 1.375

1-13 NMP1-18-1.156-CS 1.156

1-14 NMP1-18-.937-CS-106 .937

1-16 NMP-18-120-CS 1.375

1-17 NMP-18-100-CS 1.156

1-21 NMP1-16-120-CS 1.24

1-22 NMP-16-100-CS 1.031

1-23 NMP1-16-.375-CS-106 .375

1-25 NMP1-14-120-CS 1.219

1-28 NMP1 -14-XX2-SS .935

1-29 NMP-14-XX1 -SS .760

1-30 NMP-14-STD-CS .375

1-32 NMP1-12-1.44-CS-105 1.44

1-33 NMP1-12-.688-SS .688

1-36 NMP1-12-XX2-SS .855

1-37 NMP-12-XX1-SS .720

1-38 NMP-12-STD-CS .375

File: NMP1 ISIPL.wpd

Page 275: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N V NIAGARA NUCLEAR POWER STATIONnU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Pace 27 of 40

1-40 NMP1-10-.594-CS .700

1-42 NMP1-10-.522-SS-F2 .522

1-43 NMP1-10-.500-SS-403 .500

1-44 NMP1 -10-160-SS 1.141

1-47 NMP1-10-100-CS .75

1-49 NMP1 -1 0-80-CS .600

1-50 NMP-10-XX1 -SS .727

1-51 NMP1-10-XX1-SS-358 .591

1-52 NMP1-10-SE-1 .900

1-55 NMP1-8-120-CS .720

1-56 NMP1 -8-80-CS .495

1-61 NMP1-6.25-RPV-STUD 2.72

1-62 NMP1-6-.596-SS .596

1-64 NMP1-6-160-CS .720

1-65 NMP1 -6-80-SS .432

1-66 NMP-6-080-CS .432

1-68 NMP1 -6-80-SS-312 .432

1-69 NMP1-6-SE-2 1.5

1-70 NMP1 -6-SE-1 .75

1-77 NMP1 -4-80-CS .337

1-81 NMP1 -2.75-RCP-STUD

1-82 NM1-2.50-B16-1

1-83 NM1 -2.50-B1 6-2

1-84 NM1-2.25-B16

File: NMP1 ISIPL.wpd

Page 276: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N V NIAGARA NUCLEAR POWER STATIONLU MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 28 of 40

1-92 NMP1-FW-1.50-CS-516 LAB

1-94 FWMU-N1-P3-8.1-RV LAB

1-96 NMP1-IR-9 LAB

1-97 NMP1-IR-7.5 LAB

1 -98 NMP1-IR-5.5 LAB

1-99 NMP11-IR-3.3 LAB

1-100 NMP11-IR-1.7 1.7

1-108 NMP-80XI-N278-ALT-BL1 10.75

1-111 NMP1 -SW-1 020-CS .1-3.00

1-113 NMP1 -SW-304-SS .1-3.00

1-114 NMP1-SW-600-IN .1-1.0

1-128 P8R-1.260 1.260

1-130 P8R-.75-1 .75

1-133 P8R-.3-1 .3

1-137 PIS-6.25 2.72

1-138 PIS-2.5 16.7

1-140 PIR-1.5-1 1.5

1-143 PIN-6.25 1.62

1-146 PIF-1.5C 1.5

1-158 NMP1-RPV-4 27.0

1-159 NMP1-RPV-1 4.60

1-165 NMP-EPRI-CS

1-166 NMP-EPRI-SS

2-1 NMP2-48-3.50-CS 3.50

File: NMP1 ISIPL.wpd

Page 277: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

U NIAGARA NUCLEAR POWER STATION

NU MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999PLAN AND SCHEDULE Paae 29 of 40

2-2 NMP2-30-2.90-CS 2.90

2-3 NMP2-28-2.60-CS 2.60

2-4 NMP2-28-1 .34-CS 1.34

2-5 NMP2-27-1.57-CS 1.57

2-6 NMP2-26-1.26-CS 1.26

2-7 NMP2-25-1 .84-NOZ 1.84

2-8 NMP2-24-2.469-CS 2.469

2-9 NMP2-24-2.06-CS 2.06

2-10 NMP2-24-1.317-SS 1.317

2-11 NMP2-24-1.234-SS 1.234

2-12 NMP2-24-1.219-CS 1.219

2-13 NMP2-24-1.002-SS 1.002

2-14 NMP2-24-.500-SS .500

2-15 NMP2-24-.500-CS .500

2-16 NMP2-24-.375-CS .375

2-17 NMP2-20-1.031 -SS 1.031

2-18 NMP2-20-1.031 -CS 1.031

2-19 NMP2-20-.84-SS .84

2-20 NMP2-20-.812-CS .812

2-21 NMP2-20-.594-CS .594

2-22 NMP2-20-.500-CS .500

2-23 NMP2-20-.375-CS .375

2-24 NMP2-20-.375-SS .375

2-25 NMP2-18-.938-CS .938

File: NMP1 ISIPL.wpd

Page 278: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMPI-ISI-003-10

N Y NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 30 of 40

2-26 NMP2-18-.500-CS .500

2-27 NMP2-18-.375-CS .375

2-28 NMP2-18-.375-SS .375

2-29 NMP2-16-1.031 -CS 1.031

2-30 NMP2-1 6-.822-SS .822

2-31 NMP2-16-.500-CS .500

2-32 NMP2-1 6-.375-SS .375

2-33 NMP2-16-.375-CS .375

2-34 NMP2-14-.375-CS .375

2-35 NMP2-12-1.00-SS 1.00

2-36 NMP2-12-.844-SS .844

2-37 NMP2-12-.844-CS .844

2-38 NMP2-12-.688-CS .688

2-39 NMP2-12-.688-SS .688

2-40 NMP2-12-.657-SS .657

2-41 NMP2-12-.375-SS .375

2-42 NMP2-12-.375-CS .375

2-43 NMP2-1 1.625-1.125-CS 1.125

2-44 NMP2-1 0-1.00-CS 1.00

2-45 NMP2-10-.719-CS .719

2-46 NMP2-10-.594-CS .594

2-47 NMP2-10-.365-CS .365

2-48 NMP2-9.3-1.77-CS 1.77

2-49 NMP2-8-.906-CS .906

File: NMP1 ISIPL.wpd

Page 279: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N v NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 31 of 40

.7182-50~ NMP2-R-_718-CS

2-51 NMP2-8-.594-CS .594

2-52 NMP2-8-.500-CS .500

2-53 NMP2-8-.322-SS .322

2-54 NMP2-8-.322-CS .322

2-55 NMP2-6.3-1.24-CS .562

2-57 NMP2-6-.432-CS .432

2-58 NMP2-6-.280-CS .280

2-59 NMP2-5.8-.365-SS .365

2-60 NMP2-5.25-.69-NOZ .69

2-61 NMP2-5-.78-CS .78

2-62 NMP2-4-.337-SS .337

2-63 NMP2-4-.337-SS-182 .337

2-64 NMP2-4-.337-CS .337

2-65 NMP2-4-.250-CS .250

2-66 NMP2-4-.250-SS .250

2-67 NMP2-3.25-23.5-STUD 23.5

2-68 NMP2-2.25-10-STUD 10.0

2-69 NMP2-IR-9-CS 9.0

2-70 NMP2-IR-7.5-CS 7.5

2-71 NMP2-IR-4-CS 4.0

2-72 NMP2-RHS-.75-CS .75

2-73 NMP2-RHS-IR-3.75-CS 3.75

2-74 NMP2-FLG-RPV 38.0

File: NMP1 ISIPL.wpd

Page 280: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N ' NIAGARA NUCLEAR POWER STATION

U MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 32 of 40

2-75 NMP2-RPV-STUD-1 2.69

2-76 NMP2-RPV-NUT-1 7.125

2-77 NMP2-128-1-RPV 5.25

2-78 NMP2-127-1-RPV 3.18

2-79 NMP2-126-1-RPV 7.90

2-80 NMP2-125-1-RPV 6.80

2-81 NMP2-124-1-RPV 6.68

2-82 NMP2-123-1 -RPV 8.11

2-900 GE795E254G3

2-84 NMP2-2.24-15.88-STUD 15.88

1-95 HJT-6-13-A .55

File: NMP1 ISIPL.wpd

Page 281: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N v NIAGARA NUCLEAR POWER STATIONNU MOHAWK l

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15, 1999PLAN AND SCHEDULE Paae 33 of 40

C-26830-C 01 Main Steam

C-26831-C 02 Main Steam

C-26832-C 03 Main Steam

C-27165-C 05 Emergency Condenser Vent

C-27165-C 05.1 Emergency Condenser Vent

C-27165-C 05.2 Emergency Condenser Vent

C-26839-C 31 High Pressure Reactor Feedwater

C-26846-C 32 Reactor Recirculation

C-26852-C 33 Reactor Clean UP

C-26852-C 33.1 Reactor Clean UP

C-26839-C 33.2 Reactor Clean UP

C-26839-C 33.3 Reactor Clean UP

C-26851-C 34 Reactor Head Spray

F-45028-C 36 Reactor Instrumentation

C-26852-C 37 Reactor Drain

C-45060-C 37 Reactor Head Vent

C-26852-C 37.1 Reactor Drain

C-26847-C 38 Reactor Shutdown Cooling

C-26843-C 39 Emergency Condenser

C-26844-C 40 Reactor Core Spray

C-35682-C 40.1 Reactor Core Spray

C-27168-C 41 Liquid Poison

C-27168-C 42 Liquid Poison

File: NMP1ISIPL.wpd

Page 282: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N V NIAGARA NUCLEAR POWER STATIONNU MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 34 of 40

C-27168-C 42.1 Liquid Poison

C-26849-C 44.1 Control Rod Drive Hydraulic

C-34124-C 44.2 Control Rod Drive Hydraulic

C-27171-C 54 Fuel Pool Cooling

C-27178-C 66 Main Steam Line

C-26855-C 70 Reactor Building Closed Loop Cooling

C-39816-C 70 Closed Loop Cooling

C-27179-C 72 Service Water System

F-45236-C 72 Service Water System

C-26848-C 80 Reactor Containment Spray

C-27181-C 80.1 Reactor Containment Spray

C-26845-C 81 Reactor Core Spray

C-26845-C 81.1 Reactor Core Spray

C-27183-C 93 Containment Spray Cooling Raw Water

1 N/A Weld Map Index

2 01 Main Steam

2A 01 Main Steam

2B 01 Main Steam

3 02 Main Steam

3A 02 Main Steam

4 03 Main Steam Turbine By Pass to Condenser

5 31 Reactor Feedwater

5A 31 Reactor Feedwater

6 34 Reactor Head Spray

File: NMP1 ISIPL.wpd

Page 283: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N v NIAGARA NUCLEAR POWER STATIONN U MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 35 of 40

7 32 Reactor Recirculation

7A 32 Reactor Recirculation

7B 32 Reactor Recirculation Pump Discharge Instrumentation

7C 32 Reactor Recirculation Pump Instrumentation

7D 36 Reactor Recirculation Pump Seal Cavity Instrumentation

8 36 Reactor Instrumentation Level Protection System

8A 36 Reactor Instrumentation Level Control Range

8B 36 Reactor Instrumentation Level Control Range

8C 36 Reactor Instrumentation Level Protection System

8D 36 Reactor Instrumentation Wide Range Level

8E 36 Reactor Instrumentation Seal Leak Detection

8F 36 Reactor Instrumentation Level Triple Low

8G 36 Reactor Instrumentation Level Triple Low

8H 36 Reactor Instrumentation Emergency Condenser Steam

8J 36 Reactor Instrumentation Emergency Condenser Steam

9 37, 37.1 Reactor Head Vent and Drain

10 38 Reactor Shutdown Cooling

1 OA 38 Reactor Shutdown Cooling

11 39 Emergency Condenser Steam Supply

11A 39 Emergency Condenser Steam Return

11 B 39 Emergency Condenser Drain and Overflow Lines

12 40, 40.1 Reactor Core Spray

12A 40,40.1 Reactor Core Spray

13 80,80.1 Reactor Core Spray

File: NMP1 ISIPL.wpd

Page 284: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10N NIAGARA NUCL EAR POWER STATIONN MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 36 of 40

13A 80,80.1 Reactor Core Spray

13B 80,80.1 Reactor Core Spray

13C 80,80.1 Reactor Core Spray

14 42.1 Liquid Poison

15 80 Reactor Containment Spray

15A 80 Reactor Containment Spray

15B 80 Reactor Containment Spray

15C 80 Reactor Containment Spray

15D 80 Reactor Containment Spray

16 93,93.1 Reactor Containment Spray

16A 93,93.1 Reactor Containment Spray

16B 93,93.1 Reactor Containment Spray

16C 93,93.1 Reactor Containment Spray

17 44.2 Control Rod Drive

17A 44.2 Control Rod Drive

18 44.1 Control Rod Drive

19 44.3 Control Rod Drive

20 33,33.2,33.3 Reactor Clean Up

21 27 Reactor Head Spray

22 05,05.1,05.2 Emergency Condenser Vent

22A 05,05.1,05.2 Emergency Condenser Vent

23 23 Main Steam Line Drain

24 66 Main Steam Power Operated Relief Valve Discharge

24A 66 Main Steam Power Operated Relief Valve Discharge

File: NMP1 ISIPL.wpd

Page 285: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

Nv NIAGARA NUCLEAR POWER STATIONN U MOHAWK

THIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 37 of 40

_ 25 | 80.1 Reactor Containment SprayI

25A 80.1 Reactor Containment Spray

26 41,42 Liquid Poison

28 00.0 Reactor Vessel

28A 00.0 Reactor Vessel

i

___________________ A _______________ L

File: NMP1 ISIPL.wpd

Page 286: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMPl-ISI-003-10

N NIAGARA NUCLEAR POWER STATIONN MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 38 of 40

APPENDIX EASME CODE CASES

The following ASME Code Cases have been reviewed for possible use during the Third Inservice Inspection Interval. CodeCases used during the inspection interval shall be identified with the specific component within the Inspection/ ExaminationTables.

ASME CODE CASE LISTING

CODE CASE TITLE RG 1.147 IMPLEMENTEDNUMBER Revision IN PROGRAM

N-236-1 Repair and Replacement of Class MC Vessels, Section Xl, Rev. 12 NoDivision 1.

N-355 Calibration Block for Angle Beam Ultrasonic Examination of Rev. 12 NoLarge Fittings in accordance with Appendix 111-3410, Section XI,Division 1.

N-389-1 Alternative Rules for Repairs, Replacements, or Modifications, Rev. 12 NoSection Xl, Division 1

N-416-1 Alternative Pressure Test Requirement for Welded Repairs or Rev. 12 YesInstallation of Replacement Items by Welding, Class 1, 2 and 3,Section Xl, Division 1.

N-432 Repair Welding Using Automatic or Machine Gas Tungsten-Arc Rev. 12 NoWelding (GTAW) Temper Bead Technique, Section Xl, Division1.

N-457 Qualification Specimen Notch Location for Ultrasonic Rev. 12 NoExamination of Bolts and Studs, Section XI, Division 1.

N-458-1 Magnetic Particle Examination of Coated Materials, Section XI, None NoDivision 1.

N-460 Alternative Examination Coverage for Class 1 and Class 2 Rev. 12 YesWelds, Section XI, Division 1

N-461 Alternative Rules For Piping Calibration Block Thickness, Section Rev. 12 NoXl, Division 1

N-472 Use of Digital Readout and Digital Measurement Devises for Rev. 12 Noperforming Pump Vibration Testing, Section XI, Division 1.

N-485-1 Eddy Current Examination of Coated Ferritic Surfaces as an Rev. 12 Noalternative to Surface Examination, Section Xl, Division 1.

N-490-1 Alternative Vision Test Requirements for Nondestructive Rev. 12 NoExaminers, Section XI, Division 1.

File: NMP1 ISIPL.wpd

Page 287: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N' NIAGARA NUCLEAR POWER STATION

NU MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 39 of 40

ASME CODE CASE LISTING

CODE CASE TITLE RG 1.147 IMPLEMENTEDNUMBER Revision IN PROGRAM

N-491 -1 Alternative Rules for Examination of Class 1, 2, 3, and MC Rev. 12 YesComponent Supports, Section Xl, Division

N-496-1 Helical Coil Threaded Inserts, Section XI, Division 1 Rev. 12 No

N-498-1 Alternative Rules for 10-Year System Hydrostatic Testing for Rev. 12 NoClass 1, 2 and 3 Systems, Section XI, Division 1

N-504-1 Alternative Rules for Repair of Class 1, 2 and 3 Austenitic Rev. 12 NoStainless Steel Piping, Section Xl, Division 1

N-509 Alternative Rules for the Selection and Examination of Class 1, 2 Rev. 12 Yesand 3 Integrally Welded Attachments, Section XI, Division 1

N-516 Underwater Welding, Section XI, Division 1 Rev. 12 No

N-522 Pressure Testing of Containment Penetration Piping, Section Xl, Rev. 12 NoDivision 1

N-523 Mechanical Clamping Devices for Class 2 and 3 piping, Section None NoXi, Division 1.

N-524 Alternative Examination Requirements for Longitudinal Welds in Rev. 12 YesClass 1 and Class 2 Piping, Section Xi, Division 1

N-526 Alternative Requirements for Successive Inspection of Class 1 None Yesand 2 Vessels, Section XI, Division 1

N-532 Alternative Requirements to Repair and Replacement None YesDocumentation Requirements and Inservice Summary ReportPreparation and Submission as required by IWA-4000 and IWA-6000, Section Xi, Division 1.

N-534 Alternative Requirements for Pneumatic Pressure Testing, None NoSection XI, Division 1

N-537 Location of Ultrasonic Depth Sizing Flaws, Section XI, Division 1. Rev. 12 No

N-554 Alternative Requirements for Reconciliation of Replacement None NoItems, Section XI, Division 1.

N-573 Transfer of Procedure Qualification Records Between Owners, None YesSection Xl, Division 1.

File: NMP1 ISIPL.wpd

Page 288: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer

NINE MILE POINT NMP1-ISI-003-10

N NIAGARA NUCLEAR POWER STATION

U MOHAWKTHIRD INSERVICE INSPECTION INTERVAL Rev. 0

TEN-YEAR INSERVICE INSPECTION Date: October 15,1999PLAN AND SCHEDULE Paae 40 of 40

END OF DOCUMENT

File: NMP1 ISIPL.wpd

Page 289: New N NIAGARA hU MOHAWK · 2014. 2. 19. · CAMP1 -ISI Program Manager Approved by: ie/ / Glenn R. erkins -Supervisor ASME Sectioh Xl Programs Approved by: -6' /C 7 V Wilfiam Y7aeer