new chaparral elementary school PROGRAMMING BOOK | APRIL 15, 2014 7601 jefferson ne, suite 100, albuquerque, nm 87109 | 505.761.9700 ph 505.761.4222 fx | www.dpsdesign.org
26

new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

Oct 29, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

new chaparral elementary schoolP R O G R A M M I N G B O O K | A P R I L 1 5 , 2 0 1 4

7601 jef ferson ne, su i te 100 , a lbuquerque, nm 87109 | 505 .761 .9700 ph 505 .761 .4222 fx | www.dpsdesign.org

Page 2: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

new chapar ra l e lementary schoo l | p rogramming book

Dekker/Perich/Sabatini 7601 Jefferson NE, Suite 100 Albuquerque, NM 87109 tel 505.761.9700fax 505.761.4222 www.dpsdesign.org

tab le of contents

INTRODUCTION

PROJECT TEAM AND COMMITTEE ....................................................................................................1

EXECUTIVE SUMMARY .......................................................................................................................2

PROGRAMMING

NUMERIC PROGRAM ..........................................................................................................................5

UTILIZATION.........................................................................................................................................9

SPACE DIAGRAMS- TEST FITS ............................................................................................................10

PROJECT SITE

SITE ANALYSIS ....................................................................................................................................11

SITE IMAGES .......................................................................................................................................12

SUPPORTING MATERIALS

PROJECT SCHEDULE ...........................................................................................................................13

PROJECT BUDGET ...............................................................................................................................14

REGIONAL DRAINAGE MANAGEMENT PLAN ...................................................................................15

FIVE MILE RADIUS MAP ......................................................................................................................16

ONE MILE RADIUS MAP ......................................................................................................................17

MEETING MINUTES ............................................................................................................................18

psfa rev iew phase checkl is t

Updated 3-5-12

Program Statement: Submit 1 (one) copy of:

□ Program statement follows completion of educational programming and affirms the overall project budget, the MACC portion of the budget, and establishes the goals, facts, regulations, conditions and concepts that bound the Project and describe such information as to who this project serves the needs of the school(s) and district

□ Provide the overall project budget with MACC as a subset estimate in a Level 1 Uniformat probable cost estimate

□ Identify regional drainage management plan that will be used to create the drainage solution for the proposed Project.

□ Include a 5 mile radius map with scale and north indicator shown, that indicates: a) proposed project location, including grade levels and contours; b) existing attendance centers including, grade levels; and c) including railroads, rivers, access highways, airports and similar obstructions, barriers or hazards. (Not required for building renovation/repair.)

□ If project is a remodel or renovation, indicate if project: will be a Level 1, 2 or 3 in accordance with the ICC Existing Building Code.

□ All documents shall be on 8 ½” x 11” sheet(s) or folded to fit into a letter size file folder.

Schematic Phase: Submit 1 (one) set (projects located in Bernalillo County, submit 2 sets and submit 5 additional site plans) of:

□ Provide the overall project budget with MACC as a subset estimate in a Level 1 UniFormat probable cost estimate

□ Preliminary Project Description (PPD) that clearly indicates the extent and relationship of the project components.

□ Schematic documents that include preliminary schematic drawings. □ Description of any special or unique conditions which could create an exception to Adequacy

Standards. □ Proposed building type. □ These documents should include a Site Plan, including drainage patterns. □ A brief description of proposed mechanical and electrical systems. □ If facility is planned to hookup to any utility, a signed affidavit by each utility provider is required

describing expected capacity, such as ability to support water flow required for fire protection system. If utility is not currently present, affidavit must verify availability prior to expected facility Certificate of Occupancy. It is strongly advised, due to costs, that all utilities required for construction, such as power and water, be available prior to Invitation to Bid, or be included in the Construction Documents.

□ A brief description of fire flow, hydrant(s) and fire lane locations □ All drawings shall be to a common and readable scale (1/8”= 1’-0” minimum scale). Note: Projects located within the City of Albuquerque: For new buildings and additions, a preliminary plan review meeting with the City’s Building Safety Division for building and fire code compliance is strongly recommended. At this time contacts should be made if not already to ensure compliance with zoning, hydrology, transportation, solid waste disposal and environmental health for specific project submitted at this phase.

Design Development Phase: Submit 1 (one) set (projects located in Bern. County and the City of Abq . shall submit 2 sets) of: □ Provide an overall project budget that includes a Level 2 UniFormat™ probable project cost estimate. □ Design Development (DD) documents that finalize and describe the size and character of the entire

project and should be approximately 60% complete. □ Project Manual and plan documents with elements, such as civil, structural, mechanical and electrical

systems, special systems including alarms, fire protection systems, roofs, walls, floors fully developed and lacking only specific installation details required to construct.

□ Clearly indicate which flood plain or drainage artery (if any) the site is located within. □ Floor plans indicating net square footages for all spaces and maximum student loads for all classrooms. □ Framing plans and/or roof framing plans, indicating how a maintained and sustainable background

sound level of less than 55 decibels is achieved.

ü

üü

ü

ü

Page 3: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 1

new chapar ra l e lementary schoo l | p rogramming book

INTRODUCTIONproject team and commit tee

PROJECT TEAM

Gadsden Independent School DistrictCo-owner

PSFACo-owner

Dekker/Perich/SabatiniArchitecture, Structural Engineering, Interior Design,

Bohannan HustonCivil Engineering

Bridgers and PaxtonMechanical, Electrical and Plumbing Engineering

DESIGN COMMITTEERafael Gallegos, GISD Executive Director for Energy Management & Construction

Earl Franks, Public School Facilities Authority (PSFA) Regional Manager

Lucy Fischer, Desert Trail Elementary School Principal

Miguel Villalobos, Desert Trail Elementary School Assistant Principal

Maria Alba, Desert Trail Elementary School 3rd Grade Teacher

Cynthia Voldahl, Desert Trail Elementary School Special Education

Ana M. Stewart, Desert Trail Elementary School 1st Grade Teacher

Michael Mosholder, Desert Trail Elementary School 6th Grade Teacher

Alvaro Jimarez, Chaparral New Mexico Community member

Page 4: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 2

new chapar ra l e lementary schoo l | p rogramming book

INTRODUCTIONexecut ive summaryPROJECT SUMMARYThe new elementary school for Gadsden Independent School District (GISD) is for a facility to adequacy for a core of 550 with classrooms for 250 students to serve grades K-6th. Allowable GSF per PSFA Adequacy Standards for the facility will be 50,871gsf as indicated in the Program of Spaces spreadsheet. The Educational Specifications (Ed Spec) for this school were created by Architectural Research Consultants in 2013 for Desert View ES and will be also used for the new Chaparral ES project. This Ed Spec is for a new elementary school to adequacy for a total of 550 students and a total of 68,750gsf. Currently, Desert Trail Elementary School and Chaparral Elementary School both exceed their population capacity. The design committee includes representatives from district staff, PSFA, school administration from Desert Trail Elementary School, and the community.

This program submittal is based on the following:• Compliance with PSFA’s Adequacy Standards• Adherence to the key concepts of the Ed Specs• Minor changes to the proposed space program based on input

from staff and the design committee

Included in this submittal are a detailed Space Program that reflects spaces that are needed to support the curriculum and implement the ED Spec. Based upon information gathered from the ED Spec and meetings with the Design Committee, the new elementary school should comprise of a core that can not only accommodate school activities, but also serve the community for public events, provide classrooms with ample storage, and offer flexible learning environments. This narrative provides background on key aspects of the project and summarizes the detailed information found in the supporting documents.

PROJECT GOALSThe Ed Spec established multiple project goals, which can be summarized as follows:1. Create a safe school with visitor control.2. Create a facility that is easy to lock down.3. Make the school inviting NOT prison like.4. Provide clear separation of vehicular and pedestrian

circulation.5. Provide hands-on education with gardens.6. Design to encourage community use of the site and after

school activities: walking, Zumba, and summer youth programs.

7. Encourage community use of library.8. Provide safe playgrounds with fall zones and shade.9. Provide ample space/seating for assembly-type events.10. Design every classroom to have a sink to meet EPSS plan.11. Include extra classrooms for either science or as a surge

classroom.

12. Design a large bookroom attached to half-classroom.13. Separate the Dining room from the gymnasium.14. Allow for future bleachers in gymnasium.15. Provide adequate storage.16. Include restrooms in first grade classrooms.17. Improve classroom sizes.18. Design HVAC system that is easy to operate and maintain.19. Provide a newcomer program - unique to school.

The Design Committee added the following additional goals:1. Provide a school layout that can be used for public events

without providing access to the entire school.2. Raised Platform is desired within the cafeteria/ gymnasium.3. Multiple computer labs.4. Cafeteria to have easy access to playground and bus area.

Page 5: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 3

new chapar ra l e lementary schoo l | p rogramming book

INTRODUCTIONexecut ive summaryPROGRAMMING AND UTILIZATIONThe ED Spec proposed Program for the New Chaparral Elementary School has been revised based on discussions with school staff, Design Committee, and GISD. Many of the changes are driven by the desire to have flexible learning spaces that can serve different needs depending on the population and curriculum. These revisions include:

• Sinks (with hot and cold water) to be provided in every classroom for K-6th grades. The sinks are needed for teaching certain science curriculums.

• Individual restroom for each kindergarten classroom as opposed to a shared restroom between two kindergarten classrooms.

• A shared restroom for every two 1st grade classrooms.• D/P/S used test fit diagrams to illustrate the benefits of having

casework storage within classroom as opposed to having a separate storage room. The Committee is in favor of using this strategy.

• A shared storage closet for a cluster of classrooms was considered, but the Committee was not in favor of the idea due to the difficulty of keeping track of belongings.

• If any spaces have to be cut out of the General Classroom spaces, the Committee would prefer the Multi-age classroom be eliminated.

• No space will be required for in-school suspension.• The Committee would like the teacher lounge and teacher

workroom as two separate spaces.• The head nurse & nurse assistant will share an office.• A cot room will accommodate four cots with curtain dividers

for privacy.• Waiting/reception space for the Nurse’s area is not needed.• No shower will be needed in the Nurse Area toilet if one is

provided in the D level classroom located nearby.• Math 180 and Reading 180 classes are used by the district

to help advance under performing students. A dedicated classroom will need to be provided for each course. Each classroom will have a dedicated teacher with students rotating in and out throughout the day.

• The Committee would like a raised platform in the gymnasium.• The Committee explained that they have tried computers

on wheels (COWS) and have had trouble with the system. They would prefer that two computer labs be provided for the new school (30 computer stations each). One lab will be accommodated in the Media Center and second will be in a separate space.

• Four computer stations will be provided for each K-6th classroom.

• Special Ed spaces were discussed with Randall Rapanut and

Rafael Gallegos. It was determined that two Type I and Type II classroom will be provided along with a Early Childhood (DD) classroom and the necessary support spaces.

• The cafeteria will be sized to accommodate three servings (the district uses a continual serving method).

• Cafeteria and gymnasium will be connected. A divider between the spaces may be needed.

• The Gymnasium will be reduced in size from 3,900sf to 2,400sf now that the cafeteria will be connected to the gymnasium.

• Separate Kiln room is not needed. Utilities needed for a kiln to be stubbed out at an exterior location in case an exterior kiln needs to be added in the future.

• No grounds storage room is needed in the school building. An exterior concrete pad will be provided with necessary utilities so that the district can provide a portable building for grounds storage when needed.

These changes do not affect the overall square footage, and all of the proposed spaces still meet or exceed Adequacy Standards. Discussion of classroom needs, anticipated furniture and equipment, and test fit diagrams confirmed that the classroom sizes proposed in the Ed Spec will meet School needs.

Page 6: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 4

new chapar ra l e lementary schoo l | p rogramming book

INTRODUCTIONexecut ive summaryPROGRAMMING AND UTILIZATIONDiscussions of the adjacency relationships expressed in the Ed Spec confirmed the following desired relationships:• Create a cafeteria adjacent to the playground so children

do not have to travel through vehicular zones to access the playground.

• Create a core that is accessible to the community but allows for classroom wings to be closed off. This core will provide restrooms for the public when after-hour activities are held and will limit access to the rest of the facility as needed. For reading night (which is usually held in the corridors and classrooms) the entire school can be open to the public.

• Group classes by grade level: with K-2 together and 3-6 together.

• Cafeteria, gymnasium, and raised platform to be connected. A divider between the spaces may be needed.

The design for all classrooms, with the exception of the Kindergarten classrooms, will be standardized to allow for instructional flexibility and the option of serving different grade levels depending on the student population of a given school year.

PROJECT SITEThe Colquitt Company donated a 15-acre site to GISD for the New Chaparral Elementary School. The site can be accessed by Angelina Blvd. west of U.S. 54. The site is covered with relatively small dunes and slopes downward from southwest to the northeast and is undeveloped. The neighboring properties are mostly natural desert landscape with a large Photovoltaic Power Station adjacent to the site's west boundary. Sewer, water, and fiber-optic backbone lines appear to be close by on adjacent roads. There is no evidence of three phase power near by the site. The new school site is farther outside of Chaparral than the existing two elementary schools, so the district anticipates the majority of children will need bus service. A traffic study if needed, will be done evaluating the impact of access options to the site, keeping in mind the safety of pedestrians and bicyclists. From the northwest to the southwest are views of the Franklin Mountain Range.

Page 7: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 5

new chapar ra l e lementary schoo l | p rogramming book

PROGRAMMINGnumer ic program

This program spreadsheet lists each space identified as aneed either in the Ed Spec or through the programming process.

• Column “A” shows PSFA minimum adequacy for each space.

• Column “B” shows the number and size of spaces proposed in the Ed Spec.

• Column “C” shows the number and size of spaces proposed for a design program for a facility to adequacy for a core of 550 with classrooms for 250 students grades K-6th.

• Column “D” shows the number and size of spaces proposed for a design program for an addition that would accommodate classrooms for 300 students grades K-6th.

• Column “E” shows the number and size of spaces proposed for a design program of a new elementary school to adequacy for a total of 550 students.

As shown, the proposed changes include additional spaces and both increases and decreases of square footage of specific spaces.

The required storage space has been included within the classroom square footage. In most cases, this storage will be provided through lockable casework.

Page 8: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 6

new chapar ra l e lementary schoo l | p rogramming book

PROGRAMMINGnumer ic program

This program spreadsheet lists each space identified as aneed either in the Ed Spec or through the programming process.

• Column “A” shows PSFA minimum adequacy for each space.

• Column “B” shows the number and size of spaces proposed in the Ed Spec.

• Column “C” shows the number and size of spaces proposed for a design program for a facility to adequacy for a core of 550 with classrooms for 250 students grades K-6th.

• Column “D” shows the number and size of spaces proposed for a design program for an addition that would accommodate classrooms for 300 students grades K-6th.

• Column “E” shows the number and size of spaces proposed for a design program of a new elementary school to adequacy for a total of 550 students.

As shown, the proposed changes include additional spaces and both increases and decreases of square footage of specific spaces.

The required storage space has been included within the classroom square footage. In most cases, this storage will be provided through lockable casework.

Page 9: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 7

new chapar ra l e lementary schoo l | p rogramming book

PROGRAMMINGnumer ic program

This program spreadsheet lists each space identified as aneed either in the Ed Spec or through the programming process.

• Column “A” shows PSFA minimum adequacy for each space.

• Column “B” shows the number and size of spaces proposed in the Ed Spec.

• Column “C” shows the number and size of spaces proposed for a design program for a facility to adequacy for a core of 550 with classrooms for 250 students grades K-6th.

• Column “D” shows the number and size of spaces proposed for a design program for an addition that would accommodate classrooms for 300 students grades K-6th.

• Column “E” shows the number and size of spaces proposed for a design program of a new elementary school to adequacy for a total of 550 students.

As shown, the proposed changes include additional spaces and both increases and decreases of square footage of specific spaces.

The required storage space has been included within the classroom square footage. In most cases, this storage will be provided through lockable casework.

Page 10: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 8

new chapar ra l e lementary schoo l | p rogramming book

PROGRAMMINGnumer ic program

This program spreadsheet lists each space identified as aneed either in the Ed Spec or through the programming process.

• Column “A” shows PSFA minimum adequacy for each space.

• Column “B” shows the number and size of spaces proposed in the Ed Spec.

• Column “C” shows the number and size of spaces proposed for a design program for a facility to adequacy for a core of 550 with classrooms for 250 students grades K-6th.

• Column “D” shows the number and size of spaces proposed for a design program for an addition that would accommodate classrooms for 300 students grades K-6th.

• Column “E” shows the number and size of spaces proposed for a design program of a new elementary school to adequacy for a total of 550 students.

As shown, the proposed changes include additional spaces and both increases and decreases of square footage of specific spaces.

The required storage space has been included within the classroom square footage. In most cases, this storage will be provided through lockable casework.

Page 11: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 9

new chapar ra l e lementary schoo l | p rogramming book

PROGRAMMINGut i l i zat ion calculat ions: pro jected enrol lment

TEACHERS NAME CLASSROOM USE/ GRADE LEVEL

ROOM NUMBER

CLASSROOM SQUARE

FOOTAGE

CURRENT STUDENT 40TH DAY

COUNT

Max. Number of Students per

Adequacy Standards Sq.

Ft.

PED Max. PTR per Classroom

% Classroom Occupancy

DOES CLASSROOM

MEET ADEQUACY

MONDAY HOURS

USED PER DAY

TUESDAY HOURS

USED PER DAY

WEDNESDAY HOURS

USED PER DAY

THURSDAY HOURS

USED PER DAY

FRIDAY HOURS

USED PER DAY

TOTAL HOURS CLASSROOM IS USED DURING

SCHOOL WEEK

TOTAL HOURS CLASSROOM IS

AVAILABLE DURING SCHOOL

WEEK

UTILIZATION RATE PERCENT

(%)

Kindergarten 1100 19 21 20 95% yes 7 7 7 7 7 35 35 100%Kindergarten 1100 19 21 20 95% yes 7 7 7 7 7 35 35 100%Kindergarten 1100 19 21 20 95% yes 7 7 7 7 7 35 35 100%Kindergarten 1100 19 21 20 95% yes 7 7 7 7 7 35 35 100%1st grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%1st grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%1st grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%1st grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%2nd grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%2nd grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%2nd grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%2nd grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%3rd grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%3rd grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%3rd grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%3rd grade 830 19 24 22 86% yes 7 7 7 7 7 35 35 100%4th grade 830 19 24 24 79% yes 7 7 7 7 7 35 35 100%4th grade 830 19 24 24 79% yes 7 7 7 7 7 35 35 100%4th grade 830 19 24 24 79% yes 7 7 7 7 7 35 35 100%4th grade 830 19 24 24 79% yes 7 7 7 7 7 35 35 100%5th grade 830 19 24 24 79% yes 7 7 7 7 7 35 35 100%5th grade 830 19 24 24 79% yes 7 7 7 7 7 35 35 100%5th grade 830 19 24 24 79% yes 7 7 7 7 7 35 35 100%5th grade 830 19 24 24 79% yes 7 7 7 7 7 35 35 100%6th grade 830 19 28 24 79% yes 7 7 7 7 7 35 35 100%6th grade 830 19 28 24 79% yes 7 7 7 7 7 35 35 100%6th grade 830 19 28 24 79% yes 7 7 7 7 7 35 35 100%6th grade 830 19 28 24 79% yes 7 7 7 7 7 35 35 100%Computer Lab 1 760 24 22 24 107% yes 4.5 5 5 5 5 24.5 35 70%Computer Lab 2 760 24 22 24 107% yes 4.5 5 5 5 5 24.5 35 70%SPED Type II 947.5 8 17 8 100% yes 7 7 7 7 7 35 35 100%SPED Type II 947.5 8 17 8 100% yes 7 7 7 7 7 35 35 100%Science 450 12 13 24 91% yes 4.5 4.5 4.5 4.5 4.5 22.5 35 64%Reading 180 830 24 24 24 100% yes 7 7 7 7 7 35 35 100%Math 180 830 24 24 24 100% yes 7 7 7 7 7 35 35 100%Art 900 24 26 24 100% yes 4.5 2.5 2.5 2.5 5 17 35 49%Music 900 24 26 24 100% yes 4.5 2.5 2.5 2.5 5 17 35 49%Gym/ Cafeteria 5160 24 N/A 24 100% yes 6.45 6.45 6.45 6.45 6.45 32.25 35 92%

Totals 89% Totals 95%

Attach floor plan

3-Utilization Rate Calculation: Total number of hours classroom is actually used per week / (divided by) the maximum possible classroom hours per week = (equals) total classroom utilization.

Count general classrooms as being used while students are attending recess, lunch, library time, and PE activities.NOTES:

ALL CLASSROOMS (General, Art, PE, Computer Lab SPED, Title1, PT/OT, Etc.) DAYS AND HOURS SPACE IS USED UTILIZATION

1-Max. Number of Students per Adequacy Standards Sq. Ft.: The maximum number of students allowed per the Statewide Adequacy Standards square feet. 2-PED Max. PTR per Classroom: PED's maximum pupil/teacher ratio per classroom

GRADE LEVEL

TOTAL CURRENT

STUDENT 40th DAY COUNT

NUMBER OF DD / SPECIAL

NEEDS STUDENTS PER GRADE

(Avg. of 3 existing E.S.)

CURRENT NUMBER OF TEACHERS

NUMBER OF CLASSROOMS

Kindergarten 78 15

1st Grade 78 13

2nd Grade 78 11

3rd Grade 78 114th Grade 78 12

5th Grade 79 9

6th Grade 79 10

TOTALS 548 81

7:502:50

Total Hours in School Day 7

3

SCHOOL HOURS

School End TimeSchool Start Time

Number of Lunch Turns Per Day

District School Date 15, April 2014

New Chaparral Elementary SchoolGadsden Independent School District

Page 12: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 10

new chapar ra l e lementary schoo l | p rogramming book

PROGRAMMINGspace d iagrams - test f i t

COMPUTER LAB760sf SEATING FOR 30 STUDENTS + TEACHER

GENERAL CLASSROOM830sf WITH FOUR COMPUTER STATIONS

8' w.brd8' w.brd8' tck.brd

MA

RK

ER

BO

AR

D

EASEL

ROUNDTABLE

ROUNDTABLE

CU

BB

IES

8' w.brd8' w.brd8' tck.brd

MA

RK

ER

BO

AR

D

EASEL

ROUNDTABLE

ROUNDTABLE

CU

BB

IES

FLAT FILES SINK

FLAT FILES SINK

8' w.brd8' tck.brd

BOOKCASE EASEL

MA

RK

ER

BO

AR

D

ROUNDTABLE

ROUNDTABLE

8' w.brd8' tck.brd

BOOKCASE

EASEL

MA

RK

ER

BO

AR

D

ROUNDTABLE

ROUNDTABLE

KINDERGARTEN1,040sf CLASSROOM WITH 60sf RESTROOM

SPED TYPE II (D LEVEL)840sf CLASSROOM WITH 80sf RESTROOM AND KITCHENETTE

8' w.brd 8' tck.brd

BOOKCASE

EASEL

Page 13: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 11

new chapar ra l e lementary schoo l | p rogramming book

CHAPARRAL ELEMENTARY SCHOOL

VIEWS LOOKING SOUTH OF FRANKLIN MOUNTAINS

TEMPERATURE (AVERAGE)

PRECIPITATION (AVERAGE)

WIND (AVERAGE)

SUN PATH

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

0.6in- 0.5 0.0 0.1 0.8 0.7 2.1 3.1 2.8 0.6 0.3 0.5

74 83 88 94 105 107 104 99 94 88 74

18 19 23 33 42 58 62 63 52 33 23 13°F

°F

HIGHEST RECORDED:112°F (1994)

LOWEST RECORDED:-5°F (1962)

STUDENT POPULATION: CORE FOR 550 WITH CLASSROOMS FOR 250TOTAL SITE AREA: 15 ACRES

107

FRANKLIN

M

OUNTAINS

VIEW

S TO

SOLA

R AR

RAYS

VIEW

S OF

FRANKLIN MOUNTAINS

VIEWS TO

NORTH

ANGELINA BLVD.

ANGELINA BLVD.

SOLAR ARRAYFARM

PREVAILING WINDSFROM THE SOUTHWEST

SLOPE

SUMMERSUNRISE

WINTERSUNRISE

SUMMERSUNSET

WINTERSUNSET

CHAPARRACHAPARRAL LELEMENTAELEMENTARY RY

SITESITE

MONTH

PROBABILITY

SPEED

AIR TEMP.

DIRECTION

CITY WATER

FIBER OPTIC CABLE

QUEST MAN HOLE

GAS

ELECTRICAL

TRANSMISSION LINE/THREE PHASE POWER LOCATED NORTH OF SITE

IRRIGATION CABLE

PROJECT SITEs i te analys is

This site analysis illustrates the existing physical and environmental conditions of the proposed Chaparral New Elementary School site.

The site is bordered on the west by a large scale solar energy plant and developing residential neighborhoods to the south. Currently to the north and east the land is undeveloped and remains natural desert. The site is in close proximity to existing utilities but may have to bring in three phase power. The site will be studied in detail in schematic design to determine the building footprint and siting and address site circulation challenges.

Page 14: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 12

new chapar ra l e lementary schoo l | p rogramming book

PROJECT SITEs i te images

SITE PANO ∙ 360˚

NORTHWEST EAST

Page 15: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 13

new chapar ra l e lementary schoo l | p rogramming book

SUPPORTING MATERIALSproject scheduleThe schedule below is based on the Design Team’s contract and milestones that were agreed upon with GISD and PSFA. The schedule will be reviewed and adjusted as needed based on input from the selected Contractor.

PHASE DATE/DAY TO BE COMPLETED

Programming Phase April 14, 2014

Programming Phase Review April 21, 2014

Schematic Design Phase May 14, 2014

Schematic Design Phase Review May 21, 2014

Design Development Phase July 17, 2014

Design Development Phase Review July 24, 2014

Construction Documents Phase November 20, 2014

Construction Documents Phase Review December 09, 2014

Bidding Phase January 2015

Construction Phase Begins February 2015

Substantial Completion May 2016

Schedule and Milestones

FEB

‘14

MAR

‘14

APR

‘14

MAY

‘14

JUN

'14

JUL '

14

AUG

'14

SEP

'14

OCT

'14

NOV

'14

DEC

'14 JAN '15 -

OCT ‘15 NOV

'15

DEC

'15

JAN

'16

FEB

'16

MAR

'16

APR

‘16

MAY

‘16

JUN

'16

JUL '

16

AUG

'16

Feasibility/Site Investigation

Programming

ReviewDesign

Schematic DesignReviewDesign DevelopmentReviewConstruction DocumentsOwner ReviewState and Local Review/Permitting

Bidding and Construction Contract

Construction

Systems Commissioning FFE Design/Selection

FFE Bidding

FFE Installation

Move-In

War

rant

y In

spec

tion

2.15

.201

7

Construction Start

Substantial Completion

Page 16: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 14

new chapar ra l e lementary schoo l | p rogramming book

SUPPORTING MATERIALSproject budgetThe Preliminary Opinion of Probable Cost of Construction reflects our current understanding of the established MACC.The established MACC for the proposed facility is $14,866,200. This MACC is representative of a facility to adequacy for a core of 550 students with classrooms for 250 students in alignment with the Educational Specifications.

The below Programming Phase cost estimate is in line with the established Maximum Allowable Construction Cost (MACC) for the project.

This estimate will be refined in collaboration with GISD and PSFA as the project moves forward and geotechnical investigation is completed further informing the soils condition and recommendations for the building footings.

Gadsden Independent School District - Chaparral New Elementary SchoolDEKKER/PERICH/SABATINI | 7601 Jefferson NE, Suite 100, Albuquerque, NM 87109 Date: 04/2014 DPS Project No: 14-000114-0027

Cost Bldg AreaItem Description per SF Labor Material Subcontract Total 50,871

NEW SCHOOL & SITE WORK @ 50,871 SFA10 Foundations $20.00 $0 $0 $0 $1,017,420B10 Super Structure $11.00 $0 $0 $0 $559,581B20 Exterior Enclosure $14.00 $0 $0 $0 $712,194B30 Roofing $8.00 $0 $0 $0 $406,968C10 Interior Construction $16.00 $0 $0 $0 $813,936C30 Interior Finishes $13.50 $0 $0 $0 $686,759D20 Mechanical (HVAC & Plumbing) $48.00 $0 $0 $0 $2,441,808D50 Electrical $32.00 $0 $0 $0 $1,627,872E10 Equipment $4.50 $0 $0 $0 $228,920E20 Furnishings $5.50 $0 $0 $0 $279,791F10 Special Construction $1.00 $0 $0 $0 $50,871G10 Site Preparation $5.00 $0 $0 $0 $254,355G20 Site Improvements $14.00 $0 $0 $0 $712,194G30 Site Mechanical Utilities $5.00 $0 $0 $0 $254,355G40 Site Electrical Utilities $2.50 $0 $0 $0 $127,178Subtotal $200.00 $0 $0 $0 $10,174,200Contractor General Conditions 6.00% $610,452Contractor Overhead and Profit 6.00% $647,079Bond 1.50% $171,476Contingency at Programming Phase 22.00% $2,552,706Price Escalation 5.00% $707,796Subtotal $292.18 50,871 $14,863,709Total (not including NMGRT) $14,863,709NMGRT on Construction 7.0000% $1,040,460Subtotal to Adequency K-6 $15,904,169Total including applicable taxes $15,904,169

Page 17: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 15

new chapar ra l e lementary schoo l | p rogramming book

SUPPORTING MATERIALSregional dra inage management p lan

Page 18: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 16

new chapar ra l e lementary schoo l | p rogramming book

SUPPORTING MATERIALSf ive mi le radius map

TEXAS

NEW MEXICO

OTER

O CO

UNTY

DONA

ANA

COU

NTY

˜

CHAPARRAL

PROJECT SITE

NORTH

five miles

Page 19: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 17

new chapar ra l e lementary schoo l | p rogramming book

˜

CHAPARRAL

PROJECT SITE

NORTH

one mile

SUPPORTING MATERIALSone mi le radius map

solar energy plant

Page 20: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

D E K K E R / P E R I C H / S A B AT I N I 18

new chapar ra l e lementary schoo l | p rogramming book

SUPPORTING MATERIALSmeet ing minutes

A Design Committee meeting related to the Programming Phasewas held on March 31, 2014.

• A preliminary programming discussion meeting was held at PSFA Albuquerque office on April 10, 2014 and was attended by Martica Casias, Brad Jackson, John Valdez, and Earl Franks.

Page 21: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

Meeting Minutes Project No.: 14-0027.001 Project: GISD NEW CHAPARRAL ELEMENTARY SCHOOL Date: March 31, 2014 Place: Desert Trail Elementary School Library Attending: See Attendance Record (attached) By: Owen Kramme, Dekker/Perich/Sabatini (D/P/S) Copies To: Earl Franks, PSFA; Rafael Gallegos, GISD; Lucy Fischer, DTE;

Miguel Villalobos, DTE; Maria Alba, DTE; Cynthia Voldahl, DTE; Ana M. Stewart, DTE; Alvaro Jimarez, Parent of Student; Benjamin Gardner, D/P/S; Sanjay Kadu, D/P/S; Hartwell Briggs, D/P/S; Tim Grattan, D/P/S; Helena Lickteig D/P/S; Owen Kramme, D/P/S

Issue Date: April 07, 2014 Discussion Items: 1. Brief introductions were conducted by each Committee individual and the Project Team.

2. Lines of communication were established. All emails to be sent to Rafael Gallegos, Earl Franks, and Sanjay Kadu for distribution to the Design Committee and other design team members.

3. Website - Project website will be established at http://www.dpsdesign.org/ces The Design Committee was in favor of posting project related material to the web site for public access.

4. Design process overview was conducted by Sanjay Kadu a. The role of the design committee was explained .

1. The design committee will act as an ambassador to the greater community. 2. Communication is the key. Concerns to be quickly communicated by both, the Design Team and the

Design Committee. b. Design Process

1. Education Specifications (Ed Spec) i. Complied by Architectural Research Consultants. ii. Pre-design evaluation to define the physical and performance requirements for the new facility. The

Ed Spec is used to ensure programming and curricular needs of the school district are being met. iii. A steering committee, appointed by the Board, was consulted in the development of the Ed Spec. iv. Ed Specs will be uploaded to the website for the design committee to access. v. Overall design process for the new school will include following phases;

a. Programming b. Schematic Design c. Design Development d. Construction Document

c. General Programming 1. Ed Specs helped to inform the desired spaces of the project as noted in the Program Spreadsheet. 2. The Program Spreadsheet was developed to be able to compare the state adequacy, Ed Spec and Proposed

square footage for each space. 3. Tare was then added to the assignable square footage to determine the buildings gross square footage. Tare

includes any unassigned space such as corridors, walls, mechanical and electrical rooms and restrooms. 4. Adjacency Diagrams provided within the Ed Spec act as a guide to determining which spaces need to be in

proximity to each other. d. Program Discussion and Design Committee comments;

1. Water quality does not seem to be a concern as was mentioned in the Ed Spec. 2. Water Pressure for Fire suppression may be a concern and will need to be tested. 3. DPS to coordinate districts technology guidelines. 4. The Design Committee to provide DPS with an events calendar for the fall semester of 2014,

so that a presentation of the project to the public can be scheduled. 5. The Committee would like sinks (with hot and cold water) to be provided at every classroom

in the school K-6th grades. The sinks are needed for teaching certain science curriculum.

Page 22: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

6. The Committee would like individual restroom for each kindergarten classroom opposed to a shared restroom between 2 kindergarten classrooms.

7. DPS illustrated the potential of having the storage within the classroom as casework with test fit diagrams as opposed to having a separate storage room. The Committee agreed that the storage would be more beneficial in the classroom and would prefer that to a separate storage room.

8. The question was presented for providing a shared storage closet for a cluster of classrooms but the Committee was not in favor of this idea due to keeping track of belongings.

9. If any spaces have to be cut out of the General Classroom spaces then the Committee would prefer the Multi-age classroom be eliminated.

10. No space will be required for in school suspension. 11. The Committee would like the teacher lounge and teacher workroom as 2 separate spaces. 12. The head nurse & nurse assistant will share an office. 13. Cot room to accommodate 3 cots with curtain dividers for privacy. 14. Waiting/ reception space for the Nurse’s area is not needed. 15. No shower will be needed in the Nurse Area toilet if one is provided in the D level suite. 16. Math 180 and Reading 180 classes are used by the district to help advance underperforming students. A

dedicated classroom will need to be provided for each. Each classroom will have a dedicated teacher with students rotating in and out throughout the day.

17. The Design Committee was asked how they conduct events with the community and what type of events are held at the elementary school. Response was that multiple parts of the school are used for different events. After further discussion the Design Committee preferred the idea of having a core that was accessible to the community but allowed for classroom wings to be locked down. This core would provide restrooms for the public when after-hour activities are held at the school and would limit access to the facility as needed. For reading night (which is usually held in the corridors and classrooms) the entire school can be opened up to the public.

18. The Design Committee desires the cafeteria and playground to be adjacent so that children do not have to travel through vehicular zones to access the playground.

19. The Committee would like a raised platform in the gymnasium. 20. The Committee was asked about the need for a computer lab. The Design Professional informed the

committee about other current projects and how computer labs are being replaced with COWS (Computers On Wheels) & Tablets so that every room can become a computer lab as needed. The Committee explained that they have tried COWS and have had trouble with the system. They would prefer that 2 computer labs be provided for the new school (30 computer stations each). One lab to be accommodated in the Media Center and second to be a separate space.

21. 4 computer stations to be provided in every classroom K-6th grades. 22. Special Ed spaces to be further discussed with the school district. 23. The cafeteria will be sized based on 3 servings (the district uses a continual serving method). 24. Cafeteria and gymnasium to be connected. A divider between the spaces may be needed. 25. The Gymnasium will be reduced in size from 3900 SF to 2400 SF now that the cafeteria will be connected

to the gymnasium. 26. Separate Kiln room is not needed. Utilities needed for a kiln to be stubbed out at an exterior location in case

exterior kiln needs to be added in future. 27. No grounds storage room is needed in the school building. A exterior concrete pad will be provided with

necessary utilities so that the district can provide a portable building for grounds storage when needed. 28. Revised Program of Spaces spread sheet is attached with the minutes

5. Project Schedule Overview: a. Design and Construction schedule overview conducted by Sanjay Kadu.

1. Programming completion: 4/14/2014. Review completed: 4/21/2014 2. Schematic Design completion: 5/14/2014. Review completed: 5/21/2014 3. Design Development completion: 7/17/2014. Review completed: 7/24/2014 4. Construction Documents completion: 11/20/2014. Review completed: 12/09/2014 5. Bidding: Month of January 2015 6. Construction: Starts February 2015 7. Project Completion: May 2016

4. Design Committee Meeting Dates are set for:

a. Tuesday, April 22nd at 3:00 PM at Desert Trail Elementary School Library. b. Tuesday, May 6th at 3:00 PM at Desert Trail Elementary School Library. c. Tuesday, May 20th at 3:00 PM at Desert Trail Elementary School Library.

Page 23: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

5. Identifying Project Goals: a. Discussion facilitated by Sanjay Kadu b. Ed specs established multiple project goals. Goals applicable to the new Chaparral Elementary School are as

follows: 1. Create a safe school with visitor control 2. Facility that is easy to lock down 3. Make the school inviting NOT prison-like 4. Clear separation of vehicular and pedestrian circulation 5. Provide hands-on education with gardens 6. Design to encourage community use of the site and after school activities 7. Provide safe playgrounds with fall zones and shades 8. Provide ample space/seating for assembly type events 9. Every classroom to have a sink to meet EPSS plan 10. Extra classroom for either science or as a surge classroom 11. Dining room to be separate from gymnasium 12. Space allowance for future bleachers in gymnasium 13. Adequate storage 14. Restrooms in first grade classrooms 15. HVAC system that is easy to operate and maintain 16. Newcomer program- Unique to the school

6. The following additional goals were added by the Design Committee:

a. Possibly create a bus depot on site so that buses to not have to drive back to Anthony twice a day. Ralph explained that this is a contracted service and that maintenance, driver shuttles, etc add complexity to this issue.

b. Provide a school layout that can be used for public events without providing access to the entire school. c. Raised Platform is desired within the cafeteria/ Gymnasium. d. Multiple computer labs. e. Cafeteria to have easy pedestrian access to playground and bus area.

7. Next Steps:

a. Review of revised Program Spreadsheet and overall building area. b. Review the graphic program. c. Review Site Analysis and site challenges and advantages d. Present design concepts for new school and have Design Committee participate in design discussions

This report is assumed to be a true and accurate account of this communication unless notice to the contrary is received within 10 calendar days of issue. End of Minutes

Page 24: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

Page 1 of 1

AGENDA

Project No.: 14-0027.001

Project: GISD New Chaparral Elementary School Date: 3/31/2014

Discussion Items: 1. Introductions

a. Committee to introduce themselves b. Project Team to introduce themselves and rest of team c. Lines of communication for the project d. Project website: www.dpsdesign.org/ces e. Design process

2. Project Schedule Overview

a. D/P/S to present preliminary design and construction schedule b. Committee to comment and suggest committee meeting dates. Propose Bi-weekly meetings

3. Project Goals

a. D/P/S to facilitate brainstorming of Project goals (new and from Ed Spec) b. Committee to help prioritize listed goals c. Brainstorm ideas to make new school feel part of the community d. Who else do we need to meet with/present the project during the design phase? e. Community engagement ideas

4. Program of Spaces

a. Establish maximum allowable Gross Square footage for; i. School for 550 students ii. School with Core spaces for 550 and Classroom spaces for 250 students iii. Additional Classroom space for expansion to accommodate 300 students.

b. Program of Spaces Discussion

5. Next Steps a. Finalize Program of Spaces b. On Site survey with off-site utility locations c. Geotech investigation d. Conductivity borehole testing e. Water quality testing f. Fire flow test on the municipal water system g. Discussion for procurement of work;

Technology Master Site Drainage plan FFE Landscaping

h. Next Committee Meetings i. 04/22/2014 ii. 05/06/2014 iii. 05/20/2014

END OF AGENDA

Page 25: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design
Page 26: new chaparral elementary school€¦ · (Not required for building renovation/re pair.) If project is a remodel or renovation, indicate if project: will be a Level 1, 2 ... Design

7601 jef ferson ne, su i te 100 , a lbuquerque, nm 87109 | 505 .761 .9700 ph 505 .761 .4222 fx | www.dpsdesign.org