CAMBIE & MARINE REZONING SUBMISSION CAMBIE STREET SKYTRAIN - CANADA LINE SW MARINE DRIVE W 64TH AVE. PHASE 2 PHASE 1 PHASE 2 PHASE 1 NORTH CORNER PLAZA FOCAL POINT FOCAL POINT NORTH COURT SOUTH COURT PUBLIC ART WALKWAY PHASE 1 ENTRY COURT SOUTH CORNER PLAZA PHASE 2 ENTRY COURT VEHICLE ACCESS LANE / MEWS WATER/STORMWATER FEATURE WATER/STORMWATER FEATURE W 64TH AVE STREETSCAPE SW MARINE DR STREET SCAPE LANDSCAPE SCHEMATIC SITE PLAN CONCEPT DIAGRAM
6
Embed
New CAMBIE & MARINE · 2010. 8. 23. · cambie & marine rezoning submission july 30, 2010 cambie & marine 1 landscape schematic site plan- concept diagram cambie street skytrain -
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
CAMBIE & MARINE REZONING SUBMISSIONJuly 30, 2010
CAMBIE & MARINE
1LANDSCAPE SCHEMATIC SITE PLAN- CONCEPT DIAGRAM
CA
MB
IE S
TRE
ET
SK
YTR
AIN
- C
AN
AD
A LI
NE
SW MARINE DRIVE
W 64TH AVE.
PHASE 2PHASE 1
PHASE 2PHASE 1
NORTH CORNER PLAZA
FOCAL POINT
FOCAL POINT
NORTH COURT
SOUTH COURT
PUBLIC ART WALKWAY
PHASE 1 ENTRY COURT
SOUTH CORNER PLAZA
PHASE 2 ENTRY COURT
VEHICLE ACCESS LANE / MEWS
WATER/STORMWATER FEATURE
WATER/STORMWATER FEATURE
W 64TH AVE STREETSCAPE
SW MARINE DR STREET SCAPE
LANDSCAPE SCHEMATIC SITE PLAN CONCEPT DIAGRAM
JAMES KM CHENG ARCHITECTSJuly 30, 2010
CAMBIE & MARINE
2
CA
MB
IE S
TRE
ET
SK
YTR
AIN
- C
AN
AD
A LI
NE
SW MARINE DRIVE
LANDSCAPE SCHEMATIC SITE PLAN
W 64TH AVE.
North Corner Plaza• pedestrian node• focal point with public art interpretation• separate public and private with planting
and hedging
North Court• stepped terraces• seating / gathering opportunities• stormwater channel with planting• green buffer between private patio
and public realm
South Court• stepped terraces and stormwater
channel links upper level and lower level Entry Courts
• lawn for recreation• stone “bridges” cross the channel• seating / gathering opportunities• green buffer between private patio
and public realm
Public Art walkway• public art interpretation• double row of trees• 5’ green buffer on both sides• 3.5% pathway• 10’ wide pedestrian pathway• 8’ wide bikeway
Phase 2 Entry Court• water feature surrounds the lobby• bridge to Main Entry• grand steps connect to the South
Court• seating areas• planting buffer as a backdrop• water channel connects to the
stormwater feature in the south court• special paving to enhance the east-
west connection
Phase 2 Drop-Off• services phase 2 lobby• steps/ ramps connect to the Entry
Court
Vehicle Access Lane / Mews• double row of street trees• 5’ green buffer on both sides• access to entry drop-off, parking
entries and loading areas
Phase 1 Drop-Off• services phase 1 lobby• steps/ ramps connect to the Entry
Court
Live / Work Private Patio (phase 2)• every 2-3 units at same FFE on
level 1• separate public and private with
grade change, planting and hedging
• landscape buffer / edge provides privacy
Live / Work Private Patio (phase 1)• every 2-3 units at same FFE on
level 1• separate public and private with
grade change, planting and hedging
• landscape buffer / edge provides privacy
W 64th Ave Street Scape• continuation of street trees and
sidewalk width from adjacent parcel• separate public and private with
grade change, planting and hedging
• entry court leads to the vehicle access lane / mews
• seating areas / informal gathering
Loading & Parking Entry (phase 2)• screen between live/work and
loading area• AcquaPave permeable paving
Phase 1 Entry Court• water feature surrounds the lobby• bridge to Main Entry• special paving to enhance the east-
west connection
Retail Frontage• stepped terraces• outdoor cafe/ seating• planters defi ne the edge and
provide seating opportunities
South Corner Plaza• pedestrian node• public art interpretation• informal trees• site furniture / seating areas
Phase 2 Phase 2Phase 1 Phase 1
Loading & Parking Entry (phase 1)• screen between Entry Court and
loading area• AcquaPave permeable paving
Potential Future Plaza• strong connection to Phase 1 Entry
Court• pedestrian node / focus point• site furniture / seating areas
SW Marine Drive Streetscape• street trees and planting provide