Top Banner
New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting Inc. 2006 May 8
27

New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

Mar 31, 2015

Download

Documents

Sydnee Bleckley
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

New Build Nuclear:Who takes completion risk?

Platts Nuclear Energy –

Opportunities for Growth & Investment in Europe

by

Milton Caplan

President, MZConsulting Inc.

2006 May 8

Page 2: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

2

Outline

• The return of nuclear power

• Risks and Realities of Nuclear Power

• Examples

• Moving forward

Page 3: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

3

It’s Cool to be a Nuke!

• France to build at Flamanville

• UK considers new nuclear

• Finland commits to Olkiluoto 3

• Germany to do energy review

• Sweden supports ongoing nuclear operations

• Canada considers nuclear

• US supports nuclear energy

• G8 supports nuclear power as part of the mix

• Bush reopens nuclear cooperation with India

• Environmentalists now supportive

Page 4: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

4

Nuclear Advantages

• Environmental – no GHG emissions

• Security of Supply

• Economic

• Excellent performance of existing fleet

Page 5: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

5

What are the Alternatives?

• Fossil fuels falling from favour– Coal is dirty, new clean coal technology on the way

– Gas prices volatile and increasing

• Renewables increasing in use – Acceptance that it can’t do it all

• Nuclear is the only large scale generation option available for baseload requirements

Page 6: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

6

Is it time to Celebrate?

Maybe its still too soon.

Page 7: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

7

Making it happen!

• Support for nuclear is only the beginning

• Is the infrastructure in place to enable new build projects to succeed?

BIG RISK

Governments support new build, but do not create the criteria for success!!

Page 8: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

8

Nuclear Issues

• Large capital

• Long project schedule

• Low variable cost of operations

• Complex regulatory regime

Page 9: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

9

Project Risk Triangle

Market

Construction Operations$ + $

= $

Generator

•Evolving markets•De-regulated/liberalized

• Fixed risk (PPA)• Merchant Plant

•Low variable cost•Strong performance •Much M&A experience•Confidence is High

•High Capital Cost•Poor performance in past•New Improved Designs•Confidence is building

Page 10: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

10

What is Completion Risk?

• The total cost of the completed plant including – Engineering

– Equipment

– Construction and erection

– Commissioning

– Fuel

– Financing costs

– Regulatory approvals

– etc

Page 11: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

11

Old Model

• Vendors built on cost plus basis• Utilities (Generators) borrowed on balance sheet• All costs both construction and operations passed

on to the customer

Essentially 100% risk on the customer

Many projects had long delays and significant overruns

Page 12: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

12

The Market Fights Back

Generator

Market

Vendor

Lenders

Project Finance

Turnkey

PUSH

Page 13: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

13

Vendors Listen

• Vendors have now taken a more product oriented view i.e. develop new products considering all the risks associated with its implementation

• Modern designs such as EPR, AP1000, ESBWR and ACR-1000

• Worked with regulators to improve processes and governments to improve planning approvals

• Results are lower costs and lower risks

Page 14: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

14

Criteria for a Successful Project

• Well designed economic plants• Stable regulatory regime• Risk sharing amongst all project stakeholders• Strong project team • Extensive Project Planning

Confidence

Page 15: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

15

Generator Risk Models

Generator

Turnkey

Scope B

Scope A

Scope F Scope E

Scope CScope D

• There is a limit to the risk that vendors will take

• Exclude circumstances beyond their control

• Consequences commensurate with role and responsibility

• No consequential damages

Generator cannot lay off all of the risk!

Page 16: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

16

New Build Nuclear Reality #1

Generators have the completion risk

Page 17: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

17

Financing

• Projects– Large Capital– Long schedules– Risk profile varies from construction to operations

• Lenders will require– Strong debt coverage (large equity)– Overrun funds in place (stand by facilities)– Date certain for start of repayment

• Project Financing is not ideal and high cost• On balance sheet creates EPS dilution issues

Page 18: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

18

New Build Nuclear Reality #2

Generators have the financing risk

– Credit risk

– Funds to complete

Page 19: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

19

Plan for Success

• Well planned and managed project• Structure to assure successful project completion• Completion risk is real

– Assess the risk– Mitigate the risk– Manage the risk

• Low risk, high consequence• Economics not robust enough to price it in• Generators cannot risk bankruptcy on one project

Page 20: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

20

New Build Nuclear Reality #3

Generators will not bet the company on a new build nuclear project

Page 21: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

21

Recent Projects

• Finland Olkiluoto 3 Project– Turnkey supply of EPR from Areva– Customer owned utility– Deliver power to customers at cost

• Canada Bruce Units 1&2 Restart– Multiple contracts managed by independent

project manager– Shared risk of overruns with government

Page 22: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

22

USA

• Government programs to support new build include:– Delay insurance for regulatory and litigation risk– Loan guarantees for 80% of project cost– Production tax credit of 1.8 cents / kWh

Page 23: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

23

Let’s get real!

New Build Nuclear Realities1) Generators have completion risk

2) Generators have financing risk

3) Generators will not bet the company on a new nuclear project

Page 24: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

24

Business Models that Work

• Large utility with multiple units• Well structured project that places

significant risk with vendors• Strong project management• On balance sheet financing• Risk sharing with the market

– Regulated, or PPA with some overrun risk sharing

Page 25: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

25

Making it Happen!

• More work to be done to create well structured projects that can proceed

• Requires committed stakeholders to work together to develop details of workable models

• Different markets will have different solutions

Page 26: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

26

Objective is Clear

Well managed successful new build nuclear projects!!

It’s cool to be a Nuke!!

Page 27: New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.

Thank You

Milton CaplanMZConsulting [email protected]+1.647.271.4442