2. Parish Amendments to IBC 2015 where applicable. 3. Life Saftey Code, ANSI/NFPA 101, Latest Edition. 4. Americans with Disabilities Act, Public Law 101-336 5. Design loads per ASCE-7 1. International Building Code, 2015 Edition. CODES & COMPLIANCES: 21. The drawings and specifications, including drawings prepared by specific engineering disciplines such as mechanical, electrical, etc. are complimentary. Items shown in any one location of the drawings shall be requirements of the Contractor for construction. In the event of an inconsistency between the drawings and the specifications or within either document, the Contractor shall seek clarification from the Architect / Engineer prior to bidding and construction. 22. All items not specifically noted as owner provided or installed shall be provided or installed by Contractor. 23. Contractor is to coordinate all work schedules within building with owner and users. Access into the building shall not be interrupted unless owner and user approval has been obtained. 24. Where repairs are performed, Contractor is responsible for providing all necessary components and labor in order to create a complete and workmanlike repair. 25. The contractor shall be responsible for determining the exact location, depth, and size of all utilities and structures, and shall be liable for any damage caused by failure to comply with these instructions. 9. The drawings represent general locations of improvements. It shall be the General Contractors responsibility to locate all improvements on project prior to alteration, addition, or tie-in. All damage shall be properly repaired by the General Contractor, at the Contractors expense. 10. The Contractor shall be responsible for permits and any charges for tie-in to existing street and utilities. 11. All work shall be performed in accordance with all applicable National, State, and local codes and regulations. 12. Concealed insulation shall have a Flame Spread of 0-25 and Smoke Development factor of 0-450. 13. All materials shall be new except where otherwise noted and shall conform with the standards of Underwriters Laboratory in every case where such a standard has been established for the particular type of material in question. 14. The Contractor shall obtain and pay all necessary permits, and after completion furnish owner certificates of inspections and approval as issued by the inspection department of the Parish. GENERAL NOTES: 1. The Contractor shall visit the project and thoroughly aquaint himself with all aspects of the construction outlined in this document prior to submitting a bid. Any discrepancies shall be brought immediately to' the attention of the Architect or Engineer. 2. The Contractor shall provide all necessary safety apparatus required to insure the health of workers as well as the owners and general public. 3. The Contractor shall provide any project demolition / utility relocation necessary for completion of work. 4. In no way do the dimensions shown on the plans represent an exact quantity of materials. The bidder is soley responsible for the quantities in his bid. 5. All floor plan dimiensions are to the face of brick, face of stud, or to centerline of columns. 6. The Contractor shall keep the site and all interior spaces clean or trash and construction debris during construction during construction on a daily basis. 20. The drawings and specifications are separated into disiplines for the convenience of the Architect / Engineer and the Contractor. The seperatons used herein are used only for the purposes of convenience and reference and in no way do they define or limit the scope or intent of any part of the drawings or the drawings and specifications as a whole. The fact that the drawings are seoperated in no way to be constructed as a complete integrated and unified whole. 15. The Contractor shall be responsible for obtaining all necessary certificates of inspection, both at rough-in and completion. 16. All work is to have a one year warranty, minimum. 17. All portion of the existing building shall remain weathertight at all times. If construction is postponed, the contractor shall secure the building from inclement weather and vandalism. 18. Removal and disposal of all substances and materials to be accomplished according to specifications and Federal, State, and local regulations. 19. The storage of materials on site shall be allowed on designated areas. These areas will be determined prior to construction. N or t h T c h o u p i t o u l a s S t r e e t Joseph Street (Side) Arabella Street (Side) 5 6 2 0 T c h o u p i t o u l a s S t r e e t E X I S T I N G B U I L D I N G N e w O r l e a n s , L o u i s i a n a L e a ke A v e nu e ( 1 1 0' R.O . W .) N E W D O C K F A C I L I T Y N e w c o n c r e t e f o r k l i f t r a m p (In accordance w/ O.S.H.A. 19.10.178(n)(17) E x i s t i n g d e a d - e n d o f A r a b e l l a S t r e e t PLEASE BE ADVISED THAT I HAVE RESEARCHED THE BUILDING & RELATED CONSTRUCTION CODES FOR ORLEANS PARISH AND THE LA. STATE UNIFORM CONSTRUCTION CODE, AND TO THE BEST OF MY KNOWLEDGE AND BELIEF THESE DRAWINGS ARE IN COMPLIANCE THEREWITH. PLEASE BE ADVISED THAT THESE PLANS HAVE BEEN PREPARED UNDER MY DIRECT SUPERVISION, BEING A REGISTERED ARCHITECT / CIVIL ENGINEER IN THE STATE OF LOUISIANA, AND THE DESIGN AND SPECIFICATIONS GENERALLY COMPLY WITH ALL CITY, PARISH, AND STATE BUILDING CODE REQUIRMENTS TO THE BEST OF MY KNOWLEDGE AND BELIEF. THIS REVIEW DOES NOT ATTEST TO COMPLIANCE WITH ZONING, OR ENVIRONMENTAL REQUIREMENTS. I MADE NO SITE INSPECTION. I AM NOT ADMINISTERING THE CONSTRUCTION WORK. I TAKE FULL RESPONSIBILITY FOR THE CONTENTS OF THESE PLANS. PROFESSIONAL ARCHITECT / CIVIL ENGINEER STEPHEN P. CALI 58 CYCAS KENNER, LA. 70065 504-388-8719 REG. #21941 1. The site shall be filled and graded as necessary so that the entire property drains forward toward catch basiins at the street, except when conditions exist where the site can be sloped to drain in an alternate direction. Rain run-off shall be diverted around and away from any structures and shall not drain onto any abutting properties. If subsurface drainage is specified, rain run-off shall be directed to adequate and effective subsurface drainage systems. Site shall be graded so that rain run-off does not drain on to abutting properties even if the subsurface drainage system fails. Contractor shall observe minimum mandated flood elevations. GENERAL SITE DEVELOPMENT NOTES: Scale: 1 16 " =1'-0" 1 A101 2. Verify required elevation of air conditioning condensing units with local code enforcing agencies prior to placing equipment. 3. Owner shall be responsible for retaining the services of an arborist to determine potential damage to existing trees. Owner shall protect trees in accordance with arborists recommendations. 4. Finished floor elevation shall be determined from an applicable and professionally certified firm and verified by survey prior to construction begins. 5. Remove all organic vegetation and fill to 95% compaction below building foundation. Consult Architect / Engineer if site is to be filled more than 2 feet above natural ground elevation. ENGINEER OF RECORD: PROPOSED DOCK FACIITY FOR MISSIONARY EXPEDITORS & CARGO LOGISTICS 5620 TCHOUPITOULAS STREET NEW ORLEANS, LOUISIANA Site Plan Site Plan / Design Criteria A-101 CADD DWG No: T.T.C. DRAWN BY: SHEET DESIGNED BY: PROJECT No: S.P.C. DATE: 04/2020 A-101 SITE PLAN / DESIGN CRITERIA A-103 A-102 A-104 EXTERIOR ELEVATIONS / BUILDING CROSS-SECTION FLOOR PLAN FOUNDATION PLAN / FOUNDATION SECTIONS / FRAMING PLAN SHEET INDEX:
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
2. Parish Amendments to IBC 2015 where applicable.3. Life Saftey Code, ANSI/NFPA 101, Latest Edition.4. Americans with Disabilities Act, Public Law 101-3365. Design loads per ASCE-7
1. International Building Code, 2015 Edition.
CODES & COMPLIANCES:
21. The drawings and specifications, including drawings prepared by specific engineering disciplines such as mechanical, electrical, etc. are complimentary. Items shown in any one location of the drawings shall be requirements of the Contractor for construction. In the event of an inconsistency between the drawings and the specifications or within either document, the Contractor shall seek clarification from the Architect / Engineer prior to bidding and construction.
22. All items not specifically noted as owner provided or installed shall be provided or installed by Contractor.
23. Contractor is to coordinate all work schedules within building with owner and users. Access into the building shall not be interrupted unless owner and user approval has been obtained.
24. Where repairs are performed, Contractor is responsible for providing all necessary components and labor in order to create a complete and workmanlike repair.
25. The contractor shall be responsible for determining the exact location, depth, and size of all utilities and structures, and shall be liable for any damage caused by failure to comply with these instructions.
9. The drawings represent general locations of improvements. It shall be the General Contractors responsibility to locate all improvements on project prior to alteration, addition, or tie-in. All damage shall be properly repaired by the General Contractor, at the Contractors expense.
10. The Contractor shall be responsible for permits and any charges for tie-in to existing street and utilities.
11. All work shall be performed in accordance with all applicable National, State, and local codes and regulations.
12. Concealed insulation shall have a Flame Spread of 0-25 and Smoke Development factor of 0-450.
13. All materials shall be new except where otherwise noted and shall conform with the standards of Underwriters Laboratory in every case where such a standard has been established for the particular type of material in question.
14. The Contractor shall obtain and pay all necessary permits, and after completion furnish owner certificates of inspections and approval as issued by the inspection department of the Parish.
GENERAL NOTES:
1. The Contractor shall visit the project and thoroughly aquaint himself with all aspects of the construction outlined in this document prior to submitting a bid. Any discrepancies shall be brought immediately to' the attention of the Architect or Engineer.
2. The Contractor shall provide all necessary safety apparatus required to insure the health of workers as well as the owners and general public.
3. The Contractor shall provide any project demolition / utility relocation necessary for completion of work.
4. In no way do the dimensions shown on the plans represent an exact quantity of materials. The bidder is soley responsible for the quantities in his bid.
5. All floor plan dimiensions are to the face of brick, face of stud, or to centerline of columns.
6. The Contractor shall keep the site and all interior spaces clean or trash and construction debris during construction during construction on a daily basis.
20. The drawings and specifications are separated into disiplines for the convenience of the Architect / Engineer and the Contractor. The seperatons used herein are used only for the purposes of convenience and reference and in no way do they define or limit the scope or intent of any part of the drawings or the drawings and specifications as a whole. The fact that the drawings are seoperated in no way to be constructed as a complete integrated and unified whole.
15. The Contractor shall be responsible for obtaining all necessary certificates of inspection, both at rough-in and completion. 16. All work is to have a one year warranty, minimum.
17. All portion of the existing building shall remain weathertight at all times. If construction is postponed, the contractor shall secure the building from inclement weather and vandalism.
18. Removal and disposal of all substances and materials to be accomplished according to specifications and Federal, State, and local regulations.
19. The storage of materials on site shall be allowed on designated areas. These areas will be determined prior to construction.
North
Tchoupitoulas Street
Joseph
Str
eet
(Sid
e)
Ara
bell a
Str
eet
( Sid
e)
5620 Tchoupitoulas Street
EXISTING BUILDING
New Orleans, Louisiana
Leake Avenue
(110' R.O.W.)
NEWDOCK
FACILITY
New concretefork lift ramp
(In accordance w/ O.S.H.A. 19.10.178(n)(17)
Existing dead-end ofArabella Street
PLEASE BE ADVISED THAT I HAVE RESEARCHED THE BUILDING & RELATED CONSTRUCTION CODES FOR ORLEANS PARISH AND THE LA. STATE UNIFORMCONSTRUCTION CODE, AND TO THE BEST OF MY KNOWLEDGE AND BELIEF THESE DRAWINGS ARE IN COMPLIANCE THEREWITH.
PLEASE BE ADVISED THAT THESE PLANS HAVE BEEN PREPAREDUNDER MY DIRECT SUPERVISION, BEING A REGISTERED ARCHITECT / CIVIL ENGINEER IN THE STATE OF LOUISIANA, AND THE DESIGN ANDSPECIFICATIONS GENERALLY COMPLY WITH ALL CITY, PARISH, ANDSTATE BUILDING CODE REQUIRMENTS TO THE BEST OF MY KNOWLEDGE AND BELIEF. THIS REVIEW DOES NOT ATTEST TO COMPLIANCE WITH ZONING, OR ENVIRONMENTAL REQUIREMENTS. I MADE NO SITE INSPECTION. I AM NOT ADMINISTERING THE CONSTRUCTION WORK. I TAKE FULL RESPONSIBILITY FOR THE CONTENTS OF THESE PLANS.
PROFESSIONAL ARCHITECT / CIVIL ENGINEER
STEPHEN P. CALI58 CYCASKENNER, LA. 70065504-388-8719REG. #21941
1. The site shall be filled and graded as necessary so that the entire property drains forward toward catch basiins at the street, except when conditions exist where the site can be sloped to drain in an alternate direction. Rain run-off shall be diverted around and away from any structures and shall not drain onto any abutting properties. If subsurface drainage is specified, rain run-off shall be directed to adequate and effective subsurface drainage systems. Site shall be graded so that rain run-off does not drain on to abutting properties even if the subsurface drainage system fails. Contractor shall observe minimum mandated flood elevations.
GENERAL SITE DEVELOPMENT NOTES:
Scale: 116" =1'-0"
1
A101
2. Verify required elevation of air conditioning condensing units with local code enforcing agencies prior to placing equipment.3. Owner shall be responsible for retaining the services of an arborist to determine potential damage to existing trees. Owner shall protect trees in accordance with arborists recommendations.4. Finished floor elevation shall be determined from an applicable and professionally certified firm and verified by survey prior to construction begins.5. Remove all organic vegetation and fill to 95% compaction below building foundation. Consult Architect / Engineer if site is to be filled more than 2 feet above natural ground elevation.
ENGINEER OF RECORD:
PRO
PO
SED
DO
CK F
ACIITY
FO
R M
ISSIO
NARY E
XPED
ITO
RS &
CARG
O L
OG
ISTIC
S5
62
0 T
CHO
UPIT
OULA
S S
TREET
NEW
ORLE
ANS,
LOUIS
IANA
Site Plan
Site P
lan
/ D
esig
n Crite
ria
A-101
CADD DWG No:
T.T.C.
DRAWN BY:
SHEET
DESIGNED BY:
PROJECT No:
S.P.C.
DATE:
04/2020
A-101 SITE PLAN / DESIGN CRITERIA
A-103A-102
A-104EXTERIOR ELEVATIONS / BUILDING CROSS-SECTIONFLOOR PLAN
FOUNDATION PLAN / FOUNDATION SECTIONS / FRAMING PLAN
SHEET INDEX:
FacilityDockNew
Roof overhang
New concrete fork lift ramp(In accordance w/ O.S.H.A. 19.10.178(n)(17)
Trench drain
Trench drain
EXISTING BUILDING
New
Dock
Fac
ility
Existing
Bui
ldin
g
New Dock Facility New Fork Lift Ramp
Existing dead-end ofArabella Street
Line of new edge ofArabella Street
Ara
bella
Str
eet
Roof overhang/4"o downspout
4"o PVC drain line
/
North
Note: Existing area is stone and concrete pavement.
Elevation ofbuilding floor
Existing
8"o
PVC d
rain
lin
e for
roof dra
ins
/
Existing elevation New elevation Drainage slope
New limestone gravel
EJ
Expansion joint
EJ
New limestone gravel
New 6" thick concrete
EJ EJ
EJ EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
LegendNOTE:Arabella Street & Leake Avenueto be reconstructed & extended under the existing constructioncontract for the new PrytaniaVeterinary Hospital located onParcel No. 21995, Hurtsville Square 2, New Orleans, LA.
New extension ofArabella Street
New extension ofLeake Avenue
PRO
PO
SED
DO
CK F
ACIITY
FO
R M
ISSIO
NARY E
XPED
ITO
RS &
CARG
O L
OG
ISTIC
S5
62
0 T
CHO
UPIT
OULA
S S
TREET
NEW
ORLE
ANS,
LOUIS
IANA
Paving / Drainage PlanA102
1
Dra
inag
e P
lan
A-102
CADD DWG No:
T.T.C.
DRAWN BY:
SHEET
DESIGNED BY:
PROJECT No:
S.P.C.
DATE:
04/2020
Scale: 1"=10'-0"
New 14'w x 12'h roll-up door unit
New 4"x 14" HSSTsteel tube column
A1052(Ref: Detail )
NOTE: Anchor 4" HSST steel tube column & base to slab - weld W8x15 header to column plate / HSST column - and weld assembly to existing horizontal steel building struts. Weld new door jambs to HSST columns & install new roll-up door & components as per manufacturers recomendations.
(In accordance w/ O.S.H.A. 19.10.178(n)(17)
New concrete fork lift ramp
Up
Roof overhang
NewDockFacility
420 FIM 20ga flat slat certified 135 mph windload and impactrated rolling steel service doorby ASTA Door Corporation.