Top Banner
1 3 79720-0033 GHE CLEAN LINE PIPE SPOOL - THRU TRENCH TO DISTRIBUTION - - 6 2 79720-0024 GHE CLEAN LINE INTAKE SPOOL ASSY - - 1 1 79720-0023 GHE CLEAN LINE MAIN HEADER PIPE SPOOL - - QTY REQD ITEM NO. PART OR IDENTIFYING NO. NOMENCLATURE OR DESCRIPTION MATERIAL SPECIFICATION NOTES PARTS LIST QTY REQD NOMENCLATURE OR DESCRIPTION QTY REQD NOTES ITEM NO. PARTS LIST MATERIAL SPECIFICATION PART OR IDENTIFYING NO. \ .XX \ .X \ \ .XXX \ REV. C C 7 7 6 6 5 5 4 4 3 3 2 8 8 D B A D B A 1 2 1 REVISION HISTORY ZONE REV DESCRIPTION DATE APPROVED THIRD ANGLE PROJECTION MATERIAL DEBURR & BREAK ALL SHARP EDGES DO NOT SCALE DRAWING SHEET OF USED ON ASSY NO. SCALE DWG. NO. SIZE DRAWN D 1 1 United States Department of Energy Newport News Virginia DIM & TOL PER ASME Y14.5. UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES. FRACTIONS DECIMAL ANGLES FINISH MACHINE SURFACES UNLESS OTHERWISE NOTED DATE TOLERANCES ARE: LCLS-II STORAGE WARM He GHe CLEAN LINE PIPING ARRANGEMENT 79720-0012 - NONE 79720-0010 SEE PARTS LIST 125 T. CRAHAN 28APR17 N/A .1 .01 .005 .50` ISOMETRIC VIEW 3 2 1 TYP CONTINUE TO 79120-2017 (ON 79120-0028, CP1 NORTH SLAB) RESTRICTIVE NOTICE: These designs and drawings were prepared by Jefferson Science Associates, LLC, hereinafter the Contractor, under Contract No. DE-AC05-06OR23177 with the Department of Energy (DOE). All rights in the designs and drawings are reserved by DOE on behalf of the United States Government and the Contractor as provided in the Contract. You are authorized to use these works for Governmental purposes but it is not to be released or distributed to the public. NEITHER THE GOVERNMENT NOR THE CONTRACTOR MAKES ANY WARRANTY, EXPRESS OR IMPLIED, OR ASSUMES ANY LIABILITY FOR THE USE OF THESE DESIGNS OR DRAWINGS. (This notice including this sentence must appear on any copies of these designs or drawings.) DETAIL A DETAIL A TYP 6X 1) ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THE GHE CLEAN LINE IS A NORMAL SERVICE SYSTEM. 2) SEE SPOOL DRAWINGS FOR SERVICE, DESIGN PARAMETERS AND LEAK TEST METHOD / PRESSURE. REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. LEAK TEST PIPES PRIOR TO FASTENING TO SUPPORTS. 3) CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES. 4) DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION. 5) P&ID 79720-0000 IS ASSOCIATED WITH THIS PIPING ASSEMBLY. THIS ASSEMBLY BELONGS TO PRESSURE SYSTEM 79720-PS-002. 6) TEE AND ELBOW LOCATIONS SET BY AS-BUILT LOCATIONS OF TRENCH AND ASSOCIATED CONNECTIONS ON THE HELIUM STORAGE TANKS. 7) TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #1 SHALL BE LABELED WITH A PREFIX OF "C1", TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #2 SHALL BE LABELED WITH A PREFIX OF "C2". COMPONENTS COMMON TO BOTH CRYOGENIC PLANTS SHALL BE LABELED WITH A PREFIX OF "C". 8) ALL COMPONENTS ON THIS DRAWING ARE COMMON TO BOTH CRYOGENIC PLANTS. 9) INTERFACE WITH GFP(E) HE GAS STORAGE TANK (79720-0021). SEE 79720-0021 FOR INTERFACE DEMOLITION DETAILS. SEE 79720-0010 FOR INTERFACE CONNECTION DETAILS. 7,8 7,8 7,8 7,8 7,8 7,8 HE-011 9 HE-021 HE-031 HE-041 HE-051 HE-061 9 9 9 9 9 EV11103 EV11203 EV11303 EV11403 EV11503 EV11603 Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell | GC PACKAGE 100% FOR REVIEW
10

New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

Oct 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

1 3 79720-0033 GHE CLEAN LINE PIPE SPOOL -THRU TRENCH TO DISTRIBUTION - -

6 2 79720-0024 GHE CLEAN LINE INTAKE SPOOLASSY - -

1 1 79720-0023 GHE CLEAN LINE MAIN HEADERPIPE SPOOL - -

QTYREQD

ITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

QTYREQD

NOMENCLATUREOR DESCRIPTION

QTYREQD NOTESITEM

NO.

PARTS LIST

MATERIALSPECIFICATION

PART ORIDENTIFYING NO.

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION DATE APPROVED

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

DIM & TOL PER ASME Y14.5. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.

FRACTIONS DECIMAL ANGLES

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

TOLERANCES ARE:

LCLS-IISTORAGEWARM He

GHe CLEAN LINE PIPING ARRANGEMENT

79720-0012 -NONE 79720-0010

SEE PARTS LIST

125

T. CRAHAN 28APR17

N/A .1.01.005

.50`

ISOMETRIC VIEW

3

2

1

TYP

CONTINUE TO 79120-2017(ON 79120-0028,CP1 NORTH SLAB)

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pre

pare

d by

Jef

fers

on S

cienc

e As

socia

tes,

LLC,

her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct No

. DE-

AC05

-06OR

2317

7 with

the

Depa

rtmen

t of E

nerg

y (DO

E). A

ll rig

hts

in th

e de

signs

and d

rawi

ngs

are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovide

d in

the

Cont

ract

. You

are

aut

horiz

ed to

use

thes

e wo

rks

for G

over

nmen

tal pu

rpos

es b

ut it

is n

ot to

be

relea

sed

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY L

IABI

LITY

FOR T

HE US

E OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

cludi

ng th

is se

nten

ce m

ust a

ppea

r on

any c

opies

of t

hese

des

igns

or d

rawi

ngs.

)

DETAIL A

DETAIL A

TYP

6X

1) ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THE GHE CLEAN LINE IS A NORMAL SERVICE SYSTEM.

2) SEE SPOOL DRAWINGS FOR SERVICE, DESIGN PARAMETERS AND LEAK TEST METHOD / PRESSURE. REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. LEAK TEST PIPES PRIOR TO FASTENING TO SUPPORTS.

3) CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4) DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

5) P&ID 79720-0000 IS ASSOCIATED WITH THIS PIPING ASSEMBLY. THIS ASSEMBLY BELONGS TO PRESSURE SYSTEM 79720-PS-002.

6) TEE AND ELBOW LOCATIONS SET BY AS-BUILT LOCATIONS OF TRENCH AND ASSOCIATED CONNECTIONS ON THE HELIUM STORAGE TANKS.

7) TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #1 SHALL BE LABELED WITH A PREFIX OF "C1", TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #2 SHALL BE LABELED WITH A PREFIX OF "C2". COMPONENTS COMMON TO BOTH CRYOGENIC PLANTS SHALL BE LABELED WITH A PREFIX OF "C".

8) ALL COMPONENTS ON THIS DRAWING ARE COMMON TO BOTH CRYOGENIC PLANTS.

9) INTERFACE WITH GFP(E) HE GAS STORAGE TANK (79720-0021). SEE 79720-0021 FOR INTERFACE DEMOLITION DETAILS. SEE 79720-0010 FOR INTERFACE CONNECTION DETAILS.

7,8

7,8

7,8

7,8

7,8

7,8

HE-011

9HE-021

HE-031

HE-041

HE-051

HE-061

9

9

9

9

9

EV11103

EV11203

EV11303

EV11403

EV11503

EV11603 Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 2: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION DATE APPROVED

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

DIM & TOL PER ASME Y14.5. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.

FRACTIONS DECIMAL ANGLES

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

TOLERANCES ARE:

LCLS-IISTORAGEWARM He

GHe PURIFIER DISCHARGE LINE PIPING ARRANGEMENT

79720-0013 -NONE 79720-0010

SEE PARTS LIST

125

T. CRAHAN 1 MAR 16

1/16" .1.01.005

.50`

1 3 79720-0032 GHE PURIFIER DISCHARGE PIPESPOOL - THRU TRENCH - -

6 2 79720-0028 GHE PURIFIER DISCHARGEUPPER SPOOL ASSY - -

1 1 79720-0027 GHE PURIFIER DISCHARGEHEADER SPOOL ASSY - -

QTYREQD

ITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

2

1

3

ISOMETRIC VIEW

TYP

CONTINUE FROM79120-2017 (ON 79120-0028, CP1,NORTH SLAB)

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pre

pare

d by

Jef

fers

on S

cienc

e As

socia

tes,

LLC,

her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct No

. DE-

AC05

-06OR

2317

7 with

the

Depa

rtmen

t of E

nerg

y (DO

E). A

ll rig

hts

in th

e de

signs

and d

rawi

ngs

are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovide

d in

the

Cont

ract

. You

are

aut

horiz

ed to

use

thes

e wo

rks

for G

over

nmen

tal pu

rpos

es b

ut it

is n

ot to

be

relea

sed

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY L

IABI

LITY

FOR T

HE US

E OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

cludi

ng th

is se

nten

ce m

ust a

ppea

r on

any c

opies

of t

hese

des

igns

or d

rawi

ngs.

)

DETAIL A

DETAIL A

TYP

6X

9

9

9

9

7,8

7,8

7,8

7,8

HE-012

HE-022

HE-032

HE-042

HE-052

HE-062

9

9

7,8

7,8

NOTES:

1) ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THE GHE PURIFIER DISCHARGE IS A NORMAL SERVICE SYSTEM.

2) SEE SPOOL DRAWINGS FOR SERVICE, DESIGN PARAMETERS AND LEAK TEST METHOD/PRESSURE. REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. LEAK TEST PIPES PRIOR TO FASTENING TO SUPPORTS.

3) CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4) DIMENSIONS ARE NOMINAL FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

5) P&ID 79720-0000 IS ASSOCIATED WITH THIS PIPING ASSEMBLY. THIS ASSEMBLY BELONGS TO PRESSURE SYSTEM 79720-PS-002.

6) TEE AND ELBOW LOCATIONS SET BY AS-BUILT LOCATIONS OF TRENCH AND ASSOCIATED CONNECTIONS ON THE HELIUM STORAGE TANKS.

7) TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #1 SHALL BE LABELED WITH A PREFIX OF "C1", TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #2 SHALL BE LABELED WITH A PREFIX OF "C2". COMPONENTS COMMON TO BOTH CRYOGENIC PLANTS SHALL BE LABELED WITH A PREFIX OF "C".

8) ALL COMPONENTS ON THIS DRAWING ARE COMMON TO BOTH CRYOGENIC PLANTS.

9) INTERFACE WITH GFP(E) HE GAS STORAGE TANK (79720-0021). SEE 79720-0021 FOR INTERFACE DEMOLITION DETAILS. SEE 79720-0010 FOR INTERFACE CONNECTION DETAILS.

EV11102

EV11202

EV11302

EV11402

EV11502

EV11602 Approved: 5/2/2017; E-Sign ID : 342100; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 3: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

1 6JAMESBURY

2-4CBV-3600XT-B2W/ ELEC ACTR

BALL VALVE, 2 NPS 3-PC STDPORT SW 2500 PSI W/ VALVCON

LCR600S2TS24DCSS 316 -

1 5 75600-0026-0300-A-300

FLANGE, 3 NPS 300# WN RF,O-RING GROOVE

ASME B16.5ASTM A182-F304/304L -

1 4 - FLANGE, 3 NPS 300# WN RF,32 RMS

ASME B16.5ASTM A182-F304/304L -

2 3 - ELBOW 90 DEG, 2 NPS SCH-10LR, BW

ASME B16.9 ASTM A403-WP304/304L -

1 2 - TEE REDUCING, 3 X 2 NPSSCH-10, BW

ASME B16.9 ASTM A403-WP304/304L -

A/R 1 - PIPE 2 NPS SCH-10 ASTM A312-TP304/304L -QTY

REQDITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

QTYREQD

NOMENCLATUREOR DESCRIPTION

QTYREQD NOTESITEM

NO.

PARTS LIST

MATERIALSPECIFICATION

PART ORIDENTIFYING NO.

LCLS-IISTORAGEWARM He

GHe DIRTY LINE INTK SPOOL ASSY

79720-0017 -NONE 79720-0011

SEE PARTS LIST

125

J.TSCHIRHART 26AUG2016

1/8 .1.01.005

.50`\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

DATE/REVISER

DIM & TOL PER ASME Y14.5 2009. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.TOLERANCES ARE:FRACTIONS DECIMAL ANGLES

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

DATE/REVISER

DIM & TOL PER ASME Y14.5 2009. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.TOLERANCES ARE:FRACTIONS DECIMAL ANGLES

NOTES:

3'-6"

ISOMETRIC VIEW

5

2

4

1

1

3

6

3

1

1138"

3'-10 516"

1

1/8BOTH ENDS

TYP

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pre

pare

d by

Jef

fers

on S

cienc

e As

socia

tes,

LLC,

her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct No

. DE-

AC05

-06OR

2317

7 with

the

Depa

rtmen

t of E

nerg

y (DO

E). A

ll rig

hts

in th

e de

signs

and d

rawi

ngs

are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovide

d in

the

Cont

ract

. You

are

aut

horiz

ed to

use

thes

e wo

rks

for G

over

nmen

tal pu

rpos

es b

ut it

is n

ot to

be

relea

sed

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY L

IABI

LITY

FOR T

HE US

E OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

cludi

ng th

is se

nten

ce m

ust a

ppea

r on

any c

opies

of t

hese

des

igns

or d

rawi

ngs.

)

1) ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THIS SYSTEM IS DESIGNATED:NORMAL SERVICE 2) FLUID HELIUM DESIGN PRESSURE=320 PSIG. DESIGN TEMPERATURE=30 F MIN TO 120 F MAX

3) CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4) REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. PERMITTED LEAK TEST FOR THIS ASSEMBLY IS A PNEUMATIC TEST AT 352 PSIG. 5) DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

6) PRINT THE DRAWING ASSEMBLY NUMBER ON EACH SPOOL SEGMENT PIPE SURFACE USING INDELIBLE INK.

7) DRAIN TEE LOCATION SET BY AS-BUILT LOCATION OF ASSOCIATED CONNECTION ON THE HELIUM STORAGE TANKS.

8) TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #1 SHALL BE LABELED WITH A PREFIX OF "C1", TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #2 SHALL BE LABELED WITH A PREFIX OF "C2". COMPONENTS COMMON TO BOTH CRYOGENIC PLANTS SHALL BE LABELED WITH A PREFIX OF "C".

9) ALL COMPONENTS ON THIS DRAWING ARE COMMON TO BOTH CRYOGENIC PLANTS.

10) TAG NUMBERS THAT ARE TYPICAL TO MORE THAN ONE LOCATION USE X TO INDICATE THE CHARACTER THAT VARIES BY LOCATION. IN THIS APPLICATION, X IS EQUAL TO THE LAST DIGIT IN THE TAG NUMBER OF THE ASSOCIATED GAS HELIUM STORAGE TANK

EV11X04

10

9

6

3'-034"

8 Approved: 5/2/2017; E-Sign ID : 342103; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 4: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

1 6 - CAP, 4 NPS SCH-10, BW ASME B16.9ASTM A403-WP304/304L -

2 5 - ELBOW 90 DEG, 4 NPS SCH-10LR, BW

ASME B16.9ASTM A403-WP304/304L -

1 4 - ELBOW 90 DEG, 4 NPS SCH-10SR, BW

ASME B16.9ASTM A403-WP304/304L -

2 3 - ELBOW 45 DEG, 4 NPS SCH-10,BW

ASME B16.9ASTM A403-WP304/304L -

6 2 - TEE REDUCING, 4 X 2 NPSSCH-10, BW

ASME B16.9ASTM A403-WP304/304L -

A/R 1 - PIPE 4 NPS SCH 10 ASTM A312-TP304/304L -QTY

REQDITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

QTYREQD

NOMENCLATUREOR DESCRIPTION

QTYREQD NOTESITEM

NO.

PARTS LIST

MATERIALSPECIFICATION

PART ORIDENTIFYING NO.

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION DATE APPROVED

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

DIM & TOL PER ASME Y14.5. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.

FRACTIONS DECIMAL ANGLES

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

TOLERANCES ARE:

LCLS-IISTORAGEWARM He

GHe CLEAN LINE MAIN HEADER PIPE SPOOL

79720-0023 -NONE 79720-0012

SEE NOTES

125

T. CRAHAN 1 MAR 16

1/16 .1.01.005

.50`

6

5

2

14'-858" 14'-0" 14'-0" 14'-0" 14'-0" 14'-0"

86'-034"

4'-478"

5'-014"

NOTES:1. ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THIS SYSTEM IS DESIGNATED: NORMAL SERVICE 2. FLUID HELIUM DESIGN PRESSURE= 320 PSIG. DESIGN TEMPERATURE = 30 F MIN TO 120 F MAX.

3. CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4. REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. PERMITTED LEAK TEST FOR THIS ASSEMBLY IS A PNEUMATIC TEST AT 352 PSIG. 5. DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

6. PRINT THE DRAWING ASSEMBLY NUMBER ON EACH SPOOL SEGMENT PIPE SURFACE USING INDELIBLE INK.

7. TEE AND ELBOW LOCATIONS SET BY AS-BUILT LOCATIONS OF TRENCH AND ASSOCIATED CONNECTIONS ON THE HELIUM STORAGE TANKS.

ISOMETRIC VIEW

6X

4

1'-418"

5

2X1

TYP

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pr

epar

ed b

y Je

ffers

on S

cienc

e As

socia

tes,

LLC

, her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct N

o. D

E-AC

05-06

OR23

177 w

ith th

e De

partm

ent o

f Ene

rgy (

DOE)

. A

ll rig

hts

in th

e de

signs

and

dra

wing

s are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovid

ed in

the

Cont

ract

. You

are

auth

orize

d to

use

thes

e wo

rks

for G

over

nmen

tal p

urpo

ses b

ut it

is n

ot to

be

rele

ased

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY

LIAB

ILIT

Y FO

R THE

USE

OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

clud

ing

this

sent

ence

mus

t app

ear o

n an

y cop

ies

of th

ese

desig

ns o

r dra

wing

s.)

DETAIL A

9 316"

1'-31116"

4

1

3

9 316"

REF

1

REF

TYP Approved: 5/2/2017; E-Sign ID : 342112; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 5: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

QTYREQD

NOMENCLATUREOR DESCRIPTION

QTYREQD NOTESITEM

NO.

PARTS LIST

MATERIALSPECIFICATION

PART ORIDENTIFYING NO.

LCLS-IISTORAGEWARM He

GHe CLEAN LINE INTAKE SPOOL ASSY

79720-0024 -NONE 79720-0012

SEE PARTS LIST

125

J.TSCHIRHART 26AUG2016

1/8 .1.01.005

.50`\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

DATE/REVISER

DIM & TOL PER ASME Y14.5 2009. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.TOLERANCES ARE:FRACTIONS DECIMAL ANGLES

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

DATE/REVISER

DIM & TOL PER ASME Y14.5 2009. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.TOLERANCES ARE:FRACTIONS DECIMAL ANGLES

1 4

JAMESBURY2-4CBV-3600XT-B2

W/ ELEC ACTRADCW6

BALL VALVE, 2 NPS 3-PC STDPORT SW 2500 PSI W/ VALVCON

ADCW600UL2-UPSS 316 -

1 3 - FLANGE, 2 NPS 300# SO RF,32 RMS

ASME B16.5 ASTM A182-F304/304L 7

2 2 - ELBOW 90 DEG, 2 NPS SCH-10LR, BW

ASME B16.9ASTM A403-WP304/304L -

A/R 1 - PIPE 2 NPS SCH-10 ASTM A312-TP304/304L -QTY

REQDITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pre

pare

d by

Jef

fers

on S

cienc

e As

socia

tes,

LLC,

her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct No

. DE-

AC05

-06OR

2317

7 with

the

Depa

rtmen

t of E

nerg

y (DO

E). A

ll rig

hts

in th

e de

signs

and d

rawi

ngs

are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovide

d in

the

Cont

ract

. You

are

aut

horiz

ed to

use

thes

e wo

rks

for G

over

nmen

tal pu

rpos

es b

ut it

is n

ot to

be

relea

sed

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY L

IABI

LITY

FOR T

HE US

E OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

cludi

ng th

is se

nten

ce m

ust a

ppea

r on

any c

opies

of t

hese

des

igns

or d

rawi

ngs.

)

4

2

1

37

4'-734"

7'-512"

6"

ISOMETRIC VIEW

1

TYP

1/8 BOTH ENDS

TYP

NOTES:1) ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THIS SYSTEM IS DESIGNATED: NORMAL SERVICE 2) FLUID HELIUM DESIGN PRESSURE= 320 PSIG. DESIGN TEMPERATURE = 30 F MIN TO 120 F MAX.

3) CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4) REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. PERMITTED LEAK TEST FOR THIS ASSEMBLY IS A PNEUMATIC TEST AT 352 PSIG. 5) DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

6) PRINT THE DRAWING ASSEMBLY NUMBER ON EACH SPOOL SEGMENT PIPE SURFACE USING INDELIBLE INK.

2X

7) SEE DRAWING 75600-0691 FOR SLIP-ON FLANGE WELDING DETAILS.

8) FLANGE LOCATION SET BY AS-BUILT LOCATION OF ASSOCIATED CONNECTION ON THE HELIUM STORAGE TANKS.

9) TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #1 SHALL BE LABELED WITH A PREFIX OF "C1", TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #2 SHALL BE LABELED WITH A PREFIX OF "C2". COMPONENTS COMMON TOBOTH CRYOGENIC PLANTS SHALL BE LABELED WITH A PREFIX OF "C".

10)ALL COMPONENTS ON THIS DRAWING ARE COMMON TO BOTH CRYOGENIC PLANTS.

11)TAG NUMBERS THAT ARE TYPICAL TO MORE THAN ONE LOCATION USE X TO INDICATE THE CHARACTER THAT VARIES BY LOCATION. IN THIS APPLICATION, X IS EQUAL TO THE LAST DIGIT IN THE TAG NUMBER OF THE ASSOCIATED GAS HELIUM STORAGE TANK.

9

10

11

491516"

EV11X03 Approved: 5/2/2017; E-Sign ID : 342097; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 6: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

1 6 - CAP, 4 NPS SCH-10, BW ASME B16.9 ASTM A403-WP304/304L -

1 5 - ELBOW 90 DEG, 4 NPS SCH-10SR, BW

ASME B16.9 ASTM A403-WP304/304L -

2 4 - ELBOW 90 DEG, 4 NPS SCH-10LR, BW

ASME B16.9 ASTM A403-WP304/304L -

1 3 - ELBOW 45 DEG, 4 NPS SCH-10,BW

ASME B16.9 ASTM A403-WP304/304L -

6 2 - TEE REDUCING, 4 X 2 NPSSCH-10, BW

ASME B16.9 ASTM A403-WP304/304L -

A/R 1 - PIPE 4 NPS SCH-10 ASTM A312-TP304/304L 6QTY

REQDITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

QTYREQD

NOMENCLATUREOR DESCRIPTION

QTYREQD NOTESITEM

NO.

PARTS LIST

MATERIALSPECIFICATION

PART ORIDENTIFYING NO.

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION DATE APPROVED

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

DIM & TOL PER ASME Y14.5. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.

FRACTIONS DECIMAL ANGLES

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

TOLERANCES ARE:

LCLS-IISTORAGEWARM He

GHe PURIFIER DISCHARGE HEADER SPOOL ASSY

79720-0027 -NONE 79720-0013

SEE PARTS LIST

125

T. CRAHAN 1 MAR 16

1/16 .1.01.005

.50`

5

1

4

2

6

14'-158" 14'-0" 14'-0" 14'-0" 14'-0" 14'-0"

85'-534"

3'-478"

5'-014"

ISOMETRIC VIEW

6X

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pre

pare

d by

Jef

fers

on S

cienc

e As

socia

tes,

LLC,

her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct No

. DE-

AC05

-06OR

2317

7 with

the

Depa

rtmen

t of E

nerg

y (DO

E). A

ll rig

hts

in th

e de

signs

and d

rawi

ngs

are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovide

d in

the

Cont

ract

. You

are

aut

horiz

ed to

use

thes

e wo

rks

for G

over

nmen

tal pu

rpos

es b

ut it

is n

ot to

be

relea

sed

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY L

IABI

LITY

FOR T

HE US

E OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

cludi

ng th

is se

nten

ce m

ust a

ppea

r on

any c

opies

of t

hese

des

igns

or d

rawi

ngs.

)

1'-418"

DETAIL B

B

49 316"

9 316"

5REF1

3

1 REFDETAIL A

DETAIL A

TYP

NOTES:

1) ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THIS SYSTEM IS DESIGNATED: NORMAL SERVICE 2) FLUID HELIUM DESIGN PRESSURE= 275 PSIG. DESIGN TEMPERATURE = 30 F MIN TO 120 F MAX.

3) CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES,INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4) REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. PERMITTED LEAK TEST FOR THIS ASSEMBLY IS A PNEUMATIC TEST AT 303 PSIG.

5) DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

6) PRINT THE DRAWING ASSEMBLY NUMBER ON EACH SPOOL SEGMENT PIPE SURFACE USING INDELIBLE INK.

7) TEE AND ELBOW LOCATIONS SET BY AS-BUILT LOCATION OF TRENCH AND ASSOCIATED CONNECTIONS ON THE HELIUM STORAGE TANKS.

TYP Approved: 5/2/2017; E-Sign ID : 342102; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 7: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

LCLS-IISTORAGEWARM He

GHe PURIFIER DISCHARGE UPPER SPOOL ASSY

79720-0028 -NONE 79720-0013

SEE PARTS LIST

125

J.TSCHIRHART 26AUG2016

1/8 .1.01.005

.50`\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

DATE/REVISER

DIM & TOL PER ASME Y14.5 2009. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.TOLERANCES ARE:FRACTIONS DECIMAL ANGLES

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

DATE/REVISER

DIM & TOL PER ASME Y14.5 2009. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.TOLERANCES ARE:FRACTIONS DECIMAL ANGLES

1 4

JAMESBURY2-4CBV-3600XT-B2

W/ ELEC ACTRADCW6

BALL VALVE, 2 NPS 3-PC STDPORT SW 2500 PSI W/ VALVCON

ADCW600UL2-UPSS 316 -

1 3 - FLANGE, 2 NPS 300# SO RF,32 RMS

ASME B16.5ASTM A182-F304/304L 7

2 2 - ELBOW 90 DEG, 2 NPS SCH-10LR, BW

ASME B16.9ASTM A403-WP304/304L -

A/R 1 - PIPE 2 NPS SCH-10 ASTM A312-TP304/304L -QTY

REQDITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pre

pare

d by

Jef

fers

on S

cienc

e As

socia

tes,

LLC,

her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct No

. DE-

AC05

-06OR

2317

7 with

the

Depa

rtmen

t of E

nerg

y (DO

E). A

ll rig

hts

in th

e de

signs

and d

rawi

ngs

are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovide

d in

the

Cont

ract

. You

are

aut

horiz

ed to

use

thes

e wo

rks

for G

over

nmen

tal pu

rpos

es b

ut it

is n

ot to

be

relea

sed

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY L

IABI

LITY

FOR T

HE US

E OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

cludi

ng th

is se

nten

ce m

ust a

ppea

r on

any c

opies

of t

hese

des

igns

or d

rawi

ngs.

)

NOTES:

3

2

2

1

4

7

TYP

1/8 BOTH ENDS

6"

5'-734"

9'-512"

ISOMETRIC VIEW

9

10

11

1) ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THIS SYSTEM IS DESIGNATED: NORMAL SERVICE 2) FLUID HELIUM DESIGN PRESSURE= 275 PSIG. DESIGN TEMPERATURE = 30 F MIN TO 120 F MAX.

3) CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES,INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4) REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. PERMITTED LEAK TEST FOR THIS ASSEMBLY IS A PNEUMATIC TEST AT 303 PSIG.

5) DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIORTO THE START OF FABRICATION.

6) PRINT THE DRAWING ASSEMBLY NUMBER ON EACH SPOOL SEGMENT PIPE SURFACE USING INDELIBLE INK.

7) SEE DRAWING 75600-0691 FOR SLIP-ON FLANGE WELDING DETAILS.

8) FLANGE LOCATION SET BY AS-BUILT LOCATION OF ASSOCIATED CONNECTION ON THE HELIUM STORAGE TANKS.

9) TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #1 SHALL BE LABELED WITH A PREFIX OF "C1", TAG NUMBERS FOR COMPONENTS USED IN CRYOGENIC PLANT #2 SHALL BE LABELED WITH A PREFIX OF "C2". COMPONENTS COMMON TO BOTH CRYOGENIC PLANTS SHALL BE LABELED WITH A PREFIX OF "C".

10) ALL COMPONENTS ON THIS DRAWING ARE COMMON TO BOTH CRYOGENIC PLANTS.

11) TAG NUMBERS THAT ARE TYPICAL TO MORE THAN ONE LOCATION USE X TO INDICATE THE CHARACTER THAT VARIES BY LOCATION. IN THIS APPLICATION,X IS EQUAL TO THE LAST DIGIT IN THE TAG NUMBER OF THE ASSOCIATED GAS HELIUM STORAGE TANK.

6'-11516"

EV11X02

TYP

1REF Approved: 5/2/2017; E-Sign ID : 342101; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 8: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

1 2 - ELBOW 90 DEG, 4 NPS SCH-10LR, BW

ASME B16.9ASTM A403-WP304/304L -

A/R 1 - PIPE 4 NPS SCH-10 ASTM A312-TP304/304L -QTY

REQDITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

QTYREQD

NOMENCLATUREOR DESCRIPTION

QTYREQD NOTESITEM

NO.

PARTS LIST

MATERIALSPECIFICATION

PART ORIDENTIFYING NO.

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION DATE APPROVED

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

DIM & TOL PER ASME Y14.5. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.

FRACTIONS DECIMAL ANGLES

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

TOLERANCES ARE:

LCLS-IISTORAGEWARM He

DIRTY LINE PIPE SPOOL - THRU TRENCH

79720-0031 -NONE 79720-0011

SEE PARTS LIST

125

T. CRAHAN 3 MAR 16

1/16 .1.01.005

.50`

1

2

NOTES:

1. ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THIS SYSTEM IS DESIGNATED: NORMAL SERVICE 2. FLUID HELIUM DESIGN PRESSURE= 320 PSIG. DESIGN TEMPERATURE = 30 F MIN TO 120 F MAX.

3. CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4. REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. PERMITTED LEAK TEST FOR THIS ASSEMBLY IS A PNEUMATIC TEST AT 352 PSIG. 5. DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

6. PRINT THE DRAWING ASSEMBLY NUMBER ON EACH SPOOL SEGMENT PIPE SURFACE USING INDELIBLE INK.

ISOMETRIC VIEW

56'-10 316"

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pr

epar

ed b

y Je

ffers

on S

cienc

e As

socia

tes,

LLC

, her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct N

o. D

E-AC

05-06

OR23

177 w

ith th

e De

partm

ent o

f Ene

rgy (

DOE)

. A

ll rig

hts

in th

e de

signs

and

dra

wing

s are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovid

ed in

the

Cont

ract

. You

are

auth

orize

d to

use

thes

e wo

rks

for G

over

nmen

tal p

urpo

ses b

ut it

is n

ot to

be

rele

ased

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY

LIAB

ILIT

Y FO

R THE

USE

OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

clud

ing

this

sent

ence

mus

t app

ear o

n an

y cop

ies

of th

ese

desig

ns o

r dra

wing

s.)

Approved: 5/2/2017; E-Sign ID : 342113; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 9: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

1 2 - ELBOW 90 DEG, 4 NPS SCH-10LR, BW

ASME B16.9ASTM A403-WP304/304L -

A/R 1 - PIPE 4 NPS SCH-10 ASTM A312-TP304/304L -QTY

REQDITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

QTYREQD

NOMENCLATUREOR DESCRIPTION

QTYREQD NOTESITEM

NO.

PARTS LIST

MATERIALSPECIFICATION

PART ORIDENTIFYING NO.

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION DATE APPROVED

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

DIM & TOL PER ASME Y14.5. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.

FRACTIONS DECIMAL ANGLES

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

TOLERANCES ARE:

LCLS-IISTORAGEWARM He

GHe PURIFIER DISCHARGE PIPE SPOOL - THRU TRENCH

79720-0032 -NONE 79720-0013

SEE PARTS LIST

125

T. CRAHAN 1 MAR 16

1/16 .1.01.005

.50`

58'-9 316"

ISOMETRIC VIEW

1

2

NOTES:

1. ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THIS SYSTEM IS DESIGNATED: NORMAL SERVICE 2. FLUID HELIUM DESIGN PRESSURE= 275 PSIG. DESIGN TEMPERATURE = 30 F MIN TO 120 F MAX.

3. CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4. REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. PERMITTED LEAK TEST FOR THIS ASSEMBLY IS A PNEUMATIC TEST AT 303 PSIG. 5. DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

6. PRINT THE DRAWING ASSEMBLY NUMBER ON EACH SPOOL SEGMENT PIPE SURFACE USING INDELIBLE INK.

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pr

epar

ed b

y Je

ffers

on S

cienc

e As

socia

tes,

LLC

, her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct N

o. D

E-AC

05-06

OR23

177 w

ith th

e De

partm

ent o

f Ene

rgy (

DOE)

. A

ll rig

hts

in th

e de

signs

and

dra

wing

s are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovid

ed in

the

Cont

ract

. You

are

auth

orize

d to

use

thes

e wo

rks

for G

over

nmen

tal p

urpo

ses b

ut it

is n

ot to

be

rele

ased

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY

LIAB

ILIT

Y FO

R THE

USE

OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

clud

ing

this

sent

ence

mus

t app

ear o

n an

y cop

ies

of th

ese

desig

ns o

r dra

wing

s.)

Approved: 5/2/2017; E-Sign ID : 342111; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW

Page 10: New Approved: 5/2/2017; E-Sign ID : 342096; signed by: Ap. 1: S. … · 2017. 6. 1. · elbow 90 deg, 2 nps sch-10 lr, bw asme b16.9 astm a403-wp304/304l-1 2 - tee reducing, 3 x 2

\.XX \.X \\

.XXX \

REV.

CC

7

7

6

6

5

5

4

4

3

3 2

8

8

D

B

A

D

B

A

12

1

REVISION HISTORY

ZONE REV DESCRIPTION DATE APPROVED

THIRD ANGLE PROJECTION

MATERIAL

DEBURR & BREAK ALL SHARP EDGES

DO NOT SCALE DRAWING

SHEET OFUSED ON ASSY NO.SCALE

DWG. NO.SIZE

DRAWND

1 1

United States Department of Energy

Newport News Virginia

DIM & TOL PER ASME Y14.5. UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES.

FRACTIONS DECIMAL ANGLES

FINISHMACHINE

SURFACES

UNLESSOTHERWISE

NOTED

DATE

TOLERANCES ARE:

LCLS-IISTORAGEWARM He

GHe CLEAN LINE PIPE SPOOL - THRU TRENCH TO DISTRIBUTION

79720-0033 -NONE 79720-0012

SEE PARTS LIST

125

T. CRAHAN 1 MAR 16

1/16 .1.01.005

.50`

53'-734"

ISOMETRIC VIEW

1 2 - ELBOW 90 DEG, 4 NPS SCH-10LR, BW

ASME B16.9ASTM A403-WP304/304L -

A/R 1 - PIPE 4 NPS SCH-10 ASTM A312-TP304/304L -QTY

REQDITEMNO.

PART ORIDENTIFYING NO.

NOMENCLATUREOR DESCRIPTION

MATERIALSPECIFICATION NOTES

PARTS LIST

1

2

REST

RICTIV

E NOT

ICE:

The

se d

esign

s and

dra

wing

s wer

e pr

epar

ed b

y Je

ffers

on S

cienc

e As

socia

tes,

LLC

, her

eina

fter t

he C

ontra

ctor

, und

er C

ontra

ct N

o. D

E-AC

05-06

OR23

177 w

ith th

e De

partm

ent o

f Ene

rgy (

DOE)

. A

ll rig

hts

in th

e de

signs

and

dra

wing

s are

rese

rved

by D

OE o

n be

half

of th

e Un

ited

Stat

es G

overn

ment

and

the

Cont

ract

or a

s pr

ovid

ed in

the

Cont

ract

. You

are

auth

orize

d to

use

thes

e wo

rks

for G

over

nmen

tal p

urpo

ses b

ut it

is n

ot to

be

rele

ased

or d

istri

bute

d to

the

publ

ic. N

EITHE

R TH

E GOV

ERNM

ENT N

OR TH

E CON

TRAC

TOR M

AKES

ANY W

ARRA

NTY,

EXPR

ESS O

R IM

PLIE

D, O

R ASS

UMES

ANY

LIAB

ILIT

Y FO

R THE

USE

OF T

HESE

DESIG

NS O

R DRA

WING

S. (T

his

notic

e in

clud

ing

this

sent

ence

mus

t app

ear o

n an

y cop

ies

of th

ese

desig

ns o

r dra

wing

s.)

NOTES:

1. ALL PRESSURE BOUNDARY WELDS SHALL BE MADE, EXAMINED, INSPECTED AND TESTED PER APPLICABLE ASME B31.3 REQUIREMENTS. THIS SYSTEM IS DESIGNATED: NORMAL SERVICE 2. FLUID HELIUM DESIGN PRESSURE= 320 PSIG. DESIGN TEMPERATURE = 30 F MIN TO 120 F MAX.

3. CLEAN AND PREPARE COMPONENTS PER PROJECT STATEMENT OF WORK. PIPE SPOOLS AND COMPONENTS SHALL BE PROTECTED FROM DAMAGE AND CONTAMINATION AT ALL TIMES, INCLUDING CAPPING OPEN PIPE ENDS WHEN NOT BEING WORKED AND APPLYING PROTECTIVE COVERS TO FLANGE FACES.

4. REFER TO STATEMENT OF WORK FOR LEAK TESTING DETAILS. PERMITTED LEAK TEST FOR THIS ASSEMBLY IS A PNEUMATIC TEST AT 352 PSIG. 5. DIMENSIONS ARE NOMINAL, FABRICATOR TO VERIFY ALL DIMENSIONS PRIOR TO THE START OF FABRICATION.

6. PRINT THE DRAWING ASSEMBLY NUMBER ON EACH SPOOL SEGMENT PIPE SURFACE USING INDELIBLE INK.

Approved: 5/2/2017; E-Sign ID : 342099; signed by: Ap. 1: S. Kaminski; Ap. 2: M. Bevins; C.: P. Hansen; D: T. Fuell |

GC PACKAGE 100% FOR REVIEW