NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

Feb 02, 2018

Download

Documents

phungkien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

CONSTRUCTION & INVESTMENT

N E W A N D R E N E W A B L E E N E R G Y

COAL BED METHANE | COAL GASIFICATION |

GEOTHERMAL | WIND POWER | SOLAR POWER | BIOFUEL | BIOMASS |

Prepared by Muchsin

Page 2: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

N E W A N D R E N E W A B L E E N E R G Y

CONTENTS

1. BACKGROUND

2. NEW ENERGY

a. Coal Bed Methane

b. Coal Gasification

3. RENEWABLE ENERGY

a. Geothermal

b. Wind Power

c. Solar Power

e. Biofuel

f. Biomass

CONSTRUCTION & INVESTMENT

Page 3: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

N E W A N D R E N E W A B L E E N E R G Y

BACKGROUND

CONSTRUCTION & INVESTMENT

Why New & Renewable Energy Are Important:

1. Energy Security (Import and Diversification) 2. Reduce the dependency of fossil fuels 3. Reduce greenhouse gas emission 4. Alternative energy for peak oil season 5. Because…….. It is renewable!

Indonesia Primary Energy Source

Source: USAID Report

Emission Source

Source: USAID Report

Page 4: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

Indonesia Electricity Generation Based on Fuel (GWh)

N E W A N D R E N E W A B L E E N E R G Y

BACKGROUND

CONSTRUCTION & INVESTMENT

Indonesia Development Plant for New & Renewable Energy – Small Scale

Source: RUPTL PLN 2011-2020

Page 5: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

CONSTRUCTION & INVESTMENT

N E W E N E R G Y

COAL BED METHANE | COAL GASIFICATION |

Page 6: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

COAL BED METHANE

- Other names: coal bed gas; coal seam gas - It was formed during conversion of plant into coal - Safety risk in coal mining - It’s called sweet gas, cause lack of H2S - Production cost 1.5 – 2 x compare to conventional gas, even though the wells are shallower than conventional gas

TOTAL NATURAL GAS RESOURCES = 104.70 TCF (1.4% WORLD’S RESERVE, AVERAGE ANNUAL PRODUCTION 0.7 TCF) MAIN PLAYER INDONESIA: MEDCO ENERGY, VICO, EXXON MOBILE

TYPICAL PRODUCTION OF CBM

PROJECTS OPPORTUNITY: 1. Pipeline 2. Gas Processing Plant 3. Gas Fired Power Plant

5TH WORLD RANK

Page 7: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

COAL GASIFICATION

- Gas produced from Coal Gasification is named syngas / synthetic gas - The process is using low rank coal (Only 13% of Indonesia’s coal reserve is high rank) - Syngas is released during “half” burning process - The syngas can be used as natural gas and also electricity generation. - Case study: PLN Kepri PLTGB 6MW Investment : 11,952,000 USD Economical : IRR 10%, Payback 6 years

TOTAL COAL RESSERVE = 5,529 MILLION TONNES (0.6% WORLD’S RESERVE, 2011 PRODUCTION 324.9 MILLION TONNES) 1 TONNE OF LIGNITE EQUAL TO 400 – 700 NM3 OF SYNGAS PROJECT DEVELOPMENT: PT BUKIT ASAM, PLN

COAL GASIFICATION PLANT

PROJECTS OPPORTUNITY: 1. Gasification Plant 2. Gas Fired Power Plant 3. Integrated Coal Gasification Combined Cycle Power Plane

Integrated Coal Gasification Combined Cycle Power Plant

Page 8: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

CONSTRUCTION & INVESTMENT

R E N E W A B L E E N E R G Y

GEOTHERMAL | WIND POWER | SOLAR POWER | BIOFUEL | BIOMASS |

Page 9: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

Geothermal Energy Technology Steam Gathering

System Power Plant

System

Geothermal Resources

Well Head

Separator

Piping

Surveys Conceptual Model Drilling

Reservoir Management

Turbine

Condensing

Plant Options

Page 10: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

GEOTHERMAL SURFACE FEATURES

Associated with heat and mass discharged from the ground, and being the most obvious manifestations of a geothermal system. The type of surface features, with investigation of water color, pH, chemistry content, may be useful to classify geothermal area as a liquid or steam dominated system.

Steam Ground and Fumaroles (Steam Dominated System)

Bubbling Mud Pool (Steam Dominated System)

Geothermal System Temperature Production Enthalpy

Liquid Dominated 225 – 330 °C 1500 – 2000 kJ/kg

Steam Dominated 250 – 330 °C 2600 – 2800 kJ/kg

Cibuni Field is considered as steam dominated, high enthalphy 2600 kJ/kg, reservoir temperature 240 deg Celcius), refer to data of 1996.

Two Phase Geothermal System

Page 11: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

Sinter Terraces, Geyser, Hot Pools (Liquid Dominated System) Boiling Water

(Liquid Dominated System)

GEOTHERMAL SURFACE FEATURES

Page 12: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

Time Frame: 3 – 6 Months Locate & Assess a Prospect - Desktop Data Research & Analysis - Regional Reconnaissance - Geology & Geochemistry Resource Study - Historical Drilling Data - Infrastructure Availability

Assess Lease & Permits -Land Acquisition - Land Use Laws - Contact Federal Agencies - Water Right - Environmental Review

Establish Baseline Business Model -Economic Modeling Baseline - Resource Expectation Baseline - Project Scale Business - Electric Market Analysis - Land Use Cost - Land Use Limitation - Grid Compatibility, Interconnection Cost

Identification

Time Frame: 1 – 1.5 Years District Exploration - Geochemical Analysis - Geophysical Survey

Prospect Exploration - Exploratory Temperature Gradient Drilling - Resource Measurement

Permitting - Permitting Application – Procedures for Exploration - Environmental Impact Statement for Exploration

Re-Evaluate Business Model - Site, Scale & Technology Choice - Generation Potential Revisions - Feasibility Analysis

Exploration

Time Frame: 1 – 2 Years Design & Estimate Cost of Well - Design Characteristic - Geological Structure - Predicted Drilling Curve

Permits - Drilling Permits - Environmental Impact Statement for Drilling - Water Reintroduction

Assemble Equipment & Crew - Market Fluctuations w/ O & G - Crew Availability - Rig Cost & Maintenance - Daily Rate of Other Equipments

Drill, Test & Complete the Well - Reservoir Management - Casing - Pumps

Drilling & SGS

Time Frame: 1 – 2 Years Obtain Financing - Completed Power Purchase Agreement - Bankable Geothermal Reservoir Report - EPC Contract

Preliminary Facility Design - Equity Constraint - Geophysical Constraints - Temperature & Chemistry Constraints

EPC Manufacture EPC Construction Power Plant Production (O & M)

Production

Investment Landscape Power Purchase Agreement

GEOTHERMAL ENERGY DEVELOPMENT PHASES

Deloitte: Geothermal Risk Mitigation Strategies Report, 2008

Page 13: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

(Peter Barnett – SKM, 2006)

Page 14: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

Plant Size Cost

High Quality

Resource (US$ / kW -

2009)

Medium Quality

Resource (US$ / kW -

2009)

High Quality

Resource (US$ / kW -

2011)

Medium Quality

Resource (US$ / kW -

2011)

Small Plants < 5 MW

Exploration Steam Field Power Plant

1000 – 2000 250 – 500

2750 - 3250

1000 – 2500 750 – 1500 2750 - 3500

1043 – 2086 260 – 521

2868 - 3390

1043 – 2608 782 – 1565

2868 - 3650

Total 4000 - 5750 4500 - 7500 4172 - 5997 4694 - 7823

Medium Plants (5 – 30 MW)

Exploration Steam Field Power Plant

625 – 1000 500 – 1250 2125 - 3000

625 – 1500 1000 – 1750 2375 - 3000

652 – 1043 522 – 1304 2216 - 3129

652 – 1565 1043 – 1825 2477 - 3129

Total 3250 - 5250 4000 - 6250 3390 - 5478 4172 - 6519

Large Plants (> 30 MW)

Exploration Steam Field Power Plant

250 – 1000 750 – 1125 1875 - 2750

250 – 1000 750 – 1750 2125 - 2750

260 – 1043 782 – 1173

1956 - 2868

260 – 1043 782 – 1825 2216 - 2868

Total 2875 - 4375 3375 - 5500 2999 - 4563 3520 - 5734

Geothermal Power Direct Capital Cost per kW Installed Capacity

(Al-Dabbas, 2009)

Estimate US$ inflation rate 4.3% for period 2009 - 2011

Page 15: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

STEAM FIELD EQUIPMENTS

Expansion Loop for Pipe Multiple Wells Separator

Page 16: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

STEAM FIELD EQUIPMENTS

Geothermal Field

Separator and Silencer

Production Well Reinjection Well Piping

Page 17: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

GEOTHERMAL DRILLING

DRILLING RIG (Left: Rick Mast and Platform, Right Above: BOP, Right Centre: Mud Pond, Right Bottom: Cementing Pump)

Page 18: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

GEOTHERMAL POWER PLANT

o Single Flash System o Double Flash System o Multi Flash System o Binary System o Combined Cycle (Flash + Binary)

Single Flash Double Flash

Page 19: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

GEOTHERMAL POWER PLANT

Page 20: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

GEOTHERMAL BINARY PLANT

WAIRAKEI AND MOKAI BINARY POWER PLANT

Page 21: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

GEOTHERMAL DIRECT USE

Hot Pool

Green House

Timber Drying Hospital Heating

Page 22: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

GEOTHERMAL AREAS

Page 23: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

WIND POWER

- Average wind speed 3 – 5 m/s, low compare to other countries - China has the biggest total wind power capacity (62,733 MW or 26.3% world total) - The electricity production is intermittent, only average 24% of capacity factor - Economically, wind power could not compete with fossil fuel.

ONSHORE & OFFSHORE WIND FARM Cost Structure

Onshore Offshore

WIND RESOURCE INDONESIA

www.energyblueprint.info Can’t live without subsidize & feed in tariff

Page 24: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

SOLAR POWER

- Indonesia’s solar power potency is 1300 - 1600 kWh/m2 annually 0.2 kW/m2 average. - To produce 1 MW, it will require 5000 m2. - Economically, solar power could not compete with fossil fuel. - Electricity production only 20 – 30% of capacity factor. - World biggest solar power producer: 1. Germany – 24.8 GW 2. Italy – 12.8 GW 3. Japan – 4.9 GW 4. USA – 4.3 GW 5. Spain – 4.2 GW

SOLAR POWER PLANT

Photovoltaic Power Plant

Concentrating Solar Thermal Power

Application in Indonesia: Electrification for 1000 Outer Islands

Cirata Green Energy Park (Rencana 1 MW PV)

Page 25: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

BIOFUEL

- Biofuel: bioethanol (similar to premium) and biodiesel (similar to solar) - Bioethanol: carbohydrat conversion into glucose, by adding fermentation process ethanol can be produced from the glucose. - Biodiesel: Fat accid is processed through transesterification and result to ester and glycerol. Ester as biodiesel. - Installed capacity 3.726 million kiloliters / year but 2011 production only 0.65 million kiloliters.

Raw Materials: Palm oil, Coconut, Jatropha

Raw Materials: Molases, Cassava, Corn

Challenges: 1. Raw materials

compete with increasing food price

2. Economical price of biofuel can’t compete with subsidized fossil fuel

World’s biggest producers: USA – 567,000 b/doe Brazil – 265,000 b/doe Germany – 57,000 b/doe

Biodiesel Plant (Kansas USA) 211 million liters / year

Prospective Partners for Developing Biofuel: 1. PTPN 2. Private companies (Wilmar, SGRO, SMART,

UNSP)

Page 26: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

BIOMASS

- Biomass: plant / waste matter used to generate electricity, either by direct combustion (steam turbine) or gasification (gas engine/turbine). - Sources of biomass: wood chip, bagase, palm oil, rice husk, corn hull.

Middlesbrough Biomass Power Plant 30 MW, UK

Page 27: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

BIOMASS

APPLICATION OF BIOMASS POWER PLANT

1. PLTBS Sei Mangke – PTPN III Capacity : 2 x 3.5 MW Investment : IDR 97,000,000,000 Economical : IRR 14.11%, Payback period 7 years (Based on electricity price 787 Rp/kWh)

2. Waste to Energy / PLTSa - PT Navigat Organic Energy Indonesia

Location : Sarbagita (10 MW) – Investment 30 Million USD Bantargebang (26 MW) – Investment 75 Million USD

Gasification, Landfill, Anaerobic Digestion

3. Merauke Integrated Food & Energy Estate - PT Medco Energy

- Sugar Cane & Sorghum Plantation - Power Plant 40 MW - Ethanol Distillery

Page 28: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

RECOMMENDATION

PT. PP (Persero) Tbk – Playing a Role in New & Renewable Energy Development

1. Strengthen company brand as green contractor by participating in clean & renewable

energy development projects.

2. EPC Division has a firm grid for gas power plant, needs to keep its competitiveness

a. Gas Engine Power Plants

b. Combined Cycle Power Plant

Strategic alliances with key manufacturers

3. Many opportunities for geothermal projects, need to develop partnerships to

participate in geothermal power plant projects.

4. Developing network and capability in new & renewable energy with other companies.

Page 29: NEW AND RENEWABLE ENERGY - …knowledgecenter.ptpp.co.id/app/assets/upload/files/42c03c7cf4b548d... · NEW AND RENEWABLE ENERGY COAL BED METHANE | COAL GASIFICATION | ... Waste to

THANK YOU