PARSIPANY II EXPANSION PROJECT UPDATES Steady progress on the Net Access Parsippany II data center expansion. Once completed it will give us 70,000 gross sq. ft. of additional building space, with the capacity for 1,500 new cabinets. Look for our Grand Opening in Q1 2015!
13
Embed
Net Access Data Center Expansion Update - Parsippany NJ
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PARSIPANY II EXPANSION PROJECT UPDATES
Steady progress on the Net Access Parsippany II data center expansion. Once completed it will give us 70,000 gross sq. ft. of additional building
space, with the capacity for 1,500 new cabinets. Look for our Grand Opening in Q1 2015!
November 2014 – Security Wall Construction
September 2014 - First Floor Poured Concrete Slab
3
August 2014 – Advanced Cooling System Install
July 2014
June 2014 - 1st Floor Rebar Foundation
June 2014 – ‘Drone’s Eye’ View
May 2014
March 2014
January 2015
Parsippany II, Phase II (WBR2)
• 70,000 gross sq. ft. of additional building space (120,000 total sq. ft.)• Capacity for 1,500 new Cabinets• Powered by two additional Power Systems with over 5MG of usable UPS power• Onsite JCP&L Power Substation• Available for occupancy in Q1 2015
11
Parsippany II Data Center – Overview (WBR)• Owned, purpose-built, state-of-the-art
facility – 2 mirrored UPS rooms supported by 2
mirrored generator rooms– 4 independent N+1 electrical systems– N+1 cooling redundancy– 4.9 megawatts of useable UPS at capacity
• Advanced, ultra efficient N+1 cooling • Hot air discharged via cabinet
chimneys – hot/cold air don’t mix
• Hot air exchanged with cooler outside air
• Full portfolio of Onsite FLEXServices for hybrid IT solution implementations