NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
18

NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

Dec 16, 2015

Download

Documents

Ashlee Dean
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

NERC’s 2007-2016 Long-TermReliability Assessment (LTRA) Workshop:Natural Gas Dependency in New England

Michael I. HendersonISO New England Inc.

Page 2: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

2 Natural Gas Dependency

In New England

New England’s Electric Power Grid

• 6.5 million customer meters– Population: 14 million

• 350+ generators• 8,000+ miles of high voltage

transmission lines• 12 interconnections to three

neighboring systems:– New York, New Brunswick,

Quebec

• 31,000 megawatts (MW) of installed generating capacity

• 300+ market participants• Summer peaking system

– Summer: 28,130 MW (8/06)– Winter: 22,818 MW (1/04)

ISO and Local Control Centers

Page 3: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

3 Natural Gas Dependency

In New England

New England’s Capacity – Summer 2007

Pumped

Storage1,689

Coal

2,782

Nuclear

4,555

Oil

6,730

Hydro

1,648

Non-Hydro

Renewables/Misc.917

Gas

12,205

Oil

22.1%

Nuclear

14.9%

Coal

9.1%

Pumped

Storage5.5%

Hydro

5.4%

Non-Hydro

Renewables/Misc.3.0%

Gas

40.0%

Generation capacity mix by primary fuel type, 2007, summer ratings, MW and percentage.Note: “Non-Hydro Renewables” include biomass, refuse, landfill gas, and wind.

Page 4: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

4 Natural Gas Dependency

In New England

New England’s Energy Production - 2006

1.2%

5.4%6.3%

15.2%

28.9%

39.7%

3.3%

0

10,000

20,000

30,000

40,000

50,000

60,000

1,00

0 M

Wh

New England electric energy production by fuel type, 2006, in 1,000 MWh.Note: “Non-Hydro Renewables” include biomass, refuse, landfill gas, and wind.

Page 5: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

5 Natural Gas Dependency

In New England

New England’s Gas-Fired Fleet

• Potential Concerns:– “Just-in-time” delivery of fuel source– Unplanned outage or closure of the regional LNG facility– LNG shipping disruption or embargo– Loss of natural gas pipeline or compressor stations – Wholesale electricity’s exposure to natural gas price volatility

• Actual Experience:– Temporary shutdown of regional LNG facility – Post 9/11– Greater Northeast Cold Snap – January 14-16, 2004– Hurricanes Katrina & Rita - Fall of 2005

Page 6: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

6 Natural Gas Dependency

In New England

Regional Response

• Developed robust rules and operating procedures to manage the electric system through short or long-term fuel supply or delivery constraints:

– Appendix H of Market Rule #1: “Operations During Cold Weather Conditions.”

– Operating Procedure No. 21: “Action During an Energy Emergency.”

• Added provisions in new markets to promote resource availability at time of need:

– Forward Capacity Market (FCM)– Locational Forward Reserve Market (LFRM)

• Created the Electric/Gas Operations Committee (EGOC)– Increased communications and coordination with the regional natural gas

sector via the Northeast Gas Association (NGA)

Page 7: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

7 Natural Gas Dependency

In New England

Regional Response – cont’d

• Dual fuel conversions of single-fuel, gas-only power stations

• Newly proposed LNG terminals and expansion of regional natural gas grid

• Confirm existing practices are compliant with FERC Order 698: (electric & gas sector communications)

Page 8: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

8 Natural Gas Dependency

In New England

Inter-Regional Response

• 3 ISO/RTO MOU on Natural Gas:– Transfer of knowledge between ISO-NE, NYISO & PJM– Coordinated operations & planning– Continuous pre & post-seasonal discussions– Sharing of information, studies & methodologies– Refinement of communications protocols and contact lists– Direct communications between Control Room and Gas Control– Table-Top exercises

Page 9: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

9 Natural Gas Dependency

In New England

Long-Term Outlook

• ISO-NE Regional System Plan:– Annual 10-year plan– Loads, generation, transmission & demand-side– Fuel diversity, availability, deliverability

• ISO-NE’s Scenario Analysis:– New England will continue to depend on natural gas– Interconnection queue predominately gas-fired– Relatively low air emissions– Renewable Portfolio Standards (RPS)

Page 10: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

10 Natural Gas Dependency

In New England

Long-Term Outlook – cont’d

• NERC LTRA– Resource adequacy assessment– Fuel supply & delivery assessment

• NPCC Triennial Review of Resource Adequacy– 5-year resource adequacy review (LOLE)– Comprehensive review every three years– Interim review every year

• Emerging Issue:– LNG Interchangeability

Page 11: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

11 Natural Gas Dependency

In New England

Operable Capacity Analysis

• New England’s total installed capacity: 33,425 MW (winter)– 16,733 MW (50%) are capable of burning natural gas

(as either a startup, primary, secondary or stabilization fuel)– 8,587 MW (26%) are single-fuel, gas-only stations– 8,146 MW (24%) are fully functional, dual-fuel stations (gas/oil)

• 2007 Regional System Plan – Assessed the amount of gas-only resources required under winter peak conditions:

– 50/50 load:• 2007/08 ~ 450 MW • 2011/12 ~ 1,650 MW

– 90/10 load:• 2007/08 ~ 1,400 MW• 2011/12 ~ 2,700 MW

Page 12: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

12 Natural Gas Dependency

In New England

Market Rules and Operating Procedures

• Appendix H of Market Rule #1: “Operations During Cold Weather Conditions”

– 7-Day Forecast Projects Cold Weather Conditions– Cold Weather Watch, Warning & Event– Cold Weather Event triggers rollback of wholesale electric market

timelines to align with natural gas nomination deadlines

• Operating Procedure No. 21: “Action During an Energy Emergency”

– Triggered by fuel supply shortage or deliverability constraint– Requests fuel switching to non-constrained fuels – Allows collection of fuel inventory data from generation fleet– Dispatch system to manage and preserve fuel inventories

Page 13: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

13 Natural Gas Dependency

In New England

New Natural Gas Infrastructure

Source: Northeast Gas Association (NGA)

Page 14: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

14 Natural Gas Dependency

In New England

New Natural Gas Infrastructure

Source: Northeast Gas Association (NGA)

Page 15: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

15 Natural Gas Dependency

In New England

Conclusions

• New England will continue to rely heavily on natural gas-fired generation (primary finding from ISO-NE’s Scenario Analysis)

• Close coordination between electric and gas industries is required

• Markets promote unit availability at time of need – Dual fuel & firm fuel purchases

• Renewable Portfolio Standards (RPS) and demand-side resources will assist in diversifying the region’s fuel supply

• Newly proposed LNG terminals and expansion of the regional natural gas grid will improve the amount of natural gas supply

Page 16: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

16 Natural Gas Dependency

In New England

Appendix

• 2007 Regional System Plan:– http://www.iso-ne.com/trans/rsp/index.html

• ISO-NE’s Scenario Analysis:– http://www.iso-ne.com/committees/comm_wkgrps/othr/sas/

index.html

• NERC LTRA– http://www.nerc.com/~filez/rasreports.html

• NPCC Triennial Review of Resource Adequacy:– http://www.npcc.org/adequacy.cfm

Page 17: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

17 Natural Gas Dependency

In New England

Appendix – cont’d

• Appendix H of Market Rule #1: Cold Weather Operations– http://www.iso-ne.com/regulatory/tariff/sect_3/

mr1_appendix_h_11-27-06.pdf

• Operating Procedure No. 21: Action During an Energy Emergency

– http://www.iso-ne.com/rules_proceds/operating/isone/op21/index.html

• Northeast Gas Association:– http://www.northeastgas.org

Page 18: NERC’s 2007-2016 Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.

18 Natural Gas Dependency

In New England

QUESTIONS

Michael I. HendersonDirector – Regional Planning and Coordination

ISO New England Inc.(413) 535 – 4166

[email protected]