Top Banner
NEPAL EARTHQUAKE NEPAL EARTHQUAKE Relief work carried out by EFFORT and NIB (Nepalese in Relief work carried out by EFFORT and NIB (Nepalese in Bangalore) Bangalore) May 5th 2015 - May 11th 2015
37

Nepal earthquake Relief work

Jan 17, 2017

Download

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Nepal earthquake Relief work

NEPAL EARTHQUAKENEPAL EARTHQUAKERelief work carried out by EFFORT and NIB (Nepalese in Relief work carried out by EFFORT and NIB (Nepalese in

Bangalore)Bangalore)

May 5th 2015 - May 11th 2015

Page 2: Nepal earthquake Relief work

Date – 24/05/2015 (11:56:26 AM)Date – 24/05/2015 (11:56:26 AM) Epicenter – Lamjung, Nepal.Epicenter – Lamjung, Nepal. Magnitude – 7.8 Richter scale , 15 KM depth.Magnitude – 7.8 Richter scale , 15 KM depth. Casualties – 8,859 dead and 21,592 injured (official data) Casualties – 8,859 dead and 21,592 injured (official data) Total damage - $5 Billion (About 5 % of Nepal’s GDP)Total damage - $5 Billion (About 5 % of Nepal’s GDP)

Page 3: Nepal earthquake Relief work

THE CRISISTHE CRISIS

• On April 25, 2015 at 11:56 local time, a 7.8 magnitude earthquake struck On April 25, 2015 at 11:56 local time, a 7.8 magnitude earthquake struck Nepal, with the epicenter in Lamjung District (north-west) of Kathmandu and Nepal, with the epicenter in Lamjung District (north-west) of Kathmandu and south of the China border. This event and dozens of aftershocks killed more south of the China border. This event and dozens of aftershocks killed more than 8,000 and displaced 1.3 million people. Then, on May 12, another 7.3 than 8,000 and displaced 1.3 million people. Then, on May 12, another 7.3 magnitude earthquake wreaked further havoc just 76 km northeast of magnitude earthquake wreaked further havoc just 76 km northeast of Kathmandu.Kathmandu.

• Hundreds of thousands of people were made homeless with entire villages Hundreds of thousands of people were made homeless with entire villages flattened, across many districts of the country. Centuries-old buildings were flattened, across many districts of the country. Centuries-old buildings were destroyed at UNESCO World heritage sites in the Kathmandu Valley.destroyed at UNESCO World heritage sites in the Kathmandu Valley.

• 329 aftershocks had occurred with different epicenters and magnitudes 329 aftershocks had occurred with different epicenters and magnitudes equal to or above 4 Mequal to or above 4 Mww (out of which 47 aftershocks are equal to or above 5 (out of which 47 aftershocks are equal to or above 5 MMww)and more than 20,000 aftershocks less than 4 M)and more than 20,000 aftershocks less than 4 Mw.w.

Page 4: Nepal earthquake Relief work
Page 5: Nepal earthquake Relief work

THE STRATEGYTHE STRATEGY

• Our priority was to serve victims of the earthquake in hilly regions who would Our priority was to serve victims of the earthquake in hilly regions who would otherwise be neglected. People living in these mountain villages experienced otherwise be neglected. People living in these mountain villages experienced greater suffering because, even before the earthquake, these regions were greater suffering because, even before the earthquake, these regions were poorly connected and rarely visited.poorly connected and rarely visited.

• The relief work was carried out in 3 planned phases –The relief work was carried out in 3 planned phases –

Phase 1 – Emergency Relief.Phase 1 – Emergency Relief.Phase 2- Stabilization.Phase 2- Stabilization.Phase 3 – Reconstruction.Phase 3 – Reconstruction.

Page 6: Nepal earthquake Relief work
Page 7: Nepal earthquake Relief work

HEALTH CAMPS IN NUWAKOT AND DARAULIHEALTH CAMPS IN NUWAKOT AND DARAULI

Page 8: Nepal earthquake Relief work
Page 9: Nepal earthquake Relief work
Page 10: Nepal earthquake Relief work
Page 11: Nepal earthquake Relief work
Page 12: Nepal earthquake Relief work
Page 13: Nepal earthquake Relief work
Page 14: Nepal earthquake Relief work
Page 15: Nepal earthquake Relief work

RELIEF MATERIAL DISTRIBUTION CAMPSRELIEF MATERIAL DISTRIBUTION CAMPS

Page 16: Nepal earthquake Relief work
Page 17: Nepal earthquake Relief work
Page 18: Nepal earthquake Relief work
Page 19: Nepal earthquake Relief work
Page 20: Nepal earthquake Relief work
Page 21: Nepal earthquake Relief work
Page 22: Nepal earthquake Relief work
Page 23: Nepal earthquake Relief work
Page 24: Nepal earthquake Relief work
Page 25: Nepal earthquake Relief work
Page 26: Nepal earthquake Relief work
Page 27: Nepal earthquake Relief work
Page 28: Nepal earthquake Relief work

SCHOOL RECONSTRUCTIONSCHOOL RECONSTRUCTION

Page 29: Nepal earthquake Relief work
Page 30: Nepal earthquake Relief work
Page 31: Nepal earthquake Relief work
Page 32: Nepal earthquake Relief work
Page 33: Nepal earthquake Relief work
Page 34: Nepal earthquake Relief work

UNDER GOING CONSTRUCTIONUNDER GOING CONSTRUCTION

• Due to constant efforts by selfless volunteers in Nepal , another school in under Due to constant efforts by selfless volunteers in Nepal , another school in under construction in Darauli. Anybody willing to support can help educate 150 children.construction in Darauli. Anybody willing to support can help educate 150 children.

Page 35: Nepal earthquake Relief work
Page 36: Nepal earthquake Relief work

HELPING HANDSHELPING HANDS NIB (Nepalese in Bangalore) , a forum supporting all the Nepali’s residing in NIB (Nepalese in Bangalore) , a forum supporting all the Nepali’s residing in

Bangalore took the initiative of collecting funds and other relief materials Bangalore took the initiative of collecting funds and other relief materials across the colleges of Bangalore.across the colleges of Bangalore.

EFFORT ( A govt. regd. NGO ) , carried the collections of aid and relief EFFORT ( A govt. regd. NGO ) , carried the collections of aid and relief materials across the corporate circles of Bangalore through Facebook and materials across the corporate circles of Bangalore through Facebook and other online forums.other online forums.

AKALI NETWORK arranged for donation drives in Gurudwara located at AKALI NETWORK arranged for donation drives in Gurudwara located at Ulsoor, Bangalore.Ulsoor, Bangalore.

With the funds and aids donated by generous individuals , a group of 23 With the funds and aids donated by generous individuals , a group of 23 volunteers served the tragedy stricken people.volunteers served the tragedy stricken people.

Page 37: Nepal earthquake Relief work

THANK YOU NOTETHANK YOU NOTE

• We are thankful to each soul that contributed towards the relief works in any We are thankful to each soul that contributed towards the relief works in any form within their capacity. Your generosity and support for the long-term form within their capacity. Your generosity and support for the long-term recovery in Nepal is making sure that survivors weather the storm and that all recovery in Nepal is making sure that survivors weather the storm and that all the progress made so far is not lost. the progress made so far is not lost.

• Thank you for being part of an incredible global community that is deeply committed to building and supporting a community of local nonprofits, who, after disasters, are often best-positioned to provide the long-term recovery work that communities need long after the news stories have faded from the headlines.

Zia Nomani ([email protected]) (EFFORT)