NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14
18

NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

Dec 18, 2015

Download

Documents

Brett Wiggins
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

NEPA ASSIGNMENT

SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM

Presentation to State and Federal Agencies12/1/14

Page 2: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHAT IS NEPA ASSIGNMENT?

• Formal Assignment of FHWA’s NEPA responsibilities to a State who would assume: • All NEPA classes of action: CE’s, EA’s and EIS’s• All environmental laws, rules and orders• Under this program, ODOT is deemed to be FHWA on

all projects for environmental matters.

Page 3: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

THE NEPA ASSIGNMENT PROGRAM• ODOT assumes legal responsibility and liabilities to

ensure compliance with all environmental requirements• ODOT agrees to be sued in Federal court

• ODOT’s Assignment does not change any current legal requirements• ODOT is deemed to be a Federal Agency [FHWA]

• Savings is from reduced reviews - not shortcutting process or legal requirements.

Page 4: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHERE HAS THIS BEEN DONE BEFORE?

• CALTRANS since 2006…• Positive experience thus far

• Texas is in the process (MOU almost executed)…• Utah and Alaska are beginning the process…• Other States may be considering…

Page 5: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

SCOPE OF THE NEPA ASSIGNMENT PROGRAM• The MOU defines the range of project actions and

environmental responsibilities the State assumes• FHWA retains the following:• Engineering decisions• Project level air quality conformity determinations• Government to government Tribal consultation• USDOT responsibilities for statewide and metropolitan

planning• Projects that cross state lines

Page 6: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

HOW WILL THIS CHANGE THE PROCESS?

• Resource Agencies may not see much change.• ODOT already handles the program on a day to day basis

• With this program, ODOT solely becomes responsible and legally liable for their decisions.• Processes will be changed to reflect that ODOT has

assumed FHWA’s responsibilities.• All requirements will be addressed, just as they are today.

Page 7: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

HOW WILL THIS IMPACT FHWA?• FHWA retains oversight responsibilities, and will provide

the following:• Training• Program Technical assistance and policy interpretation• But no project assistance

• Audits of ODOT processing and decision making• Twice yearly for first 2 years, once a year after• Process and Program reviews• Reports back to Congress

Page 8: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHAT ARE THE GOALS OF NEPA ASSIGNMENT?• ODOT Goals of the NEPA Assignment• Streamline the Environmental Process-while still meeting

environmental protection standards.• Deliver program an overall 2,140 days quicker= 20% time

savings• Save costs to the Department• Assignment program will save ODOT $45 million each year

Page 9: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHAT ARE THE BENEFITS?

• More efficient environmental review process• Time and cost savings by eliminating a layer of review

• More efficient project delivery program• Provides for more efficient consultation between ODOT

and our agencies• Provides an increased focus on local decision-making• Continue ODOT’s leadership of our program

Page 10: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

HOW WILL THIS IMPACT ODOT?• ODOT must comply with its MOU commitments in

assuming FHWA’s environmental responsibilities:• Maintain detailed files, records and make them available

to FHWA• Conduct regular self assessments and continuous QA/QC

on all actions• Maintain the professional and experienced staff to carry

out the necessary scope• Report all NEPA decisions to FHWA

Page 11: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

HOW DOES ODOT HAVE TO CHANGE?

• “If it’s not written down, it didn’t happen!”• ODOT has to effectively document it’s actions.• Ensure actions are tracked and accounted for.

• QA/QC is a must!• One document goes thru 2x reviews due to corrections• Cost US $10,000 and 30-60 days. Times it by 600 documents

yearly!

• Follow the PDP and it’s supporting guidance• Ensure commitments are carried out in the field

Page 12: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHAT CAN GO WRONG?• ODOT will be legally responsible and liable for all

NEPA decisions• ODOT will defend in federal court• Required for both on and off the State Highway System- pass

thru federal monies are the same as ODOT spending them• No more FHWA backstop “The feds are making us do it….”• ODOT has to make the right decisions, based on the required

process and laws and stand by it.• Failure - FHWA can take the program away.

Page 13: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHAT’S NEXT?• Path to entering NEPA Assignment• Limited waiver of sovereign immunity• Identify desired scope of Assignment• Prepare Application, make available to the public• Update existing MOU’s, PA and processes• Draft NEPA Assignment MOU, make available to the

public• Develop auditing tools• Train and implement

Page 14: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

THE APPLICATION FOR NEPA ASSIGNMENT• Draft Application is being developed now• The Application identifies:• Scope of Assignment• Current & Proposed Organization• Current & Proposed Procedures, Tools• Roles and Responsibilities• Training• Resources

Page 15: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHAT ARE THE NEXT STEPS FOR NEPA ASSIGNMENT?• Meet with agencies and associations- 12/2014

• Gain support• Identify improvement areas/concerns

• Limited waiver of sovereign immunity- 3/2015• Public Notice of Application- 4/2015• MOU to FHWA- 6/2015• MOU Public Notice- 9/2015• Effective Date of program- 12/2015

Page 16: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHY WE WILL SUCCEED…

• Experienced environmental team• Excellent training, manuals, processes already in place• Renewed focus on QA/QC • Commitment to make it succeed- savings of $45 mil• Commitment to continue to improve and adapt

Page 17: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

WHAT CAN YOU DO TO HELP?• Need to understand and address any concerns you

may have.• One-one-one follow up meetings planned for

December and early January.• Work with us to update any areas that are necessary.• Prepare letters of support during the Application

comment period.• Help us continue to improve and ensure positive

performance of this program!

Page 18: NEPA ASSIGNMENT SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM Presentation to State and Federal Agencies 12/1/14.

NEPA ASSIGNMENT

SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM

Contacts: Tim Hill, AdministratorOffice of Environmental [email protected]

Erica Schneider, Assistant Administrator

Office of Environmental [email protected]