Our Strategic DestinationBy 2015, Nemours will be recognized as a leading children’s health system as defined by being in the top 5 percent of institutions in patient satisfaction as well as in health and quality outcomes.
Using IT To Support Our Strategy “Our use of technology and information systems within Nemours should no longer be considered a novelty, nor should it be considered innovation. That said, our use of technology and information systems should officially be designated as our DNA.”
Steve Lawless, MDNemours, Vice President, Quality and Safety
Our Keys To Success � Support from the top � IT Strategy Governance Committee � Initiative Management Council – strategic initiatives
Building Our Network � Over 45 new servers installed & configured � Over 60 new virtual servers created & configured � New IBM XIV Storage Area Network (SAN) installed with 161TB of disk space
� LTO4 tape library installed w/12 drives � Created 24x7 service desk structure at NCH
– Designed new schedule to accommodate two site 24x7 staffing
� 35 network switches installed � 312 CISCO wireless access points installed � 6,489 cable drops installed and still growing
– 1.5 million feet or 284 miles of 6A copper cabling– 7,900 feet or 1.5 miles of copper analog cabling
� 10,925 feet or 2 miles of fiber optic cabling
Supporting Our Clinicians � 42 application implementations (9 New to Nemours)
– Rauland Borg nurse call– Voalte (nurse communications)
� 12 lab instruments installed and interfaced to Sunquest � 140 infusion pumps and 125 syringe pumps deployed � 95 iPads installed to support the Patient Care Display (PCD) � 141 Philips monitors installed � Over 30 Pyxis stations installed � More than 950 Associates completed almost 16,000 Epic courses
� 87 Nemours-created courses and 45 Epic eLearning courses taken through Nemours University
Supporting Our Associates � 89 iPhones provisioned � Approximately 850 new PCs configured and installed � Approximately 820 new monitors installed � Approximately 140 new printers installed � 19 video conferencing & multimedia rooms � 3 training rooms � 3 computer labs � 871 VOIP telephones installed and counting