1 Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria -Vlada-Government Ministria e Zhvillimit Ekonomik Ministarstvo Ekonomskog Razvoja-Ministry of Economic Development 2 nd National Energy Efficiency Action Plan (NEEAP) of Kosovo June 2013
88
Embed
nd National Energy Efficiency Action Plan (NEEAP) of Kosovomzhe-ks.net/repository/docs/Kosovo_2nd_NEEAP... · The KEEA, as the main institution responsible for development and implementation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
Republika e Kosovës
Republika Kosova-Republic of Kosovo
Qeveria -Vlada-Government
Ministria e Zhvillimit Ekonomik
Ministarstvo Ekonomskog Razvoja-Ministry of Economic Development
2nd National Energy Efficiency Action Plan (NEEAP) of Kosovo
1. Overall context of the second NEEAP…………………………………………………………………………..5
1.1 Highlights of the Second NEEAP ................................................................................................................................. 6
1.2 National context of energy savings ............................................................................................................................ 8
2. Primary energy SAVINGS………………………………………………………………………………………….15
2.1 Overview of primary saving and targets …..……………………………………….……………………………………..16
2.1.1 List of Strategies …………………………………………………………………………………………………………..……17 2.1.2 Energy saving assumptions/targets ……………………………………………………………………………………21
2.2 Primary energy saving measures ............................................................................................................................ 22
2.2.1 Measures in the lignite sector ................................................................................................................................... 22
2.2.2 Measures in the electricity generation sector .................................................................................................... 23
2.2.3 Measures in the transmission sector ..................................................................................................................... 26
2.2.4 Measures in electricity distribution sector ......................................................................................................... 26
2.2.5 Measures in the heating sector ................................................................................................................................. 27
3. Energy savings achieved in the energy end-use sectors……………………………………………30
3.1 Calculation of energy savings achieved ......................................................................................................................... 30
3.2 Description of energy savings achieved .............................................................................................................. 32
3.3 Description of energy savings measures implementation .................................................................................... 35
3.4 Summary on energy savings planned and achieved ................................................................................................ 43
4. Energy efficiency measures of the second NEEAP in the energy end-use sectors ............... 44
4.1 Measures in the residential sector ................................................................................................................................... 44
4.2 Measures in transport sector ............................................................................................................................................. 50
4.3 Measures in the tertiary sector ................................................................................................................................ 55
4.4 Measures in the Industry and SME sectors................................................................................................................ 62
4.5 Measures in the building sector ........................................................................................................................................ 66
4.7 Summary of overall final energy savings ...................................................................................................................... 72
4.8 Exemplary role of public sector ........................................................................................................................................ 72
4.9 Ensuring availability of advice and information ....................................................................................................... 81
4.10 Obligations of energy companies to promote energy savings in end-use consumption ...................... 82
4.11 Market for energy services ............................................................................................................................................... 82
4.12 Strategy for the increase of nearly-zero energy buildings ................................................................................. 83
4.13 Alternative measures for heating and air conditioning systems..................................................................... 84
4.14 Measures to support EPBD implementation ............................................................................................................ 85
5 Establishment of Competent Bodies and Assigned Organisations ..................................... 87
4
ABBREVIATIONS:
KEEA Kosovo Energy Efficiency Agency
MED Ministry of Economic Development
MEM Ministry of Energy and Mining
KEPA Kosovo Environment Protection Agency
MESP Ministry of Environment and Special Planning
MF Ministry of Finance
TPP Thermo Power Plant
DH District Heating
KEK- J.S.C. Kosovo Energy Corporation, Joint Stock Company
HPP Hydro Power Plant
KOSTT Kosovo Transmission System and Market Operator
EnCS Energy Community Secretariat
ORF-EE/GIZ Open Regional Fund-Energy Efficiency / Geselschaft für Intenationale Zusammenarbeit
CCEAM Commission for Certification of Energy Auditors and Managers
AI Administrative Instruction
LPG Liquid Petroleum Gas
SME Small and Medium Enterprise
EU European Union
EC European Commission
EBRD European Bank for Reconstruction and Development
MTI Ministry of Trade and Industry
KBRA Kosovo Business Registration Agency
EPBD Energy Performance of Buildings Directive
5
1 OVERALL CONTEXT OF THE SECOND NEEAP The Kosovo National Energy Efficiency Action Plan (NEEAP) is a basic document for the implementation of Kosovo’s policies on energy efficiency. Kosovo’s NEEAP (2010 – 2018) was approved by the Ministry of Economic Development on September 30
th, 2011. It foresees the indicative target of 9% of 1021.08 ktoe to be
achieved at the end of the period (2010 – 2018). Therefore, the amount of energy that Kosovo aims to save by the end of 2018 is 91.89 ktoe. The first Kosovo Energy Efficiency Action Plan (2010 – 2012) (hereinafter – 1
st NEEAP) was also approved by
the Ministry of Economic Development on September 30th
, 2011. The intermediate indicative target of 3% for energy savings has been adopted. The target quantity of 3% of the overall amount for the period (2010 – 2012) is 31.00 ktoe. Kosovo’s second National Energy Efficiency Action Plan (hereinafter – 2
nd NEEAP) has been prepared on the
basis of Article 10 of the Law on Energy Efficiency. The “Guide and template for the preparation of the second national energy efficiency action plan” developed by the European Commission’s Joint Research Centre has been taken into account preparing the 2
nd NEEAP, and adapted by the Energy Community Energy Efficiency
Task Force in October 2012. The Kosovo Energy Efficiency Agency (hereinafter – KEEA) was established in April 2012. According to the Article 6 of the Law on Energy Efficiency among other tasks KEEA is responsible for the following actions to be taken in relation to the National Energy Effiency Plan:
to propose the National Energy Efficiency Plan,
to prepare the Progress Report on the Implementation of the National Energy Efficiency Plan,
to develop the system for monitoring the implementation of the National Energy Efficiency Plan and achievement of the indicative targets for energy saving.
The KEEA, as the main institution responsible for development and implementation supervision of the NEEAP, lead the process of its development. In order to support KEEA, an inter-institutional working group was established by the Ministry of Economic Development (Decision Nr. 283, on February 14, 2013), consisting of representatives from the following institutions:
1. Ministry of Economic Development, 2. Prime Minister’s Office, 3. Ministry of Environmental and Spatial Planning, 4. Ministry of Finance, 5. Ministry of Infrastructure, 6. Ministry of Trade and Industry, 7. Ministry of Public Administration, 8. Ministry of Local Administration 9. Ministry of Security Forces of Kosovo, 10. University of Prishtina, 11. Association of Local Municipalities, 12. Energy Regulator’s Office – ERO, 13. Power Corporation of Kosovo – KEK, 14. Kosovo Operator for Transmission and Trade – KOSTT, 15. District Heating of Prishtina – TERMOKOS, 16. Kosovo Statistics Agency, 17. Kosovo Customs , 18. Institute for Development Policy – INDEP, 19. Kosovo Renewable Energy Association – KREA.
It is foreseen that this inter-institutional cooperation platform will continue its operations after the approval of the 2
nd NEEAP and will evaluate implementation progress of the 2
nd NEEAP (2013 – 2015) and the long-term
NEEAP (2010 – 2018) on regular basis, as well as taking measures for adjustments if needed.
6
1.1 Highlights of the Second NEEAP
The 1
st NEEAP (2010-2012) mainly consisted of promotional and regulatory framework establishment
measures, and only some concrete investment project-based measures. The review process of the 1st
NEEAP implementation experience showed that the 1
st NEEAP had too many measures – almost 40 - and that most of
them were soft ones, like awareness raising campaigns, administrative instructions, etc. So many measures do not create a targeted and result-oriented policy. Nevertheless, measures implemented during the 1
st NEEAP
implementation period – like adoption of the Law on Energy Efficiency, establishment of the KEEA, development of energy auditing systems, etc. created a very good starting point for further activities. Therefore, in the development process of the 2
nd NEEAP, it was decided to put implementation of energy
efficiency measures with measurable energy savings at its centre. Soft-measures, like awareness raising campaigns, energy audits will continue to have a facilitating role. The Kosovo Energy Efficiency Agency was established in April, 2012. According to Article 6 of the Energy Efficiency Law, the KEEA’s responsibilities are to:
propose to the Minister policies to promote energy efficiency,
develop and maintain the database on energy efficiency,
develop the system of monitoring implementation of the National Energy Efficiency Action Plan and achievement of the indicative targets for energy saving,
propose to the Minister the National Energy Efficiency Action Plan,
prepare the Progress Report on the Implementation of the National Energy Efficiency Action Plan,
guide and support municipalities in the preparation of the municipal energy efficiency plans and their progress reports,
promote energy efficiency through public awareness campaigns,
provide recommendations on necessary improvements to national and municipal energy efficiency plans,
prepare its Annual Work Report for the Minister,
cooperate with the Ministry and other relevant institutions in implementing energy efficiency plans,
support the participation of interested parties in undertaking energy efficiency initiatives,
propose to the Ministry improvements in and completion of legal and regulatory frameworks on energy efficiency, with a view to approximation with relevant European standards on energy efficiency,
support municipal energy offices on matters related to energy efficiency planning and promotion, and implementation of various energy efficiency programs at municipal level,
promote information and educational activities in the field of energy efficiency, in cooperation with ministries responsible for energy, construction and education.
During the process of the 1
st NEEAP implementation review, a lack of statistical data on energy efficiency
(especially in the transport sector and the industry sector) was identified as one of the main barriers to the proper assessment and reporting of energy savings achieved. Therefore actions were taken to establish a system for collection of data by the KEEA on energy efficiency measures taken. The KEEA will become the core institution that will develop solid monitoring and evaluation systems for the assessment of results achieved and planning of the next steps to be taken. The 2
nd NEEAP will become the core document for planning of energy efficiency policy and its implementation
in Kosovo, which will attract IFI's financing and will mobilize national funding for implementation of the energy efficiency measures planned.
1st NEEAP 2nd NEEAP 3rd NEEAP TOTAL
mill. Euro ktoe % mill. Euro ktoe % mill. Euro ktoe % mill. Euro ktoe %
¹ Reported for R1, R10, R12 NB: Not all of the sub-totals add up, because some estimates have been included, as follows: 108.776
² Reported for S7,S13,S15,S16,S17) - Figures in red are estimates that have been included in the totals and sub-totals3 3 year program to include 200 - 250 buildings, est. cost US$22.5m. - Figures in brown are estimates that have not been included in the totals and sub-totals 91.89 Target 4 Cumulative totals
5 Excluding horizontal measures
6 Including horizontal measures
8
1.2 National context of energy savings
Kosovo has approved the indicative target of 9% of 1021.08 ktoe to be achieved by the end of the period (2010 – 2018). Therefore, the calculated national indicative energy savings target for 2018 is 91.89 ktoe. The planned energy savings targets for 2018 are not being changed and will remain valid until 2016, when the 3
rd National
Energy Efficiency Action Plan will be developed.
Table2. Overview of the share of all sectors in final consumption (ktoe)
Economic sector 2010 2011 2012*
Industrial sector 254.89 315.64 290.68
Household sector 461.67 490.51 498.71
Services sector 113.39 119.57 115.19
Agricultural sector 18.44 19.95 20.51
Transport sector 318.91 338.58 336.47
Total 1167.31 1284.25 1261.56
Source: Energy Balance of Kosovo - 2010, 2011, 2012 (forecast)*, Ministry of Economic Development Table 2 shows that energy consumption for 2012 reached 1261.56 ktoe, which marks a decrease of 22.69 ktoe (-1.77 %) in comparison with 2011 (1284.25 ktoe) and an increase of 94,25 ktoe (8.07 %) in comparison with 2010 (1167.31 ktoe). The sectors, in order of their energy consumption in 2012, were as follows: the household sector, which consumed 498.71 ktoe ( 39.53 % of overall consumption), followed by the transport sector, 336.47 ktoe (26.67 %), the industry sector, 290.68 ktoe (23.04%), the service sector, 115.19 ktoe (9.13 %) and the agriculture sector, 20.51 ktoe (1.63 %).
Fig1. Overview of the share of all sectors in final consumption (ktoe)
9
Fig 2. Energy end-use by sector for 2012
Taking into account that the household and transport sectors are the largest for energy end-use consumption - i.e. accounting for 39.53 % and 26.67 % respectively of total energy end-use consumption - these sectors have been designated as priority sectors for the 2
nd NEEAP.
The 2
nd NEEAP has been prepared taking into account the following policy planning documents:
Kosovo Economic Development Plan (2011 – 2014);
Action Plan of the Economic Vision of Kosovo (2011 – 2014);
Energy Strategy of the Republic of Kosovo (2009 – 2018);
Heating Strategy for Kosovo (2011– 2018);
Kosovo Energy Efficiency Action Plan (2010 – 2018); as well as other sectorial and inter-sectorial development documents, policies and strategies. The Kosovo Economic Development Plan (2011 – 2014) describes the economic development planning framework and proactive commitment of the Government to the economic growth and development of the country. With the implementation of this plan, the objective is to achieve a growth rate of 7-8% per annum in the medium term and a reduction in the level of the registered unemployed by approximately 8-10% per annum.
Table3. GDP annual growth data realized for the period 2007-2011
2007 2008 2009 2010 2011
GDP 6.3% 6.9% 2.9% 3.9% 5.0%
Source: Ministry of Finance.
10
The forecast of macroeconomic indicators shows that the Kosovo economy is expected to reach an average
growth of 6.8% during 2011‐2014. The positive growth rate is expected to be driven by an expansionary fiscal
policy, while private investments and exports are expected to continue at a relatively stable growth rate
throughout the forecasting period. More precisely, higher economic growth is projected to be reached in 2013,
resulting from increased exports, investments and consumption, mainly as a result of raising public sector
wages, and its multiplicative effect on the economy of Kosovo.
Table4. Main macroeconomic indicators, 2008-2014 (millions of euro)
Net export ‐1,587 ‐1,534 ‐1,684 ‐1,867 ‐1,979 ‐2,035 ‐2,075
Export of goods and services 612 820 875 933 995 1,049 1,049
Import of goods and services ‐2,156 ‐2,146 ‐2,504 ‐2,742 ‐2,912 ‐3,030 ‐3,124
GDP 3,905 3,912 4,289 4,639 4,978 5,214 5,501
Real GDP Growth, in % 6.9 2.9 4.0 5.3 5.1 5.4 6.0
GDP per capita in euro 1,847 1,848 1,996 2,127 2,249 2,321 2,412
Inflation, in % 9.2 ‐2.4 3.5 5.3 2.1 1.5 1.4
Source: Microeconomic Department, MoF
Issues related to energy sector development are regulated in the following legislative acts, administrative
instructions and regulations:
11
Laws:
Law on Energy,
Law on Energy Efficiency,
Law on the Energy Regulator,
Law on Electricity,
Law on Natural Gas,
Law on Mines and Minerals,
Law on Spatial Planning,
Law on Construction,
Law on Public Procurement,
Law on Environment Protection,
Law on Trade of Petroleum and Petroleum Products,
Law on Scientific Research Activities,
Regulation on Long-term Allocations of Real Estate in Socially-Owned Property, managed by Kosovo municipalities,
Law on Foreign Investments,
Government Decision on restructuring of KEK j.s.c.,
Government Decision on unbundling of KEK j.s.c.,
Government Decision on the Establishment of an Electricity Distribution and Supply Company and its privatization through a public tender,
Law on Publicly-Owned Enterprises,
Government Decision on Central POE property policy,
Government Decision on the installation of efficient light bulbs in public buildings,
Law on Competition,
Law on Expropriation,
Law on Central Heating, and
Law on Public-Private Partnerships and Concessions.
Administrative Instructions:
Administrative Instruction for Promotion of energy efficiency for the final consumers and energy services,
Administrative Instruction for Labeling of energy using equipment,
Administrative Instruction for Energy Audit,
Administrative Instruction Rules on energy balance,
Administrative Instruction for Security of supply in natural gas sector, and
Administrative Instruction for opening of market for electric energy for all non-households costumers. Regulations:
Regulation Nr. 01/2012 for Establishing and functioning of a commission for certifying energy auditors and managers,
Regulation Nr. 08/2011 for Internal organization of the Agency for Energy Efficiency, and
Technical regulation Nr. 03/2009 on thermal energy saving and thermal protection in buildings. Energy intensity in Kosovo still remains at a relatively high level.
Table5. Energy Intensity 2009 – 2011
2009 2010 2011
Energy intensity
(toe/1000 €)
0.63 0.57 0.54
Source: Energy Balance of the Republic of Kosovo for 2009, 2010 and 2011
12
The energy consumption forecast includes the development of the new Power Plant ‘Kosova e Re’, economic sector demands and energy efficiency measures. In calculating energy consumption forecasts, three basic factors are taken into account:
Economic growth,
Number of households,
Energy consumption in the three last years. Because of the influence of these measures on the demand of all sectors, as well of measures to rehabilitate the electro-energy system, the final energy consumption demand in 2020 is expected to be 1583.56 ktoe. Also, the energy sector is expected to have the same impact in terms of energy efficiency.
Table6. Overview of forecast final energy consumption (ktoe)
Source: Long Term Energy Balance of the Republic of Kosovo 2013-2022 The sector with the most intensive growth in energy demand will be the industry sector. In Kosovo, with all forecasts indicating more energy intensive development trends in industry, the industry sector share of total energy consumption, even in 2022, will be below the developing countries consumption rate of 29% of energy consumed. Kosovo is not actively participating in the implementation of the EU Framework Convention on Climate Change. However, taking into account the fact that in future Kosovo will have to meet the international obligations related to the implementation of this Convention, strategic directions and priorities in this field are set in the national legislative documents. Despite the fact that Kosovo is not a member state of UNO, actions are being taken to establish a legal framework and to build capacities in order to be able to participate in international efforts to combat climate change. From this perspective, Kosovo’s actions are in accordance with the United Nations Convention on Climate Change (UNFCCC) and the Kyoto Protocol.
Transport sector 342.36 349.21 356.19 363.31 370.58 377.99 385.55 393.26
Total 1298.67 1346.79 1385.10 1419.81 1463.48 1501.50 1544.43 1583.56
13
Table7. Sources of greenhouse gases according to sector for 2008 and 2009
GHG Sources
Unit ton/year
2008 2009
CO2 CH4 N2O CO2 CH4 N2O
Energy 6,221,976.11 5,388.79 252.56 7,040,831.31 5,578.54 269.94
Industry 11,054.45 1.32 0.18 11,474.52 1.37 0.18
Transport 1,073.30 0.15 0.07 1,110.44 0.15 0.07
TOTAL 6,234,103.86 5,390.26 252.81 7,053,416.27 5,580.06 270.19
Source: State of Air Report, year 2012, KEPA/MESP
EU Directive 2001/80/EC of 21 October 2001, determines the ceilings for power plant pollution. The Directive requires a reduction of pollutant emissions for existing plant (Kosovo A and B) and also determines ceilings for emissions from new plants (Kosova e Re).
Figure3. Forecast of dust, NOx and SO2 emissions from Kosovo power plants for the period 2013-2022
Figure4. Forecast of CO2 emissions from Kosovo power plants for the period 2013-2022
14
Table8. Overview of forecast energy consumption in all sectors* (ktoe)
Total 1338.19 1394.12 1436.18 1471.40 1504.87 1534.74 1578.01 1617.48
Source: Long Term Energy Balance of the Republic of Kosovo 2013-2022 * including non-energy consumption
15
2 PRIMARY ENERGY SAVINGS In general, the 2
nd NEEAP has been drafted to assess energy savings in meeting targets outlined in Directive
2006/32/EC, for end-customers and energy services, while the EC format and instructions recommend an assessment of energy savings also in transformation and transmission (energy efficiency measures on primary energy savings in the energy sector – in generation, transmission and distribution).
Realized consumption of primary energy in Kosovo in 2010 and 2011 was 2437.51 ktoe and 2505.03 ktoe
respectively. Calculations for 2012 have yet to be completed taking into account available data. Final energy
consumption is considerably lower, due to the proportionately high use of lignite as primary energy. For
instance in 2011 lignite accounted for 64.81% and oil by-products and biomass for 23.61% and 9.66%
respectively.
The energy balance for Kosovo in 2011 indicates that non-energy needs reached 50.41 ktoe, while the final
energy consumption totalled 1284.25 ktoe and additionally, the transformation sector with energy losses and
internal energy consumption of the sector).
Table9. Primary and final energy consumption and relevant differences
Year Primary consumption in ktoe Target of final energy
consumption in ktoe
Final consumption in
ktoe
Difference
2010 2437.51 1191.3 1167.31 1270.20
2011 2505.03 1254.2 1284.25 1220.78
For the reporting period 2010-2011 there were no forecasts for the primary energy production therefore no
targets are reported.
Figure5. Graphical presentation of primary and final energy consumption in 2010 and 2011
In the transformation sector, energy efficiency is low as power plants use lignite as fuel and because of the low
coefficient of use of TPP Kosovo A (around 26.86%) and TPP Kosovo B (around 34.48%), and the use of oil by-
products as primary energy for meeting the needs of Kosovo. This coefficient of use is expected to increase
16
considerably with the implementation of TPP Kosova e RE (projected for a later period) and co-generation in
TPP Kosovo B, in 2013 (see details in the chapters on efficient measures in generation and heating with DH
Termokos).
2.1 Overview of primary saving and targets
Table10. Forecast primary energy consumption (ktoe)
Solar energy 1.29 1.93 3.22 5.16 7.09 9.03 10.96 12.90
Total 1338.19 1394.12 1436.18 1471.40 1504.87 1534.74 1578.01 1617.48
Source: Long Term Energy Balance of the Republic of Kosovo 2013-2022
In analysing long-term demand forecasts for energy, the Kosovo Energy Efficiency Plan (2010 – 2018) has been taken as the baseline, with the general target for 2018 based on the assumption that every year there will be 1% of energy savings at the end-consumption level. According to the development of long term trends, electricity consumption will increase almost as quickly as petroleum consumption. In addition to any individual and private initiatives for installing such equipment, several energy efficiency and renewable energy projects have been planned. According to the Decision of the Ministerial Council of Energy Community Secretariat (derived from the meeting held on 18
th October 2012 in Budva, Montenegro), Kosovo is bound to generate 25% of gross final
energy consumption from renewable energy sources, including solar energy, both for heating and electricity. Table 11 below summarizes forecast consumption of all energy products used for energy purposes only, for the years 2013, 2015 and 2020.
17
Table 11. Overview of consumption forecast for all energy products (ktoe and %)
Source: Long Term Energy Balance of the Republic of Kosovo 2013-2022
2.1.1 List of Strategies Following documents are the list of strategies that addressing the objectives for the reduction of primary energy consumption in the Republic of Kosovo:
Energy Strategy of Kosovo 2009-2018
Heating Strategy 2011-2018
Long-term Energy Balance of the Republic of Kosovo 2013-2022
Transmission Development Plan 2012 - 2021
Distribution Development Plan 2010-2014
District Heating Development Plan – Termokos
Action Plan of Economic Vision of Kosovo 2011-2014
Total energy saving targets for electricity generation: 146 + 264 + 3.2 + 6.96 + 25.6 + 37 + 104 + 155 = 741.76 GWh/year = 63.78 ktoe/year
Total targets for increase of electricity generation capacity:
25 + 25 + 20 = 70 MW
EE saving targets for electricity transmition system:
Reduction of losses by 0.06 % of total demand as a result of implementation of projects until 2016: 467.67 ktoe x 0.06% = 28.06 ktoe respectively 326.34 GWh.
EE saving targets for electricity distribution sector:
New reviewed middle and long term targets for distribution sector are not yet known because it is now a new privatised company (KEDS).
Particular energy efficiency measures and target projections are included in the tables below for each energy
sector during the period 2013-2015, and explanations until 2018.
22
The 2nd
NEEAP does not provide full details about energy efficiency measures in the energy transformation
and transmission sector, because Kosovo is only now, for the first time, confronting energy efficiency
planning and implementation issues for this sector in the proper manner. It is expected that realistic,
comprehensive and concrete EE measures will be enforced and developed only in the 3rd
NEEAP.
2.2 Primary energy saving measures
2.2.1 Measures in the lignite sector
Electricity generation in Kosovo is secured from two lignite-fired thermal power plants, Kosovo A and Kosovo
B, with a total effective capacity of up to 950 MW (installed capacity 1478 MW), while lignite generation is
secured from “South-West Siboc” (SWS) and Sitnica lignite mines. Lignite is the most vital energy resource of
Kosovo, supplying around 97% of the total electricity generation. Maximum coal generation in South West
Siboc is 9.0 ml.t./year. To reach this level of generation, the main mining equipment must be overhauled in
line with the supplementary mining plan, which envisages the purchase of two coal excavators. According to
the exploitation forecasts for SWS it is safe to assume that the condition of the existing coal excavators cannot
guarantee sustainable generation for the period 2013-2024.
Table13. Measures in lignite production
Nr.
Measure Target of the use of
primary energy/sector
Timeline Achieved
energy savings
in 2015/other
indicators
Estimated primary energy
savings in TPP A-2016 and
TPP B - 2018 and other
indicators
1. Repair of lignite
excavator E- 8B
Increase of capacity
usage and duration
2013 Reduction of own
electricity
consumption from
5.97 kwh/m3 to 5.1
kwh/m3
and
reduction in
excavator
downtime
Increase of effective capacity
from 500m³ /h to 650m³/h
Consumption before
implementation of measure:
13.310 GWh/year
Consumption after
implementation of measure:
11.540 GWh/year
Saving: 1.770 GWh/year
2 Repair of excavator
E- 9B
Increase of capacity
usage and duration
2014 Reduction of own
electricity
consumption from
5.97 kwh/m3 to 5.1
kwh/m3 and
reduction in
excavator
downtime
Increase of effective capacity
from 500m³/h up to 650m³/h
Consumption before
implementation of measure:
3.700 GWh/year
Consumption after
implementation of measure:
3.160 GWh/year
Saving: 0.540 GWh/year
23
2.2.2 Measures in the electricity generation sector
Lignite mining, generation and electricity distribution assets are operated by KEK j.s.c., a publicly owned enterprise. Electricity supply is mainly from generation from power plants ‘Kosova A’ and ‘Kosova B’ and on a smaller scale from hydropower plants (Ujmani, Lumbardhi, Radaci, Dikanci and Burimi). Gross electricity generation in existing TPPs in 2011 was 5697 GWh
1 and electricity generated from hydropower plants in 2011
was 105 GWh2.
Despite a continuous increase in the operational capacities of generation units in the recent years, their performance remains below installed parameters.
Technical data based on rehabilitation measures of the electricity generation sector (TPPs and HPPs in Kosovo).
Table14. Existing thermal generation capacities in Kosovo
No.
Generation units
Year of
commissioning
Installed capacity Current power
Generator Threshold -
net Generator Threshold-
net
MW MW MW MW
1 TPP-A1 1962 65 58 Not in operation-end of lifetime
2 TPP-A2 1964 125 110 Not in operation-end of lifetime
The most significant plant outside KEK j.s.c. is the hydropower plant Ujmani/Gazivoda (2 X 17.5 MW = 35 MW),
administered by the Publicly Owned Company Hidrosistemi Ibër - Lepenc.
1Source: Annual energy balance (realized) of the Republic of Kosovo, 2011
2Source: Annual energy balance (realized) of the Republic of Kosovo, 2011
24
Table15. Measures in electricity generation
Nr.
Measure Target of the use of primary energy/sector
Timeline Achieved energy savings in 2015/other indicators
Estimated primary energy savings in TPP A-2016 and TPP B - 2018 and other indicators
1. 1. Repair and modernization of mills in TPP B 2. Improvement of coal quality from the mines for TPP A & B 3. Maintaining heating surfaces clear of ash layers in boiler pipes of TPP A & B
Reduction of specific coal consumption in:
TPP A from 1.9 to 1.75 ton/ MWh
and
TPP B from 1.5 to 1.4 ton/MWh
TPP A&B 2013-2014
TPP A = 0.15 ton/ MWh
TPP B = 0.1 ton/MWh
Lignite savings forecast:
TPP A –255.000 ton/year
TPP B – 370.000 ton/year
EE savings forecast:
TPP A – 146 GWh/year
TPP B – 264 GWh/year
2. Reduction of oil costs due to reduction of planned downtimes to the minimum, increasing the technical availability of TPP A to the highest level
Reduction of specific oil consumption in TPP A from 2.8 to 2.2 lit/MWh
2013 - 2014
0,6 lit/MWh 1.020.000 lit/year = 876 ton/year
Specific oil consumption 0.32 lit/kWh = 0.272 ton/MWh
867/0.272x1000
Savings =3.2 GWh/year
3. Reduction of heavy fuel oil costs due to reduction of planned downtimes to the minimum, increasing the technical availability of TPP B to the highest level
Reduction of specific crude oil consumption in TPP B from 2.5 to 2.0 kg/MWh
2013 - 2014
0.5 kg/MWh 1850000 kg/year =1850 ton/year Specific heavy fuel oil consumption 0.2657 ton/MWh
1850/0.2657 x 1000
Savings = 6.96 GWh/year
4. Rehabilitation of equipment (mills, coal feeders, air heaters, grill and kratzer, soot ventilators, supply pumps, ventilation fittings, drainage, supply, boiler interlocking, etc.) to a technically acceptable level, reinforcing prevention and planned repairs in TPP A
Reduction of TPP A own electricity consumption from 12 to 10.5 %
2013-2014
1.5 % Savings: 25.6 GWh/year
25
5. Rehabilitation of equipment (mills, coal feeders, air heaters, grill and kratzer, soot ventilators, supply pumps, ventilation fittings, drainage, supply, boiler interlocking, etc.) to a technically acceptable level, reinforcing prevention and planned repairs in TPP B
Reduction of TPP B own electricity consumption from 9.5 to 8.5 %
2013-2014
1 % Savings: 37 GWh/year
6. Reduction of unplanned outages in the unit to the minimum by increasing the technical availability as high as possible in TPP A&B
Reduction of unplanned downtime of units in TPP A&B by 30 %
2013-2014
Planned annual downtime per unit:
TPP A – 15 outages/year
TPP B – 20 outages/year
Reduction by 30%:
TPP A – 10 outages/year
TPP B – 14 outages/year
Savings: TPP A – 104 GWh/year TPP B – 155 GWh/year
7. Capital overhaul of A4 Unit -2013
Capital overhaul of Turbine and Generator, SM
Repair of boiler
Implementation 2013
Prior to overhaul: Unit power 130 MW
After overhaul: Unit power 155 MW Increase in capacity of 25 MW
8. Capital overhaul of A5 Unit-2014
Capital overhaul of turbine and generator, SM Partial repair of the boiler
Implementation 2014
Prior to overhaul: Unit power 130 MW
After overhaul: Unit power 155 MW
Increase in capacity of 25 MW
9. Revitalization of units TPP B1 & B2 2016-2017
1. Longer lifetime of unit 2. Higher unit usage
rate 3. Higher availability of
unit 4. Lower specific costs
of coal, water Demi and Deka, chemicals and own consumption
5. Elimination of bottlenecks
Revitalization
TPP B2-2016 TPP B1 - 2017
Pre-revitalization: 1. Lifetime of units: TPP B1 until 2023, TPP B2 until 2024 2. Unit capacity 310 MW 3. Specific use of steam 3.05 ton/MWh 4. Coal specific consumption 1.40 ton/kg 5. Own electricity consumption 9.5%
After revitalization: 1. Lifetime after revitalization:
The electricity system in Kosovo (ESK) is interconnected through its cross-border lines with neighbouring countries (Serbia, Macedonia, Montenegro and Albania) through high voltage 400kV, 220kV transmission lines and three 110kV lines. Kosovo’s energy system is characterized by a strong 400 kV interconnection network, which is strongly interconnected in the regional network. A key on-going activity is the construction of the 400 kV line with Albania which, in the mid-term and long-term, will facilitate electricity exchanges and will allow an optimization of two complementary systems – thermal in Kosovo and hydro in Albania. The 400 kV line also has great importance for electricity exchanges in the region.
KOSTT – Kosovo Transmission System and Market Operator, operates at five voltage levels – 400 kV, 220 kV, 110 kV, 35kV and 10(20)kV, with a total length of transmission system lines (400 kV, 220 kV and 110 kV) of 1,211 km.
Table16. Measures to enhance the electricity transmission system
Nr.
Measure Timeline Estimated savings of primary energy and other indicators
1. Second transformer 40MVA in SS Skenderaj
Q2-2014
Reduction of losses by 0.06 % of total demand as a result of implementation of projects until 2016:
467.67 ktoe x 0.06% = 28.06 ktoe respectively 326.34 GWh
Enhancement of security and reliability of supply in Skenderaj. Optimization of substation maintenance process. Creation of transformation reserves.
2. AT2-300 MVA in SS PEJA3 and SS FERIZAJ 2
Q4-2015 Increase of transformation capacities and fulfilment of N-1 security criterion
3. New 110 kV line SS Peja 3- SS Peja 1 and revitalization of SS Peja 1
Q4-2015
Construction of the line allows the fulfilment of N-1 criterion. In addition, revitalization of SS Peja 1 has an effect in enhancing security and reliability of system operation.
4. Revitalization of 110 kV line: L126/2 SS Peja 2- SS Deçan
Q4- 2015
Increase of transmission capacity of the line from 83 MVA to 114 MVA with the aim of reducing power losses, improving the N-1 security criterion for the substation ring 110 kV Peja3-Peja1-Peja2-Deçan –Gjakova1.
2.2.4 Measures in electricity distribution sector
Further upgrading and new investment are needed in the distribution network to reduce losses, while
demand-side investments in energy efficiency should be undertaken to help curve demand. Targeted
investments will improve reliability of the distribution system and help reduce technical losses. Rehabilitation
of several substations is necessary to decrease technical losses and improve service standards and reliability.
27
The most urgent investments in the distribution network concern metering assets at the sub-station level and
secure metering at the end-user level.
The Government recognizes that successful privatization on this scale needs to be well prepared in order to
maximize the benefits for Kosovo. It is well aware of the fact that the speed of the process depends critically
on its own decision-making regarding strategic sector options, on its institutional capacity and on prevailing
market conditions. After privatization of KEK Distribution, the private investor should increase the number of
supply points, as well as reinforce 110/35 kV and 35/10 kV substations along with interconnection lines. In
addition, the investor should enhance the network configuration, distribution lines and transformation
stations.
Anticipated measures and actions related to the distribution network during the period 2009-2018 are:
Realization of necessary rehabilitations, strengthening and modernization of the network so as to eliminate congestion, reduce technical losses and improve security of electricity supply for end-use consumers;
Construction of required substations at all levels;
Definition of new substations required in the future and for shifting to different voltage levels; and
Creation of conditions for connection of renewable power generation capacity to the distribution system.
In general, both lines and transformer stations are overloaded during the winter, resulting in high technical losses which in 2006 were 17.93%, in 2007 17.19%, in 2008 around 17%, in 2009 around 18%, in 2010 around 17%, in 2011 around 17% and in 2012 around 16%.
The distribution network operates 625.55 km of the 35 kV network. The 10 (20) kV network has a length of
958.80 km, the 10 kV system a length of around 5915.40 km, the 6 kV network 49.65 km and the 0.4 kV
network has a length of 11,904.88 km.
This Division owns 6.200 transformer stations of 220 kV (from transformer) to 10(20)/ 0.4 kV.
Remark: As of 1st
of May 2013 Distribution Division of KEK has been passed to the Private owner as a result of
privatization.
2.2.5 Measures in the heating sector
District heating systems exist only in Prishtina, Gjakova and Mitrovica. These systems meet only 3% of heating
demand. Existing heating technologies are based on residual fuel oil and diesel. This sector also is challenged
by old technology, negative environmental impacts and a low level of billing and collection for the energy
supplied. The need to develop the heating market was recognised in the results of the Heating Market Study
(ELC, World Bank Study, 2007). Development of such a market will be incentivized by the Government. The
Law on Public Enterprises has placed these enterprises under municipal administration.
Also the district heating sector, especially the existing system in Prishtina (named Termokos), faces financial
difficulties and, to date, it has not proven to be self-sustainable without support from the Kosovo Budget.
Commercial losses are high, while the existing tariffs, although not very low, do not completely cover the costs
of supply.
A further challenge lies in the introduction of thermal energy consumption meters for individual households in apartment buildings.
The World Bank study on the heating market (2007) recommended the expansion of the DH market. The government is supporting the development of DH systems.
28
Existing DH plants tend to supply those city areas which have a high population density and which include public facilities, such as hospitals, schools and administrative buildings.
Table17. District Heating in Kosovo
Enterprise
(town)
Installed capacity
(MW)
Operation Capacity
(MW)
Length of distribution
network (km)
No. of substations
DH “Termokos” J.S.C 135.62 116 MW 70 312
DH Gjakova, J.S.C 38.6 15 MW 23.5 275
DH Termomit Mitrovica 16.9 6 MW 4.5 20
Plans for the implementation of the thermal energy cogeneration project at TPP Kosovo B to supply the district
heating system in Prishtina are a promising development in terms of improving the efficiency of supply of
thermal energy for space heating.
MEASURES IN THE HEATING SECTOR – DH “TERMOKOS” J.S.C. – Prishtina
Thermal energy (hot water) generation is delivered by two boilers, VKLM 58 MW, which use heavy fuel oil,
producing 11.3 MWh/Ton with a sulphur content of less than 1%.
As an alternative source for providing heating for hospitals in Prishtina, two boilers, each with a capacity of 7.5
MW and which run on light fuel oil, are often used.
Table18. Measures in DH TERMOKOS
Nr.
Measure Target of the use of
primary energy/sector Timeline
Energy savings in
2013-2015/ other
indicators
Estimated primary energy savings in 2018 and other
indicators
1
Cogeneration with TPP B- Prishtina DH Company “Termokos” 2013-2014
Thermal heating system for the city of Prishtina
Implementation:
2013 – 2014
Electricity (MWhe) which is reduced for the benefit of Thermal energy (MWhth):
Reduction in electricity consumption by Prishtina city heating from 80 MWhe to 22-24 MWhe
Possibility of connecting cogeneration to New Kosovo TPPs after 2017
2
Reconstruction of 50 thermal substations in the Termokos distribution
Improvement of heating quality;
System balancing;
2014 Savings as a result of reducing hot water
Reconstruction of substations also includes the introduction of SCADA monitoring and
29
network Reduction in energy losses from 18% to 15 %.
production:
1.94 GWh
Savings in water 8447m³
control systems for the 50 substations at the central office in Termokos
3
Replacement of 11.6 km of pipes in the primary network
15% reduction in water losses compared to current average losses.
Reduction in energy losses from 18% to 15% due to improved pipeline insulation.
2014
4
Partial rehabilitation of Termokos :
Installation of energy delivered meters
Installation of new equipment to measure % O2 during the combustion process;
Accurate information on energy delivered from the district heating system.
Real assessment of energy losses in the distribution network, compared with energy received at substations.
Quality control of burning heavy fuel oil and environmental protection when boilers are operating.
2013-2014
0.412 GWh
These measures enhance efficiency of boilers, fuel savings, and environmental protection and minimize downtimes.
MEASURES IN THE DISTRICT HEATING - DH GJAKOVA J.S.C. Having found itself in financial difficulties as a result of high heavy fuel oil prices, high consumption of electricity and high operating costs, DH Gjakova is seeking alternative ways of generating electrical and thermal energy. The cogeneration system planned through this plant, in a ratio of electrical energy/thermal energy of 4.5 MWhe/25 MWhth, is currently in its initial phase, undergoing a feasibility study supported by WBIF (EU’s Western Balkans Investment Framework). There is an interest in supporting this project with grants and loans provided by KfW, with the participation of the Kosovo Government. Currently, there are two boilers in the District Heating Company, with a nominal capacity of 18 MW and 20 MWh. The first was installed in 1980 and the second in 1987. Both boilers are in urgent need of repair to their ignition, screens and water heaters. In 2010, all pipes included in the water heater package were replaced in the 20 MW boiler in order to use it as an operational boiler, while the second boiler is kept in reserve. The efficiency level of the two boilers is around 65 – 70%. Annual consumption of primary energy for heating in Gjakova in 2012 was 11 GWh, while final energy consumption of heating was 9 GWh.
30
3 ENERGY SAVINGS ACHIEVED IN THE ENERGY END-USE SECTORS
Kosovo has adopted a cautious approach to establishing an intermediate indicative energy savings target for its first National Energy Efficiency Action Plan (2010 – 2012), which amounts to 3% of the overall amount for the period (1021.08 ktoe) i.e. 31 ktoe. The national indicative target was allocated between the sectors of final energy demand, so that the effectiveness of the proposed measures could be monitored at a more disaggregated level. The sectorial allocation of the national target was based on the following:
the proportion of final energy consumption accounted for by the individual sectors,
the potential for efficiency improvements,
the economic efficiency concept of different energy efficiency measures for different sectors (so it is much better to promote the most effective measures) and
the necessary level of policy and legal interventions in the sectors. A summary of target levels within each sector is provided in the table below.
Table 19: Intermediate energy saving targets, by sector
Indicative Energy Saving Target: 31.00 ktoe
Period (2010-2012)
Sector % ktoe GWh
Residential 40 12.40 144.212
Services 30 9.30 108.159
Industry*
25.5 7.905 91.935
Transport 4.5 1.395 16.224
Total 100 31.00 360.53
Source: Kosovo NEEAP (2010 – 2012) * The Agriculture sector has been included within the Industry Sector The approved intermediate indicative target of 31 ktoe was allocated between the sectors of final energy demand, so that the effectiveness of the proposed measures could be monitored. In the first NEEAP 2010 – 2012, a total of 38 energy efficiency measures was foreseen, that included:
15 measures in the household sector,
18 measures in the services sector (public and private services),
2 measures in the industrial sector,
2 measures in the transport sector,
1 measure in the agriculture sector.
3.1 Calculation of energy savings achieved
The bottom-up (BU) method was used to calculate energy savings achieved in the 1
st NEEAP implementation
period. The methodology, which was recommended by the EnCS, is based on an analysis of changes to key energy efficiency indicators selected for the end-use sectors during the period from the selected reference year to the reporting year. The calculation methodology and MS Excel-based tables and calculations of all relevant Indicators were developed through the project “Capacity building for monitoring, verification and
31
evaluation (M&V&E System) of the energy efficiency policies in SEE countries, in terms of the EU accession process” (PN 08.2016.7-005.00) supported by ORF-EE/GIZ. The calculation Methodology developed with ORF-EE/GIZ support is formalized in Kosovo’s Legislation through AI no.14/2012. Article 4 of this AI refers to the calculation methodology which is added in annex IV as integral part of AI. Hence, for the purpose of the current report, the calculations of energy savings achieved by implementing of the First NEEAP are carried out based on AI no. 14/2012. Due to a lack of adequate statistical data and surveys, KEEA was not able to apply the top-down (TD) methodology for calculation of EE indicators. KEEA is working with relevant Institutions to ensure that adequate statistical data shall be collected for reporting the achievements made by the Second (2
nd) NEEAP.
At the end of 2012, the KEEA carried out a survey of municipalities and central government ministries to collect information on projects implemented in the public sector:
In municipalities (projects related to insulation refurbishment measures applied in building components for existing public buildings, changes in the quantity and type of light bulbs used, street lighting projects implemented).
In central government buildings (insulation refurbishment measures applied in building components for existing central government buildings, changes in the quantity and type of light bulbs used).
To assess the energy savings achieved by implementing the administrative instruction on labelling of household electrical appliances, data from the Customs Office of Kosovo on imported household appliances was used. Using the above mentioned data for a proper assessment of the energy savings achieved, bottom–up calculations were used for 8 energy efficiency measures that were implemented, out of a total of 38 that were included in the 1
st NEEAP.
Table 20: Overview of EE measures and indicators used for calculation of energy savings achieved
Sector Id Measure Indicator used
Residential R1 AI on labeling electrical household appliances Replacement of new household appliances (washing machines, refrigerators, dishwashers) in residential buildings
R 10 Promotion of EE in households Insulation refurbishment measures applied in building components in existing residential buildings
R 12 Public campaign on energy savings and improved EE
Replacement or new installation of lamps in residential buildings
Services S 7 EE promotion at municipal level Insulation refurbishment measures applied in building components in existing tertiary buildings
S 13 Public campaign on energy savings and improved EE through efficient lighting
Replacement or new installation of lamps in public buildings
S 15 Stimulation of use of solar systems and panels for sanitary water heating and public lighting
Solar water heating in tertiary buildings
S 16 Improved EE through efficient lighting in public buildings
Replacement or new installation of lighting systems in tertiary buildings
S 17 Efficient public street lighting Replacement or new installation of street lighting systems.
32
3.2 Description of energy savings achieved
Residential sector
The following bottom-up indicators were used as the basis for calculating energy savings:
Replacement or installation of new household appliances (washing machines, refrigerators, dishwashers) in residential buildings;
Insulation refurbishment measures applied in building components in existing residential buildings;
Replacement or new installation of lamps in residential buildings. AI on labelling household electric appliances (R1) Energy savings for the replacement of new household appliances (washing machines, refrigerators, dishwashers) in residential buildings have been calculated using the following formula:
Calculations are based on the reference values provided in the approved BU methodology and information concerning the number of imported appliances obtained from Kosovo Customs. It has been assumed that the residential sector accounts for 80% of washing machines and dishwashers, while the service sector accounts for the remaining 20%. For refrigerators, the equivalent figures are 70% (residential sector) and 30% (service sector)
Promotion of EE in households (R10) Energy savings from insulation refurbishment measures applied in building components in existing residential buildings have been calculated using the following formula:
yearcomp ins. of m
kWhc
baHDDUU
UFEScompnewcompini
comp 2
__
1000
124
(Uini_comp=1.4 W/m2K and Unew_comp=0.35 W/m
2K, HDD=2915 Kd/y)
Total savings: 172.7 GWh, or 14.86 ktoe Remarks:
After 1999 a large number of private houses and buildings in Kosovo were in a destroyed or damaged condition.
As a result of public awareness raising campaigns on the energy savings that can be achieved by applying EE measures, a considerable number of households improved the insulation of their houses during the reporting period.
Pro-Credit Bank and Raiffeisen Bank have provided substantial loans under the Eco-program launched in 2009.
KEEA has carried out a survey with manufacturers of insulation materials (Stiropor N4) and large building material markets in Kosovo who provided KEEA with data on the amounts of insulation materials produced respectively sold in the Kosovo market during the reporting period.
KEEA has assumed 30% of total insulation material sold was used for rehabilitation and upgrading of existing houses, while the remaining 70% was used for insulating newly constructed houses and buildings.
33
Based on expert estimations, KEEA came to the conclusion that up to 30 % of total investments for insulation of existing houses may be attributed to the impact of the current measure. Hence only 30 % of the total EE savings as results of insulation of existing houses is reported. Data provided by the Kosovo Agency of Statistics shows that the average living space per family in Kosovo is 78.47 m
2.
It is considered that the majority of refurbished houses belongs to the construction periods 1960-1998 and 1999-2001 defined in the BU-Methodology
U- reference values were calculated from BU-Methodology as weighted average for the construction periods 1960-1998 and 1999-2001
Public campaign on energy savings and improved EE (R12)
Energy savings resulting from the replacement of existing lamps or the installation of new lamps in buildings were calculated using the following formula:
]//[1000
___ yearunitkWhnFPP
UFEShrep
PROMOTEDMARKETBESTAVERAGESTOCK
For reporting purposes, 80% of the savings achieved by implementing this measure have been attributed to the residential sector.
Total savings: 100.02 GWh, or 8.60 ktoe Remarks:
Calculations are based on the approved BU methodology and information on the number of imported EE bulbs obtained from Kosovo Customs.
It was assumed that 75 % of total imported bulbs were used to replace bulbs in existing houses and buildings while 25 % were used in newly constructed buildings.
It was further assumed that 80% of the imported bulbs were used to replace existing bulbs in the residential sector and 20% in the service sector.
Service sector The bottom-up formulas for calculation of energy savings that result from implementation of the following energy efficiency measures were used:
Insulation refurbishment measures applied in building components in existing tertiary buildings,
Replacement or new installation of lamps in residential buildings,
Solar water heating in tertiary buildings,
Replacement or new installation of lighting systems in tertiary buildings,
Replacement of or new installation of street lighting systems. EE promotion at municipal level (S7) Energy savings from insulation refurbishment measures applied in building components in existing public buildings were calculated using the following formulas:
Doors and Windows
Refurbishment of doors and windows in the municipal buildings of 15 municipalities, using U-values stipulated in Table 12 of the BU methodology (Uini.= 5.1 W/m
2K, Unew= 2.8 W/m
2K and HDD=2915 Kd/y):
34
yearcomp ins. of m
kWhc
baHDDUU
UFEScompnewcompini
comp 2
__
1000
124
Insulation of walls
Refurbishment of walls in the municipal buildings of 15 municipalities, using U-values stipulated in Table 12 of the BU methodology (Uini.=1.03 W/m
2K, Unew=0.36 W/m
2K and HDD=2915 Kd/y):
yearcomp ins. of m
kWhc
baHDDUU
UFEScompnewcompini
comp 2
__
1000
124
Total savings: 9.39 GWh, or 0.81 ktoe Remarks:
Assumptions are based on the data received from 15 Municipalities throughout Kosovo which have implemented EE measures from their own budgets.
It is considered that the majority of refurbished public buildings belongs to the construction period 1960-1998, defined in the BU-Methodology
U-reference values were calculated from the BU-Methodology as weighted averages for public buildings and schools constructed in the period 1960-1998
Public campaign on energy savings and energy efficiency improvement (S13)
Energy savings from the replacement of existing or installation of new lamps in the Service Sector were calculated using the following formula:
]//[1000
___ yearunitkWhnFPP
UFEShrep
PROMOTEDMARKETBESTAVERAGESTOCK
For reporting purposes, 20% of the savings achieved by implementing these measures have been attributed to the services sector.
Total savings: 25 GWh/year, or 2.15 ktoe Remarks:
Calculations are based on the approved BU methodology and information on the number of imported EE bulbs obtained from Kosovo Customs.
It was assumed that 75 % of total imported bulbs were used to replace bulbs in existing houses and buildings while 25 % were used in newly constructed buildings.
It was further assumed that that 80% of the imported bulbs were used in the residential sector and 20% were used in the service sector.
Stimulation of use of solar systems and panels for sanitary water heating and public lighting (S15)
Energy savings resulting from the installation of solar water heating in tertiary buildings were calculated using the following formula:
systemsheatingaveragestock
USAVEUFES
___
35
Total savings: 0.99 GWh/year, or 0.085 ktoe
Improved EE through efficient lighting in public buildings (S16) Energy savings from replacement or new installation of lighting systems in tertiary buildings were calculated using the following formula:
]//[1000
__ yearunitkWhnPnP
UFES newhnewinihini
Total savings: 0.72 GWh/year, or 0.06 ktoe Remarks:
Assumption was based on data received from the Ministry of Public Administration and the Ministry of Foreign Affairs.
Efficient public street lighting (S17)
Energy savings resulting from the replacement of existing or installation of new street lighting systems were calculated using the following formula:
]//[1000
_,_, yearmkWhnPnP
UFES newshnewsinishinis
Total savings: 8.82 GWh/year, or 0.76 ktoe
3.3 Description of energy savings measures implementation
The 1
st NEEAP included 38 energy efficiency measures in total. Most of these measures were foreseen in the
residential and services sectors, the sectors which had the highest energy saving targets to be achieved. Table 21 presents an overview of the measures included in the 1
st NEEAP and an evaluation of their
implementation.
36
Table 21: Overview of EE measures and evaluation of their implementation
Residential sector
Id Name of energy saving
measure
Energy savings planned
to be achieved in 1
st NEEAP
(ktoe)
Energy savings reported
(ktoe)
Status of implementation
Comments
R 1 AI on labeling of household electric appliances
6.92
4.60
Implemented – AI on labeling adopted on June 27, 2012
Energy savings were calculated from replacement of washing machines, refrigerators, dishwashing machines.
R 2 AI on energy auditing
- -
Implemented – AI on energy auditing adopted on April 14, 2008 and revised on January 30, 2012
52 energy auditors were trained and certified.
R 3 AI on EE promotion for final consumers and energy services
-
-
Implemented – AI on Promotion of energy efficiency for final consumers and energy services adopted on 31
st of
October, 2012.
Insulation refurbishment measures applied in building components in existing residential buildings.
R 4 Enhancement of municipal capacities for managing projects and energy audits in municipalities
- -
Implemented – training took place in December 2010
60 officers in municipalities were trained on energy management. 30 officers in municipalities were trained on energy planning and compilation of municipal EE action plans
R 5 Initial training courses for energy auditors
-
-
Implemented – training took place in May 2010
52 Energy Auditors were trained
37
R6 Enhancement of the collection rate and improved EE (campaign by KEK J.S.C.)
- -
KEK and KOSTT reported that: - KEK launched public awareness campaign on a yearly basis to enhance collection rate KEK procured 97.600 multifunctional and simple digital meters. During the reporting period KEK has replaced 57.000 digital meters. Commercial losses decreased on yearly basis (24.02% in 2010, 21.37% in 2011 and 18.81% in 2012)
Implementation of the measure had a positive impact on introducing of EE light bulbs (R12 and S13) and implementation of AI on labeling household electric appliances (R1)
R 7 Promotion of LPG for heating and kitchen use 1.5
-
At the current price of LPG the planned target is not achievable.
R 8 Technical regulation on energy performance of buildings.
-
-
Implemented – Technical regulation adopted on May 25th, 2009.
R 9 Law on EE
-
-
Implemented – Law on EE was adopted on July 8th, 2011.
R 10 Promotion of EE in households
-
14.86
Implemented Raiffeisen Bank has disbursed: ~ 200.000 euro to microcredits ~ 1 mil euro to SMEs ~ 4 mil euro loan to big industrial client ProCredit Bank has disbursed: ~ 20 mil euro to microcredits ~ 2 mil euro to SMEs
R 11 Development of a system for certification of energy auditors
-
-
Implemented through adoption of Regulation no.01/2012 on Establishment and Functioning of CCEAM. Adoption date 26.01.2012
During the reporting period, 52 energy auditors were certified and secondary legislation on the establishment of the Commission for Certification of
38
Energy Auditors and Managers was adopted.
R 12 Public campaign on energy savings and improved EE
4.85
8.60
Implemented Total savings introducing EE bulbs were calculated for residential and services sectors together, for reporting purposes 80% of savings reported on R12
R 13 AI on heating of new collective buildings
-
-
Not implemented - in the reporting period the AI was not approved yet
R 14 Reforms of public procurement legislation to benefit of energy efficiency incentives
- -
Implemented –amendments to Procurement Law approved on 31 August, 2011
R15 Incentivize usage of solar energy for sanitary water heating
-
-
Installation of solar collectors observed, but due to insufficient information achieved savings are not reported
Total from measures: 13.27 ktoe 28.06 ktoe
Services sector
Id Name of energy saving
measure
Energy savings planned
to be achieved in 1
st NEEAP
(ktoe)
Energy savings reported
(ktoe)
Status of implementation
Comments
S 1 AI on labeling of office electric appliances
-
-
Implemented – AI on labeling adopted on 27.06.2012.
Revised AI no.09/2012 on Labeling of Energy related Products, includes all appliances used in Residential and Services Sector.
S 2 AI on energy auditing
-
-
Implemented – AI on energy auditing adopted on April 14, 2008 and revised on January 30, 2012.
52 energy auditors were trained and certified
39
S 3 AI on EE promotion for final consumers and energy services
-
-
Implemented – AI on Promotion of energy efficiency for the final consumers and energy services adopted on 31
st of
October 2012.
S 4 Development of municipal capacities for project management and energy audits in municipalities
-
-
Implemented – training took place in December 2010.
60 officers in municipalities were trained on energy management. 30 officers in municipalities were trained on energy planning and compilation of municipal EE action plans
S 5 Training of energy auditors at municipal level
-
-
Implemented – training took place in December 2010.
30 trained Municipal officers.
S6 Enhancement of the collection rate and improved EE (campaign by KEK J.S.C.)
-
-
KEK and KOSTT reported that: KEK launched public awareness campaign on yearly bases to enhance collection rate. KEK procured 97. 600 multifunctional and simple digital meters. During the reporting period KEK has succeeded in replacing 57. 000 digital meters. Commercial losses decreased on yearly basis (24.02% in 2010, 21.37% in 2011 and 18.81% in 2012)
Implementation of the measure had positive impact on introducing of EE light bulbs (R12 and S13) and implementation of AI on labeling household electric appliances (R1)
S 7 EE promotion at municipal level
1.2 0.81
Refurbishment of doors and windows in municipal buildings of 15 municipalities totaling 40.919 m2 Refurbishment of walls in municipal buildings of 17 municipalities totalling 97.818 m2
40
S 8 LPG promotion
0.5
-
With current price of LPG the planned target is not achievable.
S 9 Technical regulation on energy performance of buildings
-
-
Implemented – Technical regulation adopted on May 25th, 2009
S 10 Law on EE
- - Implemented – Law on EE was adopted on July 8th, 2011
S 11 Promotion of EE in SMEs
- -
EE investments in SMEs observed, but due to insufficient information savings are no reported
Raiffeisen Bank has disbursed: ~ 200.000 euro to microcredits ~ 1 mil euro to SMEs ~ 4 mil euro loan to big industrial client ProCredit Bank has disbursed: ~ 20 mil euro to microcredits ~ 2 mil euro to SMEs
S 12 Creation of a system for certifying auditors
- -
Implemented through adoption of Regulation no.01/2012 on Establishment and Functioning of CCEAM. Adoption date 26.01.2012
During the reporting period, 52 energy auditors were certified and secondary legislation on the establishment of the Certification Commission for Energy Auditors and Managers was adopted
S 13 Public campaign on energy savings and energy efficiency improvement
7.20 2.15
Implemented Total savings from introduction of EE light bulbs were calculated for residential and services sectors together, for reporting purposes 20% of savings reported on S13
S 14 Transformation of procurement legislation, with the aim of improving EE
- -
Implemented – amendments to Procurement Law approved on 31 August 2011.
41
S 15 Stimulation of use of solar systems and panels for sanitary water heating and public lighting 4.34
0.085
MED/MEM has financed exemplary pilot projects installing Solar Panels in 3 hospital clinics, one students dormitory and its Administrative Building, while the University Students Centre has financed one Students Dormitory
S 16 Improved EE through efficient lighting in public buildings
-
0.06
13 municipalities and 3 ministries have reported energy savings by replacing lighting systems in public buildings
S 17 Efficient public street lighting
- 0.76
In 2010 through co-funding (GIZ, MEM and Municipalities) pilot projects in 5 municipalities have been implemented on replacement of street lighting systems
In 2011 and 2012 13 more municipalities have replaced street lighting systems from their own budgets
S 18 Improved EE in heating equipment for the services sector
- -
Due to lack of data, savings achieved are not evaluated and reported
Total from measures 13,24 ktoe 3.865 Ktoe
Industry Sector
Id Name of energy saving
measure
Energy savings planned
to be achieved in 1
st NEEAP
(ktoe)
Energy savings reported
(ktoe)
Status of implementation
Comments
I 1 EE promotion among SMEs
- -
Due to lack of data, savings achieved are not evaluated and reported
Raiffeisen Bank has disbursed: ~ 200.000 euro to microcredits ~ 1 mil euro to SMEs ~ 4 mil euro loan to
42
big industrial client ProCredit Bank has disbursed: ~ 20 mil euro to microcredits ~ 2 mil euro to SMEs
I 2 Encouragement of simple audits in the industry sector and a campaign on awareness raising in this sector
2.2 -
Due to lack of data, savings achieved are not evaluated and reported
Total from measures 2.2 ktoe 0 ktoe
Transport sector
Id Name of energy saving
measure
Energy savings planned
to be achieved in 1
st NEEAP
(ktoe)
Energy savings reported
(ktoe)
Status of implementation
Comments
T 1 AI on introduction of bio-fuel in transport
-
-
In the reporting period the AI was not yet approved
T 2 Public awareness raising campaign in transport
1.4 -
Due to lack of data, savings achieved are not evaluated and reported
Total from measures 1.4 ktoe 0 ktoe
Agriculture sector
Id Name of energy saving
measure
Energy savings planned
to be achieved in 1
st NEEAP
(ktoe)
Energy savings reported
(ktoe)
Status of implementation
Comments
A 2 Awareness campaign on energy efficiency
0,15 -
Due to lack of data, savings achieved are not evaluated and reported
Total from measures 0.15 ktoe 0 ktoe
TOTAL 30,26ktoe 31.925 ktoe
Analysis of actual energy savings achieved show that more than 80% of the target has been achieved in residential sector. However, it should be taken into account that due to a lack of data, savings achieved in the services sector have not been fully evaluated and reported. In addition, savings achieved in the industry and transport sectors have not been reported at all.
43
Remark: Besides the reported saving measures, First NEEAP has had many soft measures connected with implementation of Laws and AI’s which could have provided tangible results but we could not apply the M&V&E methodology, therefore are not reported on this report. In addition, on these soft measures we do not foresee substantial developments in upcoming period of Second NEEAP as a matter of budgetary constraints, therefore are not included in the Second NEEAP.
Table 22: Actual energy saving achieved by sector
Indicative Energy Saving Target: 31 ktoe
Period (2010-2012)
Sector (%) (ktoe) (GWh)
Residential 87.89 28.06 326.34
Services 12.11 3.865 44.95
Industry 0 0 0
Transport 0 0 0
Total 100 31.925 371.29
3.4 Summary on energy savings planned and achieved
The saving target set in the 1
st NEEAP of 31.00 ktoe has been over achieved – 31.916 ktoe.
Preliminary estimates show that energy savings reached in the first mid-term period 2010 – 2012 are even higher than reported, but due to the lack of statistical data energy savings cannot be properly assessed and reported. Energy savings reached in the transport and industry sectors were not evaluated at all in the 1
st
NEEAP.
Table 23: National indicative target and its accomplishment
National indicative target in 2018 91.89 ktoe
Intermediate indicative target in 2012 31.00 ktoe
Separation of sector targets
Sector target Energy savings in 2012 Approximate
assumption of energy savings in 2018
2012 2018 Total (TD)
From measures (BU)
Total (TD)
From measures
(BU)
Residential (ktoe) 12.40 30.64 28.06 ktoe 46.98
Services (ktoe) 9.30 12.26 3.865 ktoe 18,91
Industry (ktoe)** 7.905 24.84 Not evaluated 14.00
Transport (ktoe) 1.395 24.15 Not evaluated 12.00
Total (equivalent units): ktoe 31.00 91.89 31.925ktoe 91.89 ktoe
Total (GWh): 360.53 1068.68 371.29 GWh 1068.68 GWh
Percentage (%)(compared to ESD reference consumption)
3 % 9 % 3.1 % 9.00%
*Fields shaded in grey include values from the first NEEAP
**Agriculture sector has been included in into the Industry Sector Remark: In the First NEEAP we have not forecast a national target for nearly zero energy buildings.
44
4 ENERGY EFFICIENCY MEASURES OF THE SECOND NEEAP IN THE ENERGY END-USE SECTORS In total, 17 energy efficiency measures have been included the 2nd NEEAP. Most of these energy efficiency measures are planned to be implemented in the services sector – 5, and followed by the residential sector.
4.1 Measures in the residential sector
The residential sector is the second largest energy end-use sector in Kosovo. In 2012, energy end-use in the residential sector was 498.71 ktoe or 39.53 % of total energy end-use consumption. It is estimated that the energy savings potential for the residential sector is around 10-40%. It is clear from the above that the household sector would contribute most energy savings, but it is also the most difficult sector in which to achieve progress, due to lack of incentives and penalties for non-implementation. Reduction of energy consumption will be one of the greatest challenges in the future. It is certainly required, as rising energy prices will put an increasingly heavy burden on households - in particular on low income households, who already can hardly afford to pay their energy bills. The draft of new Condominium Law is approved by the Parliamentary Commission. The Law will be presented to the parliament for the second reading in next Months. The Law will regulate the use, management and maintenance of jointly owned buildings. It is important to note that the creation of house owners’ associations will become obligatory. The implementation of the Law will regulate the rights and duties of apartment owners, the allocation of profit, charges and costs, general meeting and binding decisions for minorities after majority votes, preconditions for unanimous decisions, etc. The policy planning document that addresses housing development issues in Kosovo is the Strategy of the Ministry of Environment and Spatial Planning (2011 – 2014). The following two strategic objectives address issues related to the establishment of a legal and institutional framework for the promotion of energy efficiency:
increasing access to housing that is affordable and compatible with the economic circumstances of families and with the preservation of the value of the housing stock;
regulating construction activities by engineering technical regulations in compliance with EU standards.
Issues related to promotion of energy efficiency in multi-apartment buildings will be the main priority of the Ministry of Environment and Spatial Planning for the coming years.
The following 4 measures for the residential sector have been included in the 2nd NEEAP:
Improving EE through implementation of energy efficiency measures in residential buildings,
Improving EE through implementation of energy efficiency measures in the residential sector,
Improving EE through implementation of energy efficiency measures in multi-apartment buildings,
Improving EE through continuing information campaigns on energy efficiency.
45
Table 24
Summary table of energy efficiency improvement measures in the residential sector
No Title of the energy saving measure
Target group
Duration Achieved energy savings in 2012 - summary of sectorial savings based on measures defined in 1st NEEAP
Energy savings expected in 2018
R.1. Improving EE through implementation of energy efficiency measures in residential buildings
Households 2014
to
2015
28,06 ktoe
51,56 ktoe R.2. Improving EE
through implementation of energy efficiency measures in the residential sector
Households 2013
to
2018
R.3. Improving EE through implementation of energy efficiency measures in multi-apartment buildings
Owners of apartments in multi-apartment buildings
2013
to
2018
R.4. Improving EE through continuing information campaigns on energy efficiency
Households 2013 to 2015
Title of the energy saving measure Improving EE through implementation of energy efficiency measures in residential buildings
Index of the measure R1
Description
Category Financial instrument
Timeframe Start: 2014
End: 2015
Aim/brief description Measure aims at increase of energy efficiency in residential buildings
Target end-use Existing buildings
Target group Households
46
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is planned that energy saving measures will be implemented in residential buildings. Energy saving measures in residential buildings foresees insulation of walls, replacement of windows, insulation of roofs and basements.
Budget and financial source Total EBRD contribution (loan/grant) – 12mil Euro.
(The total budget for measures R1 (3 mil., Euro) and I1 (9 mill. Euro)).
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA has developed a project post-implementation monitoring system which foresees that final beneficiaries will submit information on actual energy consumption after project implementation.
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
2,00 ktoe
Expected impact on energy savings in 2018 (if available)
Assumptions Estimates of expected energy savings are based on an assessment of energy savings achieved with similar investment in the 1
st
NEEAP, foreseeing that approx. 1/3 of budget available will be invested in residential sector (the rest in Industry and SMEs sector – I1)
Overlaps, multiplication effect, synergy
-
Title of the energy saving measure Improving EE through implementation of energy efficiency measures residential sector
Index of the measure R2
Description
Category Financial instrument
Timeframe Start: 2013
End: 2018
Aim/brief description Measure aims at increase of energy efficiency in residential buildings
Target end-use Existing buildings
Target group Households
47
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is planned that energy saving measures will be implemented in residential buildings. Energy saving measures in residential buildings foresees insulation of walls, replacement of windows, insulation of roofs and basements.
Budget and financial source Commercial banks have already issued a large number of loans for implementation measures in the residential and SME sectors – it is also expected that in the period of the 2
nd NEEA
implementation overall costs will at least remain at the same level – i.e. at least 20 mill. euro
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA together with commercial banks is developing a project implementation monitoring system that will allow assessment of the energy savings achieved.
Expected savings in 2012 as per 1
st NEEAP
2,86 ktoe
Savings achieved in 2012 9,76 ktoe
Expected energy savings in 2015
7 ktoe
Expected impact on energy savings in 2018 (if available)
Assumptions Estimates of expected energy savings are based on an assessment of the energy savings achieved with similar investments in the 1
st
NEEAP
Overlaps, multiplication effect, synergy
-
Title of the energy saving measure Improving EE through implementation of energy efficiency measures in multi-apartment buildings
Index of the measure R3
Description
Category Regulation / Financial instrument
Timeframe Start: 2013
End: 2018
Aim/brief description Measure aims to increase energy efficiency in multi-apartment buildings.
Target end-use Existing buildings
48
Target group Owners of apartments in multi-apartment buildings
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
Draft Law on Condominiums which is in the second reading stage in Parliament, foresees establishment of housing associations as an obligation. It creates a legal basis for the further implementation of EE measures in multi-apartment buildings.
The Ministry of Environment and Spatial Planning will draft an administrative regulation concerning technical housing norms for condominiums; an administrative instruction for a certification program for administrators, an administrative instruction about condominium agreements and an administrative instruction for a register of condominiums, in parallel, administrators at local level will start a promotion campaign for the establishment of housing owner associations. It will be an obligatory precondition for receiving further support from the state for preparation of energy audits and the implementation of energy saving measures.
There is a Capstone Project being carried out by an officer of the Ministry of Environment and Spatial Planning which aims to be deliver a promotional program for the Law for development of the condominium management mechanisms.
It is planned that energy saving measures will be implemented in multi-apartment buildings. Energy saving measures foresee insulation of walls, replacement of windows, insulation of roofs and basements.
Budget and financial source AI – budget of the Ministry of Environment and Spatial Planning
Promotional measures for establishment of housing associations for 12 multi-apartment buildings (Ministry of Environment and Spatial Planning would cover half the cost in the form of conditional grants for establishment of owner associations and the other half should be covered by the building owners)
Implementation of first pilot projects – for 4 multi-apartment buildings (Ministry of Environment and Spatial Planning would invest in renovation measures covering half of the total amount as conditional grants and the rest would be covered by the building owners)
Total budget for promotion measures and Implementation of pilot projects – 540 000
49
euro.
Implementing body Ministry of Environment and Spatial Planning
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA has developed a project post-implementation monitoring system that foresees that final beneficiaries should submit information on actual energy consumption after projects’ implementation.
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
0,5 ktoe
Expected impact on energy savings in 2018 (if available)
9,00 ktoe
Assumptions -
Overlaps, multiplication effect, synergy
-
Title of the energy saving measure Improving EE through continuing information campaigns on energy efficiency
Index of the measure R4
Description
Category Information measure
Timeframe Start: 2012
End: 2015
Aim/brief description Measure aims at increasing awareness of energy efficiency issues and that this will facilitate further implementation of EE measures in residential, industrial and services sectors.
Target end-use Residential
Target group Households
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is planned that KEEA will carry out continuing awareness raising campaign for energy efficiency measures.
Budget and financial source
MED/ KEEA budget – 150.000 euro during the period 2012- 2014, 50.000 euro for each year.
50
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
TD
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
Expected impact on energy savings in 2018 (if available)
Assumptions
Overlaps, multiplication effect, synergy
4.2 Measures in transport sector
The transport sector is the second largest energy end-use sector in Kosovo. In 2012, energy end-use in transport sector was 336.47 ktoe or 26.67 % of total energy end-use consumption.
Table25. Overview of total energy consumption by transport subsectors 2010-2012
Subsectors / Year 2010 2011 2012*
Road transport 316.52 325.44 322,35
Railway transport 1.15 1.21 1,24
Air Transport 1.24 11.93 12,88
Total transport sector 318.91 338.58 336.47
Source: Energy Balance of Kosovo - 2010, 2001, 2012 (forecast)*, Ministry of Economic Development Two energy efficiency measures were included in the 1
st NEEAP, which envisaged energy savings of 1.4 ktoe in
the transport sector. Due to the lack of data for calculation of energy efficiency indicators in the transport sector, no achieved energy savings have been reported in the 1st NEEAP. The Ministry of Infrastructure has planned to make improvements in the data collection system – especially regarding the collection of data on mileage, creating the possibility to calculate energy savings achieved in the transport sector in the 2
nd NEEAP.
Development of the public infrastructure has been included as one of the pillars in the Action Plan of the Economic Vision of Kosovo (2011-2014). Several transport sector infrastructure development projects have been included in the above mentioned policy document. For instance, in road infrastructure development,- construction of the highway R7 Morinë – Merdare, highway R6 Prishtinë - Hani i Elezit, expansion of national roads, etc. It also foresees investment projects in the railroad sector - rehabilitation and modernization of the south sector line 10 of the railroad. There are two main policy planning documents in the transport sector:
Strategy of Multimodal Transport and Action Plan;
51
Strategy of the Ministry of Infrastructure (2011 – 2014). The goal of the Ministry of Infrastructure is to contribute to economic growth through the establishment of an efficient and integrated multimodal system – road, railway, air. The following 3 measures have been included for the transport sector in the 2nd NEEAP:
Improving EE through a continuing information campaign on promotion of eco-driving;
Systematic inspections of the technical condition of vehicles;
Improving the public transport system in Pristina city.
Table26. Summary table of energy efficiency improvement measures in the transport sector
No Title of the energy saving measure
Target group
Duration Achieved energy savings in 2012 - summary of sectorial savings based on measures defined in 1st NEEAP
Energy savings expected in 2018
T.1. Improving EE through continuing information campaign on promotion of eco-driving
All vehicle owner groups
2012
to
2014
Savings not reported due to lack of data
12 ktoe
T.2. Systematic inspections of the technical condition of vehicles
All vehicle owner groups
2013
to
2015
T.3. Improving of public transport system in Pristina city
Users of public transport in Pristina city
2013
to
2015
Title of the energy saving measure Improving EE through continuing information campaign on promotion of eco-driving
Index of the measure T1
Description
Category Information measure
Timeframe Start: 2013
End: 2015
Aim/brief description To promote eco-driving that will lead to more efficient driving and reduced consumption of energy resources by vehicles.
Target end-use Transport
Target group All vehicle owner groups
52
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
In order to promote eco-driving the following actions will take place:
continuing awareness raising campaign on eco-driving will be carried out;
starting 2013, eco-driving will be introduced as a part of the training course and final examination for obtaining a driving license;
drivers at the ministries will be encouraged to pass eco-driving courses
Budget and financial source Budget of the Ministry of Infrastructure
Costs are covered by the cost of the driving licence
Budgets of central government ministries
Implementing body Ministry of Infrastructure
Monitoring authority Ministry of Infrastructure / KEEA
Energy savings Method for monitoring/measuring the resulting savings
TD
Expected savings in 2012 as per 1
st NEEAP
Savings achieved in 2012
Expected energy savings in 2015
Expected impact on energy savings in 2018 (if available)
Assumptions
Overlaps, multiplication effect, synergy
Title of the energy saving measure Systematic inspections of the technical condition of vehicles
Index of the measure T2
Description
Category Specific measures in the transport sector
Timeframe Systematically
Aim/brief description To ensure that vehicles are being operated according to the manufacturer's requirements.
Target end-use Transport
Target group All vehicle owner groups
53
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
In order to reduce the consumption of energy resources by vehicles:
every vehicle owner shall ensure periodic maintenance of his vehicle according to the manufacturer’s requirements;
vehicle owners shall ensure that the mandatory technical inspection is carried out in accordance with Law No. 02/L-70 On Road Traffic Safety Article 316 – on an annual basis for privately owned vehicles and once in 6 months for commercial vehicles.
Budget and financial source Technical inspection costs are covered by vehicle owners
Implementing body Ministry of Infrastructure
Licensed companies that carry out inspections
Monitoring authority Ministry of Infrastructure / KEEA
Energy savings Method for monitoring/measuring the resulting savings
TD
Expected savings in 2012 as per 1
st NEEAP
Savings achieved in 2012
Expected energy savings in 2015
Expected impact on energy savings in 2018 (if available)
Assumptions
Overlaps, multiplication effect, synergy
Title of the energy saving measure Improving of public transport system in Pristina city
Index of the measure T3
Description
Category Specific measures in the transport sector
Timeframe 2013 – 2015 (investment component to be finished by the end of 2014)
Aim/brief description To improve the public transport infrastructure – the quality of services offered – in Pristina city that would lead to increased use of public transport instead of using privately owned
54
cars.
Target end-use Public transport In Pristina city
Target group Users of public transport in Pristina city
Regional application Pristina city
Information on implementation
List and description of energy saving actions substantiating the measure
Program for improvement of public transport system in Pristina city foresees the following activities to be taken:
Public awareness raising campaign supported by special offers to promote the use of public transport
Investment component – it is planned that 50 new buses will be bought for improvement of public transport services in Pristina city
Budget and financial source Public awareness raising campaign – budget of Pristina city council
Investment component – 5.5 mill. euro (budget of Pristina city council – 2 mill. Euro, Government of Japan – 3.5 mill. Euro)
Implementing body Pristina city council
Monitoring authority Pristina city council / KEEEA
Energy savings Method for monitoring/measuring the resulting savings
BU
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
0.54 ktoe - by the end of the implementation period related energy savings will be reported
Expected impact on energy savings in 2018 (if available)
Assumptions (old bus – new bus) - by the end of the implementation period the number of replaced buses and related energy savings will be reported
Overlaps, multiplication effect, synergy
55
4.3 Measures in the tertiary sector
Energy efficiency measures in the tertiary sector – which includes public administration, healthcare etc. institutions - will be central investment projects in the 2
nd NEEAP. The 2
nd NEEAP contains five measures for
implementation, for which financing from the national budget of Kosovo, local municipal budgets and IFIs has been mostly committed. More than 200 buildings will be renovated as a result of the implementation of investment projects in the above mentioned activity. The following 5 measures have been included for the tertiary sector in the 2nd NEEAP:
Improving EE through renovation of public buildings in municipalities,
Improving EE through renovation of central government buildings,
Improving EE through renovation of public buildings (municipal buildings),
Improving EE through renovation of municipal buildings and street lighting,
Promotion of energy efficiency measures by preparing energy audits.
Table 27. Summary table of energy efficiency improvement measures in the public sector
No Title of the energy saving measure
Target group Duration Achieved energy savings in 2012 – summary of sectorial savings based on measures defined in 1st NEEAP
Energy savings expected in 2018
S1 Improving EE through renovation of public buildings in municipalities
Public services
2013
to
2014
3,865 ktoe
20,71 ktoe
S2 Improving EE through renovation of governmental buildings
Central government buildings
2014
to
2015
S3 Improving EE through renovation of public buildings (municipal buildings)
Public services
2014
to
2019
S4 Improving EE through renovation of municipal buildings and street lighting
Public services
2013
to
2016
S5 Promotion of energy efficiency measures by preparing energy audits
Public services, central government buildings
2012
to
2014
56
Title of the energy saving measure Improving EE through renovation of public buildings in municipalities
Index of the measure S1
Description
Category Financial instrument
Timeframe Start: 2013
End: 2014
Aim/brief description Measure aims at increasing energy efficiency in municipal buildings
Target end-use Existing buildings
Target group Public services
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is planned that energy saving measures will be implemented in 65 public buildings (63 schools and 2 hospitals). Energy saving measures foresees insulation of walls, replacement of windows, insulation of roofs and basements, as well as installation of energy efficient lighting. Concrete measures that will be implemented in each building have been identified in the process of preparation of energy audits.
Budget and financial source EC contribution (grant) – 15.6mil. euro – post monitoring implementation period will show energy savings results
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA has developed a project post-implementation monitoring system which foresees that final beneficiaries should submit information on actual energy consumption after projects’ implementation.
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
2,17 ktoe
Expected impact on energy savings in 2018 (if available)
Assumptions Estimates of expected energy savings are based on energy audits that were carried out for each building.
Overlaps, multiplication effect, synergy
-
57
Title of the energy saving measure Improving of EE through renovation of governmental buildings
Index of the measure S2
Description
Category Financial instrument
Timeframe Start: 2013
End: 2019
Aim/brief description 3 year program which aims to increase energy efficiency in central government and municipality buildings
Target end-use Existing buildings
Target group Public services
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is planned that the project will include 200 - 250 buildings:
energy audits will be prepared for all central government buildings (except: police, military) and some municipality buildings
energy saving measures will be implemented in all central/local governmental buildings that will be audited.
Energy saving measures foresees insulation of walls, replacement of windows, insulation of roofs and basements. Concrete measures that will be implemented in each building will be identified during the preparation of energy audits.
Budget and financial source
WB (loan) is estimated at US$18m for the central government component and US$4.5m. for the municipality component also 0.7€ m EC contribution as grant (energy audits) – in total about 17.5 mill. Euro
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA has developed a project post-implementation monitoring system which foresees that final beneficiaries should submit information on actual energy consumption after projects’ implementation.
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
2.,34 ktoe
Expected impact on energy savings in 2018 (if available)
7.34 ktoe (cumulative total)
Assumptions Estimates of expected energy savings are based on average energy savings evaluated in energy audits that have already been prepared for central and
58
local government buildings.
Overlaps, multiplication effect, synergy
-
Title of the energy saving measure Improving of EE through renovation of public buildings (municipal buildings)
Index of the measure S3
Description
Category Financial instrument
Timeframe Start: 2013
End: 2016
Aim/brief description Measure aims at increase of energy efficiency in public (municipal) buildings
Target end-use Existing buildings
Target group Public services
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is planned that energy saving measures will be implemented in 30 public buildings. Energy saving measures foresees insulation of walls, replacement of windows, insulation of roofs and basements. Concrete measures that will be implemented in each building will be identified during the preparation of energy audits.
Budget and financial source
KfW/EC contribution grant – 5.0 mill. Euro, in total 5.0 mill. Euro.
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA has developed a project post-implementation monitoring system that foresees that final beneficiaries should submit information on actual energy consumption after projects’ implementation.
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2014
Expected energy savings in 2015
1,0 ktoe
Expected impact on energy savings in 2018 (if available)
Assumptions Estimates of expected energy savings are based on average energy savings evaluated in energy audits that have already been prepared for public buildings.
59
Overlaps, multiplication effect, synergy
-
60
Title of the energy saving measure Improving EE through renovation of municipal buildings and street lighting
Index of the measure S4
Description
Category Financial instrument
Timeframe Start: 2013
End: 2018
Aim/brief description Measure aims at increase of energy efficiency in municipal buildings
Target end-use Existing buildings
Target group Public services
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
Municipal energy efficiency plans are expected to be developed for approx. 15 municipalities in Kosovo.
It is foreseen that this initiative will have a positive impact on municipalities’ willingness to invest in energy efficiency projects. It is expected that it will lead to implementation of approx. 100 investment projects in municipalities overall in Kosovo. Energy saving measures foresees insulation of walls, replacement of windows, insulation of roofs and basements, as well as installation of efficient lighting.
Budget and financial source
National budget (Ministry of Local Governments Administration) and budgets of municipalities – depending on the investment to be made by these two institutions.
Implementing body Ministry of Local Governments and Administration Municipalities/Municipalities
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA has developed a project post-implementation monitoring system that foresees that final beneficiaries should submit information on actual energy consumption after projects’ implementation.
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
Expected impact on energy savings in 2018 (if available)
Assumptions Estimates of expected energy savings are based on average energy savings evaluated in energy audits that have already been prepared for public buildings.
Overlaps, multiplication effect, synergy
-
61
Title of the energy saving measure Promotion of energy efficiency measures by preparing energy audits
Index of the measure S5
Description
Category Energy audits
Timeframe Start: 2013
End: 2015
Aim/brief description The measure aims at promoting the implementation of energy efficiency measures by carrying out energy audits.
Target end-use Existing buildings
Target group Public services, central government buildings
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is expected that by using resources of the Kosovo national budget and also resources provided by IFIs energy audits will be prepared for public buildings – municipal and central government buildings. This process will facilitate the further implementation of energy efficiency investment projects.
Budget and financial source MED/KEEA budget - 144 000 euro committed (2013 – for 116 energy audits to be carried out)
The WB/EC project (measure S2) foresees approx. 250 energy audits to be carried out in central government buildings.
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
TD
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
Expected impact on energy savings in 2018 (if available)
Assumptions
Overlaps, multiplication effect, synergy
62
4.4 Measures in the Industry and SME sectors
According to Kosova Business Registration Agency (KBRA) at the MoTI, on December 31st 2010, there were more than 100,000 registered SMEs, with 216,799 employees, representing 79.59 % of total employees in the private sector and 62.24% of the total number of employees in Kosovo. From a total of 103,755 enterprises, 102,070 (or 98.37%) are micro enterprises, 1,406 (1.35%) are small, 221 (0.22%) are medium and only 58 (0.06%) are classified as large. The overwhelming predominance of micro-enterprises has implications for the SME Strategy. In terms of sector breakdown, SMEs are mostly concentrated in: retail (around 50%); transport, storage and distribution (14%); food products, beverages and tobacco (9%); and, hotels and restaurants (9%). According to the SME Policy Index 2009, the sectorial distribution has remained stable over time. Industry is the third largest energy end-use sector in Kosovo. In 2012, energy end-use in the industry sector was 290.68 ktoe or 23.04% of total energy end-uses consumption.
Table28. Overview of total energy consumption by industrial subsectors 2010-2012 in ktoe
Sub-sectors / Year 2010 2011 2012*
Iron and steel 59,36 69,03 77,82
Non-ferrous metal industry 61,75 64,47 41,06
Chemical industry 1,83 1,89 1,74
Glass, ceramics & construction material industry 28,4 60,69 59,83
Excavating industry 2,56 2,7 2,14
Food, drinks & tobacco industry 78,88 83,8 73,21
Textile, leather and clothing 0,16 0,17 0,13
Paper and printing 0,24 0,26 0,26
Engineering & other metallic industries 0,01 0,01 0,01
Other industry 21,72 32,62 34,47
Total Industry sector 254,89 315,64 290,68
* Forecast consumption Source: Energy Balance of Kosova for 2010, 2011, 2012
63
The 2010 energy consumption results by industrial sub-sector show that food, drink and tobacco was the
largest sub-sector, consuming 78.88 ktoe or 30.90 % of the total industry sector consumption. It was followed
by the non-ferric metal sub-sector with 61.75 ktoe or 24.20 % and then by the steel and iron sub-sector with
59.36 ktoe or 23.30 % of the total energy consumption.
The 2011 energy consumption results by industrial subsector show that the food, drink and tobacco subsector
had the highest consumption with 83.80 ktoe or 26.5% of the total industry sector consumption, followed by
the steel and iron subsector with 69.03 ktoe or 21.9%, the non-ferric metal subsector with 64.47 ktoe or
20.4%, glass, ceramic and construction material industry with 60.69 ktoe or 19.2%, and other industrial
subsectors with 32.62 ktoe or 10.3%.
Until now, the forecast (not realized) energy consumption for 2012 in the iron and steel subsector shows a perceptible increase of 11.30% in consumption, from 69.03 ktoe (2011) to 77.82 ktoe (2012) or 26.77% of the total industry sector, a decrease in the share of the food, drinks & tobacco industry, from 83,8 to 73,21 ktoe, and a decrease in the consumption of the non-ferrous metal industry from 64,47 to 41,06 ktoe. Two energy efficiency measures were included in the 1st NEEAP, which envisaged energy savings of 2.2 ktoe in the industry sector. Due to the lack of data for calculation of energy efficiency indicators in the industry sector, no achieved energy savings have been reported in the 1st NEEAP. The following 2 measures have been included in the 2nd NEEAP:
Improving EE through implementation of energy efficiency measures in SMEs,
Improving EE through implementation of energy efficiency measures in industrial enterprises. Table29. Summary table of energy efficiency improvement measures in the industry sector
No Title of the
energy saving measure
Target group
Duration Achieved energy savings in 2012 - summary of sectorial savings based on measures defined in 1st NEEAP
Energy savings expected in 2018
I1 Improving EE through implementation of energy efficiency measures in SMEs
SMEs 2014
to
2015
Savings not reported due to lack of data
15.50 ktoe
I2 Improving EE through implementation of energy efficiency measures in industrial enterprises
SMEs 2013
to
2015
64
Title of the energy saving measure Improving EE through implementation of energy efficiency measures in SMEs
Index of the measure I1
Description
Category Financial instrument
Timeframe Start: 2014
End: 2015
Aim/brief description Measure aims at increase of energy efficiency in SMEs by implementing energy savings measures.
Target end-use Industry and SMEs
Target group Industry and SMEs
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is planned that energy saving measures will be implemented in SMEs. Energy saving measures in SMEs foresee replacement of old inefficient production units as well as implementation of efficient lighting solutions.
Budget and financial source Total EBRD/EC contribution (loan/grant) – 12 mill euro
(Total budget for measures I1 (9) and for R1 (3))
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA has developed a project post-implementation monitoring system that foresees that final beneficiaries should submit information on actual energy consumption after projects’ implementation.
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2014
Savings achieved in 2012 Implementation of the measure will start in 2014
Expected energy savings in 2015
3,50 ktoe
Expected impact on 2018 energy savings (if available)
Assumptions Estimates of expected energy savings are based on an assessment of energy savings achieved with similar investment in the 1
st
NEEAP, foreseeing that approx. 2/ 3 of budget available will be invested in the SME sector
Overlaps, multiplication -
65
effect, synergy
Title of the energy saving measure Improving EE through implementation of energy efficiency measures in industrial enterprises
Index of the measure I2
Description
Category Financial instrument
Timeframe Start: 2013
End: 2015
Aim/brief description Measure aims at increase of energy efficiency as a result of the industry sector and SMEs implementing energy savings measures.
Target end-use Industry and SMEs
Target group Industry and SMEs
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
It is planned that energy saving measures will be implemented in SMEs and industrial enterprises. Energy saving measures in SMEs foresee replacement of old inefficient production units as well as implementation of efficient lighting solutions.
Budget and financial source Commercial banks have already issued a large number of loans for implementation measures in the residential and SME sectors – it is expected that in the period of the 2
nd NEEAP
implementation the costs will remain at least at the same level – i.e. at least 10 mill. euro
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
KEEA, together with the commercial banks, is developing a project implementation monitoring system that will allow assessment of the energy savings achieved.
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
5,00 ktoe
Expected impact on energy savings in 2018 (if available)
66
Assumptions Estimates of expected energy savings are based on an assessment of energy savings achieved with similar investment in the 1
st
NEEAP
Overlaps, multiplication effect, synergy
-
4.5 Measures in the building sector
The construction characteristics of building units in Kosovo, in terms of insulating materials and quality of
windows and doors, have tended to improve in recent times. In general, buildings constructed since 1999
achieve mandatory construction standards, while buildings constructed before 1999, particularly those in the
public sector, are characterized by poor overall thermal insulation quality, especially in respect of attics,
external walls and windows.
According to the NEEAP and CENSUS 2011, there were approximately 310,000 residential buildings in Kosovo
in 2011, over 55,000 commercial buildings and around 2,000 public buildings.
The public building stock of Kosovo (schools, universities, hospitals, health centres, government buildings, etc.)
includes some 1,800 buildings. Most parts of public buildings are fully heated, with fuel oil, district heating and
electricity being the most common space heating fuels. Since most of these buildings date back to the pre-
1999 period, their construction characteristics are relatively poor.
The Private/Commercial Service Building Sector is a developing sector in Kosovo. In many instances, the
private sector has experienced modernization and qualitative improvements. This group of businesses includes
activities such as hotels, restaurants, banks, tourist agencies, consultancies and insurance offices, etc., as well
as many private services that operate in parallel with the public sector, such as education, culture, health, etc.
Many of these businesses are aiming to introduce modern energy efficiency technology, but improvements are
still needed to ensure the efficient utilization of such technology. However, it should be noted that the Private
Service Sector also includes some traditional repair-service workshops and small shops and restaurants that
have neither the demand for, nor the opportunity to install, space heating and air conditioning.
67
Table30. Summary table of energy efficiency improvement measures in the building sector
o Title of the energy saving measure
Target group
R.1. Improving EE through implementation of energy efficiency measures in residential buildings
Households
R.2. Improving EE through implementation of energy efficiency measures in residential sector
Households
R.3. Improving EE through implementation of energy efficiency measures in multi-apartment buildings
Owners of apartments in multi-apartment buildings
R.4. Improving EE through continuing information campaign on energy efficiency
Households
S1 Improving EE through renovation of public buildings in municipalities
Public services
S2 Improving EE through renovation of central government buildings
Central government buildings
S3 Improving EE through renovation of public buildings (municipal buildings)
Public services
S4 Improving EE through renovation of municipal buildings and street lighting
Public services
S5 Promotion of energy efficiency measures by preparing energy audits
Public services, central government buildings
4.6 Horizontal measures
Energy efficiency horizontal measures are those that apply to more than one energy end-use sector and in the long-term these measures can show real energy savings. Three measures that have the greatest potential for promotion of energy efficiency are included in the 2
nd
NEEAP:
Amendments to the Energy Efficiency Law,
Green public procurement policies,
Improving minimum energy efficiency requirements in new buildings and existing buildings that are to be reconstructed.
68
Table31. Summary table of horizontal energy efficiency improvement measures
No Title of the
energy saving measure
Target group
Duration Achieved energy savings in 2012
- summary of sectorial savings based on measures defined in 1st NEEAP
Energy savings expected in 2018
H.1. Amendments to the Energy Efficiency Law
All end-users
2013
to
2015
Implementation of the measure
will start in 2013
9,00 ktoe
H.2. Green public procurement
State authorities
Local authorities
2013
to
2015
H.3. Improving minimum energy efficiency requirements in new buildings and in existing buildings that are to be reconstructed
Owners of buildings
2013
to
2018
Title of the energy saving measure Amendments to the Energy Efficiency Law
Index of the measure H1
Description
Category Regulation
Timeframe Start: 2013
End of October 2013
Aim/brief description Measure aims at the further development of the legal framework and laying the basis for secondary legislation that will introduce penalties/incentives for promotion of implementation of energy measures
Target end-use All end-users
Target group All end-users
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
Amendments to the Energy Efficiency Law will include the following main initiatives: To be determined according to recommendations of the Parliamentary Commission.
69
Budget and financial source KEEA budget – Not yet estimated
Implementing body MED/KEEA
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
TD
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
Expected impact on energy savings in 2018 (if available)
Assumptions
Overlaps, multiplication effect, synergy
Title of the energy saving measure Green public procurement
Index of the measure H2
Description
Category Cooperative instruments
Timeframe Start: 2013
End: 2015
Aim/brief description Measure aims at facilitation of the penetration of energy efficient technologies through public procurement procedures, leading to a reduced impact on the environment as well as to budget savings.
Target end-use Public sector
Target group State authorities
Local authorities
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
In its procurement policy the contracting entity will set out environmental requirements for suppliers' abilities and include them in the technical specifications for the subject of the procurement, by making use of the relevant standards and eco-labelling, and also by including environmental and energy efficiency factors in the selection criteria for the most economically advantageous tender.
70
Budget and financial source State or local authority budgets, according to the authorities' procurement plans
Implementing body State and local authorities
Monitoring authority KEEA
Energy savings Method for monitoring/measuring the resulting savings
TD
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
Expected impact on energy savings in 2018 (if available)
Assumptions
Overlaps, multiplication effect, synergy
Title of the energy saving measure Improving minimum energy efficiency requirements in new buildings and in buildings that are to be reconstructed
Index of the measure H3
Description
Category Legislation
Timeframe Start: 2013
End: 2018
It is planned that by the end of 2013 the government will finalize and amend the Building Code. Part of this code will be a Chapter which defines standards for energy savings and thermal protection of buildings.
Aim/brief description Measure aims at facilitating the implementation of energy saving measures and at introducing higher standards for new and reconstructed buildings.
The aim is to set standards and facilitate measures for implementation of energy savings in new and existing buildings.
Target end-use Buildings
Target group Owners of buildings
In new and renovated dwellings and administrative buildings.
71
Regional application Nationwide
Information on implementation
List and description of energy saving actions substantiating the measure
The Building Code will set minimum energy efficiency requirements for new buildings and for reconstructed buildings.
Budget and financial source Budget of the Ministry of Environment and Spatial Planning No Budget planned
Implementing body Ministry of Environment and Spatial Planning, Municipalities, MED, MTI
Monitoring authority Ministry of Environment and Spatial Planning
Energy savings Method for monitoring/measuring the resulting savings
TD
Implementation of this regulation requires professional and human capacities
Expected savings in 2012 as per 1
st NEEAP
Implementation of the measure will start in 2013
Savings achieved in 2012 Implementation of the measure will start in 2013
Expected energy savings in 2015
6,00 ktoe
Expected impact on energy savings in 2018 (if available)
Assumptions Planned energy savings of 30 kWh/m2 in new
and in reconstructed buildings. The average area of new or reconstructed buildings is 800.000 m
2 per year 2013 – 2015) and
1.200.000 m2
per year (2015 – 2018)
Overlaps, multiplication effect, synergy
72
4.7 Summary of overall final energy savings
The planned and achieved energy end-use savings have been collated in Table 32 below.
Table32. Summary of final energy savings
Sector Calculation methodology Achieved energy savings in 2012
(in ktoe) - summary of sectorial savings based on measures defined in 1st NEEAP
Energy savings expected in 2018 (in ktoe)
Residential sector
TD/BU 28,06 51,56
Transport sector
TD/BU - 12,00
Services Sector
TD/BU 3,865 20,71
Industry & SMEs
TD/BU - 15,50
Horizontal measures
TD - 9,00
TOTAL 31,925 108,77
Remark: The calculation of the energy saving targets and estimation of the energy saving measures has been
carried out in accordance with Directive 2006/32/EC (ESD), Annex II.
4.8 Exemplary role of public sector
Various market assessments in recent years have identified a significant level of potential energy savings that
could be achieved in Kosovo by implementing energy efficiency measures in the country’s building stock. By far
the largest contribution to the energy saving potential comes from the residential sector, followed by the
private and commercial sector. Although the energy saving potential of municipal and central public buildings
is low – less than 10% of the total - in comparison with the other two sectors, public buildings at present
provide the best opportunities for achieving real energy savings because in many cases they already meet the
minimum energy performance levels set in the current Technical Regulation on Thermal Energy Savings and
Thermal Protection in Buildings, No.03/2009. This fact suggests that any energy efficiency program should
begin with the implementation of measures in public buildings.
Therefore implementation of the national energy efficiency policy of Kosovo is focused on the public sector,
not only because of ESD requirements, but also because of the fact that it is most practical to begin with
activities in this sector. Furthermore, this represents a pragmatic approach to EE due to the immature energy
efficiency market in Kosovo. Through its activities and decisions, the public sector can influence citizens and
organisations from other sectors and encourage them to undertake similar activities to reduce energy
consumption.
Despite their relatively low savings potential, launching the EE implementation program in the central and
municipality public building sectors would give a strong message that the government is prepared to lead by
example and it would provide a showcase for encouraging other EE initiatives in Kosovo. This in turn would
help to foster a market for EE goods and services and create better access to public and donor funds. On the
supply side (that is, in the provision of goods and services that improve EE, such as the installation of efficient
heating and cooling systems, solar hot water systems, efficient light bulbs, etc.), a successful implementation
73
program will create real opportunities for construction, heating and air conditioning companies and they will
be incentivized to improve their skills and knowledge in order to win future business. After completing a
number of EE implementation projects successfully, the experience of other countries suggests that some of
these companies will evolve and transform into ESCOs. Secondary legislation to support the ESCO contracting
framework would need to be prepared, as required by the Law on Energy Efficiency, to provide an enabling
environment for the uptake of ESCO business.
Carrying out a programme of EE investments will generate many benefits for the Kosovo economy, including
increased energy savings, reduced energy imports and a lower trade deficit, increased life of retrofitted
buildings, growth in the number of businesses and in employment and a reduction in GHG and acid rain
emissions.
The available evidence shows that the building sector of Kosovo provides significant opportunities for realizing
energy savings. Since space heating accounts for the major share of energy consumption in buildings, most
energy saving potential is associated with thermal insulation, heat loss reduction and the introduction of
efficient boilers. More than half of the Kosovo building stock was constructed in the period 1970 to 1985,
which is reflected in the relatively high specific heat consumption of these buildings. The current level of heat
consumption in Kosovo is estimated to be about 219 kWh/m2 year, compared to 80–150 kWh/m
2 year in
Western Europe, which indicates that there is a significant opportunity for EE improvements.
In order to exploit the existing energy saving potential, any supporting legislation and programs must take
advantage of existing EE market drivers. One such driver that has become increasingly important in recent
years is energy security. Despite increased use of local energy resources, such as lignite and biomass, Kosovo
depends totally on imports of oil by-products and to a lesser degree on imports of electricity, which overall
accounted for about 25% of its energy needs in 2010. The introduction of EE measures can enhance energy
security by (a) reducing imports of oil by-products and thereby reducing the trade deficit; (b) cutting down on
the consumption of fire wood and thereby preventing deforestation; and (c) minimizing the volume of
electricity imports, thereby reducing the need for government subsidies.
Improvement of the fiscal balance is a high priority for the GoK, especially given the current economic
situation. EE measures represent an opportunity for the government and the public sector to reduce their
energy budget expenditures. This would be a cost-effective measure because investments made in order to
improve EE in government facilities will pay for themselves through savings at the national level. In addition, if
the government wishes to consider the introduction of financial incentives to support the development of an
EE market, these incentives can be partially offset by reducing subsidies on domestic energy sales.
EE investments have a positive economic impact since they contribute to the development of a modern
industry that offers jobs and a range of business development opportunities. They also generate revenues
from increased taxation on the construction work required for EE implementation, which creates a positive
situation, whereby the GoK’s need to optimize tax revenues is supported by the development of an EE market
with its various associated social and environmental benefits.
The need to achieve mandatory comfort levels (i.e. minimum energy performance levels) in buildings in line
with EU Directives on the energy performance of buildings means that renovation of the existing building stock
carries a high priority in Kosovo. Old buildings require immediate investment in thermal insulation, the
introduction of efficient double/triple glazed windows and the introduction of efficient space heating and hot
water systems. Important energy savings have been identified for other energy services, such as cooking,
lighting and in the use of other electrical appliances. This presents an opportunity for the GoK to ensure that
such renovations are realized in an energy-efficient way that contributes to the Kosovo’s sustainable economic
development. In addition, renovating old and damaged buildings will contribute to the achievement of the
NEEAP’s energy savings target for the period up to 2018.
74
Implementation of EE measures represents an economically rational response to energy scarcity and
increasing energy prices - as well as to environmental concerns. Yet in all sectors the uptake of loans to pay for
EE investments is not as enthusiastic as might be expected. Therefore, it is necessary to identify the nature of
the barriers that are constraining the implementation of EE measures in Kosovo and to consider how these
constraints might be overcome.
The constraints operating in Kosovo can best be understood by classifying them according to the building
sector they apply to - residential/commercial, public or ‘cross-sector’ – and according to their origin –
economic, institutional, legal and regulatory, financial. The severity of barriers differs between the various
building sub-sectors, so that for example, the low-income segment of the residential market experiences more
problems in securing finance and will be less able to invest in the repair and renovation of buildings.
In a relatively low-income economy, many householders and small businesses need access to capital at zero or
very low cost. According to the Statistics Agency of Kosovo (November 2012) the average monthly wage in the
budget (public) sector of Kosovo in 2011 was €368, so inevitably many householders are not in a position to
take up loans for improvement of buildings on commercial terms and have higher priority needs to attend to,
such as provision of food, clothing and transport. A typical EE loan in Kosovo currently averages between
€5,000 and €6,000 at a ‘special’ (discounted) interest rate of around 10%.
Some constraints, therefore, could be addressed by the introduction of financial mechanisms, such as grants,
‘soft’ interest rates, guarantee schemes, dedicated funds, credit lines, more efficient procedures in financial
institutions and so on. In some circumstances, successful financing programs can serve as a mechanism to
remove some constraints from the market, although the removal of other barriers may also require legislative
or organizational change in the institutional framework.
The cost benefit analyses of the buildings that have been subjected to energy audits indicate that in the
majority of cases, the Economic IRR (based on economically efficient ‘shadow prices’) is higher than the
Financial IRR (based on actual prices), which demonstrates the importance of increasing energy prices
(especially electricity, lignite and fire wood) to the level of their long-run marginal costs of supply without
interruption.
The barriers constraining the implementation of energy efficiency measures in Kosovo are significant. A
summary of the main issues is presented below:
1. Residential and Commercial Sector Issues
(i) Economic Constraints
Market distortions in local energy markets mean that the prices of some fuels do not reflect their true
production costs (e.g. firewood, lignite) and therefore energy savings are undervalued.
(ii) Institutional Constraints
Many households adhere to traditional methods of cooking and space and water heating, either
because of preference, lack of awareness or, in areas where power cuts are common, for security of
supply reasons. (Over 50% of customers fall into the ‘C’ category of the KEK power rationing scheme.)
(iii) Legal and Regulatory Constraints
Since 2000, a large number of ‘illegal’ buildings have been constructed in Kosovo without the required
building permits. As a result, building energy performance standards are not enforced or monitored,
often resulting in excessive energy consumption.
75
There is no secondary legislation to promote the establishment of ‘owners’ communions’ (or Housing
Associations) and current structures to deal with refurbishment of the fabric of joint dwellings and
‘common areas’ in apartment blocks are ineffective.
Inefficient energy pricing: (a) electricity and heat tariffs are not yet fully cost-reflective, (b) tariffs are
subsidized and (c) some inefficient tariff structures persist.
(iv) Financial Constraints
Lack of affordable EE financing schemes for lower income households unable to access the loan
market.
High level of commercial losses and non-payment of energy bills.
2. Public Sector Issues
(i) Economic Constraints
EE is not a top priority for municipality mayors - water supply, waste disposal, sewage treatment are
considered more important issues.
(ii) Institutional Constraints
Insufficient EE expertise and resources at municipal level. There are 38 municipalities in Kosovo, 28 of
which had a budget of below €10m in 2010. The demands of the decentralization process are placing
an increasing burden on municipalities, while their resources are frozen or being reduced.
(iii) Legal and Regulatory Constraints
Budgetary rules do not allow municipalities to benefit from any energy savings they achieve in the
longer term – each year’s budget allocation is based on the previous year’s outturn.
Technical Regulation Nr. 03/2009, which states that ‘energy sustainability’, requires the achievement
of planned comfort levels in public buildings, as well as energy efficiency.
The Law on Public Procurement should ensure that the process for evaluating government tenders
takes account of any EE related benefits that a particular proposal will deliver.
(iv) Financial Constraints
The Law on Public Debt imposes various restrictions on municipalities’ ability to borrow money.
(Although for those municipalities that meet the required standards, the legal and regulatory
environment appears to be favourable to municipality lending.)
Central government budgetary constraints prevent direct finance of EE projects and the creation of an
energy efficiency fund is at present not allowed.
3. Cross Sector Issues
(i) Economic Constraints
Underdeveloped local EE/RES business infrastructure.
Absence of ESCOs and ESCO based schemes from the local market
(ii) Institutional Constraints
Inadequate data and institutional capacity to monitor evaluate and verify the impact of EE programs.
76
Lack of impartial and detailed technical information on EE markets and the goods and services they
provide.
Lack of surveys on the quality of EE services and products means that potential customers are not
well positioned to make informed decisions.
Lack of a comprehensive and reliable EE data base for Kosovo. Poor quality of data leads to poor
decision making which in turn results in ineffective investments.
(iii) Legal and Regulatory Constraints
The Kosovo Energy Efficiency Agency is under resourced relative to its responsibilities and obligations
The Law on Energy Efficiency laid down procedures for setting up an EE fund to promote EE and RES
projects. However such a fund is not permissible under existing legislation.
(iv) Financial Constraints
High level of transaction costs for (in terms of both money and time) for EE investments
Lack of funds for energy auditors and energy audits
Specific initiatives to address and alleviate and/or remove these constraints are planned.
Other activities in the public sector
A number of Energy Efficiency Projects in Kosovo have been completed in Kosovo in the recent past, including
the following:
1. The GIZ project “Modernization of Municipal Services” (MMS) ran from 2006 to 2012 and implemented 56
EE projects. The main focus of the project was a program of small municipal investments in the field of energy
efficiency, jointly financed by the 20 participating municipalities and through a fund established by GIZ and
Association of Kosovo Municipalities. The project did not involve any detailed energy audits but consisted of a
series of individual investments in EE projects in public buildings: schools, clinics and municipal buildings.
Projects included refurbishment of public buildings (doors, windows, thermo-insulation and installation or
upgrading of central heating systems) and modernization of street lighting. The total joint investment was in
the order of €2.5 million and resulted in energy savings of around 0.4 ktoe. The project also included
“Improvement of Energy Efficiency in Kosovo”, to improve awareness on utilization of energy saving
technologies as well as a program to improve local waste management.
2. ‘Assistance to the Ministry of Energy and Mining’ was a two-year EU-funded project which ran from 2009 to
2011. Included amongst its objectives were: (a) to strengthen the capacity of MEM staff to revise and update
policies and programs on energy efficiency and renewable energy sources and (b) to incorporate the
requirements of the Energy Community Treaty in the area of energy efficiency. The Project assisted MEM with
the preparation of the first National Action Plan on Energy Efficiency as well as training key staff in MEM’s
Energy Efficiency and Renewable Energy Sources Division. In the course of carrying out these tasks, the Project
developed, in accordance with EU regulations, an Energy Labelling Scheme and identified the changes to
primary and secondary legislation that would be needed to allow for the enforcement of domestic appliance
labelling. A “Manual of Energy Efficiency for Small and Medium Enterprises (SMEs) and Light Industry” was
produced to promote energy savings by setting out a list of practical steps explaining how businesses can
reduce energy bills. The Manual was made available to small businesses throughout Kosovo. The project also
produced a booklet entitled “EU Assisting Energy Sector reforms in Kosovo” which summarized the progress
that was being made in the areas of energy efficiency, renewable energy sources and the environment and a
‘Project Factsheet’, describing the work and the specific achievements of the project.
77
3. Installation of efficient public lightning in public facilities, financed by MEM/MED and GIZ (€572k) which was
completed in 2012. In June 2011 the MED and GIZ signed a memorandum of understanding which set out the
arrangements for co-funding a project on efficient lighting in public facilities at municipal level. The purpose of
the project was to contribute to the modernization of lighting in public facilities and street lighting by replacing
inefficient light bulbs with efficient ones. The project, which was co-funded by MED, GIZ and the
municipalities, was implemented over a two-year time frame and involved five municipalities - Pristina,
Mitrovica, Ferizaj, Podujevo and Gjilan. Another beneficiary was one of the dormitories at the University of
Prishtina. This project has contributed to the achievement of the targets set in the 1st
National Energy
Efficiency Plan.
4. Study and Implementation of EE measures in Municipalities (63 schools and 2 hospitals), financed by EU
(€15.6 m). The beneficiaries are the selected municipalities and the Ministry of Health. The project, which
started in March 2011, involves implementing EE measures in some 33 municipalities in buildings pre-selected
by the Ministry of Local Government Administration and the EC Liaison Office and handed over to the
contractors for audit. The project is grant funded. Implementation was due to commence in September 2012
and three foreign companies were contracted to carry out the works. However, due to time and budget
constraints, the quality of the energy audit data was limited. Only the overall geometry of buildings and total
investment requirements were evaluated and there was no baseline scenario analysis to facilitate monitoring
and no detailed energy audit reports were prepared. The implementation project has now been put on hold,
while the data collected in the audits is re-assessed.
5. Feasibility Study and Implementation of EE measures in public buildings at municipality level, supported by
KfW/EU/WBIF (€7.5 m). The ‘Implementation of Energy Efficiency Measures in Public Buildings’ project ran
from April 2011 to January 2012. Subject to a successful application to the WBIF/KfW/EU for further funding,
the implementation phase of the project could begin this year and continue over the following 48 months. The
results of the energy audits which were performed by the project auditors show that when the EE measures
are in place and all 30 selected buildings are operating at their planned comfort levels, total annual energy
savings could amount to over €650,000. Moreover, the auditors calculated that because of introducing EE
measures in these 30 public buildings, it would be possible to reduce the total volume of GHG emissions by
more than 3,600 tons of CO2 equivalent/year.
6. In 2012 the MED commissioned a program of 48 energy audits of municipal buildings. The program was
completed in December 2012.
Special measures for public procurement
To meet the requirements of Directive 2006/32/EC in the context of its exemplary role, the public sector must apply at least two of the six eligible energy efficient public procurement measures which are set out in Annex VI of the Directive: (a) use of financial instruments for energy savings, including energy performance contracting; (b) purchase of equipment and vehicles based on lists of energy-efficient product specifications; (c) purchase of equipment that has efficient energy consumption in all modes, including in standby mode; (d) replace or retrofit existing equipment and vehicles with the equipment listed in points (b) and (c); (e) use energy audits and implement the resulting cost-effective recommendations; (f) purchase or rent energy-efficient buildings and replace or retrofit such buildings in order to render them more energy-efficient. Transposition of the EPB Directive will mean that the minister responsible for construction (MESP) will in future regulate in detail the issues concerning the performance of energy audits of buildings, energy performance certification of buildings and the performance of independent controls of reports on energy audits and issued energy certificates.
78
In the area of energy efficiency, however, the Law on Public Procurement Act does implicitly allow for energy efficiency to be taken into account when evaluating public tenders (Article 52 states that criteria for awarding a contract can be either the lowest price only or the economically most advantageous tender) but at present there is no accompanying secondary legislation (Administrative Instruction) in place to explain how the Law is to be implemented. Through transposition of the provisions of Directive 2010/30/EU (and succeeding Directives) on labelling of energy and other energy-related products, Kosovo will in time strengthen the obligation to procure energy efficient products. Recommendations for future periods The Kosovo Energy Efficiency Agency is now the focal point for all EE related projects and initiatives. The
Agency is now overseeing and coordinating the following projects:
1. Initial meetings have been held with the Municipality of Prishtina concerning participation in the EU
initiative Covenant of Mayors (CoM). This initiative will be pursued further as it can significantly
contribute to achieving the targets of the ESD and this NEEAP.
2. Promotion of EE measures in households through ‘Eko’ loans financed by KfW (€20 m.) and
implemented by ProCredit Bank and Raiffeisen Bank – on going to 2014. Kosovo is among the partner
countries involved with the German State Development Bank KfW, which provided the ProCredit and
Raiffeisen Banks with a credit loan to finance energy efficiency schemes for the wider population of
Kosovo. To promote the scheme, the banks issued a range of publicity materials, including some
general information relating to EE on their websites.
3. ‘Promoting EE and RES in Kosovo’, technical assistance for capacity building, funded by EU (€1.5 m) –
on-going to 2014. The purpose of this project is to support the relevant Kosovo institutions at central
and local level in enhancing the legal framework and developing policies and action plans to increase
energy efficiency and the use of renewable energy sources. The anticipated results of this project
include the updating, monitoring and evaluation of the National Energy Efficiency Action Plan, the
preparation of municipal energy plans, completion of the Kosovo RES Plan, improved energy planning
capacity at the beneficiary institutions, better cooperation between central and local level in the EE
and RES planning processes and the transposition of EU Directives on the energy performance of
buildings and on renewables into the national legal framework/secondary legislation as required by
the Energy Community Treaty.
4. National Building Energy Efficiency Study for Kosovo was carried out in 2012 with the support of the
World Bank and is to be followed by implementation a program of EE measures in 200 to 250 central
and local government buildings, funded by supported by WB/EC as follows: EE investments in central
government buildings, US$18m.; Pilot EE investment program for municipalities, US$4.5m. (in total,
approximately 16.8 mill. Euro).
5. EBRD is providing €20m for the establishment of a “Regional Energy Efficiency Programme for the
Western Balkans”. The programme is structured as follows:
Window 1: Institutional capacity building/regulatory support and new product development for public sector energy efficiency:
Theme 1: €5m. for ESCO projects (legal and technical), with the objective of supporting
individual local entities (e.g. cities, regions) in implementation of ESCO/EnPC
programmes and individual projects.
79
Theme 2: €1m. for general efficiency policy dialogue (tariff, metering, EPBD,
procurement), with the objective of address in market barriers and establishing an
enabling legal framework for effectively translating the NEEAPs and Municipal Energy
Plans, into investment plans and actions on the ground.
Theme 2 has three focus areas:
a) support tariff reforms, smart metering and billing regulations;
b) support the transposition of the Energy Performance f Buildings Directive (EPBD);
and
c) improve, and where necessary develop, public procurement rules relating to energy
efficient equipment.
Window 2: Credit lines for financing of smaller scale sub projects in public and private sector
(including ESCOs), channelled through local participating banks
Window 3: Direct financing for medium-sized renewable energy and energy efficiency measures,
including ESCOs
Below is a summary of proposed activities for successful and effective promotion of energy efficiency,
awareness raising and activation of transformation and sustainable development of energy efficiency market
Activity
Activity 1 – Development of Marketing and Communication Strategy
The strategy has to be developed in order to define the necessary activities for successful awareness raising
and activation of EE market transformation and sustainable development. As part of the strategy development
national media profile has to be analysed and defined, as well as research of the EE market.
Activity 2 - Creation, development and activation of EE web-site
The site has to be informative, educational, interactive and user-friendly. Its content has to be organized
properly in order to enable visitors with different level of technical understanding to find relevant information
for themselves.
Activity 3 - Telephone info-line for EE advices to the citizens
Activation of Free-of-charge telephone line; EE advisors have to be organized, educated and trained for
interactive communication with citizens; Advices must be competent and guarantee precise information to
each citizen for their concrete case.
Activity 4 - EE info-corners and centres
Attractive and easy reachable location for establishment of EE info-corners and centres will be identified and
the centres established; The EE info-corners will be the place where citizens could come to see available EE
technology and ask EE advisors for optimal solution for their concrete case. Also would serve as the point
where educated demand meets with qualified supply.
Activity 5 - Educational course for EE advisors
The course should be organized for the EE advisors who will give advices for citizens through the telephone
info-line, but also as advisors and guides at the EE info-corner and EE info-centre.
Activity 6 - EE awareness survey
EE awareness survey among citizens will be conducted to determine actual awareness and knowledge about
EE. It has to be repeated periodically (on annual basis at least, or even more frequently).
80
Activity 7 - National educational EE campaign in media
National educational EE campaign will be developed, produced and broadcasted (advertised) in media; the
campaign should include: television, radio, newspapers and magazines, outdoor advertising and Internet.
Activity 8 - Informative-educational publications Informative-educational publications, such as brochures which could be used by citizens as EE guides, should be developed, designed, printed and disseminated to the citizens. (As we will work closely with our colleagues from UNDP Croatia, the idea is to use 5 of their successful publications: “One ton CO2 Challenge”, “200 EE Tips”, “Green Office – handbook”, “Green Office – workbook” and “Handbook for EE advisors”.)
Activity 9 - EE pool of producers and/or distributors of EE technology, products and providers of services
Identify and gather producers and/or distributors of available EE technology and products, as well as providers
of services, in informal EE Pool is important to activate them in education process by enabling them to present
their technology, but also to motivate them to offer more adequate products at the market and cooperate
with construction sector.
Activity 10 - Comprehensive PR activities
Public Relation (PR) activities should promote results from the pilot projects of implemented EE measures, but
those activities should also deliver public promotion of different stakeholders involved in the process –
politicians, decision makers, opinion makers, experts, construction professionals, producers and distributors,
but also propose interesting content for journalist covering EE and related subjects (i.e. public signings of
National Charter for EE and RES, public openings of various info-points established at local municipalities etc.)
Activity 11 - Cooperation with media and journalists
The cooperation with media and journalists has to be established in order to enable them to cover energy
efficiency more as subject and not only as news, by providing them with necessary information or even
enabling them with education through workshops, presentations, visits to pilot projects locations and
advanced technology fairs and events. The assistance to the journalists and other media professionals could
also be realized by proposing them some attractive media formats for successful communication of EE as
subject.
Activity 12 - Education of children in primary schools and kindergartens
Special tool and format for education of children in primary schools and kindergartens have been developed as
a part of the EE Project in Croatia. The format is called “Think of tomorrow” School Hour, and it consist of a 10
minutes educational animated film projection that serves as a base for interactive discussion with children
about EE and RES within one school hour. The idea is to use this already developed, and proven successful
format, translated and adapted to the local situation).
Activity 13 – Handbook for EE
KEEA is planning to issue a handbook of practical EE measures that can be implemented in the residential and
SME sectors.
During implementation phase of the 2nd
NEEAP, for all the reasons outlined in this section, strong emphasis
will be placed on the exemplary role of public sector and on ensuring a close linkage between the public sector
and the measures described in Chapter 4.3 which deal with the tertiary sector.
81
4.9 Ensuring availability of advice and information
One of the tasks being undertaken by a current EU-funded project
3 is to support the establishment of local and
regional energy agencies for promoting EE and RES in the five ‘development regions’ in Kosovo. Activities
under this task aim at promoting the establishment of regional/local energy agencies in the form of NGOs,
funds or organisations of public or private or mixed status that will operate independently of the
municipalities. The establishment of these agencies will be supported by the creation of a communication
platform to facilitate internet networking both amongst themselves and with other similar agencies across the
EU.
The project is also implementing a ‘Communication and Visibility Plan’ to promote the joint work of the project
and the MED/KEEA (project objectives, outputs, activities and events) and to publicise the EU's role and
intentions. Secondly, it aims to promote project activities which provide support to central and local level
Kosovo institutions on enhancing the legal framework and on developing policies and action plans to increase
energy efficiency and the use of renewable energy sources in line with the relevant EU and EnCT policies.
The immediate target group consists of the Ministry of Economic Development (MED) and the 38 Kosovo
municipalities. The project also interacts with the Ministry of Local Government (MLGA), the Ministry of
Environment and Spatial Planning (MESP) and the Ministry of European Integration (MEI). The secondary
target group includes organizations and institutions which may benefit from the project indirectly. In addition,
where possible, the project seeks to inform and educate the wider public, through communication materials.
The main communication and visibility activities include the creation and management of the project web-site
and communication platform and publishing project quarterly newsletters. Newsletters are an important tool
for ensuring visibility of the project and raising awareness about the implementation of national plans on EE
and RES and are distributed by e-mail and also posted on the project web site (in Albanian, Serbian and
English).
The project web-site is being developed in order to communicate effectively with the target groups and
facilitate on-line sharing of the project activities4. It provides a platform for communicating the latest updates
of the activities of the project, supporting awareness raising activities, disseminating information, allowing
access to key references, procedural documents, lists of project stakeholders, news of current and forthcoming
events, various materials (background documents, activity reports, articles, reports, training course materials
etc.) and links to other related governmental bodies, NGOs, etc.
KEEA is planning to develop its own web-side supported by UNDP (see earlier section ‘Recommendations for
future period’, Activity 2).
Feedback that has been received from energy consumers indicates that while there is a good level of
awareness concerning the general benefits of EE and RES, there is:
A lack of impartial and detailed technical information on EE markets and the goods and services they provide.
A lack of surveys on the quality of EE services and products, which means that potential customers are not well positioned to make informed decisions.
3 ‘Promoting EE and RES in Kosovo’, a two year project scheduled to end in June 2014.
Directive 2010/31/EU sets minimum requirements for the energy performance of buildings and building
elements. Newly constructed buildings and buildings which have undergone major renovation must have
energy certificates, as must buildings which are being rented or sold. Therefore the energy certification
process must be integrated with the process of obtaining consents for the rental or sale of property.
Transposition of this Directive must be achieved by adopting a Law on Energy Performance of Buildings (EPB).
By revising the existing Law on Construction, the Government of Kosovo accepted the obligation to formalize
the construction process - but in doing so it did not set any clear requirements for the transposition of the
Directive on the Energy Performance of Buildings within the new system and the division of responsibilities
between Ministries in the field of energy efficiency is not sufficiently clear.
The proposed amendment of the Law on Construction (Law No.04/L-110) provides a legal framework for the
construction process and anticipates that most of its measures, obligations and objectives are to be regulated
by secondary legislation rather than being specified within the primary legislation. As the secondary legislation
has not yet come into force, the legal framework is incomplete.
In progress
All seven sub-normative acts required by the Law on Construction (6 AIs listed below plus the construction
code) are in various stages of completion, and will be completed by July 2013. Below is additional information
on the status of the Administrative Instructions under the Law on Construction.
Administrative Instruction Status
Construction Permit Fees Adopted by 19 November 2012
Construction Permitting Procedures Adopted by MESP on 04 June 2013.
Categories of Construction Works Adopted by MESP on 22 May 2013.
Construction Works for which no Construction Permit is Required
Adopted by MESP on 22 May 2013.
Contents of the Construction Diary Under development
Construction Inspection Procedures Under development
Improvements in the energy performance of buildings may require other legislative and/or organizational
change in the institutional. Specifically the Legislative Program 2013, approved in December 2012 and updated
in February and March 2013, requires the submission of Draft Amendments to the Law on Energy Efficiency so
that it fully transposes the Energy Services Directive 2006/32/EC.
Similarly, the Draft Law on Treating Illegal Construction is with the Parliamentary Commission and is expected
to be adopted by Parliament by the end of this year.
Electricity and heat tariffs in Kosovo are not yet fully cost-reflective, some tariffs are subsidized and some
inefficient tariff structures still exist. ERO has stated that all tariffs will be fully cost-reflective by 2017, thereby
making investment in EE measures more attractive.
The current high levels of commercial losses and non-payment of bills will reduce over the next few years with
the implementation of KEDS metering replacement program, which also strengthen the incentives for
households and businesses to invest in EE measures.
Finally, Kosovo’s long-term NEEAP sets targets and identifies measures for energy savings up to 2018.
86
Recommendations for transposition
Kosovo has, in effect, already started the process of transposing Directive 2010/31/EU by making references to
it in the Law of the Republic of Kosovo on Construction, which was adopted on 31 May 2012. The Law foresees
that implementation of energy efficiency measures is one of the objectives of the Unified Construction Code of
the Republic of Kosovo. Building development based on efficiency standards is now required by the Law on
Construction, where each user of the building under development is obliged to obtain a utilization certificate,
which sets out the required energy efficiency measures. However, as Kosovo has not yet implemented a
system for building energy certification in practice, there only two related regulations that exist at the
moment: (1) the Technical Regulation on thermal energy saving and thermal protection in buildings and (2) the
Regulation on Establishment and functioning of the Commission for Certification of Energy Auditors and
Managers.
The option to transpose Directive 2010/31/EU by secondary legislation might not be considered the best
option and all activities would clearly have to be very carefully coordinated. At the moment, the proposed
content of the draft Unified Construction Code covers only two out of the six issues that need to be regulated.
The alternative option of transposing the Directive by drafting a Law could be more efficient, since a Law
would establish a framework for concentrated action, mobilize the government to achieve the various new
tasks that must be fulfilled and give a clear signal to the construction sector and to the general public about
the new requirements and the new opportunities that exist. The adoption of a Law would also give a positive
signal to the EU that Kosovo is not just transposing the minimum requirements, but is fully aware of the
further implementation of directive. A third option might be to amend the existing laws, but in Kosovo`s case
amending the relevant laws that are currently in force would be more time-consuming than drafting a new
Law.
Creating inventories, data bases and research and analysis on data availability, as well as development of data
models and calculation methodologies are not permanent duties of MESP Department of Construction. This
requires highly qualified experienced experts. The task required by Article 5, Annex 3 of the Directive, to
establish an “Inventory of building stock, definition of reference buildings, defining energy performance
measures, cost effectiveness estimation for different measures and different types of buildings, drafting a
method for calculation of buildings energy performance (including software) and methodology for calculation
of cost-optimal levels of energy performance requirements for buildings and building elements“ can only be
undertaken if appropriate technical assistance is provided to the MESP, as the Department of Construction is
not equipped with all the necessary competences and expertise needed to carry out this tasks. The most
effective option for implementation of the energy certification of buildings in Kosovo is to deliver technical
assistance projects for all the above mentioned tasks, as they are all closely interconnected and need to be
effectively coordinated.
Accordingly, a request for funding ‘Transposition of Directive 2010/31/EU for the Energy Performance of
Buildings’ under the EBRD ‘Theme Two’ energy efficiency policy dialogue was prepared and submitted jointly
by MED and MESP in May 2013.
In order to satisfy requirements of reporting under Article 10 of EPBD (by 30 June 2013 to ECS) as required by
Article 10(2) of Directive 2010/31/EU, following measures mentioned in NEEAP are listed also here:
• Government Decision on the installation of efficient light bulbs in public buildings, • Measures for residential sector R.1. Improving EE through implementation of energy efficiency measures in residential buildings
R.2. Improving EE through implementation of energy efficiency measures in the residential sector
87
R.3. Improving EE through implementation of energy efficiency measures in multi-apartment buildings
R.4. Improving EE through continuing information campaigns on energy efficiency
• Measures for tertiary sector
S1 Improving EE through renovation of public buildings in municipalities
S2 Improving EE through renovation of governmental buildings
S3 Improving EE through renovation of public buildings (municipal buildings)
S4 Improving EE through renovation of municipal buildings and street lighting
S5 Promotion of energy efficiency measures by preparing energy audits
• The GIZ project “Modernization of Municipal Services”
• Installation of efficient public lightning in public facilities, financed by MEM/MED and GIZ
• Study and Implementation of EE measures in Municipalities
• Feasibility Study and Implementation of EE measures in public buildings at municipality level
• Program of 48 energy audits of municipal buildings
• Promotion of EE measures in households through ‘Eko’ loans
• National Building Energy Efficiency Study for Kosovo
• Activities to ensure availability of advice and information”
5 . Establishment of Competent Bodies and Assigned Organizations
The Ministry of Economic Development is the lead ministry in the field of energy sector development, energy
efficiency policy planning and implementation supervision. It has also a leading role in development and
implementation of economic sector structural development policy, industrial policy development and other
policies in those areas specified in the relevant legislation.
88
The KEEA will be responsible for monitoring of the 2nd NEEAP implementation progress. It has already
established an energy efficiency data base for collection and analysis of information on project based energy
savings achieved. Development of energy efficiency statistics has been identified as the highest priority activity
that will be carried out by all the parties involved. Several other line ministries have been actively involved in
the 2nd NEEAP preparation process and will have an important role in ensuring the success of its
implementation.
The Ministry of Infrastructure will be responsible for implementation of policies related to transport sector
development and promotion of energy efficiency in the transport sector.
The Ministry of Environment and Spatial Planning will be responsible for activities related to transposition of
the EPBD and its implementation. The KEEA is responsible for reporting on implementation of the EPBD.