1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. • Vessel Installation Support Concept Identified. • Vessel Handling Support Concept Identified. • Hard Points and Access Identified. • Preliminary Stress Analysis Complete.
12
Embed
NCSX WBS-1201 - 190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS
NCSX WBS-1201 - 190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS. Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept Identified. Vessel Handling Support Concept Identified. Hard Points and Access Identified. Preliminary Stress Analysis Complete. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
WBS-1201-190 HANDLING/SUPPORT UPDATE 7/23/03 Vessel Handling Concept Contin.Handling Procedure (abridged version)a. Mount vessel period to fixture using vertical ports, NB port. Install
insulation, diagnostics, etc
b. Manipulate coil/shell assys over vessel ends with handler and bolt up to each other.
c. Install 4 vessel hangers and radial lugs at NB port to shell and align vessel.
d. Install TF coils.
e. Install port extensions.
f. Release vessel from fixture, suspending it from shell.
g. Perform field period testing, metrology.
h. Transport assembly to site and mate to other period sectors.