Submitted by the General Services Administration Preliminary Site Development Plans NCPC File #: 7624 St. Elizabeths West Campus I-295 /Malcolm X Interchange Improvement Project ______________
22

NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

Jun 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

Submitted by the General Services Administration

Preliminary Site Development Plans

NCPC File #: 7624

St. Elizabeths West CampusI-295 /Malcolm X Interchange Improvement Project

______________

Page 2: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

2

Project Information

Project summary:The General Services Administration submitted for preliminary approval an access roadway project associated with theSaint Elizabeths West Campus development. This project consists of the following:

• An Off-Site Access Road through Shepherd Parkway connecting to the previously approved and constructed On-SiteAccess Road and connecting to an improved I-295/Malcolm X Interchange;

• Two retaining walls support the Off-Site Access Road: The retaining wall along the eastern side (adjacent to ShepherdParkway) is designated RW-1 and the retaining wall along the western side (between NB I-295 and the Off-Site AccessRoad) is designated RW-2. These wall heights range from less than 5 feet to as tall as 20 feet.

• I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additionalretaining walls to accommodate access to the Off-Site Access Road. These wall heights range from less than 5 feet toup to 32 feet.

• 80% of the retaining walls are less than 15 feet. The other 20% are between 15 and 32 feet.• Landscape, lighting, signage, utilities and site work within the Limits of Disturbance (LOD) associated with the

construction of these Off-Site Transportation Improvements.• More than a mile long and• Requires a land transfer from NPS

Commission meeting date: May 7, 2015

NCPC review authority: USC 40 8722 (b)(1) and (d)

Applicant request: Preliminary site development approval

Delegated / consent / open / executive session: Open

NCPC Review Officer: Hart

NCPC File number: 7624

Page 3: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

3

Project Location

Page 4: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

4

Existing Conditions

Page 5: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

5

Project Area

Page 6: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

6

Limits of Disturbance

Page 7: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

7

Wall Heights – Northern Section

Page 8: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

8

Wall Heights – Middle Section

Page 9: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

9

Wall Heights – Southern Section

Page 10: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

10

Landscape Design Concept

Page 11: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

11

Roadway Landscaping

Page 12: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

12

Roadway Landscaping

Page 13: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

13

Roadway Landscaping

Page 14: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

14

Roadway Section with Landscaping

Page 15: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

15

Roadway Section with Landscaping

Page 16: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

16

Area of Potential Effects

Page 17: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

17

Detail Section

Design specifics:• Three 11-foot travel

lanes• 10-foot shared use

path• Handrails, fencing,

lighting• Bio-retention areas

Page 18: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

18

View Simulation – Westward along Malcolm X Avenue

Existing View Proposed View

Page 19: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

19

View Simulation – Looking eastward from JBAB

Existing View Proposed View

Page 20: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

20

Section

Page 21: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

21

Proposed Signage

Page 22: NCPC File #: 7624 St. Elizabeths West Campus · • I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additional retaining

22

Proposed Lighting