NORTHERN COALFIELD LIMITED

(A Government of India Mini Ratna Company)SINGRAULI (M.P.)

An ISO 9001:2008, ISO 14001:2004,OHSAS 18001:2007 & SA 8000:2008 Certified

Company

Page 2: NCL Singrauli project

NCL is the subsidiary of coal India Limited (CIL). It was found in the

year (1948). Earlier it was a subsidiary of Central Coalfields Limited (CCL). It is among the top PSU’s in India.

Type – Public Industry Established – In 1986 Headquarter – Singrauli ( M.P.) Area of NCL - above 2202 sq. KM. Turnover – 9303.88 Crore (2013 – 14) Achieved - ISO 9001, ISO 14001, OHSAS 18001, SA 8000

Northern Coalfields Limited (NCL) – A Profile

Page 3: NCL Singrauli project

VISION“Be the leading energy supplier in the country, through best practices from mine to market”.

MISSION“The mission of Northern Coalfields Limited is to produce and market the planned quantity of

coal and coal products efficiently and economically with due regard to safety, conservation, quality and environment”.

Page 4: NCL Singrauli project

COKING COAL SEMI COKING COAL NLW COKING COAL NON-COKING COAL WASHED AND BENEFICIATED COAL CIL COKE / LTC COKE TAR / HEAVY OIL / LIGHT OIL / SOFT PITCH

Products & Services

Page 5: NCL Singrauli project

5

RPCO

ATPS

MP UP

GOVINDVALLABH

PANTSAGAR

POWER C

ORRIDOR

PARTLY EXPLORED

SSTPSPOWER CORRIDOR

EXPLORATION COMPLETED

KHADIA10 MTY

JHINGURDHA5 MTY

RUHELA

ROPE WAY

KA

KRI

4MTY

CH

AN

DEL

A

BOUNDARY FAULT

GORBI-B

Co. Hd.Qr.Singrauli

VSTPS

RUNNING PROJECTS – 10 NosEXHAUSTED MINES 2 No.

JAYANT12.5MTYNIGAHI

15 MTYDUDHICHUA12.5MTY

NIGAHI EXTN.

GORBI

BLOCK B3.5 MTY

MEHRAULI

BAG

HELAWEST

EASTNORTH

SEMARIA

MOHER

BUNDELA

FUTURE PROJECTS

RhTPS

KRISHNASHILA4MTY

BINA EXT.6 MTY

DUDHICHUA OCP

AREA OF OPERATION

AMLOHRI10.0MTY

Page 6: NCL Singrauli project

SWOT ANALYSIS

Page 7: NCL Singrauli project
Page 8: NCL Singrauli project

Planning to set up a 1000 megawatts coal based

power plant in Uttar Pradesh.

FUTURE PLAN OF THE COMPANY

Page 9: NCL Singrauli project

0

2

4

6

8

10

12

Current Ratio Quick Ratio Stockturnover

Ratio

Debtorsturnover

Ratio

OperatingRatio

2014

2013

FINANCIAL ANALYSIS

Page 10: NCL Singrauli project

0.00%

50.00%

100.00%

150.00%

200.00%

250.00%

300.00%

350.00%

400.00%

Net Profit Ratio Working CapitalTurnover Ratio

Creditor TurnoverRatio

2014

2013

Page 11: NCL Singrauli project

In the NCL there not to create debtors they generally deal with

first to receive the cash or cheque, and then they supply the finished material.

During the study I find that there is no huge variation in budget decided and the actual one.

In the NCL their working capital management is very good; they use the IBS (ERP system) to manage the overall activity.

some the staff members of the NCL are lack of the computer knowledge.

the management should arrange special training for educating them.

MAJOR FINDINGS & SUGESSTION

Page 12: NCL Singrauli project

After analyzing the different Ratios of the NORTHERN

COALFIELDS LIMITED I found that the company is really in Good financial condition because the management has taken a great effort in managing the funds like acquiring and allocation of funds, optimum utilization of the available resources. The organization is in sound position which is good for the company, stakeholders as well as the country also. It is currently in good financial condition and it is continuously trying to implement new and techniques to improve its productivity as well as profitability.

CONCLUSION

Page 13: NCL Singrauli project