-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
Part RA Administrative Requirements (Part 3 Section 1) Part RB
Inservice Inspection of Pressure-Retaining Items (Part 2
Inspection) Part RC Repairs and Alterations of Pressure-Retaining
Items (Part 3 Repairs and Alterations) Part RD Repair/Alteration
Methods (Part 3 Repairs and Alterations) Part RE Repairs of
Pressure Relief Valves (Part 3 Repairs and Alterations Supplement
7) Mandatory Appendices Appendix 1 Preparation of Technical
Inquiries to the National Board Inspection Code Committee (Parts 1,
2, & 3 Section 8) Appendix 2 Stamping and Nameplate Information
(Part 2 & 3 Section 5) Appendix 3 Steam Locomotive Firetube
Boiler Inspection, Repair, and Storage (Parts 1 & 2 Supplement
1) Appendix 4 Glossary of Terms (Parts 1, 2, & 3 Section 9)
Appendix 5 National Board Forms Part 1 2.10.6, Part 2 5.5, Part 3
5.13) Appendix 6 Examples of Repairs and Alterations (Part 3 3.3.3)
Appendix 7 Procedures to Extend the VR Certificate of Authorization
Stamp to ASME NV Stamped Pressure Relief Devices (Part 3 Supplement
9) Appendix 8 Inspection, Repair, and Alteration of Graphite
Pressure Equipment (Part 2 & 3 Supplement 3) Appendix 9 Repair,
Alteration, and Inspection of Fiber-Reinforced Thermosetting
Plastic Pressure Equipment (Part 2 & 3 Supplement 4) Appendix
10 NBIC Policy on Metrication (Part 1, 2, & 3 Section 7)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
Nonmandatory Appendices Appendix A Standard Welding Procedures
(Part 3 2.3) Appendix B Recommended Preheat Temperatures (Part 3
2.5.1) Appendix C Historical Boilers (Part 2 & 3 Supplement 2)
Appendix D Recommended Guide for the Design of a Test System for
Pressure Relief Devices in Compressible Fluid Service (Part 3
Supplement 8) Appendix E Recommended Procedures for Repairing
Pressure Relief Valves (Part 3 S7.14) Appendix F Pressure
Differential between Safety or Safety Relief Valve Setting and
Boiler or Pressure Vessel Operating Pressure (None) Appendix G
Safety Valves on the Low Pressure Side of Steam Pressure-Reducing
Valves (Part 1 Supplement 2) Appendix H Recommended Guide for the
Inspection of Pressure Vessels in LP Gas Service (Part 2 Supplement
7) Appendix I Installation Requirements (Part 1 Installation)
Appendix J Guide to Jurisdictions for Authorization of Owners to
Make Adjustments to Pressure Relief Valves (Part 3 S7.10) Appendix
K Inspection, Repairs, and Alterations for Yankee Dryers (Part 1
Supplement 1, Part 2 & 3 Supplement 5) Appendix L Continued
Service, Inspection, and Repair of DOT Vessels (Part 2 & 3
Supplements 6) Interpretations (Part 1, 2, & 3 Section 10)
Index (Part 1, 2, & 3 Section 11)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
Part RA Administrative Requirements RA-1000 General (Part 3
Section 1) RA-1010 Scope (Part - 3 1.1) RA-1020 Accreditation
Process (Part 3 - 1.5.1) RA-2000 Accreditation of Repair
Organizations (Part 3 - 1.5.1) RA-2010 Scope (Part 3 - 1.6.1)
RA-2020 Scope Issuance and Revision to Pressure-Retaining Items
(Part 3 - 1.3.1) RA-2030 Scope Issuance and Revision to Pressure
Relief Valves
(Part 3 - 1.3.1) RA-2100 R Administrative Rules and Procedures
(Part 3 - 1.6) RA-2110 Scope (Part 3 1.6.1) RA-2111 Owner-User
Organizations (Part 3 - 1.6.1) RA-2120 Prerequisites for Issuing a
National Board Certificate of
Authorization (Part 3 - 1.6.2) RA-2130 Procedure for Obtaining
or Renewing a National Board Certificate
of Authorization (Part 3 - 1.6.3) RA-2140 National Board R
Symbol Stamp (Part 3 - 1.6.4) RA-2150 Quality System (Part 3 -
1.6.5) RA-2151 Outline of Requirements for a Quality System for
Qualification for
the National Board R Certificate of Authorization (Part 3 -
1.6.5.1)
RA-2200 VR Administrative Rules and Procedures (Part 3 - 1.7)
RA-2210 Scope (Part 3 - 1.7.1) RA-2212 Jurisdictional Participation
(Part 3 - 1.7.2) RA-2213 General Rules (Part 3 - 1.7.3) RA-2214
Repair of Nuclear Valves (Part 3 1.7.4) RA-2220 Issuance and
Renewal of the VR Certificate and Stamp
(Part 3 - 1.7.5) RA-2221 General (Part 3 1.7.5.1) RA-2222
Issuance of Certificate (Part 3 1.7.5.2) RA-2223 Renewal of
Certificate (Part 3 1.7.5.3) RA-2224 Review of Applicants Facility
(Part 3 1.7.5.4) RA-2225 Verification Testing (Part 3 1.7.5.5)
Ra-2226 Verification Testing Alternatives (Part 3 1.7.5.6) RA-2230
Use of the VR Stamp (Part 3 - 1.7.6) RA-2231 Technical Requirements
(Part 3 - 1.7.6.1) RA-2232 Stamp Use (Part 3 - 1.7.6.2) RA-2233
Return of Stamp (Part 3 - 1.7.6.3)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
RA-2234 Multiple Locations (Part 3 - 1.7.6.4) RA-2240
Certificate of Authorization Contents (Part 3 - 1.7.6.5) RA-2241
Changes to Certificates of Authorization (Part 3 - 1.7.6.6) RA-2242
Issuance of more than one VR Symbol Stamp to A Certificate Holder
(Part 3 - 1.7.6.7) RA-2250 Quality System (Part 3 - 1.7.7) RA-2251
General (Part 3 - 1.7.7.1) RA-2252 Written Description (Part 3 -
1.7.7.2) RA-2253 Review (Part 3 1.7.7.3) RA-2254 Maintenance of
Controlled Copy (Part 3 - 1.7.7.4) RA-2255 Outline of Requirements
for a Quality System (Part 3 - 1.7.7.5) RA-2256 ASME U, HV, or UV
Certificate Holders (Part 3 - 1.7.8) RA-2300 NR Accreditation
Requirements (Part 3 - 1.8) RA-2310 Scope (Part 3 - 1.8.1) RA-2320
Prerequisites for Issuing a National Board NR Certificate
of Authorization (Part 3 - 1.8.2) RA-2330 Procedures for
Obtaining or Renewing a National Board NR
Certificate of Authorization (Part 3 - 1.8.3) RA-2340 National
Board NR Symbol Stamp (Part 3 - 1.8.4) RA-2350 Quality System
Program (Part 3 - 1.8.5) RA-2360 Outline of Requirements for a
Quality System Program for
Qualification for the National Board NR Symbol Stamp (Part 3 -
1.8.5.1)
RA-2370 Interface with the Owners Repair/Replacement Program
(Part 3 - 1.8.6)
PART RB INSERVICE INSPECTION OF PRESSURE-RETAINING ITEMS
(Section 2) RB-1000 General Requirements for Inservice Inspection
of
Pressure-Retaining Items (Section 2) RB-1010 Scope (Part 2 -
1.1) RB-1020 Administration (Part 2 - 1.2) RB-1030 Stamping (Part 2
- 5.1) RB-1040 Reference to Other Codes and Standards (Part 2 -
1.3) RB-1050 Conclusions (Part 2 - None) RB-2000 Personnel Safety
and Inspection Activities
(Part 2 - 1.4) (Part 2 - 1.5) RB-2010 Scope (Part 2 1.1) RB-2100
Personnel Safety (Part 2 1.4)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
RB-2110 Equipment Operation (Part 2 1.4.2) RB-2120 Vessel Entry
Requirements (Part 2 1.4.1) RB-2200 Inspection Activities (Part 2
1.5 & 1.5.1) RB-2210 Preparation for Internal Inspection (Part
2 1.5.3) RB-2220 Pre-inspection Activities (Part 2 1.5.2) RB-2230
Post-inspection Activities (Part 2 1.5.4) RB-3000 Inspection and
Test Methods (Part 2 Section 4) RB-3010 Scope (Part 2 4.1) RB-3100
Nondestructive Examination Methods (NDE) (Part 2 4.2) RB-3110
Visual (Part 2 4.2.1) RB-3120 Magnetic Particle (Part 2 4.2.2)
RB-3130 Liquid Penetrant (Part 2 4.2.3) RB-3140 Ultrasonic (Part 2
4.2.4) RB-3150 Radiography (Part 2 4.2.5) RB-3160 Eddy Current
(Part 2 4.2.6) RB-3170 Metallographic (Part 2 4.2.7) RB-3180
Acoustic Emission (Part 2 4.2.8) RB-3200 Testing (Part 2 4.3)
RB-3210 Pressure Testing (Part 2 4.3.1) RB-3220 Leak Testing (Part
2 4.3.2) RB-3300 Material Preparation General Guidelines (Part 2
None) RB-4000 Causes of Deterioration and Failure Mechanisms
(Part 2 Section 3) RB-4010 Scope (Part 2 3.1) RB-4020 General
(Part 2 3.2) RB-4100 Corrosion (Part 2 3.3) RB-4110 Macroscopic
Corrosion Environments (Part 2 3.3.1) RB-4120 Microscopic Corrosion
Environments (Part 2 3.3.2) RB-4200 Control of Corrosion (Part 2
3.3.3) RB-4210 Process Variables (Part 2 3.3.3.1) RB-4220
Engineering Design (Part 2 3.3.3.5) RB-4230 Protection (Part 2
3.3.3.2) RB-4240 Material Selection (Part 2 3.3.3.3) RB-4250
Coatings (Part 2 3.3.3.4) RB-4300 Conclusions (Part 2 3.3.3.6)
RB-4400 Failure Mechanisms (Part 2 3.4) RB-4410 Fatigue (Part 2
3.4.1) RB-4420 Creep (Part 2 3.4.2) RB-4430 Temperature (Part 2
3.4.3) RB-4440 Hydrogen Embrittlement (Part 2 3.4.4)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
RB-4450 Hydrogen Attack (Part 2 3.4.5) RB-4451 Hydrogen Damage
(Part 2 3.4.6) RB-4460 Bulges and Blisters (Part 2 3.4.7) RB-4470
Overheating (Part 2 3.4.8) RB-4480 Cracks (Part 2 3.4.9) RB-4500
Specific Inspection Requirements (Part 2 Section 2) RB-5000
Inspection of Boilers (Part 2 2.2) RB-5010 Scope (Part 2 2.2.1)
RB-5100 General Conditions (Part 2 2.2.2) RB-5200 Pre-Inspection
Activities (Part 2 2.2.3) RB-5300 Condition of Installation (Part 2
None) RB-5310 General (Part 2 2.2.4) RB-5400 Inspections (Part 2
None) RB-5410 External Inspection (Part 2 2.2.5) RB-5420 Internal
Inspection (Part 2 2.2.6) RB-5430 Evidence of Leakage (Part 2
4.3.3) RB-5500 Inspection Requirements General (Part 2 2.1 (b))
RB-5510 Corrosion (Part 2 2.2.8) RB-5520 Inspection of Piping,
Parts, and Appurtenances (Part 2 2.2.10) RB-5521 Boiler Piping
(Part 2 2.2.10.1) RB-5522 Waterside Deposits (Part 2 2.2.9) RB-5523
Stays and Staybolts (Part 2 2.2.10.2) RB-5524 Flanged or Other
Connections (Part 2 2.2.10.3) RB-5525 Miscellaneous (Part 2
2.2.10.4) RB-5526 Gages (Part 2 2.2.10.5) RB-5527 Pressure Relief
devices (Part 2 2.2.10.6) RB-5528 Controls (Part 2 2.2.10.7)
RB-5529 Records Review (Part 2 2.2.11) RB-5600 Specific Inspection
Requirements for Boiler Types
(Part 2 2.2.12) RB-5601 Watertube Boilers (Part 2 2.2.12.1)
RB-5602 Kraft or Sulfate Black Liquor Recovery Boilers (Part 2
2.2.12.2) RB-5603 Thermal Fluid Heaters (Part 2 2.2.12.3) RB-5604
Waste Heat Boilers (Part 2 2.2.12.4) RB-5605 Cast-Iron Boilers
(Part 2 2.2.12.5) RB-5606 Electric Boilers (Part 2 2.2.12.6)
RB-5607 Fired Coil Water Heaters (Part 2 2.2.12.7) RB-5608 Fired
Storage Water Heaters (Part 2 2.2.12.8) RB-5609 Firetube Boilers
(Part 2 2.2.12.9) RB-5700 Inservice Inspection Activities (Part 2
None)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
RB-6000 Inspection of Pressure Vessels (Part 2 2.3) RB-6010
Scope (Part 2 2.3.1) RB-6100 General Conditions (Part 2 2.3.2)
RB-6200 Inspections General Requirements (Part 2 None) RB-6210
Condition of Installation (Part 2 2.3.2) RB-6220 External
Inspection (Part 2 2.3.3) RB-6230 Internal Inspection (Part 2
2.2.4) RB-6240 Inspection of Parts and Appurtenances (Part 2 2.3.5)
RB-6250 Gages, Safety Devices, and Controls (Part 2 None) RB-6251
Gages (Part 2 2.3.5.1) RB-6252 Safety Devices (Part 2 2.3.5.2)
RB-6253 Controls/Devices (Part 2 2.3.5.3) RB-6300 Records Review
(Part 2 2.3.5.4) RB-6400 Inspections for Specific Types of Pressure
Vessels
(Part 2 None) RB-6410 General (Part 2 2.3.6) RB-6420 Deaerators
(Part 2 2.3.6.1) RB-6430 Compressed Air Vessels (Part 2 2.3.6.2)
RB-6440 Expansion Tanks (Part 2 2.3.6.3) RB-6450 Liquid Ammonia
Vessels (Part 2 2.3.6.4) RB-6460 Inspection of Pressure Vessels
with Quick-Actuating Closures
(Part 2 2.3.6.5) RB-6470 Graphite Pressure Equipment (Part 2
Supplement 3) RB-6480 Fiber-Reinforced Vessels (Part 2 Supplement
4) RB-6490 Propane LP Gas Vessels (Part 2 Supplement 7) RB-6500
Nondestructive Examination (NDE) (Part 2 None) RB-6600 Remaining
Life and Inspection Intervals (Part 2 None) RB-6700 Inservice
Inspection Activities (Part 2 None) RB-7000 Inspection of Piping
Systems (Part 2 2.4) RB-7010 Scope (Part 2 2.4.1) RB-7100 General
Conditions (Part 2 2.4.2) RB-7200 Assessment of Piping Design (Part
2 2.4.3) RB-7300 Inspection (Part 2 None) RB-7310 External
Inspection of Piping (Part 2 2.4.4) RB-7320 Internal Inspection of
Piping (Part 2 2.4.5) RB-7330 Evidence of Leakage (Part 2 2.5.6)
RB-7340 Provisions for Expansion and Support (Part 2 2.4.7) RB-7350
Gages, Safety Devices, and Controls (Part 2 2.4.8) RB-7351 Gages
(Part 2 2.4.8.1) RB-7352 Safety Devices (Part 2 2.4.8.2)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
RB-7353 Quick-Disconnect Coupling (Part 2 2.4.8.3) RB-7400
Inservice Inspection Activities (Part 2 None) RB-8000 Inspection of
Pressure Relief Devices (Part 2 2.5) RB-8010 Scope (Part 2 2.5.1)
RB-8100 Safety Considerations (Part 2 None) RB-8200 Device Data
(Part 2 2.5.2) RB-8210 Device Condition (Part 2 2.5.3) RB-8300
Installation Condition (Part 2 2.5.4) RB-8400 Testing and
Operational Inspection (Part 2 2.5.4 & 2.5.7) RB-8410
Recommended Inspection and Test Frequencies (Part 2 2.5.8) RB-8500
Additional Inspection Information (Part 2 2.5.5) RB-8510 Boilers
(Part 2 2.5.5.1) RB-8520 Pressure Vessels and Piping (Part 2
2.5.5.2) RB-8530 Rupture Disks (Part 2 2.5.5.3) RB-8600
Requirements for Shipping and Transporting (Part 2 2.5.6) RB-8700
Inservice Inspection Activities (Part 2 1.5.1) RB-9000 Methods to
Assess Damage Mechanisms and Inspection
Frequency for Pressure-Retaining Items (Part 2 5.3) RB-9010
Scope (Part 2 5.3.1) RB-9020 General Requirements (Part 2 5.3.2)
RB-9021 Responsibilities (Part 2 5.3.3) RB-9030 Remaining Service
Life Assessment Methodology (Part 2 5.3.4) RB-9040 Data
Requirements for Remaining Service Life Assessments (Part 2 5.3.5)
RB-9041 Identification of Damage Mechanisms (Part 2 5.3.6) RB-9050
Determining Inspection Intervals (Part 2 5.3.7) RB-9100 Method for
Estimating Inspection Intervals for Pressure-Retaining
Items Subject to Erosion or Corrosion (Part 2 5.3.7.1) RB-9110
Method for Estimating Inspection Intervals for Exposure to
Corrosion (Part 2 5.3.7.2) RB-9120 Method for Inspection
Intervals for Pressure-Retaining Items
Where Corrosion Is Not a Factor (Part 2 5.3.7.3) RB-9200
Evaluating Inspection Intervals of Pressure-Retaining Items
Exposed to Inservice Damage Mechanisms (Part 2 5.3.8) RB-9210
Exposure to Elevated Temperature (Creep) (Part 2 5.3.8.1) RB-9220
Exposure to Brittle Fracture (Part 2 5.3.8.2) RB-9230 Evaluating
Conditions That Cause Bulges/Blisters/Laminations
(Part 2 5.3.8.3) RB-2040 Evaluating Crack-Like Indications in
Pressure-Retaining Item (Part 2 5.3.8.4)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
RB-9250 Evaluating Exposure of a Pressure-Retaining Item to Fire
Damage (Part 2 5.3.8.5) RB-9260 Evaluating Exposure of
Pressure-Retaining Items to Cyclic Fatigue
(Part 2 5.3.8.6) RB-9270 Evaluating Pressure-Retaining Items
Containing Local Thin Areas (Part 2 5.3.8.7) PART RC REPAIRS AND
ALTERATIONS OF PRESSURE-RETAINING ITEMS (Part 3 Repairs and
Alterations) RC-1000 General Requirements (Part 3 Section 1)
RC-1010 Scope (Part 3 1.1) RC-1020 Construction Standards (Part 3
1.2) RC-1030 Accreditation (Part 3 1.5.1) RC-1040 Materials (Part 3
3.2.1) RC-1050 Replacement Parts (Part 3 3.2.2) RC-1060
Authorization (Part 3 1.3.2) RC-1070 Inspector (Part 3 1.31)
RC-1090 Welding (Part 3 Section 2) RC-1100 Heat Treatment (Part 3
Section 2) RC-1110 Nondestructive Examination (Part 3 4.2) RC-1120
Pressure Gages, Measurement, Examination, and Test Equipment
(Part 3 4.3) RC-1130 Acceptance Inspection (Part 3 1.3.2)
RC-1140 Stamping (Part 3 Section 5) RC-1150 Registration of R Forms
(Part 3 5.5) RC-2000 Additional Requirements for Repairs (Part 3
3.3) RC-2010 Scope (Part 3 None) RC-2020 Defect Repairs (Part 3
3.3.1) RC-2030 Authorization (Part 3 1.3.2) RC-2031 Routine Repairs
(Part 3 3.3.2) RC-2050 Examination and Test (Part 3 4.4.1) RC-2060
Stamping (Part 3 5.7.2) RC-2070 Documentation (Part 3 5.2) RC-2071
Preparation of Form R-1 (Part 3 5.2.1) RC-2072 Distribution of Form
R-1 (Part 3 5.3) RC-2073 Registration for Repairs (Part 3 5.5.1)
RC-2080 Repair of ASME Code Section VIII, Division 2 or 3, Pressure
Vessels (Part 3 3.3.5) RC-2081 Scope (Part 3 3.3.5.1) RC-2082
Repair Plan (Part 3 3.3.5.2) RC-3000 Additional Requirements for
Alterations (Part 3 3.4)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
RC-3010 Scope (Part 3 3.1) RC-3020 Design (Part 3 3.2.4) RC-3021
Calculations (Part 3 3.2.5) RC-3022 Re-Rating (Part 3 3.4.1)
RC-3023 Drawings (Part 3 3.2.3) RC-3024 Allowable Stresses (Part 3
3.4.2) RC-3025 Alteration of ASME Code Section VIII, Division 2 or
3 Pressure Vessels (Part 3 3.4.4) RC-3026 Scope (Part 3 None)
RC-3027 Alteration Plan (Part 3 3.4.4.1) RC-3030 Examination and
Test (Part 3 4.4.2) RC-3040 Stamping (Part 3 5.7.3) RC-3050
Documentation (Part 3 5.2) RC-3051 Preparation (Part 3 5.2.2)
RC-3052 Distribution (Part 3 5.4) RC-3053 Registration (Part 3 5.5)
PART RD REPAIR/Alteration Methods (Part 3 Section 2) RD-1000
Alternatives to Postweld Heat Treatment (Part 3 2.5.3) RD-1010
Scope (Part 3 None) RD-1020 Nondestructive Examination of Welds
(Part 3 4.2) RD-1030 Welding Method 1 (Part 3 2.5.3.1) RD-1040
Welding Method 2 (Part 3 2.5.3.2) RD-1050 Welding Method 3 (Part 3
2.3.5.3) RD-1060 Welding Method 4 (Part 3 2.5.3.4) RD-1070 Welding
Method 5 (Part 3 2.5.3.5) RD-1100 Alternative Local Postweld Heat
Treatment Method
(Part 3 2.5.2 b)) RD-2000 Repair Methods (Part 3 3.3.4) RD-2010
Scope (Part 3 3.3.4.1) RD-2020 Defect Repairs (Part 3 3.3.4.2)
RD-2030 Wasted Areas (Part 3 3.3.4.3) RD-2040 Seal Welding (Part 3
3.3.4.4) RD-2050 Re-Ending or Piecing Pipes or Tubes (Part 3
3.3.4.5) RD-2060 Patches (Part 3 3.3.4.6_ RD-2070 Stays (Part 3
3.4.4.7) RD-3000 Alterations Based on Allowable Stress Values (Part
3 3.4.2) RD-3010 Re-rating (Part 3 3.4.1) RD-3020 Minimum Wall
Thickness (Part 3 3.4.2)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
Part RE Repairs of Pressure Relief Valves (Part 3 Supplement 7)
RE-1000 General Requirements (Part 3 None) RE-1010 Scope (Part 3
S7.1) RE-1020 Definition of Repair (Part 3 Section 9) RE-1030
Accreditation (Part 3 None) RE-1040 Materials (Part 3 S7.4) RE-1050
Replacement Parts (Part 3 S7.5) RE-1060 Nameplates (Part 3 5.9.1)
RE-1061 Repair Nameplate (Part 3 5.9.2) RE-1062 Changes to Original
Pressure Relief Valve Nameplate Information (Part 3 5.9.3) RE-1063
Test Only Nameplate (Part 3 5.9.4) RE-1064 Replacement of Illegible
or Missing Nameplate (Part 3 5.9.5) RE-1070 Field Repair (Part 3
S7.7) RE-1071 Audit Requirements (Part 3 S7.8) RE-1072 Use of
Owner-User Personnel (Part 3 S7.9) RE-1100 Welding for Pressure
Relief Valves (Part 3 S7.3 & S7.12) RE-1110 Welding Procedure
Specifications (Part 3 S12.1) RE-1120 Standard Welding Procedure
Specifications (Part 3 S7.12.2) RE-1130 Performance Qualification
(Part 3 S7.12.3) RE-1140 Welding Records (Part 3 S7.12.4) RE-1150
Welders Identification (Part 3 S7.12.5) RE-1160 Welders Continuity
(Part 3 S7.12.6) RE-1200 Heat Treatment (Part 3 S7.13) RE-1210
Preheating (Part 3 S7.13.1) RE-1220 Postweld Heat Treatment (Part 3
S7.13.2) RE-2000 Performance Testing and Testing Equipment (Part 3
4.5) RE-2010 Test Medium and Testing Equipment (Part 3 4.5.1)
RE-2020 Owner-User Section VIII Steam Testing (Part 3 4.5.2)
RE-2030 Lift Assist Testing (Part 3 4.5.3) RE-2040 Pressure Test of
Parts (Part 3 4.5.4) RE-3000 Training and Qualification of
Personnel (Part 3 S7.11) RE-3010 General (Part 3 S7.11.1) RE-3020
Contents of Training Program (Part 3 S7.11.2) RE-3030 Qualification
of Personnel (Part 3 S7.11.3) RE-3040 Annual Review of
Qualification (Part 3 S7.11.4)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
APPENDIX 1 PREPARATION OF TECHNICAL INQUIRIES TO THE NATIONAL
BOARD INSPECTION CODE COMMITTEE (Section 8) 1-1000 Introduction
(Parts 1, 2, & 3 8.1) 1-2000 Inquiry Format (Parts 1, 2, &
3 8.2) 1-3000 Code Revisions or Additions (Parts 1, 2, & 3 8.3)
1-4000 Code Interpretations (Parts 1, 2, & 3 8.4) 1-5000
Submittals (Parts 1, 2, & 3 8.5) APPENDIX 2 STAMPING AND
NAMEPLATE INFORMATION (Parts 3 5.9.6) 2-1000 Scope (Parts 3
5.9.6.1) 2-2000 General Requirements for Stamping and
Nameplates
(Parts 3 5.9.6.2) 2-2100 Additional Stamping Requirements for
Repairs (Parts 3 5.9.6.3) 2-2200 Additional Stamping Requirements
for Alterations and Re-Ratings (Parts 3 5.9.6.4) 2-2300 Additional
Requirements for Parts (Parts 3 5.9.6.5) 2-2400 Additional Stamping
Requirements for Pressure Relief Valves
(Parts 3 None) APPENDIX 3 STEAM LOCOMOTIVE FIRETUBE BOILER
INSPECTION, REPAIR AND STORAGE (Parts 2 & 3 Supplement 1)
3-1000 General Requirements (Parts 3 S1.1) 3-1010 Scope (Parts 2
& 3 S1.1) 3-1100 Special Jurisdictional Requirements (Parts 2
S1.2) 3-1200 Federal Railroad Administration (FRA) (Part 2 S1.3)
&
(Part 3 S1.1.1) 3-1300 Requirements for Welding Activities (Part
3 S1.1.2) 3-1400 Formula and Calculations for Steam Locomotive
Boilers
(Part 3 S1.1.4) 3-2000 Locomotive Firetube Boiler Inspection
(Part 2 S1.4) 3-1010 Inspection Methods (Part 2 S1.4.1) 3-2020
Inspection Zones (Part 2 S1.4.2) 3-2030 Steam Testing (Part 2 None)
3-3000 Locomotive Firetube Repairs (Part 3 S1.2) 3-3010 Repair of
Stay Bolts (Part 3 S1.2.1) 3-3020 Threaded Staybolts (Part 3
S1.2.2) 3-3030 Ball Socket-Type Flexible Staybolts, Sleeves, and
Caps
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
(Part 3 S1.2.3) 3-3040 Seal Welded Staybolts (Part 3 S1.2.4)
3-3050 Welded Installation of Staybolts (Part 3 S1.2.5) 3-3060
Diagonal Braces, Gusset Braces and Throat Sheet/Tubesheet
Braces
(Part 3 S1.2.6) 3-3070 Threaded Studs (Part 3 S1.2.7) 3-3080
Patch Bolts (Part 3 S1.2.8) 3-3100 Flues, Arch Tubes, Circulators,
Thermic Syphons (Part 3 S1.2.9) 3-3110 Flue and Tube Re-Ending
(Part 3 - S1.2.9.1) 3-3120 Arch Tubes (Part 3 S1.2.9.2) 3-3121 Tube
Wall Thickness for Arch Tubes (Part 3 S1.2.9.3) 3-3130 Thermic
Syphons (Part 3 S1.2.9.4) 3-3140 Circulators (Part 3 S1.2.9.5)
3-3200 Repairs and Alterations to Boiler Barrel Unstayed Areas
(Part 3 S1.2.10) 3-3300 Repairs and Alterations to Boiler Barrel
Stayed Areas
(Part 3 S1.2.11) 3-3310 Firebox Sheet Repair (Part 3 S1.2.11.1)
3-3320 Firebox Patches (Part 3 S1.2.11.2) 3-3330 Repair of Firebox
Sheets Grooved or Wasted at the Mudring
(Part 3 S1.2.11.3) 3-3340 Mudring Repairs (Part 3 S1.2.11.4)
3-3350 Repair of Firebox Knuckles (Part 3 S1.2.11.5) 3-3360
Tubesheet Repairs (Part 3 S1.2.11.6) 3-3400 Seams and Joints (Part
3 S1.2.12) 3-3410 Caulking Riveted Seams and Rivet Heads (Part 3
S1.2.12.1) 3-3500 Threaded Openings in Vessel Walls, Bushings, and
Welded Nozzles
(Washout Plug Holes and Other Connections) (Part 3 S1.2.12.2)
3-3600 Fittings and Gages (Part 3 S1.2.13) 3-3610 Water Gage
Connection (Part 3 S1.2.13.1) 3-3700 Material List for Steam
Locomotive Boilers (Part 3 S1.1.3.1) 3-4000 Guidelines for Steam
Locomotive Storage (Part 2 S1.5) 3-4010 Storage Methods (Part 2
S1.5.1) 3-4020 Wet Storage Method (Part 2 S1.5.2) 3-4030 Dry
Storage Method (Part 2 S1.5.3) 3-4040 Recommended General
Preservation Procedures (Part 2 S1.5.4) 3-4050 Use of Compressed
Air to Drain Locomotive Components
(Part 2 S1.5.5) 3-4060 Return to Service (Part 2 S1.5.6)
APPENDIX 4 GLOSSARY OF TERMS (Parts 1, 2, & 3 Section 9)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
APPENDIX 5 National Board Forms (Parts 2 & 3 Section 5) Form
R-1 Report of Repair (Part 3 5.13.1) Form R-2 Report of Alteration
(Part 3 5.13.2) Form R-3 Report of Parts Fabricated By Welding
(Part 3 5.13.3) Form R-4 Report Supplementary Sheet (Part 3 5.13.4)
Guide for Completing National Board R Reports (Part 3 5.13.4.1)
Form NR-1 Nuclear Components and Systems in Nuclear Power Plants
(Part 3 5.13.5) Guide for Completing National Board Form NR-1 and
NVR-1 Reports (Part 3 5.13.6.1) Form NVR-1 Nuclear Pressure Relief
Devices (Part 3 5.15.6) Replacement of Stamped Data Form (Part 2
5.5.2) Form NB-4 New Business or Discontinuance Used by Authorized
Inspection Agencies (Parts 2 5.5.3) Form NB-5 Boiler or Pressure
Vessel Data Report (First Internal Inspection) (Part 2 5.5.4) Form
NB-6 Boiler-Fired Pressure Vessel Report of Inspection (Part 2
5.5.5) Form NB-7 Pressure Vessels report of Inspection (Part 2 -
5.5.6) Boiler Installation Report I-1 (Part 1 1.4.5.1) Guide for
Completing National Board Installation Report (Part 1 1.4.5.1.1)
APPENDIX 6 EXAMPLES OF REPAIRS AND ALTERATIONS (Part 3 Section 3)
6-1000 Introduction (Part 3 None) 6-2000 Examples of Repairs (Part
3 3.3.3) 6-3000 Examples of Alterations (Part 3 3.4.3) APPENDIX 7
PROCEDURES TO EXTEND THE VR CERTIFICATE OF OPERATION TO ASME NV
STAMPED PRESSURE RELIEF DEVICES (Part 3 Supplement 9) 7-1000
Introduction (Part 3 S9.1) 7-2000 Administrative Procedures (Part 3
S9-2) 7-3000 General Rules (Part 3 - S9.3)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
APPENDIX 8 INSPECTION, REPAIR AND ALTERATION of GRAPHITE
PRESSURE EQUIPMENT (Parts 2 & 3 Supplement 3) 8-1000 Scope
(Part 2 S3.1 & Part 3 S3.1) 8-1010 Application (Part 2 S3.2)
8-1020 Operations (Part 2 S3.4) 8-3000 Repairs (Part 3 S3.2) 8-3010
Repairs of a Routine Nature (Part 3 S3.3) 8-4000 Alterations (Part
3 S3.4) 8-5000 Repair Guide for Impervious Graphite (Part 3 S3.5)
8-5010 Introduction (Part 3 S3.5.1) 8-5020 Typical Graphite
Fractures (Part 3 S3.5.2) 8-5021 Major Fracture (Part 3 S3.5.2.1)
8-5022 Intermediate Fracture (Part 3 S3.5.2.2) 8-5023 Minor
Fracture (Part 3 S3.5.2.3) 8-5030 Graphite Repair by Plug Stitching
(Part 3 S3.5.3) 8-5031 Plug Stitching Procedure (Part 3 S3.5.3.1)
8-5040 Figures Typical Plug Stitching Procedure (Part 3 S3.5.3.2)
8-5050 Reimpregnation of Graphite Parts (Tubesheets, heads and
Blocks)
(Part 3 S3.5.4) 8-5060 Control of Impregnation Material (Part 3
S3.5.4.1) 8-5070 Finishing the Repair (Part 3 S3.5.4.2) 8-6000
Alternative Marking and Stamping (Part 3 5.10) APPENDIX 9 REPAIR,
ALTERATION, AND INSPECTION of FIBER-REINFORCED THERMOSETTING
PLASTIC PRESSURE EQUIPMENT (Parts 2 & 3 Supplement 4) 9-1000
General Requirements (Parts 2 & 3 None) 9-1010 Scope (Parts 2
& 3 S4.1) 9-1020 Limitations (Part 3 S4.4) 9-1030 Repair
Limitations for Filament Wound Vessels (Part 3 S4.5) 9-1031 Vessels
Fabricate Using Elevated Temperature Cured Resin Systems
(Part 3 S4.6) 9-1040 Code of Construction (Part 3 S4.7) 9-1050
Materials (Part 3 S4.8) 9-1060 Replacement Parts (Part 3 S4.9)
9-1070 Secondary Bonding (Part 3 S4.10) 9-1071 Secondary Bonding
Procedure Specification (Part 3 S4.10.1) 9-1072 Performance
Qualification (Part 3 S4.10.2) 9-1073 Records (Part 3 S4.10.3)
9-1074 Secondary Bonders Identification (Part 3 S4.10.4)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
9-1075 Secondary Bonders Continuity (Part 3 S4.10.5) 9-1080
Curing (Part 3 S4.11) 9-1090 Nondestructive Examination (Part 3
S4.12) 9-1100 Pressure and Acoustic Tests (Part 3 S4.13) 9-1110
Pressure Gages, Measurement, and Examination and Test Equipment
(Part 3 S$.13.1) 9-1120 Acceptance Inspection (Part 3 S4.14)
9-1130 Stamping (Part 3 S4.14.1) 9-1140 Removal of Original
Stamping or Nameplate (Part 3 5.11.1) 9-1150 Registration of
Documentation (Part 3 5.5.3) 9-2000 Additional Requirements for
Repairs (Part 3 S4.16) 9-2010 Scope (Part 3 S4.16.1) 9-2020
Drawings (Part 3 S4.16.2) 9-2030 Repair Plan (Part 3 S4.16.3)
9-2040 Routine Repair (Part S16.4) 9-2050 Repair Methods (Part
S16.5) 9-2060 Pressure Testing for Repairs (Part 3 S4.15) 9-2070
Stamping (Part 3 5.11.2) 9-2080 Documentation (Part 3 5.2 b))
9-2081 Preparation of Form R-1 (Part 3 5.2.1) 9-2082 Distribution
(Part 3 5.3) 9-3000 Additional Requirements for Alterations (Part 3
S4.17) 9-3010 Scope (Part 3 - S4.17.1) 9-3020 Design (Part 3 -
S4.17.2) 9-3022 Calculations (Part 3 - S4.17.4) 9-3023 Re-Rating
(Part 3 - S4.17.5) 9-3024 Drawings (Part 3 3.2.3) 9-3030 Pressure
Testing (Part 3 - S4.17.6) 9-3040 Stamping (Part 3 5.11.3) 9-3050
Documentation (Part 3 5.2 b)) 9-3051 Preparation (Part 3 5.2.2)
9-3051 Distribution (Part 3 5.4) 9-4000 Repair/Alteration Methods
(Part 3 S4.18) 9-4010 General Requirements (Part 3 S4.18.1) 9-4020
Classification of Repairs (Part 3 S4.18.2) 9-4021 Type 1 Repair of
the Corrosion Barrier (Part 3 S4.18.2.1) 9-4022 Type 1B Repair of
the Corrosion Barrier for Vessels With
Precision Bores (Part 3 S4.18.2.2) 9-4023 Type 2 Corrosion
Barrier and Internal Structural Layer Repairs (Part 3
S4.18.2.3)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
9-4024 Type 3 External Structural Layer Repairs (Part 3
S4.18.2.4) 9-4025 Type 4 Alterations (Part 3 S4.18.2.5) 9-4026 Type
5 Miscellaneous General External Repairs or Alterations
(Part 3 S4.18.2.6) 9-4027 Type 6 Thermoplastic Repairs (Part 3
S4.18.2.7) 9-4028 Type 7 Gel Coat repairs (Part 3 S4.18.2.8) 9-5000
Inservice Inspection (Part 2 S4.2) 9-5100 General (Part 2 S4.3)
9-5200 Visual Examination (Part 2 S4.4) 9-5300 Inspector
Qualifications (Part 3 S4.2) 9-5400 Assessment of Installation
(Part 2 S4.6) 9-5410 Preparation (Part 2 S4.6.1 9-5420 Leakage
(Part 2 S4.6.2) 9-5430 Tools (Part 2 S4.6.3) (Part 3 S4.3) 9-5440
Safety (Part 2 None) 9-5500 External Inspection (Part 2 S4.7)
9-5510 Insulation or Other Coverings (Part 2 S4.7.1) 9-5520 Exposed
Surfaces (Part 2 S4.7.2) 9-5540 Structural Attachments (Part 2
S4.7.3) 9-5600 Internal Inspection (Part 2 S4.8) 9-5620 General
(Part 2 S4.8.1) 9-5630 Examination (Part 2 None) 9-5700 Records
Keeping (Part 2 None) 9-5800 Inspection Frequency (Part 2 S4.9)
9-5810 Newly Installed Equipment (Part 2 S4.9.1) 9-5820 Previously
Repaired or Installed Equipment (Part 2 S4.9.2) 9-5900 Photographs
of Typical Conditions (Part 2 S4.10) APPENDIX 10 NBIC POLICY FOR
METRICATION (Parts 1, 2, & 3 Section 7) General (Parts 1, 2,
& 3 7.1) Equivalent Rationale (Parts 1, 2, & 3 7.2)
Procedure for Conversion (Parts 1, 2, & 3 7.3) Referencing
Tables (Parts 1, 2, & 3 7.4) APPENDIX A STANDARD WELDING
PROCEDURE (Part 3 - 2.3) APPENDIX B RECOMMENDED PREHEAT
TEMPERATURES (Parts 3 Table 2.5.1
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
APPENDIX C HISTORICAL BOILERS (Parts 2 & 3 Supplement 2)
C-1000 Purpose (Parts 2 & 3 None) C-1010 Scope (Parts 2 & 3
None) C-2000 Pre-Inspection Requirement (Part 2 S2.4.1) C-2010
Initial Inspection (Part 2 S2.7.3.1) C-2020 Recurring Inspection
Requirements (Part 2 S2.7.3.2) C-2030 Safety Devices and Controls
(Part 2 S2.8) C-2031 Pressure Relief Valves (Part 2 S2.8.1) C-2032
Gage Glass (Part 2 S2.8.2) C-2033 Try Cocks (Part 2 S2.8.3) C-2034
Fusible Plug (Part 2 S2.8.4) C-2035 Pressure Gage (Part 2 S2.8.5)
C-2040 Appurtenances (Part 2 - S2.9) C-2041 Piping and Fittings
(Part 2 S2.9) C-3000 Replacements (Part 2 S2.9.1) C-4000 Maximum
Allowable Working Pressure (Part 2 S2.10) C-4010 Strength (Part 2
S2.10.1) C-4020 Rivets (Part 2 S2.10.2) C-4030 Cylindrical
Components (Part 2 S2.10.3) C-4040 Stayed Surfaces (Part 2 S2.10.4)
C-4050 Braced and Stayed Surfaces (Required Brace or Staybolt
Diameter) (Part 2 S2.10.4) C-4060 Construction Code (Part 2
S2.10.5) C-4070 Nomenclature (Part 2 S2.10.6) C-5000 Limitations
(Part 2 S2.10.7) C-6000 Repairs (Part 3 S2.4) C-6010 Construction
Standards (Part 3 S2.5) C-6020 Accreditation (Part 3 S2.6) C-6030
Materials (Part 3 S2.7) C-6040 Replacement Parts (Part 3 S2.7.1)
C-6050 Welded Repair Inspection (Part 3 S2.8) C-6060 Welding (Part
3 S2.9) C-6070 Heat Treatment (Part 3 S2.10) C-6080 Nondestructive
Examination (Part 3 S2.11) C-6090 Documentation (Part 3 S2.12)
C-6090 Boiler Inspection Guideline (Part 2 S2.11)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
PART PR REQUIREMENTS FOR BOILERS FABRICATED BY RIVETING PR-1
Scope (Parts 2 & 3 None) PR-5 Materials (Parts 2 & 3 None)
PR-9 Design (Parts 2 & 3 None) PR-10 Strength of Plates (Parts
2 & 3 None) PR-11 Strength of Rivets (Parts 2 & 3 None)
PR-12 Crushing Strength of Plates (Parts 2 & 3 None) PR-14
Thickness of Buttstraps (Parts 2 & 3 None) PR-15 Joint
Efficiency (Parts 2 & 3 None) PR-16 Longitudinal Joints (Parts
2 & 3 None) PR-17 Circumferential Joints (Parts 2 & 3 None)
PR-20 Transverse Pitch (Back Pitch) of Rows of Rivets
(Parts 2 & 3 None) PR-21 Preparation of Plate Edges (Parts 2
& 3 None) PR-22 Edge Distance (Parts 2 & 3 None) PR-23
Riveted Connections (Parts 2 & 3 None) PR-25 Reinforcement of
Openings (Parts 2 & 3 None) PR-30 Fabrication (Parts 2 & 3
None) PR-31 Buttstraps (Parts 2 & 3 None) PR-32 Rivet Holes
(Parts 2 & 3 None) PR-37 Assembly of Joints (Parts 2 & 3
None) PR-39 Riveting (Parts 2 & 3 None) PR-40 Joint Tightness
(Parts 2 & 3 None) PR-50 Inspection and Tests (Parts 2 & 3
None) PART PFT REQUIREMENTS FOR FIRETUBE BOILERS PFT-1 General
(Parts 2 & 3 None) PFT-5 Materials (Parts 2 & 3 None) PFT-8
Design (Parts 2 & 3 None) PFT-9 Minimum Thickness (Parts 2
& 3 None) PFT-10 Shell Joints (Parts 2 & 3 None) PFT-11
Attachment of Heads and Tubesheets (Parts 2 & 3 None) PFT-12
Tubes (Parts 2 & 3 None) PFT-13 Combustion Chamber Tubesheet
(Parts 2 & 3 None) PFT-14 Plain Circular Furnaces (Parts 2
& 3 None) PFT-15 Circular Flues (Parts 2 & 3 None) PFT-16
Adamson Type (Parts 2 & 3 None) PFT-17 Ring Reinforced Type
(Parts 2 & 3 None) PFT-18 Combined Plain Circular and
Corrugated Type
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
(Parts 2 & 3 None) PFT-20 Attachment of Furnaces (Parts 2
& 3 None) PFT-21 Firebox and Water Legs (Parts 2 & 3 None)
PFT-22 Stayed Surfaces (Parts 2 & 3 None) PFT-23 Working
Pressure for Curved Surfaces (Parts 2 & 3 None) PFT-24 Flexible
Staybolts (Parts 2 & 3 None) PFT-25 Attachment of Stays and
Staybolts by Welding
(Parts 2 & 3 None) PFT-26 Maximum Spacing (Parts 2 & 3
None) PFT-27 Area Supported by Stay (Parts 2 & 3 None) PFT-28
Staybolts and Stays (Parts 2 & 3 None) PFT-29 Structural
Reinforcements (Parts 2 & 3 None) PFT-30 Staying Segments of
Heads (Parts 2 & 3 None) PFT-31 Areas of Heads to be Stayed
(Parts 2 & 3 None)
(Parts 2 & 3 None) PFT-32 Stresses in Diagonal and Gusset
Stays (Parts 2 & 3 None) PFT-33 Design of Stays and Stay
Connections (Parts 2 & 3 None) PFT-34 Gusset Stays (Parts 2
& 3 None) PFT-35 Staying of Upper Segments of Tube Heads by
Steel Structural
Shapes (Parts 2 & 3 None) PFT-36 Crown Bars and Girder Stays
(Parts 2 & 3 None) PFT-37 Truncated Cone Shaped Combustion
Chambers of Vertical Tubular Boilers (Parts 2 & 3 None) PFT-38
Stay Tubes (Parts 2 & 3 None) PFT-39 Riveted Door Openings
(Parts 2 & 3 None) PFT-40 Welded Door Openings (Parts 2 & 3
None) PFT-41 Openings in Wrapper Sheets (Parts 2 & 3 None)
PFT-42 Access and Firing Doors (Parts 2 & 3 None) PFT-43
Location of Manholes and Handholes (Parts 2 & 3 None) PFT-44
Opening Between Boiler and Safety Valve (Parts 2 & 3 None)
PFT-45 Domes Requirements for Domes (Parts 2 & 3 None) PFT-46
Setting Method of Support (Parts 2 & 3 None) PFT-47 Water
Glasses (Parts 2 & 3 None) PFT-48 Feed Piping (Parts 2 & 3
None) PFT-49 Blowoff Piping (Parts 2 & 3 None)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
APPENDIX EXPLANATORY OF THE CODE AND CONTAINING MATTER WHICH IS
NOT MANDATORY UNLESS SPECIFICALLY REFFERED TO IN THE RULES OF CODE
EFFICIENCY OF JOINTS A-1 Efficiency of Riveted Joints (Parts 2
& 3 None) A-2 Example Lap joint, longitudinal or
circumferential, single riveted (Parts 2 & 3 None) A-3 Example
- Lap joint, longitudinal or circumferential, double riveted (Parts
2 & 3 None) A-4 Example Butt and double-strap joint, double
riveted (Parts 2 & 3 None) A-5 Example - Butt and double-strap
joint, triple riveted (Parts 2 & 3 None) A-6 Example - Butt and
double-strap joint, quadruple riveted (Parts 2 & 3 None) BRACED
AND STAYED SURFACES A-8 Formula for allowable loads based on the
net cross-sectional area of Staybolts with V-threads (Parts 2 &
3 None) A-9 Allowable loads on net cross-sectional areas of round
stays or braces A-10 Net area of segments of heads for use in
computing stays (Parts 2 & 3 None) APPENDIX D RECOMMENDED for
the DESIGN of a TEST SYSTEM for PRESSURE RELIEF DEVICES in
COMPRESSIBLE FLUID SERVICE (Part 3 - Supplement 8) D-1000
Introduction (Parts 3 S8.1) D-1010 (Parts 3 S8.2) D-1020 (Parts 1,
2, & 3 Section 9) D-2000 (Part 3 S8.3) D-3000 (Part 3 S8.4)
Figures (Part 3 S8.5)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
APPENDIX E RECOMMENDED PROCEDURES FOR REPAIRING PRESSURE RELIEF
VALVES (Part 3 S7.14) E-1000 Introduction (Part 3 S7.14.1) E-2000
Spring Loaded Relief Valves (Part 3 S7.14.2) E-3000 Piloted
Operated Safety Relief Valves (Part 3 S7.14.3) APPENDIX F PRESSURE
DIFFERENTIAL BETWEEN SAFETY or SAFETY RELIEF VALVE SETTING and
BOILER or PRESSURE VESSEL OPERATING PRESSURE (Parts 1, 2 & 3
None) APPENDIX G SAFETY VALVES ON THE LOW-PRESSURE SIDE OF STEAM
PRESSURE-REDUCING VALVES (Part 1 Supplement 2) G-1000 Scope (Part 1
S2.1) G-2000 Installation of Safety Valves (Part 1 None) G-3000
Safety Valve Capacity (Part 1 S2.2) G-4000 Calculating of Safety
Valve Relieving Capacity (Part 1 S2.3) G-5000 Steam Flow When Flow
Coefficients Are Not Known
(Part 1 S2.4) G-6000 Two-Stage Pressure-Reducing Valve Stations
(Part 1 S2.5) APPENDIX H RECOMMENDED GUIDE FOR THE INSPECTION OF
PRESSURE VESSELS IN LP GAS SERVICE (Part 2 Supplement 7) H-1000
General Conditions (Part 2 S7.1) H-2000 Pre-Inspection Activities
(Part 2 S7.2) H-3000 Assessment of Installation (Part 2 S7.3)
H-3100 Definitions (Parts 1, 2, & 3 Section 9) H-3200 External
Inspection (Part 2 S7.4) H-3300 Internal Inspection (Part 2 S7.5)
H-3400 Nondestructive Examination (NDE) (Part 2 S7.3.1) H-3500
Acceptance Criteria (Part 2 S7.8) H-3510 Cracks (Part 2 S7.8.1)
H-3520 Dents (Part 2 S7.8.2) H-3530 Bulges (Part 2 S7.8.3) H-3540
Cut or Gouges (Part 2 S7.8.4) H-3550 Corrosion (Part 2 S7.8.5)
H-3560 Leaks (Part 2 S7.6) H-3570 Fire Damage (Part 2 S7.7) H-4000
Records (Part 2 2.3.5.4 b)) H-5000 Conclusions (Part 2 None)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
APPENDIX I INSTALLATION REQUIREMENTS (Part 1 Installation)
I-1000 Installation Requirements (Part 1 None) I-1100 Introduction
(Part 1 1.1) I-1200 Purpose (Part 1 1.2) I-1300 Application of
These Rules (Part 1 1.3) I-2000 Power Boilers (Part 1 Section 2)
I-2110 Scope (Part 1 2.1) I-2120 Power Boilers (Part 1 2.2) I-2200
Certification, Inspection, and Jurisdictional Requirements
(Part 1 1.4) I-2210 Responsibility (Part 1 1.4.1) I-2200
Equipment Certification (Part 1 1.4.2) I-2230 Jurisdictional Review
(Part 1 1.4.3) I-2240 Inspection (Part 1 1.4.4) I-2300 General
Requirements (Part 1 2.3) I-2310 Supports, Foundations, and
Settings (Part 1 2.3.1) I-2330 Clearances (Part 1 2.3.2) I-2340
Boiler Room Requirements (Part 1 2.4) I-2341 Exit and Egress (Part
1 2.4.1) I-2342 Ladders and Runways (Part 1 2.4.2) I-2343 Drains
(Part 1 2.4.3) I-2344 Water (Part 1 2.4.4) I-2400 Source
Requirements (Part 1 2.5) I-2410 Feedwater (Part 1 2.5.1) I-2411
Volume (Part 1 2.5.1.1) I-2412 Connection (Part 1 2.5.1.2) I-2413
Pumps (Part 1 2.5.1.3) I-2414 Valves (Part 1 2.5.1.4) I-2420 Fuel
(Part 1 2.5.2) I-2430 Electrical (Part 1 2.5.3) I-2440 Ventilation
and Combustion Air (Part 1 2.5.4) I-2450 Lighting (Part 1 2.5.5)
I-2460 Emergency Valves and Controls (Part 1 2.5.6) I-2500
Discharge Requirements (Part 1 2.6) I-2510 Chimney or Stack (Part 1
2.6.1) I-2520 Ash Removal (Part 1 2.6.2) I-2530 Drains (Part 1
2.6.3) I-2531 Connection (Part 1 2.6.3.1) I-2532 Pressure Rating
(Part 1 2.6.3.2) I-2533 Parts (Part 1 2.6.3.3)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
I-2600 Operating Systems (Part 1 2.7) I-2610 Breeching and
Dampers (Part 1 2.7.1) I-2620 Burners and Stokers (Part 1 2.7.2)
I-2630 Steam Supply (Part 1 2.7.3) I-2640 Condensate and Return
(Part 1 2.7.4) I-2650 Blowoff (Part 1 2.7.5) I-2700 Control and
Gages (Part 1 2.8) I-2710 Water (Part 1 2.8.1) I-2720 Pressure
(Part 1 2.8.2) I-2721 Gage Requirements (Part 1 2.8.2) I-2722
Connection (Part 1 2.8.2.1) I-2730 Temperature (Part 1 2.3) I-2800
Pressure Relief Valves (Part 1 2.9) I-2810 Valve Requirements (Part
1 2.9.1) I-2820 Number (Part 1 2.9.1.1) I-2830 Location (Part 1
2.9.1.2) I-2840 Capacity (Part 1 2.9.1.3) I-2850 Set Pressure (Part
1 2.9.1.4) I-2860 Forced-Flow Steam Generator (Part 1 2.9.2) I-2870
Superheaters (Part 1 2.9.3) I-2871 Economizers (Part 1 2.9.4)
I-2880 Pressure-Reducing Valves (Part 1 2.9.5) I-2890 Mounting and
Discharge Requirements (Part 1 2.9.5.1) I-2900 Testing and
Acceptance (Part 1 2.10) I-2910 General (Part 1 2.10.1) I-2920
Pressure Test (Part 1 2.10.2) I-2930 Nondestructive Examination
(Part 1 2.10.3) I-2940 System Testing (Part 1 2.10.4) I-2950 Final
Acceptance (Part 1 2.10.5) I-2960 Boiler Installation Report (Part
1 1.4.5) (Part 1 2.10.6) I-3000 Heating Boilers and Potable Water
Heaters (Part 1 Section 3) I-3100 Introduction (Part 1 None) I-3110
Scope (Part 1 3.1) I-3120 Definitions (Part 1 3.2) I-3121 Steam
Heating Boilers (Part 1 3.2.1) I-3122 Hot-Water Heating and
Hot-Water Supply Boilers (Part 1 3.2.2) I-3123 Potable Water
Heaters (Part 1 3.2.3) I-3200 Certification, Inspection and
Jurisdictional Requirements
(Part 1 1.4) I-3210 Responsibility (Part 1 1.4.1)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
I-3220 Equipment Certification (Part 1 1.4.2) I-3230
Jurisdictional Review (Part 1 1.4.3) I-3240 Inspection (Part 1
1.4.4) I-3300 General Requirements (Part 1 3.3) I-3310 Supports
(Part 1 3.3.1) I-3311 Method of Support for Steam Heating,
Hot-Water Heating, and
Hot-Water Supply Boilers (Part 1 3.3.1.1) I-3320 Settings (Part
1 3.3.2) I-3330 Structural Steel (Part 1 3.3.3) I-3340 Clearances
(Part 1 3.3.4) I-3350 Boiler Room Requirements (Part 1 3.4) I-3351
Exit and Egress (Part 1 3.4.1) I-3352 Ladders and Runways (Part 1
3.4.2) I-3353 Ventilation and Combustion Air (Part 1 3.5.4) I-3354
Lighting (Part 1 3.5.5) I-3355 Emergency Valves and Controls (Part
1 3.5.6) I-3400 Source Requirements (Part 1 3.5) I-3410 Water (Part
1 3.5.1) I-3420 Fuel (Part 1 3.5.2) I-3430 Electrical (Part 1
3.5.3) I-3500 Discharge Requirement (Part 1 3.6) I-3510 Chimney or
Stack (Part 1 3.6.1) I-3520 Ash Removal (Part 1 3.6.2) I-3530
Drains (Part 1 3.6.3) I-3600 Operating Systems (Part 1 3.7) I-3610
Oil Heaters (Part 1 3.7.1) I-3620 Breeching and Dampers (Part 1
3.7.2) I-3630 Burners and Stokers (Part 1 3.7.3) I-3640 Feedwater,
Makeup Water and Water Supply (Part 1 3.7.4) I-3650 Stop Valves
(Part 1 3.7.5) I-3651 Steam Heating, Hot-Water Heating, and
Hot-Water Supply Boilers (Part 1 3.7.5.1) I-3652 Potable Water
Heaters (Part 1 3.7.5.2) I-3660 Return Pipe Connections (Part 1
3.7.6) I-3670 Bottom Blowoff and Drain Valves (Part 1 3.7.7) I-3671
Steam Heating, Hot-Water Heating, and Hot-Water Supply Boilers
(Part 1 3.7.7.1) I-3672 Potable Water Heaters (Part 1 3.7.7.2)
I-3680 Modular Steam Heating and Hot Water Heating Boilers
(Part 1 3.7.8)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
I-3681 Individual Modules (Part 1 3.7.8.1) I-3682 Assembled
Modular Boilers (Part 1 3.7.8.2) I-3690 Provisions for Thermal
Expansion in Heating Boilers (Part 1 3.7.9) I-3691 Expansion Tanks
and Piping for Steam Heating, Hot-Water Heating,
and Hot-Water Supply Boilers (Part 1 3.7.9.1) I-3692 Expansion
Tanks and Piping for Potable Water Heaters
(Part 1 3.7.9.2) I-3700 Instruments, Fittings, and Controls
(Part 1 3.8) I-3710 Steam Heating Boilers (Part 1 3.8.1.1) I-3711
Steam Gages (Part 1 3.8.1.2) I-3712 Water Gage Glass (Part 1
3.8.1.2) I-3713 Water Column and Water Level Control Pipes (Part 1
3.8.1.3) I-3714 Pressure Control (Part 1 3.8.1.4) I-3715 Automatic
Low-Water Fuel Cut-off and/or Water Feeding Device (Part 1 3.8.1.5)
I-3716 Modular Steam Heating Boilers (Part 1 3.8.1.6) I-3717
Instruments, Fittings, and Controls Mounted Inside Boiler Jackets
(Part 1 3.8.1.7) I-3720 Hot-Water heating or Hot-Water Supply
Boilers (Part 1 3.8.2) I-3721 Pressure or Altitude Gages (Part 1
3.8.2.1) I-3722 Thermometers (Part 1 3.8.2.2) I-3723 Temperature
Control (Part 1 3.8.2.3) I-3724 Low Water Fuel Cut-Off (Part 1
3.8.2.4) I-3725 Modular Hot Water Heating Boilers (Part 1 3.8.2.5)
I-3726 Instruments, Fittings, and Controls Mounted Inside Boiler
Jackets (Part 1 3.8.2.6) I-3730 Potable Water Heaters (Part 1
3.8.3) I-3731 Temperature Controls (Part 1 3.8.3.1) I-3732
Thermometer (Part 1 3.8.3.2) I-3800 Pressure Relieving Valves (Part
1 3.9) I-3810 Safety Valve Requirements for Steam Boilers (Part 1
3.9.2) I-3820 Safety Relief Valve Requirements for Heating or
Hot-Water Supply
Boilers (Part 1 3.9.3) I-3830 Mounting Safety and Safety Relief
Valves for Steam Heating,
Hot-water Heating, and Hot-Water Supply Boilers (Part 1 3.9.1.1)
I-3831 Permissible Mountings (Part 1 3.9.4.2) I-3832 Requirements
for Common Connection for Two or More Valves (Part 1 3.9.4.3)
I-3833 Threaded Connections (Part 1 3.9.1.2) I-3834 Prohibited
Mountings (Part 1 3.9.1.3)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
I-3835 Use of Shutoff Valves Prohibited (Part 1 3.9.1.4) I-3836
Safety and Safety Relief Valve Discharge Piping (Part 1 3.9.1.5)
I-3837 Temperature and Pressure Safety Relief Valves (Part 1
3.9.1.6) I-3840 Safety and Safety Relief Valves for Tanks and Heat
Exchangers (Part 1 3.9.5) I-3841 Steam to Hot-Water Supply (Part 1
3.9.5.1) I-3842 High Temperature Water to Water Heat Exchanger
(Part 1 3.9.5.2) I-3843 High Temperature Water to Steam Heat
Exchanger (Part 1 3.9.5.3) I-3850 Safety Relief Valve Requirements
for Potable Water Heaters (Part 1 3.9.4) I-3851 Installation (Part
1 3.9.4.1) I-3852 Permissible Mountings (Part 1 3.9.4.2) I-3853
Requirements for Common Connection for Two or More Valves (Part 1
3.9.4.3) I-3854 Thread Connections (Part 1 3.9.4.4) I-3855
Prohibited Mountings (Part 1 3.9.4.5) I-3856 Use of Shutoff Valves
Prohibited (Part 1 3.9.4.6) I-3857 Safety Relief Valve Discharge
Piping (Part 1 3.9.4.7) I-3900 Testing and Acceptance (Part 1 3.10)
I-3910 Pressure Test (Part 1 3.10.1) I-3920 Final Acceptance (Part
1 3.10.2) I-3930 Boiler Installation Report (Part 1 3.10.3) I-3940
Tables and Figures (Part 1 3.10.4) I-4000 Pressure Vessels (Part 1
Section 4) I-4100 Introduction (Part 1 None) I-4110 Scope (Part 1
4.1) I-4120 Pressure Vessels (Part 1 4.2) I-4200 Certification,
Inspection and Jurisdictional Requirements
(Part 1 1.4) I-4210 Responsibility (Part 1 1.4.1) I-4220
Equipment Certification (Part 1 1.4.2) I-4230 Jurisdictional Review
(Part 1 1.4.3) I-4240 Inspection (Part 1 1.4.4) I-4300 General
Requirements (Part 1 4.3) I-4310 Supports (Part 1 4.3.1) I-4320
Clearances (Part 1 4.3.2) I-4330 Piping (Part 1 4.3.3) I-4700
Instruments and Controls (Part 1 4.4) I-4710 Level Indicating
Devices (Part 1 4.4.1) I-4720 Pressure Indicating Devices (Part 1
4.4.2
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
I-4800 Pressure Relief Devices (Part 1 4.5) I-4810 Device
Requirements (Part 1 4.5.1) I-4820 Number of Devices (Part 1 4.5.2)
I-4830 Location (Part 1 4.5.3) I-4840 Capacity (Part 1 4.5.4)
I-4850 Set Pressure (Part 1 4.5.5) I-4860 Installation and
Discharge Piping Requirements (Part 1 4.5.6) I-4900 Testing and
Acceptance (Part 1 4.6) I-5000 Piping (Part 1 Section 5) I-5100
Scope (Part 1 5.1) I-5120 Additions to Existing Piping (Part 1
5.2.1) I-5200 Certification, Inspection, and Jurisdictional
Requirements
(Part 1 1.4) I-5210 Responsibility (Part 1 1.4.1) I-5220
Equipment Certification (Part 1 1.4.2) I-5230 Jurisdictional Review
(Part 1 1.4.3) I-4240 Inspection (Part 1 1.4.4) I-5250 Operating
Permit (Part 1 1.4.3) I-5300 Layout and Configuration (Part 1 None)
I-5310 Proximity to Other Equipment and Structures (Part 1 5.2.2)
I-5320 Flanges and Other Non-Welded Joints (Part 1 5.2.3) I-5330
Valves (Part 1 5.2.4) I-5400 Materials (Part 1 5.2.5) I-5500
Hangers and Supports (Part 1 5.2.6) I-5600 Protection and Cleaning
(Part 1 5.2.7) I-5700 Welding and Brazing (Part 1 5.2.8) I-5800
Pressure Relief Devices (Part 1 5.3) I-5810 Device Requirements
(Part 1 5.3.1) I-5820 Number of Devices (Part 1 5.3.2) I-5830
Location (Part 1 5.3.3) I-5840 Capacity (Part 1 5.3.4) I-5850 Set
Pressure (Part 1 5.3.5) I-5860 Installation and Discharge Piping
Requirements (Part 1 5.3.6) I-5900 Examination, Inspection, and
Testing (Part 1 5.4)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
APPENDIX J GUIDE to JURISDICTIONS for AUTHORIZATION of
OWNERS-USERS to MAKE ADJUSTMENTS to PRESSURE RELIEF VALVES (Part 3
S7.10) J-1000 General (Part 3 S7.10.1) J-1010 Training (Part 3
S7.10.2) J-1020 Documentation (Part 3 S7.10.3) J-1030 Quality
System (Part 3 S7.10.4) J-1040 External Adjustment (Part 3 S7.10.5)
J-1050 Repairs (Part 3 S7.10.6) APPENDIX K INSPECTION, REPAIR, AND
ALTERATION OF YANKEE DRYERS (Part 1 Supplement 2, Parts 2 & 3
Supplement 5) K-1000 Inspection of Yankee Dryers (Rotating
Cast-Iron Pressure Vessels)
With Finished Shell Outer Surfaces (Part 2 Supplement 5) K-1010
Scope (Part 1 S1.1) (Part 2 S5.1) K-1020 Assessment of Installation
(Part 1 S1.2) (Part 2 S5.2) K-1030 Causes of Deterioration and
Damage (Part 2 S5.3) K-1031 Local Thinning (Part 2 S5.3.1) K-1032
Cracking (Part 2 S5.3.2) K-1033 Corrosion (Part 2 S5.3.3) K-1040
Inspections (Part 2 S5.4) K-1050 Nondestructive Examination (Part 1
S1.6) (Part 2 S5.5) K-1060 Pressure Testing (Part 1 S1.5) (Part 2
S5.6) K-2000 General Requirements for Repairs and Alterations to
Yankee Dryers
(Part 3 Supplement 5)
K-2010 Scope (Part 3 S5.1) K-2020 Replacement Parts (Part 3
S5.3.1) K-2030 Examinations and Test Methods (Part 3 S5.2) K-2040
Determination of Allowable Operating Parameters (Part 1 S1.3)
(Part 2 S5.2.1) K-2041 ASME Code Primary Membrane Stress
Criterion (Part 1 S1.4) K-2042 Adjusting the Maximum Allowable
Operating Parameters of the
Yankee Dryer Due to a Reduction in Shell Thickness from Grinding
for Machining (Part 2 S5.2.2)
K-2043 Documentation of Shell Thickness and Adjusted Allowable
Operating Parameters (Part 2 S5.2.3)
K-2050 Stamping
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
K-3000 Yankee Dryer Repair Methods (Part 3 S5.3) K-3010 Scope
(Part 3 S5.1) K-3020 Repair Guide for Yankee Dryers (Part 3 S5.4)
K-3030 Procedures Which do not Require Stamping or Nameplate
Attachment (Part 3 S5.5) K-3050 Damage Repair (Part 3 S5.6)
K-3051 Repair of Local Thinning (Part 3 S5.6.1) K-3052 Treatment of
Crack-Like Flaws (Part 3 S5.6.2) K-3053 Driven Plug Repair (Part 3
S5.6.3) K-4000 Alterations to Yankee Dryers (Part 3 S5.7) K-4010
Scope (Part 3 S5.7.1) K-4020 Alteration Types (Part 3 S5.7.2)
APPENDIX L CONTINUED SERVICE, INSPECTION, and REPAIR for DOT
VESSELS (Parts 2 & 3 Supplement 6) L-1000 General Requirements
(Part 3 S.0) L-1010 Scope (Part 2 S6.4.1) L-1015 Terminology (Part
2 S6.2) L-1020 Administration (Part 2 S6.3) L-1030 Stamping (Part 2
S6.5.2) L-1040 Potential Deterioration and Failure Mechanisms (Part
2 S6.6) L-1050 Classification Boundaries (Part 2 S6.7) L-1060
Pressure, Temperature, and Capacity Requirements for Transport
Tanks (Part 2 S6.8) L-1070 Reference to Other Codes and
Standards (Part 2 S6.9) L-1080 Conclusion (Part 2 S6.10) L-2000
Personnel Safety and Inspection Activities (Part 2 S6.11) L-2010
Scope (Part 2 S6.11) L-2100 Personnel Safety (Part 2 S6.11 c))
L-2110 Transport Tank Entry Requirements (Part 2 S6.12) L-2200
Inspection Activities (Part 2 S6.12.1) L-2210 Preparation for
Internal Inspection (Part 2 S6.12.2) L-2220 Pre-Inspection
Activities (Part 2 S6.12.1) L-2230 Post-Inspection Activities (Part
2 S6.12.3) L-3000 Scope (Part 2 None) L-3100 Inspection and Tests
of Cargo Tanks (Part 2 S6.13) L-3110 Visual External Inspections
(Part 2 S6.13.1) L-3120 Inspection of Piping, Valves and Manholes
(Part 2 S6.13.2) L-3130 Inspection of Appurtenances and Attachments
(Part 2 S6.13.3)
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
L-3140 Visual Internal Inspection (Part 2 S6.13.4) L-3150 Lining
Inspections (Part 2 S6.13.5) L-3160 Pressure Tests (Part 2 S6.13.6)
L-3161 Hydrostatic or Pneumatic Test Method (Part 2 S6.13.6.1)
L-3162 Pressure Testing Insulated Cargo Tanks (Part 2 S6.13.6.2)
L-3163 Pressure testing Cargo Tanks Constructed of Quenched and
Tempered Steels (Part 2 S6.13.6.3) L-3164 Pressure Testing Cargo
Tanks Equipped With a Heating System (Part 2 S6.13.6.4) L-3165
Exceptions to Pressure Testing (Part 2 S6.13.6.5) L-3166 Acceptance
Criteria (Part 2 S6.13.6.6) L-3167 Inspection Report (Part 2
S6.13.6.7) L-3168 Additional Requirements for MC 330 and MC 331
Cargo Tanks (Part 2 S6.13.7) L-3169 Certificates and Reports (Part
2 S6.13.8) L-3170 Leakage Test (Part 2 S6.13.9) L-3180 New or
Replaced Delivery Hose Assemblies (Part 2 S6.13.10) L-3181
Thickness Testing (Part 2 S6.13.10.1) L-3182 Testing Criteria (Part
2 S6.13.10.2) L-3183 Thickness Requirements (Part 2 S6.13.10.3)
L-3190 Cargo Tanks That No Longer Conform to Minimum Thickness
Requirements in Tables L-3183-1 and L-3883-2 (Part 2 S6.13.11)
L-3191 Minimum Thickness Requirements for 400 Series Cargo Tanks
(Part 2 S6.13.11.1) L-3192 DOT 406 Cargo Tanks (Part 2 S6.13.11.2)
L-3193 DOT 407 Cargo Tanks (Part 2 S6.13.11.3) L-3194 DOT 412 Cargo
Tanks (Part 2 S6.13.11.4) L-3200 Inspection and Test of Portable
Tanks (Part 2 S6.14) L-3210 Periodic Inspection and Test (Part 2
S6.14.1) L-3220 Intermediate Periodic Inspection and Test (Part 2
S6.14.2) L-3230 Internal and External Inspections (Part 2 S6.14.3)
L-3240 Exceptional Inspection and Test (Part 2 S6.14.4) L-3250
Internal and External Inspection Procedure (Part 2 S6.14.5) L-3260
Pressure Tests Procedures for Specification 51, 57, 60, IM, or UN
Portable Tanks (Part 2 S6.14.6) L-3261 Specification 57 Portable
Tanks (Part 2 S6.14.6.1) L-3262 Specification 51 or 56 Portable
Tanks (Part 2 S6.14.6.2) L-3263 Specification 60 Portable Tanks
(Part 2 S6.14.6.3) L-3264 Specification IM or Unportable Tanks
(Part 2 S6.14.6.4) L-3270 Inspection and Test markings for IM or UN
Portable Tanks
-
NBIC Cross Reference 2004 Edition 2006 Addenda to 2007
Edition
(Part 2 S6.14.7) L-3280 Inspection and Test Markings for
Specification DOT 51, 56, 57, or
60 (Part 2 S6.14.8) L-3290 Record Retention (Part 2 S6.14.9)
L-3300 General Requirements for DOT Specifications 106A and 110a
Tank
Cars (Ton Tanks) (Part 2 S6.15) L-3310 Special Provisions for
Ton Tanks (Part 2 S6.15.1) L-3320 Visual Inspection of Ton Tanks
(Part 2 S6.15.2) L-3330 Inspection and Tests of DOT Specification
106A and DOT
Specification 110A Ton Tanks (Part 2 S6.15.3) L-3331 Air Tests
(Part 2 S6.15.13.1) L-3332 Pressure Relief Testing (Part 2
S6.15.3.2) L-3333 Rupture Discs and Fusible Plugs (Part 2
S6.15.3.3) L-3334 Successful Completion of the Periodic
Retesting
(Part 2 S6.15.3.4) L-3335 Exceptions to Periodic Hydrostatic
Retesting (Part 2 S6.15.3.5) L-3336 Record of Retest Inspection
(Part 2 S6.15.3.6) L-3340 Stamping Requirements of DOT 106a and DOT
110A Ton Tanks (Part 2 S6.15.4) Definitions (Parts 2 & 3
Definitions) INTERPRETATIONS (Parts 1, 2, & 3 Section 10 NBIC
Approved Interpretations) Index (Parts 1, 2, & 3 Section 11 -
Index