NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS THE DESIGNING AND DEVELOPMENT OF A “BALANCED SCORECARD” FOR THE INTERNATIONAL PROCUREMENT DEPARTMENT OF THE PROCUREMENT DIRECTORATE IN THE HELLENIC NAVY SUPPLY CENTER by Ilias Polymenidis June 2003 Thesis Co-Advisors K. J. Euske Mary Malina Approved for public release; distribution is unlimited
133

NAVAL POSTGRADUATE · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Feb 07, 2018

Download

Documents

truonganh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

NAVAL POSTGRADUATE SCHOOL Monterey, California

THESIS THE DESIGNING AND DEVELOPMENT OF A “BALANCED

SCORECARD” FOR THE INTERNATIONAL PROCUREMENT DEPARTMENT OF THE PROCUREMENT DIRECTORATE IN

THE HELLENIC NAVY SUPPLY CENTER

by

Ilias Polymenidis

June 2003

Thesis Co-Advisors K. J. Euske Mary Malina

Approved for public release; distribution is unlimited

Page 2: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

Page 3: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank)

2. REPORT DATE June 2003

3. REPORT TYPE AND DATES COVERED Master’s Thesis

4. TITLE AND SUBTITLE: The Designing and Development of a “Balanced Scorecard” for the International Procurement Department of the Procurement Directorate in the Hellenic Navy Supply Center 6. AUTHOR(S) Ilias Polymenidis

5. FUNDING NUMBERS

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Postgraduate School Monterey, CA 93943-5000

8. PERFORMING ORGANIZATION REPORT NUMBER

9. SPONSORING /MONITORING AGENCY NAME(S) AND ADDRESS(ES) N/A

10. SPONSORING/MONITORING AGENCY REPORT NUMBER

11. SUPPLEMENTARY NOTES The views expressed in this thesis are those of the author and do not reflect the official policy or position of the Department of Defense or the U.S. Government. 12a. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public release; distribution is unlimited

12b. DISTRIBUTION CODE

13. ABSTRACT (maximum 200 words) The Balanced Scorecard (BSC) is a performance management model that has been successfully

implemented both in the private and public sectors. It is a framework for translating an organization’s mission into an integrated set of performance indicators. Kaplan and Norton (1996) developed a BSC model, which has four generic perspectives: Financial, Customer, Internal Processes, and Learning and Growth. The objective of this research is to design a BSC framework for the International Procurement Department (IPD) in the Hellenic Navy Supply Center. Initially, the study analyzed the IPD’s environment, mission, strategy, desired outcomes, critical processes, and key success factors. After clarifying strategy, desired outcomes, and critical performance variables, the study focused on identifying causal relationships among performance drivers, multiple objectives and desired outcomes. Finally, performance measures were developed, for those performance indicators that need to be monitored and incorporated into the proposed BSC framework. The ultimate purpose of this study is to clarify and gain consensus about the IPD strategy and performance drivers and design a BSC model that aligns strategy and objectives and contributes to the IPD overall success, thus providing IPD with an innovative management control system.

15. NUMBER OF PAGES

133

14. SUBJECT TERMS Performance Measurement, Management System, Balanced Scorecard, Hellenic Navy Supply Center, HNSC, International Procurement Department, IPD

16. PRICE CODE

17. SECURITY CLASSIFICATION OF REPORT

Unclassified

18. SECURITY CLASSIFICATION OF THIS PAGE

Unclassified

19. SECURITY CLASSIFICATION OF ABSTRACT

Unclassified

20. LIMITATION OF ABSTRACT

UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std. 239-18

i

Page 4: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

ii

Page 5: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Approved for public release; distribution is unlimited

THE DESIGNING AND DEVELOPMENT OF A “BALANCED SCORECARD” FOR THE INTERNATIONAL PROCUREMENT DEPARTMENT OF THE PROCUREMENT DIRECTORATE IN THE HELLENIC NAVY SUPPLY

CENTER

Ilias Polymenidis Lieutenant Commander, Hellenic Navy

B.S, Aristotelian University of Thessalonica, Greece, 1987

Submitted in partial fulfillment of the requirements for the degree of

MASTER OF SCIENCE IN MANAGEMENT

from the

NAVAL POSTGRADUATE SCHOOL June 2003

Author: Ilias Polymenidis

Approved by: K. J. Euske Thesis Co-Advisor

Mary Malina Thesis Co-Advisor Douglas A. Brook, Ph.D. Dean, Graduate School of Business and Public Policy

iii

Page 6: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

iv

Page 7: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

ABSTRACT

The Balanced Scorecard (BSC) is a performance management model that has

been successfully implemented both in the private and public sectors. It is a framework

for translating an organization’s mission into an integrated set of performance indicators.

Kaplan and Norton (1996) developed a BSC model, which has four generic perspectives:

Financial, Customer, Internal Processes, and Learning and Growth. The objective of this

research is to design a BSC framework for the International Procurement Department

(IPD) in the Hellenic Navy Supply Center. Initially, the study analyzed the IPD’s

environment, mission, strategy, desired outcomes, critical processes, and key success

factors. After clarifying strategy, desired outcomes, and critical performance variables,

the study focused on identifying causal relationships among performance drivers,

multiple objectives and desired outcomes. Finally, performance measures were

developed, for those performance indicators that need to be monitored and incorporated

into the proposed BSC framework. The ultimate purpose of this study is to clarify and

gain consensus about the IPD strategy and performance drivers and design a BSC model

that aligns strategy and objectives and contributes to the IPD overall success, thus

providing IPD with an innovative management control system.

v

Page 8: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

vi

Page 9: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

TABLE OF CONTENTS

I. INTRODUCTION........................................................................................................1 A. PURPOSE AND OBJECTIVES OF RESEARCH .......................................1 B. BACKGROUND ..............................................................................................2

1. The Examined Department.................................................................2 2. Discussion..............................................................................................5

C. RESEARCH QUESTIONS.............................................................................6 1. Primary Question.................................................................................6 2. Secondary Questions............................................................................6

D. SCOPE OF RESEARCH ................................................................................7 E. EXPECTED BENEFITS FROM THIS THESIS..........................................7 F. ORGANIZATION OF STUDY ......................................................................8

II. LITERATURE REVIEW ...........................................................................................9 A. THE BALANCED SCORECARD CONCEPT.............................................9

1. Seeking Balance Out of Chaos ............................................................9 2. Features...............................................................................................10

a. The Four Perspectives of the BSC (Kaplan and Norton, 2000) ........................................................................................12

3. Benefits from Effectively Implementing a BSC Model ..................16 4. Problems Identified in the BSC Building Process...........................17

B. BALANCED SCORECARD IN PUBLIC SECTOR..................................19 C. CHAPTER SUMMARY................................................................................21

III. METHODOLOGY ....................................................................................................23 A. FEATURES OF THE QUESTIONNAIRES...............................................23 B. ANALYSIS OF THE QUESTIONNAIRES AND DISCUSSION.............24

1. The Preliminary Questionnaire ........................................................24 2. The First Questionnaire ....................................................................27 3. The Second Questionnaire ................................................................32

C. CHAPTER SUMMARY................................................................................33

IV. OVERVIEW OF INTERNATIONAL PROCUREMENT DEPARTMENT.......35 A. IPD BACKGROUND ....................................................................................35 B. IPD MANAGEMENT ANALYSIS ..............................................................41

1. IPD Readiness.....................................................................................44 a. Tsiakiris Findings ...................................................................45 b. Comparative Analysis .............................................................49 c. Discussion................................................................................50

2. IPD as Organizational Unit...............................................................52 3. IPD and Common Issues in Public Organizations..........................53

C. CHAPTER SUMMARY................................................................................55

V. BUILDING A PROPOSED MODEL.......................................................................59

vii

Page 10: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

A. IPD STRATEGIC GOALS ...........................................................................59 B. IPD MULTIPLE OBJECTIVES..................................................................60 C. IPD CRITICAL PROCESSES AND KEY FACTORS..............................61 D. PUTTING IT ALL TOGETHER.................................................................65

VI. DEVELOPMENT OF PERFORMANCE MEASURES........................................69 A. SELECTING PERFORMANCE MEASURES .........................................69

1. Customer Perspective Measures.......................................................71 2. Internal Processes Perspective Measures ........................................72 3. Financial Perspective Measures........................................................75 4. People Perspective Measures ............................................................76

B. CHAPTER SUMMARY................................................................................78

VII. CONCLUSIONS AND RECOMMENDATIONS...................................................81 A. RESEARCH QUESTIONS ..........................................................................81

1. Primary Research Question..............................................................81 2. Secondary Research Questions.........................................................81

B. RECOMMENDATIONS FOR COMMUNICATING THE MODEL......81 C. RECOMMENDATIONS FOR FURTHER STUDY ..................................83

APPENDIX A. PRELIMINARY QUESTIONNAIRE......................................................85

APPENDIX B. FIRST QUESTIONNAIRE .......................................................................93

APPENDIX C. SECOND QUESTIONNAIRE ................................................................109

LIST OF REFERENCES....................................................................................................115

INITIAL DISTRIBUTION LIST .......................................................................................117

viii

Page 11: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

LIST OF FIGURES Figure 1.1. HNSC Organization Chart (From: Hellenic Navy General Staff, 2003). .........3 Figure 1.2. Procurement Directorate Organization Chart (From: Hellenic Navy

General Staff, 2003)...........................................................................................4 Figure 1.3. IPD Organization Chart (From: Hellenic Navy General Staff, 2003). .............5 Figure 2.1. The BSC Four Perspectives (From: Simons, 2000).........................................13 Figure 2.2. The Generic Internal Value Chain (From: Kaplan and Norton, 2000). ...........14 Figure 4.1. Fund Approval Process. ...................................................................................38 Figure 4.2. The Service Classification Scheme (From: Fitzgerald et al., 1993). ...............40 Figure 5.1. IPD’s BSC Architecture...................................................................................59 Figure 5.2. IPD’s Strategic Objectives...............................................................................61 Figure 5.3. Links Among Critical Processes and Strategic Objectives..............................62 Figure 5.4. Links Among Factors and Critical Processes. .................................................64 Figure 5.5. Links Between Key Factors and Strategic Objectives. ....................................65 Figure 5.6 Putting All the Links Together. .......................................................................66 Figure 5.7. IPD’s Proposed BSC Framework. ...................................................................67 Figure 6.1. IPD’s BSC Model Including Performance Metrics. ........................................80

ix

Page 12: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

x

Page 13: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

LIST OF TABLES Table 3.1. IPD’s Desired Outcomes..................................................................................28 Table 3.2. IPD’s Strategic Objectives and Their Links. ...................................................28 Table 3.3. IPD’s Important Processes. ..............................................................................29 Table 3.4. IPD’s Critical Processes and Their Influence. .................................................30 Table 3.5. Critical Processes and Strategic Objectives.....................................................30 Table 3.6. IPD’s Key Success Factors. .............................................................................32 Table 3.7. Influence of Factors Over Processes................................................................32 Table 4.1. IPD Classification as Service Type..................................................................41 Table 4.2. Indicators and the Evaluation of NLC (After: CAM-I (2000) and Tsiakiris

(2000)...............................................................................................................48 Table 4.3. Matrix Assessing Impact of BSC Process on IPD Environment. ....................51 Table 6.1. Desired Outcomes Oriented.............................................................................71 Table 6.2. Strategic Objectives Oriented. .........................................................................71 Table 6.3. Critical Processes Oriented. .............................................................................71 Table 6.4. Desired Outcomes Oriented.............................................................................72 Table 6.5. Strategic Objectives Oriented. .........................................................................73 Table 6.6. Critical Processes Oriented. .............................................................................74 Table 6.7. Key Factors Oriented. ......................................................................................75 Table 6.8. Desired Outcomes Oriented.............................................................................75 Table 6.9. Strategic Objectives Oriented. .........................................................................76 Table 6.10. Critical Processes Oriented. .............................................................................76 Table 6.11. Key Factors Oriented. ......................................................................................76 Table 6.12. Strategic Objectives Oriented. .........................................................................77 Table 6.13. Key Success Factors Oriented. ........................................................................77

xi

Page 14: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

xii

Page 15: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

ACKNOWLEDGMENTS

The author would like to acknowledge the respondents who provided the

necessary data and information for this thesis.

The author would also like to acknowledge Professor K. J. Euske and Professor

Mary Malina for their patience, encouragement, and mentoring.

Finally, the author would like to acknowledge his wife Polyxeni Beneki for her

patience and support.

xiii

Page 16: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

xiv

Page 17: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

I. INTRODUCTION

People and their managers are working so hard to be sure things are done right, that they hardly have time to decide if they are doing the right things.

Stephen R. Covey

A. PURPOSE AND OBJECTIVES OF RESEARCH

The Hellenic Ministry of Defense is continually looking to make the best use of

the provided financial resources (Georgios Tsiakiris, 2000). Understanding, adopting,

and implementing leading-edge management practices and ideas can make the difference

between success and failure. Measures of performance are vital to the future of all

organizations whether profit oriented or not-for-profit. The “Balanced Scorecard” (BSC),

a concept made popular by Robert S. Kaplan and David P. Norton, suggests an integrated

set of performance measures organized in four areas of performance: Financial,

Customer, Internal Business Processes, and Learning and Growth. (Kaplan and Norton,

1996, 2000) Although the Balanced Scorecard concept was initially developed for profit-

oriented organizations, its concepts have been successfully applied to nonprofit

organizations as well (Kaplan and Norton, 1996, 2000; Balanced Scorecard Institute

Website, 2003; Department of Energy Website, 2003; Procurement Executives’

Association Website, 2003).

The general purpose of this research is to study and analyze the necessary

information and then design and develop a BSC model for the International Procurement

Department (IPD) of the Procurement Directorate (PD) in the Hellenic Navy Supply

Center (HNSC). The Balanced Scorecard (BSC) building process should help to clarify

and gain consensus of the IPD strategy, and communicate the strategy throughout the

department. However, the ultimate purpose of this research is to provide the IPD

management with an effective performance-based management control system organized

in different strategic perspectives depending on the organization and mission of the

department.

1

Page 18: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Specifically, the study is designed to analyze the current conditions and

environment in the IPD with the objective of (1) identifying the mission, (2) defining

desired outcomes that must be achieved for the IPD overall mission to be accomplished,

(3) clarifying strategy and objectives, (4) identifying critical processes and key success

factors that contribute to the achievement of the desired outcomes, (5) identifying and

analyzing cause-and-effect relationships among critical activities/processes, critical

factors and desired outcomes, (6) designing and developing a set of performance

measures that can help align departmental effort with strategy from four perspectives:

Financial, Customer, Internal Processes, and Learning and Growth, and (7) making

recommendations for the communication of the multiple linked objectives and the related

performance measures to management and employees in the IPD in order to increase

their understanding of the consequences of their actions for IPD overall success.

B. BACKGROUND

1. The Examined Department The International Procurement Department (IPD) is one of the five Departments

in the Procurement Directorate (PD) of the Hellenic Navy Supply Center (HNSC). The

HNSC mission is to perform the Hellenic Navy supply program for secondary materials

and services (support items/services and spare parts), with the objective of contributing in

the effective logistics support of the Hellenic Navy Units (ships and shore-units), in

accordance with the official supply policy objectives defined by the Hellenic Navy

General Staff. In accomplishing its mission, the HNSC is organized in functions

(Directories and Departments) that compose an integrated supply system of which the

organization chart is shown in Figure 1.1.

The Procurement Directorate (PD) is responsible for the procurement of

secondary material and services from sources inside and outside the country, in

accordance with needs specified by the Inventory Provision & Control Directorate or the

Hellenic Navy General Staff. The organization chart of the PD is shown in Figure 1.2.

2

Page 19: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

HNSC Commanding

Officer

Deputy Commander

Office for Accident

PreventionCO

Administration

Procurement Supreme

Committee

Urgent Procurement

Echelon

Inventory Provision & Control

Directorate

Procurements Directorate

Receiving & Transshipment

Directorate

Technical Support

Directorate

IT Directorate

Manufacturing Research in

Domestic Market

Figure 1.1. HNSC Organization Chart (From: Hellenic Navy General Staff, 2003).

Given the PD organization structure, policy, and objectives, the IPD mission, as

described in the departmental Memorandum of Operations (International Procurement

Department, 1991), is to procure support items, spare parts and minor systems from

sources outside the country in accordance with the Hellenic Navy defined needs through

the use of one of the three following methods:

• International Competitions

• Sole Source Procurements

• International Agreements.

3

Page 20: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

1300 PROCUREMENTS

DIRECTORATE PROCUREMENTS

DIRECTORATE ADMINISTRATION

1310 1320 1330 1340 1350

• 1310: DOMESTIC PROCUREMENTS DEPARTMENT • 1320: INTERNATIONAL PROCUREMENTS DEPARTMENT • 1340: DOMESTIC SERVICE CONTRACTS DEPARTMENT • 1350: FINANCIAL DEPARTMENT

Figure 1.2. Procurement Directorate Organization Chart (From: Hellenic Navy

General Staff, 2003).

In order to accomplish its mission, the IPD has been organized in offices and sub-

departments as shown in Figure 1.3. According to its organization and mission the IPD,

with an annual budget of almost $50 million, has a unique position in the HNSC

organization, as it is the only international procurements agency for secondary items in

the Hellenic Navy. It can be considered as a multi-service- process department including

processes such as requisitioning funds, contracting, placing procurement orders, placing

repair orders, collecting, reviewing, and processing procurement and repair documents,

making payments, monitoring deliveries, and accommodating respective accounts.

(Hellenic Navy General Staff, 2003; International Procurement Department, 1991)

4

Page 21: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

1320 International Procurements Department

1320/2-3-4-5 International Procurements

Offices

1320/7 Transportation

Payments Office

1320/9 International Procurements

Office

1323 Accounting

Office

1324 Repairable

Items Office

1330 FMS Programs

Office

Figure 1.3. IPD Organization Chart (From: Hellenic Navy General Staff, 2003).

2. Discussion

Given the mission, organization, and structure of the IPD, the initial objective

anticipated to be achieved through the BSC building process is to gain clarification and

focus of the IPD desired outcomes and strategy. However, the real power of the BSC

process is the development of a performance measurement system that can align

departmental and individual efforts with desired outcomes. Studying, analyzing, and

discussing with IPD management and key personnel the internal processes and activities

should reveal those critical processes and key success factors that contribute to the

achievement of the desired outcomes. Mapping of the relationships among the processes,

factors, and outcomes is expected to contribute to the identification of those critical

processes and factors for which performance measures should be developed. However,

setting goals for the IPD processes and activities cannot be based on standards

established in the market due to the nature of the specific department. Management

experience and past performance can be used as benchmarks in setting the goals

wherever applicable.

5

In addition, the research may reveal that some of the processes are not value-

added in relation to the strategy and the desired outcomes or that new processes need to

be established for achieving the desired outcomes. Though there are no explicit obstacles

Page 22: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

for the elimination of processes that are not value-added, for new processes that might

need to be established it is assumed that the proposed processes should not lead to

additional cost of internal operations in terms of either money or time.

Furthermore, due care should be exercised in gathering and using relevant

information due to management and employee differing backgrounds and biases as well

as different perceptions about objectives and priorities. However, it is estimated that the

BSC process is a learning process, thus, it is anticipated to facilitate the participants’

common understanding of management objectives and priorities.

Finally, though the whole process is not expected to generate personnel

resistance, an effective communication plan prior to the implementation of the BSC

model is required. Though the implementation of the proposed BSC model and the

development of a respective communication plan are outside the scope of this research,

the research will emphasize on the need for the effective communication of the new

management control system.

C. RESEARCH QUESTIONS

1. Primary Question

What is the design of a proposed Balanced Scorecard model that applies to the

International Procurement Department?

2. Secondary Questions Secondary, supportive research questions are:

• What is the IPD management perspective about successful desired outcomes?

• What are the strategy and multiple objectives inside the IPD that must be achieved for the desired outcomes to be accomplished?

• What are the processes, activities, and factors in the IPD that contribute to the achievement of the multiple objectives?

• What are the cause-and-effect relationships among processes, activities, factors and desired outcomes?

• What are the critical processes and key success factors that need to be better controlled?

6

Page 23: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

• What performance metrics can be developed for measuring the critical processes, activities, and factors to align overall performance with strategy?

D. SCOPE OF RESEARCH The scope of this research will include:

• A discussion of relative literature in order to provide the reader with a general understanding of the BSC concept and its important characteristics, the benefits organizations can realize by its effective implementation, and the potential causes of the BSC failure to function as an effective strategic management system. It is assumed that the reader has a basic knowledge of business, management, and accounting concepts and terminology. The reader should also be aware that the terms framework and model, and measures and metrics, and non-for-profit will be used interchangeably.

• A review of existing IPD organization and management environment, functions, and processes.

• An examination and analysis of the IPD desired outcomes, strategy, multiple objectives, processes, activities, and resources.

• An examination and analysis of the cause-and-effect relationships among critical processes, factors and desired outcomes.

• The design of a BSC proposed framework organized in four perspectives.

• The development of performance measures, wherever applicable, that can effectively capture the cause-and-effect relationships.

• Recommendations for the communication of the proposed BSC model throughout the IPD.

The scope will not include:

• A detailed evaluation of current IPD management control systems.

• A detailed communication plan for the implementation of the proposed BSC model.

• A cost and time analysis required for the implementation of the proposed BSC model.

E. EXPECTED BENEFITS FROM THIS THESIS This research is anticipated to provide the IPD management with an integrated

performance-based management control model and serve as a pilot project for other

Departments inside the Procurement Directorate to develop their own BSC model.

7

Page 24: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

F. ORGANIZATION OF STUDY

This study contains seven chapters. Chapter I provides the background of the

study and introduces the thesis subject. Also included in this chapter, are comments on

the purpose and the objectives of the study, primary and secondary research questions,

the scope of the research, and the benefits of the study. Chapter II emphasizes pertinent

information discovered in the literature review intending to add to the readers’ knowledge

and understanding of the concepts related to the BSC building process. Chapter III

presents the methodology used in the study emphasizing the features of questionnaires

and the analysis of the information collected. Chapter IV provides an analysis of the IPD

organization and management intending to add to the readers’ knowledge and

understanding of the current IPD structure and environment for which a BSC model will

be developed. Chapter V builds a proposed BSC model for the IPD. Chapter VI

provides an analysis of the performance measures suggested for the IPD’s proposed BSC

model. Finally, Chapter VII concludes the thesis with findings and recommendations

resulting from this thesis.

8

Page 25: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

II. LITERATURE REVIEW

This chapter, through a discussion of relevant literature, attempts to provide a

general understanding of the Balanced Scorecard (BSC) concept and its important

characteristics, the benefits organizations can realize by its effective implementation, and

the potential causes of the BSC failure to function as an effective strategic management

system.

It is assumed that the reader has a basic knowledge of commercial and public

organizational structure as well as management concepts and principles and is familiar

with the management and accounting terminology used in this chapter.

It is worth emphasizing that the BSC concept as a performance-based

management system was developed with the private sector in mind. Arguably, the

private sector has a richer experience in performance management techniques than the

public sector and nonprofit organizations. (Kaplan and Norton, 1996, 2000; Balanced

Scorecard Institute Website, 2003; The Government Performance and Results Act of

1993) Thus, the second part of this chapter deals with issues related to the development

and implementation of the BSC concept in the public sector and in nonprofit

organizations.

A. THE BALANCED SCORECARD CONCEPT

1. Seeking Balance Out of Chaos At the dawn of the 21st century, in a rapidly changing business environment,

many corporations are struggling to adapt their organization design to this global era of

uncertainty and hyper-business competition (Lawler, 1996). The issue of adapting to a

changing environment has been the subject of theoretical and empirical inquiry since the

days of Heraclitus. Suspended in the webs of uncertainty due to a change-or-die

environment, modern complex organizations seek management approaches that provide

clarity and direction enhancing their sustainability. The impact of the information age

and global competition led both service and manufacturing corporations to seek ways of

reinventing and reengineering themselves in an attempt to adopt more responsive and

flexible management systems. Traditional management systems that solely focused on 9

Page 26: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

how to achieve financial goals have proved to be ineffective in balancing organizational

tensions. Management was losing clarity of direction while organizational uncertainty

about long-term success was increasing. (Lawler, 1996)

In today’s competitive environment, corporations realized that they could no

longer rely on a bureaucratic management approach that used the previous century’s

management tools and ideas. During the industrial age, the traditional financial control

systems accompanied by appropriate financial measures such as return on capital

employed (ROCE) and Residual Income (RI) were used both to direct a company’s

productive investments and monitor the company’s effectiveness against those

investments. However, in the information age, those tools prove to be inadequate for

guiding and evaluating the driving forces behind the results that create future value

through investments in customers, employees, processes, technology, and innovation.

(Kaplan and Norton, 1996; Simons, 2000)

The new business environment led to the development of a growing market for

new management practices and ideas. Complex corporations seeking new direction

realized the need for mobilizing and exploiting their intangible assets and using them as

“leverage” in creating and sustaining competitive advantage. Performance-based

management addressed the need for effectively managing and measuring tangible as well

as intellectual assets. The BSC concept, which was developed by Arthur Schneiderman

at Analog Devices, Inc. in 1987, emphasized the importance of aligning strategy and

multiple organizational objectives with desired outcomes and developing balanced

measures for monitoring overall performance. (Euske, 1998; Kaplan and Norton, 1996,

2000; Lynch and Cross, 1995; Schneiderman, 1999)

Since its inception, the BSC concept has attracted significant attention from many

organizations in the private and public sectors. An example of its wide interest was noted

in a recent World Wide Web search of the term “Balanced Scorecard”, which resulted in

over 900,000 hits. (Kaplan and Norton, 1993, 1996, 2000)

2. Features Kaplan and Norton’s version of the “Balanced Scorecard”, developed in the early

1990’s, provides managers with an approach to measure overall organizational 10

Page 27: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

performance. Recognizing some of the weaknesses of previous management approaches,

the BSC approach provides a clear prescription as to what strategy-focused companies

should measure in order to achieve their long-term objectives. Their basic point, and that

of the designers of the original BSC, is that to be successful in an increasingly

competitive world, companies must satisfy a variety of benchmarks, not just financial

performance. They emphasized that financial and nonfinancial measures must be part of

the information system for employees at all levels of the organization. (Kaplan and

Norton, 1996, 2000)

The BSC is a management system that can help organizations clarify their vision

and strategy and translate them into action. Eventually, the BSC can facilitate translation

of mission and strategy into goals and specially developed measures. In the Kaplan and

Norton version of the BSC the measures are organized into four perspectives: Financial,

Customer, Internal Processes, and Learning and Growth. Additionally, the BSC provides

feedback around both the internal business processes and external outcomes, facilitating

alignment of organizational multiple linked objectives, in order to continuously improve

strategic performance and results. However, the BSC methodology builds on some key

concepts of previous management ideas such as Total Quality Management (TQM) and

Key Performance Indicators (KPI) scorecards. As Kaplan and Norton have demonstrated

through their research, those management ideas are not likely to help companies realize

performance breakthroughs unless they are accompanied by an explicit strategy including

customer satisfaction, continuous improvement, employee empowerment and

commitment, and feedback. (Kaplan and Norton, 1993, 1996, 2000)

Following on their initial efforts at implementing the BSC, Kaplan and Norton

emphasized the use of the BSC as a strategy implementation tool. Organizations without

any explicit strategy can use the process of building a BSC as the mechanism to develop

a strategy. They can use the following principles during the BSC building process to

achieve “alignment and focus” realizing performance breakthroughs (Kaplan and Norton,

2000):

11

Page 28: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

• Translate the strategy to operational terms.

• Align the organization to the strategy.

• Make strategy everyone’s job.

• Make strategy a continual process.

• Mobilize change through leadership.

Finally, Kaplan and Norton emphasized the need for a “double-loop feedback”

(Deming, 1986) process as an effective management tool for measuring overall

performance in strategy-focused organizations. The BSC incorporates feedback around

internal business process outputs, but also adds a feedback loop around the desired

outcomes of business strategies enhancing management attention and facilitating

identification of cause-and-effect relationships among linked objectives (Kaplan and

Norton, 2000; Simons, 2000). The conceptual framework of the BSC four perspectives is

shown in Figure 2.1.

a. The Four Perspectives of the BSC (Kaplan and Norton, 2000) (1) Financial Perspective. The BSC retains the financial

performance perspective since the financial measures developed in this perspective are

essential in providing the focus for goals, objectives, and measures and indicators across

the scorecard. Financial objectives, when isolated from the whole process, become

measures of past events, but, when incorporated in the BSC, they effectively indicate the

economic consequences of strategy implementation. Companies can choose from a

variety of financial objectives, depending on the stage in their life cycle. Kaplan and

Norton simplify the choices and identify three major stages of the life cycle: (1) grow, (2)

sustain, and (3) harvest. In the early stage (grow), traditional financial measures such as

sales growth rates and revenue growth rates can be used in the BSC. Later, in the sustain

stage, additional measures such as return on investment (ROI) or return on capital

employed (ROCE) can be used as lagging indicators of overall performance. Finally, in

the last stage (harvest) where short-period paybacks are required, operating cash flows

and working capital reduction rates can be used as financial measures indicating

organizational effectiveness. (Kaplan and Norton, 1996, 2000)

12

Page 29: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Customer Perspective

How can we continue to improve and create value?

Goals Measures Targets Initiatives

How do our customers see us?

Goals Measures Targets Initiatives

What must we excel at internally?

Goals Measures Targets Initiatives

How do we look to the shareholders?

Goals Measures Targets Initiatives

Learning & Growth Perspective

Internal Business Perspective

Financial Perspective

Missionand

Strategy

Figure 2.1. The BSC Four Perspectives (From: Simons, 2000).

(2) Customer Perspective. This perspective captures the ability

of the organization to provide those product/service attributes such as quality, price,

delivery time, functionality, and product/service reputation that maximize customer

satisfaction and contribute to the development of a unique value proposition. Companies

must identify their customers and the segments in which they will compete. These

customers and segments should be expected to deliver the financial results necessary to

sustain the business. Core customer outcomes such as customer satisfaction, loyalty,

acquisition, retention, and profitability turn into the leading indicators of organizational

overall success. The customer perspective includes several core measures that can be

used across all kinds of organizations. Examples of metrics include customer

satisfaction, market share, customer retention, and customer profitability. (Kaplan and

Norton, 1996, 2000) 13

Page 30: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

(3) Internal Business Processes. In this perspective, companies

must identify those processes that are most critical to achieve financial and customer

objectives. These key business processes must be monitored through specially developed

measures to ensure that outcomes are satisfactory. However, Kaplan and Norton

emphasized the importance for those metrics to be carefully designed by both the BSC

model developer and those who know those processes most intimately. An important

distinction of business processes in service organizations should be made between: (1)

mission oriented processes and (2) support processes. The former are usually unique in

nature and more difficult to measure while the latter are repetitive in nature and easier to

measure.

Senior management must understand which internal business

processes ultimately contribute to the desired outcomes. Each business will have a

unique set of processes for creating value for customers and producing financial results.

The internal value chain model (Kaplan and Norton, 1996) provides a template that

companies can use to customize their own objectives and measures. Figure 2.2 provides

a generic value chain model that encompasses the three principal internal business

processes: (1) innovation processes, (2) operations processes and (3) post-sale service

processes. Examples of measures in this perspective include the cycle time measure

(from need identification to need satisfaction), first pass yield, or the amount of time a

customer must wait in line for service. (Euske, 1998; Kaplan and Norton, 1996, 2000)

Service The

Customer

Deliver The

Products/Services

Build The Products/ Services

Create The

Product/Service Offering

Identify The

Market

Post –sale service Cycle Operations Cycle Innovation Cycle

Customer Need Satisfied

Customer Need Identified

Figure 2.2. The Generic Internal Value Chain (From: Kaplan and Norton, 2000).

14

Page 31: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

(4) Learning and Growth Perspective. This perspective

captures the ability of employees, information systems, and organizational alignment to

manage the business and adapt to change. Processes will only succeed if adequately

skilled and motivated employees, supplied with accurate and timely information, are

driving them. Kaplan and Norton identify three principal categories for the learning and

growth perspective that exist across a wide variety of organizations: (1) employee

capabilities, (2) information system capabilities and (3) motivation, empowerment and

alignment. Today, there are few examples of measures in the learning and growth

perspective because, as Norton and Kaplan emphasized in their research, companies do

not appear to be linking the learning and growth area to their strategy and long-term

objectives (Norton and Kaplan, 2000). Core measurements for this perspective include

employee satisfaction, employee productivity, team performance versus individual

performance, and current level of skills versus skills required to meet customer need

satisfaction. (Norton and Kaplan, 1996, 2000)

The multiple measures on a properly constructed BSC should

consist of a linked series of goals and measures that are both consistent and mutually

reinforcing. This integrated system of scorecard measures should incorporate the

complex set of cause-and-effect relationships among the critical variables that describe

the strategy. The chain of cause-and-effect relationships should pervade all four

perspectives of a BSC. Additionally, the multiple linkages should incorporate both

outcome measures (lagging indicators) and performance drivers (leading indicators). In

this way the BSC helps translate the business strategy into a linked set of measures that

define long-term strategic objectives, as well as the mechanisms for achieving those

objectives. (Norton and Kaplan, 1996, 2000)

Finally, there is a question still remaining in the BSC literature as

to how many perspectives are sufficient. As Kaplan and Norton emphasize in their

research: No mathematical theorem exists that four perspectives are both necessary and

sufficient. Companies rarely use fewer than four perspectives, but depending on the

situation and the business strategy, one or more additional perspectives may be needed.

(Norton and Kaplan, 1996, 2000)

15

Page 32: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

3. Benefits from Effectively Implementing a BSC Model

Companies initially adopt the BSC for a variety of reasons, including gaining

clarification, consensus, and focus on their strategy and then communicating that strategy

throughout the organization. However, the BSC is more than a tactical or an operational

measurement system. The BSC can be the cornerstone of an organization’s management

system since it helps to align and support key processes, including clarification of

strategy, communication of strategy, alignment of multiple objectives, alignment of

strategic initiatives, and linking of strategic objectives to long–term goals. Used in this

way, the BSC can become a powerful strategic management system. (Norton and Kaplan,

1996, 2000)

The BSC as a strategic management system provides feedback around both the

internal business processes and external outcomes in order to continuously improve

strategic performance results. When fully deployed, the BSC can provide an efficient

and effective performance-based management system that (Norton and Kaplan, 1993,

2000):

• Translates mission and vision into clear measurable outcomes that define success, and that are shared throughout the organization as well as with customers and shareholders;

• Provides a tool for assessing, managing, and improving the overall health and success of business systems;

• Facilitates the shift from prescriptive, audit-and-compliance-based oversight to an ongoing, forward-looking strategic partnership;

• Includes measures of quality, cost, customer satisfaction, employee satisfaction, motivation, and employee skills to provide an in-depth understanding of the critical performance drivers;

• Measures process efficiency providing a rational basis for selecting what business process improvements to make first;

• Allows managers to identify performance drivers and cause and effect relationships and expand their usage in new strategic initiatives; and

• Mobilizes the entire organization towards a clearly defined strategic goal.

16

Page 33: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

4. Problems Identified in the BSC Building Process

Kaplan and Norton, while working on the BSC building process in several

organizations, noted that some organizations did not succeed in launching their BSC

programs. Despite spending considerable effort and resources, some companies could

not implement the new management system. Following up their initial work, Kaplan and

Norton identified what they state are the root causes of BSC implementation failures

emphasizing that those failures are related to either the BSC design or some

organizational pitfalls that hinder the implementation of it. (Norton and Kaplan, 1996,

2000)

According to Kaplan and Norton, using too few or easily attainable measures is

one of the primary causes of a BSC design failure. The design fails to achieve a balance

between the outcomes and the performance drivers or between individual and

organizational objectives. On the other hand, the use of too many measures without

identifying the critical ones can lead to management confusion and to a BSC design that

fails to illustrate the true “story of success”. In other cases, the companies failed to

capture the true cause-and–effect relationship between desired outcomes and

performance drivers, developing measures that were not linked with each other. As a

result, according to Norton and Kaplan, the organizations created a poor BSC design,

which failed to mobilize organizational effort towards the strategic goal. (Norton and

Kaplan, 1996, 2000)

Design failures also occurred in cases where corporate strategy was not clearly

communicated throughout the organization. Thus, organizational business units

developed their BSCs based on their own perception of organizational strategy, which

was not aligned with corporate objectives. Their BSC design, though effective for their

business unit, failed to fulfill corporate strategic goals leading to confusion and

organizational tensions. (Norton and Kaplan, 1996, 2000)

The lack of commitment of senior management is one common cause of

implementation failure. Senior management commitment is required because not only do

they have the knowledge to articulate the organization’s strategy but they also have the

authority to mobilize middle-level management participation in the process. While senior 17

Page 34: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

management commitment is essential for the process, the lack of involvement of lower-

level managers can also prove to be fatal. For the BSC to be effective, it must eventually

be shared with everyone in the organization. One of the BSC building process objectives

is to have everyone in the organization understand the process and contribute to its

implementation. (Norton and Kaplan, 1996, 2000)

The perception that the BSC process is a onetime event has also led companies to

implementation failure. Believing that they had only one chance to launch their BSC,

they spent considerable effort and resources, on the one time effort, trying to produce the

perfect scorecard. However, the BSC is not a onetime event. It is a continuous

improvement process where objectives, measures, and data collection are modified over

time, adjustments continue around objectives and measures, and new measures evolve

with use and experience. (Norton and Kaplan, 1996, 2000)

Hiring external inexperienced consultants instead of mobilizing internal forces,

during the BSC building process, is another cause of implementation failure. Each

organization is a unique entity and a BSC recipe does not exist that fits all organizations.

External consultants, when inexperienced with the specific organization, are unlikely to

provide an effective BSC design and implementation plan. “Buy-in” is the recommended

practice for the effective implementation of the BSC program. (Norton and Kaplan, 1996,

2000)

According to Arthur Schneiderman, who developed and used the corporate

scorecard concept at Analog Devices, Inc, the following factors can also lead to BSC

implementation failure (Schneiderman, 1999):

• Non-financial variables on the scorecard are incorrectly identified as the primary drivers of future stakeholder satisfaction.

• The metrics are poorly defined.

• Improvement goals are negotiated rather than based on stakeholder requirements, fundamental process limits, and improvement process capabilities.

• There is no deployment system that breaks high-level goals down to the sub-process level where actual improvement activities reside.

18

Page 35: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

• A state of the art improvement system is not used.

• There is not and cannot be a quantitative linkage between non-financial and expected financial results.

B. BALANCED SCORECARD IN PUBLIC SECTOR In August 1993, U.S. Congress, aiming at improving government, put forth a bill

that became Public Law 103-62, entitled the Government Performance and Results Act

(GPRA) (U.S. Printing Office). The act required Federal agencies to improve their

performance through developing strategic plans, clarifying their mission, setting goals

and objectives, and developing measures that could monitor progress towards their goals.

These goals must focus on results, service quality, and customer satisfaction. Since then,

various initiatives have been undertaken that encourage and support the use of

performance-based management ideas and practices in the public sector. The

implementation of those initiatives indicates that the BSC has the potential to make a

contribution to the management of public sector even though the concept was initially

developed with the private sector in mind. (Department of Energy Website, 2003)

However, adopting and implementing the BSC concept in organizations where

profitability is not the driving force and where the organization’s existence depends on

mission necessity and not on mission accomplishment, revealed important conclusions.

Modifications of the BSC architecture are necessary before the BSC program is

implemented. (Department of Energy Website, 2003; Procurement Executives’

Association Website, 2003)

Further examination of the BSC implementation efforts in public sector (Balanced

Scorecard Institute Website, 2003; Procurement Executives’ Association Website, 2003)

revealed that financial success could not be at the top of the process since this is not the

primary objective of those organizations. Hence, reorganization of the framework

putting customer satisfaction at the top of the process was one of the first adjustments

made in the BSC architecture. Even though the desire for customer satisfaction is a clear

resemblance between private and public sectors, there is still a difference, because the

definition of “customer’ is different in the two sectors. In the public sector, donors,

taxpayers or legislators can be considered customers together with the product/service

19

Page 36: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

end-user. Accordingly, public sector organizations should initially define who is their

customer. (Norton and Kaplan, 1996, 2000; Balanced Scorecard Institute Website, 2003;

Department of Energy Website, 2003; Procurement Executives‘ Association Website,

2003)

Additionally, in the public sector, government agencies have the authority to

conduct their mission that is delegated either by congressional statute or by Executive

order. Hence, unlike private-sector businesses that can change direction in any way

depending on their financial goals, government agencies are constrained to work within

their authorized mission. Their performance priorities, therefore, are not financial in

nature, but rather mission effectiveness. Financial goals that are clearly defined in the

private sector and are related to profit, growth, and market share, cannot be used as

performance indicators. However, another difficulty with mission effectiveness metrics

is that they often are defined differently for each departmental mission, and to some

extent, they are unique. Consequently, they cannot directly be compared or benchmarked

against other more generic measures available in the market. However, past performance

can be used as the alternative and comparison of measures against themselves can be

made over time. (Balanced Scorecard Institute Website, 2003; Department of Energy

Website, 2003; Procurement Executives’ Association Website, 2003)

In the learning and growth perspective of the generic BSC framework, the

workforce is seen as motivated either by intrinsic incentives, such as recognition and

satisfaction, or by extrinsic incentives, such compensation bonuses. However, in the

public sector, the values on which incentives can be based may not be the same. On the

other hand, nonprofit and public sector organizations are not as likely as profit making

organizations to use financial incentives to motivate human behavior. Due care should be

exercised during the BSC development process in order to identify those human

perceptions that may influence the implementation of the program. (Neely, Walters,

2002)

Additionally, in the public sector, given mission necessity, personnel

commitment, somehow, is taken for granted since almost all of them have the sense that

they serve a superior idea. However, that perception by itself without training and 20

Page 37: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

encouragement is unlikely to mobilize employee participation during the BSC

development process. Therefore, as in the private sector, leadership style becomes the

critical ingredient that can effectively communicate change and mobilize personnel

involvement and commitment for the successful implementation of the program.

Stereotyped leadership that is based on a command and control management philosophy

is unlikely to create the environment for the communication of vision and strategy

throughout the organization and encourage initiatives that contribute to the performance

improvement. Accordingly, given the culture in the public sector, leadership that has a

management style that emphasizes communication, participation and employee initiative

can become the catalytic factor for the successful implementation of the BSC concept.

(Norton and Kaplan, 1996, 2000; Department of Energy Website, 2003; Procurement

Executives Association Website, 2003)

C. CHAPTER SUMMARY In today’s competitive environment where market globalization has increased

business uncertainty about future success, traditional management systems based solely

on financial goals are inadequate to provide management clarity and direction and ensure

long-term success. A performance-based management approach addresses the need for a

performance measurement system that can determine whether goals and objectives are

being achieved. Performance measures should not be based solely on tangible assets.

They should be expanded on intangible assets as well, since these are the driving forces

behind the results that create future value.

This chapter provided an example of a framework for a performance

measurement system, which is called the “Balanced Scorecard”. Initially developed by

Arthur Schneiderman at Analog Devices, Inc. in 1987 and popularized by Kaplan and

Norton in the early 1990s, the BSC has become a very popular management system in the

private sector. Starting with organizational mission and strategy, the desired outcomes

(lagging indicators), critical processes and factors (leading indicators), and cause-and-

effect relationships should be identified in order to provide focus and alignment.

Subsequently, an integrated set of measures should be developed in different perspectives

depending on the organization and the conditions. The four commonly used perspectives

21

Page 38: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

are: Financial, Customer, Internal Processes, and Learning and Growth. By balancing

performance in all perspectives, alignment of organizational mission, strategy, and

overall performance can be achieved leading to long-term success.

This chapter also provided an analysis of the BSC key characteristics emphasizing

the benefits organizations can realize by the effective implementation of the BSC

concept. It continued by emphasizing the major problems identified during the BSC

building process in several organizations. Those major problems, as classified by Kaplan

and Norton, are related either to initial design failures or to organizational processes that

hinder the effective implementation of the program.

Finally, the last part of this chapter emphasized key differences in business

practices between the private and public sectors, illustrating how those differences

influence the design and implementation of the BSC concept in public sector

organizations. Depending on the mission characteristics, BSC architecture modifications

are necessary before the BSC program is implemented in public sector organizations.

22

Page 39: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

III. METHODOLOGY

The features of this research comprise what is known in the research discipline as

field research. Field research is advisable in studies that are closely related to examining

and trying to understand day-to-day practices within a specific environment and regarded

as contributing to the study of the processes within their natural setting (Babbie and

Huitt, 1983). The nature of this research encourages the use of this method since it

contributes to the better understanding of the IPD’s management conditions and

processes in the course of the BSC building process. Flexibility in the analysis of the

data collected is also an advantage of this method given that the majority of data related

to this research are qualitative in nature. However, because of its qualitative approach to

data and its relatively informal sampling procedures, this research method is not suitable

for obtaining generalizable results (Babbie and Huitt, 1983). In this case, it is not an

impediment since the research is tailored to one specific unit and not intended to have

generalizable results.

A. FEATURES OF THE QUESTIONNAIRES Based on the main principles of field research, a series of questionnaires was

prepared for collecting relevant data from the examined department. Those

questionnaires were closely followed by phone interviews with follow-up questions

wherever necessary. This questionnaire method was chosen to collect the data because

the respondents were located in Greece, far away from the location of the author, in the

USA. Additionally, this method is considered quite useful when used by managerial

personnel and it is the most inexpensive method to gather the data needed for such

research (Miller, 1996; Babbie and Huitt, 1983).

The questionnaires contained both questions and statements, organized in

managerial themes. The questions and statements were followed by a list of responses

appropriate to the topic from which the respondent is instructed to choose. This method

facilitates the respondent’s participation and helps ensure uniformity of responses

23

Page 40: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

(Babbie and Huitt, 1983). Additionally, an open-ended structure was also used for

questionnaire items where it was impossible to provide, in advance, an exhaustive list of

responses to a particular question or statement allowing for respondent discretion.

Questionnaires unlikely to incorporate all the political and personal issues that are

unknown to the researcher and which may influence the responses. Although it is

unlikely that biases and misinterpretations due to those parameters can be fully detected

and avoided, the follow-up phone interviews are expected to identify and mitigate the

effects of those issues.

Another disadvantage, common in this research method, is the tendency of the

respondents to focus on confirming evidence and the possibility of an incomplete analysis

because of the complexity of the task (Malina, 2001). However, the team approach

employed in the process, the involvement of the author in the data interpretation stage,

and the critique of two experienced professors is expected to help overcome the potential

problems.

Finally, the questionnaires were developed in English, which is not the native

language of the respondents. However, a translation of the questionnaires in the

respondents’ language was not considered to be necessary since the initial contact

revealed that all of the participants had adequate knowledge of the English language.

Two of the respondents had received their MS in management degree from academic

institutions in the USA.

B. ANALYSIS OF THE QUESTIONNAIRES AND DISCUSSION

1. The Preliminary Questionnaire

The preliminary questionnaire (Appendix A) was prepared by the author and

answered by the IPD’s manager. The IPD’s manager was the first contact in the field and

was the primary point of focus within IPD. He provided the researcher with background

information in relation to the organization and the internal structure of IPD and access to

other relevant documentation.

24

Page 41: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

The rationale for the preliminary questionnaire was (1) for the author to gain a

better understanding of the IPD operations and management environment and (2) for the

first of the key-participants in the research to become aware of the research process.

Although the outcomes of this questionnaire were not expected to contribute directly to

this research they facilitated the whole process since they helped (1) the writer to make

initial assessments about IPD operations and environment and (2) the IPD manager to

become familiar with BSC basic concepts. Additionally, this questionnaire, together with

telephone interviews, contributed to the development of a “common language” between

the writer and the participant, which was necessary for the subsequent research process

given the differences in backgrounds, the distance, and the research time available.

This questionnaire was organized in three managerial themes. In the first part,

(respondent’s demographics) the IPD’s manager was asked to provide personal

information related to his background and position in IPD. In the second part,

(organizational profile) the respondent was asked to provide information related to the

IPD’s mission, organization, personnel, inputs, processes, and outcomes. This kind of

information was regarded as necessary for the analysis of IPD’s organization and

structure. In the final part (organizational perspective) the respondent was asked to

provide further information related to the IPD’s current management conditions. This

information was regarded as necessary for the analysis of IPD’s management

environment in relation to the BSC building process.

Regarding the BSC building process, the preliminary questionnaire was used, as

the primary source of information for gaining insight into the IPD management

perspective of the IPD desired outcomes. Given the IPD manager’s experience and

background (Appendix A), it is assumed that the IPD desired outcomes, as they are

defined in the preliminary questionnaire, provide a good frame of reference, which

together with the IPD mission statement contribute to the clarification of the IPD

strategic objectives that need to be fulfilled for the desired outcomes to be achieved and

the mission to be accomplished. In essence, strategic objectives and desired outcomes

25

Page 42: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

are the starting points that elicit knowledge of the performance drivers and their causal

interdependencies during the building process of the conceptual performance model

(Abernethy et al., 2002).

Taking into account the importance of those factors, the analysis of the

information collected by this questionnaire revealed that there were some areas of

concern in relation to BSC development process that needed further clarification over the

next stage. Specifically:

• The desired outcomes should be further tested against the other participants’ perspective in order to achieve consensus and focus.

• All the different stakeholders should be familiarized with the nature of the IPD mission.

• The multiple strategic objectives that are associated with the desired outcomes should be identified and described.

• The critical processes and key-success factors that contribute to the achievement of the strategic objectives should be identified and linked, capturing the cause-and-effect relationships.

Finally, in this preliminary questionnaire the respondent was asked to identify the

key participants for the study. The key participants of the study are (1) the Head of the

FMS Programs Office and (2) the Head of the 1320/4 Office. The sample is considered

to be adequate for this research given the qualitative nature of information required for

the BSC building process, the total number of the IPD’s employees, the participants’

experience, and the position of the participants in the department.

Both of the participants are Supply Officers, which indicates that they have been

trained for the specific duties that have been assigned in IPD. The distance between their

military ranks and the rank of the IPD’s manager and their professional relationship are

not such that they are likely to influence their discretion in developing their viewpoint

about key issues related to the BSC building process. In addition, they perform different

roles in the department, have adequate experience with IPD operations and processes, and

are involved in the majority of the processes inside IPD. Their participation in the

research is expected to facilitate the process and contribute to consensus and

identification of performance drivers.

26

Page 43: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

2. The First Questionnaire

The first questionnaire (Appendix B) was prepared by the author and answered by

the three key participants in the research. The questionnaire was closely followed by

telephone interviews with follow-up questions wherever necessary. The objective of this

questionnaire was to elicit knowledge of the key participants regarding their perspectives

about IPD’s desired outcomes, strategy and objectives, critical processes and key success

factors that contribute to the achievement of the desired outcomes, and the perceived

interrelationships among critical processes, key-success factors and desired outcomes.

The ultimate objective of this questionnaire is to gain consensus of the IPD’s

strategy and communicate the strategy among the key participants. Kaplan and Norton

(1996) emphasized that, an important condition for success in the development process is

the active involvement of an executive team that contributes to the description of the

strategic objectives and the identification of the links among multiple objectives and

desired outcomes. The three key participants comprise the IPD’s executive team, which

at this stage of the BSC building process, helps to describe strategy and contribute to the

identification of the links among desired outcomes, individual strategies, and

performance drivers. Linking strategy with desired outcomes and putting strategy at the

center of the process is an essential step in the BSC building process for the strategy-

focused organizations (Kaplan and Norton, 2000).

This questionnaire was organized in three managerial themes. In the first part,

(Mission and Strategy) the respondents were initially asked to provide their perspectives

about the IPD’s desired outcomes. Testing the participants’ perspective about the IPD’s

desired outcomes contributes to consensus and focus. In addition, testing desired

outcomes against IPD’s mission contributes to the perception of causality between IPD’s

outcomes and mission accomplishment. The identified desired outcomes are described in

Table 3.1. In addition, as shown in Table 3.1 a codification of the desired outcomes was

done in order to facilitate the development of the proposed BSC model.

27

Page 44: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Outcome Description Outcome Coding Customer Needs Prompt Fulfillment D1 Regulation Compliance D2 On Time Payments D3 Cost Reduction D4

Table 3.1. IPD’s Desired Outcomes.

In this part, of the questionnaire the respondents were also asked to identify the

IPD’s different customers. Given the nature of the IPD’s mission, identification and

consensus of the IPD’s customers contributes to the design of a BSC model that includes

the whole spectrum of IPD’s strategic objectives that need to be achieved for

stakeholders’ satisfaction and mission success.

Finally, in this part the respondents were asked to identify the multiple strategic

objectives that need to be achieved for the customers to be satisfied and the desired

outcomes to be accomplished and to link those objectives with the respective desired

outcomes. The identification of the multiple objectives contributes to the articulation of a

desired strategy that helps to focus on the activities and factors inside IPD that are the

drivers of the desired outcomes. The identified multiple strategic objectives and the links

with specific desired outcomes are described in Table 3.2.

Strategic Objective DescriptionObjective Coding

Linked with Desired Outcome:

Lower Delivery Time S1 D1 Increase Quality S2 D1 Enhance Internal Auditing S3 D2, D3 Achieve Timely & Effective Review S4 D2, D3 Increase use of IT S5 D2, D3 Achieve Full & Open Competition S6 D4

Achieve Economies of Scale S7 D4

Improve Employees' Skills S8 D2, D3 Increase Employees' Capabilities S9 D2, D3 Improve Employees' Knowledge S10 D2, D3

Table 3.2. IPD’s Strategic Objectives and Their Links.

28

Page 45: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

In Table 3.2 the objectives were coded to facilitate the development of the

proposed BSC model.

In the second part of this questionnaire (Strategy and Critical Processes) the

respondents were asked to identify the important internal processes that directly

contribute to the achievement of the IPD’s desired outcomes. The identified important

processes are described in Table 3.3. In Table 3.3 the important processes were coded to

facilitate the development of the proposed BSC model.

Process Description Process Coding

Requisitioning Funds P1 Preparing Solicitation Document P2a Publicizing Solicitation Document P2b Issuing Contract Award P3 Placing Procurement Orders P4 Transferring Funds to Naval Attaches and Banks P5 Monitoring Material Deliveries P6 Collecting Procurement, Repair, and Transportation Documents P7 Reviewing Procurement, Repair, and Transportation Documents P8 Making Payments (Procurement, Repair, Transportation) P9 Submitting Procurement and Repair Documents for Audit P10

Table 3.3. IPD’s Important Processes.

An additional question was added in order to clarify cause-and-effect

relationships among those important processes and their links with the strategic

objectives. The supplementary question contributed to the clarification of the previously

identified important activities inside IPD that are the drivers (lead indicators) of the

desired outcomes (lag indicators) and their interrelationships. Identifying the

interrelationships among those important processes also contributed to the identification

of the processes inside IPD that need to be controlled and measured (critical processes)

since they contribute to the IPD’s overall success. The identified critical processes and

their influence upon other important processes are illustrated in Table 3.4.

29

Page 46: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Critical Process:

Could Improve Process:

P1 P5, P9 P2b P3 P6 P7, P8, P10 P7 P8 P8 P9, P10

Table 3.4. IPD’s Critical Processes and Their Influence.

In addition, the supplementary question contributed to the classification of the

critical processes in strategic themes based on their direct influence on specific strategic

objectives. The identified direct influences of the critical processes on specific strategic

objectives and their classification are described in Table 3.5.

Critical Process:

Links with Strategic Objective:

Perspective

P1 S3, S4, Internal Processes

P2b S6 Financial

P6 S1, S2 Customer

P7 S3, S4 Internal Processes

P8 S3, S4 Internal Processes

Table 3.5. Critical Processes and Strategic Objectives.

The identification by the key participants of the critical processes and the

interrelationships among critical processes and strategic objectives contributes to the

development of a causal model that is based on the key interviewees’ experience. This

method of capturing causality is considered to be advantageous in this stage of the BSC

building processes, taking into account that either objective data are unavailable or over-

reliance on available data could lead to an irrelevant model that is unrelated to original

strategic goals (Abernethy et al., 2002).

30

Page 47: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

In the last part of this questionnaire (Strategy and Key Factors) the respondents

were asked to identify the important factors (key success factors) that directly influence

internal processes and contribute to the achievement of the IPD’s desired outcomes.

However, slight differences were observed in the respondents’ perspective about the key-

success factors. Ultimately, the “majority rule” approach was used in order to isolate

those important factors, which need to be incorporated in the BSC model, and for which

performance measures need to be developed. Based on that principle, two of the eight

factors initially mentioned as important (Empowerment and Information Technology)

were ultimately not incorporated in the model since they were not regarded as important

by two of the three key interviewees. This “majority rule” approach also contributes to

simplicity of the BSC design.

The process also revealed that there is an exogenous key factor, which influences

IPD’s activities and which is outside IPD management’s control. The identification and

inclusion of this important external factor in the IPD’s BSC model can contribute to the

validity of its design. (Abernethy et al., 2002) However, including in the BSC model

external factors for which there is no previous experience of controlling and measuring

may contribute to the complexity of the model and increase the difficulties during the

implementation process.

The identified key success factors for which the IPD key participants reached

consensus are described in Table 3.6. In Table 3.6 the key success factors were coded to

facilitate the development of the proposed BSC model.

Finally, in this part the respondents were asked to identify the cause-and-effect

relationships among key success factors and critical processes. After interactions with

the key participants the “consensus” approach was used in order to capture and describe

the influence of the key success factors upon the critical processes.

31

Page 48: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Factor Description Factor Coding

Available Funds F1 Communications F4 Employee Commitment F5 Employee Responsibility F6 Access to Information F7 Procurement Policy Changes X1

Table 3.6. IPD’s Key Success Factors.

The identified influence of the key success factors upon the IPD’s critical

processes is illustrated in Table 3.7. The critical processes are those presented in bold.

The identification of those interrelationships contributes to focus on the key-success

factors that need to get management attention. It also facilitates the inclusion in the BSC

model of those key factors (lead indicators) that need to be controlled and measured for

contributing to the IPD’s overall success.

Improvement in factor: Could improve process: F1 P1, P2b, P9

F4 P2a, P2b, P4, P5, P6, P7, P8

F5 P3, P6, P7, P8, P9, P10 F6 P3, P6, P7, P8, P10 F7 P2b, P6, P7, P8

Table 3.7. Influence of Factors Over Processes.

3. The Second Questionnaire

The second questionnaire (Appendix C) was prepared by the author and answered

by the three key participants in the research as a team. The questionnaire was closely

followed by telephone interviews with follow-up questions wherever necessary.

This questionnaire included a set of balanced performance measures that was

developed by the author and suggested to the key interviewees as appropriate for

monitoring IPD’s performance. The development of those measures was based on the 32

Page 49: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

principles identified in the literature (Fitzgerald et al., 1993; Simons, 2000; Kaplan and

Norton, 2000; Balanced Scorecard Institute Website, 2003; Procurement Executives’

Association Website, 2003) regarding the selection of appropriate performance measures

and the IPD’s specific conditions.

Those suggested metrics were tailored to specific elements of the IPD’s BSC

model and classified in different strategic areas based on the perceived priorities and

objectives of the IPD’s management. In addition, taking into account the IPD’s

characteristics that are demonstrated in Chapter IV and the nature of the metrics in

addition to the definition of the metrics (formula), a method of measurement was

suggested for each performance metric, which is expected to facilitate the implementation

of the BSC model.

The respondents were then asked to read the suggested measures and make

recommendations (adjustments, deletions, or additions) in accordance with their

experience and the applicability of implementing that set of performance measures. In

addition, the respondents were asked to keep in mind during the evaluation of the

suggested measures that the measurement method has been identified in the literature as a

suitable method for collecting measurement data. Other methods can also be applicable

depending on the IPD’s characteristics and options. In that sense, the suggested

measurement method should not function as a restrictive factor in the evaluation of the

suggested metrics. The whole process contributed to the development of performance

measures that are tailored to specific objectives, in accordance with the principles

identified in the literature, and meaningful for the users. The outcomes of this

questionnaire are presented in Chapter VI together with the analysis of the selection

principles and the suggested measures.

C. CHAPTER SUMMARY In the first part of this chapter, the methodology that was used for this study was

presented. The features of this research comprise what is known as field research. After

that, the advantages and restrictions of this research method were demonstrated with

emphasis on the main characteristics and the nature of the questionnaires that were

prepared for collecting relevant data for the purposes of this study.

33

Page 50: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

In the second part of this chapter, an analysis and discussion of the relevant data

that were collected by the three questionnaires that were developed for this study were

provided. Those questionnaires were used as the source of information for

accommodating the IPD’s management analysis and the BSC building process.

Specifically, the preliminary questionnaire together with telephone interviews

(Appendix A) was used as the primary source of information for collecting data in

relation to the IPD’s organization, mission, operations, important processes, desired

outcomes, and management environment. In addition, this questionnaire was used for

identifying all of the IPD’s key participants in the study.

The first questionnaire (Appendix B) together with telephone interviews was used

for collecting information in relation to the IPD’s strategic objectives, critical processes,

key success factors and their interrelationships. The whole process contributed to focus

and consensus about IPD’s desired outcomes and strategic objectives, the identification

of the performance drivers, and their causal interrelationships. The analysis revealed

those critical processes and key success factors that need to be incorporated into the

IPD’s BSC model and measured for contributing the IPD’s mission success.

Finally, the second questionnaire (Appendix C) was used for testing the

performance measures that were developed and suggested by the author to be

incorporated into the IPD’s BSC model against the key interviewees’ perspective in

relation to the metrics’ usefulness and applicability. The process contributed to the

development of performance measures that are tailored to specific objectives, in

accordance with the principles identified in the literature, and meaningful for the users.

34

Page 51: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

IV. OVERVIEW OF INTERNATIONAL PROCUREMENT DEPARTMENT

A. IPD BACKGROUND As shown in Figure 1.2, the International Procurement Department (IPD) is one of

the five departments of the Procurement Directorate (PD) in the Hellenic Navy Supply

Center (HNSC). The HNSC is one of the major commands in Hellenic Naval Logistic

Center (NLC). The HNSC is the primary Supply Center of the Hellenic Navy, organized

in functions (Directorates and Departments) that compose an integrated supply system for

procuring secondary items (support parts, minor systems, and services) from sources

inside and outside the country. The HNSC deals with about 500,000 Stock Keeping

Units (SKU) and monitors them through a central database, which is an automated and

integrated logistic system first established in the early 1980’s. The organization chart of

the HNSC is shown in Figure 1.1. (Hellenic Navy General Staff, 2002)

The IPD function is unique in nature inside the HNSC since it is the only

International Procurement Agency for the acquisition of support items and minor systems

in the Hellenic Navy. The mission of IPD is described in the IPD Memorandum of

Operations (International Procurement Department, 1991) and is cited below:

To procure secondary items (spare parts and minor systems) from sources (manufacturers and vendors) outside the country, for fulfilling the Hellenic Navy’s specific needs through the following processes:

• International Competitions

• Sole Source Procurements

• International Agreements

To accomplish its mission the IPD is organized in sub-departments and offices as

shown in Figure 1.3. The IPD currently employs 16 employees including the IPD

manager. The IPD can be considered to be a multi-process department and among the

processes distributed across the sub-departments and offices. The processes as described

in the departmental Memorandum of Operations are the following:

35

Page 52: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

• Requisitioning funds from Inventory Provision & Control Directorate

• Preparing solicitation documents and issuing contract awards

• Monitoring contract execution

• Monitoring material delivery

• Collecting, reviewing, and processing procurement and repair documents

• Making payment proposals

• Ordering item shipment to the repair sites

• Making transportation cost payments

• Transferring funds to respective bank accounts (including Naval Attaché Offices bank accounts)

• Managing the account balances of the Naval Attaché offices in Washington, London, Berlin, and Paris

• Managing FMS programs requisitioning process

• Submitting all the procurement and repair documents to the Audit Agency for the final account accommodation

The activities and the specific operations of each sub-department and office inside

IPD are described in detail in Appendix A. Appendix A is the result of a preliminary

questionnaire prepared for this research and answered by the IPD manager. As

demonstrated in the previous chapter, the objective of this questionnaire was (1) for the

author to elicit knowledge of the IPD’s operations and management environment and (2)

for the first of the key participants in the research to become familiar with the research

process.

The IPD’s desired outcomes described by the IPD manager (Appendix A) provide

a good frame of reference, which together with the IPD mission statement, contribute to

the clarification of the IPD strategic objectives that need to be fulfilled for the desired

outcomes to be achieved and the mission to be accomplished. However, the desired

outcomes, as they are described in previous chapter, do not have associated measurable

goals that can translate strategic objectives into operational terms. Further elaboration is

required during the implementation phase of the BSC model in order to clarify desired

outcomes in terms of measurable goals.

36

Page 53: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Regarding the identification of inputs the IPD utilizes in carrying out its

operations, the departmental Memorandum of Operations (International Procurement

Department, 1991) was used as the primary source of information. However, given the

time since the Memorandum of Operations was first issued and the potential changes that

may have taken place a question was included in the preliminary questionnaire regarding

inputs. The IPD manager’s response about inputs is concurrent with the information

contained in the departmental Memorandum of Operations. Research in the literature

also revealed that these inputs are regarded as generic among public procurement

agencies. (Procurement Executives’ Association Website, 2003; The Balanced Scorecard

Institute Website, 2003). The inputs the IPD uses for accomplishing its operations are the

following:

• Procurement funds that are approved and made available by the Inventory Provision & Control Directorate (IP&CD)

• Public laws, acquisition regulation, and directives issued by the HNGS and NLC for procurement actions

• Human resources

• Information Technology (IT) for data collection and data processing

According to the fund-approval process, IP&CD makes the decision for the funds

approved and allocated to IPD. IPD is not officially involved in the IP&CD budget

allocation policy before a procurement requisition is submitted. IP&CD, based on its

inventory policy, submits to IPD a procurement requisition accompanied by a purchase

description with an initial cost estimation. IPD is then held responsible for developing

initiatives and exploring alternatives in determining the most effective procurement

method in terms of time and money that satisfies the specified need. Additionally, there

are procurement cases where the funds are not obligated in advance but the final

decision-making about fund approval is based on the IPD’s detailed fund-proposal and

the funds that are available. The process is depicted in Figure 4.1.

Although acquisition regulations and human recourses are two distinctive inputs

in procurements agencies, they are fairly interrelated in the sense that each of them is a

necessary but not sufficient condition for the internal operations to be effective. Clarity

of regulations and personnel understanding the regulations are both essential for the

37

Page 54: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

effective implementation of internal operations. (The Government Performance and

Results Act of 1993; Procurement Executives’ Association Website, 2003)

( : Precedent, : Subsequent, : Influence)

SEARCH

FUNDS REQUISITIONING

INVENTORY POLICY

METHOD SELECTION

FUND APPROVAL

DOMESTIC

ALTERNATIVES EXPLORATION

DPD

IPD

SOURCE SELECTION

SOURCE IDENTIFICATION

FUND POLICY

INITIAL COST ESTIMATE

PRELIMINARY MARKET RE

NEED IDENTIFICATION

IP&CD

FUND APPROPRIATION IN THE BEGINNING OF

FISCAL YEAR

FOREIGN

Figure 4.1. Fund Approval Process.

38

Page 55: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Based on the preliminary questionnaire, it is assumed that both preconditions are satisfied

in IPD’s current environment. This assumption is also reinforced by the fact that

according to management’s perspective IPD’s personnel are quite qualified for carrying

out their duties.

Regarding IT, NLC and particularly HNSC were pioneers in integrated

computerized logistics and utilization of IT in everyday operations in Greece. HNSC

installed its first automated and integrated logistic system in the early 1980’s. However,

even though the usage of IT in IPD for carrying out its operations is taken for granted,

due care should be exercised in later stages of the BSC building process since IT current

capabilities are essential for the establishment of an effective BSC feedback process.

Finally, according to Fitzgerald et al. (1993), there are three archetypal service

types that are met across the entire spectrum of service organizations: professional

services, service shop, and mass services. Each service organization can be classified in

one of the three generic service types. This classification contributes to the identification

of common problems shared among the three major services types and facilitates the

development and selection of performance measurements that are appropriate for the

specific service class. The criterion for the differentiation of the service organizations is

the volume of the customers processed in relation to the following six classification

dimensions (Fitzgerald et al., 1993):

• People/equipment focus.

• Front/back office focus.

• Product/process focus.

• Level of customization of the services provided.

• Discretion available to front office staff.

• Contact time available by front office staff.

Figure 4.2 represents a version of the service classification scheme that was developed by

Fitzgerald (Fitzgerald et al., 1993).

Given the organization, the mission, and the input-process-output model that

applies in IPD, a classification of the services provided is regarded as necessary since

39

Page 56: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

such a classification will contribute to the better understanding of the IPD management

conditions and facilitate the selection of performance metrics during the last stage of the

BSC building process.

Mass Services

Service Shops

Professional Services

LOW

MEDIUM

H

Figure 4.2. The Service Classification Scheme (From: F

40

Table 4.1 depicts the results of the IPD evaluation

developed by Fitzgerald et al. Based on the organization struc

Contact Time Customization Discretion

Contact Time Customization Discretion

Contact Time Customization Discretion

EVALUATION

HIG

SERVICE TYPE

People Focus

People /Equipment

Equipment Focus

itz

in

tur

CRITERIA

gerald et al., 1993).

relation to the criteria

e and operations carried

Page 57: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

out in IPD, the department can be classified as a mass service type organization. Taking

into account the main characteristics of the mass service organizations, which have been

identified by Fitzgerald et al. (1993), this classification will help us extract valuable

conclusions about the development and selection of appropriate performance measures

during the performance metrics development phase. Many customer transactions, limited

contact time, little customization, modest discretion, and difficulties in cost traceability

are some of the key characteristics of the mass service organizations. Though companies

do not necessarily fit neatly into one category, the differentiations in functions and

activities related to cost control, quality, resource utilization, and flexibility among the

three generic service types influence strategic objectives and the performance measures

that are needed to ensure overall success (Fitzgerald et al., 1993).

DIMENSIONS HIGH MEDIUM LOW

Contact Time IPD

Customization IPD

Discretion IPD

Equipment Focus IPD

Front Office

Oriented IPD

Product Oriented IPD

People Focus IPD

Process Oriented IPD

Table 4.1. IPD Classification as Service Type.

B. IPD MANAGEMENT ANALYSIS

41

The contribution of IPD performance to HNSC overall mission is demonstrated

by the fact that (1) the Hellenic Navy essentially procures a large majority (above ninety

percent) of its major systems (ships and weapon systems) from sources outside the

Page 58: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

country and consequently, all the support items and spare parts for those systems should

also be procured from sources outside the country and (2) the average annual budget for

IPD procurements (almost $50 million) is approximately three times the funds spent for

procuring secondary items from domestic sources. (HNSC Annual Budget, 2001)

Additionally, although IPD cannot directly participate in allocation of the

HNSC’s budget, the IPD’s operations have an indirect impact on the effectiveness of the

HNSC’s budget management (Figure 4.1). The contribution of the IPD operations to the

management of the budgeted HNSC resources seems to be well understood inside IPD

and is reflected by (1) the inclusion of the fund requisitioning process as an important

course of action in the operations of IPD offices and sub-departments and (2) the IPD

manager’s perspective of the acquisition cost reduction as one of the desired outcomes.

Although the whole process allows the IPD to exercise discretion in selecting the most

effective procurement method that contributes to budget efficiency, budget process does

not facilitate the IPD’s long-term procurement planning process, which is considered to

be essential for the implementation and use of the BSC model as a strategic system.

Given the importance of the IPD’s role in the HNSC operations, a first assessment

regarding IPD mission was regarded as necessary for this study. The mission statement

as described in the Departmental Memorandum was used as the frame of reference for the

first assessment. By examining the IPD mission in relation to the HNSC overall mission

we can notice that the IPD as the international procurement function seems to fit well

within the HNSC’s overall mission. It contributes to the HNSC’s Integrated Supply

System organizational concept since it exclusively fulfills the supply system requirement

for procuring items from international sources.

However, the fact that IPD is responsible for fulfilling specific needs implies that

the procurement needs have already been identified and approved on another

management level and the IPD management has little if any discretion in developing

initiatives or setting management objectives for need identification, evaluation, and

prioritization. In essence, IPD management appears to be limited in exploring

alternatives and to selecting one of the three procurement methods and based on the time

and cost to make procurement proposals for satisfying the already identified needs to the 42

Page 59: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

responsible agencies (Inventory Provision & Control Directorate or Hellenic Navy

General Staff), which exercise control over the need generation process. Yet, excluding

the IPD management from the need identification and need prioritization process

influences the IPD’s management function of planning resources to meet new challenges

in the long term. The IPD is forced to operate as a reactive unit, of which the mission is

to fulfill submitted procurement orders and comply with procurement regulations

exercising initiatives only in terms of selecting one of the three acceptable procurement

methods that best meets the time and cost requirements. Additionally, the fact that the

procurement methods that IPD can use for fulfilling its mission are clearly defined in its

mission statement implies that IPD management discretion is restricted if not prohibited

from seeking different procurement methods that could increase effectiveness and

efficiency.

Although lack of internal management control is common in public organizations

and does not significantly influence the development of a BSC model, the lack of IPD’s

management control over external environment and changed policy objectives may in the

long run hinder the BSC model from being transformed into a strategic system that can

capture exogenous important factors that influence IPD’s long term strategic planning.

(Muralidharan, 1997) Recommendations will be made at the end of the BSC building

process that contribute to the effective implementation of the BSC model, emphasizing

the need of the development of a mission statement that does not exclude the IPD

management from the need-identification and fund-approval processes.

Given such a mission philosophy, the IPD’s management perspective about

desired outcomes that emphasize regulation compliance and procurement cost reduction

is justified by the mission necessity. This is not uncommon in public organizations. One

of the major concerns in government and nonprofit organizations is accountability.

Accountability is essential for preserving public trust and satisfying the different

customer’s interests (Taylor, 1996). However, effective measuring of accountability in

government and nonprofit organizations is a major concern highlighted in relevant

literature (Conroy, 2002). A potential solution emphasized by recent research is the

development of an integrated set of measures for both legal compliance and economic

43

Page 60: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

efficiency compatible with the existing regulatory regime of the respective organization

(Conroy, 2002). In that sense, given the IPD’s regulatory environment, regulation

compliance and procurement cost reduction comprise an effective set of performance

indicators of the IPD’s overall mission.

Given the important role of IPD and the initial assessment made in relation to

IPD’s mission statement, further analysis of the IPD’s management environment was

made in three dimensions. First, the current management environment was evaluated in

relation to its readiness and ability to adopt and implement leading-edge management

practices such as the BSC model. Second, IPD was examined in relation to its position

on the organizational structure of the HNSC in order to identify potential obstacles in the

BSC building process. Finally, the major issues that have been identified in the literature

and are connected to the adoption and implementation of the BSC model in the public

sector were examined in relation to the IPD’s current conditions.

1. IPD Readiness

To assess the IPD readiness to adopt and implement the BSC concept the results

of similar research, conducted by Georgios Tsiakiris in 2000, is used. The results of that

research are compared with the current information gained through the preliminary

questionnaire and the interviews with the IPD manager in order to obtain a better

understanding of the issues related to the adoption and implementation of a BSC model in

IPD.

Tsiakiris (2000) examined the readiness of two units in the Hellenic Navy to

implement leading-edge management practices. The two units examined were the NLC

and the Naval Base of Crete. IPD is a sub-unit inside NLC. The process used during that

research was based on questionnaires designed by the Consortium for Advanced

Manufacturing-International (CAM-I) and answered by five respondents from each

organization. Although that research was oriented to adopting and implementing Activity

Based Cost Management (ABCM), the indicators generated provide valuable conclusions

about the management environment of those two units in relation to their readiness to

adopt contemporary management practices (Tsiakiris, 2000). The results of that research

44

Page 61: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

are also examined in contrast with the assessments based on information gained by the

preliminary questionnaire (Appendix A) and the interviews through the phone with IPD’s

manager and key personnel.

a. Tsiakiris Findings Five respondents were selected in NLC to complete the CAM-I

instrument. The respondents were selected in order to represent different departments

inside NLC. Although the sample size was small the research provided the general

indication of the readiness of the NLC. The questionnaire included two major categories

of questions; questions that dealt with the unit’s situation profile and questions that dealt

with the readiness assessment. From those questions, 20 indicators were produced and

used to evaluate the unit’s readiness. Table 4.2 presents the indicators and the evaluation

(negative, indeterminate, or positive) of NLC in different managerial areas related to its

readiness (Tsiakiris, 2000). For the purposes of this research we did not include those

indicators that were tailored to the ABCM implementation process because they were

regarded as irrelevant to this research.

The important features of those indicators that are relevant to this research

are summarized next (CAM-I, 2000):

(1) Indicator 1. This indicator refers to the structure of the

organization. The likelihood of a successful implementation of a new management

practice is greater when the organization is flat, less bureaucratic, and has a process

orientation.

(2) Indicator 2. This indicator concerns the stability of the

organizational structure and the degree of employee turnover. The likelihood of a

successful implementation is greater when the organizational structure is stable and has

relatively low employee turnover.

(3) Indicator 3. This indicator is related to the successful

implementation of and sustaining previous initiatives and the perception that people in

organization have about change initiatives. The unsuccessful implementation and

support of previous improvement initiatives in an organization is an issue of concern.

45

Page 62: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

(4) Indicator 4. This indicator concerns the perception

employees have about management. The likelihood of a successful implementation of a

new management practice is greater when employees at the site perceive management as

being open-minded, trustworthy, proactive, and effective communicators.

(5) Indicator 5. This indicator is related to the degree

employees have a high morale, support the current leadership, feel empowered, have a

continuous improvement mindset, place larger organizational goals above work

unit/department objectives, and work effectively in a team environment. When

employees support the current leadership, are empowered, have a high morale, and strive

to improve their organization, the likelihood of a successful implementation is greater.

(6) Indicator 6. This indicator is related to the characterization

of an organization’s information system as state-of-art, well documented, integrated,

accessible, reliable, timely, and user-friendly. The shortage of a well documented,

integrated, accessible, reliable, timely, and user-friendly information system is an issue of

concern. Higher-quality IT systems enable managers more than insufficient IT systems to

implement management techniques because the costs of measurements are lower.

(7) Indicator 7. This indicator is related to the degree the

management stayed involved and validated its past improvement initiatives. The degree

of participation in the initiatives and validation of initiatives upon completion to ensure

that original objectives are met is an issue of concern.

(8) Indicator 8. This indicator concerns the decision-making

process and the use of relevant data. The likelihood of success is greater when

management uses an effective decision-making process by gathering the necessary

information, objectively developing and considering alternatives, and then acting on

those decisions.

(9) Indicator 9. This indicator is related to the degree that

management aligns change initiatives with the strategic objectives of their organization.

The degree of alignment of significant change initiatives with the strategic objectives is

an issue of concern.

46

Page 63: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

(10) Indicator 10. This indicator is related to communication.

The likelihood of success is greater when management effectively communicates the

purpose and value of system changes and improvement initiatives to all levels of the

organization.

(11) Indicator 11. This indicator is related to the degree that

management solicits and responds to feedback on new initiatives. The degree to which

management solicits feedback on initiatives and the responses it takes due to this

feedback is an issue of consideration.

(12) Indicator 12. This indicator is related to the degree that

user and customer needs have driven initiatives and the degree of satisfaction the users

and customers have received from those initiatives. The degree to which past customers’

and users’ needs have driven and been satisfied by previous initiatives is an issue of

concern.

(13) Indicator 13. This indicator is related to the degree that

innovation is encouraged and rewarded, while failures resulting from the pursuit of

innovation are not punished. The absence of encouragement, recognition, and reward for

innovations is an issue of concern.

(14) Indicator 14. This indicator is related to the degree that a

new management initiative is provided adequate financial resources, dedicated and

capable personnel, time, training, and a good project plan. The expectation that

management will not provide financial and personnel support, adequate time, training,

and a good project plan is an issue of concern.

47

Page 64: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

A/A INDICATOR NLC 1. Organization is flat, less bureaucratic, and has a process

orientation Indeterminate

2. Organizational structure is stable and has relatively low employee turnover

Indeterminate

3. The site has successfully implemented and sustained other improvement initiatives without negatively perceived headcount

reductions

Negative

4. Employees at the site perceive management as being open-minded, trustworthy, proactive, effective communicators, team

players, and change agents

Indeterminate

5. Employees support the current leadership, are empowered, have a high morale, and strive to improve the organization

Indeterminate

6. The site has effectively used IT to develop systems that are current, accurate, reliable, timely, integrated, and user friendly

Negative

7. Management has a history of following through on improvement initiatives

Indeterminate

8. Management uses an effective decision-making process by gathering the necessary information, objectively developing, and

considering alternatives, and then acting on those decisions

Positive

9. Management aligns improvement initiatives with the strategic objectives of the organization

Indeterminate

10. Management effectively communicates the purpose and value of system changes and improvement initiatives to all levels of the

organization

Negative

11. Management solicits and responds to feedback on new initiatives Indeterminate 12. Systems satisfy users/customers needs Indeterminate 13. Organizational culture is conducive to change Indeterminate

14. The new initiative receives adequate time, financial, and personnel support, and is accompanied by adequate training

Indeterminate

Table 4.2. Indicators and the Evaluation of NLC (After: CAM-I (2000) and Tsiakiris (2000).

The conclusions of that research indicated that indeterminate and negative

indicators could be turned into positive ones by management. Tsiakiris concluded that if

management is interested in adopting and implementing new management initiatives it

should focus primarily on indicators 2, 6, 7, 9, 10, 11, and 14. Some of those indicators

can be relatively easily turned into positive ones. Leadership and management

commitment can turn indicators 2, 4, 6, 7, 9, 10, and 11 into positive ones while financial

support by higher-level management and personnel commitment could turn indicators 6

48

Page 65: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

and 14 into positive. Tsiakiris’ final conclusion was that without specific management

actions factors represented by the indicators would likely hinder the effective

implementation of a new management practice.

…without specific management attention and action to influence the indeterminate and negative indicators a successful implementation is not highly likely. However, if NLC takes certain actions it could increase the likelihood of successful implementation (Tsiakiris, 2000).

b. Comparative Analysis

Comparing the results of that research with the information gathered

through the preliminary questionnaire (Appendix A) we can observe that the current

management conditions in IPD are analogous with those described in the research.

Specifically, the answers to questions 5, and 6 of the preliminary questionnaire indicate

that employee involvement and empowerment is still indeterminate in IPD.

Additionally, the answer to question 9 of the preliminary questionnaire

indicates that top management’s interactive communication with departmental personnel

in relation to new improvement initiatives is an issue of concern. In essence, the fact that

eighty five percent of the manager’s working time is used diagnostically to review and

control internal processes indicates a strict organizational structure that emphasizes a

“following the rules” philosophy. This philosophy is clearly reflected in one of the

perceived desired outcomes, which emphasizes regulation compliance.

On the other hand the answers to questions 3 and 4 of the preliminary

questionnaire indicate a quite qualified workforce. Moreover, the answer to question 8 of

the preliminary questionnaire indicates that incentives can be used to motivate employee

participation and commitment toward a new initiative. Both of them, when seen in

conjunction, point out that indicator 5 can be turned into positive one with the

appropriate management conduct.

49

Page 66: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Additionally, through the interviews with IPD’s top management, it was

confirmed that current IT capabilities in IPD is not an issue of concern since current

technology is utilized and personnel are quite qualified in its use. However, IT capability

is relevant depending on the project requirements. Thus, further investigation of the

current IT capabilities may be required prior to the implementation phase.

Finally, the answers to questions 8 and 9 of the preliminary questionnaire

indicate that IPD has in effect a management control system to measure its performance.

Even if that system at the moment does not capture the relationships between

performance drivers and strategic objectives, the BSC building process can be used as the

mechanism which will help to clarify strategic objectives and cause-and-effect

relationships and contribute to the development of the appropriate measures and goals

enhancing the existent management system (Kaplan and Norton, 2000).

c. Discussion The above analysis revealed that there are issues of concern in the current

IPD management environment that are related to the implementation of the BSC model.

However, those issues are not expected to create obstacles in the design of an effective

BSC model. On the contrary, the BSC development process should help IPD to clarify

strategic objectives, mobilize leadership, and focus organizational improvement

initiatives. Organizations without any explicit or shared strategic direction and change

initiatives have used the process of building a BSC as the mechanism to clarify strategic

objectives, focus, and direction (Kaplan and Norton, 2000).

Additionally, strategic thinking and control are two essential ingredients

for the development of strategy-focused organizations and the BSC provides the

framework to develop and enhance that strategic control (Kaplan and Norton, 2000). To

demonstrate the contribution of the BSC building process to the adjustment of the IPD’s

current management environment towards a more strategic one, we used the five

management principles, suggested by Muralidharan (1997). According to Muralidharan,

those principles when followed by the public sector, organizations can enhance strategic

control (Muralidharan, 1997). Those preconditions are summarized next:

50

Page 67: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

• Agree on unambiguous descriptions of a set of strategic goals.

• Agree on the actions necessary to achieve these goals and the results that are expected (cause-and-effect relationships).

• Monitor the implementation of the plan using indicators chosen and tailored to the identified purpose (performance metrics).

• Monitor changes in the external environment (policy, directives, economy).

• Involve staff in the decision-making process.

In Table 4.3, we developed a matrix showing how the current IPD’s

management environment will be affected through the BSC building process in relation

to those preconditions.

1 2 3 4 5

Table 4.3. M

Based on the BSC

favorable for precond

influence preconditio

building process and

alteration of the uncl

process and enhancin

Finally

new management pra

commitment employe

initiative. Leadershi

MURALIDHARAN PRECONDITIONS:

F F F U U :

IPD ENVIRONMENT/

IMPACT ASSESSMENT

(F=Favorably, U=Unclear)

atrix Assessing Impact of BSC Process on IPD Environment.

building process, the current environment in IPD will become

itions 1, 2, and 3. It is not clear whether the process by itself can

ns 4 and 5. Recommendations will be made at the end of the

prior to the implementation process, which can contribute to the

ear preconditions to favorable ones facilitating the implementation

g strategic control.

, another area of concern, vis-à-vis the ability of IPD to implement

ctices such as the BSC model, is related to the leadership style and

d for the development and implementation of the new management

p is an essential ingredient that can effectively communicate the

51

Page 68: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

change and mobilize personnel involvement and commitment for the successful

implementation of the program (Kaplan and Norton, 2000). Regarding the BSC building

process followed by IPD, a team approach is suggested for the development of the BSC

model. Though this approach contributes to the effective design of the BSC, it does not

make an effective implementation certain. Given the management philosophy in IPD,

leadership style and commitment are the primary concerns for an effective

implementation of the BSC model. Recommendations will be made at the end of the

design process that contribute to the adoption of a leadership style that can mobilize

personnel towards the successful implementation of the model.

2. IPD as Organizational Unit One of the major concerns of organizations that decide to develop their BSC for

the first time is the identification of the appropriate organizational unit for launching their

program. There is no a simple answer to that question. The answer depends on several

factors related to organizational structure, strategy, and leadership. (Kaplan and Norton,

1996, 2000) Given the organizational structure of IPD and the uniqueness of its mission,

it is assumed that IPD is a good organizational level for developing a BSC model. Since

a clear mission statement has been defined for IPD and a comprehensive strategy can be

formulated, IPD is a valid candidate for a BSC program. (Kaplan and Norton, 1996,

2000) Additionally, the initial BSC can be used as frame of reference for other

departments inside PD to develop their own BSC model.

Again, once more, it is necessary to emphasize that independent of the

organizational level that is chosen for the first BSC program, leadership style is an

essential ingredient contributing to an effective implementation. Additionally, if this

model will be used as a pilot program for other departments inside PD to launce their

own BSC, further analysis is required for achieving alignment of the strategic objectives

of the different organizational units with the higher-level organizational strategy. Such

an alignment contributes to the BSC program’s successful expansion. (Kaplan and

Norton, 1996, 2000)

52

Page 69: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

3. IPD and Common Issues in Public Organizations

In the public sector, the financial perspective differs from that of the traditional

private sector. Financial considerations for public organizations may have an enabling or

constraining role, but will rarely be the primary objective for business systems. Success

for public organizations is related to mission effectiveness and the desired outcomes

should be tailored to mission necessity. (Kaplan and Norton, 2000; Procurement

Executives’ Association, 2003; The Balanced Scorecard Institute, 2003)

A closer look at IPD’s organization and mission verifies the above-identified

features of the public sector in relation to the BSC model. The creation of financial value

cannot be the ultimate goal of IPD since it is a nonprofit organization and its mission

statement defines a nonprofit orientation. Given the IPD’s mission necessity for the

HNSC overall success, efficiency of operations, customer satisfaction, and accountability

(public trust) for the work authorized to the department are better performance indicators.

The desired outcomes, as IPD management defines them, reflect the IPD’s perspective

for performance success. However, even those clearly defined and mission-tailored

outcomes are not free from concerns related to complexities inherent in governmental

agencies.

The team approach employed in the BSC building process (IPD manager and key

personnel) along with the involvement of the author in the data interpretation stage and

the critique of two experienced professors, contribute to a valid design of a conceptual

causal performance model. However, there are complexities related to the IPD’s mission

nature and organizational structure that need careful consideration before using the

proposed model as a functioning performance measuring model.

Identification and gaining consensus of the IPD’s different stakeholders should be

one of the first priorities in the development process. They will contribute to the design

of a performance model that includes the customer concept with a broadened perspective.

In effect, they should contribute to the development of a valid performance model that

includes the whole spectrum of IPD’s strategic objectives that need to be achieved for the

stakeholders’ satisfaction and the mission success.

53

Page 70: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Additionally, given the uniqueness of IPD’s mission, it is apparent that the

metrics that need to be developed for the desired outcomes cannot be compared or

benchmarked against other more generic measures available in the market. Past

performance should be used as the alternative. However, lack of available data on which

reliable measures can be based is a common issue in public organizations (Procurement

Executives’ Association, 2003; The Balanced Scorecard Institute, 2003). Even though

this may not be the case in IPD it is not certain that the data available in IPD are relevant

to the specific program given that this is a unique program developed for the first time.

This deficiency may influence the implementation of the model (Abernethy et al., 2002).

On the other hand, over-reliance on available data could lead to an irrelevant model that

is unrelated to original strategic goals (Abernethy et al., 2002). Consequently, the current

data availability in IPD should not be expected to influence the ability of the conceptual

model to capture the IPD’s intended strategy and casual interrelationships. Additionally,

the classification of IPD as a mass service organization should help in the selection and

development of appropriate performance measures tailored to this specific service type in

the final stage of the BSC building process. However, a potential lack of adequate data

should be expected to influence the testing of the model during the implementation

process. Recommendations will be made at the end of the development process for the

collection and maintenance of relevant past performance data that can be used as

benchmarking of future performance.

Finally, another area of concern common in the public sector is related to the

degree of influence various exogenous factors may have on the organization’s operations

and the ability of the organization to monitor and control that influence (Neely and

Walters, 2002). The identification and inclusion of those important external factors in the

IPD’s BSC model can contribute to the validity of its design. (Abernethy et al., 2002)

However, including external factors in the BSC model for which there is no previous

experience of controlling and measuring may contribute to the complexity of the model

and increase the difficulties during the implementation process. Regarding IPD, the

design process is expected to reveal those important exogenous factors that influence its

operations. The inclusion of those factors in the conceptual performance model should

54

Page 71: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

contribute to the validity of its design. However, further research may be required for the

evaluation of those factors and the ability of IPD management to control or influence

those factors. Though such a study is outside the scope of this research,

recommendations will be made at the end of the BSC development process.

C. CHAPTER SUMMARY The first part of this chapter provided information about the IPD’s organizational

structure and mission. The mission statement, important processes, desired outcomes,

and additional managerial information were illustrated in order to provide the reader with

a clearer understanding of the IPD’s operations and organizational objectives. The

information presented in this part was based on two primary sources; the departmental

Memorandum of Operations (International Procurement Department, 1991) and a

preliminary questionnaire developed for this purpose (Appendix A).

Additionally, the IPD was classified according to in relation to the three typical

service types identified by Lin Fitzgerald (1993). Taking into account the IPD’s

organization and operations, the department was classified as a mass service

organization. This classification will contribute to the better understanding of the IPD

management conditions and facilitate the selection of performance metrics during the last

stage of this study.

In the second part of this chapter information was provided about the role of IPD

in relation to the HNSC’s overall mission. An initial assessment of the IPD’s mission

statement was made in relation to the HNSC’s overall mission. This assessment provided

further insight into the nature of the mission emphasizing issues related to management

philosophy and departmental objectives. The analysis revealed that the mission and

management philosophy are reflected in the management perspective about IPD’s desired

outcomes. Given the management environment and the defined desired outcomes, the

development of a valid conceptual performance model is possible for IPD. However, in

the long run the current management conditions may hinder the proposed BSC model

from being employed as an effective strategic management tool.

55

Page 72: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

In this part of the chapter further analysis of the IPD’s current management

conditions was also made in three dimensions. First, the current management

environment was evaluated in relation to its readiness and ability to adopt and implement

leading-edge management practices. Second, IPD was examined as an organizational

unit in HNSC in order to identify potential obstacles in the BSC building process.

Finally, the major issues that have been identified in the literature and are connected to

the adoption and implementation of the BSC model in public sector were examined in

relation to the IPD’s current conditions.

Regarding the examination of IPD’s readiness to adopt and implement new

management practices, the results of similar research, conducted by Georgios Tsiakiris in

2000, was initially used. The results of that research were examined in conjunction with

the current information gained through the preliminary questionnaire and the interviews

with the IPD manager. The analysis revealed that there are no major obstacles for the

design of a valid BSC model for IPD. However, there are some managerial areas in IPD

that need particular consideration before the commencement of the BSC implementation

process. Given the IPD’s current management conditions, and the contribution of the

BSC building process to IPD’s strategic thinking, leadership style and commitment are

anticipated to become the catalytic factors that contribute to the effective implementation

of the model.

Regarding the examination of IPD as an organizational unit, the analysis revealed

that IPD is a valid candidate for a BSC program. According to Kaplan and Norton, since

a clear mission statement has been defined for IPD and a comprehensive strategy can be

formulated, the conditions are favorable for IPD to launch its initial BSC model.

In the last part of this chapter several important issues related to the development

of the BSC model in public organizations were examined in conjunction with IPD’s

conditions. Different perceptions about financial and customer perspectives between the

public and private sector are expected to influence the architecture of the BSC model in

IPD. Desired outcomes are to be primarily tailored to mission effectiveness while

customer concept needs to be broadened to include all the identified stakeholders.

Additionally, the proposed measures cannot be benchmarked against measures available 56

Page 73: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

in the market due to IPD’s unique mission. Collection and maintenance of relevant past

performance data are important for the effective implementation of the model. Finally,

though the identification and inclusion of exogenous factors may contribute to the

validity of the conceptual performance model it is not quite certain whether IPD

management has the ability to control and measure the influence of those factors on its

operations. Further study may be required for the evaluation of those factors and the

ability of IPD to monitor them.

57

Page 74: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

58

Page 75: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

V. BUILDING A PROPOSED MODEL

A. IPD STRATEGIC GOALS A strategy map describes the process of transforming intangible assets into

tangible desired outcomes. Building a strategy map for an organization helps make

explicit the strategic objectives and the links among performance drivers (leading

indicators) and desired outcomes (lag indicators). Based on the data gathered through the

first questionnaire (Appendix B) we identified the IPD’s desired outcomes, critical

processes, and key success factors (Tables 3.1 through 3.6). Based on that data, we

developed the architecture of the IPD’s BSC for describing its strategy. The proposed

BSC architecture is based on the IPD’s links among its mission, desired outcomes, and

strategies to achieve them.

The desired outcomes of the IPD are classified in three primary strategic themes

that constitute the initial architecture of the IPD’s BSC. Figure 5.1 below depicts the

IPD’s BSC architecture.

Figure 5.1. IPD’s BSC Architecture.

IPD MISSION

IPD STRATEGY

Strategic Goals: Cost Reduction

FINANCIAL PERSPECTIVE

Strategic Goals: Regulation Compliance

On Time Payments

INTERNAL PROCESSES

PERSPECTIVE

Strategic Goals: Customers Satisfaction

CUSTOMER PERSPECTIVE

59

Page 76: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Starting with IPD’s mission, the IPD’s strategy is classified in three strategic

themes. Based on the IPD’s desired outcomes (Table 3.1) the specific strategic goals that

need to be achieved for mission accomplishment have been identified and described in

each of the three strategic themes.

The three strategic themes in Figure 5.1 represent three of the four generic BSC

perspectives described in the literature. Modification of the generic BSC architecture

was necessary given the IPD’s mission necessity. Financial success could not be at the

top of the process since it is not the primary objective. Putting customer satisfaction at

the top of the process was one of first adjustments made in the BSC architecture.

Additionally, taking into account that IPD has authority to conduct its mission that is

delegated by public law and that its performance priorities are not financial in nature, but

rather mission effectiveness and accountability, the internal processes perspective with

emphasis on regulation compliance was necessary to be included in the BSC architecture.

On the other hand, based on the IPD’s executive team perspective about desired

outcomes, the fourth generic perspective (learning and growth) was not included in the

IPD’s initial BSC architecture.

B. IPD MULTIPLE OBJECTIVES Based on the above-identified strategic goals and Table 3.2, this section provides

a description of the IPD’s multiple strategic objectives. The description in turn

contributes to the articulation and explicit description of the IPD’s desired strategy. The

description of the multiple strategic objectives assists in the identification of the priorities

inside IPD and facilitates the identification of the activities and factors that are the drivers

of the desired outcomes. Since in the analysis and description of the IPD’s strategic

objectives some strategic objectives were identified to be directly related to the IPD’s

people factor, in this stage of the IPD’s BSC design the people perspective was also

included in the IPD’s strategy map in order to facilitate the inclusion of the whole

spectrum of the cause-and-effect relationships in the final BSC design. Figure 5.2 depicts

the IPD’s multiple strategic objectives that need to be achieved, classified in the four

60

Page 77: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

strategic themes. These strategic objectives comprise the IPD’s integrated strategy. They

illustrate the IPD’s management priorities that need to be measured since they contribute

to the IPD’s mission accomplishment.

PEOPLE

Strategic Objectives:

- Improve Skills

- Increase Capabilities

- Improve knowledge

FINANCIAL

Strategic Objectives:

- Full & Open Competition - Economies of Scale

PROCESSES

Strategic Objectives:

- Timely & Effective Review of Documents - Increase use of IT - Enhance Auditing

CUSTOMERS

Strategic Objectives: - Lower Delivery Time - Increase Quality

IPD STRATEGY

Figure 5.2. IPD’s Strategic Objectives.

However, strategy is a set of hypotheses that implies the movement of an organization

from its present position to a desirable but uncertain position (Kaplan and Norton, 2000).

In that sense, the identification of the multiple objectives contributes to alignment and

focus for a valid design of a BSC model, In the future, this set of hypotheses should be

tested again and adapted as required.

C. IPD CRITICAL PROCESSES AND KEY FACTORS The critical processes identified in Chapter III (Table 3.4) are classified in the

respective strategic theme based on the direct impact they have on the identified strategic

objectives (Table 3.5). Figure 5.3 depicts those direct links (dashed arrows) of critical

processes with the IPD’s strategic objectives that have been identified by the key

61

Page 78: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

interviewees and analyzed by the author. In addition, in Figure 5.3, the interrelationships

among the critical processes are also depicted (black arrows) illustrating the cause-and-

effect relationships among the critical processes as they have been identified by the key

interviewees, based on their experience. This method is advantageous for creating causal

models in early stages of developing conceptual performance models, when more

objective data are either unavailable or inappropriate (Abernethy et al., 2000). The

critical processes depicted in Figure 5.3 are those from which a black directional arrow

begins. These critical processes need to be controlled, and performance measures need to

be developed.

P10P8

P7

P9P5

P1

P6

P3 P2b

S10 S8 S9

People Customer Internal Processes Financial

Out

com

es

Proc

esse

s O

bjec

tives

S2S1 S7S6

D3D2 D1 D4

S5S3 S4

Figure 5.3. Links Among Critical Processes and Strategic Objectives.

62

Page 79: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

The influence of the key success factors upon the critical processes that have been

identified in the previous chapter (Table 3.7), is depicted on Figure 5.4. Those factors are

the performance drivers (lead indicators) that need to be controlled and measured since

they contribute to the improvement of the performance of the critical processes. The

black arrows in Figure 5.4 illustrate the cause-and-effect relationships between key

factors and critical processes as they have been identified by the key interviewees in the

research. The key interviewees were allowed to identify performance factors and causal

links based on their experience of causality. As shown in Figure 5.4 the directional

arrows are not associated with specific critical processes because one factor may

influence more than one process in each strategic theme as was demonstrated in the

Chapter III.

Figure 5.4 also includes an exogenous factor (X1), the inclusion of which

contributes to the validity of the BSC model. Although this factor influences IPD’s

critical processes, the degree of that influence cannot be assessed or measured by

management in this stage. Further research may be required for the evaluation of this

factor and the ability of IPD management to control and measure the influence of this

factor. Finally, the links (dashed arrows) between the IPD’s key success factors and the

strategic objectives that have been identified by the key interviewees are depicted in

Figure 5.5.

63

Page 80: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

F4

F1

F6F7

F5

P6

P8

P7 P1

P2b

Exogenous Factors

Critical Processes

X1

Factors C

usto

mer

s Fi

nanc

ial

Inte

rnal

Pro

cess

es

Peop

le

Figure 5.4. Links Among Factors and Critical Processes.

64

Page 81: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Out

com

es

Proc

esse

s Fa

ctor

s O

bjec

tives

S2S1S7S6S5S3 S4S1S8 S9

F1

D3D2 D1 D4

People Customers Internal Processes Financial

F6 F7

F5 F4

Figure 5.5. Links Between Key Factors and Strategic Objectives. D. PUTTING IT ALL TOGETHER

65

The conceptual casual framework that describes the IPD’s desired outcomes,

strategic objectives, critical processes, key success factors and their causal

interrelationships is depicted in Figure 5.6. Figure 5.6 comprises the IPD’s causal

performance model, organized in four strategic themes, that integrates and communicates

IPD’s strategy and incorporates and describes the causal links of performance for all the

critical elements illustrating the IPD’s “story of success”. Those links that are depicted

by directional arrows illustrate the cause-and-effect relationships among the elements of

Page 82: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

the model for which a set of performance measures should be developed and monitored

by management since they contribute to alignment and focus of IPD’s efforts for the

mission success.

Figure 5.6 Putting All the Links Together.

Taking into account the causal framework depicted in Figure 5.6 the IPD’s

propose

D4 D1 D2 D3

Financial Internal Processes Customers People ExogenousFactors

X1

Proc

esse

s O

bjec

tives

Fa

ctor

s O

utco

mes

F1F4

F5

F7

F6

S1 S2S4S3 S5S9S8 S10 S6 S7

P1

P3 P5 P9P2b

P6

P7

P8P10

d BSC model is depicted in Figure 5.7. The main difference with the model

initially depicted in Figure 5.1 is that it has incorporated one more strategic perspective

(people). Evan though it was not clearly described by the key interviewees, can be easily

inferred by the interviewees’ perception about IPD’s strategic objectives. In addition, the

model does not include the exogenous factor identified in the previous chapter since the

degree of its influence cannot be assessed or measured by management at this stage.

66

Page 83: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

IPD MISSION

& STRATEGY

Measures

Desired Outcome: D1

Strategic Objectives: S1 - S2

Critical Processes: P6

Targets

FINANCIAL PERSPECTIVE

Measures

• Desired Outcome: D4

• Strategic Objectives: S6 - S7

• Critical Processes: P2b

• Key-Factors: F1

PROCESSES PERSPECTIVE

Measures

Desired Outcome: D2 – D3

Strategic Objectives: S3 - S4 - S5

Critical Processes: P1 – P7 – P8 Key-Factors:

F4

Targets PEOPLE PERSPECTIVE

Measures

Strategic Objectives: S8 – S9 – S10 Key-Factors: F5 - F6 – F7

Targets

Targets

CUSTOMERS PERSPECTIVE

Figure 5.7. IPD’s Proposed BSC Framework.

In the next chapter of this study, a set of performance measures will be developed

and suggested to be incorporated in the model transforming the model into a potential

management control system that facilitates IPD’s management focus and control on

IPD’s overall performance.

67

Page 84: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

68

Page 85: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

VI. DEVELOPMENT OF PERFORMANCE MEASURES

A. SELECTING PERFORMANCE MEASURES A successful BSC is one that communicates strategy and objectives through an

integrated set of measurements that includes both desired outcomes and performance

drivers (Kaplan and Norton, 2000). In addition, Kaplan in his work on the BSC

emphasizes that: Choice of appropriate measures is an art that must be practiced in

conjunction with the strategic goals (Kaplan, 1984). However, the development of a

proper set of performance metrics has proven to be the most difficult aspect of the BSC

process (Balanced Scorecard Institute Website, 2003). As Simons argues, to determine if

a measure is suitable to support a performance objective, it must be subject to three tests

(Simons, 2000):

• It must align with strategy.

• It must be measured effectively (verifiable, complete, and responsive).

• It must be linked with value.

In addition to those generic principles applicable to all types of organizations,

Fitzgerald et al. emphasizes the differences between manufacturing and service

organizations in developing performance measures. The business strategy and the

archetypal service type in which the specific organization is classified are the key factors

in determining the appropriate performance measures for service organizations

(Fitzgerald et al., 1993).

Our analysis in Chapter IV revealed that IPD can been classified as a mass service

organization. According to Fitzgerald et al. (1993) mass service organizations after

identifying their strategic objectives should develop a balanced set of performance

metrics, measuring both results and determinants, taking into account the following

factors:

• Operating costs are not easily traceable in mass services making it difficult to analyze profitability of individual services.

• While professional services can afford to measure customer satisfaction in different stages of the service process, in mass services the measurements mostly rely on customer surveys.

69

Page 86: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

• While professional services can afford to measure quality and effectiveness of internal processes in different stages of the service process, in mass services the measurements mostly rely on service outputs.

• For measures related to resource utilization mass services tend to rely mostly on development of ratios as more understandable and easily traceable.

Taking into account the above-identified principles that govern the selection of

the appropriate performance measures, the author initially developed a set of suggested

measures. In a second stage, the key interviewees were asked to adjust and approve the

suggested measures. The key interviewees, in their response, agreed on the usefulness

and the applicability of the suggested measures. The only concern they expressed was

about the influence of the external factor (X1) upon the measurement of the fund

availability.

A set of measures, classified in the four strategic themes that were identified and

developed in the previous chapter, was developed for IPD. The measures suggested for

the IPD’s BSC model reflect the uniqueness of the IPD mission and are not considered to

be generic in nature. All of them are associated with specific strategic objectives, which

in turn are associated with specific outcomes, critical processes, and key factors,

reflecting the conceptual cause-and-effect relationships and contributing to alignment and

focus. In ten of the cases, a combination of measures is suggested for specific strategic

objectives to better monitor the performance of the specific objective.

The set of metrics suggested include both objective and subjective metrics.

Objective metrics can be collected from present operational data that may be already

available from the information system in place in IPD. Other objective metrics may be

new, for which data are not available and data collection must begin to track them.

Subjective metrics can be derived from people’s perceptions as in the case of “customer

satisfaction”.

Taking into account the IPD’s conditions that were demonstrated in chapter IV,

the nature of the metrics, and the definition of the metrics (formula), a method of

measurement is suggested for each performance metric, which is expected to facilitate the

implementation of the BSC model.

70

Page 87: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

1. Customer Perspective Measures

The suggested measures for the IPD’s customer perspective have been classified

in three major categories: Desired outcomes, strategic objectives, and critical processes.

In addition, a codification of the measures was made in order to facilitate the reader’s

understanding of the proposed BSC model. The suggested measures for the customer

perspective are the following:

Objective Measure Coding Measurement Method

Customer needs prompt fulfillment.

a. Percentage of customers satisfied with delivery time. b. Percentage of customers satisfied with item quality.

CDM1a CDM1b

- Setting objective and attainable goals. - Customer sampling survey. - Benchmarking on past performance.

Table 6.1. Desired Outcomes Oriented.

Objective Measure Coding Measurement Method

1. On time delivery.

Percentage of cases (procurement, repair, FMS) where contractual delivery date meets actual delivery/acceptance date.

CSM1

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Increase quality. a. Percentage of defective products reaches the end user. b. Percentage of defective shipments.

CSM2a

CSM2b

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

Table 6.2. Strategic Objectives Oriented.

Process Objective Measure Coding Measurement

Method Monitoring material deliveries.

On time delivery.

a. Percentage of delayed shipments. b. Percentage of materials delivered within the contractual time during a specific period of time in relation to the total number of the materials delivered (monthly, quarterly, or yearly).

CPM1a CPM1b

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

Table 6.3. Critical Processes Oriented.

71

Page 88: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

2. Internal Processes Perspective Measures

The suggested measures for the IPD’s internal processes perspective have been

classified in four major categories: Desired outcomes, strategic objectives, critical

processes, and key factors. In addition, a codification of the measures was made in order

to facilitate the reading of the proposed BSC model. The suggested measures for the

internal processes perspective are the following:

Objective Measure Coding Measurement Method 1. Regulatory compliance.

a. Percentage of cases submitted for audit on time in relation to the total cases submitted for audit during a specific period of time (monthly, quarterly, or yearly). b. Percentage of cases submitted for audit on time, (without protests for faults or mistakes) in relation to the total cases submitted for audit during a specific period of time (monthly, quarterly, or yearly).

IPDM1a IPDM1b

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. On time payments.

a. Percentage of cases where contractual payment date meets actual payment date. b. Percentage of interest paid for payment delays in relation to the total payments (in money value) made in one year.

IPDM2a IPDM2b

- Setting objective and attainable goals. - Generating database in IPD.

- Benchmarking on past performance.

Table 6.4. Desired Outcomes Oriented.

72

Page 89: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Objective Measure Coding Measurement Method 1. Enhance internal auditing.

a. Extent to which employees involved in internal auditing meet pre-established standards of training, knowledge and experience in each position. b. Ratio of daily time spent correcting mistakes in documents submitted to manager for approval (and returned back for corrections) to total daily time spent preparing documents for submitting documents to manager for approval.

IPSM1a

IPSM1b

- Setting qualification standards. - Employee survey - Employee training. - Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Timely & effective review of documents.

Percentage of cases reviewed effectively the first time within predetermined time targets in relation to the total cases reviewed in a specific period of time (monthly, quarterly, or yearly).

IPSM2

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

3. Increase use of IT.

a. Percentage of daily transactions made through the use of IT in relation to the total daily transactions made. b. Extent to which employees involved in IPD activities have been trained in using IT transactions. c. The difference in the investment made for IT between current year and previous year divided by the investment made in previous year.

IPSM3a

IPSM3b

IPSM3c

- Setting objective and attainable goals. - Generating database in IPD. -Benchmarking on past performance.

- Setting training goals. - Employee survey. - Employee training. - Benchmarking on past performance.

-Setting a long-term IT investment plan taking into account market capabilities, prices, and inflation.

Table 6.5. Strategic Objectives Oriented.

73

Page 90: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Process Objective Measure Coding Measurement Method

1. Requisitioning Funds.

a. Timeliness. b. Accuracy & Thoroughness.

Percentage of requisitions issued and submitted within predetermined time target in relation to the total requisitions issued in a specific period of time (monthly, quarterly, or yearly). Percentage of requisitions issued on time, right, the first time (without any further correction) in relation to the requisitions issued in a specific period of time (monthly, quarterly, or yearly).

IPPM1a

IPPM1b

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Collecting documents.

Timeliness.

Percentage of pertinent procurement and repair documents collected within predetermined time in relation to the total pertinent documents collected (monthly, quarterly, or yearly).

IPPM2

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance

3. Reviewing documents

Timeliness & Accuracy

Percentage of cases reviewed right, the first time, within predetermined time targets in relation to the total cases reviewed in a specific period of time (monthly, quarterly, or yearly).

IPPM3

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

Table 6.6. Critical Processes Oriented.

74

Page 91: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Factor Objective Measure Coding Measurement Method

1. Communications. Availability &

Reliability.

a. Percentage of times employees were satisfied with the communication systems they used in relation to the total times they made use of the systems for accomplishing their tasks. b. The difference in the investment made for communication systems between current year and previous year divided by the investment made in previous year.

IPFM1a

IPFM1b

- Setting objective and attainable goals. - Employee survey. - Generating database in IPD. - Benchmarking on past performance. -Setting a long-term investment plan in communications taking into account market capabilities, prices, and inflation.

Table 6.7. Key Factors Oriented.

3. Financial Perspective Measures The suggested measures for the IPD’s financial perspective have been classified

in four major categories: Desired outcomes, strategic objectives, critical processes, and

key factors. In addition, a codification of the measures was also made in order to

facilitate the reading of the proposed BSC model. The suggested measures for the

financial perspective are the following:

Objective Measure Coding Measurement Method

1. Cost reduction. Savings realized by switching from sole source to competitive strategy.

FDM1 - Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

Table 6.8. Desired Outcomes Oriented.

75

Page 92: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Objective Measure Coding Measurement Method

1. Full and open competition.

Ratio of procurement or repair cases made through competition to procurement or repair cases made through sole source (monthly, quarterly, or yearly).

FSM1

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Achieve economies of scale.

a. Ratio of total line items over total procurement cases in current period to line items over cases in previous period (monthly, quarterly, or yearly). b. Percentage of consolidating requirements in relation to the total requirements (monthly, quarterly, yearly).

FSM2

- Setting objective and attainable goals. - Generating database in IPD - Benchmarking on past performance.

Table 6.9. Strategic Objectives Oriented.

Process Objective Measure Coding Measurement Method

1. Publicizing solicitation documents.

Increase the number of contractors solicited.

Saving realized by increasing the number of contractors solicited for the same procurements.

FPM1

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

Table 6.10. Critical Processes Oriented.

Factor Objective Measure Coding Measurement Method

1. Available funds.

Fund availability.

Ratio of funds available in hand for procurements or repairs in the beginning of the period to funds actually consumed at the end of the same period (monthly, quarterly, yearly).

FFM1

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

Table 6.11. Key Factors Oriented.

4. People Perspective Measures The suggested measures for the IPD’s people perspective have been classified in

two major categories: Strategic objectives and key factors. In addition, a codification of

the measures was also made in order to facilitate the reading of the proposed BSC model.

The suggested measures for the people perspective are the following:

76

Page 93: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Objective Measure Coding Measurement 1. Improve employees’ skills and capabilities.

Extent to which IPD employees involved in IPD activities meet pre-established qualification standards in each position.

PSM1

- Setting qualification standards.

- Employee survey. - Employee training. - Benchmarking on past performance.

2. Improve employees’ knowledge.

Extent to which IPD employees involved in IPD activities meet pre-established knowledge standards of laws and regulations in each position.

PSM2

- Setting qualification standards. - Employee survey. - Employee training. - Benchmarking on past performance.

Table 6.12. Strategic Objectives Oriented.

Factor Objective Measure Coding Measurement

1. Employee commitment.

Improve commitment.

Extent to which employees involved in IPD activities feel satisfied and induced in each position.

PFM1

- Setting satisfaction rate goals

- Employee survey. - Benchmarking on past performance.

2. Employee responsibility.

Improve Responsibility.

Extent to which employees involved in IPD activities held accountable for their actions with respect to compliance with laws and regulations.

PFM2

- IPD management assessment of current management control system.

- Employee survey.

- IPD management initiatives.

- Benchmarking on past performance.

3. Access to information.

Improve access to strategic information.

a. Ratio of the times employees get accurate, timely, and complete information to the total times asked for this information (monthly, quarterly, or yearly). b. The difference in the investment made for information systems between current year and previous year divided by the investment made in previous year.

PFM3a

PFM3b

- Setting access to information goal. - Employee survey.

- Generating database in IPD. - Benchmarking on past performance.

-Setting a long-term investment plan in information systems taking into account market capabilities, prices, and inflation rates.

Table 6.13. Key Success Factors Oriented.

77

Page 94: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

B. CHAPTER SUMMARY

The first part of this chapter described the principles identified in the literature

that should govern the development of performance measures for monitoring

organizational performance. An emphasis was put on the principles identified by

Fitzgerald et al. (1993) for service organizations taking into account the nature of the

IPD’s operations.

Based on those principles the author developed a set of performance metrics for

IPD tailored to the IPD’s strategy, desired outcomes, critical processes, and key factors

that were identified in the previous chapters. This set of measures was reviewed and

approved by the key interviewees. This course of action contributed to the development

of a set of metrics that is both in accordance with the principles identified in the literature

and meaningful to the users.

In the last part of this chapter a matching of the suggested measures was made

with the IPD’s BSC perspectives and the respective individual objectives contributing to

the development of a complete BSC model. In addition, next to each of the performance

measures a measurement method was also suggested taking into account the IPD

environment and the nature of the measures. The complete proposed BSC framework is

depicted in Figure 6.1. As shown in Figure 6.1 the number of the suggested metrics in

each perspective is in accordance with what has been identified in the BSC literature as a

necessary and sufficient number of measures (four to seven measures in each perspective)

with the exception of the internal processes perspective (Kaplan and Norton, 1996). In

essence, the basis for selecting the appropriate number of metrics is directly related to the

ability of individuals to effectively absorb and track discrete items of information, which

is a constraint that has been identified by research in behavioral sciences and is related to

the limits of short-term memory in the process of perceiving knowledge (Hirsch, 1987).

However, as Kaplan and Norton (1996) argue, the number of metrics by itself is not the

catalytic factor for the set of performance metrics to become functional. The effective

description of the strategy by the measures that have been incorporated into the BSC and

the cause-and-effect link among measures are more important factors in the process of

selecting the appropriate number of measures. In that sense, the sixteen measures

78

Page 95: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

suggested for the internal processes perspective is not anticipated to adversely influence

the functionality of the proposed model since those metrics are assumed to reflect the

whole set of cause-and-effect relationships among desired outcomes, critical processes,

and key factors. In any case, it remains at the discretion of the IPD’s management to

eliminate some of those metrics during the implementation process if they prove to be an

impediment to the applicability of the model.

Finally, it should be emphasized that before the implementation of the proposed

model, IPD management should determine objective and attainable goals associated with

each measure, which is a prerequisite for the model to become operational.

79

Page 96: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

IPD MISSION

& STRATEGY

CUSTOMERS PERSPECTIVE

OutcomeD1

Objective

S1 S2

Process

P6

Measures - CDM1a - CDM1b - CSM1 - CSM2a - CSM2b - CPM1a - CPM1b FINANCIAL

PERSPECTIVE

OutcomeD4

ObjectiveS6 S7

Process P2b

Factor F1

Measures - FDM1 - FSM1 - FSM2 - FPM1 - FFM1

PROCESSES PERSPECTIVE

Outcome D2 D3

Objective

S3 S4 S5

Process

P1 P7 P8

Factor

F4

Measures - IPDM1a - IPDM1b - IPDM2a - IPDM2b - IPSM1a - IPSM1b - IPSM2 - IPSM3a - IPSM3b - IPSM3c - IPPM1a - IPPM1b - IPPM2 - IPPM2 - IPFM1a - IPFM1b

PEOPLE PERSPECTIVE

ObjectiveS8 S9

S10 Factor

F5 F6 F7

Measures - PSM1 - PSM2 - PFM1 - PFM2 - PFM3a - PFM3b

Figure 6.1. IPD’s BSC Model Including Performance Metrics.

80

Page 97: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

VII. CONCLUSIONS AND RECOMMENDATIONS

A. RESEARCH QUESTIONS

1. Primary Research Question

The primary research question “What is the design of a BSC model that applies to

IPD” was answered in Chapter V. In a step-by-step analysis of the casual relationships

among the elements of the BSC model that were identified in Chapter III, we identified

an appropriate BSC model that applies to IPD environment. The proposed BSC

framework is depicted in Figure 5.7.

2. Secondary Research Questions The first of the secondary questions regarding IPD’s desired outcomes was

initially answered in the first part of Chapter III and then analyzed in Chapter IV.

However, that initial assessment about IPD’s desired outcomes was further tested against

the other key interviewees’ perspective in order to reach consensus given that desired

outcomes and strategy are the starting point in the BSC building process.

The secondary questions two through four, about IPD’s strategy, multiple

objectives, critical processes, key success factors, and their interrelationships, were

answered and analyzed in Chapter III providing the basis for the design of the BSC

model.

Finally, the last of the secondary questions regarding the appropriate set of

performance measures that need to be incorporated into the BSC model, was answered

and analyzed in the preceding chapter contributing to the development of a BSC model

that can be used as a management control system. The final BSC framework is depicted

in Figure 6.1.

B. RECOMMENDATIONS FOR COMMUNICATING THE MODEL Of all the concepts needed for successful implementation of performance-based

models, effective communication is probably the most important (Kaplan and Norton,

1996, 2000; Procurement Executives’ Association Website, 2003). The analysis in

81

Page 98: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Chapter IV revealed that although current conditions in IPD do not hinder the effective

design of a BSC model there are some areas of concern that may influence its effective

implementation.

Taking into account IPD’s current conditions that were presented in Chapter IV,

the major elements of a communication plan that can be developed to contribute to the

effective implementation of the BSC model are:

• IPD top management commitment to the BSC model is required because not only do they have the knowledge to communicate the model but also the authority to mobilize employees’ participation and involvement into the process.

• The adoption by the IPD management of leadership style that emphasizes participation, development of employee’s initiative and involvement in the decision-making can become a catalytic factor for the successful implementation of the BSC concept.

• Effective communication of the function and the benefits of the model to the HNSC’s top management can ensure support for the initiative both in terms of funds and means. It can also facilitate senior management mobilization and adoption of analogous management initiatives that may be required during the implementation process.

• Training and of the employees by IPD management to understand the function and objectives of the BSC and the benefits of lunching such an initiative is likely to contribute to a better understating by the employees of how their actions relate to IPD’s overall performance, as well as enhance involvement and commitment during the implementation process.

In addition to these elements, there are actions that need to be undertaken by the IPD

management that together with the communication plan can contribute to the effective

implementation of the BSC model:

• Developing objective and attainable goals for each of the identified objectives is required both in the short run and in the long run.

• Establishing a data collection system that can be used for benchmarking against past performance and training of IPD’s employees involved in the project on its use.

• Accountability for result should be clearly assigned and well understood.

• Seeking and adopting appropriate incentives that are tailored to specific objectives and measures and are suitable for motivating actions towards the specific objectives.

82

Page 99: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

• Constant monitoring of the changes in the internal and external environment and adjustment of the BSC elements as required.

• Sustaining of IT capabilities on a level appropriate to support and enhance the initiative.

• Developing initiatives that contribute to the (1) participation of IPD in the fund approval and need determination process and (2) re-definition of the IPD’s mission in order to provide more discretion in the decision making process can in the long run enhance strategic control and transform the BSC model from a management control system to a strategic system.

C. RECOMMENDATIONS FOR FURTHER STUDY

A follow-up study for the implementation of the proposed BSC model would be

appropriate. This additional study could statistically test the cause-and-effect

relationships among the BSC metrics. As data on the metrics are collected over time,

conclusions about leading and lagging relationships would provide insight into the

appropriateness of the BSC design.

An additional study could be undertaken for the evaluation of the influence of

exogenous factors upon the IPD’s operations and the ability of IPD to control those

factors and incorporate them into the BSC model.

83

Page 100: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

84

Page 101: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

APPENDIX A. PRELIMINARY QUESTIONNAIRE

1. Name: --------------------------- (Intentionally covered). 2. Rank: Commander

3. Specialty: Supply Officer 4. Level of Education (please highlight):

a. High School b. College c. Bachelor degree d. Master’s degree e. Post-graduate/Doctorate

5. Current position: Hellenic Navy Supply Center, International Procurements Department

6. Number of months in current position: Nineteen (19)

7. Phone number: ---------------------------- (Intentionally covered).

8. E-mail: ------------------------------------- (Intentionally covered). 9. Please describe briefly your current duties: Head of the Department

Comments: ____________________________________________________________________________________________

End of section “A” of preliminary questionnaire.

A. Respondent Demographics:

85

Page 102: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

1. Please briefly describe the International Procurement Department (IPD) mission:

“To procure spare parts and minor systems from sources (manufacturers and vendors) outside the country, for

fulfilling the Hellenic Navy’s specific needs through the following processes:

A. International Competitions

B. Sole Source Procurements. C. International Agreements ”

2. Does the following organizational chart describe the organization structure of the International Procurement

Department? (If yes go to the next question. If not please make the necessary adjustments).

Respond: YES!

3. Please briefly describe the duties of the offices that are under your Department (IPD) (Attach additional offices

if necessary):

Office 1320/2-3-4-5:

i. Title: INTERNATIONAL PROCUREMENTS OFFICE. ii. Duties (describe briefly):

This office currently occupies four employees. Each of them, who have the title procurement case

operator, has similar duties. They are responsible for undertaking exclusively a procurement case and making the

follow-up from the material need generation to the material delivery. Among their important activities is the timely

Collecting and effective review and processing of all the pertinent receiving records, invoices and vouchers so that to

achieve on time payment of all the accounts due. However, the main differentiation in their duties comes from the

B. Organizational Profile

1320 International Procurements Department

1320/2-3-4-5 International Procurements

Offices

1320/7 Transportation

Payments Office

1320/9 International Procurements

Office

1323 Accounting

Office

1324 Repairable

Items Office

1330 FMS Programs

Office

86

Page 103: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

payment process that is followed with respect to the procurement case total cost. For cases above €45,000 (€1 = $1.09),

they have three alternatives depending on the agreement. One alternative is to make the payment through the

respective Naval Attaché Office in Washington, London, Berlin, or Paris. In that case, after completing pertinent

document review they should make certain a credit transfer from Greek Central Bank to the respective Naval Attaché

account. The respective Naval Attaché office is responsible for the final payment. A second alternative is to make use

of a letter of credit (open account) in the name of the contractor to the Central Bank in Greece. In that case, they

should make certain that all the pertinent documents are sent to the Central Bank and the Bank makes the payment.

Finally, they can make use of a transfer credit from the Central Bank to a specific bank account defined by the

contractor. For cases bellow € 45,000 they can make the contractor’s payment either through the “letter of credit”

process or by ensuring a transfer credit to a contractor’s specific bank account. At the end of the process all of them

are responsible for the case closeout and the timely submission of all the procurement documents to the Audit Agency.

Office 1320/7: i. Title: TRANSPORTATION PAYMENTS OFFICE. ii. Duties (describe briefly):

This office is responsible for the timely collecting, review, and processing of all the documents pertinent to

either the transportation of items from foreign contractors (procurement orders or repair orders) to Greece or from

Greece to foreign contractors (repair orders). After completing the review and processing of all the transportation

documents, this office is responsible for making the final payment for the transportation costs and submitting all the

payment documents to the Audit Agency.

Office 1320/9: i. Title: INTERNATIONAL PROCUREMENTS OFFICE. ii. Duties (describe briefly):

This office consists of one employee, who has also the title procurement case operator. However, the main

difference is that this office only undertakes procurement cases of total worth less than € 45,000 and for which the

payment is agreed to be made through a respective Naval Attaché office in Washington, London, Berlin, or Paris.

Office 1323: i. Title: ACCOUNTING OFFICE.

ii. Duties (describe briefly):

This sub-department is responsible for collecting, reviewing, and processing all the pertinent procurement

documents (receiving records, vouchers, invoices) for those procurement cases that are less than € 45,000 total worth

and for which the payment is to be made through one of the Naval attaché offices in Washington, London, Berlin, or

Paris. After completing the review and processing of all the procurement documents it is responsible for making

certain a credit transfer to the respective Naval Attaché office for replacing its available balance. It is also responsible

for managing the General and Administration account balance of the Naval Attaché offices in Washington, London,

Berlin, or Paris. Finally, it is responsible for the above-mentioned cases’ closeout and the timely submission of all the

procurement documents to the Audit Agency.

Office 1324: i. Title: REPAIRABLE ITEMS OFFICE. ii. Duties (describe briefly):

This sub-department is responsible for placing repair orders in foreign manufacturers. The whole process

87

includes, the request for proposals, the receiving of the repair offers, the approval or not of the repair cost, the repair

order placement, and the shipment of the repairable items in the respective manufacturer in case of approval. It is also

responsible for the timely collection, review, and processing of all the pertinent repair documents (receiving

Page 104: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

88

records, vouchers, invoices) and the payment of the contractor through one of the above-mentioned payment

processes. With the repair case closeout, it is responsible for the timely submission of all the documents to the Audit

Agency.

Office 1330: i. Title: FMS PROGRAMS OFFICE. ii. Duties (describe briefly):

This sub-department is responsible for procuring or repairing items through the use of the US FMS

programs. Regarding FMS procurements, it is responsible for placing orders, tracking order status, collecting,

reviewing, and processing procurement documents, and making the proposal for the payment through the Naval

Attaché office in Washington. Regarding FMS repairs, it is responsible for the shipment of the repairable items in

the respective manufacturer, the receiving of the repair offer, the approval or not of the repair cost, and the repair

order placement in case of approval. It is also responsible for the timely collection, review, and processing of all the

pertinent repair documents (receiving records, vouchers, invoices) and the proposal for the payment of the

contractor through the Naval Attaché office in Washington. With the repair and procurement cases closeout, it is

responsible for the timely submission of all the documents to the Audit Agency.

4. Based on the organizational structure you could define IPD as (Please highlight):

a. A company b. An autonomous business unit (SBU) c. A Single process Department d. A multi-process Department e. Other Commends: _________________________________________________________________

5. What is the total annual Budget associated with IPD?

Less Than $10-50 $50-100 $101-250 $251-500 Over 500 $10 Million Million Million Million Million Million

6. Please take into account the following generic Input-Process-Output model,

which applies in every organization: Feedback 7a. (Output). Given the IPD mission what are the actual outcome/s for the Department to be successful in its operations in terms of financial objectives, cost control, regulation compliance, customer satisfaction, or reputation? (Describe the outcomes in any order):

• Achieve customer needs prompt fulfillment.

• Ensure regulation compliance.

• On time payment οf all the financial obligations for procurements, repairs and transportation

costs.

a. Reduction of procurement, repair, and transportation costs.

Input Process Output

Page 105: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

7b. (Process). Please clearly describe in any order the ten most important processes/ functions, in each offi ce for achieving the outcomes described in the previous question: (Please simply describe the processes/ functions without comments assuming the importance in terms of cost control, time consuming, regul atory compliance, customer need satis faction, and department al overall objectives):

Office 1320/2-3-4-5 i. Title: INTERNATIONAL PROCURE MENTS OFFICE. ii. Important functions/activities/processes:

• Requisitioning funds from Inventory Provision & Control Directorate. • Placing Procurement orders. • Transferring funds to Attaches and banks. • Collecting procuremen cuments. • Reviewing procuremen uments. • Making payment proposal. • Submitting procurement documents for audit. • Monitoring material deliveries. • Preparing solicitation Document. • Solicitation Document Publication. • Monitoring negotiations. • Issuing Contract award.

Office 1320/7 i. Title: TRANSPORTATION PAYMENTS OFFICE. ii. Important functions/activities/processes:

• Requisitioning funds from Inventory Provision & Control Directorate. • Making payments to freight forwarders. • Collecting transportation documents. • Reviewing transportation documents. • Submitting payment documents for audit. • Monitoring terial deliveries.

Office 1320/9

i. Title: INTERNATIONAL PROCUREME NTS OFFICE. ii. Important functions/activities/processes:

• Placing orders. • Monitoring material deliveries.

Office 1323

i. Title: ACCOUNTING OFFICE. ii. Important functions/activities/processes:

• Requisitioning funds from Inventory Provision & Control Directorate. • Transferring funds to Naval Attaches. • Collecting procurement documents. • Reviewing procuremen uments. • Submitting payment documents for audit. • Issuing Contract award for FMS programs. • Monitoring naval attaches’ account balances.

Office 1324 i. Title: REPAIRABLE ITEMS OFFICE

ii. Important functions/activities/processes:

• Requisitioning funds from Inventory Provision & Control Directorate. • Transferring funds to respective banks. • Repair cost approval. • Collecting documents. • Reviewing documents.

t dot doc

ma

t doc

89

Page 106: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

• Solicitation Document preparation. • Issuing Contract award. • Making payment proposal. • Submitting payment documents for audit. • Requesting quotations for repairs. • Ordering item shipment to the repair sites.

Office 1330 i. Title: FMS PROGRAMS OFFICE ii. Important functions/activities/processes:

• Requisitioning process management.

- Placing Procurement Orders. - Placing Repair Orders. - FMS cases follow-up. - Handling the Discrepancy reporting System.

• Tracking order status. (Procurement or repair). • Informing departments about requisitioning status. • Budget Control of FMS cases (Making payment proposal). • Monitoring the repairable process via the FMS channel. • Executing the repairable process via the FMS channel. • Keeping informed the item Managers for any revision/change in the FMS process. • Monitoring material deliveries?

7c. (Inputs). Please briefly describe the inputs IPD uses in order to accomplish its processes described in previous question (e.g. funds, other resources, people, customer needs generation, directives):

• Available Funds (Approved by the Inventory Provision & Control Directorate).

• Public laws, Acquisition Regulation, and Directives.

• Human Resources

• Information Technology

8. For measuring your organization’s performance in relation to the desired outcomes to what extent are performance measures used:

9. For measuring your organization’s performance in relation to the desired outcomes to what extent are pre-

established goals used:

Comments: ___________________________________________________________________________________

End of section “B” of preliminary questionnaire.

Not At All

A Great Deal

Not At All

A Great Deal

.

90

Page 107: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

1. Given the mission and structure of your organization you could describe IPD as (please highlight more thanone if necessary):

a. Customer satisfaction oriented b. Regulation compliance oriented c. Cost control oriented d. Process improvement oriented e. Employee satisfaction oriented f. Other (please define) Comments_____________________________________________________

2. Based on your experience, to what extent do the current official regulations and IPD job description

guidebook clearly describe the procedures that should be followed in every day functions/processes andactivities.

3. Based on your experience, to what extent are the department personnel aware of the procedures they should

follow in every day activities:

4. Given the procedures and processes, to what extent can the department personnel be considered to be

qualified for carrying out its duties:

5. Based on your experience, to what extent do the department personnel develop initiatives in everydayactivities:

6. Given the management environment, to what extent do the department personnel participate in the decision

making process:

7. Given the management environment, to what extent are financial incentives used for motivating the

department employees’ performance:

C. Organizational Perspective

Not At All

Entirely

Not At All

Entirely

Not At All

Entirely

Not At All

Entirely

Not At All

Entirely

91

Page 108: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

8. Given the management environment, to what extent are non-financial incentives used for motivating the

department employees’ performance:

9. If you were asked to describe how you allocate your working time for performing your management duties

you could say that:

a. I approximately use. 85% of my working time diagnostically to review and control internal processes and department personnel performance.

b. I approximately use. 4% of my working time interactively with department personnel in order to

face new challenges and uncertainties.

c. I approximately use. 4% of my working time alone thinking about future challenges and seeking innovative ways to face them.

d. I approximately use. 2% of my working time diagnostically with the top management for

reviewing and controlling people and internal processes.

e. I approximately use. 5% of my working time interactively with top level management for discussing ways of facing new challenges.

f. I approximately use Ø % of my working time differently (please define). Comments: ___________________________________________________

10. Based on your experience, you could describe IPD in terms of Effectiveness:

11. Based on your experience, you could describe IPD in terms of Efficiency

12. Can you identify one or two key-employees in IPD that could participate in the research, taking into account

his/her position, experience, and knowledge? (If more than two please define).

a. Name: Lieutenant Commander ------------------ (Intentionally covered). Position: Head of FMS Programs Office.

b. Name: Lieutenant ----------------------- (Intentionally covered).

Position: 1320/4 Office.

Comments: _______________________________________________________________________________

End of preliminary questionnaire.

Thank you very much for your participation! Your contribution is quite important to this research!

Not Effective

At all

Quite effective

Not Efficient

At all

Quite efficient

Not At All

Entirely

92

Page 109: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

APPENDIX B. FIRST QUESTIONNAIRE

FIRST QUESTIONNAIRE IPD MANAGER RESPONSE (FOUR PAGES)…………………………………94

HEAD OF FMS PROGRAMS OFFICE RESPONSE (FOUR PAGES)……….98

CONTRACT MANAGER RESPONSE (FOUR PAGES)………………………103

93

Page 110: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

1. Name: ---------------------- (Intentionally covered). 2. Rank: Commander

3. Specialty: Supply Officer 4. Level of Education (please highlight):

a. High School b. College c. Bachelor degree d. Master’s degree e. Post-graduate/Doctorat e

5. Current position: Hellenic Navy Supply Center, International Procu rements Department

6. Number of months in current position: Nineteen (19

7. Phone number: --------------------------- (Intentionally covered).

8. E-mail: -------------------------------- (Intentionally covered).

9. Please describe bri efly your current duties: Head of the Department Comments: ____________________________________________________________________________________________ I. According to the preliminary questionnai re the Mission of the Int ernational Procurement Department (IPD) is the following: ‘To procure spare parts and minor systems from sources (manufacturers and vendors) outside the country, for fulfilling the Hellenic Navy’s specific needs through the following methods: A. International Comp etitions.

B. Sole Source Procurements. C. International Agreements ’

1. Do you agree with the above statement? Please define YES or NO: YES i. If YES go to the next statement. ii. If NO please commend and then continue: _______________________________________________

II. Additionally, these are the IPD’s Desired Outcomes:

• Customer needs prompt fulfillment.

• Ensure regulation compliance.

• On time payment οf all the financial obligations for procurements, repai rs and transportation

costs.

• Reduction of procuremen t, repair, and transportation costs.

B. Mission and Strategy

A. Respondent Demographics:

)

94

Page 111: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

1. Do you agree with the above statement? Please define YES or NO: YES

i. If YES go to the next questions. ii. If NO please commend and then continue: _________________________________________________

III. IPD Strategic Objectives: 1. Given the IPD mission and Desired Out comes please answer the following: a. Who do you think that is your customer? (Please highlight more than one i f necessary):

• The items’ end-user (ultimate customer).

• The agency that submits the need requirement to IPD.

• The Audit Agency.

• Other (pl ease define).

2. Given the IPD Mission and Desi red Outcomes please answer the following:

a. To better look to the previously identi fied customer(s) you need to (Please highlight more than one i f necessary):

• Lower th e time the items reach the end user.

• Ensure to the maximum ext ent possible the items’ functionality.

• Achieve the best possible item quality.

• Reduce acquisition and repair costs.

• Achieve timely and effective revi ew of all the payment documents.

• Other (pl ease define).

b. To better ensure regulation compliance you need to (Please highlight more than one i f necessary):

Enhance internal auditing process.

Ensure employee Knowledge of regulations.

Increase employees’ skills and capabilities.

Other (Please define).

c. To achieve on time payment of all the financial obligations you need to (Please highlight more than one if

necessary):

Achieve timely and effective review of all the payment documents.

Enhance internal auditing processes.

Increase use of Information Technology.

Increase employees’ skills and capabilities.

Other (Please define).

d. To achieve reduction of procurement, repai r, and transportation costs you need to: (Please highlight more than

one if necessary):

• Achieve full and open competition to the maximum extent possible.

• Achieve economies of scale.

Other (Please define).

95

Page 112: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

96

In the following table (Table 1) the IPD most important internal processes that identified in the

preliminary questionnaire are listed. Please look into these processes and answer the following:

1. Given the IPD mission and the previously identified strategic objectives, which of these processes you think that

directly contribute (critical processes) to the achievement of the desired outcomes (e.g. improvement in one of the

critical processes is expected to contribute directly to the achievement of the desired outcomes). (Please put a

criticality indicator (X) next to the important processes)

2. If possible please put an indicator of the chronological order (1=first, 2=second) next to the identified important

processes from the previous question (In case of processes that executed at the same time please use the same number):

Table 1 IPD important Processes Critical Process

Indicator (X) Chronological

Order Indicator (1=first, 2 =second...)

Comments

Requisitioning funds from Inventory Provision & Control Directorate.

X 1

Preparing Solicitation Document. Publicizing Solicitation Document. X 2 Monitoring negotiations. Issuing Contract award. X 3 Placing Procurement orders. X 4 Transferring funds to Naval Attaches and banks. X 5 Collecting procurement documents. X 7 Reviewing procurement documents. X 8 Making payment proposal. X 9 Submitting procurement and repair documents for audit.

X 10

Monitoring material deliveries. X 6 Making payments to freight forwarders. X 9 Collecting transportation documents. X 7 Reviewing transportation documents. X 8 Issuing Contract award for FMS programs. Monitoring Naval Attaches’ account balances. Approving repair cost. Ordering item shipment to the repair sites. Placing FMS Procurement Orders. Placing FMS Repair Orders. Tracking status of FMS cases (follow-up). Handling the FMS discrepancy reporting System.

Informing departments about requisitioning status.

Controlling Budget of FMS cases (Making payment proposal).

Monitoring the repairable process via the FMS channel.

Executing the repairable process via the FMS channel.

Keeping informed the item Managers for any revision/change in the FMS process.

Other (please define)

C. Strategy and Critical Processes

Page 113: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

In Table 2 below the factors that may influence the IPD internal processes are listed. Please take into

account these factors and answer the following:

1. Given the mission, strategic objectives, and important processes, which of the following factors you think that are

most important (key-success factors) in determining whether IPD meets its objectives or achieves good performance

(Please put a key-success factor indicator (K) next to the important factors):

Table 2

Important Factors Key-success factor Indicator (K)

Measurable factor Indicator (M)

Comments

Available funds. K M

Available means.

Information Technology. K

Leadership.

Empowerment. K

Communications. K

Employee turnover. M

Employee commitment. K

Employee responsibility. K

Employee qualifications

Employee satisfaction

Access to information. K

Employee satisfaction.

Exogenous factors. (Define) Procurement Policy Changes

K

Other (please define).

2. Which of the above-identified key-factors you think that they can be controlled and measured? (Go back to table 2

and put a measurable factor indicator (M) next to those key-factors that you think that can be controlled and

measured).

3. Are the above-identified key-factors linked in any way with the previously identified important processes?

(e.g. Does an improvement in one area lead to improvement in other areas? If so, can you mach them):

D. Strategy and Key-Factors

97

Page 114: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

IMPROVEMENT IN: COULD IMPROVE:

Available Funds 1

Information Technology 5-6-8-9

Empowerment 9

Communications 2-7

Employee Commitment 3-7-8-9-10

Employee Responsibility 3-7-10

Access to Information 6-8

Other

Comments______________________________________________________________________________________

End of first questionnaire. Thank you very much for your participation!

Your contribution is quite important to this research!

1. Name: ------------------------- (Intentionally covered). 2. Rank: Lt. Commander

3. Specialty: Supply Officer 4. Level of Education (please highlight):

a. High School b. College c. Bachelor degree d. Master’s degree e. Post-graduate/Doctorate

5. Current position: Hellenic Navy Supply Center, FMS Programs Office.

6. Number of months in current position: Thirty (30)

7. Phone number: -------------------------- (Intentionally covered).

8. E-mail: -------------------------------------- (Intentionally covered).

9. Please describe briefly your current duties: Head of FMS Programs Office.

Comments: As Head of FMS Programs Office I am responsible for organizing, monitoring, and auditing procurements and repairs of items via the FMS Programs channel. Additionally, my duties include involvement in budgetary matters (review, and proposal) related to the FMS Cases.

A. Respondent Demographics:

98

Page 115: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

I. According to the preliminary questionnai re the Mission of the Int ernational Procurement Department (IPD) is the following: ‘To procure spare parts and minor systems from sources (manufacturers and vendors) outside the country, for fulfilling the Hellenic Navy’s specific needs through the following methods: A. International Competi tions.

B. Sole Source Procurements. C. International Agreements ’

1. Do you agree with the above statement? Please define YES or NO:…YES…

i. If YES go to the next statement. ii. If NO please commend and then continue: _______________________________________________

II. Additionally, these are the IPD’s Desired Outcomes:

• Customer needs prompt fulfillment.

• Ensure regulation compliance.

• On time payment οf all the financial obligations for procurements, repai rs and transportation

costs.

• Reduction of procuremen t, repair, and transportation costs.

1. Do you agree with the above statement? Please define YES or NO: …YES…

i. If YES go to the next questions. ii. If NO please commend and then continue: ________________________________________________

III. IPD Strategic Objectives: 1. Given the IPD mission and Desired Outcomes please answer the following: a. Who do you think that is your customer? (Please highlight more than one i f necessary):

• The items’ end-user (ultimate customer).

• The agency that submits the need requirement to IPD.

• The Audit Agency.

• Other (pl ease define).

2. Given the IPD Mission and Desi red Outcomes please answer the following:

a. To better look to the previously identi fied customer(s) you need to (Please highlight more than one i f necessary):

• Lower th e time the items reach the end user.

• Ensure to the maximum ext ent possible the items’ functionality.

• Achieve the best possible item quality.

• Reduce acquisition and repair costs.

• Achieve timely and effective revi ew of all the payment documents.

• Other (pl ease define).

B. Mission and Strategy

99

Page 116: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

b. To better ensure regul ation compliance you need to (Please highlight more than one i f necessary):

Enhance internal auditing process.

Ensure employee Knowledge of regulations.

Increase employees’ skills and capabilities.

Other (Please define).

c. To achieve on time payment of all the financial obligations you need to (Please highlight more than one if

necessary):

Achieve timely and effective review of all the payment documents.

Enhance internal auditing processes.

Increase use of Information Technology.

Increase employees’ skills and capabilities.

Other (Please define).

d. To achieve reduction of procurement, repair, and transport ation costs you need to: (Please highlight more than

one if necessary):

• Achieve full and open competition to the maximum

extent possible.

• Achieve economies of scale.

Other (Please define).

In the following table (Table 1) the IPD most important internal processes that identi fi ed in the

preliminary questionnaire are listed. Please look into these processes and answer the following:

1. Given the IPD mission and the previously identi fied s trategic objectives, which of these processes you think that

directly con tribute (criti cal processes) to the achievement of the desired outcomes (e.g. improvement in one of the

critical processes is expected to contribute di rectly to the achi evement of the desi red outcomes). (Please put a

criti cality indicator (X) next to the important processes)

C. Strategy and Critical Processes

100

Page 117: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

2. If possible please put an indicator of the chronological order (1=first, 2=second) next to the identified important

processes from the previous question (In case of processes that executed at the same time please use the same number):

Table 1

IPD important Processes Critical Process

Indicator (X)

Chronological Order Indicator

(1=first, 2 =second...)

Comments (Process Code)

Requisitioning funds from Inventory Provision & Control Directorate.

X 1

Preparing Solicitation Document. X 2 Publicizing Solicitation Document. Monitoring negotiations. Issuing Contract award. X 3 Placing Procurement orders. X 4 Transferring funds to Naval Attaches and banks. X 5 Collecting procurement documents. X 6 Reviewing procurement documents. X 6 Making payment proposal. X 10 Submitting procurement and repair documents for audit.

X 7

Monitoring material deliveries. X 6 Making payments to freight forwarders. X 9 Collecting transportation documents. X 8 Reviewing transportation documents. X 8 Issuing Contract award for FMS programs. X 1A Monitoring Naval Attaches’ account balances. X 10 Approving repair cost. Ordering item shipment to the repair sites. Placing FMS Procurement Orders. X 2A Placing FMS Repair Orders. X 2A Tracking status of FMS cases (follow-up). Handling the FMS discrepancy reporting System.

Informing departments about requisitioning status.

Controlling Budget of FMS cases (Making payment proposal).

X 4A

Monitoring the repairable process via the FMS channel.

X 3A

Executing the repairable process via the FMS channel.

Keeping informed the item Managers for any revision/change in the FMS process.

Other (please define)

In Table 2 below the factors that may influence the IPD internal processes are listed. Please take into

account these factors and answer the following:

D. Strategy and Key-Factors

101

Page 118: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

102

End of first questionnaire.

Thank you very much for your participation!

Your contribution is quite important to this research!

1. Given the mission, strategic objectives, and important processes, which of the following factors you think that

are most important (key-success factors) in determining whether IPD meets its objectives or achieves good

performance (Please put a key-success factor indicator (K) next to the important factors):

Table 2

Important Factors Key-success factor

Indicator (K) Measurable factor

Indicator (M) Comments

Available funds. K M

Available means.

Information Technology.

Leadership.

Empowerment.

Communications. K

Employee turnover. K M

Employee commitment. K M

Employee responsibility. K

Employee qualifications

Employee satisfaction K

Access to information. K M

Exogenous factors: Emergency Procurements Procurement Policy by (HNGS)

K

K

Other (please define). 2. Which of the above-identified key-factors you think that they can be controlled and measured? (Go back to table 2

and put a measurable factor indicator (M) next to those key-factors that you think that can be controlled and

measured).

3. Are the above-identified key-factors linked in any way with the previously identified important processes? (e.g.

Does an improvement in one area lead to improvement in other areas? If so, can you mach them):

IMPROVEMENT IN: COULD IMPROVE:

Available funds 1,5,6,7,10,13,16, 20,21

Communications 2,6,7,10,12,14,17,20,21,26

Access to information 2,8,12,14,17,25,26

Employee responsibility 2,5,6,8,9,10,12,14,15,17,20,21

Employee Turnover 2,6,9,10,11,12,15,17, 26

Employee commitment 2,6,9,10,11,12,15,17, 26

Other

Comments______________________________________________________________________________________

Page 119: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

103

1. Name: ----------------------- (Intentionally covered). 2. Rank: Lieutenant

3. Specialty: Supply Officer 4. Level of Education (please highlight):

a. High School b. College c. Bachelor degree d. Master’s degree e. Post-graduate/Doctorat e

5. Current position: Hellenic Navy Supply Center, International Procu rements Department

6. Number of months in current position: Nine (9

7. Phone number: -------------------------- (Intentionally covered).

8. E-mail: ---------------------------- (Intentionally covered).

9. Please describe briefly your current duties: Contract Manager Comments:__________________________________________________________________________________

I. According to the preliminary questionnaire the Mission of the International Procurement Department (IPD) is the following: ‘To procure spare parts and minor systems from sources (manufacturers and vendors) outside the country, for fulfilling the Hellenic Navy’s specific needs through the following methods: A. International Competitions. B. Sole Source Procuremen ts.

C. International Agreements ’

1. Do you agree with the above statement? Please define YES or NO: YES

i. If YES go to the next statement. ii. If NO please commend and then continue: ________________________________________________

II. Additionally, these are the IPD’s Desired Outcomes:

• Customer needs prompt fulfillment.

• Ensure regulation compliance.

• On time payment οf all the financial obligations for procurements, repai rs and transportation

costs.

• Reduction of procuremen t, repair, and transportation costs.

1. Do you agree with the above stat ement? Please define YES or NO: YES

i. If YES go to the next questions. ii. If NO please commend and then continue: _________________________________________________

A. Respondent Demographics:

B. Mission and Strategy

)

Page 120: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

III. IPD Strategic Objectives: 1. Given the IPD mission and Desired Outcom es please answer the following: a. Who do you think that is your customer? (Please highlight more than one i f necessary):

• The items’ end-user (ultimate customer).

• The agency that submits the need requirement to IPD.

• The Audit Agency.

• Other (pl ease define).

2. Given the IPD Mission and Desi red Outcomes please answer the following:

a. To better look to the previously identi fied custom er(s) you need to (Please highlight more than one i f necessary):

• Lower th e time the items reach the end user.

• Ensure to the maximum ext ent possible the items’ functionality.

• Achieve the best possible item quality.

• Reduce acquisition and repair costs.

• Achieve timely and effective revi ew of all the paym ent documents.

• Other (pl ease define).

b. To better ensure regulation compliance you need to (Please highlight more than one i f necessary):

Enhance internal auditing process.

Ensure employee Knowledge of regulations.

Increase employees’ skills and capabilities.

Other (Please define).

c. To achieve on time payment of all the financi al obligations you need to (Please highlight more than one i f

necessary):

Achieve timely and effective review of all the payment documents.

Enhance internal auditing processes.

Increase use of Information Technology.

Increase employees’ skills and capabilities.

Other (Please define).

d. To achieve reduction of procurem ent, repai r, and transportation costs you need to: (Please highlight more than

one if necessary):

• Achieve full and open competition to the maximum extent possible.

• Achieve economies of scale.

Other (Please define).

In the following table (Table 1) the IPD most important internal processes that identi fi ed in the

preliminary questionnaire are listed. Please look into these processes and answer the following:

C. Strategy and Critical Processes

104

Page 121: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

2. If possible please put an indicator of the chronological order (1=first, 2=second) next to the identified important

processes from the previous question (In case of processes that executed at the same time please use the same number):

Table 1

IPD important Processes Critical Process Indicator (X)

Chronological Order Indicator

(1=first, 2 =second...)

Comments (Process Code)

Requisitioning funds from Inventory Provision & Control Directorate.

X 1

Preparing Solicitation Document. X 2 Publicizing Solicitation Document. Monitoring negotiations. Issuing Contract award. X 3 Placing Procurement orders. X 4 Transferring funds to Naval Attaches and banks.

X 5

Collecting procurement documents. X 6 Reviewing procurement documents. X 6 Making payment proposal. X 10 Submitting procurement and repair documents for audit.

X 7

Monitoring material deliveries. X 6 Making payments to freight forwarders. X 9 Collecting transportation documents. X 8 Reviewing transportation documents. X 8 Issuing Contract award for FMS programs. X 1A Monitoring Naval Attaches’ account balances. X 10 Approving repair cost. Ordering item shipment to the repair sites. Placing FMS Procurement Orders. X 2A Placing FMS Repair Orders. X 2A Tracking status of FMS cases (follow-up). Handling the FMS discrepancy reporting System.

Informing departments about requisitioning status.

Controlling Budget of FMS cases (Making payment proposal).

X 4A

Monitoring the repairable process via the FMS channel.

X 3A

Executing the repairable process via the FMS channel.

Keeping informed the item Managers for any revision/change in the FMS process.

Other (please define)

105

Page 122: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

106

Employee commitment 2,6,9,10,11,12,15,17, 26 Other

In Table 2 below the factors that may influence the IPD internal processes are listed. Please take into

account these factors and answer the following:

1. Given the mission, strategic objectives, and important processes, which of the following factors you think that

are most important (key-success factors) in determining whether IPD meets its objectives or achieves good

performance (Please put a key-success factor indicator (K) next to the important factors):

Table 2

Important Factors Key-success factor Indicator

(K)

Measurable factor Indicator

(M)

Comments

Available funds. K M

Available means.

Information Technology.

Leadership.

Empowerment.

Communications. K

Employee turnover. K M

Employee commitment. K M

Employee responsibility. K

Employee qualifications

Employee satisfaction K

Access to information. K M

Exogenous factors: Emergency Procurements Procurement Policy by (HNGS)

K

K

Other (please define). 2. Which of the above-identified key-factors you think that they can be controlled and measured? (Go back to table 2

and put a measurable factor indicator (M) next to those key-factors that you think that can be controlled and

measured).

3. Are the above-identified key-factors linked in any way with the previously identified important processes? (e.g.

Does an improvement in one area lead to improvement in other areas? If so, can you mach them):

IMPROVEMENT IN: COULD IMPROVE:

Available funds 1,5,6,7,10,13,16, 20,21 Communications 2,6,7,10,12,14,17,20,21,26

Access to information 2,8,12,14,17,25,26 Employee responsibility 2,5,6,8,9,10,12,14,15,17,20,21

Employee Turnover 2,6,9,10,11,12,15,17, 26

D. Strategy and Key-Factors

Page 123: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Comments______________________________________________________________________________________

End of first questionnaire.

Thank you very much for your participation! Your contribution is quite important to this research!

107

Page 124: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

108

Page 125: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

APPENDIX C. SECOND QUESTIONNAIRE

Below there is a set of performance measures that is suggest ed to be incorporated in the IPD’s BSC model. The metrics are classi fi ed in the four strategic themes (Customers, Internal Processes, Financi al, and People) that comprise the IPD’s BSC framework. Each met ric is t ailored to a speci fic obj ective that is associ ated with a desired outcome, strategic obj ective, critical process, or key-factor. In some of the cases a combination of metrics is suggested for better monitoring performance against a speci fic obj ective. Finally, next to each set of measures a generic measurement method that has been identi fied in literature is suggested for facilitating the implementation of the model.

Please t aking into account IPD’s conditions, the int errelationships among desired out comes, strategic objectives, critical processes, and key-factors have a look on the metrics and answer the questions at the end of each set of measures.

A. Customer Perspective Measures 1. Desired Outcomes Orien ted:

O bjective Measure Coding Measurement Method Customer needs prompt ful fillment.

a. Percentage of customers satis fied with delivery time. b. Percent age of customers satis fied with item quality.

CDM1a CDM1b

- Setting objective and attainabl e goal. - Customer sampling survey. - Benchmarking on past performance.

2. Strategic Objectives Oriented: O bjective Measure Coding Measurement Method

1. On time delivery.

Percentage of cases (procurement, repair, FMS) where cont ractual delivery dat e meets actual delivery/acceptance date.

CSM1

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Increase quality. a. Percentage of defective products reaches the end user. b. Percent age of defective shipments.

CSM2a

CSM2b

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

3. Critical Processes Oriented: Process O bjective Measure Coding Measurement Method

Monitoring materi al deliveri es.

On time delivery.

a. Percentage of delayed shipments. b. Percentage of mat eri als delivered on contractual time in a speci fic period of time in rel ation to the total number of the materi als delivered (monthly, quarterly, or yearly).

CPM1a

CPM1b

- Setting objective and attainabl e goals. - Generating database in IPD. - Benchmarking on past performance.

Do you agree with the above-suggested measures? Please define YES or NO: YES

If YES go to the next set of measures. If NO please make the necessary adjustments, deletions, or additions. Additional comments: VERY GOOD!

109

Page 126: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

110

year divided by the investment made in previous year.

IPSM3c

plan taking into account market capabilities, prices, and infl ation.

B. Internal Processes Perspective Measures

1. Desired Outcomes Orien ted: O bjective Measure Coding Measurement Method

1. Regulation compliance.

a. Percentage of cases submitted for audit within predetermined time target in relation to the total cases submitted for audit in a speci fi c period of time (monthly, quarterly, or yearly). b. Percent age of cases submitted for audit on time, right, the first time (without protests for faults or mistakes) in relation to the total cases submitted for audit on time (monthly, quarterly, or yearly).

IPDM1a IPDM1b

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. On time payments.

a. Percentage of cases where contractual payment date meets actual payment dat e. b. Percent age of payment interest paid for payment delays in relation to the total payments (in money value) made in one year.

IPDM2a IPDM2b

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Strategic Objectives Oriented: O bjective Measure Coding Measurement Method

1. Enhance internal auditing.

a. Extent to which employees involved in internal auditing meet pre-established standards of training, knowledge and experience in each position. b. Ratio of daily time spent for correcting mistakes in documents submitted to manager for approval (and returned back for corrections) to total daily time spent for preparing documents for submitting documents to manager for approval.

IPSM1a

IPSM1b

- Setting qualifi cation standards. - Employee survey. - Employee training. - Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Timely & effective review of documents.

Percentage of cases reviewed effectively the fi rst time within predetermined time targets in rel ation to the total cases reviewed in a speci fi c period of time (monthly, quarterly, or yearly).

IPSM2

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

3. Increase use of IT.

a. Percentage of daily transactions made through the use of IT in relation to the total daily transactions made. b. Extent to which employees involved in IPD activities have been trained in using IT transactions. c. The difference in the investment made for IT between current year and previous

IPSM3a

IPSM3b

- Setting objective and attainable goals. - Generating database in IPD - Benchmarking on past performance. - Setting training goals. - Employee survey. - Employee training. - Benchmarking on past performance. -Setting a long-term IT investment

Page 127: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

3. Criti cal Processes Oriented: Process O bjective Measure Coding Measurement Method

1. Requisitioning Funds.

a. Timeliness. b. Accuracy & Thoroughness.

Percent age of requisitions issued and submitted within predetermined time target in rel ation to the total requisitions issued in a speci fi c period of time (monthly, quarterly, or yearly). Percentage of requisitions issued on time, right, the first time (without any further correction) in relation to the requisitions issued in a speci fi c period of time (monthly, quarterly, or yearly).

IPPM1a

IPPM1b

- Setting objective and attainabl e goals. - Generating database in IPD. - Benchmarking on past performance.

2. Collecting documents.

Timeliness.

Percentage of pertinent procurement and repai r documents collect ed within predetermined time in relation to the total pertinent documents collect ed (monthly, quart erly, or yearly).

IPPM2

- Setting objective and attainabl e goals. - Generating database in IPD. - Benchmarking on past performance

3. Reviewing documents

Timeliness & Accuracy

Percentage of cases reviewed right, the first time, within predetermined time targets in rel ation to the total cases reviewed in a speci fi c period of time (monthly, quarterly, or yearly).

IPPM3

- Setting objective and attainabl e goals. - Generating database in IPD. - Benchmarking on past performance.

4. Key-Factors Oriented : Factor O bjective Measure Coding Measurement Method

1. Communications. Availability &

Reliability.

a. Percent age of times employees were satis fi ed with the communication systems they made use in relation to the total times they made use of the systems for accomplishing their tasks. b. The difference in the investment made for communication systems between current year and previous year divided by the investment made in previous year.

IPFM1a IPFM1b

- Setting objective and attainable goals. - Employee survey. - Generating database in IPD. - Benchmarking on past performance. -Setting a long-term investment plan in communications taking into account market capabilities, prices, and infl ation.

111

Page 128: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

Do you agree with the above-suggest ed measures? Please define YES or NO: YES

If YES go to the next set of measures. If NO please make the necessary adjustments, deletions, or additions.

Additional comments: VERY GOOD! However, possible probl ems may occur in case of serious budget reductions, for unknown or unpredictable cases (War, Olympic Games, etc). In that case, it is rather di fficult to requisition funds, based on a model. A contingency plan might be helpful.

C. Financial Perspective Measures 1. Desired Outcomes Orien ted:

O bjective Measure Coding Measurement Method 1. Cost reduction. Savings realized by switching

from sole source to competitive strategy.

FDM1

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Strategic Objectives Orien ted: O bjective Measure Coding Measurement Method

1. Full and open competition.

Ratio of procurement or repair cases made through competition to procurement or repair cases made through sole source (monthly, quarterly, or yearly).

FSM1

- Setting objective and attainable goals. - Generating database in IPD. - Benchmarking on past performance.

2. Achieve economies of scale.

a. Ratio of total line items over total procurement cases in current period to line items over cases in previous period (monthly, quart erly, or yearly). b. Percentage of consolidating requirements in relation to the total requirements (monthly, quart erly, yearly).

FSM2

- Setting objective and attainable goals. - Generating database in IPD - Benchmarking on past performance.

3. Criti cal Processes Oriented: Process O bjective Measure Coding Measurement Method

1. Publicizing solicitation documents.

Increase the number of contractors solicited.

Saving realized by increasing the number of contractors solicited for the same procurements.

FPM1

- Setting objective and attainabl e goals. - Generating database in IPD. - Benchmarking on past performance.

4. Key-Factors Oriented Factor O bjective Measure Coding Measurement Method

1. Available funds.

Fund availability.

Ratio of funds available in hand for procurements or repairs in the beginning of the period to funds actually consumed at the end of the same period (monthly, quart erly, yearly).

FFM1

- Setting objective and attainabl e goals. - Generating database in IPD. - Benchmarking on past performance.

Do you agree with the above-suggest ed measures? Please define YES or NO: YES

If YES go to the next set of measures. If NO please make the necessary adjustments, deletions, or additions. Additional comments: VERY GOOD!

112

Page 129: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

D. People Perspective Measures1. Strategic Objectives Orien ted:

O bjective Measure Coding Measurement Method 1. Improve employees’ skills and capabilities.

Extent to which IPD employees involved in IPD activities meet pre-established quali fi cation standards in each position.

PSM1

- Setting qualifi cation standards. - Employee survey. - Employee training. - Benchmarking on past performance.

2. Improve employees’ knowledge.

Extent to which IPD employees involved in IPD activities meet pre-established knowl edge standards of laws and regulations in each position.

PSM2

- Setting qualifi cation standards. - Employee survey. - Employee training. - Benchmarking on past performance.

2. Key-Success Factors Oriented: Factor O bjective Measure Coding Measurement Method

1. Employee commitment.

Improve commitment.

Extent to which employees involved in IPD activities feel satis fied and induced in each position.

PFM1

- Setting satisfaction rate goals - Employee survey. - Employee intrinsic incentives. - Benchmarking on past perform ance.

2. Employee responsibility.

Improve Responsibility.

Extent to which employees involved in IPD activities held accountable for their actions with respect to compliance with laws and regul ations.

PFM2

- IPD management assessm ent of current management control system. - Employee survey. - IPD management initiatives. - Benchmarking on past perform ance.

3. Access to information.

Improve access to strategic information.

a. Ratio of the times employees get accurat e, timely, and complete information to the total times asked for this information (monthly, quart erly, or yearly). b. The difference in the investment made for information systems between current year and previous year divided by the investment made in previous year.

PFM3a

PFM3b

- Setting access to information goal. - Employee survey. - Generating database in IPD. - Benchmarking on past perform ance.

-Setting a long-term investment plan in information systems taking into account market capabilities, prices, and infl ation rat es.

Do you agree with the above-suggest ed measures? Please define YES or NO: YES

If NO please make the necessary adjustments, deletions, or additions. Additional comments: VERY GOOD!

End of second questionnaire.

Thank you very much for your participation! Your contribution is quite important to this research!

113

Page 130: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

THIS PAGE INTENTIONALLY LEFT BLANK

114

Page 131: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

LIST OF REFERENCES

Abernethy, Margaret A., Horne, Malcolm, Lillis, Anne M., Malina, Mary and Selto, Frank, Building Casual Performance Models from Qualitative Data, 2002.

Babbie, Earl R. and Huitt, Robert E., The Practice of Social Research, Belmont, California, 1983.

Department of Energy Website, “Balanced Scorecard Homepage”, [http://www.pr.doe.gov/], January 2003.

Euske, K. J., Frause, Norm, Peck, Tom, Rosenstiel and Schreck, Bruce Steve, Service Process Measurement: Breaking the Code, CAM-I, 1998.

Fitzgerald, Lin, Johnston, Robert, Brignall, Stan, Silvestro, Rhian and Voss, Christopher, Performance Measurement in Service Business, CIMA, 1993.

Hellenic Navy General Staff, Official Web Page, [http://www.hellenicnavy.gr/], January 2003.

International Procurement Department, Memorandum of Operations, August 1991.

Kaplan, Robert S. and Norton, David P., Putting the Balanced Scorecard to Work, Harvard Business Review, September – October, 1993, Harvard Press, 1993.

Kaplan, Robert S. and Norton, David P., The Balanced Scorecard, Harvard Business School Press, 1996.

Kaplan, Robert S. and Norton, David P., The Strategy-Focused Organization, Harvard Business School Press, 2000.

Lawler, Edward E., From the Ground Up, Jossey-Bass Publishers, San Francisco, 1996.

Lynch, Richard L. and Cross, Kelvin F., Measure Up, Blackwell Business, 1995.

Neely, Andy and Walters, Angela, Performance Measurement and Management: Research and Action, Boston, USA, July 2002.

Procurement Executives’ Association, Guide to a Balanced Scorecard Performance Management Methodology, [http://oamweb.osec.doc.gov/bsc/guide.htm], January 2003.

Schneiderman, A., Why Balanced Scorecard Fail, Journal of Strategic Performance Measurement, January 1999.

Simons, Robert, Performance Measurement & Control Systems for Implementing Strategy, Prentice Hall, 2000.

115

Page 132: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

The Balanced Scorecard Institute Website, [http://www.balancedscorecard.org/], January 2003.

Tsiakiris, Georgios, Examination of the Readiness of Two Units of the Hellenic Navy to Implement Activity Based Cost Management (ABCM), December 2000.

U.S. Printing Office, The Government Performance and Results Act of 1993, (103rd Congress of the United States of America), 1993.

116

Page 133: NAVAL POSTGRADUATE  · PDF fileNAVAL POSTGRADUATE SCHOOL Monterey, ... Hellenic Navy Supply Center, ... Aristotelian University of Thessalonica, Greece,

INITIAL DISTRIBUTION LIST

1. Dudley Knox Library Naval Postgraduate School Monterey, California 2. Professor K. J. Euske, Code GB/SG Graduate School of Business and Public Policy Naval Postgraduate School Monterey, California 3. Professor Mary Malina Graduate School of Business and Public Policy Naval Postgraduate School Monterey, California 4. Hellenic Navy General Staff Athens, Greece 5. Hellenic Navy Supply Center (KEFN) Naval Logistic Center Scaramangas Athens, Greece 6. LTCDR Ilias Polymenidis Athens, 16345 Greece

117