NATIONAL RURBAN MISSION NRuM 1 Atul Kumar Tiwari [email protected] Performance Review Committee (PRC) Ministry of Rural Development 17 th November, 2017
NATIONAL RURBAN MISSION
NRuM
1
Atul Kumar [email protected]
Performance Review Committee (PRC) Ministry of Rural Development
17th November, 2017
2
Progress from last PRC (Jan-2017)
157
73
0
266
147
40
Clusters Selected ICAPs approved DPRs with 60% UC
PRC_Jan PRC_Nov
Physical Progress
• 266 clusters identified• 147 ICAPs approved• 40 DPRs submitted with 60% UC
• All ICAPs for all Phases to be approved by March 2018• All DPRs for all Phases by Dec 2018
3
Progress from last PRC (Jan-2017)
Financial Progress
600
1000
599.44
359.50
0 500 1000 1500
FY 16-17
FY 17-18
Released Budget Allocation
release against allocation• FY 16-17 – 100%• FY- 17-18- 33%
challenge
Detailed Action plan drawn out State-wise to meet the challenge
Rs. in Cr.
4
State-wise releases of CGF
Rs 904.05 Crores has been released as CGFUCs are required every quarter & MPRs required Cluster-wise
81.00
4.50
20.25 21.60
56.70
5.40
34.19 32.40
20.25
8.10
30.39
13.50
64.80
32.40
56.10
16.20 16.2012.15
8.10
62.10
10.80
48.60
4.05
54.0051.30
44.55 43.12
16.20
35.10
An
dh
ra P
rad
esh
Aru
nac
hal
Pra
de
sh
Ass
am
Bih
ar
Ch
hat
tisg
arh
Go
a
Gu
jara
t
Har
yan
a
Him
ach
al P
rad
esh
Jam
mu
& K
ash
mir
Jhar
kh
and
Kar
nat
aka
Ke
rala
Mad
hya
Pra
de
sh
Mah
aras
htr
a
Man
ipu
r
Me
gh
alay
a
Miz
ora
m
Nag
alan
d
Od
ish
a
Pu
nja
b
Raj
asth
an
Sik
kim
Tam
il N
adu
Tele
ng
ana
Trip
ura
Utt
ar P
rad
esh
Utt
arak
han
d
We
st B
en
gal
Rs. in Cr.
5
State-wise releases of Admin. Fund
Rs 85.50 Crores has been released as Admin. FundUCs are required to be submitted quarter-wise
Rs. in Cr.
6
Vacancies in SPMU & DPMUneeds to be filled urgently
3 2 2 3 30
3 3 3 31
30
3 2 3 2 2 2 2 2 2 2 2 2 1 2 2 2 13 3 2 3
2
20
6
1417
0
2 3
24
13
7 5
2
1218
2
17
22
5 5 6
2 2
21
3
12
23
6
17
24
11
29
8
21
0
5
10
15
20
25
30
35
An
dam
an &
Nic
ob
ar
An
dh
ra P
rad
esh
Aru
nac
hal
Pra
de
sh
Ass
am
Bih
ar
Ch
hat
tisg
arh
Dam
an &
Diu
Go
a
Gu
jara
t
Har
yan
a
Him
ach
al P
rad
esh
Jam
mu
& K
ash
mir
Jhar
khan
d
Kar
nat
aka
Ke
rala
Laks
had
we
ep
Mad
hya
Pra
de
sh
Mah
aras
htr
a
Man
ipu
r
Me
gh
alay
a
Miz
ora
m
Nag
alan
d
De
lhi
Od
ish
a
Pu
du
che
rry
Pu
nja
b
Raj
asth
an
Sik
kim
Tam
il N
adu
Tele
ng
ana
Trip
ura
Utt
ar P
rad
esh
Utt
arak
han
d
We
st B
en
gal
SPMU
DPMU
7
State-wise releases of Balance States’ Share required
37.80
0.452.25
14.40
27.00
3.60
11.99
21.60
1.13 0.902.70
9.00
28.80
1.80 0.72 1.58 0.770.36
8.847.20
14.63
0.45
18.0021.60
3.650.05
23.40
An
dh
ra P
rad
esh
Aru
nac
hal
Pra
de
sh
Ass
am
Bih
ar
Ch
hat
tisg
arh
Go
a
Gu
jara
t
Har
yan
a
Him
ach
al P
rad
esh
Jam
mu
& K
ash
mir
Jhar
khan
d
Kar
nat
aka
Ke
rala
Mad
hya
Pra
de
sh
Man
ipu
r
Me
gh
alay
a
Miz
ora
m
Nag
alan
d
Od
ish
a
Pu
nja
b
Raj
asth
an
Sik
kim
Tam
il N
adu
Tele
ng
ana
Trip
ura
Utt
ar P
rad
esh
We
st B
en
gal
States’ Share need to be mobilised immediately before second release
Rs. in Cr.
8
Works on Ground
17 States have submitted details of Works on Ground so far…The progress is on convergence, but expenditure on CGF needs to be expedited
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
Ch
hat
tisg
arh
Ke
rala
Pu
nja
b
Tam
il N
adu
An
dh
ra P
rad
esh
Har
yan
a
Tela
ng
ana
Jhar
kh
and
Od
ish
a
Nag
alan
d
Gu
jara
t
Mah
aras
htr
a
Trip
ura
Raj
asth
an
Miz
ora
m
Me
gh
alay
a
Sik
kim
Expenditure incurred as a % of Total Investment
Rs. in Cr.
9
Issues requiring Immediate Attention
• Slow progress of Critical Gap Fund (CGF) expenditure on ground
•Needs to be Expedited
•Release of Critical Gap Funding (CGF) from Treasury to RD (Rurban) accounts •Release of State Share into Treasury and further into RD (Rurban) accounts
• Regular monitoring of release of funds to ensure convergence
Works on ground to commence soon after DPRs are approved by SLEC-provided the % sectoral allocation, remains the same and the variation in costper component is within +/- 20%
CGF and Convergence buckets are to be kept separate– CGF - Investment leading to thematic economic activities– Convergence - saturation of basic, social and digital amenities
O&M- States to get approval of O&M mechanisms from SLEC
All States to expedite completion of Master Plans for all clusters
All States to identify thematic needs for all Rurban clusters that can attractprivate investments (EOI)
10
ISSUES RELATED TO GUIDELINES / POLICY MATTERS-ADVISORIES FOR STATES
11
INNOVATIONS/ BEST PRACTICES/ CASE STUDIES Examples to Learn from others
•Special fund has been set up in the State Budget for enablingconvergence in the clusters of Andhra Pradesh
•Saturation based approach for implementation by
Chhattisgarh
• 14 desirable components to be saturated in Rurban clusterswithin the Mission period
• Clusters are prioritised based on extent of gaps in saturation.
• Rurban clusters are NRLM intensive clusters with livelihoodfocus
12
1 Dahita Hastatanta O krushi bhittik cluster
2 Keshpur Matsya –o-krushi udyog cluster
3 Murtama (T) Makka cluster
4 Kotagada (T) Haldi-o-krushi udyog Cluster
5 Sibtala (T) Udyan-Krushi-0-kaushal vikas cluster
INNOVATIONS/ BEST PRACTICES/ CASE STUDIES Odisha has done thematic identification of Rurban Clusters based on economic activities
13
INNOVATIONS/ BEST PRACTICES/ CASE STUDIES
Kerala has a software called PRICE for online tendering for all works being executed in the State
14
INNOVATIONS/ BEST PRACTICES/ CASE STUDIES
Tamilnadu has issued Standard Operating Guidelines to ensure ease of preparation of DPRs
Uttarakhand has done detailed land use planning for each GP of the Cluster
15
INNOVATIONS/ BEST PRACTICES/ CASE STUDIES
Bhagtanpur Abidpur clusterGP: Bahadar Pur Jatt
Athoorwala clusterGP: Athoorwala
Telangana has used MIS linked Mobile application for 100% household surveyfor preparation of ICAPs.
16
Household Survey Data Entry Screen
INNOVATIONS/ BEST PRACTICES/ CASE STUDIES
Ongoing Works in Clusters
Andhra Pradesh
Solid Waste Mangament Centre at Kuppam Cluster
Skill Training at Singarayakonda Cluster
Ongoing Works in Clusters
Chhattisgarh
Nadep Tank Construction in Murmunda Cluster
Himachal Pradesh
Stone Road Construction in Sangla Cluster
Ongoing Works in Clusters
Kerala
Irrigation Canal in Puthenvelikara Cluster
Farm Pond Construction in Loni Kalbhor Cluster
Maharashtra
Ongoing Works in Clusters
Tamil Nadu
Road Construction at Madhukkarai Cluster
Solid Waste Management Centre at Kuthambakkam Cluster
State / Union Territory Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018
Andaman & Nicobar Islands
- - √ - -
Andhra Pradesh - √Arunachal Pradesh √ √
Assam √ √
Bihar √ √Chattisgarh √
Dadra & Nagar Haveli √ - - - -
Daman & Diu - - - - -Delhi - - √ √ - -Goa
Gujarat - √
Haryana √ - - √ -
Himachal Pradesh - - √ - -
Jammu & Kashmir √ - - - -
Jharkhand √ √
Karnataka √ √
TIMELINES: ICAPs SUBMISSION under Phase II & III(Phase II)(Phase III)
State / Union Territory Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018
Kerala √
Lakshadweep - - √ - -
Madhya Pradesh - √ - √ -
Maharashtra - √
Manipur √ √
Meghalaya √
Mizoram √
Nagaland √
Odisha √
Puducherry √ √ - - - -
Punjab √ - √ - -
Rajasthan - √ √
Sikkim √
Tamilnadu √ √
TIMELINES: ICAPs SUBMISSION under Phase II & III(Phase II)(Phase III)
State/Union Territory Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018
Telangana - √
Tripura √
Uttar Pradesh √ √
Uttarakhand √ - √ - -
West Bengal √ √
TIMELINES: ICAPs SUBMISSION under Phase II & III(Phase II)(Phase III)
State / Union Territory Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018
Andaman & Nicobar Islands
- - - - -
Andhra Pradesh √
Arunachal Pradesh √
Assam √
Bihar √
Chattisgarh
Dadra & Nagar Haveli - - - √ -Daman & Diu - - - - -Delhi - - - - -
Goa - - - √ -
Gujarat - - √ - -
Haryana - - √ √ -
Himachal Pradesh - - √ - -
Jammu & Kashmir - - √ √ -
Jharkhand √
TIMELINES: DPRs- SLEC APPROVAL WITH 60% UC(Phase II)(Phase I)
State / Union Territory Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018
Karnataka √ Kerala - √ - - -
Lakshadweep - - - - -
Madhya Pradesh - - √ √ -Maharashtra - √ - - -
Manipur
Meghalaya √Mizoram √
Nagaland
Odisha √
Puducherry - - - √√ -
Punjab - - √ √ -
Rajasthan - - - - -
Sikkim
TIMELINES: DPRs- SLEC APPROVAL WITH 60% UC (Phase II)(Phase I)
State / Union Territory Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018
Tamilnadu √
Telangana √
Tripura √
Uttar Pradesh - - √ - -
Uttarakhand - √ - √ -
West Bengal
TIMELINES: DPRs- SLEC APPROVAL WITH 60% UC (Phase II)(Phase III)
Key Issues- Recap
Challenge to meet the balance release target of Rs. 640 Crores
– Need to expedite submissions of ICAPs of all phases as per timelines below
– Need to expedite Works on ground through Critical Gap Funding (CGF) and submission of DPRs approved by SLEC with 60% UC
– Need to expedite release of State Share to Treasury and further to State RD (Rurban) account
– UCs and MPRs to be furnished to MoRD regularly
– Remaining Phase 3 Clusters to be furnished urgently by end Nov. 2017
Vacancies in SPMU & DPMU needs to be filled urgently
Master planning exercise to be expedited for all Clusters
MIS
RURBAN Central web - based MIS will be released by December as test for use
27
THANK YOU
Vineeta Hariharan, Chief Program Manager.National Rurban Mission.