NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport and Highways) Government of India Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypass connecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis MONTHLY INSPECTION REPORT (November - 2015) INDEPENDENT CONSULTANT CONCESSIONAIRE Intercontinental Consultants and Technocrats Pvt. Ltd., (ICT) A-8, Green Park, New Delhi, India M/s Patna Highway Projects Limited 2 nd floor, Centric Plaza, Plot No.- 8, Pocket- 4, Sector-II, Dwarka, New Delhi- 110075.
79
Embed
NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Monthly Inspection Report... · NATIONAL HIGHWAYS AUTHORITY OF INDIA ... MONTHLY INSPECTION REPORT (November
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
NATIONAL HIGHWAYS AUTHORITY OF INDIA(Ministry of Road Transport and Highways)
Government of India
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000to Km. 46.300 and construction of 16.87 kms New Bypass connecting NH-
28 of East West Corridor at Km. 515.045 in the State of Bihar under(NHDP Phase-III) on BOT(Annuity) Basis
MONTHLY INSPECTION REPORT(November - 2015)
INDEPENDENT CONSULTANT CONCESSIONAIRE
Intercontinental Consultantsand Technocrats Pvt. Ltd.,(ICT)A-8, Green Park, New Delhi,India
3 Mr. M.D. Lacsmana Sr. Pavement Specialist 18.07.2012 Whole contract PackageReplacement on Sl.
No. 2
1 Mr. R. N. Goel Sr.Bridge Design
Engineer18.12.10 Whole contract Package
2 Mr. R.E. P. SharmaSr. Quality / Material
Expert30.11.10 Whole contract Package
3 Mr. Lal Narayan SinghResidential Cum
Highway Engineer19.11.10 Whole contract Package
Resigned effective
22.12.2012 as on
this MPR still no
replacement for Mr.
L.N. Singh
4 Mr. S. P.SinghBridge / Structural
Engineer02.12.10 Whole contract Package
5 Mr. P. K. Sikdar Road Safety Expert 17.01.11 Whole contract Package
1 Mr. Dinesh Kumar Survey Engineer 24.12.10 Whole contract Package
2 Mr. Manoj Kumar Mishra Ass. Bridge Engineer 09.02.2013 Whole contract PackageResigned dated-
02.08.2014
3 Mr. Om Prakash. Asst. Highway Engineer 01.02.11 Whole contract Package
4 Mr. Ashok Kumar Asst. Highway Engineer 22.08.14 Whole contract PackageReplacement on Sl.
No.3
5 Mr. Guddu KumarAsst.Quality cum
Material Engineer16.10.12 Whole contract Package
6 Mr. Akhilesh Kr. Mishra Asst. Highway Engineer12.05.11/
12.12.2013Whole contract Package
7 Mr. Anish KumarAsst.Quality cum
Material Engineer
17.02.11/
12.12.2013Whole contract Package
8 Mr. Nagendra Kumar Asst. Bridge Engineer09.12.11/
12.12.2013Whole contract Package
9 Mr. Dhan Singh Horticulturist 28.09.11 Whole contract Package
1 Mr. Ram Sen Singh Manager 01.01.11 Site Office
2 Mr. S.K.Choubey Accountant 23.11.10 Site Office
3 Mr. Shravan Kr. Computer Operator 20.06.11 Site Office
4 Mr. Deepak Kumar Steno 03.04.12 Site Office
5 Mr. Biswajit MohantyPhoto Copy Machine
Operator01.07.13 Site Office
6 Mr. Ghuran Kumar Office boy 22.04.14 Site Office
7 Mr.Shanker Pandit Guard 01.12.12 Site Office
8 Mr. Sanjay Kumar Guard 07.01.11 Site Office
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypass connecting NH- 28 of East West Corridor at
Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
( c) Sub Professional:
(d) Support Staff:
Deployment of Independent Consultant's Site Staff
(a) Expatriate:
(b) Key Professional:
Not included in
(EOT) Extention Of
Time proposed by
NHAI
Monthly Inspection Report (November - 2015) 19
Monthly Inspection Report (November - 2015)
20
Four Laning of Hajipur-Muzaffarpur Section of NH-77(Km. 0+000 to Km. 46+300 and 16.87 Kms. Of New Bypass Connecting NH-28)
Mr. R. P. SinghRegional Officer, (Patna)
Mr. Ram Kumar YadavProject Director, NHAI
Mr. R.S.MorelosTeam Leader
Independent Consultant (IC), ICT
Sr. Pavement SpecialistVacant
Road Safety ExpertDr. P.K Sikdar
HTMS/Toll ExpertAshwani Kumar
Sr. Bridge Design Engr.Mr. R.N.Goel
AccountantMr. S.K.Choubey
Sr. Quality/ Material ExpertMr. Mr. R.E.P. Sharma
Bridge/Structural EngineerMr. S.P.Singh
Resident cum Highway EngineerVacant
StenoMr. Deepak Kr.
Computer OperatorMr. Shravan Kr.
AQMEGuddu Kumar
AHEMr. Ashok Kumar
ABEVacant
CAD ExpertMr. Vasu A. Sharma
Electrical EngineerAdhir Kumar Pani
Environmental EngineerMr. Sujeet Kumar
Survey EngineerMr. Dinesh Kumar
PROJECTORGANIZATION CHART
AS ON OCTOBER 2015
Traffic andTransportation ExpertMr. R. K. Makhija
Highway Design Engr.Mr. Rajiv Singla
HorticulturistVacant
Financial ExpertMr. Amitava Basu
Legal ExpertR.O.Chhabra
Admin. ManagerMr. Ram Sen Singh
Mr. N.K. SinhaEngineer,
ICT Pvt. Ltd.
Assistant (Helper)(04 Nos.)
Mr. Amit Kumar OjhaManager Tech., NHAI
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
0.1
00
0.2
00
0.3
00
0.4
00
0.5
00
0.6
00
0.7
00
0.8
00
0.9
00
1.0
00
1.1
00
1.2
00
1.3
00
1.4
00
1.5
00
1.6
00
1.7
00
1.8
00
1.9
00
2.0
00
2.1
00
2.2
00
2.3
00
2.4
00
2.5
00
2.6
00
2.7
00
2.8
00
2.9
00
3.0
00
3.1
00
3.2
00
3.3
00
3.4
00
3.5
00
3.6
00
3.7
00
3.8
00
3.9
00
4.0
00
4.1
00
4.2
00
4.3
00
4.4
00
4.5
00
4.6
00
4.7
00
4.8
00
4.9
00
5.0
00
5.1
00
5.2
00
5.3
00
5.4
00
5.5
00
5.6
00
5.7
00
5.8
00
5.9
00
6.0
00
6.1
00
6.2
00
6.3
00
6.4
00
6.5
00
6.6
00
6.7
00
6.8
00
6.9
00
7.0
00
7.1
00
7.2
00
7.3
00
7.4
00
7.5
00
7.6
00
7.7
00
7.8
00
7.9
00
8.0
00
8.1
00
8.2
00
8.3
00
8.4
00
8.5
00
8.6
00
8.7
00
8.8
00
8.9
00
9.0
00
9.1
00
9.2
00
9.3
00
9.4
00
9.5
00
9.6
00
9.7
00
9.8
00
9.9
00
10.0
00
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
0.1
00
0.2
00
0.3
00
0.4
00
0.5
00
0.6
00
0.7
00
0.8
00
0.9
00
1.0
00
1.1
00
1.2
00
1.3
00
1.4
00
1.5
00
1.6
00
1.7
00
1.8
00
1.9
00
2.0
00
2.1
00
2.2
00
2.3
00
2.4
00
2.5
00
2.6
00
2.7
00
2.8
00
2.9
00
3.0
00
3.1
00
3.2
00
3.3
00
3.4
00
3.5
00
3.6
00
3.7
00
3.8
00
3.9
00
4.0
00
4.1
00
4.2
00
4.3
00
4.4
00
4.5
00
4.6
00
4.7
00
4.8
00
4.9
00
5.0
00
5.1
00
5.2
00
5.3
00
5.4
00
5.5
00
5.6
00
5.7
00
5.8
00
5.9
00
6.0
00
6.1
00
6.2
00
6.3
00
6.4
00
6.5
00
6.6
00
6.7
00
6.8
00
6.9
00
7.0
00
7.1
00
7.2
00
7.3
00
7.4
00
7.5
00
7.6
00
7.7
00
7.8
00
7.9
00
8.0
00
8.1
00
8.2
00
8.3
00
8.4
00
8.5
00
8.6
00
8.7
00
8.8
00
8.9
00
9.0
00
9.1
00
9.2
00
9.3
00
9.4
00
9.5
00
9.6
00
9.7
00
9.8
00
9.9
00
10.0
00
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Serv
ice R
oad
0.0
00
Main
Carr
iag
ew
ay
Km. 00+000 To 10+000 (LHS)
PAVEMENT PROGRESS CHART
3
10
.00
0
Main
Carr
iag
ew
ay
Km. 00+000 To 10+000 (RHS)Progress
Serv
ice R
oad
Section - I (Km. 00+000 To 46+300)
Monthly Inspection Report (November - 2015) 21
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
10.1
00
10.2
00
10.3
00
10.4
00
10.5
00
10.6
00
10.7
00
10.8
00
10.9
00
11.0
00
11.1
00
11.2
00
11.3
00
11.4
00
11.5
00
11.6
00
11.7
00
11.8
00
11.9
00
12.0
00
12.1
00
12.2
00
12.3
00
12.4
00
12.5
00
12.6
00
12.7
00
12.8
00
12.9
00
13.0
00
13.1
00
13.2
00
13.3
00
13.4
00
13.5
00
13.6
00
13.7
00
13.8
00
13.9
00
14.0
00
14.1
00
14.2
00
14.3
00
14.4
00
14.5
00
14.6
00
14.7
00
14.8
00
14.9
00
15.0
00
15.1
00
15.2
00
15.3
00
15.4
00
15.5
00
15.6
00
15.7
00
15.8
00
15.9
00
16.0
00
16.1
00
16.2
00
16.3
00
16.4
00
16.5
00
16.6
00
16.7
00
16.8
00
16.9
00
17.0
00
17.1
00
17.2
00
17.3
00
17.4
00
17.5
00
17.6
00
17.7
00
17.8
00
17.9
00
18.0
00
18.1
00
18.2
00
18.3
00
18.4
00
18.5
00
18.6
00
18.7
00
18.8
00
18.9
00
19.0
00
19.1
00
19.2
00
19.3
00
19.4
00
19.5
00
19.6
00
19.7
00
19.8
00
19.9
00
20.0
00
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
10.1
00
10.2
00
10.3
00
10.4
00
10.5
00
10.6
00
10.7
00
10.8
00
10.9
00
11.0
00
11.1
00
11.2
00
11.3
00
11.4
00
11.5
00
11.6
00
11.7
00
11.8
00
11.9
00
12.0
00
12.1
00
12.2
00
12.3
00
12.4
00
12.5
00
12.6
00
12.7
00
12.8
00
12.9
00
13.0
00
13.1
00
13.2
00
13.3
00
13.4
00
13.5
00
13.6
00
13.7
00
13.8
00
13.9
00
14.0
00
14.1
00
14.2
00
14.3
00
14.4
00
14.5
00
14.6
00
14.7
00
14.8
00
14.9
00
15.0
00
15.1
00
15.2
00
15.3
00
15.4
00
15.5
00
15.6
00
15.7
00
15.8
00
15.9
00
16.0
00
16.1
00
16.2
00
16.3
00
16.4
00
16.5
00
16.6
00
16.7
00
16.8
00
16.9
00
17.0
00
17.1
00
17.2
00
17.3
00
17.4
00
17.5
00
17.6
00
17.7
00
17.8
00
17.9
00
18.0
00
18.1
00
18.2
00
18.3
00
18.4
00
18.5
00
18.6
00
18.7
00
18.8
00
18.9
00
19.0
00
19.1
00
19.2
00
19.3
00
19.4
00
19.5
00
19.6
00
19.7
00
19.8
00
19.9
00
20.0
00
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Section - I (Km. 00+000 To 46+300)
Serv
ice R
oad
10.0
00
PAVEMENT PROGRESS CHART
Km. 10+000 To 20+000 (LHS)
PQC
Progress
Km. 10+000 To 20+000 (RHS)
Main
Carr
iag
ew
ay
Serv
ice R
oad
10.0
00
Main
Carr
iag
ew
ay
PQC
Monthly Inspection Report (November - 2015) 22
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
20
.10
0
20
.20
0
20
.30
0
20
.40
0
20
.50
0
20
.60
0
20
.70
0
20
.80
0
20
.90
0
21
.00
0
21
.10
0
21
.20
0
21
.30
0
21
.40
0
21
.50
0
21
.60
0
21
.70
0
21
.80
0
21
.90
0
22
.00
0
22
.10
0
22
.20
0
22
.30
0
22
.40
0
22
.50
0
22
.60
0
22
.70
0
22
.80
0
22
.90
0
23
.00
0
23
.10
0
23
.20
0
23
.30
0
23
.40
0
23
.50
0
23
.60
0
23
.70
0
23
.80
0
23
.90
0
24
.00
0
24
.10
0
24
.20
0
24
.30
0
24
.40
0
24
.50
0
24
.60
0
24
.70
0
24
.80
0
24
.90
0
25
.00
0
25
.10
0
25
.20
0
25
.30
0
25
.40
0
25
.50
0
25
.60
0
25
.70
0
25
.80
0
25
.90
0
26
.00
0
26
.10
0
26
.20
0
26
.30
0
26
.40
0
26
.50
0
26
.60
0
26
.70
0
26
.80
0
26
.90
0
27
.00
0
27
.10
0
27
.20
0
27
.30
0
27
.40
0
27
.50
0
27
.60
0
27
.70
0
27
.80
0
27
.90
0
28
.00
0
28
.10
0
28
.20
0
28
.30
0
28
.40
0
28
.50
0
28
.60
0
28
.70
0
28
.80
0
28
.90
0
29
.00
0
29
.10
0
29
.20
0
29
.30
0
29
.40
0
29
.50
0
29
.60
0
29
.70
0
29
.80
0
29
.90
0
30
.00
0
30
.10
0
30
.20
0
30
.30
0
30
.40
0
30
.50
0
30
.60
0
30
.70
0
30
.80
0
30
.90
0
31
.00
0
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
20
.10
0
20
.20
0
20
.30
0
20
.40
0
20
.50
0
20
.60
0
20
.70
0
20
.80
0
20
.90
0
21
.00
0
21
.10
0
21
.20
0
21
.30
0
21
.40
0
21
.50
0
21
.60
0
21
.70
0
21
.80
0
21
.90
0
22
.00
0
22
.10
0
22
.20
0
22
.30
0
22
.40
0
22
.50
0
22
.60
0
22
.70
0
22
.80
0
22
.90
0
23
.00
0
23
.10
0
23
.20
0
23
.30
0
23
.40
0
23
.50
0
23
.60
0
23
.70
0
23
.80
0
23
.90
0
24
.00
0
24
.10
0
24
.20
0
24
.30
0
24
.40
0
24
.50
0
24
.60
0
24
.70
0
24
.80
0
24
.90
0
25
.00
0
25
.10
0
25
.20
0
25
.30
0
25
.40
0
25
.50
0
25
.60
0
25
.70
0
25
.80
0
25
.90
0
26
.00
0
26
.10
0
26
.20
0
26
.30
0
26
.40
0
26
.50
0
26
.60
0
26
.70
0
26
.80
0
26
.90
0
27
.00
0
27
.10
0
27
.20
0
27
.30
0
27
.40
0
27
.50
0
27
.60
0
27
.70
0
27
.80
0
27
.90
0
28
.00
0
28
.10
0
28
.20
0
28
.30
0
28
.40
0
28
.50
0
28
.60
0
28
.70
0
28
.80
0
28
.90
0
29
.00
0
29
.10
0
29
.20
0
29
.30
0
29
.40
0
29
.50
0
29
.60
0
29
.70
0
29
.80
0
29
.90
0
30
.00
0
30
.10
0
30
.20
0
30
.30
0
30
.40
0
30
.50
0
30
.60
0
30
.70
0
30
.80
0
30
.90
0
31
.00
0
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Section - I (Km. 00+000 To 46+300)
Km. 20.000 To 31+100 (LHS)
Km. 20.000 To 31+100 (RHS)
Ma
in C
arr
iag
ew
ay
Progress
PAVEMENT PROGRESS CHART
Se
rvic
e R
oa
dS
erv
ice
Ro
ad
20
.00
02
0.0
00
Ma
in C
arr
iag
ew
ay
Monthly Inspection Report (November - 2015) 23
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
31.1
00
31.2
00
31.3
00
31.4
00
31.5
00
31.6
00
31.7
00
31.8
00
31.9
00
32.0
00
32.1
00
32.2
00
32.3
00
32.4
00
32.5
00
32.6
00
32.7
00
32.8
00
32.9
00
33.0
00
33.1
00
33.2
00
33.3
00
33.4
00
33.5
00
33.6
00
33.7
00
33.8
00
33.9
00
34.0
00
34.1
00
34.2
00
34.3
00
34.4
00
34.5
00
34.6
00
34.7
00
34.8
00
34.9
00
35.0
00
35.1
00
35.2
00
35.3
00
35.4
00
35.5
00
35.6
00
35.7
00
35.8
00
35.9
00
36.0
00
36.1
00
36.2
00
36.3
00
36.4
00
36.5
00
36.6
00
36.7
00
36.8
00
36.9
00
37.0
00
37.1
00
37.2
00
37.3
00
37.4
00
37.5
00
37.6
00
37.7
00
37.8
00
37.9
00
38.0
00
38.1
00
38.2
00
38.3
00
38.4
00
38.5
00
38.6
00
38.7
00
38.8
00
38.9
00
39.0
00
39.1
00
39.2
00
39.3
00
39.4
00
39.5
00
39.6
00
39.7
00
39.8
00
39.9
00
40.0
00
40.1
00
40.2
00
40.3
00
40.4
00
40.5
00
40.6
00
40.7
00
40.8
00
40.9
00
41.0
00
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
31.1
00
31.2
00
31.3
00
31.4
00
31.5
00
31.6
00
31.7
00
31.8
00
31.9
00
32.0
00
32.1
00
32.2
00
32.3
00
32.4
00
32.5
00
32.6
00
32.7
00
32.8
00
32.9
00
33.0
00
33.1
00
33.2
00
33.3
00
33.4
00
33.5
00
33.6
00
33.7
00
33.8
00
33.9
00
34.0
00
34.1
00
34.2
00
34.3
00
34.4
00
34.5
00
34.6
00
34.7
00
34.8
00
34.9
00
35.0
00
35.1
00
35.2
00
35.3
00
35.4
00
35.5
00
35.6
00
35.7
00
35.8
00
35.9
00
36.0
00
36.1
00
36.2
00
36.3
00
36.4
00
36.5
00
36.6
00
36.7
00
36.8
00
36.9
00
37.0
00
37.1
00
37.2
00
37.3
00
37.4
00
37.5
00
37.6
00
37.7
00
37.8
00
37.9
00
38.0
00
38.1
00
38.2
00
38.3
00
38.4
00
38.5
00
38.6
00
38.7
00
38.8
00
38.9
00
39.0
00
39.1
00
39.2
00
39.3
00
39.4
00
39.5
00
39.6
00
39.7
00
39.8
00
39.9
00
40.0
00
40.1
00
40.2
00
40.3
00
40.4
00
40.5
00
40.6
00
40.7
00
40.8
00
40.9
00
41.0
00
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
PAVEMENT PROGRESS CHART
Section - II (Km. 31+000 To 46+300)S
erv
ice
Ro
ad
31
.00
0
Ma
in C
arr
iag
ew
ay
Work in progress
Km. 31+000 To 41+000 (LHS)
Se
rvic
e R
oa
d
31
.00
0
Ma
in C
arr
iag
ew
ay
Km. 31+000 To 41+000 (RHS)
Monthly Inspection Report (November - 2015) 24
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
41
.10
0
41
.20
0
41
.30
0
41
.40
0
41
.50
0
41
.60
0
41
.70
0
41
.80
0
41
.90
0
42
.00
0
42
.10
0
42
.20
0
42
.30
0
42
.40
0
42
.50
0
42
.60
0
42
.70
0
42
.80
0
42
.90
0
43
.00
0
43
.10
0
43
.20
0
43
.30
0
43
.40
0
43
.50
0
43
.60
0
43
.70
0
43
.80
0
43
.90
0
44
.00
0
44
.10
0
44
.20
0
44
.30
0
44
.40
0
44
.50
0
44
.60
0
44
.70
0
44
.80
0
44
.90
0
45
.00
0
45
.10
0
45
.20
0
45
.30
0
45
.40
0
45
.50
0
45
.60
0
45
.70
0
45
.80
0
45
.90
0
46
.00
0
46
.10
0
46
.20
0
46
.30
0
Bituminous Concrete
Dense Bituminous
Macadum `
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
41
.10
0
41
.20
0
41
.30
0
41
.40
0
41
.50
0
41
.60
0
41
.70
0
41
.80
0
41
.90
0
42
.00
0
42
.10
0
42
.20
0
42
.30
0
42
.40
0
42
.50
0
42
.60
0
42
.70
0
42
.80
0
42
.90
0
43
.00
0
43
.10
0
43
.20
0
43
.30
0
43
.40
0
43
.50
0
43
.60
0
43
.70
0
43
.80
0
43
.90
0
44
.00
0
44
.10
0
44
.20
0
44
.30
0
44
.40
0
44
.50
0
44
.60
0
44
.70
0
44
.80
0
44
.90
0
45
.00
0
45
.10
0
45
.20
0
45
.30
0
45
.40
0
45
.50
0
45
.60
0
45
.70
0
45
.80
0
45
.90
0
46
.00
0
46
.10
0
46
.20
0
46
.30
0
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
PAVEMENT PROGRESS CHARTSection - II (Km. 41+100 To 46+300)
Se
rvic
e R
oa
dM
ain
Ca
rria
ge
wa
y
41
.00
0
Km. 41+000 To 46+300 (LHS)
Se
rvic
e R
oa
dM
ain
Ca
rria
ge
wa
y
41
.00
0
Km. 41+000 To 46+300 (RHS)Progress
Monthly Inspection Report (November - 2015) 25
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
0.1
00
0.2
00
0.3
00
0.4
00
0.5
00
0.6
00
0.7
00
0.8
00
0.9
00
1.0
00
1.1
00
1.2
00
1.3
00
1.4
00
1.5
00
1.6
00
1.7
00
1.8
00
1.9
00
2.0
00
2.1
00
2.2
00
2.3
00
2.4
00
2.5
00
2.6
00
2.7
00
2.8
00
2.9
00
3.0
00
3.1
00
3.2
00
3.3
00
3.4
00
3.5
00
3.6
00
3.7
00
3.8
00
3.9
00
4.0
00
4.1
00
4.2
00
4.3
00
4.4
00
4.5
00
4.6
00
4.7
00
4.8
00
4.9
00
5.0
00
5.1
00
5.2
00
5.3
00
5.4
00
5.5
00
5.6
00
5.7
00
5.8
00
5.9
00
6.0
00
6.1
00
6.2
00
6.3
00
6.4
00
6.5
00
6.6
00
6.7
00
6.8
00
6.9
00
7.0
00
7.1
00
7.2
00
7.3
00
7.4
00
7.5
00
7.6
00
7.7
00
7.8
00
7.9
00
8.0
00
8.1
00
8.2
00
8.3
00
8.4
00
8.5
00
8.6
00
8.7
00
8.8
00
8.9
00
9.0
00
9.1
00
9.2
00
9.3
00
9.4
00
9.5
00
9.6
00
9.7
00
9.8
00
9.9
00
10
.00
0
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
0.1
00
0.2
00
0.3
00
0.4
00
0.5
00
0.6
00
0.7
00
0.8
00
0.9
00
1.0
00
1.1
00
1.2
00
1.3
00
1.4
00
1.5
00
1.6
00
1.7
00
1.8
00
1.9
00
2.0
00
2.1
00
2.2
00
2.3
00
2.4
00
2.5
00
2.6
00
2.7
00
2.8
00
2.9
00
3.0
00
3.1
00
3.2
00
3.3
00
3.4
00
3.5
00
3.6
00
3.7
00
3.8
00
3.9
00
4.0
00
4.1
00
4.2
00
4.3
00
4.4
00
4.5
00
4.6
00
4.7
00
4.8
00
4.9
00
5.0
00
5.1
00
5.2
00
5.3
00
5.4
00
5.5
00
5.6
00
5.7
00
5.8
00
5.9
00
6.0
00
6.1
00
6.2
00
6.3
00
6.4
00
6.5
00
6.6
00
6.7
00
6.8
00
6.9
00
7.0
00
7.1
00
7.2
00
7.3
00
7.4
00
7.5
00
7.6
00
7.7
00
7.8
00
7.9
00
8.0
00
8.1
00
8.2
00
8.3
00
8.4
00
8.5
00
8.6
00
8.7
00
8.8
00
8.9
00
9.0
00
9.1
00
9.2
00
9.3
00
9.4
00
9.5
00
9.6
00
9.7
00
9.8
00
9.9
00
10
.00
0
Bituminous Concrete
Dense Bituminous Macadum
Wet Mix Macaduam
Granular Sub Base `
Subgrade
Embankment
Clearing & Grabing
Km. 00+000 To 10+000 (LHS)
Serv
ice R
oad
0.0
00
Ma
in C
arr
iag
ew
ay
Km. 00+000 To 10+000 (RHS)
PAVEMENT PROGRESS CHARTBypass - (Km.0+000 To 16+800)
Serv
ice R
oad
Main
Carr
iag
ew
ay
Monthly Inspection Report (November - 2015) 26
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
10
.10
0
10
.20
0
10
.30
0
10
.40
0
10
.50
0
10
.60
0
10
.70
0
10
.80
0
10
.90
0
11
.00
0
11
.10
0
11
.20
0
11
.30
0
11
.40
0
11
.50
0
11
.60
0
11
.70
0
11
.80
0
11
.90
0
12
.00
0
12
.10
0
12
.20
0
12
.30
0
12
.40
0
12
.50
0
12
.60
0
12
.70
0
12
.80
0
12
.90
0
13
.00
0
13
.10
0
13
.20
0
13
.30
0
13
.40
0
13
.50
0
13
.60
0
13
.70
0
13
.80
0
13
.90
0
14
.00
0
14
.10
0
14
.20
0
14
.30
0
14
.40
0
14
.50
0
14
.60
0
14
.70
0
14
.80
0
14
.90
0
15
.00
0
15
.10
0
15
.20
0
15
.30
0
15
.40
0
15
.50
0
15
.60
0
15
.70
0
15
.80
0
15
.90
0
16
.00
0
16
.10
0
16
.20
0
16
.30
0
16
.40
0
16
.50
0
16
.60
0
16
.70
0
16
.80
0
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing
Strip Chart
10
.10
0
10
.20
0
10
.30
0
10
.40
0
10
.50
0
10
.60
0
10
.70
0
10
.80
0
10
.90
0
11
.00
0
11
.10
0
11
.20
0
11
.30
0
11
.40
0
11
.50
0
11
.60
0
11
.70
0
11
.80
0
11
.90
0
12
.00
0
12
.10
0
12
.20
0
12
.30
0
12
.40
0
12
.50
0
12
.60
0
12
.70
0
12
.80
0
12
.90
0
13
.00
0
13
.10
0
13
.20
0
13
.30
0
13
.40
0
13
.50
0
13
.60
0
13
.70
0
13
.80
0
13
.90
0
14
.00
0
14
.10
0
14
.20
0
14
.30
0
14
.40
0
14
.50
0
14
.60
0
14
.70
0
14
.80
0
14
.90
0
15
.00
0
15
.10
0
15
.20
0
15
.30
0
15
.40
0
15
.50
0
15
.60
0
15
.70
0
15
.80
0
15
.90
0
16
.00
0
16
.10
0
16
.20
0
16
.30
0
16
.40
0
16
.50
0
16
.60
0
16
.70
0
16
.80
0
Bituminous Concrete
Dense Bituminous
Macadum
Wet Mix Macaduam
Granular Sub Base
Subgrade
Embankment
Clearing & Grabing6
Km. 10+000 to 16+800 (RHS)Work in progress
Km. 10+000 to 16+800 (LHS)
Se
rvic
e R
oa
d
10
.00
0
Ma
in C
arr
iag
ew
ay
PAVEMENT PROGRESS CHART
Bypass (Km. 10+100 To 16+800)
Se
rvic
e R
oa
d
10
.00
0
Ma
in C
arr
iag
ew
ay
Monthly Inspection Report (November - 2015) 27
Excavation PCC RAFT WALL DECK SLABRETURN
WALLRemarks Excavation PCC RAFT WALL DECK SLAB
RETURN WALL
Remarks
1 1+537 Box Culvert 1x3x3 Reconstruction .
2 4+065 Box Culvert 1x2x2 New Construction
3 7+075 Box Culvert 1x2x2 New Construction
4 8+632 Box Culvert 1x2x2 New Construction
5 9+356 Box Culvert 1x3x3 Reconstruction
6 10+053 Box Culvert 1x2x2 Reconstruction
7 11+448 Box Culvert 1x2x2 New Construction
8 12+797 Box Culvert 1x2x2 Reconstruction LR
9 13+262 Box Culvert 1x2x2 Reconstruction
10 13+734 Box Culvert 1x2x2 Reconstruction
11 14+888 Box Culvert 1x2x2 New Construction
12 15+888 Box Culvert 1x2x2 New Construction
13 16+632 Box Culvert 1x2x2 New Construction
14 16+995 Box Culvert 1x2x2 New Construction
15 19+540 Box Culvert 1x2x2 New Construction
16 20+460 Box Culvert 1x2x2 Reconstruction
17 22+370 Box Culvert 1x2x2 Reconstruction
18 23+857 Box Culvert 1x3x3 Reconstruction
19 27+565 Box Culvert 1x2x2 New Construction
20 29+138 Box Culvert 1x2x2 Reconstruction
21 30+176 Box Culvert 1x2x2 Reconstruction
22 32+058 Box Culvert 1x3x3 Reconstruction
23 32+227 Box Culvert 1x2x2 Reconstruction
24 33+358 Box Culvert 1x2x2 Reconstruction
25 33+424 Box Culvert 1x2x2 Reconstruction
26 35+906 Box Culvert 1x2x2 New Construction
27 36+235 Box Culvert 1x2x2 Reconstruction
28 36+723 Box Culvert 2x3x3 Reconstruction
29 38+667 Box Culvert 1x3x3 Reconstruction
30 39+455 Box Culvert 1x2x2 New Construction
31 40+118 Box Culvert 1x3x3 New Construction
32 41+587 Box Culvert 1x2x2 Reconstruction
33 44+759 Box Culvert 1x2x2 Reconstruction
STATUS OF BOX- CULVERTS UPTO NOVEMBER 2015 Sl. No. Chainage Type
Size of Culvert
DescriptionLHS RHS
Completed Activities
Not Started
Monthly Inspection Report (November - 2015) 28-29
Excavation PCC RAFT WALL DECK SLABRETURN
WALLRemarks Excavation PCC RAFT WALL DECK SLAB
RETURN WALL
Remarks
STATUS OF BOX- CULVERTS UPTO NOVEMBER 2015 Sl. No. Chainage Type
Size of Culvert
DescriptionLHS RHS
34 1+309 Box Culvert 1x3x3 New Construction
35 2+550 Box Culvert 1x3x3 New Construction
36 2+811 Box Culvert 1x3x3 New Construction
37 3+140 Box Culvert 1x3x3 New Construction
38 4+258 Box Culvert 1x3x3 New Construction
39 5+466 Box Culvert 1x3x3 New Construction
40 6+417 Box Culvert 1x3x3 New Construction
41 7+135 Box Culvert 1x3x3 New Construction Sze Modified
42 7+977 Box Culvert 1x3x3 New Construction
43 8+903 Box Culvert 1x3x3 New Construction Under RE wall Under RE wall
18 14+177 Minor Bridge 2 x 25 New Construction Comp.Initial
Conducted46 Comp. Comp. P1 Balance Comp Comp 44
A1= 20/20,
A2=19/20 P1=3/6
A1 comp. P1
balanceA1 Comp A1 Comp
N/A
Note : RE wall works in approaches at ROB-II in progress.
STATUS OF BRIDGES UPTO NOVEMBER - 2015
Sl.
No.Chainage Type Size Description
LHS RHS
Completed.
Completed Activities
STATUS OF FLYOVER/GRADE SEPERATOR
STATUS OF MAJOR BRIDGE
STATUS OF MINOR BRIDGES
Not Applicable
STATUS OF ROB's
Not started Not started
Not started Not started
Bypass
Completed
Completed
Existing Retained
Completed.
Monthly Inspection Report (November - 2015) 35
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)32
4.
QUALITY OF WORKS
(i) PROGRESS REVIEW AND CONSTRUCTION ACTIVITIESRoad Works
Concreting of Crash Barrier at 6+700 – 6+780. Ongoing earthwork at Sarai service road and demolition/removal of debris and structures
(buildings). Subgrade and GSB placing at 6+535 to 6+780 approaches (Muzaffarpur side). Granular fill and filter media in progress at ch. 5+930 to 6+187.79 (BHS) WMM work done at ch. 6+538 to 6+570 (BHS). DBM work done at ch. 6+640 to 6+810 (LHS), 6+640 to 6+720 (RHS). Kerb work done at ch. 6+650 to 6+810 (RHS) 6+650 to 6+800 (LHS).
Structure Works
Activities for ROB-2 is going on as well as in RE walls works in approaches since 25.04.2015
Launching of composite steel girders in progress at ROB-II. Blockage applied.
PUP at ROB-I Muzaffarpur started at 0+820.
(ii) STATUS OF FIELD LABORATORIESThe Concessionaire had constructed field laboratories at km. 9+400 at Sarai and km. 34+600 at Kamtaul.At present the Bypass laboratory is closed and only Kamtaul laboratory is operational.
(iii) STATUS OF SITE CAMPSAt present, the concessionaire is holding their offices in Kamtaul camp at ch. 34+600. TheConcessionaire is obtaining their Concrete, Asphalt, WMM mix at Kamtaul camp.
(iv) STATUS OF MATERIAL SOURCE APPROVAL.
Status of Material Source Approval up to November – 2015Month No. of MSA
SubmittalsNo. of MSAReviewed
No. of pending withConcessionaire for
compliance ofobservations
Remarks
November 2010 0 0 0
December 2010 0 0 0
January 2011 0 0 0
February 2011 05 05 0
March 2011 08 08 0
April 2011 01 01 0
May 2011 02 02 0
June 2011 04 04 0
July 2011 02 02 0
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)33
August 2011 06 06 -
September 2011 03 03 -October 2011 0 0 -
November 2011 0 0 -
December 2011 4 4 -
January 2012 2 2 0
February 2012 1 1
March 2012 0 0 0
April 2012 0 0 0
May 2012 1 1 0
June 2012 2 2 0
July 2012 0 0 0
August 2012 0 0 0
September 2012 0 0 0
October 2012 0 0 0
November 2012 4 4 0
December 2012 0 0 0
January2013 1 1 0
February 2013 0 0 0
March 2013 0 0 0
April 2013 0 0 0
May 2013 0 0 0
June 2013 0 0 0
July 2013 1 1 0
August 2013 0 0 0
September 2013 0 0 0
October 2013 0 0 0
November 2013 0 0 0
December 2013 0 0 0
January 2014 0 0 0
February 2014 0 0 0
March 2014 0 0 0
April 2014 0 0 0
May 2014 0 0 0
June 2014 0 0 0
July 2014 0 0 0
September 2014 0 0 0
October 2014 0 0 0
November 2014 0 0 0
December 2014 0 0 0
January 2015 0 0 0
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)34
February 2015 0 0 0
March 2015 0 0 0
April 2015 1 1 1
Subjected to IC letterno. ICT/102/NH-
77/PHPL/TL/2015/2888dated 15.06.2015
May 2015 0 0 0
June 2015 0 0 0
July 2015 0 0 0
August 2015 0 0 0
September 2015 0 0 0
October 2015 1 1 0 Dated 12.10.2015
November 2015 0 0 0
Total 48 48 01
Note:- With Comments return and pending.
Material Source Approval Log.SL Material Ref. no. Revision Submitted
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)43
5.
STATUS OF MILESTONES
Appointed Date : 12.08.2010
Milestone Target AchievementI (180th day from AppointedDate) i.e. 8th February, 2011
a)Should have commencedconstruction of ProjectHighway
b) Expenditure not less than10% of TPC
Work started
13.04%
II (400th day from AppointedDate) i.e. 15th December, 2011
(a) Should have commencedconstruction of all bridges
(b) (b) Expenditure not lessthan 35%
Commenced work on allbridges where sites were handedover.35.36%
III (650th day from AppointedDate) i.e. 22nd May, 2012
(a) Should have commencedconstruction of all projectfacilities
(b) Expenditure not less than70%
Targets not achieved.
Concessionaire has raised theissue of non-availability ofvacant land. Consequently EOTof Construction Period may berequired. In that case, theMilestone may have to beredefined.
IV (910th day from AppointedDate) i.e. 06th February, 2013
Completion of scheduled Four-Laning.
Not Achieved.Concessionaire has raised theissue of non-availability of land.
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)44
6.
Activities Performed by the Consultant during the month are as follows:-
1. Inspection and monitoring of construction works done by Concessionaire.
2. Attend meetings with the P.D.- NHAI and Manager Technical of NHAI.
3. Day to day consultation with the Concessionaire.
4. Review the Monthly Progress Report furnished by the Concessionaire.
5. Answer correspondences from the Concessionaire and the Client.
6. Monitor the activities of Concessionaire regarding ROB-II and service road works.
7. Check & comments MPR of Concessionaire MPR no. 62 for October 2015.
8. Check GAD of 0+000 (starting point) submitted by Concessionaire on 11th June 2015.
9. Attending PIU for meeting with the PD and Manager Technical.
10. Check GAD of GM’s entrance junction submitted by Concessionaire on 05th September 2015.
11. Attend meeting to RO office progress of ROB-2 and status of hindrance at ROB-2 Km.-32,Km-33.
12. Revised COS Turki returned by NHAI - H.O. using 2012-2013 SOR Bihar.
13. Check Maintenance of Concessionaire on done at NH-77.
14. Review of design and drawing of viaduct at H.O. submitted by the Concessionaire.
15. Check GAD of 0+000 (junction) submitted by the Concessionaire.
16. Design and drawing approved of VUP at 0+820 (ROB-I)
17. Inspection of work going on at ROB-II structural work launching of steel girder, approaches.
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)45
7.
NCR ISSUED DURING THE MONTH
Sl.No.
CoveringLetter
Description Date ofIssue
Chainage Status Remarks
1 2 3 4 5 6 7
01ICT/102/NH-77/PHPL/TL/
2015/2164
StonePitchingWorks
27.09.132+360 to 2+410 (LHS),2+460 to 2+520 (LHS),2+460 to 2+520 (RHS)
Still noCorrective
Measures doneby
Concessionaire
02ICT/102/NH-77/PHPL/TL/
2015/2836
AsphaltCrack
09.05.1544+080 to 44+160
(RHS)
Still noCorrective
Measures doneby
Concessionaire
03ICT/102/NH-77/PHPL/TL/
2015/2838
AsphaltCrack/
deficiency11.05.15
1+600 (LHS),9+100 to 9+330 (LHS),
30+195 (RHS),41+600 to 41+750 (RHS),45+350 to 45+500 (RHS)
&45+550 to 45+700 (RHS)
Still noCorrective
Measures doneby
Concessionaire
04ICT/102/NH-77/PHPL/TL/
2015/2866
RE wallfilling
25.05.155+840 to 5+950
2nd Layer
Closed letter no.-ICT/102/NH-
77/NHAI-PIU/TL/2015/
2875 dated01.06.2015
05ICT/102/NH-77/PHPL/TL/
2015/2889Turki VUP 19.06.15
39+530 to 40+170(BHS)
Still noCorrective
Measures doneby
Concessionaire
06ICT/102/NH-77/PHPL/TL/
2015/2891
Drain cumFootpath
19.06.15
27+480 to 27+580(RHS), 33+792 (RHS),
33+600 to 33+660(RHS), 18+900 to
18+995 (LHS), 27+550(RHS) and 33+795
(RHS).
Still noCorrective
Measures doneby
Concessionaire
8.
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)46
WORK DONE IN BRIEF BY EACH KEY AND SUB-PROFESSIONAL STAFF DURING THEMONTH
(1) Team Leader- Mr. Renato S. Morelos- Sr. Highway Engineer
1. Review the project implementation and preparation activities of the Concessionaire.
2. Monitor works of other staff (Sub-professional and Key Staff).
3. Responded to the communication sent by NHAI and Concessionaire.
4. Under take site visits and inspection of the project.
5. Daily interaction with Concessionaire.
6. Attended meetings with P.D. and Manager Tech. - NHAI.
7. Prepare Inspection Reports for November 2015.
8. Monitored Request for Inspection raised by the Concessionaire during the Month.
(2) Mr. R.E.P. Sharma- Sr. Quality cum Material Expert
1. Review and approval of mix design of all concrete.
2. Review test results of borrow area.
3. Assisting the Team Leader in reviewing the performance of Concessionaires plants.
4. Supervise all test conducted by Concessionaire at laboratory.
5. Assist the T.L. in preparation of Inspection Reports for November 2015.
6. Approved/Disapproved RFI raised by the Concessionaire during the Month.
(3) Mr. S.P. Singh- Bridge/Structural Engineer
1. Inspect all structures and bridges at site if it is in accordance with specification.
2. Maintaining a record set of working drawings and construction record of all structures and
bridges.
3. Assist the key personnel in reviewing all activities related to design/construction of bridges
and structures.
4. To inspect and check the on-going site activities of structures & bridges as per design &
drawing.
5. To be present during concreting work & check the adequacy of form work and
reinforcement in the structural work.
6. Assist the T.L. in preparation of Inspection Reports for November 2015.
7. Approved/Disapproved RFI raised by the Concessionaire during the Month.
8. Joint measurement of boundary wall and Railway GM office gate at ROB-I (Dighi).
9. Checking of RE panel casting at Sarai camp.
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)47
10. Checking of RE panel erection and filling in approaches of ROB-II.
11. Supervising fabrication of steel girders at Sarai camp for ROB-II.
12. Supervising riveting and welding works of composite girder at ROB-II.
13. Checking friction slab casting and reinforcement and PCC also at ROB-II.
14. Checking of fabrication and launching of steel girders at yard/site.
15. PUP PCC, raft casting done at ch. 0+820 at ROB-I Muzaffapur end.
(4) Sub-Professional Staff
1. Mr. Dinesh Kumar- Survey Engineer
A. Assisting the Team Leader with regards to survey works.
B. Assist the key personnel with regards to Elevation, Alignment, Coordinates and other
matter related to surveying.
C. Regular checking of RFI related to levels and alignment verification.
D. Assist the T.L. in preparation of Inspection Reports for November 2015.
E. Approved/Disapproved RFI raised by the Concessionaire during the Month.
2. Mr. Ashok Kumar - Assistant Highway Engineer
A. Conduct field density test at site with Concessionaire representative.
B. Collecting accident data report if any site.
C. Inspecting all highway related work like, G.fill, Filter media, GSB, WMM, Prime Coat,
Tack Coat, DBM and Kerb etc.
D. Inspecting safety aspect of the Concessionaire.
E. Attended RFI submitted by Concessionaire regarding SG, Emb., Granular fill, Filter
Media & Panel Erection for the Month of November, 2015.
3. Mr. Guddu Kumar- Asst. Quality cum Material EngineerA. Check all the source of material accordingly as per contract & specification.
B. Testing of comprehensive strength of all grades of cubes.
C. Assisting Material Engineer.
D. Monitoring day to day laboratory activities of Concessionaire.
E. Witnessed test conducted as per Frequency/ as per specified Daily Progress Report &
Attended no RFI upto 31.05.2015 for the Month of November 2015.
SECTION – c
Safety Arrangement
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypass connecting NH- 28
of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypass connectingNH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis_________________________________________________________________________________________________________
Monthly Inspection Report (November - 2015)49
SECTION - D
DEFECTS / DEFICIENCIES IN WORK:
1. GSB thickness has been checked at bypass Ch. 7+000 to 7+800 LHS, 5+220 RHS, 4+000-6+000 BS, 2+970and found out that only one layer of GSB has been provided on against the requirement of two (2) layers upto the toe of scope to serve as drain or minimum of 200 mm thickness. This is in accordance with IRC -37and the Concessionaire was notified in this deficiencies vide IC letter ICT-1817 dated 11.04.2013.
Not yet corrected by Concessionaire.
SECTION – e
Maintenance of Existing Road
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis_________________________________________________________________________________________________________
Monthly Inspection Report (November - 2015)50
SECTION – E
MAINTENANCE OF EXISTING ROAD:
The Concessionaire, in this Month of November 2015 are poorly maintained the existing roads nor thediversion that switch from asphalted pavement to another asphalted pavement. The present condition of theexisting road and the diversion is bad and need immediate action of the Concessionaire to rectify thesituation accordingly. The Concessionaire should comply to the letter of Consultant Road Safety Expert onhis last site visit at the area.
The need of warning signs and informatory signs is needed to be installed by Concessionaire especially atch. 6+200 existing bridge wherein bridge do not have parapet and pose a great danger to motorist (see ICTletter no. ICT/102/NH-77/PHPL/TL/2015/3040 dated 26.11.2015) .
The condition of existing roads and temporary diversion from 0+000 to 45+830 of NH-77 are as follows:-
Sl. No. Chainages Condition Remarks
1 0+000 to 0+850 Small pot hole,
Maintenance required
Need to fill-up with fresh
asphalt.
Safety and warning sign
board is required and Need
to fill-up with fresh asphalt.
Safety
2 0+550 to 0+800, 6+600 to 6+610,
45+850 to 45+880, 46+280 to
46+300 and existing Bridge at ch.
6+525 (RHS)
GI sheets barricades
put-up sometime on
June-2015 was already
fell-in the ground.
Need to fix-up because
some GI sheets already fell
in the ground.
SECTION – f
Expenditure of Concessionaire
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis_________________________________________________________________________________________________________
Monthly Inspection Report (November - 2015)51
SECTION – F
Expenditure of Concessionaire
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis_________________________________________________________________________________________________________
Monthly Inspection Report (November - 2015)52
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis_________________________________________________________________________________________________________
Monthly Inspection Report (November - 2015)53
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis_________________________________________________________________________________________________________
Monthly Inspection Report (November - 2015)54
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis_________________________________________________________________________________________________________
Monthly Inspection Report (November - 2015)55
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis_________________________________________________________________________________________________________
Monthly Inspection Report (November - 2015)56
*Note: - Above data was submitted by the Concessionaire in their MPR for July-2015The Concessionaire submitted balance sheets as of 31 December 2014 and explanationnotes to financial statements for 3 months period ended 31 December, 2014.
SECTION – G
Project Photographs
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)57
SECTION - GPROGRESS PHOTOGRAPHS
Stud fixing on girders at ROB-II of P3-P4 span RHS Muzaffarpur end shuttering fixing of slab also.
Staging shuttering end cross girder fixing for slab of span P3-P4 RHS ar ROB-II
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)58
Earthwork going on for approaches of ROB-II Hajipur end.
RE panel casting at Sarai camp
SECTION – H
Weather Report
DATE RAINFALL INMIN MAX MIN MAX
26-Oct-2015 22.3 31.3 32 66 0
27-Oct-2015 22.6 31.1 40 61 0
28-Oct-2015 23.0 31.1 39 62 14.2
29-Oct-2015 23.4 29.6 41 61 0
30-Oct-2015 21.8 28.8 46 63 0
31-Oct-2015 21.2 30.4 43 65 0
1-Nov-2015 21.4 30.2 42 64 0
2-Nov-2015 22.8 31.8 43 67 0
3-Nov-2015 22.8 30.9 43 68 0
4-Nov-2015 21.8 29.9 41 67 0
5-Nov-2015 21.5 29.4 40 65 0
6-Nov-2015 21.9 29.5 46 62 0
7-Nov-2015 21.4 29.1 48 67 0
8-Nov-2015 21.8 29.9 42 66 0
9-Nov-2015 20.6 29.8 44 68 0
10-Nov-2015 21.5 30.1 49 68 0
11-Nov-2015 20.7 29.9 45 69 0
12-Nov-2015 20.4 29.3 40 68 0
13-Nov-2015 20.3 28.1 49 67 0
14-Nov-2015 20.2 28.3 50 70 0
15-Nov-2015 20.1 27.8 54 76 0
16-Nov-2015 20.0 29.7 43 67 0
17-Nov-2015 20.7 29.9 44 70 0
18-Nov-2015 20.6 29.8 45 69 0
19-Nov-2015 19.7 27.8 50 79 0
20-Nov-2015 18.1 27.4 45 68 0
21-Nov-2015 17.8 27.6 44 66 0
22-Nov-2015 17.5 26.1 48 67 0
23-Nov-2015 18.8 27.1 48 60 0
24-Nov-2015 17.4 27.3 47 65 0
25-Nov-2015 17.9 27.4 46 68 0
SECTION - H
WEATHER REPORTSMonth of November - 2015
REMARKSHUMIDITY IN % TEMERATURE IN °C
Monthly Inspection Report (November - 2015) 59
SECTION – I
Project Communication
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypass connecting NH- 28 of East West Corridor at Km. 515.045 in the Stateof Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November -2015)60
SECTION – I
Project Communication (Incoming)
Sl. From To Subject Letter no. Date
1NHAI Sh. N. K. Sinha-
ICT-New DelhiApproval for replacement of sub professional NHAI/PIU-Hajipur/Haj-Muz/ICT/2011/4481 05.11.2015
2 NHAI Sh. R.G. Singh,CPD, ECrailway, Hajipur
Revised estimate for boundary wall and gate of GM office ECR,Hajipur under utility shifting
6 NHAI TL-ICT Crossing of 33KV Hajipur-Sarai line near Sarai Market NHAI/PIU-Hajipur/Haj-Muz/U.S./2011/4509 20.11.2015
7 NHAI TL-ICT Estimate for shifting of overhead 33/11 KV sub-station line nearGM building Hajipur
NHAI/PIU-Hajipur/Haj-Muz/ROB/2011/4518 23.11.2015
8 NHAI TL-ICT Grant of PCOD and Hindrances in the project NHAI/PIU-Hajipur/Haj-Muz/COD/2011/4516 23.11.2015
9 NHAI TL-ICT Gate at Sarai Market NHAI/PIU-Hajipur/Haj-Muz/ROB/2011/4522 24.11.2015
10 PHPL TL-ICT Compliance on Geotechnical investigation report of ViaductLocation at ROB-I.
PHPL/NH-77/10/2015/1691 02.11.2015
11 PHPL TL-ICT Submission of Revised Plan and Profile from Km. 0+00 to Km1+070 at ROB-1 under COS.
PHPL/NH-77/10/2015/1692 02.11.2015
12 PHPL NHAI,cc: TL-ICT
Over head 33KVA wire at ch. 9+450 near Sarai PHPL/NH-77/10/2015/1696 23.11.2015
13 PHPL NHAI,cc: TL-ICT
Hindrances in the form of pending land payment, buildingpayment in the construction zone of approaches in ROB-2, Saraimarket, Toll plaza area, Km.-13, Km-31, Km.-32 and Sakri LHS,
PHPL/NH-77/10/2015/1697 26.11.2015
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypass connecting NH- 28 of East West Corridor at Km. 515.045 in the Stateof Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November -2015)61
Project Communication (Outgoing)
1 ICT PHPL Review of B/A no. – 125 Gandak River Sand ICT/102/NH-77/PHPL/TL/2015/3036 16.11.2015
2 ICT PHPL Provision of rain water harvesting along National Highway ICT/102/NH-77/PHPL/TL/2015/3028 02.11.2015
3 ICT PHPL Road maintenance and safety arrangement ICT/102/NH-77/PHPL/TL/2015/3040 26.11.2015
19 ICT NHAI Gate at Sarai Market ICT/102/NH-77/NHAI-PIU/TL/2015/3035 13.11.2015
20 ICT NHAI Monthly Inspection Report for the month of October-2015 ICT/102/NH-77/NHAI-PIU/TL/2015/3038 24.11.2015
21 ICT NHAI Regarding work completion of construction of ROBs of Hajipur-Muzaffarpur(NH-77) 4-laning widening & strengthing.
ICT/102/NH-77/NHAI-PIU/TL/2015/3042 30.11.2015
22 ICT NHAI Hindrance due to feeder line of traction at ROB-I ICT/102/NH-77/NHAI-PIU/TL/2015/3043 30.11.2015
23 ICT NHAI Verification of credential certificate submitted by M/s R.P. Infracon Pvt. Ltd. ICT/102/NH-77/NHAI-PIU/TL/2015/3044 30.11.2015
SECTION – J
Comments on Concessionaire
Monthly Progress Report
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)62
SECTION – J
Comments of IC on Submitted MPR of Concessionaire
Until this reporting, there were no Monthly Progress Report submissions of the Concessionaire forNovember-2015 hence we are attaching our comments for October-2015 of Concessionaire.The following are the comments of IC on the submitted MPR no. 62 for the month of October - 2015;
The project progress is greatly affected due to delay in handing over of site by the Authority to theConcessionaire and major delays are due to non-availability of land, clearing of structures, non-payment to the land and building owners. In Vaishali district out of 3495 (expected) cheques, 4188cheques prepared and 4119 cheques has been issued to the land owners and in Muzaffarpur districtout of 3101 cheques 2527 cheques prepared and 2139 cheques has been issued to the land owners.The valuation of structures and payment of cheques to the buildings is another process which is inprogress. Total number of cheques prepared for structures are 5079, already issued 4668 andbalance 411 still to be issued.
Since the issuing of cheque was handed by DLAO and not NHAI. We are requesting theConcessionaire to furnish us the documents that out of 3495 cheques, 4188 cheques prepared and4119 cheques have been issued to land owners and in Muzaffarpur district out of 3101 cheques2527 cheques prepared and 2139 cheques have been issued to the land owner.
As per the S-Curve, present work progress is 91.31% “as per Certified & Submitted Invoice”against the scheduled 100.00%. The lapses are mainly due to non-availability of land and delayhanding over the land.
There were no submitted S-Curve by the Concessionaire and the only reference for actual physicalprogress is the re-evaluation of actual physical accomplishment jointly conducted by IE, NHAI andConcessionaire last 25th March, 2014 in which the physical actual accomplishment for March -2015 is 73.683%. Therefore, the actual physical accomplishment for October - 2015 is 75.202%having 0.346% accomplishment for the month of October 2015.
To expedite the progress of the works especially when the land is not made available by theAuthority, the Concessionaire is forced to revise the alignment at some locations to see that at leastone carriageway is built. These revisions are being carried out in discussion with IndependentEngineer.
The revision being carried out in discussion with Independent Engineer with regards to revision ofalignment is for vertical alignment only.
4. Chapter 4 (Pre-construction activities):
Point no. 4 – The Concessionaire was asked to substantiate the record that 624 trees is yet to beremoved which is under hindrance.
5. Chapter 5 (Progress):
Length wise progress-
(1) Please correct it.
(a) DBM 1st LHS should be 45.466 kms, RHS 47.66 a total of 93.12 kms.(b) DBM Top LHS should be 42.83 kms, RHS 45.867 a total of 88.70 kms.(c) BC LHS should be 37.543 kms, RHS 39.830 a total of 77.373 kms.
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)63
(2) Chapter – 5 (Progress on ROB-II).
(a) BOQ quantity should be the same as target quantity submitted to IC on March-2015.(b) Remove the column- upto previous IPC, During this IPC and upto date IPC. and change to
last month quantity, this month quantity and cumulative quantity.(3) Page - 13, On column (Total nos), please correct RCC Box Culvert -18 no. and make it 19 no.
6. Chapter 6 (Expenditure) :
On annexure, you have attached the balance sheet as of 31 December 2014, it is supposed to beexpenditures up to September - 2015.
7. Project Staffing Gammon :
See attached actual body count conducted by the IC as of October -2015. The Concessionaire wasasked to correct it on next submittal i.e. November-2015.
Sr. Quantity cum Material Expert ___________________ Team Leader
Survey Engineer ___________________
Asst. Highway Engineer ___________________
Asst. Material Engineer ___________________
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Monthly Inspection Report (November - 2015)64
Actual Body Count conducted by the IC as of September 2015 as correction toConcessionaire Monthly Progress Report no.- 61
Project Staffing of Gammon
Sl.No.
Name Emp Code Designation Department1 Rakesh Jha 1003562 DGM In charge Civil
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis
Four Laning of Hajipur-Muzaffarpur Section of N.H- 77 from Km. 0.000 to Km. 46.300 and construction of 16.87 kms New Bypassconnecting NH- 28 of East West Corridor at Km. 515.045 in the State of Bihar under (NHDP Phase-III) on BOT(Annuity) Basis