Top Banner
NASA Lunabotics Mining Competition Interim Design Presentation Team 19: Aleks Fedoriw Duncan Haldane Arthur Pack Michael Pearse Carlos Ruiz
18

NASA Lunabotics Mining Competition Interim Design Presentation

Feb 23, 2016

Download

Documents

fritzi

NASA Lunabotics Mining Competition Interim Design Presentation. Team 19: Aleks Fedoriw Duncan Haldane Arthur Pack Michael Pearse Carlos Ruiz. Chassis. Material: Aluminum 6063 ¾” Square Tubing ¼” Plate Primary Focus: Attachment for Motor/Gearbox Assembly - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NASA Lunabotics Mining Competition Interim Design Presentation

NASA Lunabotics Mining CompetitionInterim Design Presentation

Team 19: Aleks FedoriwDuncan HaldaneArthur PackMichael PearseCarlos Ruiz

Page 2: NASA Lunabotics Mining Competition Interim Design Presentation

Chassis

• Material:– Aluminum 6063

• ¾” Square Tubing• ¼” Plate

• Primary Focus:– Attachment for

Motor/Gearbox Assembly– Attachment for

Excavation/Dumping Systems

Page 3: NASA Lunabotics Mining Competition Interim Design Presentation

Chassis

• Additional Constraints:

– 1m x .370m Max Dimensions

– Minimize Weight

• Mass Calculations (ProEngineer):– Volume = 3.33e+06 mm3

– Surface Area = 1.33e+06 mm2

– Density = 2.685e-06 kg/mm3

– Total Mass = 8.95 kg

Page 4: NASA Lunabotics Mining Competition Interim Design Presentation

Walking

• Walking using hip actuated leg• Torque at touchdown: 70 Nm @

1.5 Hz• Motor: 18V (36V) Maxon RE65 with

50:1 gear reduction– 35 A draw for each motor– Need 105 A capability

Page 5: NASA Lunabotics Mining Competition Interim Design Presentation

Leg Design

• Semi-circular legs 0.297 m in Diameter, 9cm wide

• Need Radial Stiffness of 15,905 N/m– Pseudo Rigid Body Model

• w = 0.09m; t = 0.00518m

Page 6: NASA Lunabotics Mining Competition Interim Design Presentation

FEA Simulation

• For a 1 kN load

– Vertical tip Deflection: 65.93mm

– K = 1000/0.06593 = 15,167 N/m

Vertical Deflection

Page 7: NASA Lunabotics Mining Competition Interim Design Presentation

Excavator System

• Bucket Chain system• Uses lower plate to hold

material while scoops push it along

• Swivels on a four-bar linkage

• Powered by a single motor

Page 8: NASA Lunabotics Mining Competition Interim Design Presentation

Bucket System

• Uses two power screws to lift bucket

• Cable connected to frame forces bucket to dump contents

• Lid is hinged to allow contents to dump farther away from the bucket

• Very lightweight

Page 9: NASA Lunabotics Mining Competition Interim Design Presentation

Final Design

Page 10: NASA Lunabotics Mining Competition Interim Design Presentation

System Power Circuit

Page 11: NASA Lunabotics Mining Competition Interim Design Presentation

Battery Type

Lithium Ion Polymer

Packing 10 pcs High Power Polymer Li-Ion Cell: 3.7V

10 Ah

Voltage 37V

Capacity 10 Ah

Max. Discharging Rate

70A

Weight 5 Lb.

Cost $699 .95

Page 12: NASA Lunabotics Mining Competition Interim Design Presentation

Sensors

Webcam

Weight Sensors

Bump Sensor

Page 13: NASA Lunabotics Mining Competition Interim Design Presentation

Main Control

Page 14: NASA Lunabotics Mining Competition Interim Design Presentation

Wireless Aspects

Page 15: NASA Lunabotics Mining Competition Interim Design Presentation

MCU

Page 16: NASA Lunabotics Mining Competition Interim Design Presentation

Controls

Page 17: NASA Lunabotics Mining Competition Interim Design Presentation

Overall design

Page 18: NASA Lunabotics Mining Competition Interim Design Presentation

18

Questions?

?