    Metropolitan Transportation Authority

    2012 Annual ReportPursuant to New York Public Authorities Law Section 2800

  • 8/13/2019 Narrative Fy 2012

    2/79

  • 8/13/2019 Narrative Fy 2012

    3/79

    Annual Report Narrative 2012

    (Including Description and Board Structure

    And Litigation Reports)

    Submitted as part of the MTA 2012 Annual Report

    Pursuant to New York State Public Authorities Law Section 2800(1)(a) (1), (6), (11), (13) and (17)

  • 8/13/2019 Narrative Fy 2012

    4/79

    MTA 2012 ANNUAL REPORT NARRATIVE

    Pursuant to New York Public Authorities Law Sections 2800 (1)(a)(1), (6), (11), (13), and (17)

    Section 1Operations and Performance

    Performance 1

    NYC Transit (Subways and Buses)!Long Island Rail Road!Metro-North Railroad!MTA Bus Company!Bridges and Tunnels

    Section 2Accomplishments and Initiatives

    Customer Service Initiatives 8

    Interagency!NYC Transit (Subways)!MTA Bus Operations (NYCT Department of Buses, MTA Bus

    Company)!Long Island Rail Road!Metro-North Railroad !Bridges and Tunnels

    Operations/Technology Initiatives 15

    Interagency!NYC Transit (Subways)!MTA Bus Operations (NYCT Department of Buses, MTA Bus

    Company)!Long Island Rail Road!Metro-North Railroad !Bridges and Tunnels

    Sustainability/Transit Oriented Development (TOD) Initiatives 21

    Interagency!NYC Transit (Subways)!MTA Bus Operations (NYCT Department of Buses, MTA Bus

    Company)!Long Island Rail Road!Metro-North Railroad !Bridges and Tunnels

    Safety/Security Initiatives 25

    Interagency: MTA Police Department!NYC Transit (Subways) !MTA Bus Operations (NYCT Department of

    Buses, MTA Bus Company)!Long Island Rail Road !Metro-North Railroad !Bridges and Tunnels

    Cost Cutting/Revenue Initiatives 31

    Interagency ! NYC Transit (Subways) ! MTA Bus Operations (NYCT Department of Buses, MTA BusCompany)!Long Island Rail Road!Metro-North Railroad !Bridges and Tunnels

    Superstorm Sandy Initiatives 35

    Interagency ! NYC Transit (Subways) ! MTA Bus Operations (NYCT Department of Buses, MTA Bus

    Company)!Long Island Rail Road!Metro-North Railroad !Bridges and Tunnels

  • 8/13/2019 Narrative Fy 2012

    5/79

    Section 3Capital Projects Commitments/Completions

    2010-2014 Capital Program 40

    Capital Program Progress 41

    Funding Received Through December 31, 2012 ! Capital Program Progress, 1982-2012! Capital Program

    Progress, 2012

    New York City Transit (Subways) 43

    Major 2012 Commitments!Major 2012 Completions

    MTA Bus Operations (NYCT Dept. of Buses, MTA Bus Company) 47

    Major 2012 Commitments!Major 2012 Completions

    Long Island Rail Road 48

    Major 2012 Commitments!Major 2012 Completions

    Metro-North Railroad 51

    Major 2012 Commitments!Major 2012 Completions

    MTA Bridges and Tunnels 54

    Major 2012 Commitments!Major 2012 Completions

    MTA Capital Construction 55

    Fulton Center!Second Avenue Subway !7 Line Extension!East Side Access

    MTA InteragencyPolice Department 57

    Section 4Description of the MTA and the MTA Board Structure

    Description of the MTA and the MTA Board Structure 58

    Numbers of Employees ! Basic Organizational Structure of MTA Operations ! Governance of the MTA !

    Board Members and Committee Assignments!

    Board Members Attendance

    Section 5Material Pending Litigation Report

    Material Pending Litigation Report 65

    General Note!The MTA!Transit System!Commuter System!MTA Bridges and Tunnels!MTA Bus

    !MTA Long Island Bus

  • 8/13/2019 Narrative Fy 2012

    6/79

    Accompanying 2012 Documents

    The Following Reports Are Attached

    Financial Reports ! All Agency and Board Codes of Ethics!Asset and Service Report 2012 !Compensation

    Schedule and Biographical Information Reports !Bond Rating Reports !Consolidated Financial Statements !

    Governance Principles and By-Laws ! Grant Report 2012 ! MTA Legislation ! Mission Statement and

    Measurement Report !Management Assessment of the Effectiveness of Internal Controls !Real and Personal

    Property Reports with Guidelines!Board Self-Assessment Report

  • 8/13/2019 Narrative Fy 2012

    7/79

    1

    2012 ANNUAL REPORTSECTION 1

    Operations and Performance

    Performance

    This section of the Annual Report summarizes ridership and other performance data for the

    twelve-month period ending December 31, 2012. (See also, the Mission Statement,

    Measurement, and Performance Indicator Report, PAL Sections 1269-f and 2824-a.).1

    Despite the historic disruptions caused by Superstorm Sandy, annual ridership on the

    subways, buses, and railroads operated by the Metropolitan Transportation Authority

    (MTA) rose in 2012 to more than 2.6 billion trips for customers throughout the downstate

    region. This increase, more than half a percent over 2011, continued a twenty-year trend of

    longterm ridership growth.

    Performance measurement results for each of the principal MTA agencies, which provide

    subway, bus, commuter rail, and bridge-and-tunnel crossing services, are reported below.

    Please note that as part of its public transparency initiatives, the MTA regularly updates

    Performance Dashboards posted on its website at www.mta.info, under the heading About

    the MTA, allowing the public to track MTA performance by agency on a monthly basis.

    The Dashboards display key indicators for MTA New York City Transit (NYCT) subways,

    buses, and paratransit services; MTA Long Island Rail Road (LIRR); MTA Metro-North

    Railroad (Metro-North); MTA Bus Company; and MTA Bridges and Tunnels.2

    Performance in all categories is measured monthly and compared to published goals.

    1 Because of the timing of the Mission Statement, the performance data in that report are subject to subsequentreconciliation and adjustment as data is finalized by each agency over the course of the year. For that reason, some of thedata reported in the Mission Statement have been adjusted in this report to reflect the most recent 2012 performancedata, as of March 15, 2013.2Note that the Lease and Operating Agreement between Nassau County and MTA Long Island Bus was terminatedeffective December 31, 2011, and that Nassau County contracted with a private operator to provide bus and paratransitservice in the county commencing January 1, 2012. Accordingly, performance data for Long Island Bus is no longeravailable from the MTA.

  • 8/13/2019 Narrative Fy 2012

    8/79

    2

    New York City Transit2012 Performance

    NYCT Subways continued to experience strong subway ridership in 2012, surpassing total

    rides for the previous year and the systems peak ridership in the 1950s, with some lines

    now running near peak levels for much of the day. Total subway ridership increased by

    some 14 million rides over the previous year to 1.65 billion in 2012. This total fell slightly

    below 2012 target levels, due largely to the millions of rides lost as a result of Superstorm

    Sandy. NYCT Bus ridership continued to stabilize in 2012 after years of decline, with a

    small loss from the previous year due mainly to Sandy. After a successful pilot in 2011, the

    Bus Time program was deployed on all routes in Staten Island and the Bronx, providing

    customers with real-time bus arrivals on the web and mobile devices.

    In October 2012, Superstorm Sandy presented NYCT with enormous challenges. Building

    on lessons learned from Tropical Storm Irene in 2011, NYCT followed proven emergency

    protocols in preparation for the storm. The agency secured fleet and equipment, activated

    the Incident Command Center (ICC), and shut down the transit system prior to landfall.

    Despite record flooding and storm damage, NYCT returned a number of subway lines to

    service within four days after the shutdown and restored most of the system within two

    weeks. NYCT Department of Buses and the MTA Bus Company provided extensive

    support through emergency shuttles and alternatives to subway service. NYCTs robust

    response to the storm met with general acclaim from government officials, the media, and

    the riding public.

  • 8/13/2019 Narrative Fy 2012

    9/79

    3

    New York City Transit

    Performance Key

    !At or above target!Below target by less than 5%!Below target by 5% or more

    2012 Target 2012 ActualChange

    fromTarget

    Service Indicators

    On-Time Performance - Subways 91.9% 83.7% -8.20%

    Wait Assessment - Subways 79.2% 79.0% -.20%

    Elevator Availability - Subways 96.5% 97.7% 1.20%

    Escalator Availability - Subways 95.2% 96.2% 1.00%

    Total Ridership Subways 1,669,289,000 1,654,582,265 -0.9%

    Mean Distance Between Failures Subways (miles) 168,000 162,138 -3.49%

    Mean Distance Between Failures - Staten Island Railway (miles) 180,000 74,773 -58.46%

    On-Time Performance - Staten Island Railway 95.0% 93.1% -1.90%

    % of Completed Trips - NYCT Bus 99.36% 98.90% -0.46%

    Total Paratransit Ridership - NYCT Bus 10,501,000 9,343,283 -11.0%

    Bus Passenger Wheelchair Lift Usage - NYCT Bus 1,277,698 1,416,967 10.90%

    Total Ridership - NYCT Bus 677,433,000 667,910,621 -1.40%

    Mean Distance Between Failures - NYCT Bus (miles) 3,671 4,546 23.8%

    Safety Indicators

    Customer Injury Rate Subways (per million) 3.00 2.86 -4.67%

    Customer Accident Injury Rate - NYCT Bus (per million) 1.11 1.15 3.60%

    Collisions with Injury Rate - NYCT Bus (per million miles) 6.73 6.60 -1.93%

    Employee Lost-Time and Restricted-Duty Rate (per 100employees)

    3.09 3.09 0.00%

  • 8/13/2019 Narrative Fy 2012

    10/79

    4

    Long Island Rail Road2012 Performance

    The LIRRs ridership rose in 2012, as an improving economy and new service to Barclays

    Center boosted the number of customers to 81.8 million, 0.7 percent higher than 2011.

    Prior to Superstorm Sandy, ridership was up 4.3 percent over the same period in 2011,

    suggesting that LIRR would have seen higher growth if not for the storm. Among the

    years highlights was the opening of Barclays Center in Brooklyn, where big-draw sports

    and entertainment more than tripled LIRR ridership to and from the Atlantic Terminal.

    Extra late-night trains were added to accommodate these new customers. To attract even

    more riders, the LIRR also restored half-hourly midday service on weekdays on the Port

    Washington Branch and added new weekend trains on the Ronkonkoma Branch. In 2012,

    LIRR trains were more reliable than ever, logging a record 194,382 miles between

    breakdowns. The LIRRs Travel Information Center, which handles 1.7 million calls each

    year, won a 2012 nationwide competition by the American Public Transportation

    Association, highlighting a multiyear effort by the LIRR to improve customer service. The

    LIRRs new mobile ticketing pilot at the 2012 PGA Tour event at Bethpage Black, which

    allowed customers to print tickets at home and on their smartphones, also won industry

    acclaim, as did the LIRRs swift recovery from Superstorm Sandy.

    Long Island Rail Road

    Performance Key

    !At or above target! Below target by less than 5%! Below target by 5% or more

    2012 Target 2012 ActualChange from

    Target

    Service Indicators

    On-Time Performance 95.1% 94.3.% -.80%

    Elevator Availability 96.0% 97.4% 1.36%

    Escalator Availability 95.0% 72.6% -22.40%

    Total Ridership 80,976.682 81,754,143 .96%

    Mean Distance Between Failures (miles) 150,000 194,382 14.59%

    Safety Indicators

    Customer Injury Rate (per million) 5.14 6.13 19.25%

    Employee Lost-Time and Restricted-Duty Rate (per200,000 worker hours)

    2.38 2.50 5.04%

  • 8/13/2019 Narrative Fy 2012

    11/79

    5

    Metro-North Railroad2012 Performance

    Despite the unprecedented impact and lingering effects of Superstorm Sandy, Metro-North

    realized significant gains in a number of key performance categories during 2012. On-time

    performance across the system totaled 97.6 percent, up from 96.9 percent over the previous

    year. That included the best quarterly on-time performance (OTP) in the railroads history,

    a 98.8 percent on-time record from January through March. Ranked by line, the Harlem

    Line saw the years best OTP with 98.2 percent, followed by the Hudson Line (98.0

    percent), and the New Haven Line (96.8 percent). The West-of-Hudson service, operated

    under contract with NJ Transit, had a 97.1 percent on-time rate.

    The railroad also posted its second highest annual ridership in 2012, providing some 83

    million trips, nearing its historical record of 83.6 million trips in 2008. Metro-North

    estimates some 1.8 million rides lost due to the superstorm, which would have pushed total

    ridership well over the historical record. Setting new standards for reliability, the railroad

    chalked up a record mean distance between failures (MDBF) of 165,694 miles, some 23

    percent above the posted MDBF goal for 2012.

    Metro-North Railroad

    Performance Key

    !At or above target! Below target by less than 5%! Below target by 5% or more

    2012 Target 2012 ActualChange

    from Target

    Service Indicators

    On-Time Performance (East of Hudson) 97.8% 97.6% -.2%

    On-Time Performance (West of Hudson) 96.4% 97.1% .7%

    Elevator Availability 97.0% 98.9% 1.9%

    Escalator Availability 90.0% 94.7% 4.7%

    Total Ridership 84,180,000 82,953,628 -1.46%

    Mean Distance Between Failures (miles) 135,000 165,694 23%

    Safety Indicators

    Customer Injury Rate (per million) 2.70 2.58 -4.44%

    Employee Lost-Time and Restricted-Duty Rate (per200,000 worker hours)

    2.00 1.88 -6.00%

  • 8/13/2019 Narrative Fy 2012

    12/79

    6

    MTA Bus Company2012 Performance

    Total ridership for 2012 grew slightly at 1.3 percent over the previous year, reversing a

    small decline in ridership in 2011 and consistent with the growth trend in previous years.

    As the result of a strong focus on maintenance, the MTA Bus Company saw a nearly 40-

    percent improvement in the mean distance between failures (MDBF) for the year. After its

    successful pilot program on selected NYCT bus routes in 2011, the Bus Time system,

    which allows customers to locate buses in real time on web and mobile devices, expanded

    to all MTA Bus Company routes based in the Bronx. The MTA Bus Company, along with

    the NYCT Department of Buses, also played a significant role in the recovery efforts

    following Superstorm Sandy. The agency supplemented subway service with a bus

    bridge from Brooklyn to Manhattan, until subway service returned to downtown

    Manhattan, implemented emergency shuttles for Far Rockaway, and provided alternative

    transit services until the restoration of A train service.

    MTA Bus Company

    Performance Key

    !At or above target! Below target by less than 5%! Below target by 5% or more

    2012 Target 2012 Actual Changefrom Target

    Service Indicators

    % of Completed Trips 99.36% 98.83% -0.53%

    Bus Passenger Wheelchair Lift Usage 42,935 58,582 36.44%

    Total Ridership 118,840,000 120,877,799 1.7%

    Mean Distance Between Failures (miles) 3,790 5,300 39.84%

    Safety Indicators

    Customer Accident Injury Rate (per million) 1.31 1.25 -4.58

    Collisions with Injury Rate (per million miles) 4.58 5.39 17.69%

    Employee Lost-Time Rate (per 100 employees) 5.37 8.36 55.68%

  • 8/13/2019 Narrative Fy 2012

    13/79

    7

    Bridges and Tunnels2012 Performance

    In 2012 Bridges and Tunnels set a new record for E-ZPass sales and usage, which now

    accounts for 82 percent of daily crossings. In November, the agency implemented cashless

    tolling at the Henry Hudson Bridge. All motorists are now able to use any lane to drive

    through the toll plaza without stopping. Under the cashless tolling system, automatic

    billing remains the same for drivers with E-ZPass. For drivers without an E-ZPass tag, an

    image is taken of their license plate and a bill for the toll is mailed to the vehicles

    registered owner. In the first two months of the cashless tolling operation, 92 percent of

    crossings at the Henry Hudson Bridge were processed through E-ZPass and 8 percent were

    toll-by-mail transactions.

    Bridges and Tunnels

    Performance Key

    !At or above target! Below target by less than 5%! Below target by 5% or more

    2012 Target 2012 ActualChange

    from Target

    Service Indicators

    Total Traffic 286,442,000 282,646,972 -1.32%

    Safety Indicators

    Collisions with Injury Rate (per million vehicles) .84 .90 7.14%

    Employee Lost-Time Rate (per 200,000 work hours) 5.00 4.30 -14.00%

  • 8/13/2019 Narrative Fy 2012

    14/79

    8

    2012 ANNUAL REPORTSECTION 2

    Accomplishments and InitiativesCustomer Service Initiatives

    InteragencyCustomer Service Initiatives

    " Installed new Station Advisory Information Displays (SAID) at Grand Central

    Terminal and the 125th Street Metro-North Station, and new Help-Point emergency

    communications systems at the Fulton Center." Expanded the MTA website at www.mta.infowith new customer features, including

    self-service functions, rotating news stories, interactive service maps, and side-show

    and video links covering MTA projects.

    " Expanded customer information, press announcements, and emergency alerts for all

    agencies through the use of social media, including Facebook, Twitter, and YouTube.

    These included 24-hour emergency updates and images during Superstorm Sandy.

    " Opened up additional MTA source data through the websites Developers

    Resources page, encouraging the private development of new transit apps for web

    and mobile devices, resulting in over 100 transit apps across multiple platforms. (See

    also, Operations/Technology Initiatives)

    " Introduced versions of the Subway Time and Weekender mobile apps for

    Android and Apple iOS mobile devices.

    " Set an annual record for permanent art installations completed through Arts for

    Transit, with 21 new art projects, as well as three original art posters, two art cards,

    and a roster of more than 300 performers giving nearly 7,000 performances in the

    2012 Music Under New York program. High points for 2012 included major project

    completions at the Metro-North Tarrytown Station, the NYCT Bleeker Street transfer,

    and nine NYCT West End Line stations.

  • 8/13/2019 Narrative Fy 2012

    15/79

    9

    " Relaunched the highly popular Poetry in Motion series, now under the auspices of

    Arts for Transit, in collaboration with the Poetry Society of America. The program

    features poems embellished with art from MTA Arts for Transit projects.

    " Collaborated with a developer to create the museum in your pocket Arts for Transit

    smartphone app, listing the entire collection of public artworks displayed throughout

    the MTA system, with direction, podcasts, and images.

    " Undertook preparations for the Grand Central Terminal Centennial celebration, which

    included special public events, performances, entertainments, commemorative

    products, and an exhibit of contemporary art.

    NYC Transit (Subways)Customer Service Initiatives

    " Completed 15 of 16 scheduled FASTRACK maintenance programs, with one

    cancelled due to Superstorm Sandy. By reducing defect backlogs and producing

    visible station improvement, the new FASTRACK strategy has earned positive

    customer feedback. The program is now being extended to the outer boroughs. (See

    also, Safety/Security Initiatives)

    " Installed several pilot projects for new customer-service technologies, including

    Help Points emergency communications systems (19 locations); On the Go!

    touch-screen information kiosks (five stations); and Station Advisory Information

    Displays (SAID), which provide train status prior to station entry (three stations). (Seealso, Operations/Technology Initiatives; Safety/Security Initiatives)

    " Developed the first draft of a Rail Control Center Communications Master Plan to

    provide a unified framework for the collection and dissemination of customer

    information, including the responsibilities of the various NYCT personnel,

    departments, and divisions.

    " Participated in a project to install or redesign Public Announcement/Customer

    Information Systems (PA/CIS) in 87 B Division stations that had been without such

    systems. The cable infrastructure has been completed in three-quarters of the stations.

    " Accomplished a 99-percent air-conditioning compliance rate in subway cars during

    the hottest recorded average temperature for summer months in New York City.

    " Began development of a comprehensive, intermodal customer-information system for

    Staten Island Railway (SIR) and NYCT, including installation of On the Go! kiosks

  • 8/13/2019 Narrative Fy 2012

    16/79

    10

    at St. George Terminal and at high-volume SIR stations with connections to NYCT

    bus service. The plan will also incorporate SIR train information into existing

    smartphone apps for NYCT buses and trains.

    " Developed a customer advocate training program for the NYCT Subways Incident

    Command Center (ICC). The program was then used to hire and train a new Customer

    Advocate as a member of the ICC staff.

    " Improved customer access at several stations, opening a free transfer passageway

    between the Broadway-Lafayette and the uptown Bleecker Street stations; a new

    entrance at the Atlantic Avenue Station serving the Barclays Center; a reopened

    entrance at the 4th Avenue-9th Street Station; and a permanent extension of the G

    train to Church Avenue.

    " Improved ADA accessibility through a number of projects, including 12 new

    customer elevators at five stations; installation of 435 induction-loop systems to

    assist hearing-impaired customers; and two public meetings addressing ADA

    compliance, changes in paratransit service, and the needs of the disability community.

    " Launched real-time arrival and service information for NYCT A Division lines on the

    MTA Subway Time mobile app at the MTA website. The live data feeds are also

    made available to third-party app developers to help generate new customer

    technologies.

    MTA Bus Operations (NYCT Department of Buses, MTA BusCompany)Customer Service Initiatives

    " Deployed Bus Time to all routes and depots in Staten Island and the Bronx,

    enabling customers to track bus locations in real time via the web, mobile web, SMS,

    and quick-response codes at bus stops.

    " Expanded Select Bus Service (SBS) rapid transit to provide faster service on the S79

    route.

    " Developed a proof of concept for the Traffic Signal Priority project by outfitting 45

    M15 SBS buses with Traffic Signal Priority equipment. The equipment

    communicates real-time bus locations to the New York City Department of

    Transportation Traffic Management Center, which remotely controls traffic lights

    along the M15 corridor, making bus service faster and more reliable.

  • 8/13/2019 Narrative Fy 2012

    17/79

    11

    " Implemented a number of route path changes to MTA Bus routes BxM11, B103, Q7,

    Q41, and Q113 to better serve new and changing markets.

    " Expanded the role of the Customer Advocate, whose function is to ensure that the

    customer experience is a key focus in all aspects of bus operations. That includes

    program development and implementation; communications aboard buses and in the

    public media; and interaction with advocacy groups.

    " Initiated the first phase of the Paratransit Interactive Voice Response (IVR) system, an

    advance notification system that advises customers of the impending arrival of their

    Access-A-Ride vehicle by telephone, text message, or email. The IVR is integrated

    with the Automatic Vehicle Location Monitoring system and gives customers

    approximately 15 minutes notice to prepare for timely boarding. (See also,

    Operations/Technology Initiatives)

    Long Island Rail RoadCustomer Service Initiatives

    " Achieved record levels of fleet reliability as measured in mean distance between

    failures (MDBF), with an overall fleet average of 194,382 miles MDBF, a nearly

    25,000 mile improvement over 2011. Also increased on-time performance (OTP) to

    94.3 percent in 2012.

    "

    Restored half-hourly midday service for weekdays on the Port Washington Branch.This service had been reduced due to budget cuts in 2010, resulting in a loss of over

    180,000 rides annually. Revenue from the restored half-hourly service offset the

    increased operating costs.

    " Increased late-night train service from Atlantic Terminal for fans leaving events at the

    new Barclays Center in Brooklyn. The extra train service resulted in a 334-percent

    surge in ridership to and from Brooklyn on event nights following the opening of the

    center.

    " Added half-hourly weekend service to meet increased demand during key time

    periods between the Farmingdale Station and Penn Station on the Ronkonkoma

    Branch.

    " Continued efforts to upgrade customer communications, including expanded use of

    Facebook, Twitter, and other social media; improved reliability of email alerts, station

  • 8/13/2019 Narrative Fy 2012

    18/79

    12

    announcements, and other messaging at LIRRs 24-hour Public Information Office;

    reorganization of the emergency Customer Assistance Plan; and new web-based

    Modified Timetables for easy reference during service disruptions. (See also,

    Safety/Security Initiatives)

    " Added more GPS devices and timing points along the LIRR right-of-way to

    improve the accuracy of Train Time and information displayed on electronic signs

    at all of LIRRs 124 stations.

    " Refurbished and upgraded 11 older escalators, returning ten to service in 2012 and

    one in early 2013. All escalators were thoroughly overhauled and equipped with new

    safety sensors. In addition, LIRR formed a new Elevator & Escalator Operations

    Group with certified inspectors and a remote monitoring system.

    " Introduced a pilot version of mobile ticketing for the PGA Tour event at Bethpage

    Black. Nearly 20 percent of event tickets were sold online for home printing or

    smartphone downloads, with barcode validation by LIRR staff at the Farmingdale

    Station. With a 99-percent customer satisfaction rate, this highly successful pilot

    greenlights LIRRs full roll-out of mobile ticketing in 2014.

    " Extended the validity period for LIRR one-way and round-trip tickets from 14 days to

    60 days. The extension also applies to the refund period for one-way and round-trip

    tickets. The refund period for ten-trip tickets was extended to six months.

    " Published a formal Pledge to Customers detailing LIRRs performance goals and

    customer-service standards in such areas as safety, courtesy, cleanliness, and

    reliability.

    " Addressed a number of customer preferences with additional quiet cars on peak

    electric trains between Penn Station and Atlantic Terminal; enforcement of New York

    State smoking bans on all LIRR outdoor platforms and boarding areas; and extension

    of waiting room hours to 10 P.M. on weekdays at 41 LIRR stations.

    Metro-North RailroadCustomer Service Initiatives

    " Announced the largest service expansion in Metro-Norths history, with the addition

    of 243 trains per week, including expanded off-peak and weekend service. The

    railroad introduced 79 new trains per week in 2012, with the remaining trains to be

    brought into service in April and October 2013.

  • 8/13/2019 Narrative Fy 2012

    19/79

    13

    " Published a formal Pledge to Customers in 2012, setting down in writing for the

    first time the railroads customer-service aims regarding courtesy, accuracy of

    information, cleanliness, response to service disruptions, and other customer

    priorities.

    " Improved real-time customer information throughout the system, with new LCD

    monitors, new links to Train Time web schedules, upgraded electronic signage, and

    new advisory information displays and kiosks in Grand Central Terminal.

    " Expanded the Station Enhancement Program, a cyclical maintenance program of

    painting, lighting, repairing, and cleaning station elements, ensuring a consistent

    standard of maintenance, design, and appearance at all Metro-North stations.

    " Completed major renovation and reconstruction projects at the Cortlandt and

    Tarrytown stations, including improved waiting areas, parking, and customer access.

    (See also, Metro-North, Capital Project Commitments/Completions)

    " Introduced more quiet cars for rush hours on the New Haven Line. The program,

    which prohibits cell phone calls and loud conversations on certain cars, now extends

    to all Metro-North lines.

    " Worked with community partners to provide connecting bus service between the

    Beacon Station, the DIA:Beacon art museum, and the Beacon business district,

    enhancing customer access and local development.

    " Held four community discussions with East Bronx residents, with the eventual aim of

    providing this underserved area with Metro-North stations and access to Penn Station,

    Westchester, and Connecticut.

    Bridges and TunnelsCustomer Service Initiatives

    " Increased the E-ZPass market share by 1.5 percent to a record 82 percent of crossings.

    " Introduced cashless tolling at the Henry Hudson Bridge, enabling all motorists to

    drive through any lane without stopping and be billed either through E-ZPass or by

    license number and mail.

    " Began selling E-ZPass On-the-Go tags in cash lanes at all facilities, resulting in

    greater customer convenience and cash-lane sales of over 125,000 tags in 2012.

  • 8/13/2019 Narrative Fy 2012

    20/79

    14

    " Introduced the MTA Reload Card, which makes it easier for customers to put cash

    into an E-ZPass account at thousands of retail locations across the country via the Visa

    ReadyLink system.

    " Completed replacement of the Bronx roadway approach to the Bronx Whitestone

    Bridge, providing customers with wider lanes and a new shoulder lane.

    " Completed paving projects at the Verrazano-Narrows, Throgs Neck, and RFK bridges

    that will improve customer safety and comfort.

    " Introduced the new E-ZPass Pay Per Trip payment plan, enabling E-ZPass account

    holders to pay same-day tolls through an automated checking account debit without a

    prepaid balance or tag deposit.

    " Activated the new Spanish-language voice-response system, which received more

    than 155,000 calls in 2012, and the Spanish website homepage, which had more than

    35,000 hits during the year.

    " Exchanged over 400,000 E-ZPass tags through a customer-outreach prepaid mail

    program, part of the E-ZPass tag swap program, which replaces tags reaching the end

    of their useful life.

    " Launched the new the Drive Time app for smartphone users, providing live travel

    time information on approaches to Bridges and Tunnels facilities, as well as major

    local destinations.

    " Expanded the travel times displayed on variable message signs at most facilities to

    include major destinations, such as JFK and LaGuardia airports.

  • 8/13/2019 Narrative Fy 2012

    21/79

    15

    Operations/Technology Initiatives

    InteragencyOperations/Technology Initiatives

    " Completed Phase II of the consolidation, standardization, and migration of payroll and

    back-office functions for all MTA agencies, except Bridges and Tunnels, to the MTA

    Business Services Center (BSC). In July 2012, the BSC extended its payroll and

    human resources operations to 50,000 active employees and 20,000 retirees of New

    York City Transit and MTA Bus. (See also, Cost Cutting/Revenue Initiatives)

    " Completed Phase I of a state-mandated print reduction program to direct all in-office

    printing to centrally-located printing stations. Initiated Phase II of the program, which

    allows secure printing at departmental stations using magnetic coded ID cards and

    proximity card readers. (See also, Sustainability/TOD Initiatives)

    " Updated the user interface for www.mta.infoon customer mobile phones, expanding

    device coverage and enhancing transit information at a glance. The MTA also

    expanded its Weekender app for the newest iPhone and Android releases.

    " Restructured the MTA website with increased bandwidth, Acquia cloud-based

    support, and other security features to ensure faster, more resilient, data-rich

    communications during emergencies and other high-volume situations. (See also,

    Superstorm Sandy Initiatives)

    " Commissioned an Information Technology Survey to determine customer use of and

    attitudes about travel information, responses to MTA initiatives, and priorities for

    future IT programs.

    " Collaborated with NYCT Subways on a cloud-hosted General Transit Feed

    Specification Real-Time (GTFS-RT) system to communicate more accurate subway

    arrival and departure information for customer apps.

  • 8/13/2019 Narrative Fy 2012

    22/79

    16

    NYC Transit (Subways)Operations/Technology Initiatives

    " Launched the FASTRACK program in January of 2012, which schedules nighttime

    shutdowns on subway line segments for faster, safer, comprehensive repairs and

    maintenance. (See also, Customer Service Initiatives; Safety/Security Initiatives)

    " Overhauled 816 subways cars at the Coney Island and 207th Street shops to maintain

    fleets in a state of good repair, increasing safety and mean distance between

    failures.

    " Undertook an interdepartmental rehabilitation of the Steinway Tube, which included

    track circuit renewal, rail and plate replacement, drain cleaning, cable replacement,

    and complete removal of all silt and muck.

    " Rehabilitated ten fan plants along the Archer Avenue Line in Queens, the first fan

    plants that can be operated remotely from the Rail Control Center (RCC) using

    SONET/ATM network and computers.

    " Began the installation of a new Communications-Based Train Control (CBTC) system

    to increase reliability and capacity on the Flushing Line. (See also, NYCT Subways,

    Capital Project Commitments/Completions)

    " Completed a number of station rehabilitations on the Pelham Line (five); on the

    Brighton Line (five); on the West End Line (ten); on the Rockaway Line (five) and

    the Far Rockaway Line (one); on the Flushing Line (one) and in the Bronx (one); at

    the 59th Street Station at Columbus Circle; and at the Jay Street Station in Brooklyn.Also completed 15 station component repair projects. (See also, NYCT Subways,

    Capital Project Commitments/Completions)

    " Completed ADA accessibility at the Mott Avenue Station on the Far Rockaway Line;

    the Bay Parkway Station on the West End Line; the East 180th Street Station on the

    Lexington Avenue Line; and the Broadway-Lafayette/Bleecker Street complex.

    " Installed more reliable communication links (via the new Train Dispatcher Order-

    Wire System) between the West 4th Street tower and the towers at the World Trade

    Center, 59th Street, and 42nd Street/8th Avenue.

    " Completed final cutover of the Backup Control Center (BCC) at 130 Livingston

    Plaza, bringing the center up to active status. Drills to test BCC operations will be

    performed on a quarterly basis.

  • 8/13/2019 Narrative Fy 2012

    23/79

    17

    " Completed a track construction program that reconstructed approximately 7200 feet

    of track, installing Type III track panels. The majority of the work took place south of

    Queensboro Plaza and from 111 Street to Main Street.

    " Revised a number of agency operating rules, including new directives on train

    movements for more accurate on-time-performance (OTP) reporting; exercises for

    management involved in ICC operations; a revision of the NYCT Rulebook; a

    revision of CBTC rules; and PDA directives for a new digitized version of the R160

    operator manual.

    " Completed key phases of NYCTs rolling stock procurement programs, including

    receipt and testing of R188 prototypes; awarding of options for 103 new R142A cars

    and 370 R142A car conversions; awarding of contracts for 300 B Division R179 cars;

    and receipt of three additional rail snowthrowers. (See also, NYCT Subways, Capital

    Project Commitments/Completions)

    MTA Bus Operations (NYCT Department of Buses, MTA BusCompany)Operations/Technology Initiatives

    " Expanded a workforce development program that includes customized workshops

    focusing on specific areas of bus operations.

    " Enhanced the Business Barometer, a strategic management initiative with web-

    based tools to help operating managers evaluate key indicators and performance data,

    then apply proactive strategies for improvement.

    " Implemented a Hastus scheduling software system for the MTA Bus Company,

    similar to the Hastus system used by NYCT. This has resulted in more economical

    schedules, with the ability to more rapidly consider alternatives, as well as the ability

    to support new service information and service-monitoring initiatives.

    " Expanded the Intelligent Vehicle Network (IVN) project, which uses onboard

    computers with wireless links to depots to monitor bus components, identify andreport potential failures, and provide information used in accident investigations. The

    IVN system has been installed on a total of 2,303 buses in 24 depots.

    " Initiated the first phase of the Paratransit Interactive Voice Response (IVR) system

    with advanced notification messages that advise customers of the impending arrival of

    their Access-A-Ride vehicle by telephone, text message, or email. The IVR system is

  • 8/13/2019 Narrative Fy 2012

    24/79

    18

    integrated with the Automatic Vehicle Location Monitoring system and gives

    customers approximately 15 minutes of notice to prepare and reach the pick-up

    location for timely boarding. (See also, Customer Service Initiatives)

    Long Island Rail RoadOperations/Technology Initiatives

    " Expanded onboard ticketing by credit or debit cards using iPhone technology with a

    ticketing application developed by LIRR. The new option has increased the efficiency

    of fare collections, reduced fare disputes, and proven popular with customers. This is

    the first time on either commuter railroad that such a service has been offered to

    customers. The LIRR plans to roll out devices systemwide within the next two years." Expanded LIRRs Time Train pilot program to the West Hempstead Branch. Using

    onboard GPS devices, the system monitors real-time train locations and arrivals, along

    with regular schedule and track information, all of which can be accessed using

    mobile devices or home computers. GPS will be installed on the entire fleet by the

    second quarter of 2013, at which point Train Time goes live systemwide.

    " Deployed the new Incident Command Center (ICC) in the Jamaica Station building.

    Equipped with extra laptops, flat panel displays, cable news, video conferencing, and

    more, the ICC allows senior management to monitor ongoing situations around the

    clock and was used to direct agency responses during Superstorm Sandy. (See also,Superstorm Sandy Initiatives)

    " Migrated over 2,200 LIRR email accounts and 400 smartphones to a single-vendor

    Microsoft Exchange system, supporting the consolidation of MTA email and reducing

    overall costs to the LIRR and MTA.

    " Introduced a new Mail & Ride (M&R) system that includes improved web and

    interactive voice response (IVR) features for greater flexibility and quicker customer

    response.

    " Implemented a new dishonored checks application to replace the old mainframe

    system. The new application improves the tracking of bad checks, prevents M&R

    tickets from being issued to customers with unpaid checks, and eliminates

    unnecessary reporting.

  • 8/13/2019 Narrative Fy 2012

    25/79

    19

    " Replaced the privately owned Verizon circuits supporting ticket sales machines at 96

    separate locations with fiber-optic connections supported by the LIRR

    Communications Department, resulting in over $200,000 per year in recurring

    savings. (See also, Cost Cutting/Revenue Initiatives)

    Metro-North RailroadOperations/Technology Initiatives

    " Placed into service a total of 166 new M8 rail cars by the end of 2102, accounting for

    52.2 percent of weekly service on the New Haven Line. (See also, Metro-North

    Capital Projects Commitments/Completions.)

    " Implemented a new Kronos-based timekeeping system for improved tracking,

    documenting, and management of workforce deployment. (See also, Cost

    Cutting/Revenue Initiatives.)

    " Expanded the capabilities of the IT monitoring center, which is now staffed 24/7 to

    provide real-time monitoring, alerting, and notifications for the railroads critical IT

    infrastructure.

    " Performed a Payment Card Industry (PCI) compliance assessment to ensure the

    security of customer card data on Metro-North e-commerce systems and protect

    against liabilities associated with data breaches.

    "

    Undertook a joint program with LIRR to replace older handheld ticketing machineswith new point-of-sale devices supporting credit card, debit, barcode, and smartphone

    transactions.

    " Deployed a new network architecture at the railroads North White Plains office that

    can serve as a backup ticketing system in the event of disasters or other service

    disruptions.

    " Implemented a number of systemwide IT improvements, including software upgrades

    for all corporate computers, a new password access system for customers, new

    firewalls to secure data, new live information feeds for ticket offices, new employee

    attendance and crew management software, and new customer returned-check

    tracking.

  • 8/13/2019 Narrative Fy 2012

    26/79

    20

    Bridges and TunnelsOperations/Technology Initiatives

    " Completed a major upgrade of the Advanced Traffic Management System, a network

    of Intelligent Transportation System (ITS) subsystems and technologies used for

    facility operations, management of traffic flow, internal and public communications,

    and other critical functions. The project received the 2012 "Outstanding ITS Project of

    the Year" award from the Intelligent Transportation Society of New York.

    " Installed the new Kronos 6.2 workforce timekeeping system, which provides agency

    employees with real-time information regarding their accrual balances and access to

    timecards at kiosks throughout agency facilities.

    " Completed project design for fiber installation across all three spans of the Robert F.

    Kennedy (RFK) Bridge, which will significantly enhance security, safety, and traffic

    management.

    " Upgraded the weather recording system from tracking roadway temperatures, wind

    speeds, and other conditions at the Marine Parkway, Cross Bay, and Henry Hudson

    bridges.

  • 8/13/2019 Narrative Fy 2012

    27/79

    21

    Sustainability/Transit Oriented Development (TOD) Initiatives

    InteragencySustainability/TOD Initiatives

    " Continued systemwide energy audits and initiatives in conjunction with the New York

    Power Authority (NYPA). In 2012, these included the installation of LED lighting in

    subway tunnels, an energy-efficient heating system in LIRRs Hillside Maintenance

    Facility, and installation of T5 fluorescent lighting in the 207 thStreet Overhaul Shop

    and Yard.

    " Carried out several systemwide research and public policy initiatives relating to the

    quantification, measurement, and monetization of the MTAs carbon avoidance

    benefits.

    " Participated in new areas of sustainable design research, including the design of a

    next-generation, sustainable R211 subway car and a pilot program for solar

    powered transit information kiosks.

    " Completed Phase I and inaugurated Phase II of a print reduction program to remove

    dispersed printers and centralize two-sided office printing, reducing paper, toner, and

    disposals. By expanding the program with card access readers, IT staff is further

    reducing the waste from duplicate or unclaimed print jobs.

    " Continued to provide planning, community outreach, and support for a number of

    TOD projects around MTA stations, including the Metro-North Beacon Station and

    the LIRR Wyandanch Station in the Town of Babylon.

    NYC Transit (Subways)Sustainability/TOD Initiatives

    " Completed installation of all 317 oil-free compressors in 2012. (See also, Cost

    Cutting/Revenue Initiatives)

    " Added work cars to the 2013 Scheduled Maintenance System, extending the life of

    the car and efficiency of the running time.

  • 8/13/2019 Narrative Fy 2012

    28/79

    22

    " Initiated regular washing of HVAC condensers on new millennium cars, which

    cleans out collected pollutants, prolongs the life of the condenser, and minimizes

    failures.

    " Continued to monitor and improve sustainability efforts according to ISO 14001

    certified Environmental Management System (EMS) under the direction of NYCTs

    Department of Capital Program Management (CPM).

    " Continued CPMs construction and demolition debris recycling program, which

    recycles over 90 percent of debris away from landfills to productive reuse.

    " Completed construction of the new Church Avenue relay room, which was designed

    as a green facility, with 90 percent recycled steel, rainwater collection planters to

    control storm runoff, and other sustainability features.

    MTA Bus Operations (NYCT Department of Buses, MTA BusCompany)Sustainability/TOD Initiatives

    " Expanded the use of midday Midtown Manhattan parking of MTA Bus Company

    express buses to reduce nonrevenue vehicle miles. This reduces overall emissions and

    operating costs, while enhancing service reliability.

    " Worked with Capital Program Management to design the new Bus Command Center

    in Brooklyn as a Leadership in Energy and Environmental Design (LEED) facility.

    The facility will be energy efficient and will include natural lighting and a greenroof.

    Storm water will be managed with the use of rainwater collection.

    Long Island Rail RoadSustainability/TOD Initiatives

    " Continued development of the Wyandanch Rising project, a transit-friendly

    downtown revitalization plan centered around the LIRRs Wyandanch Station in the

    Town of Babylon. The centerpiece of the project, which has received state and

    federal funding, is the future construction of an intermodal parking facility at the

    station to accommodate increased ridership on LIRRs Main Line, including planned

    service to Grand Central Terminal.

    " Partnered with the towns of Brookhaven and Islip on the Ronkonkoma Hub Project,

    a TOD and area revitalization plan centered around the LIRRs Ronkonkoma Station.

  • 8/13/2019 Narrative Fy 2012

    29/79

    23

    The project aims to create a community of retail spaces, offices, restaurants, and

    affordable housing.

    " Completed seven asbestos abatement projects and five demolition lead abatement

    projects, with the largest projects located at Floral Park Station, Jamaica Station, and

    the Babylon tower. Another 24 abatement projects were carried out at LIRR crossings

    during 2012.

    " Commenced two large-scale construction projects that will create a state-of-the-art

    substation at the Old Hillside substation and a new freight yard at the Long Island

    City Wheel Spur Yard.

    " Opened the Babylon Train Wash, a green facility that features 70 percent

    reconditioned wash water; solar panels for lighting and heating; a leach field to purify

    runoff storm water; a separator to prevent oil and diesel fuels from entering the waste

    water system; and landscape buffer surrounding the facility.

    " Reached an agreement with National Grid to perform soil remediation at the Clinton

    Avenue grade crossing on the Montauk Branch. While the soil remediation work was

    underway, the LIRR also modernized the crossing.

    Metro-North RailroadSustainability/TOD Initiatives

    "

    Completed Phase I and launched Phase II of the Grand Central Terminal EnergyConservation Project undertaken with the New York Power Authority (NYPA). The

    project includes energy-efficient upgrading of air compressors, lighting, motors,

    ventilation, and other building equipment, resulting in energy savings of about $3

    million per year.

    " Worked with NYPA on the installation of charging stations for electric cars at the

    Cortlandt Station, with additional stations under review.

    " Achieved a LEED Silver Certificate for the agencys North Broadway facility in

    White Plains, which includes a reflective roof, high efficiency HVAC units, and other

    energy-saving features.

    " Conducted energy audits to monitor, plan, and improve energy use at 30 stations on

    the Lower Hudson and Harlem lines.

  • 8/13/2019 Narrative Fy 2012

    30/79

    24

    Bridges and TunnelsSustainability/TOD Initiatives

    " Dispensed over 80,000 gallons of Ethanol 85 (E85) fuel in 2012, representing more

    than 32 percent of the fuel used by the agency's cars and police patrol vehicles. A

    total of 91 percent of the agencys light-duty fleet now use either E85 or

    electric/hybrid power.

    " Completed the first full year in which the Robert F. Kennedy, Throgs Neck, and

    Verrazano-Narrows bridges have all used LED necklace and beacon lighting. The

    LED lighting reduced energy consumption by nearly 70 percent, as compared to the

    original fixtures, with annual savings of around $0.1 million in electric utility and

    replacement charges.

  • 8/13/2019 Narrative Fy 2012

    31/79

    25

    Safety/Security Initiatives

    Interagency: MTA Police DepartmentSafety/Security Initiatives

    " Undertook development of a new MTA Police Department (MTAPD) facility in

    Dutchess County to be used for specialized, transit-based training of MTAPD K-9

    teams.

    " Cooperated with federal and state governments to extend the free licensing of the

    MTAs See Something, Say Something security slogan in nationwide public

    awareness campaigns.

    Crime Statistics(Number of reported crimes at Long IslandRail Road, Metro-North Railroad, and StatenIsland Railway)

    2011 2012

    Murder 0 0

    Rape 2 1

    Robbery 73 55

    Felony Assault 42 36

    Burglary 7 13

    Grand Larcenies 238 229

    G.L.A. 10 5

    Total 372 339

  • 8/13/2019 Narrative Fy 2012

    32/79

    26

    NYC Transit (Subways)Safety/Security Initiatives

    Crime Statistics(Number of reported crimes on New York City

    subway system.2011 2012

    Murder 1 2

    Rape 3 10

    Robbery 787 787

    Felony Assault 203 204

    Burglary 10 27

    Grand Larcenies 1552 1680

    Total 2556 2710

    " Began installation of CCTV security cameras with associated customer assistance

    information system at every station and Rail Control Center.

    " Implemented an access control and intrusion detection system to control access to 229

    communication rooms via electronic locks, card readers, key pads, and motion

    detection alarms.

    " Created a safer working environment for maintenance and repair crews through

    implementation of the new FASTRACK program, which curbs train operations in

    work areas. (See also, Operations/Technology Initiatives; Customer Service

    Initiatives)

    " Closed out major yard fencing contracts worth $18 million at six locations to secure

    NYCT property and protect the public.

    " Completed several major ventilation plant projects on subway lines, which elevate fire

    safety standards, along with ventilation units at the East New York Maintenance

    Shop, where summer temperatures up to 115 degrees had placed workers at risk.

    "

    Continued new safety objectives for employees, including new safetycommunications, safety audits, training, and accident investigations.

    " Continued the recently introduced Safety Culture Task Force charged with

    evaluating the ways in which organizational culture impacts employee and customer

    safety.

  • 8/13/2019 Narrative Fy 2012

    33/79

    27

    MTA Bus Operations (NYCT Department of Buses, MTA BusCompany)Safety/Security Initiatives

    " Installed additional bus operator shields designed to protect drivers from assault on a

    total of 837 buses, with additional installations ongoing.

    " Expanded the Bus Camera Security System to a total of 828 buses, with additional

    installations ongoing.

    " Implemented the Bus Operator Assault Executive Task Force, which meets regularly

    to coordinate initiatives across bus operations to mitigate assaults against bus

    operators and promote bus operator and customer safety.

    " Expanded conflict-resolution training for bus operators, along with public-awareness

    initiatives to help prevent bus operator assaults.

    " Worked with the MTA Office of Security to develop and implement Phase III

    Security Awareness Training for bus operators, front-line managers, and supervisors

    with direct customer contact.

    " Continued the labor-management partnership on employee and customer safety

    through the Bus Operator Action Committee.

    " Played a leadership role in organizing the first National Transportation Workers

    Assault Conference, which was attended by representatives from other transit

    properties and from the District Attorneys offices for all five New York City

    boroughs.

    " Implemented two new crisis-management plans. The Buses Heightened Awareness

    Plan ensures that needed protocols are in place to support first responders and

    maintain vital transportation services in the event of a crisis, such as a terrorist attack.

    The Buses Hurricane Plan prepares for storm emergencies and was successfully

    deployed during Superstorm Sandy.

    " Developed a high-level operations center or Situation Room that monitors all

    aspects of MTA bus operations during major storms or other emergencies to ensure

    the safety of customers, employees, and property. The Situation Room also provides a

    single point of contact between senior management, MTA public communications

    staff, the NYC Office of Emergency Management, and other external agencies.

  • 8/13/2019 Narrative Fy 2012

    34/79

    28

    " Worked with MTA Risk Management to provide direct training for Paratransit

    dispatchers and road supervisors on proper decision-making, especially during high

    stress situations with customers and drivers.

    " Installed a custom-designed Automatic Vehicle Location Monitoring (AVLM) system

    in all paratransit road supervisor vehicles to facilitate timely, accurate supervision and

    communication with contracted drivers regarding safe driving, customer service, and

    other issues.

    Long Island Rail RoadSafety/Security Initiatives

    " Implemented two new safety programs: Think Safety/Act Safely, an agency-wide

    plan to achieve an accident-free workplace; and the Safety Goal Implementation

    Program, a decentralized approach that identifies workplace hazards at the functional

    and managerial levels.

    " Updated the Corporate Employee Safety Policy to comply with revisions to the Rail

    Safety Improvement Act and expanded oversight by OSHA. Also issued a revised

    Corporate Safety Rules for Employees, reflecting changes in federal, state, and local

    regulations and including more instructional material.

    " Reduced the number of employee accidents in 2012 by more than 13 percent, the

    number of rail accidents or incidents by 7 percent, and the number of fire-related

    incidents by 21 percent.

    " Reduced customer gap accidents by 14 percent over the previous year, marking a 75-

    percent reduction over the five-year period since the LIRR implemented a program to

    mitigate gap accidents through public awareness and modifications to train cars and

    platforms.

    " Initiated a new customer safety campaign focusing on common activities and

    behaviors that contribute to customer accidents.

    " Enhanced safety features at several LIRR locations, including K-Rated barrier arms at

    the Jamaica Station Headquarters parking lot; an upgraded camera system at the

    Babylon Station; and cameras with end-of-platform readers at the East New York

    Station.

  • 8/13/2019 Narrative Fy 2012

    35/79

    29

    " Implemented video data requirements, legacy cameras, and the MTAs Integrated

    Electronic Security System cameras into the LIRR Situation Room to improve

    responsiveness in critical situations.

    " Installed 193 advanced access control devices in 2012, bringing the total number of

    access control points protecting the agencys doors, gates, and train yards to 483.

    " Increased the capacity of Regional Security Command Center cameras from 400 to

    464, and investigated ways to integrate all camera views into a single system.

    " Initiated an alcohol ban on overnight weekend trains and station platforms after

    midnight to ensure a more orderly travel environment. MTA police stepped up

    activity in Penn Station and across the system to enforce the ban.

    Metro-North RailroadSafety/Security Initiatives

    " Reorganized the agencys Safety and Security Department, adding key positions. In

    March 2012, the department worked with FDNY, Con Edison, and others to conduct a

    full-scale response to a simulated steam release in Grand Central Terminal.

    " Expanded the agencys successful program of Local Safety Committees, which

    carried out Safety Awareness Days, facility clean-ups, and other local operations.

    " Awarded Metro-Norths first Presidents Safety Cup to the North White Plains

    District for introducing new safety improvements and significantly reducing injury

    rates, even as the district experienced 25 percent growth." Neared completion of a security perimeter at the Stamford Yard, including a staffed

    guardhouse, electronic and video surveillance, fencing, and vehicle barriers.

    " Initiated a security assessment and design project for the Harlem River Lift Bridge to

    include structural hardening, fire suppression systems, and electronic surveillance.

    " Completed an all-agency Electronic Security Program, which included advanced

    electronic security systems at Grand Central Terminal, the Park Avenue Tunnel, and

    the Harlem River Lift Bridge.

    Bridges and TunnelsSafety/Security Initiatives

    " Maintained routine safety and security at all agency facilities, issuing a total of 30,853

    summonses during 2012 and making 554 arrests, of which 226 were for driving while

  • 8/13/2019 Narrative Fy 2012

    36/79

    30

    intoxicated (DWI). The agencys Special Operations Division issued 2,288 truck

    safety violations and 319 violations for overweight vehicles.

    " Contracted an explosives detection K-9 team, which was deployed under the auspices

    of the agencys Special Operation Division to enhance security at all Bridges and

    Tunnels facilities.

  • 8/13/2019 Narrative Fy 2012

    37/79

    31

    Cost Cutting /Revenue Initiatives

    InteragencyCost Cutting/Revenue Initiatives

    " Finalized Phase II of the planned migration of payroll, human resources, and back-

    office functions from all MTA agencies, except Bridges and Tunnels, to the shared

    services operation at the MTA Business Services Center (BSC). Based on the original

    financial model, the consolidation of services under the BSC is projected to save an

    estimated $10 million in 2012 and is expected to save around $20 million per year

    hereafter. (See also, Operations/Technology Initiatives)

    " Reintroduced the marketing program to sell advertising space on MetroCards. Therevitalized program booked nearly $1 million in revenue during 2012.

    " Inaugurated the first full year of advertising on the new Grand Central Terminal

    digital displays, which earned $4.1 million in new revenues for the MTA.

    " Increased MTA trademark licensing revenues to $540,000 and began soliciting

    sponsorships for the Grand Central Terminal Centennial.

    NYC Transit (Subways)Cost Cutting/Revenue Initiatives

    " Completed installation of oil-free compressors. The oil-free, energy-efficient

    compressors reduce energy, maintenance, and oil disposal costs. (See also,

    Sustainability/TOD Initiatives)

    " Developed a staffing plan for Automatic Train Supervision (ATS) in Subdivision A

    which, when fully implemented, optimizes supervisory and hourly budgeted

    headcount through work-program efficiencies.

    " Replaced the Staten Island Railway (SIR)s fleet of nonrevenue support vehicles with

    hybrid fuel efficiency vehicles, resulting in fuel and efficiency savings in 2012. Also

    reduced administrative workforce by the elimination of positions within the Finance

    and Transportation Divisions at SIR.

  • 8/13/2019 Narrative Fy 2012

    38/79

    32

    MTA Bus Operations (NYCT Department of Buses, MTA BusCompany)Cost Cutting/Revenue Initiatives

    " Continued to increase the use of prepaid taxi debit cards and brokered car service for

    eligible paratransit riders. These steps resulted in savings of approximately $33.5

    million in 2012 compared to regular paratransit door-to-door service.

    Long Island Rail RoadCost Cutting/Revenue Initiatives

    " Installed an Address Verification System (AVS) on LIRR ticket machines to secure

    against credit card fraud, resulting in the protection of $5 million in 2012 farebox

    revenues.

    " Continued to aggressively manage inventory through tighter management control and

    corporate reviews. These processes have yielded cash expenditure savings of $9.0

    million in 2012.

    " Amended leasing and construction agreements pertaining to the John D. Caemmerer

    West Side Storage Yard. The amended agreements set a time frame for closing on the

    Eastern Rail Yard and the Western Rail Yard. Amendments to the construction

    agreements authorize certain early work on the Eastern Rail Yard and provide added

    benefits to LIRR at the developers expense.

    " Complied with the MTA All Agency Cost Reduction Policy directives by

    standardizing the use of personal computers; consolidating and reducing printing,

    maintenance, and paper costs; and reduced power usage for over 2,100 personal

    computers.

    " Amended the MTA All Agency Agreement with CBS Outdoor to allow for additional

    signage at Penn Station and Atlantic Terminal, with installation costs reimbursed by

    CBS Outdoor. The signs will mean better customer information, while generating

    additional advertising revenues for LIRR.

    " Replaced the Verizon circuits supporting ticket sales machines at 96 locations with

    fiber-optic connections supported by the LIRR, resulting in over $200,000 per year in

    recurring savings.

  • 8/13/2019 Narrative Fy 2012

    39/79

    33

    Metro-North RailroadCost Cutting/Revenue Initiatives

    " Took a number of steps that helped reduce overtime costs to their lowest level since

    2008, including rescheduling of overtime shifts, adjustment of maintenance cycles,

    and the installation of a Kronos timekeeping system at all facilities.

    " Initiated new cost-control, procurement, and inventory strategies, including

    competitive bidding for traction power on the New Haven Line and an inventory

    forecasting system that has reduced stock for retiring fleets, resulting in a $6 million

    inventory savings from 2010 through 2012.

    " Pursued joint procurement opportunities with peer agencies across the MTA,

    producing savings in such areas as ticket machine maintenance, automotive fuel, track

    and communications maintenance, and parts purchases for the rolling stock fleet.

    " Organized a new team to assess and consolidate materials inventories for various

    agency units, including Grand Central Terminal, reducing storage costs through more

    just-in-time contracts.

    " Generated around $900,000 through sales of obsolete, excess, and scrap materials.

    " Saved $1.8 million in 2011 and 2012 through more efficient work scheduling on

    several capital projects.

    " Generated about $15 million in advertising revenues for 2012, which included a 197

    percent increase in the display revenue from the new digital dioramas in Grand

    Central Terminal.

    " Increased annual revenues in a number of areas, including the agency-wide vending

    machine program ($325,000), corporate sponsorship for commissary carts ($329,000),

    commissary gross sales ($6.7 million), Grand Central Terminal audio tours

    ($106,000), and off-peak getaway travel programs ($600,000).

    " Issued a request for proposals (RFP) for an exclusive 10-year right to operate ATMs

    on Metro-North property. The winning bidder, Chase, projects a first-year

    compensation to the railroad of about $372,000 with 5 percent annual increases

    thereafter.

  • 8/13/2019 Narrative Fy 2012

    40/79

    34

    Bridges and TunnelsCost Cutting/Revenue Initiatives

    " Continued a successful reduction in overtime costs through scheduling efficiencies

    and stronger operational oversight. Despite a slight increase in overtime due to

    Superstorm Sandy, overtime expenses have declined by over 21 percent from $26.9

    million in 2009 to $21.1 million in 2012.

    " Maintained the ongoing savings achieved through the 2010 and 2011 Budget

    Reduction Programs, which have enabled the agency to achieve millions of dollars in

    savings over previous financial plans through in-depth organizational assessments.

    " Established the Central Operations Notification Unit, a centralized, 24-hour unit

    which documents, processes, and monitors unscheduled employee absences at all

    agency facilities.

  • 8/13/2019 Narrative Fy 2012

    41/79

    35

    Superstorm Sandy Initiatives

    InteragencySuperstorm Sandy Initiatives

    " Marshaled all MTA communications and media operations to provide advance public

    notice of the systemwide shutdown, evacuations, safety information, and other storm

    emergency measures.

    " Added 24-hour IT staffing and cloud-based backup to support the MTA website

    through power outages, server strains, and record volume. The website served as a

    vital, uninterrupted information source throughout the storm preparations and

    recovery.

    " Arranged 24-hour staffing for the MTA Press Office, which responded to questions,

    corrected rumors, and posted hundreds of press updates to local, regional, and national

    media. Using both traditional channels and social media, the Press Office also

    circulated onsite photos, videos, and interviews to keep the public apprised of ongoing

    conditions throughout the transit system.

    " Customized emergency versions of MTA online and printed maps, indicating

    inoperative lines and active transit lines as they returned to service following the

    storm. The special maps, which were also posted at stations, allowed customers usingmobile or web-based devices to find operative transit routes at a glance.

    NYC Transit (Subways)Superstorm Sandy Initiatives

    " Undertook advance storm preparation beginning October 22 with a review and update

    of the agencys hurricane plan.

    " Began physical preparation on October 24, securing sites and equipment, relocating

    vehicles in flood-prone areas, and activating the Incident Command Center (ICC) and

    situation rooms.

    " Finalized preparations prior to landfall, staffing up the ICC, assisting in the evacuation

    of residents in flood-prone areas, and shutting down the system on October 28.

  • 8/13/2019 Narrative Fy 2012

    42/79

    36

    " Continued 24-hour monitoring, site inspections, damage reports, and public

    communications during the storm, which peaked on October 29 with a record storm

    surge and unprecedented flooding across the subway system.

    " Began recovery efforts immediately following the storm. Despite record storm

    damage, citywide flooding, and electrical outages, NYCT crews succeeded in

    returning a number of vital subway lines to service within four days after the storm

    and restored most subway service within a week.

    " Continuing recover efforts, with a top priority on service to the Rockaways and the

    badly damaged South Ferry Station. A number of transit system links suffered

    significant damage and some remain out of service. Major flood damage hit eight

    subway stations, three train yards, eight under-river tubes, and tracks across Jamaican

    Bay. Staten Island Railway experienced significant damage to shops, equipment, and

    the signal interlocking system.

    MTA Bus Operations (NYCT Department of Buses, MTA BusCompany)Superstorm Sandy Initiatives

    " Implemented the Buses Hurricane Plan, which was used to centralize interagency and

    public communications; secure bus fleets and property; safeguard customers and

    personnel; and provide emergency evacuations. The plan also helped to support

    emergency personnel during the storm and restore transportation services as quickly

    as possible following the storm.

    " Participated in the NYC Office of Emergency Management (OEM)s Homebound

    Evacuation Operation and Healthcare Evacuation Center, providing paratransit

    services to over 1,700 evacuees affected by Superstorm Sandy.

    " Implemented supplemental bus service following Superstorm Sandy to handle

    demand caused by the long-term outage of the A train between Howard Beach and the

    Rockaway peninsula. Additional bus service was also added on the Q22, Q52, and

    Q53 routes serving the central and western sections of the peninsula.

    " Provided bus services within hours of the storms passing, and supplemented subway

    service with a bus bridge from Brooklyn to Manhattan until the subway system in

    that area was operational.

  • 8/13/2019 Narrative Fy 2012

    43/79

    37

    Long Island Rail RoadSuperstorm Sandy Initiatives

    " Prepared for landfall by moving trains to higher ground; installing flood barriers;

    securing more than 600 crossing gates against wind damage; positioning recovery

    equipment; and shutting down rail operations on October 29.

    " Provided 24-hour emergency information to employees and customers prior to,

    during, and after the storm, while developing and implementing emergency recovery

    plans.

    " Deployed crews during and after the storm for rapid recovery operations, which

    included clearing heavy debris and over 600 trees from the right-of-way; restoring

    washed-out track; and repairing third rails, switches, signals, and over 20 flooded

    electrical substations.

    " Restored limited service from Jamaica Station to Penn Station and Brooklyn within 24

    hours after the storm. Restored service on the Port Washington and Ronkonkoma

    branches within 48 hours, and service on all four of LIRRs busiest branches within

    72 hours. Nearly all service was restored by November 12, with the exception of the

    heavily damaged Long Beach Branch, which resumed on November 25.

    " Undertook round-the-clock pumping in two of Amtraks flooded East River tunnels

    and assisted Amtrak workers in rebuilding signal cases for the tunnels.

    " Developed six Restoration capital projects to address damaged infrastructure, with

    funding to be sought through insurance, the FTA Sandy Relief Bill, and FEMA. The

    projects cover the East River tunnels ($80.0); assessment of line structures

    systemwide ($17.0); the Long Beach Branch ($45.0); Western Rail Yards ($35.0);

    substation replacements ($85); and infrastructure upgrades ($5.0).

    " Developed four Mitigation capital projects to prepare the LIRR system for future

    extreme weather events, with funding to be sought through insurance, the FTA Sandy

    Relief Bill, and FEMA. These projects include the East River tunnels and West Side

    Yard ($85.0); the Atlantic Avenue tunnels ($4.0); flood and emergency management

    equipment ($20); and double track for the Main Line, Phase II ($300).

  • 8/13/2019 Narrative Fy 2012

    44/79

    38

    Metro-North RailroadSuperstorm Sandy Initiatives

    " Undertook emergency preparations by moving equipment and employees to safer

    ground; securing shops, yards, and facilities; and shutting down railroad operations

    prior to the storms arrival on October 29.

    " Provided 24-hour emergency information to employees and customers prior to and

    during the storm, while developing emergency recovery plans.

    " Deployed crews during and after the storm for rapid recovery operations, which

    included clearing trees and debris from tracks; restoring washed out track; repairing

    rail equipment in the Harmon Yard; and repairing third rails, switches, and catenary

    wires.

    " Resumed service within 48 hours after the storm, first with limited service on the

    Harlem Line. By November 5 full service was largely restored on all lines, with the

    exception of a heavily damaged branch of the New Haven Line, which returned to

    service on November 13.

    Bridges and TunnelsSuperstorm Sandy Initiatives

    " Prepared for landfall by securing all construction sites, clearing drains and gutters,

    fuelling vehicles and generators, and relocating water-sensitive assets to higher

    ground.

    " Closed all bridges and tunnels by 9 P.M. October 29. Later that night, a 13-foot storm

    surge at Battery Park flooded Lower Manhattan and the Hugh L. Carey (Brooklyn

    Battery) Tunnel, and a 14-foot surge at Newtown Creek in Queens flooded the

    Midtown Tunnel.

    " Mobilized more than 1,200 employees and 50 contractors during the storm, delivering

    over 16,000 gallons of diesel fuel to facilities, securing storm-damaged signage andinfrastructure, removing downed trees, and conducting emergency engineering

    inspections.

    " Reopened all seven bridges within the first day after the storm. Damage to bridges

    included structural damage at the Cross Bay and Marine Parkway bridges (where there

  • 8/13/2019 Narrative Fy 2012

    45/79

    39

    were 14-foot surges and 90 mph winds), and damage to roadways, lighting, navigation

    systems, and signage at the other five bridges.

    " Coordinated with 50 contractors, FEMA, Con Edison, LIPA, the NYC Office of

    Emergency Management, the Army Corps of Engineers, FDNY, and the Governors

    office on storm recovery efforts.

    " Pumped some 72 million gallons of water out of the Hugh L. Carey and Queens

    Midtown tunnels and began repairing 2,756 tunnel lighting fixtures. The tunnels

    remained closed for 15 days and 9 days respectively.

    " Initiated emergency and temporary repairs to ensure customer and employee safety,

    most notably the removal of ceiling panels from the Hugh L. Carey Tunnel. In-depth

    inspections and testing will continue for several months.

    " Commenced longterm tunnel repairs, which include damage from saltwater and oil

    contaminants to wall tiles, ceiling panels, catwalks, air ducts, roadway surfaces, and

    other tunnel elements.

    " Secured a $778 million amendment to the Capital Program, approved by the MTA

    Board in December, to fund permanent repair of the storm damage.

    MTA Capital ConstructionSuperstorm Sandy Initiatives

    "

    Prior to the onset of Superstorm Sandy on October 29, MTACC undertook emergencypreparations and secured and suspended work on all construction sites.

    " None of MTACCs four mega projectsEast Side Access, Fulton Center, the No. 7

    Subway Line Extension, or the Second Avenue Subwayexperienced any flooding or

    damage from the storm.

  • 8/13/2019 Narrative Fy 2012

    46/79

    40

    2012 ANNUAL REPORTSECTION 3

    Capital Projects Commitments and Completions

    2010-2014 Capital Program

    Since the initiation of its 2010-2014 Capital Program, the MTA has sought and achieved

    significant reductions in program costs, while continuing to meet the regions rapidly

    growing transportation demands and abide by the aims of the board-approved MTA

    Mission Statement. In 2010, through a series of savings initiatives, the MTA reduced its

    original funding proposals by $1.82 billion, resulting in a 2010-2014 Capital Program of

    $26.3 billion over five years. In 2011, the MTA Board amended the program with

    proposals to achieve additional savings of nearly $2.0 billion. These include eliminating 15

    percent of administrative staff, improving the productivity of work along the right-of-way,

    maximizing component replacement over full asset renewal, and reviewing every capital

    project as it nears implementation to ensure that it will deliver the intended public benefits

    at the lowest possible cost.

    In December 2012, the MTA Board approved an additional $4.8 billion for repairs and

    restoration of MTA assets that were damaged as a result of Superstorm Sandy, which

    struck the region on October 29, 2012. This increases the capital plan from $24.27 billion

    to $29.03 billion. That includes Bridges and Tunnels, which is not subject to Capital

    Program Review Board (CPRB) approval. Efforts in 2012 resulted in $4.56 billion in

    capital funds committed during the year and a total of $5.25 billion in capital projects

    completed. These include significant rolling stock upgrades and major milestones in the

    four MTA Capital Construction mega projects, the largest system expansions in 60 years.

    For maximum transparency, the status of all capital projects is updated regularly on the

    Capital Program Dashboard under the heading About the MTA on the MTA website at

    www.mta.info. All costs shown below are in millions unless otherwise indicated.

  • 8/13/2019 Narrative Fy 2012

    47/79

    41

    Capital Program Progress

    Funding Received ThroughDecember 31, 2012 3($ millions)

    1982-2012 2012

    Federal grants $28,981 $2,087

    State service contracts/Bond Act 3,148 401

    State appropriations 623 -

    City appropriations 5,939 324

    MTA bonds 28,321 2,599

    MAC Surplus

    5,309 -

    Lessor equity/Asset sales/Leasing 925 -

    Debt restructuring 1,525 0

    Investment Income

    1,469 5

    Capital-operating transfer/Pay-as-you-go

    1,409 191

    Other

    1,393 56

    Total 79,041 5,662

    Capital Program Progress, 1982-2012($ millions)

    Commitments Expenditures Completions

    New York City Transit 51,262.1 46,549.0 43,608.2

    Long Island Rail Road 8,318.0 7,998.9 6,982.8

    Metro-North Railroad 6,268.5 5,720.7 5,016.4

    Bridges and Tunnels 4,215.6 3,362.0 3,026.5

    Capital Construction 14,173.2 10,817.5 3,708.7

    MTA Bus Company 689.1 598.9 523.6

    Commuter Rolling Stock 1,912.8 1,911.2 1,895.4

    Other 4 561.0 508.6 337.5

    MTA Total 87,399.8 77,467.1 65,099.3

    3Funding for MTA Bridges and Tunnels Capital Programs not included.Numbers may not total due to rounding.4Includes funds for World Trade Center recovery, planning and customer service projects, interagency projects, MTAPolice, and unassigned commuter rail projects that benefited both LIRR and Metro-North in the 1982-91 Capital

    Program. Numbers may not total due to rounding.

  • 8/13/2019 Narrative Fy 2012

    48/79

    42

    Capital Program Progress, 2012($ millions)

    Commitments Expenditures Completions

    New York City Transit 2,287.3 1,979.2 2,559.5

    Long Island Rail Road 291.7 316.5 292.8

    Metro-North Railroad 293.2 221.1 214.0

    Bridges and Tunnels 477.3 222.9 359.3

    Capital Construction 1,176.1 1,979.8 1,744.4

    MTA Bus Company 23.5 91.7 84.5

    Other 5

    10.5 54.7 --

    MTA Total 4,559.6 4,865.8 5,254.5

    5Includes funds for planning and customer service projects, interagency projects, and MTA Police. Numbers may nottotal due to rounding.

  • 8/13/2019 Narrative Fy 2012

    49/79

    43

    New York City Transit (Subways)

    Major 2012 Commitments

    7 Line Extension

    " Continued work relating to the 7 Line extension to 34th Street/11th Avenue,

    connecting the existing system to new construction and providing necessary support.

    In 2012, the sixth of six contracts for Site P was awarded. ($96.0, funded by City of

    New York) (See also, MTA Capital Construction, Capital Project Commitments/

    Completions)

    Stations

    " Initiated renewals at five subway stations on the Myrtle Avenue Line in Brooklyn and

    Queens. ($40.1)

    " Began work on ADA accessibility at the Kingsbridge Road Station on the Jerome

    Avenue Line, the Hunts Point Avenue Station on the Pelham Line, and the Dyckman

    Street Station on the Broadway Line. ($44.6)

    " Continued structural repairs at eight stations along the Staten Island Railway (SIR).

    ($15.5)

    " Began design of SIRs Arthur Kill Station and parking lot. ($27.7, design cost)

    " Began upgrade of HVAC equipment at various locations systemwide. ($27.4)

    " Awarded 19 separate Small Business Mentoring Program (SBMP) projects

    systemwide. ($11.3)

    Rolling Stock

    " Awarded purchase contracts for 300 new R179 cars. These cars will replace the R32cars, currently the oldest cars in NYCTs B Division fleet. The R179 cars will support

    NYCTs plans for anticipated service increases on various B Division lines. ($735.6)

    " Issued an option contract to purchase 103 new R188 railcars and convert 370 R142A

    railcars for service growth on the Broadway-7th Avenue Line, as well as growth

  • 8/13/2019 Narrative Fy 2012

    50/79

  • 8/13/2019 Narrative Fy 2012

    51/79

    45

    " Continued rehabilitation and overcoat painting of the elevated structure from the

    Cypress Hill Station to the 130th Street abutment on the Jamaica Line in Brooklyn

    and Queens. ($41.9)

    " Started overcoat painting of elevated structure from the Alabama Avenue Station to

    the Cypress Hills Station on the Jamaica Line in Brooklyn. ($19.9)

    Major 2012 Completions

    Stations

    " Completed station rehabilitation work, ADA upgrades, and employee facilities

    rehabilitation at the East 180th Street Station on the White Plains Road Line. ($61.4)

    " Rehabilitated the Mott Avenue Station on the Far Rockaway Line, including full ADA

    compliance. ( $19.5 )

    " Completed rehabilitation of the Beach-90th Street, 98th Street, and 105th Street

    stations on the Rockaway Line. ($57.2 )

    " Completed capital improvement work at twelve stations and the associated line

    structures on the West End Line in Brooklyn and provided full ADA accessibility at

    the Bay Parkway Station. ($230.0)

    " Completed three companion projects to rehabilitate the historic Bleecker Street

    Station on the Lexington Line. The project also included construction of a free,

    ADA-accessible transfer connection between the Broadway-Lafayette Street Station

    on the 6th Avenue Line and the uptown platform of the Bleecker Street Station, along

    with installation of five elevators and a new escalator. ($127.1)

    " Completed St. George floor replacement at SIR. ($7.0)

    " Completed the NYCT Station Condition Survey, including a survey of SIR stations.

    ($7.5)

    Lines, Structures, and Other Right-of-Way Facilities

    " Completed Phase 2 of the rehabilitation of the Culver Viaduct between the Carroll

    Street and 4th Avenue stations, and modernization of the 4th Avenue interlocking on

    the Culver and Crosstown lines in Brooklyn. ($260.4)

  • 8/13/2019 Narrative Fy 2012

    52/79

    46

    " Completed a project to replace three undersized vent plants by constructing one larger

    plant at Jackson Avenue in Queens, to serve tunnel sections of the Astoria, Queens

    Boulevard, and Crosstown lines. ($70.2)

    " Completed the upgrade of approximately 6.2 miles of tunnel lightning on the Culver

    Line. ($31.3)

    " Completed a project that installed new cables between equipment control rooms and

    various remote locations at four substation control zones. ($47.3)

    " Completed the design of improvements to the SIRs Lemon Creek culvert and right-

    of-way, which includes features designed to protect the neighboring wetlands. ($0.7,

    design cost)

    " Completed overcoat painting of the elevated structure from portal to the 41st Avenue

    on the Astoria and Flushing lines in Queens. ($20.8)

    " Completed facility roof repairs and replacement at eight locations in the Brooklyn, the

    Bronx, Queens, and Manhattan. ($17.8)

    Signals and Communications

    " Completed a project to equip 64 R160 railcars with CBTC technology for use on the

    Canarsie Line. ($67.9)

    " Completed a project to provide an Integrated Application Platform for various

    subsystems, including PA/CIS, closed circuit television (CCTV), and Help-Point

    intercoms at 156 A Division stations. ($208.9)

    " Completed a project to provide Asynchronous Transfer Mode (ATM) nodes at the 289

    B Division stations, which will allow the fiber optic transmission of telephone,

    PA/CIS, CCTV, and data for MetroCard and other system functions. ($300.1)

    " Completed a project to modernize and improve the reliability of the 5th Avenue and

    Lexington Avenue interlockings on the B Division Queens Boulevard Line. Work

    included replacement of the old interlocking with a new conventional relay-based

    interlocking and the construction of new relay rooms to house associated equipment.

    ($141.1)

  • 8/13/2019 Narrative Fy 2012

    53/79

    47

    MTA Bus Operations (NYCT Dept. of Buses, MTA Bus Company)

    Major 2012 Commitments

    Depots

    " Awarded contract to relocate fuel tanks and for rehabilitation at the Eastchester Depot.

    ($12.9, MTA Bus)

    " Awarded contract to install bus cameras on buses syst