Amarkantak BARGI INDIRA SAGAR SARDAR SAROVAR Narmada Control Authority ANNUAL WATER ACCOUNT OF NARMADA BASIN UPTO SARDAR SAROVAR DAM SITE ueZnk dNkj esa ljnkj ljksoj cka/k LFky rd dk Okkf"kZd ty ys[kk Tky Ok"kZ 1 tqykbZ] 2014 & 30 twu] 2015 Water Year 1 st July, 2014 - 30 th June, 2015 Bhopal, May - 2016 FOR OFFICIAL CIRCULATION ONLY ueZnk fu;a=.k izkf/kdj.k MATIYARI BARNA SUKTA KOLAR TAWA Hkksiky] ebZ - 2016 OMKARESHWAR MAHESHWAR MAN JOBAT G U L F O F C A M B A Y
109

Narmada Control Authoritynca.gov.in/forms_pdf/annual-water-account/annual-water... · 2018. 2. 16. · Narmada Control Authority ANNUAL WATER ACCOUNT OF NARMADA BASIN UPTO SARDAR

Jan 31, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Amarkantak

    BARGI

    INDIRA

    SAGAR

    SARDAR

    SAROVAR

    Narmada Control Authority

    ANNUAL WATER ACCOUNT OF NARMADA BASIN UPTO

    SARDAR SAROVAR DAM SITE

    ueZnk dNkj esa ljnkj ljksoj cka/k LFky rd dk Okkf"kZd ty ys[kk

    Tky Ok"kZ 1 tqykbZ] 2014 & 30 twu] 2015

    Water Year 1st July, 2014 - 30th June, 2015

    Bhopal, May - 2016

    FOR OFFICIAL CIRCULATION ONLY

    ueZnk fu;a=.k izkf/kdj.k

    MATIYARI

    BARNA

    SUKTA

    KOLAR

    TAWA

    Hkksiky] ebZ - 2016

    OMKARESHWAR

    MAHESHWAR

    MAN

    JOBAT

    GULF OF CAMBAY

  • Narmada Control Authority

    ANNUAL WATER ACCOUNT OF NARMADA BASIN UPTO

    SARDAR SAROVAR DAM SITE

    ueZnk dNkj esa ljnkj ljksoj cka/k LFky rd dk Okkf"kZd ty ys[kk

    Tky Ok"kZ 1 tqykbZ] 2014 & 30 twu] 2015

    Water Year 1st July, 2014 - 30th June, 2015

    Bhopal, May - 2016

    FOR OFFICIAL CIRCULATION ONLY

    ueZnk fu;a=.k izkf/kdj.k

    Hkksiky] ebZZ - 2016

  • SL No SUBJECT Page No.

    1 NWDT Award stipulations on Water Accounting in Narmada River Basin 1 to 3

    2 Methedology for assesment of utilizable flow in Narmada basin 4

    3 Statement showing year wise water utilization in Narmada basin up to Sardar Sarovar/Garudeshwar at a Glance - Overview-I 5

    4 Utilizable flow of Narmada river and water utilization by Party States - Graph 6

    5Statement showing State wise utilizable flow and allocated share in Namada Basin during the water year 2014-15 at a glance - Overview

    – II7

    6 Statement showing State wise water withdrawals during the year 2014-15 at a glance - Overview - III (A) 8

    7 Statement Showing utilizable flow at SSP to be shared amongst the party states, during water year 2014-15 - Overview-III(B) 9

    8 State wise water utilization in MAF and category wise utilization by party States - Plate - I 10

    9 Overview of Annual Water Account upto Sardar Sarovar Dam for the Water Year 2014-15 - Overview - IV 11

    10 Zone wise utilizable flow at cardinal station - Plate - 2 12

    11 Zone wise water utilization and utilization of utilizable flow in MAF - Plate - 3 13

    12 Index map of Narmada Basin - Map - 1 14

    ZONE – I ( NARMADA UP TO BARGI PROJECT)

    13Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation

    Schemes Zone – I (upto Bargi) - Map - 2 15

    14 Summary of utilizable flow upto Bargi Reservoir 16

    15 Break-up of sector wise water utilization from major, medium projects & minor schemes 17

    16 Outflow from Power house and spillway from Bargi Reservoir. 18

    17 Upstream utilization from Major & Medium Projects upto Bargi. 19

    18 Water utilization from Major & Medium Irrigation Projects during Water Year 2014-15.

    ( i ) Bargi & Bargi Diversion Project 20

    ( ii ) Matiyari Project 21

    ( iii ) Jalgaon & Banjar Project 22

    (iv) Bichhiya & Dhuandhar Project 23

    ANNUAL WATER ACCOUNT OF NARMADA BASIN UPTO SARDAR SAROVAR DAM SITE DURING THE WATER YEAR 2014-15

    CONTENTS

    (1)

  • SL No SUBJECT Page No.

    19 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 24

    20 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 25

    21 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 26

    22 Season wise actual area irrigated and water utilization through Lift scheme during the Water Year 2014-15. 27

    23 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects 28

    ZONE –II (BARGI to BURMANGHAT)

    24Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation

    Schemes Zone-II (upto Burmanghat) - Map -3 29

    25 Summary of utilizable flow upto Burmanghat. 30

    26 Break-up of sector wise water utilization from major, medium projects & minor schemes 31

    27 Observed flow at Burmanghat 32

    28 Upstream utilization from Major & Medium Projects upto Burmanghat. 33

    29 Water utilization from Major & Medium Projects during water year 2014-15.

    (i) Mehgaon Tola Tank & Pariat Tank 34

    (ii) Barnoo & Bohribund Tank 35

    ( iii ) Madai Tank 36

    30 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 37

    31 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 38

    32 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 39

    33Season wise actual area irrigated and water utilization through Lift scheme (Irrigation & Water Supply Schemes) during the Water Year

    2014-15. 40

    34 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects. 41

    ZONE –III ( BURMANGHAT to HOSHANGABAD)

    35Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation

    Schemes Zone-III (upto Hoshangabad) - Map -4 42

    36 Summary of utilizable flow upto Hoshangabad. 43

    37 Break-up of sector wise water utilization from major, medium projects & minor schemes 44

    38 Observed flow at Hoshangabad. 45

    39 Upstream utilization from Major & Medium Projects upto Hoshangabad 46

    40 Water utilization from Major & Medium Projects during water year 2014-15.

    (2)

  • SL No SUBJECT Page No.

    (i) Tawa Project & Barna Project 47

    (ii) Dukrikheda Project & Sampna Tank 48

    41 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 49

    42 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 50

    43 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 51

    44Season wise actual area irrigated and water utilization through Lift Schemes (Irrigation & Water Supply Schemes) during the Water Year

    2014-15.52

    45 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects. 53

    ZONE –IV ( HOSHANGABAD to INDIRA SAGAR PROJECT )

    46Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation

    Schemes Zone-IV (upto Indira Sagar Project) - Map -554

    47 Summary of utilizable flow upto Indira Sagar Project. 55

    48 Break-up of sector wise water utilization from major, medium projects & minor schemes 56

    49 Out flow from Power Houses & Spillway from Indira Sagar Reservoir. 57

    50 Upstream utilization from Major & Medium Projects upto Indira Sagar Project. 58

    51 Water utilization from Major & Medium Projects during water year 2014-15.

    ( i ) Kolar Project & ChandraKeshar Project. 59

    (ii) Indira Sagar Project & Sukta (Bhagwant Sagar) Project. 60

    52 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 61

    53 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 62

    54 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 63

    55Season wise actual area irrigated and water utilization through Lift Schemes (Irrigation & Water Supply Schemes) during the Water Year

    2014-15. 64

    56 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects. 65

    ZONE –V ( INDIRA SAGAR PROJECT to MANDLESHWAR)

    57Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation

    Schemes Zone-V (upto Mandleshwar)-Map -6 66

    (3)

  • SL No SUBJECT Page No.

    58 Summary of utilizable flow upto Mandleshwar. 67

    59 Break-up of sector wise water utilization from major, medium projects & minor schemes 68

    60 Observed flow at Omkareshwar 69

    61 Upstream utilization from Major & Medium Projects upto Mandleshwar . 70

    62 Water utilization from Major & Medium Projects during water year 2014-15.

    ( i ) Dejla Dewda Tank & Paras Tank 71

    (ii ) Choral Nakheri Tank & Upper Beda Tank 72

    (iii) Omkareshwar Sagar Project 73

    63 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 74

    64 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 75

    65 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 76

    66Season wise actual area irrigated and water utilization through Lift Schemes (Irrigation & Water Supply Schemes) during the Water Year

    2014-15. 77

    67 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects. 78

    ZONE –VI ( MANDLESHWAR to SARDAR SAROVAR PROJECT)

    68Map showing location of existing and ongoing Major & Medium Projects and Irrigation Division wise jurisdiction for Minor Irrigation

    Schemes Zone-VI (upto Sardar Sarovar Project)- Map -7 79

    69 Summary of utilizable flow upto Sardar Sarover Project. 80

    70 Break-up of sector wise water utilization from major, medium projects & minor schemes 81

    71 Observed flow at Sardar Sarovar Project. 82

    72 Upstream utilization from Major & Medium Projects upto Sardar Sarovar Project. 83

    73 Water utilization from Major & Medium Projects during water year 2014-15.

    ( i ) Man Project & Jobat Project. 84

    (ii) Sardar Sarovar Project. 85

    (iii) Satak & Segwal Tank 86

    (iv) Kunda & Sakalda Tank. 87

    (4)

  • SL No SUBJECT Page No.

    74 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Kharif. 88

    75 Crop wise actual and planned area irrigated through Major & Medium Projects for the Water Year 2014-15 for Rabi & Hot weather. 89

    76 Season wise actual area irrigated and water utilization through Minor Surface Gravity schemes during the Water Year 2014-15. 90

    77Season wise actual area irrigated and water utilization through Lift Schemes (Irrigation & Water Supply Schemes) during the Water Year

    2012-13.91

    78 Carry over live storage and difference in live storage for the Major & Medium Irrigation Projects 92

    79 Ten Daily releases of Narmada Water from Narmada Main Canal to Rajasthan for the water year 2014-15. 93

    80 Map showing location of GDS sites in Upper, Middle & Lower Zone in Narmada Basin Maps 8 – 10. 94-96

    (5)

  • NWDT AWARD STIPULATIONS ON WATER ACCOUNTING IN NARMADA RIVER BASIN Clause II - Determination Of The Utilisable Quantum Of Narmada Water

    The Tribunal hereby determines that the utilisable quantum of waters of the Narmada at Sardar Sarovar Dam Site on the basis of 75 per cent dependability should be assessed at 28 Million Acre Feet (34,537.44 M.cu.m.).

    Clause III - Apportionment of the Utilizable Quantum of Narmada Water (1) The Tribunal hereby orders that out of the utilisable quantum of Narmada water, (a) Madhya Pradesh is entitled to a share of 18.25 Million Acre Feet

    (22,511.01 M.cu.m.), (b) Gujarat is entitled to a share of 9 Million Acre Feet (11,101.32 M.cu.m.), (c) Rajasthan is entitled to a share of 0.5 Million Acre Feet (616.74 M.cu.m.) and (d) Maharashtra is entitled to a share of 0.25 Million Acre Feet (308.37 M.cu.m.);

    (2) Further, it is clarified that the apportionment relates to actual withdrawals and not consumptive use; (3) Within its share of water, each party State is free to make such changes in the pattern of water use and in the areas to be benefited within or outside the

    Narmada basin in its territory as it may consider necessary. Clause IV - Order With Regard To Excess Water and Sharing of Distress (1) The utilisable flow of Narmada in excess of the 28 Million Acre Feet (34,537.44 M.cu.m.) of utilisable flow in any water year, i.e., from 1st of July to 30th

    of June of next calendar year is apportioned in the following ratios of allocation i.e., 73 for Madhya Pradesh, 36 for Gujarat, 1 for Maharashtra and 2 for Rajasthan;

    (2) In the event of the available utilisable waters for allocation in any water year from 1st of July to 30th June of the next calendar year falling short of 28

    Million Acre Feet (34,537.44 M.cu.m.), the shortage should be shared between the various States in the ratio of 73 for Madhya Pradesh, 36 for Gujarat, 1 for Maharashtra and 2 for Rajasthan.

    3) The available utilisable waters in a water year will include the water carried over from the previous water year as assessed on the 1st of July on the basis

    of stored water available on that date:

    (1)

  • (4) The available utilisable water on any date will be inclusive of return flows and exclusive of losses due to evaporation of the various reservoirs; (5) It may be mentioned that in many years there will be surplus water in the filling period after meeting the storage requirements and withdrawals during the

    period. This will flow down to sea. Only a portion of it will be utilisable for generating power at Sardar Sarovar River-Bed Power-House and the rest will go waste. It is desirable that water which would go waste without even generating power at the last River-Bed Power-House, should be allowed to be utilised by the party States to the extent they can. Gujarat is, therefore, directed that whenever water starts going waste to sea without generating power, or based on the information received from upstream gauging stations, it anticipates that water would so go waste, it shall inform the Narmada Control Authority (hereinafter referred to as the Authority) and designated representatives of all the concerned States. Gujarat shall also inform them when such flows cease. During the period of such flows, the party States, whose reservoirs are spilling and the spill water cannot be stored elsewhere, may utilise such flows from the said reservoirs as they like and such utilisation by the party States will not count towards allotment of suppliers to them, but, use of such water will not establish any prescriptive rights.

    Clause IX - Regulated Releases to be made by Madhya Pradesh for the Requirement of Sardar Sarovar Project (vi) Utilisation in a water year by each party State shall be figured out on the basis of actual daily discharge at canal head on every major and medium

    project. For minor project, it shall be on the basis of area irrigated under different crops, the delta for each crop being approved by the Authority. For pumping schemes, drawing directly from the river, its tributaries or reservoirs, whether for irrigation, domestic or industrial use, water drawn shall be reckoned on the basis of the rated capacity of pumps and the number of hours they run. For a cross check, the seasonwise and cropwise area irrigated by each pumping scheme shall also be recorded, and if the figures of water drawn as worked out by the two aforesaid methods differ, the decision of the Authority as regards water drawn shall be final.

    (vii) Withdrawals from Sardar Sarovar for Navagam Canal for Gujarat and Rajasthan shall be measured at the head of Navagam Canal. The supply to

    Rajasthan shall be measured at Gujarat-Rajasthan border. The loss in the canal in carrying the supply for Rajasthan shall be determined by the Authority after the canal has been constructed and shall reckon against the share of Rajasthan. Water let down into the river from Sardar Sarovar through power house turbines shall be measured on the basis of power generated by it and that escaped through the spillway by measurement at the spillway. Gujarat may let down water from Sardar Sarovar for its downstream use by making specific indent for it and such releases shall reckon against its share. Such releases for downstream use shall be made through the turbines and the power so generated shared between Madhya Pradesh, Maharashtra and Gujarat in the prescribed ratio. Water let down into the river from Sardar Sarovar except at the specific indent of Gujarat shall not reckon against the share of Gujarat. The water drawn from Sardar Sarovar for use in Madhya Pradesh and Maharashtra, as the case may be, shall reckon against the share of water of that State.

    (2)

  • (viii) For major and medium projects, water account shall be kept by 10 daily period. The last 10 daily period of a month may have 11 days, 10 days or less, depending upon the number of days in the month. For minor schemes water accounts shall be kept by crop seasons, Kharif (July to October) Rabi (November to March) and hot weather (April to June). For pumping schemes and domestic and industrial uses it shall be monthly.

    (ix) The water use by minor and pumping schemes in any ten daily period may provisionally be taken to be the same as in the corresponding period in the

    previous year on the basis of average use during the crop period. For final water account, however, it will be determined as in (vi) above. (x) Each State shall furnish to the Authority and make available to any party State desiring the same, such data and information as the Authority may require

    and ask for. (xi) The Authority shall arrange the review of the ten day releases made by Madhya Pradesh at least once a month and oftener as considered necessary for

    directing any change in the releases. It may designate a person for doing so. (xii) The Authority shall direct final adjustment to be made in the following water year of the use in excess of the authorized use, if any, by any State or States

    during the preceding water year by curtailing the share(s) of the State or States concerned which have used water in excess and make over the same to the State or States which have received short supplies. Water supplied to Rajasthan on any day in excess of 10 per cent over and above its indent shall reckon against use by Gujarat.

    (xiii) The Authority shall furnish the annual water account for the water year to the Governments of the party States by the end of August of the next water

    year. Each State may make any observation on the account and/or point out corrections in it, if any, within one month of its receipt. After making the necessary modifications, the Authority shall furnish to each party State the final annual water account for the water year by 31st October. The Authority shall cause the annual water account to be published each year.

    (3)

  • METHODOLOGY FOR ASSESSMENT OF UTILIZABLE FLOW IN NARMADA BASIN

    The Narmada Water Dispute Tribunal assessed and apportioned utilizable quantum of Narmada water amongst party States, i.e. Madhya Pradesh, Gujarat, Maharashtra and Rajasthan as described in page 1. Accordingly, NCA has been publishing Annual Water Account (AWA) every year since 1980-81. The AWA till the water year 2005-06 was prepared on the basis of “A Manual on preparation of Annual Water Account of Narmada Basin” prepared by Regional Office, NCA in 2001 by following two major steps:

    (a) Virgin flow at the terminal point over a water Year = Flow measured at d/s end of reach + Actual total withdrawal in the reach (irrigation use, domestic & industrial use and diversions outside basin) + Evaporation losses (10% of the storages created u/s of gauge site) – Regeneration from withdrawals (10% of irrigation use, 60% of domestic & industrial use) ± Change in storage between beginning and end of water Year.

    (b) Utilizable flow in water Year available for allocation = Virgin flow (as calculated above) + Regeneration from withdrawals + Total live storage available at the beginning of water year in reach (carry over) – Evaporation losses from storages.

    Since the above methodology was very cumbersome exercise , a review was carried out by SSRRC about the procedure of preparing AWA and the methodology for estimation of utilizable flow at any control point as per stipulations given in NWDT Award was modified in the 9th SSRRC meeting. The AWA from the water year 2006-07 onwards has been prepared as per the modified methodology represented as below:

    utilizable flow at any point = Observed flow at any point + u/s utilization ± change in storages ± carryover storage in u/s reservoirs

    CONTROL POINTS

    Keeping in view of the developments taken place in Narmada river , following six control points are finalized in the main river and one in the Narmada Main Canal. (i) RABLS (Bargi) Project (ii) Burmanghat (iii) Hoshangabad (iv) Indira Sagar Project (v) Maheshwar Project (Mandleshwar site till Maheshwar dam comes up) (vi) Sardar Sarovar Project (vii) Gujarat-Rajasthan border

    These control points will basically divide the Narmada river basin in 6 zones and Narmada Main Canal Command Area into 2 zones (Gujarat & Rajasthan). At present discharge at Gujarat- Rajasthan Border is being measure by GoG using Acoustic Doppler Current Profiler (ADCP) instrument installed at 1 Km upstream of the border, which is duly verified by GoR. Amarkantak Burmanghat ISP SSP Source Bargi Hoshangabad Maheshwar

    Guj-Raj Border

    (4)

  • OVERVIEW - I

    S.No. Area Irrigated

    (M.Cum) ( Maf ) (Lakh Ha.) (M.Cum) ( Maf ) (M.Cum) ( Maf ) (M.Cum) (M.Cum)

    1 1980 - 1981 39251.00 31.82 1.13 1,196.40 0.97 1254.00 1.02 788.92 2711.00

    2 1981 - 1982 30622.00 24.83 1.16 1,224.49 0.99 1283.00 1.04 504.33 2711.00

    3 1982 - 1983 22176.00 17.98 1.48 1,656.77 1.34 1714.00 1.39 1147.06 2716.00

    4 1983 - 1984 42726.00 34.64 1.56 1,898.16 1.54 1963.00 1.59 376.31 2730.00

    5 1984 - 1985 44550.00 36.12 1.97 2,344.24 1.90 2418.00 1.96 404.72 2730.00

    6 1985 - 1986 25330.00 20.54 1.87 1,863.57 1.51 1979.00 1.60 652.69 2730.00

    7 1986 - 1987 38677.00 31.36 2.47 2,261.41 1.83 2331.00 1.89 1450.63 2730.00

    8 1987 - 1988 17027.00 13.80 2.11 1,960.42 1.59 2026.00 1.64 730.30 6226.00

    9 1988 - 1989 37080.00 30.06 2.91 2,527.11 2.05 2619.00 2.12 795.16 6276.00

    10 1989 - 1990 27972.00 22.68 2.67 2,565.55 2.08 2702.00 2.19 1509.32 6296.00

    11 1990 1991 56012.00 45.41 3.17 3,063.94 2.48 3223.00 2.61 937.18 6314.00

    12 1991 - 1992 29612.00 24.01 5.24 3,545.37 2.87 3738.00 3.03 588.04 6370.00

    13 1992 - 1993 24326.00 19.72 3.79 2,837.16 2.30 2966.00 2.40 927.29 6370.00

    14 1993 - 1994 42468.00 34.43 3.99 3,046.67 2.47 3264.00 2.65 2913.29 6370.00

    15 1994 - 1995 73471.00 59.56 4.50 3,392.28 2.75 3597.00 2.92 1775.22 6370.00

    16 1995 - 1996 27419.00 22.23 4.48 3,521.41 2.85 3725.00 3.02 805.90 6370.00

    17 1996 - 1997 31751.00 25.74 5.14 3,892.50 3.16 4082.00 3.31 802.98 6370.00

    18 1997 - 1998 39359.00 31.91 6.80 4,605.47 3.73 4807.00 3.90 1768.10 6370.00

    19 1998 - 1999 26955.00 21.85 6.21 4,088.44 3.31 4306.00 3.49 1696.38 6370.00

    20 1999 - 2000 51895.00 42.07 4.67 3,592.54 2.91 3812.00 3.09 991.30 6370.00

    21 2000 - 2001 17025.00 13.80 3.97 2,547.53 2.07 3151.00 2.55 916.58 6370.00

    22 2001 - 2002 28807.77 23.35 4.59 4,499.04 3.65 6000.86 4.86 1045.32 6370.43

    23 2002 - 2003 28077.87 22.76 8.10 4,981.24 4.04 5640.52 4.57 1209.45 6370.43

    24 2003 - 2004 41437.34 33.59 8.90 6,008.40 4.87 6415.28 5.20 969.25 6370.43

    25 2004 - 2005 23131.35 18.75 9.34 5,298.93 4.30 5648.21 4.58 869.59 6370.43

    26 2005 - 2006 46033.36 37.32 5.63 6,060.20 4.91 6556.85 5.32 655.23 22008.30

    27 2006 - 2007 43465.01 35.25 4.81 4,321.45 3.50 5860.55 4.75 1768.47 22070.24

    28 2007 2008 38045.97 30.84 7.83 6,677.72 5.41 7585.51 6.15 1152.40 22070.24

    29 2008 - 2009 23577.57 19.11 8.93 9,522.47 7.72 10581.55 8.58 1146.36 22070.24

    30 2009 - 2010 26799.50 21.72 3.6 10,090.07 8.18 11432.25 9.27 856.51 22070.24

    31 2010 - 2011 28557.52 23.15 6.78 9,833.16 7.97 11180.81 9.06 1918.44 22070.24

    32 2011 - 2012 43180.60 35.04 5.74 11425.87 9.26 13066.18 10.59 2357.03 22070.24

    33 2012 - 2013 51509.77 41.75 12.11 13204.66 10.71 15394.39 12.48 1173.53 22070.24

    34 2013 - 2014 76437.36 61.97 15.10 12787.85 10.37 14917.37 12.09 4077.44 22070.24

    35 2014 - 2015 33467.27 27.13 13.68 15691.42 12.72 17528.05 14.21 1917.50 22451.35

    Note:2. Utilizable quantum of water of the Narmada at Sardar Sarovar Dam site on the basis of 75 % dependability = 34.54 BM3 ( 28.00 Maf )3. Allocation of water to states as per N.W.D.T. Award : (a) Madhya Pradesh = 22.51 BM3 ( 18.25 Maf ) (b) Gujarat = 11.10 BM3 ( 9.00 Maf ) (c) Maharashtra = 0.31 BM3 ( 0.25 Maf )

    (d) Rajasthan = 0.62 BM3 ( 0.50 Maf )

    1. Virgin Flow from 1980-81 to 2005-06 & utilizable flow 2006-07 to 2014-15

    Water use for

    irrigationGross water use for Irrigation,

    Domestic & Industrial sector

    STATEMENT SHOWING YEARWISE WATER UTILIZATION IN NARMADA BASIN UP TO SARDAR SAROVAR /GARUDESHWAR AT A GLANCE

    Water YearVolume of virgin/utilizable

    flow at Garudeshwar/SSP

    Available live storage

    as on 1st July in

    Major & Medium

    Projects

    Created reservoir live storage

    (Major & Medium Projects)

    5

  • 6

    0

    10000

    20000

    30000

    40000

    50000

    60000

    70000

    80000

    1980

    -81

    1981

    -82

    1982

    -83

    1983

    -84

    1984

    -85

    1985

    -86

    1986

    -87

    1987

    -88

    1988

    -89

    1989

    -90

    1990

    -91

    1991

    -92

    1992

    -93

    1993

    -94

    1994

    -95

    1995

    -96

    1996

    -97

    1997

    -98

    1998

    -99

    1999

    -00

    2000

    -01

    2001

    -02

    2002

    -03

    2003

    -04

    2004

    -05

    2005

    -06

    2006

    -07

    2007

    -08

    2008

    -09

    2009

    -10

    2010

    -11

    2011

    -12

    2012

    -13

    2013

    -14

    2014

    -15

    V

    O

    L

    U

    M

    E

    I

    N

    M

    C

    M

    WATER YEAR (JULY-JUNE)

    UTILIZABLE FLOW OF NARMADA RIVER & WATER UTILIZATION BY PARTY STATES Total water utilization

    Utilizable flow

  • OVERVIEW - II

    = 34.536 Bm3

    (28.0 MAF)

    = 33.25 Bm3 (26.95 MAF)

    = 3.75 % (DEFICIT)

    S. No. State

    MCM MAF MCM MAF

    1 Madhya Pradesh 22511.00 18.25 21,670.84 17.57

    2 Gujarat 11101.00 9.00 10,686.99 8.66

    3 Maharashtra 308.00 0.25 296.87 0.24

    4 Rajasthan 616.00 0.50 593.72 0.48

    Total 34536.00 28.00 33248.41 26.95

    (3) Percentage excess/deficit w.r.t.(1)

    STATEMENT SHOWING STATEWISE UTILIZABLE FLOW & ALLOCATED SHARE IN NARMADA BASIN DURING THE WATER YEAR 2014-15 AT A GLANCE

    Allocated Share of utilizable flow among Party

    states as per NWDT award

    Share of Utilizable Flow among the Party States

    for the water year 2014-15

    (1) Utilizable flow at 75 % dependability (As per NWDT Award)

    (2) Actual utilizable flow during the Water Year 2014-15

    7

  • OVERVIEW - III(A)

    Irrigation Domestic Industrial

    MCM MAF MCM MCM MCM MCM MAF

    1 Madhya Pradesh 21,670.84 17.57 8466.67 295.47 13.99 8776.13 7.12

    2 Gujarat 10,686.99 8.66 6772.90 1325.72 70.20 8168.82 6.62

    3 Maharashtra 296.87 0.24 0.10 - - 0.10 0.00

    4 Rajasthan 593.72 0.48 451.75 131.25 - 583.00 0.47

    Total 33248.41 26.95 15691.42 1752.44 84.19 17528.05 14.21

    Share of Utilizable Flow among

    the party states for the water year

    2014-15StateS. No.

    Total

    STATEMENT SHOWING STATEWISE WATER WITHDRAWALS DURING THE WATER YEAR 2014-15 AT A GLANCE

    Withdrawals For Different Uses

    8

  • OVERVIEW-III(B)

    SL No Description MCM MAF

    1 Total Utilizable Flow assessed at Sardar Sarovar Project during the Water Year 2014-15 33467.27 27.13

    2

    Quantum of withdrawal made by GoG during spillover period towards maximisation of

    power through CHPH by invoking Cluase IV(5) of NWDT award, which is not tobe accounted

    towards their share , included in total utilizable flow assessed at Sardar Sarovar Project.218.86 0.18

    3Spill over quantity from Sardar Sarovar Project during the water year 2014-15, part of total

    utilizable flow assessed at Sardar Sarovar Project given in (1).2975.97 2.41

    4 Net quantum of utilizable flow to be shared amongst party states (1) - (2). 33248.41 26.95

    STATEMENT SHOWING UTILIZABLE FLOW AT SARDAR SAROVAR PROJECT TO BE SHARED AMONGST PARTY

    STATES DURING WATER YEAR 2014-15

    9

  • PLATE - 1

    0.0

    2.0

    4.0

    6.0

    8.0

    10.0

    12.0

    14.0

    16.0

    18.0

    7.12

    6.62

    0.00

    0.47

    17.57

    8.66

    0.24

    0.48

    Uti

    liza

    tio

    n (

    MA

    F)

    STATE WISE WATER UTILIZATION AND UTILIZABLE FLOW

    Actual Utilization Share of utilizable Flow

    0.0

    2.0

    4.0

    6.0

    8.0

    0.01 0.06

    0.00 0.00

    0.24 1.07

    0.00 0.11

    6.87

    5.49

    0.00 0.36

    7.12 6.62

    0.00 0.47

    CATEGORY WISE WATER UTILIZATION BY PARTY STATES

    Industrial

    Domestic

    Irrigation

    Total

    10

  • OVERVIEW - IV

    1 BARGI 374 14556 5477.54 1398.86 212.97 458.88 7548.25 6.12

    2 BARMANGHAT 526 26453 8809.83 2098.09 175.98 498.58 11582.48 9.39

    3 HOSHANGABAD 676 44548 12427.07 4693.05 497.98 794.72 18412.82 14.93

    4 INDIRA SAGAR PROJECT 845 61642 16529.71 6086.03 1009.50 1648.37 25273.61 20.49

    5 MANDLESHWAR 940 72809 19177.87 7297.70 1086.07 1415.49 28977.13 23.49

    6 SARDAR SAROVAR PROJECT 1164 87892 21452.85 17746.91 * 1320.67 1917.50 33467.27 27.13

    7 GUJARAT - RAJASTHAN BORDER - - 583.00 -

    *

    MCM

    Upstream

    Utilizations

    Inclusive of 8970.66 MCM of water released at HR of NMC for various uses by GoG & GoR and other losses , water let out through escapes and also 218.86 MCM released for

    maximisation of power generation through CHPH by GoG during spillover of SSP by invoking Clause IV(5) of NWDT Award.

    - - - -

    Catchment

    area Upto

    Cardinal Stn.

    (Sq.Km)

    Distance

    from

    Source

    (Km) MCM MCM

    Observed

    flow /Outflow

    OVERVIEW OF ANNUAL WATER ACCOUNT UPTO SARDAR SAROVAR DAM FOR THE WATER YEAR 2014-15

    Sl No CARDINAL STATIONS

    MCM MAF

    Carryover

    storage

    Change in

    Live Storage

    MCM

    Utilizable flow

    11

  • PLATE-2

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    RABLS (BargiProject)

    Barmanghat Hoshangabad Indira SagarProject

    Mandleshwar Sardar SarovarProject

    6.12 9.39

    14.93

    20.49 23.49

    6.12

    3.27

    5.54

    5.56

    3.00

    3.64

    Qu

    an

    tum

    of

    Wa

    ter

    (MA

    F)

    CARDINAL STATIONS

    ZONE-WISE UTILIZABLE FLOW

    Contribution from Zone Upstream Cumulative Utilizable Flow

    12

  • PLATE-3

    1.13 0.57

    2.10

    1.13

    0.98

    8.01

    0.47

    ZONE-WISE TOTAL UTILIZATION IN MAF

    RABLS (Bargi Project) Barmanghat Hoshangabad Indira Sagar Project

    Mandleshwar Sardar Sarovar Project Gujarat- Rajasthan Border

    TOTAL UTILIZATION: 14.39

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    RABLS (BargiProject)

    Barmanghat Hoshangabad Indira SagarProject

    Mandleshwar SardarSarovarProject

    Gujarat-Rajasthan

    Border

    1.13 1.70

    3.80 4.93

    5.92

    14.39

    0.47

    6.12

    9.39

    14.93

    20.49

    23.49

    27.13

    0.47

    UTILIZATION OF TOTAL UTILIZABLE FLOW

    Utilization Utilizable Flow

    13

  • BHOPAL RAISEN

    VIDISHA

    SEHORE

    SHAJAPUR

    DEWAS

    UJJAIN

    RATLAM

    DHAR

    INDORE

    KHARGONE

    GODHRA

    VADODARA

    BHARUCH

    SURAT

    KHANDWA

    JALGAON

    AMRAVATI

    BETUL

    HOSHANGABAD

    CHHINDWARA

    SEONI

    BALAGHAT

    NARSINGPUR

    MANDLA

    SHAHDOL

    BILASPUR

    DURG

    DAMOH

    DHULE

    NAGPUR

    P R A D E S H M A D H Y A

    M A D H Y A P R A D E S H

    R A J A S T H A N

    G U J A R A T

    G U J A R A T

    DINDORI

    RAJNANDGAON

    BARWANI

    Amarkantak

    BARGI

    INDIRA

    SAGAR

    SARDAR

    SAROVAR

    M A H A R A S H T R A

    GULF OF CAMBAY

    73o 74o 76o 77o 78o 79o 80o 81o

    24o

    23o

    22o

    21o

    75o

    BANDRA

    24o

    23o

    22o

    21o

    73o 74o 76o 77o 78o 79o 80o 81o 75o

    JABALPUR

    LEGEND

    BASIN BOUNDARY

    STATE BOUNDARY

    DISTRICT BOUNDARY

    ZONE BOUNDARY

    ROADS

    RIVERS

    SCALE : 0 20 30 60 70 KM 40 10

    ZONE-6

    MAP-1

    NARMADA CONTROL AUTHORITY

    NARMADA RIVER BASIN

    INDEX MAP OF NARMADA BASIN

    SAGAR

    MATIYARI

    BARNA

    SUKTA

    KOLAR

    TAWA

    JOBAT MAN

    MAHESHWAR

    OMKARESHWAR

    ZONE-5

    ZONE-4

    ZONE-3

    ZONE-2

    ZONE-1

    14

  • ZONE - I

    UPTO BARGI PROJECT

  • BALAGHAT

    MANDLA

    SHAHDOL

    JABALPUR

    KAWARDHA

    PENDRA

    UMARIA

    AMARKANTAK

    82 o 81 o

    80 o

    82 o 81 o 80 o

    23 o

    22 o

    23 o

    22 o

    NARMADA CONTROL AUTHORITY

    NARMADA RIVER BASIN

    MAP SHOWING LOCATION OF EXISTING AND

    ON GOING MAJOR & MEDIUM PROJECTS AND

    IRRIGATION DIVISION-WISE JURISDICTION FOR

    MINOR IRRIGATION SCHEMES-

    ZONE-I

    MAP-2

    WATER RESOURCES

    DIVISION, CHHUIKHADAN

    WATER RESOURCES

    DIVISION, KAWARDHA

    WATER RESOURCES

    DIVISION, MANDLA

    WATER RESOURCES

    DIVISION, DINDORI

    WATER RESOURCES

    DIVISION, ANUPPUR

    WATER RESOURCES

    DIVISION, NIWAS

    WATER RESOURCES

    DIVISION No-1, SEONI

    BANJAR RIVER PROJECT

    DIVISION, BAIHAR

    MEHGON

    TOLA TANK

    MATIYARI

    BICHHIYA

    TANK

    DHUANDHAR

    JALGAON

    TANK

    BANJAR

    PROJECT

    BARGI DAM

    LEGEND

    BASIN BOUNDARY

    ZONE BOUNDARY

    RIVERS

    DISTRICT HEAD QUARTERS

    IMPORTANT TOWNS

    DAM SITE & SUBMERGENCE

    ZONE-1 (UP TO BARGI)

    DISTANCE FROM SOURCE : 374 Km

    CATCHMENT AREA : 14556 Sq Km

    15

  • Sl No Description Unit

    I Observed Flow MCM 5477.54

    II Upstream Utilizations

    II a. Major & Medium Projects MCM 669.70

    II b. Minor Projects MCM 729.16

    II c. Total MCM 1398.86

    III Change (increase`+' / decrease`-') in Live Storage MCM 212.97

    IV Carryover storage (Live Storage as on 01.07.2014) MCM 458.88

    V Utilizable flow upto Bargi (I + IIc + III + IV ) MCM 7548.25

    MAF 6.12

    ZONE 1 - NARMADA UP TO BARGI RESERVOIR

    SUMMARY

    Narmada

    upto Bargi

    16

  • Unit Irrigation Domestic Industrial Total

    1 MCM 667.76 - 1.94 669.70

    0.99 -

    BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

    Water Utilization

    Major & Medium Projects

    Minor Projects Including

    Lift & Pumping Schemes

    2

    Category of Projects S.No.

    729.16MCM 728.17

    17

  • AWA - 1

    : BARGI (RANI AVANTI BAI LODHI SAGAR PROJECT)

    Category : Major

    : Narmada

    : E.E.,R.A.B.L.S. Left Masonry Dam Dn, Barginagar, Jabalpur

    Month Year 1-10 11-20 21-30/31 Total

    July 2014 52.91 24.21 0.00 77.12

    August 2014 494.57 512.02 181.34 1,187.93

    September 2014 492.33 543.11 158.99 1,194.43

    October 2014 76.73 149.38 169.31 395.42

    November 2014 127.93 118.77 129.29 375.99

    December 2014 113.37 118.40 119.33 351.10

    January 2015 119.82 95.26 97.12 312.20

    February 2015 118.36 119.52 97.07 334.95

    March 2015 119.37 137.27 147.48 404.12

    April 2015 140.03 107.98 93.86 341.87

    May 2015 113.57 119.58 110.84 343.99

    June 2015 71.51 43.19 43.72 158.42

    Total 2,040.50 2,088.69 1,348.35 5,477.54

    (Figures in MCM)

    A.I. OBSERVED FLOW (OUT FLOWS FROM POWER HOUSES & SPILLWAY )

    Name of Project

    Name of river / tributary

    Reporting Officer

    18

  • AWA - 2

    Kharif Rabi Hotweather Total

    (Ha.) (Ha.) (Ha.) (Ha.) (Ha.)

    MAJOR PROJECTS

    1 Bargi (Rani Avanti Bai

    Lodhi Sagar)

    E.E, Rani Avanti Bai Lodhi Sagar

    Project, Jabalpur 223250 14220 94818 5004 114042 419.40

    2 Bargi Diversion Project E.E, Narmada Development Division,

    Jabalpur.7397 3167 41833 - 45000 178.30

    3 Matiyari E.E, W.R.Dn., Mandla 13662 5448 6520 - 11968 49.56

    Sub Total 244309 22835 143171 5004 171010 647.26

    (A)MEDIUM PROJECT UNDER MADHYA PRADESH STATE

    1 Jalgaon Tank E.E, Banjar River Project Dn., Baihar 538 210 136 - 346 2.03

    2 Bichhiya tank E.E, W.R.Dn., Mandla 2348 400 1265 - 1665 10.53

    3 Dhuandhar tank E.E, W.R.Dn., Mandla 1393 500 1100 - 1600 3.90

    Sub Total(A) 4279 1110 2501 - 3611 16.46

    (B)MEDIUM PROJECT UNDER CHATTISGARH STATE

    1Banjar Project

    (Bahera Khar)E.E., W.R. Dn., Kawardha 2429 486 - - 486 5.98

    Sub Total(B) 2429 486 0.00 - 486 5.98

    Sub Total(A+B) 6708 1596 2501 - 4097 22.44

    Total ( Major & Medium Project) 251017 24431 145672 5004 175107 669.70

    A.II. UPSTREAM UTILIZATIONS

    S.No.

    (a) MAJOR & MEDIUM PROJECTS

    (MCM)

    Actual IrrigationPlanned annual

    Irrigation

    Actual Water

    Utilization including

    domestic &

    industrial useName of Project Reporting Officer

    19

  • AWA - 3

    : : Bargi Diversion Project

    Category : Major : Major

    : Narmada :

    : :

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 11.21 0.00 0.00 11.21 0.00 0.00 0.00 0.00

    August 2014 11.98 0.00 0.00 11.98 0.00 0.00 8.22 8.22

    September 2014 53.13 5.70 12.35 71.18 13.97 11.74 16.80 42.51

    October 2014 63.99 0.00 0.00 63.99 22.58 17.28 3.21 43.07

    November 2014 7.68 0.00 6.10 13.78 0.00 5.56 7.50 13.06

    December 2014 24.10 7.92 7.06 39.08 12.10 12.10 11.53 35.73

    January 2015 9.95 3.76 3.85 17.56 4.39 3.16 5.44 12.99

    February 2015 17.35 3.50 2.14 22.99 6.49 9.13 7.10 22.72

    March 2015 6.79 4.57 14.30 25.66 0.00 0.00 0.00 0.00

    April 2015 13.00 16.10 20.56 49.66 0.00 0.00 0.00 0.00

    May 2015 19.16 13.50 21.73 54.39 0.00 0.00 0.00 0.00

    June 2015 22.86 14.29 0.77 37.92 0.00 0.00 0.00 0.00

    Total 261.20 69.34 88.86 419.40 59.53 58.97 59.80 178.30

    (Figures in MCM) (Figures in MCM)

    Reporting Officer C.E.,Upper Narmada Zone, Jablpur (M.P.)

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15(As measured at canal head)

    Narmada Name of river / tributary

    Name of Project Bargi (Rani Avanti Bai Lodhi Sagar Project)

    C.E.,,R.A.B.L.S. Project, Bargi Hills,Jabalpur

    20

  • AWA - 3

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15(As measured at canal head)

    Name of Project : Matiyari Project

    Category : Major

    Name of river / tributary : Matiyari Project

    Reporting Officer : E.E.,W.R.Dn., Mandla

    C.E.,Wainganga Basin,W.R.D. , Seoni

    (Figures in MCM)

    Month Year 1-10 11-20 21-30/31 Total

    July 2014 0.85 0.54 0.37 1.76

    August 2014 0.34 0.37 0.87 1.58

    September 2014 1.24 1.44 3.11 5.79

    October 2014 1.54 2.80 1.51 5.85

    November 2014 0.09 0.00 0.00 0.09

    December 2014 0.53 1.37 1.16 3.06

    January 2015 0.80 1.39 0.91 3.10

    February 2015 0.71 1.08 1.58 3.37

    March 2015 0.72 1.24 2.00 3.96

    April 2015 2.07 2.07 2.28 6.42

    May 2015 3.11 1.55 3.28 7.94

    June 2015 3.45 2.15 1.04 6.64

    Total 15.45 16.00 18.11 49.56

    21

  • AWA - 3

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15(As measured at canal head)

    : : Banjar River Project ( Bahera Khar Medium Project)

    Category : Medium : Medium

    : Banjar Nalla : Banjar River/Kukurbahra Nalla

    : E.E., ,Banjar River Project Div., Baihar : E.E., Water Resources Division, Kawardha (C.G.)

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 0.10 0.08 0.04 0.22 0.00 0.00 0.00 0.00

    August 2014 0.35 0.12 0.11 0.58 0.36 0.36 0.40 1.12

    September 2014 0.26 0.08 0.10 0.44 0.36 0.36 0.36 1.08

    October 2014 0.00 0.00 0.00 0.00 0.36 0.36 0.40 1.12

    November 2014 0.00 0.00 0.00 0.00 0.24 0.24 0.24 0.72

    December 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    January 2015 0.13 0.12 0.10 0.35 0.00 0.00 0.00 0.00

    February 2015 0.14 0.11 0.19 0.44 0.00 0.00 0.00 0.00

    March 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    April 2015 0.00 0.00 0.00 0.00 0.00 0.24 0.24 0.48

    May 2015 0.00 0.00 0.00 0.00 0.24 0.24 0.26 0.74

    June 2015 0.00 0.00 0.00 0.00 0.24 0.24 0.24 0.72

    Total 0.98 0.51 0.54 2.03 1.80 2.04 2.14 5.98 *

    * Out of 5.98 Water Utilization, 4.04 MCM for Irrigation use & 1.94 for Industrial use.

    (Figures in MCM)

    Name of Project Jalgaon Project

    (Figures in MCM)

    Name of river / tributary

    C.E.,Wainganga Basin,W.R.D., Seoni

    Reporting Officer

    22

  • AWA - 3

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15(As measured at canal head)

    : Bichhiya Tank : Dhuandhar Tank

    Category : Medium : Medium

    : Kolar Nalla/Banjar : Dhundhar Nalla

    : : E.E.,W.R.Dn., Mandla

    C.E.,Wainganga Basin,W.R.D. , Seoni

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 0.00 0.29 0.00 0.29 0.00 0.00 0.00 0.00

    August 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    September 2014 0.51 0.52 0.53 1.56 0.54 0.55 0.55 1.64

    October 2014 1.05 0.80 0.65 2.50 0.79 0.03 0.04 0.86

    November 2014 1.03 0.95 0.30 2.28 0.05 0.04 0.05 0.14

    December 2014 0.33 0.32 0.33 0.98 0.30 0.31 0.09 0.70

    January 2015 0.00 0.00 0.11 0.11 0.24 0.24 0.00 0.48

    February 2015 1.01 0.52 0.49 2.02 0.00 0.00 0.02 0.02

    March 2015 0.27 0.31 0.21 0.79 0.02 0.02 0.02 0.06

    April 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    May 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    June 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Total 4.20 3.71 2.62 10.53 1.94 1.19 0.77 3.90

    C.E.,Wainganga Basin,W.R.D , Seoni

    (Figures in MCM)

    Reporting Officer E.E.,W.R.Dn., Mandla

    Name of river / tributary

    Name of Project

    (Figures in MCM)

    23

  • AWA - 4

    Category CCA (Ha) Total

    Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    Major 157000 14220 - - - - - - --

    14220

    24790 4750 26650 1322069410

    2 Bargi Diversion Project Major 44315 3167 - - - - - - - - 5162

    3263 553318

    3 Matiyari Project Major 10120 5648 - - - - - - - - 3806

    8096 8096

    4 Jalgaon Tank Medium 546 210 20

    538 - - - - - - - - 538

    5 Banjar Project Medium 2567 486 502

    2024 - - - - - - - - 2024

    6 Bichhiya Tank Medium 2797 400 606

    1992 - - - - - - - - 1992

    7 Dhuandhar Tank Medium 1410 500 800

    1191 - - - - - - - - 1191

    Bargi (Rani Avanti Bai

    Lodhi Sagar )

    AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

    S.No.

    ProjectCropwise actual / planned irrigated area during Kharif season (Ha)

    1

    24

  • AWA - 4

    Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perennial Pulses Vegetables Fodder & Total Hot

    (HYV) (ORD) & others Rabi others Weather

    1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

    Major - 38834 33883 13230 - - 8871 94818 - - - - 5004

    53300 3500 67500 9710 134010 12600 4090 1570 1570 19830

    2 Bargi Diversion Project Major 19144 12606 6173 3910 - - - 41833 - - - -

    2990 274 544 109 162 4079

    3 Matiyari Project Major 6520 6520

    5566 5566

    4 Jalgaon Tank Medium

    5 Banjar Project Medium - -

    405 405

    6 Bichhiya Tank Medium 1265 - 1265

    356 356

    7 Dhuandhar Tank Medium 1100 1100

    202 202

    - - - - -

    -- -

    - -

    - - -

    - - - - --

    -

    -

    - -

    -

    - 136 -

    - -

    -

    - -

    -

    -

    -

    - -

    - -

    -

    - - -

    - -

    -

    Bargi (Rani Avanti Bai

    Lodhi Sagar )

    AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

    S.No.

    Project Category

    Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. )

    1

    - -

    -

    - 136 - - -

    - -

    25

  • AWA - 5

    (i) MINOR SURFACE GRAVITY SCHEMES

    Kharif RabiHot

    weather

    Peren

    nial Total Kharif Rabi Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    (A)MINOR SURFACE GRAVITY SCHEMES UNDER MADHYA PRADESH STATE.

    1 BARGI

    ( i ) W.R.Dn. Anuppur 5 1598 778 21 622 0.00 - 643 0.08 1.87 1.95

    ( ii ) Banjar River Project Dn., Baihar 39 15202 10101 4322 1398 0.00 - 5720 25.42 8.22 33.64

    (iii ) W.R.Dn.No.1, Seoni 18 4219 3741 0.00 3280 0.00 - 3280 0.00 15.75 15.75

    ( iv ) W.R.Dn., Dindori 64 14731 7902 0.00 8827 0.00 - 8827 0.00 49.50 49.50

    ( v ) W.R.Dn. Mandla 24 5110 4280 4433 1900 0.00 - 6333 4.90 21.45 26.35

    Sub Total(A) 150 40860 26802 8776 16027 0.00 - 24803 30.40 96.79 127.19

    (B)MINOR SURFACE GRAVITY SCHEMES UNDER CHATTISGARH STATE

    ( i ) W.R.Dn., Chhuikhadan 4 768 331 55.00 0.00 0.00 - 55 0.22 0.00 0.22

    ( ii ) W.R.Dn., Kawardha 6 1618 - 271.00 0.00 0.00 - 271 1.91 0.00 1.91

    Sub Total(B) 10 2386 331 326 0.00 0.00 - 326 2.13 0.00 2.13

    194 43246 27133 9102 16027 0.00 - 25129 32.53 96.79 129.32

    Actual Area Irrigated (Ha) Water Utilization (MCM)

    (b) MINOR PROJECTS

    A.II. UPSTREAM UTILIZATION

    Sub Total (A+B)

    S.No. Cardinal Site Water Resources DivisionNo of

    Schmes

    CCA

    (Ha)

    Planned

    annual

    Irrigation

    (Ha)

    26

  • AWA - 5

    (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

    Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    1 E.E, W.R.Dn., Mandla 3 824 860 - - - - - 1825 - - 0.28 - 0.28 *

    2 E.E, W.R.Dn., No. 1., Seoni. 3 335 229 - - - - - - - - - - -

    3 E.E, Banjar River Project Dn., - - - - - - - - - - - - - -

    Baihar, Distt. Balaghat.

    4 Schemes of PHED & Local

    administration

    4 - - - - - - - 8985 - - 0.71 - 0.71

    - 5 Private Pumping Scheme under

    Agriculture Department of

    Mandla, Dindori & Balaghat

    Reported by NVDA.

    9925 - - - - - - - - - 598.85 - - 598.85 *

    Sub Total 9935 1159 1089 0.00 0.00 0.00 0.00 0.00 10810 0.00 598.85 0.99 0.00 599.84

    TOTAL 10129 44405 28222 9102 16027 0.00 0.00 0.00 10810 0.00 728.17 0.99 0.00 729.16

    Sr No Water Resources DivisionNo of

    SchemesC C A

    (Ha)

    (b) MINOR PROJECTS

    * Data not received , last year data is repeated.

    A.II. UPSTREAM UTILIZATION

    Actual area irrigated (Ha.) No. of pumping hours Utilization (MCM)Planned

    annual

    Irrigation (Ha.)

    27

  • AWA - 6

    Gross

    Storage

    Dead

    Storage

    Live

    Storage C.C.A.

    Live storage as

    on 1.7.2014

    Live storage

    as on 1.7.2015

    Change in

    Live Storage

    (Col. 10-9)

    (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM)

    1 2 3 4 5 6 7 8 9 10 11

    MAJOR PROJECTS

    1 E.E, RABLS, Jabalpur Rani Avanti Bai

    Lodhi Sagar

    Narmada 3920.00 740.00 3180.00 157000 427.50 657.75 230.25

    2 E.E, W.R.Dn., Mandla Matiyari Matiyari 56.80 5.68 51.12 10120 20.98 5.57 -15.41

    Sub - Total 3976.80 745.68 3231.12 167120 448.48 663.32 214.84

    (A) MEDIUM PROJECTS UNDER MADHYA PRADESH STATE.

    1 E.E, Banjar River Project

    Dn., Baihar

    Jalgaon Tank Banjar 2.34 0.17 2.17 546 0.86 0.41 -0.09

    2 E.E, W.R.Dn., Mandla Bichhiya tank Kolar nalla /

    Banjar

    7.87 0.64 7.23 2797 2.92 0.72 -2.20

    Dhuandhar tank Dhuandhar 5.26 0.15 5.11 1410 0.39 0.00 -0.39

    Sub - Total (A) 15.47 0.96 14.51 4753 4.17 1.13 -2.68

    (B)MEDIUM PROJECTS UNDER CHATTISGARH STATE

    1 E.E., W.R. Dn., Kawardha Banjar Project Banjar 14.76 1.05 13.71 2567 6.23 7.04 0.81

    Sub - Total (B) 14.76 1.05 13.71 2567 6.23 7.04 0.81

    Sub Total (A+B) 30.23 2.01 28.22 7320 10.40 8.17 -1.87

    4007.03 747.69 3259.34 174440 458.88 671.49 212.97

    CARRYOVER LIVE STORAGE & CHANGE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

    Total ( Major & Medium Project )

    S.No. Reporting Officer Name of ProjectName of river /

    tributary

    28

  • ZONE - II

    RABLS (BARGI) PROJECT TO BARMANGHAT

  • 23 o

    22 o

    23 o

    22 o

    DAMOH

    CHHINDAWARA

    NARSINGPUR

    79 o 78 o

    79 o 78 o

    MAP-3

    WATER RESOURCES

    DIVISION No-1, SEONI

    WATER RESOURCES

    DIVISION, NARSINGPUR

    WATER RESOURCES

    DIVISION, JABALPUR

    WATER RESOURCES

    DIVISION, DAMOH

    80 o

    80 o 81 o

    NARMADA CONTROL AUTHORITY

    NARMADA RIVER BASIN

    MAP SHOWING LOCATION OF EXISTING AND

    ON GOING MAJOR & MEDIUM PROJECTS AND

    IRRIGATION DIVISION-WISE JURISDICTION FOR

    MINOR IRRIGATION SCHEMES-

    ZONE-II

    WATER RESOURCES

    DIVISION, KATNI

    LEGEND

    BASIN BOUNDARY

    ZONE BOUNDARY

    RIVERS

    DISTRICT HEAD QUARTERS

    IMPORTANT TOWNS

    DAM SITE & SUBMERGENCE

    BARGI

    BARMANGHAT

    ZONE-II (BARGI TO BARMANGHAT)

    DISTANCE FROM SOURCE : 526 Km

    CATCHMENT AREA : 26453 Sq Km

    BOHRIBUND

    MADAI

    TANK BARNOO

    TANK PARIAT

    TANK

    MEHGON TOLA

    TANK

    29

  • Sl No Description Unit

    I Observed flow MCM 5477.54 8809.83

    II Upstream Utilizations

    II a. Major & Medium Projects MCM 669.70 62.20 731.90

    II b. Minor Projects MCM 729.16 637.03 1366.19

    II c. Total MCM 1398.86 699.23 2098.09

    III Change (increase`+' / decrease`-') in Live Storage MCM 212.97 -36.99 175.98

    IV Carryover storage (Live Storage as on 01.07.2014) MCM 458.88 39.70 498.58

    V Utilizable flow (I + IIc + III + IV ) MCM 7548.25 11582.48

    MAF 6.12 9.39

    ZONE 2 - NARMADA UP TO BURMANGHAT

    SUMMARY

    Narmada upto

    Barmanghat

    Bargi to

    BarmanghatUpto Bargi

    30

  • Unit Irrigation Domestic Industrial Total

    1 MCM 42.26 19.94 - 62.20Major & Medium Projects

    73.98 - 637.03

    BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

    2Minor Projects Including

    Lift & Pumping SchemesMCM 563.05

    S.No. Category of Projects Water Utilization

    31

  • AWA - 1

    : BARMANGHAT

    Category : GDS

    : Narmada

    : E.E. Narmada Division C.W.C. Bhopal

    Month Year 1-10 11-20 21-30/31 Total

    July 2014 86.56 86.57 476.19 649.32

    August 2014 1349.85 736.86 293.49 2380.20

    September 2014 896.94 836.75 258.80 1992.49

    October 2014 156.90 235.06 239.16 631.12

    November 2014 175.48 139.10 146.19 460.77

    December 2014 138.67 134.52 148.18 421.37

    January 2015 139.97 121.65 119.49 381.11

    February 2015 132.88 142.04 125.80 400.72

    March 2015 150.24 169.95 177.47 497.66

    April 2015 146.45 145.84 104.88 397.17

    May 2015 127.34 140.66 122.86 390.86

    June 2015 100.94 56.28 49.82 207.04

    Total 3,602.22 2,945.28 2,262.33 8,809.83

    (Figures in MCM)

    A.I. OBSERVED FLOW

    Name of Gauge site

    Name of river / tributary

    Reporting Officer

    32

  • AWA - 2

    Kharif Rabi Hotweather Total

    (Ha.) (Ha.) (Ha.) (Ha.) (Ha.)

    1 Mehgaon Tola Tank E.E, Hiran W.R.Dn., Jabalpur 1680 35 1790 - 1825 10.00

    2 Barnoo Tank E.E, Hiran W.R.Dn., Jabalpur 2125 787 1450 - 2237 6.31

    3 Madai Tank E.E, Hiran W.R.Dn., Jabalpur 2330 340 1295 - 1635 5.73

    4 Bohribund Tank E.E.,W.R.Dn. Katni 6495 3000 1450 - 4450 20.22

    5 Pariat TankCommissioner. Municipal

    Corporation. Jabalpur- - - - - 19.94

    Total ( Medium Project) 12630 4162 5985 - 10147 62.20

    (a) MAJOR & MEDIUM PROJECTS

    (MCM)

    Actual Irrigation

    A.II. UPSTREAM UTILIZATIONS

    Planned annual

    Irrigation

    Actual Water

    Utilization including

    domestic & industrial Name of Project Reporting OfficerS.No.

    33

  • AWA - 3

    : : Pariat Tank

    Category : Medium : Medium

    : Bidri Nalla/Gour :

    : :

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 0.00 0.00 0.00 0.00 1.03

    August 2014 0.00 0.00 0.00 0.00 1.03

    September 2014 0.00 0.00 0.00 0.00 1.01

    October 2014 0.00 0.00 0.00 0.00 1.96

    November 2014 0.17 0.15 0.62 0.94 2.74

    December 2014 1.03 3.63 0.67 5.33 2.50

    January 2015 1.11 0.00 0.00 1.11 1.53

    February 2015 0.00 0.00 2.62 2.62 2.09

    March 2015 0.00 0.00 0.00 0.00 1.25

    April 2015 0.00 0.00 0.00 0.00 1.14

    May 2015 0.00 0.00 0.00 0.00 1.49

    June 2015 0.00 0.00 0.00 0.00 2.17

    Total 2.31 3.78 3.91 10.00 19.94 *

    .

    * Data not received on Ten Daily Basis.

    C.E.,,Wainganga Basin, WRD, Seoni..

    (Figures in MCM) (Figures in MCM)

    E.E.,Hiran W.R.Dn. Jabalpur

    Mehgaon Tola Tank

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15

    (As measured at canal head)

    Pariat Name of river / tributary

    Name of Project

    Reporting Officer Commissioner. Municipal Corporation. Jabalpur

    34

  • AWA - 3

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15

    (As measured at canal head)

    : : Bohribund Tank

    Category : Medium : Medium

    : Barnoo Nalla : Bhutia Nalla/Hiran

    : :

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 0.00 0.00 0.00 0.00 0.25 0.38 0.22 0.00

    August 2014 0.00 0.00 0.78 0.78 0.00 0.00 0.00 0.00

    September 2014 0.21 0.22 0.84 1.27 1.91 2.07 0.97 4.95

    October 2014 1.00 0.20 0.00 1.20 2.88 2.00 0.38 5.26

    November 2014 0.02 0.09 0.53 0.64 1.05 1.60 1.43 4.08

    December 2014 0.62 0.11 0.28 1.01 1.13 1.09 1.01 3.23

    January 2015 0.00 0.00 0.14 0.14 0.00 0.00 0.00 0.00

    February 2015 0.23 0.51 0.53 1.27 0.13 0.17 0.22 0.52

    March 2015 0.00 0.00 0.00 0.00 0.23 0.33 0.40 0.96

    April 2015 0.00 0.00 0.00 0.00 0.12 0.14 0.11 0.37

    May 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    June 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Total 2.08 1.13 3.10 6.31 7.70 7.78 4.74 20.22

    E.E.,Hiran W.R.Dn. Jabalpur

    Barnoo TankName of Project

    Reporting Officer

    C.E.,Wain Ganga Basin.WRD, SeoniC.E.,,Wainganga Basin, WRD, Seoni..

    (Figures in MCM) (Figures in MCM)

    Name of river / tributary

    E.E.,W.R.Dn. Katni

    35

  • AWA - 3

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15

    (As measured at canal head)

    : Madai Tank

    Category : Medium

    Name of river / tributary : Madai Nalla

    Reporting Officer : E.E.,Hiran W.R.Dn. Jabalpur

    C.E.,Wainganga Basin,W.R.D , Seoni

    (Figures in MCM)

    Month Year 1-10 11-20 21-30/31 Total

    July 2014 0.00 0.00 0.00 0.00

    August 2014 0.00 0.00 0.77 0.77

    September 2014 0.00 0.20 0.64 0.84

    October 2014 0.66 0.15 0.11 0.92

    November 2014 0.11 0.13 0.81 1.05

    December 2014 0.46 0.08 0.17 0.71

    January 2015 0.02 0.05 0.10 0.17

    February 2015 0.32 0.44 0.51 1.27

    March 2015 0.00 0.00 0.00 0.00

    April 2015 0.00 0.00 0.00 0.00

    May 2015 0.00 0.00 0.00 0.00

    June 2015 0.00 0.00 0.00 0.00

    Total 1.57 1.05 3.11 5.73

    Name of Project

    36

  • AWA - 4

    Category CCA (Ha) Total

    Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    1 Mehgaontola Tank Medium 2094 35 - - - - - - - - 35

    769 769

    2 Bohribund tank Medium 5423 3000 3000

    2428 - - - - - - - - 2428

    3 Barnoo Tank Medium 2030 787 787

    1532 - - - - - - - - 1532

    4 Madai Tank Medium 2564 340 340

    1258 - - - - - - - - 1258

    AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

    Cropwise actual / planned irrigated area during Kharif season (Ha)S.No.

    Project

    37

  • AWA - 4

    Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perennial Pulses Vegetables Fodder & Total Hot

    (HYV) (ORD) & others Rabi others Weather

    1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

    1 Mehgaontola Tank Medium 1790 1790 - - - - -

    911 911

    2 Bohribund tank Medium 1450 - - - - - - 1450 - - - - -

    4047 4047

    3 Barnoo Tank Medium 1295 - - - - - - 1295 - - - - -

    - 607 607

    4 Madai Tank Medium - 4705 - - - - - 4705 - - - -

    1073 1073

    AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

    S.No.

    Project Category

    Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. )

    38

  • AWA - 5

    (i) MINOR SURFACE GRAVITY SCHEMES

    Kharif RabiHot

    weather

    Peren

    nialTotal Kharif Rabi Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    1 BARMANGHAT

    ( i ) E.E, Hiran W.R.Dn., Jabalpur 80 9877 7434 1047 7487 - - 8534 3.19 16.91 20.10

    ( ii ) E.E, W.R.Dn., Katni 35 8445 5917 1514 2649 - - 4163 6.51 14.83 21.34

    Sub TotaL 115 18322 13351 2561 10136 - - 12697 9.70 31.74 41.44

    Cardinal SiteS.No.

    A.II. UPSTREAM UTILIZATION

    Actual Area Irrigated Water Utilization (MCM)

    (b) MINOR PROJECTS

    Planned

    annual

    Irrigation

    (Ha)

    CCANo of

    SchmesWater Resources Division

    39

  • AWA - 5

    (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

    Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    1 E.E, Hiran W.R.Dn., Katni 1 1282 1195 - - - - - - - - - - -

    2 E.E, Hiran W.R.Dn., Jabalpur 7 409 409 - - - - - - - - - - -

    4 Schemes of PHED & Local

    administration except Pariat

    Tank

    7 - - - - - - - - - - 71.38 - 71.38

    5 Divisional Railway Manager,

    (Works), Jabalpur 1 0 0 - - - - - 4072 - - 2.60 - 2.60

    6 Private Pumping Scheme under

    Agriculture Department of

    Jabalpur, Katni, Seoni &

    Narsingpur Distt. reported by

    NVDA. .

    7066 - - - - - - - - - 521.61 - - 521.61

    Sub Total 7082 1691 1604 0.00 0.00 0.00 - - 4072 - 521.61 73.98 - 595.59

    TOTAL 7197 20013 14955 2561 10136 0.00 - - 4072 - 563.05 73.98 - 637.03

    (b) MINOR PROJECTS

    A.II. UPSTREAM UTILIZATION

    No of

    SchemesActual area irrigated (Ha.) No. of pumping hours Utilization (MCM)

    Sr NoC C A

    (Ha)

    * Data are not received , last year data is repeated.

    Water Resources Division

    Planned

    annual

    Irrigation

    40

  • AWA - 6

    S.No. Reporting Officer Name of ProjectName of river /

    tributary

    Gross

    Storage

    Dead

    Storage

    Live

    Storage C.C.A.

    Live

    storage as

    on 1.7.2014

    Live

    storage as

    on 1.7.2015

    Change in

    live storage

    (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM)

    1 2 3 4 5 6 7 8 9 10 11

    MEDIUM PROJECTS

    1 E.E, Hiran W.R.Dn., Jabalpur Mehgaon Tola Tank Bidri Nalla/Gour 11.62 1.11 10.51 2098 2.47 1.43 -1.04

    2 E.E, Hiran W.R.Dn., Jabalpur Barnoo Tank Barnoo Nalla 10.32 1.36 8.96 2030 4.09 0.68 -3.41

    3 E.E, Hiran W.R.Dn., Jabalpur Madai Tank Madia Nalla 8.70 0.31 8.39 2564 2.83 0.11 -2.72

    4 E.E, W.R.Dn., Katni Bohribund Tank Bhuta Nalla/Hiran 36.93 2.46 34.47 5423 10.01 0.05 -9.96

    5Commissioner, Municipal

    Corporation, Jabalpur

    Pariat Tank Pariat Nalla20.30 1.83 18.47 - 20.30 0.44 -19.86

    87.87 7.07 80.80 12115 39.70 2.71 -36.99

    CARRYOVER LIVE STORAGE & DIFFERENCE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

    Total ( Medium Project )

    41

  • ZONE - III

    BARMANGHAT TO HOSHANGABAD

  • 23 o

    22 o

    23 o

    22 o

    DAMOH SAGAR

    VIDISHA

    RAISEN BHOPAL

    HOSHANGABAD

    BETUL

    CHHINDAWARA

    NARSINGPUR

    PACHMARHI

    79 o 78 o 77 o

    79 o 78 o 77 o

    MAP- 4

    WATER RESOURCES

    DIVISION, SAGAR

    WATER RESOURCES

    DIVISION, RAISEN

    WATER RESOURCES

    DIVISION, BETUL

    WATER RESOURCES

    DIVISION, CHHINDWARA

    BARNA

    DUKRIKHEDA

    TAWA

    SAMPNA

    NARMADA CONTROL AUTHORITY

    NARMADA RIVER BASIN

    MAP SHOWING LOCATION OF EXISTING AND

    ON GOING MAJOR & MEDIUM PROJECTS AND

    IRRIGATION DIVISION-WISE JURISDICTION FOR

    MINOR IRRIGATION SCHEMES-

    ZONE-III

    LEGEND

    BASIN BOUNDARY

    ZONE BOUNDARY

    RIVERS

    DISTRICT HEAD QUARTERS

    IMPORTANT TOWNS

    DAM SITE & SUBMERGENCE

    ZONE-III (BARMANGHAT TO HOSHANGABAD)

    DISTANCE FROM SOURCE : 676 Km

    CATCHMENT AREA : 44548 Sq Km

    BARMANGHAT

    42

  • Sl No Description Unit

    I Observed flow MCM 8809.83 12427.07

    II Upstream Utilizations

    II a. Major & Medium Projects MCM 731.90 1839.08 2570.98

    II b. Minor Projects MCM 1366.19 755.88 2122.07

    II c. Total MCM 2098.09 2594.96 4693.05

    III Change (increase`+' / decrease`-') in Live Storage MCM 175.98 322.00 497.98

    IV Carryover storage (Live Storage as on 01.07.2014) MCM 498.58 296.14 794.72

    V Utilizable flow (I + IIc + III + IV ) MCM 11582.48 18412.82MAF 9.39 14.93

    Barmanghat to

    Hoshangabad

    Narmada upto

    Hoshangabad

    ZONE 3 - NARMADA UP TO HOSHANGABAD

    SUMMARY

    Upto

    Barmanghat

    43

  • Unit Irrigation Domestic Industrial Total

    1 MCM 1829.63 - 9.45 1839.08

    BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

    Category of Projects Water Utilization

    Major & Medium Projects

    S.No.

    2 Minor Projects Including Lift

    & Pumping Schemes

    755.88MCM 755.48 0.40 -

    44

  • AWA - 1

    : HOSHANGABAD

    Category : GDS

    : Narmada

    : E.E. Narmada Division C.W.C. Bhopal

    Month Year 1-10 11-20 21-30/31 Total

    July 2014 104.46 213.26 1,061.35 1379.07

    August 2014 1,753.53 993.16 442.89 3189.58

    September 2014 1,256.64 1,416.01 447.79 3120.44

    October 2014 256.41 259.24 284.35 800.00

    November 2014 218.31 178.85 168.44 565.60

    December 2014 173.67 164.23 189.85 527.75

    January 2015 176.15 158.81 155.25 490.21

    February 2015 149.58 170.52 146.13 466.23

    March 2015 159.11 182.65 215.07 556.83

    April 2015 153.35 173.41 155.03 481.79

    May 2015 145.50 176.48 154.99 476.97

    June 2015 146.85 114.03 111.72 372.60

    Total 4,693.56 4,200.65 3,532.86 12,427.07

    (Figures in MCM)

    A.I. OBSERVED FLOW

    Name of Gauge site

    Name of river / tributary

    Reporting Officer

    45

  • AWA - 2

    Kharif Rabi Hotweather Total

    (Ha.) (Ha.) (Ha.) (Ha.) (Ha.)

    MAJOR PROJECTS

    1 Tawa Project S.E, Tawa Project Circle, 332783 - 254312 - 254312 1415.75

    Hoshangabad

    2 Barna Project E.E., Barna Left Bank Canal Dn. Bari 62000 24432 63523 - 87955 404.54

    Sub Total 394783 24432 317835 - 342267 1820.29

    MEDIUM PROJECT

    1 Dukrikheda Project E.E, W.R.Dn., Hoshangabad 2672- 2702 - 2702 4.48

    2 Sampna Tank E.E, W.R.Dn., No.II, Betul 3846 - 3660 - 3660 14.31

    Sub Total 6518 - 6362 - 6362 18.79

    Total ( Medium Project) 401301 24432 324197 - 348629 1839.08

    (a) MAJOR & MEDIUM PROJECTS

    (MCM)

    Actual Irrigation

    A.II. UPSTREAM UTILIZATIONS

    Planned annual

    Irrigation

    Actual Water Utilization

    including domestic &

    industrial useName of Project Reporting OfficerS.No.

    46

  • AWA - 3

    : : Tawa Project

    Category : Major : Major

    : Barna :

    : :

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 0.00 0.00 8.97 8.97 0.00 0.00 0.00 0.00

    August 2014 5.10 14.00 31.08 50.18 0.00 0.00 0.00 0.00

    September 2014 25.04 18.59 25.82 69.45 0.00 0.00 0.00 0.00

    October 2014 33.47 28.07 0.00 61.54 0.00 7.58 74.15 81.73

    November 2014 0.00 7.64 23.77 31.41 104.99 118.95 115.64 339.58

    December 2014 29.49 14.28 13.25 57.02 111.91 102.36 119.02 333.29

    January 2015 1.47 19.85 26.65 47.97 31.47 111.82 120.30 263.59

    February 2015 20.58 27.14 28.28 76.00 120.97 123.77 94.77 339.51

    March 2015 2.00 0.00 0.00 2.00 2.57 0.00 0.00 2.57

    April 2015 0.00 0.00 0.00 0.00 0.49 9.96 8.88 19.33

    May 2015 0.00 0.00 0.00 0.00 10.01 9.50 8.62 28.13

    June 2015 0.00 0.00 0.00 0.00 8.02 0.00 0.00 8.02

    Total 117.15 129.57 157.82 404.54 390.43 483.94 541.38 1,415.75

    *Out of total 1415.75 MCM,1406.30 MCM used for Irrign.through from LBC & RBC & 9.45 MCM for Industrial use (Ordinance factory, Itarsi).

    S.E., Tawa Project Circle Hoshangabad

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15(As measured at canal head)

    TawaName of river / tributary

    Name of Project

    Reporting Officer

    C.E.,O &M Circle, Bhopal

    Barna Project

    (Figures in MCM)

    E.E.,Barna Left Bank Dn, Bari

    S.E. Kolar Project Circle. Bhopal

    (Figures in MCM)

    47

  • AWA - 3

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15(As measured at canal head)

    : : Sampna Tank

    Category : Medium : Medium

    : Ghogra Nalla/ Sukhri : Sampna

    : : E.E., W.R.Dn. No. II Betul

    C.E. (O & M) WRD Bhopal C.E. (O & M) WRD Bhopal

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    August 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    September 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    October 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    November 2014 0.80 0.80 0.90 2.50 0.00 1.28 2.67 3.95

    December 2014 0.40 0.40 0.50 1.30 1.34 0.00 0.44 1.78

    January 2015 0.60 0.08 0.00 0.68 0.00 0.00 0.00 0.00

    February 2015 0.00 0.00 0.00 0.00 2.43 0.65 1.05 4.13

    March 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    April 2015 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    May 2015 0.00 0.00 0.00 0.00 0.00 1.51 2.45 3.96

    June 2015 0.00 0.00 0.00 0.00 0.49 0.00 0.00 0.49

    Total 1.80 1.28 1.40 4.48 4.26 3.44 6.61 14.31

    E.E. W.R. Dn. Hoshangabad

    Name of river / tributary

    Reporting Officer

    (Figures in MCM) (Figures in MCM)

    Name of Project Dukrikheda Project

    48

  • AWA - 4

    Category CCA (Ha) Total

    Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    1 Tawa Project Major 246864 - - - - - - - - - -

    74060 9308 12343 37030 12343 2469 4939 7446 159938

    2 Barna Project Major 57904 24432 - - - - - - - - 24432

    9000 9000

    3 Dukrikheda Project Medium 7625 - - - - - - - - - -

    4 Sampna Project Medium 4710 - - - - - - - - - -

    AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

    Cropwise actual / planned irrigated area during Kharif season (Ha)S.No.

    Project

    49

  • AWA - 4

    Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perenial Pulses Vegetables Fodder & Total Hot

    (HYV) (ORD) & others Rabi others Weather

    1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

    1 Tawa Project Major 242084 6683 4634 - - - 911 254312 - - - - -

    74060 61717 17280 2469 4937 4937 160463 3723 1862 1862 7447

    2 Barna Project Major - 50010 11716 - 259 - 1538 63523 - - - - -

    39000 - - - - 39000

    3 Dukrikheda Project Medium - - - - - - - 2702 - - - - -

    2672 - 2672

    4 Sampna Project Medium 3660 - - - - - - 3660 - - - - -

    - 3644 3644

    AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

    S.No.

    Project Category

    Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. )

    50

  • AWA - 5

    (i) MINOR SURFACE GRAVITY SCHEME

    Kharif RabiHot

    weather

    Peren

    nial Total Kharif Rabi Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    1 HOSHANGABAD

    ( i ) E.E, W.R.Dn., Damoh 3 2359 2340 - 2602 - - 2602 - 13.04 13.04

    ( ii ) E.E, W.R.Dn., Chhindwara 18 8142 9286 - 5601 - - 5601 - 33.61 33.61

    (iii ) S.E, Tawa, Hoshangabad. 18 5070 4648 - 4132 - - 4132 - 18.53 18.53

    (iv) E.E, W.R.Dn., Raisen 52 1492 17745 - 14985 - - 14985 4.82 83.25 88.07

    (v) E.E, W.R.Dn. No. 2, Betul. 50 17845 13642 - 13177 - - 13177 - 64.97 64.97

    Sub Total 141 34908 47661 - 40497 - - 40497 4.82 213.40 218.22

    Planned

    annual

    Irrigation

    (Ha)

    Actual Area Irrigated (Ha) Water Utilization (MCM)

    (b) MINOR PROJECTS

    A.II. UPSTREAM UTILIZATION

    S.No. Cardinal Site Water Resources DivisionNo of

    Schmes

    CCA

    (Ha)

    51

  • AWA - 5

    (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

    Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    1 E.E, W.R.Dn., Damoh - - - - - - - - - - - - - -

    2 E.E, W.R.Dn., Chhindwara 4 604 724 - - - - - - - - - - -

    3 E.E, W.R.Dn., Hoshangabad. 3 307 360 - 80 - - 699 - - 0.52 - - 0.52

    4 E.E, W.R.Dn., Raisen 4 3514 3514 - - - - - - - 0.00 - - 0.00

    5 E.E, W.R.Dn. No. 2, Betul. 8 877 748 - - - - - - - - - - -

    6 Schemes of PHED & Local

    administration

    3 - - - - - - - 2555 - - 0.40 - 0.40

    7 Private Pumping Schemes under

    Agriculture Department of

    Hoshangabad (50%) reported by

    NVDA.

    12388 - - - - - - - - - 536.74 - - 536.74 *

    Sub Total 12410 5302 5346

    -

    80

    -

    - 699 2555 - 537.26 0.40

    -

    537.66

    TOTAl 12551 41007 53007-

    40577 - - 699 2555 - 755.48 0.40-

    755.88

    * Data not received, last year data is repeated.

    (b) MINOR PROJECTS

    A.II. UPSTREAM UTILIZATION

    No of

    SchemesActual area irrigated (Ha.) No. of pumping hours Utilization (MCM)

    Sr No Water Resources DivisionC C A

    (Ha)

    Planned

    annual

    Irrigation

    52

  • AWA - 6

    Gross

    Storage

    Dead

    Storage

    Live

    Storage C.C.A.

    Live storage

    as on 1.7.2014

    Live storage

    as on 1.7.2015

    Change in

    live storage

    (Col. 10-9)

    (MCM) (MCM) (MCM) (Ha) (MCM) (MCM) (MCM)

    1 2 3 4 5 6 7 8 9 10 11

    MAJOR PROJECTS

    1 E.E., Barna Left Bank Canal

    Dn. Bari.

    Barna Project Barna 539.04 83.26 455.78 57904 148.76 100.96 -47.80

    2 S.E, Tawa Project Circle,

    Hoshangabad

    Tawa Project Tawa 2310.00 260.00 2050.00 246864 146.29 516.70 370.41

    2849.04 343.26 2505.78 304768 295.05 617.66 322.61

    MEDIUM PROJECTS

    1 E.E, W.R.Dn., Hoshangabad Dukrikheda Project Ghogra Nalla /

    Sukhri

    12.25 0.75 11.50 7625 1.09 BLSL -1.09

    2 E.E, W.R.Dn., No.II, Betul Sampna Tank Sampna 16.92 2.60 14.32 7486 0.00 0.48 0.48

    29.17 3.35 25.82 15111 1.09 0.48 -0.61

    2878.21 346.61 2531.60 319879 296.14 618.14 322.00

    CARRYOVER LIVE STORAGE & DIFFERENCE IN LIVE STORAGE FOR THE MAJOR AND MEDIUM IRRIGATION PROJECTS

    Total ( Major & Medium Project )

    Total ( Medium Project )

    Total ( Major Project )

    S.No. Reporting Officer Name of ProjectName of river /

    tributary

    53

  • ZONE - IV

    HOSHANGABAD TO INDIRA SAGAR PROJECT

  • 23 o

    22 o

    23 o

    22 o

    BHOPAL

    SEHORE

    HOSHANGABAD

    BETUL

    79 o 78 o 77 o

    79 o 78 o 77 o

    MAP-5

    WATER RESOURCES

    DIVISION, BHOPAL

    WATER RESOURCES

    DIVISION, SEHORE

    WATER RESOURCES

    DIVISION, DEWAS

    WATER RESOURCES

    DIVISION, KHANDWA

    KOLAR

    INDIRA SAGAR

    CHANDRAKESHAR

    NARMADA CONTROL AUTHORITY

    NARMADA RIVER BASIN

    MAP SHOWING LOCATION OF EXISTING AND

    ON GOING MAJOR & MEDIUM PROJECTS AND

    IRRIGATION DIVISION-WISE JURISDICTION FOR

    MINOR IRRIGATION SCHEMES-

    ZONE-IV

    LEGEND

    BASIN BOUNDARY

    ZONE BOUNDARY

    RIVERS

    DISTRICT HEAD QUARTERS

    IMPORTANT TOWNS

    DAM SITE & SUBMERGENCE

    ZONE-IV (HOSHANGABAD TO INDIRA SAGAR PROJECT)

    DISTANCE FROM SOURCE : 845 Km

    CATCHMENT AREA : 61642 Sq Km

    54

  • Sl No Description Unit

    I Observed flow MCM 12427.07 16529.71

    II Upstream Utilizations

    II a. Major & Medium Projects MCM 2570.98 827.00 3397.98

    II b. Minor Projects MCM 2122.07 565.98 2688.05

    II c. Total MCM 4693.05 1392.98 6086.03

    III Change (increase`+' / decrease`-') in Live Storage MCM 497.98 511.52 1009.50

    IV Carryover storage (Live Storage as on 01.07.2014) MCM 794.72 853.65 1648.37

    V Utilizable flow (I + IIc + III + IV ) MCM 18412.82 25273.61

    MAF 14.93 20.49

    ZONE 4 - NARMADA UP TO INDIRA SAGAR PROJECT

    SUMMARY

    Narmada

    upto ISP

    Hoshangabad

    to ISP

    Upto

    Hoshangabad

    55

  • In Narmada basinOut of Narmada

    basin

    1 3 4 5 6 7 8

    1 MCM 757.26 9.20 60.54 - 827.00

    565.9851.06

    BREAK-UP OF SECTOR WISE WATER UTILIZATION FROM MAJOR, MEDIUM PROJECTS & MINOR SCHEMES

    Water Utilization

    DomesticCategory of Projects

    Unit Irrigation Industrial Total

    2.60

    Major & Medium Projects

    -

    S.No.

    2

    2 Minor Projects Including

    Lift & Pumping Schemes

    MCM 512.32

    56

  • AWA - 1

    : INDIRA SAGAR PROJECT

    Category : Major

    : Narmada

    : General Manager, NHDC, Narmada Nagar.

    Month Year 1-10 11-20 21-30/31 Total

    July 2014 114.39 24.10 339.11 477.60

    August 2014 243.73 468.97 585.61 1298.31

    September 2014 395.46 1,872.90 1,106.19 3374.55

    October 2014 394.06 246.94 410.05 1051.05

    November 2014 624.58 377.97 562.37 1564.92

    December 2014 504.39 420.01 542.68 1467.08

    January 2015 482.89 711.94 670.64 1865.47

    Feburary 2015 540.43 444.81 376.71 1361.95

    March 2015 447.80 386.03 548.22 1382.05

    April 2015 471.06 366.34 333.58 1170.98

    May 2015 311.98 469.73 292.80 1074.51

    June 2015 142.31 135.21 163.72 441.24

    Total 4,673.08 5,924.95 5,931.68 16,529.71

    (Figures in MCM)

    A.I. OBSERVED FLOW (OUTFLOWS FROM POWER HOUSES & SPILLWAY)

    Name of Gauge site

    Name of river / tributary

    Reporting Officer

    57

  • AWA - 2

    Kharif Rabi Hotweather Total

    (Ha.) (Ha.) (Ha.) (Ha.) (Ha.)

    MAJOR PROJECTS1 Indira Sagar project CE (Canals), ISP, NVDA, Sanawad 78000 16100.00 72800

    -88900 595.31

    EE, ND Dn. 25, Narmada Nagar.

    2 Sukta (Bhagwant Sagar

    Project)Project) E.E, W.R.Dn., Khandwa 14200 - 12860 12860 56.19

    3 KolarProject E.E., Kolar Canal Dn. Nasrullaganj. 60867 - 36050 - 33500 163.57

    Sub Total 153067 7100.00 121710 - 135260 815.07

    MEDIUM PROJECT

    1 Chandrakeshar tank E.E, W.R.Dn., Dewas 6060 - 4971 - 4971 11.93

    Sub Total 6060 - 4971 - 4971 11.93

    Total ( Major & Medium Project) 159127 7100.00 126681 - 140231 827.00

    (a) MAJOR & MEDIUM PROJECTS

    (MCM)

    Actual Irrigation

    A.II. UPSTREAM UTILIZATIONS

    Planned annual

    Irrigation

    Actual Water

    Utilization including

    domestic & industrial

    use

    Name of Project Reporting OfficerS.No.

    58

  • AWA - 3

    : : Chandrakeshar tank

    Category : Major : Medium

    : Kolar :

    : :

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 1.68 1.68 1.85 5.21 0.00 0.00 0.00 0.00

    August 2014 1.68 1.68 1.68 5.04 0.00 0.00 0.00 0.00

    September 2014 1.68 1.68 1.68 5.04 0.00 0.00 0.00 0.00

    October 2014 1.68 1.68 2.07 5.43 0.00 0.00 0.96 0.96

    November 2014 16.34 15.01 10.65 42.00 3.53 2.90 2.90 9.33

    December 2014 15.30 9.21 11.64 36.15 0.32 0.05 1.27 1.64

    January 2015 7.92 8.28 22.11 38.31 0.00 0.00 0.00 0.00

    February 2015 2.91 1.68 1.24 5.83 0.00 0.00 0.00 0.00

    March 2015 1.68 1.68 1.65 5.01 0.00 0.00 0.00 0.00

    April 2015 1.66 1.68 1.68 5.02 0.00 0.00 0.00 0.00

    May 2015 1.71 1.83 2.04 5.58 0.00 0.00 0.00 0.00

    June 2015 1.75 1.67 1.53 4.95 0.00 0.00 0.00 0.00

    Total 55.99 47.76 59.82 163.57 3.85 2.95 5.13 11.93

    * Out of total releases 163.57 MCM, 103.03 MCM released for irrigation and 60.54 MCM released for domestic use.

    (Figures in MCM) (Figures in MCM)

    C.E., N/T Basin, WRD, Indore.

    E.E., Kolar Canal Dn. Nasrullaganj.

    S.E. Kolar Project Circle. Bhopal

    EE, WR Dn, DewasReporting Officer

    Kolar Project

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15

    (As measured at canal head)

    ChandrakesharName of river / tributary

    Name of Project

    59

  • AWA - 3

    WATER UTILIZATION BY MAJOR & MEDIUM IRRIGATION PROJECTS DURING THE WATER YEAR 2014-15

    (As measured at canal head)

    Name of Project : Indira Sagar Project Sukta (Bhagwant Sagar Project)

    Category : Major Major

    Name of river / tributary : Narmada Sukta

    Reporting Officer : EE., N.D. Dn., No.25, Narmada Nagar. EE, WR Dn, Khandwa

    C.E., N/T Basin, WRD, Indore.

    (Figures in MCM) (Figures in MCM)

    Month Year 1-10 11-20 21-30/31 Total 1-10 11-20 21-30/31 Total

    July 2014 0.00 0.00 0.00 0.00 0.58 0.00 0.00 0.58

    August 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    September 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    October 2014 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    November 2014 5.06 21.10 26.90 53.06 0.31 0.83 4.71 5.85

    December 2014 36.83 36.51 52.11 125.45 7.17 4.29 5.57 17.03

    January 2015 42.83 42.08 45.20 130.11 0.41 3.48 2.76 6.65

    February 2015 40.26 39.72 31.24 111.22 2.51 3.91 3.51 9.93

    March 2015 32.16 29.81 27.25 89.22 4.58 1.13 0.56 6.27

    April 2015 0.00 0.00 0.00 0.00 2.18 0.00 1.68 3.86

    May 2015 0.00 11.54 25.53 37.07 1.25 1.84 0.57 3.66

    June 2015 34.21 14.97 0.00 49.18 2.03 0.33 0.00 2.36

    Total 191.35 195.73 208.23 595.31 21.02 15.81 19.36 56.19 *

    * Out of total 56.19 MCM, 9.20 MCM for domestic use & 46.99 MCM for Irrigation use.

    60

  • AWA - 4

    Category CCA (Ha) Total

    Paddy Cotton Ground Nut Jowar/Maize Pulses Vegetables Fodder Soyabeen Others Kharif

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    1 Kolar Project Major 45087 - - - - - - - - - -

    2254 9018 451 902 11272 23897

    2 Indira Sagar Project Major 123000 - - - - - - - - - 16100

    3Sukta (Bhagwant Sagar

    Project)Major 17643

    - - - - - - - - - -

    3000 1000 4000 8000

    4 Chandrakeshar Project Medium 7605 - - - - - - - - - -

    1212 1212

    AREA IRRIGATED THROUGH MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

    Cropwise actual / planned irrigated area during Kharif season (Ha)S.No.

    Project

    61

  • AWA - 4

    Wheat Wheat Gram Pulses Vegetables Peas Linseed Total Perennial Pulses Vegetables Fodder & Total Hot

    (HYV) (ORD) & others Rabi others Weather

    1 2 3 15 16 17 18 19 20 21 22 23 24 25 26 27

    1 Kolar Project Major - - - - - - - 36050 - - - - -

    - 27953 9017 36970

    2 Indira Sagar Project Major - - - - - - - 53000 - - - - -

    4069 8790 1 - - - - 12860 - - - - -

    4640 1160 5800 400 400

    Medium 3169 1319 - - - - 483 4971 - - - -

    3636 1212 - 4848

    S.No.

    Project Category

    Chandrakeshar

    Project

    Sukta (Bhagwant

    Sagar Project)3 Major

    4

    AREA IRRIGATED BY NARMADA WATER BY MAJOR AND MEDIUM PROJECTS FOR THE WATER YEAR 2014-15

    Cropwise actual / planned irrigated area during Rabi & Hot Weather ( Ha. )

    62

  • AWA - 5

    (i) MINOR SURFACE GRAVITY SCHEMES

    Kharif RabiHot

    weather

    Peren

    nial Total Kharif Rabi Total

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    1 INDIRA SAGAR PROJECT

    ( i ) WR Dn Sehore 100 11574 11633 - 11223 - - 11223 - 33.67 33.67

    Sub Total 100 11574 11633 - 11223 - - 11223 - 33.67 33.67

    Actual Area Irrigated (Ha) Water Utilization (MCM)

    (b) MINOR PROJECTS

    A.II. UPSTREAM UTILIZATION

    S.No. Cardinal Site Water Resources DivisionNo of

    Schmes

    CCA

    (Ha)

    Planned

    annual

    Irrigation

    (Ha)

    63

  • AWA - 5

    (ii) LIFT SCHEMES (Irrigation & Water Supply Schemes)

    Kharif Rabi Hotweather Perennial Irrigation Domestic Industrial Irrigation Domestic Industrial Total

    1 2 3 4 5 6 7 8 8 10 11 12 13 14 15 16

    1 W.R. Dn., Sehore 3 589 589 - - - - - - - 0.00 - - 0.00

    2 N.D.Dn., 25, Punasa 1 - - - 13100 - - - - - 110.02 - - 110.02

    3 Schemes of PHED & Local

    Administration

    1 - - - - - - - 8760 - - 50.80 - 50.80

    4 Pumping Schemes of Local

    Administration & Security Paper

    Mill, Hoshangabad.

    3 - - - - - - - 7165 - - 0.26 2.60 2.86

    5 Private Pumping Schemes under

    Agriculture Department of

    Hoshangabad (50%), Sehore,

    Raisen & Betul reported by NVDA.

    6905 - - - - - - - - - 368.63 - - 368.63 *

    Sub Total 6913 589 589 - 13100 - - - 7165 - 478.65 51.06 2.60 532.31

    TOTAL 6989 9211 9270 - 24323 - - - 7165 - 512.32 51.06 2.60 565.98

    (b) MINOR PROJECTS

    A.II. UPSTREAM UTILIZATION

    No of

    SchemesActual area irrigated (Ha.) No. of pumping hours Utilization (MCM)

    Sr No Water Resources Division

    * Data not received , last year data is re