NAPRANUM ABORIGINAL SHIRE COUNCIL OPERATIONAL PLAN 2020-21 JULY 2020 . www.napranum.qld.gov.au
NAPRANUM ABORIGINAL SHIRE COUNCIL OPERATIONAL PLAN
2020-21
JULY 2020
. www.napranum.qld.gov.au
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 1 | P a g e
Contents 1. ACHIEVING NASC GOALS ......................................................................................................................................................................................... 2
3.1 STRATEGIC KEY RESULTS AREA ......................................................................................................................................................................... 2
3.1.1 STRATEGIC KEY RESULT AREA 1: Financial Management ........................................................................................................................................ 2
3.1.2 STRATEGIC KEY RESULT AREA 2: Strong Cultural Wellbeing ................................................................................................................................... 2
3.1.3 STRATEGIC KEY RESULT AREA 3: Healthy and Safe Community with strong relationships .................................................................................... 2
3.1.4 STRAEGIC KEY RESULT AREA 4: Skilled and Educated Community ......................................................................................................................... 2
3.1.5 STRATEGIC KEY RESULT AREA 5: Good Governance ............................................................................................................................................... 2
3.1.6 STRATEGIC KEY RESULT AREA 6: Economically progressive and prosperous Community ...................................................................................... 2
2. OPERATIONAL PLAN ACTIVITIES .............................................................................................................................................................................. 3
2.1 OFFICE OF THE CHIEF EXECUTIVE OFFICER ............................................................................................................................................................................ 3
2.2 FINANCE SERVICE DIVISION ................................................................................................................................................................................................... 8
2.3 CORPORATE AND COMMUNITY SERVICE DIVISION ............................................................................................................................................................. 14
2.4 OPERATIONS SERVICE DIVISION ........................................................................................................................................................................................... 26
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 2 | P a g e
1. ACHIEVING NASC GOALS
3.1 STRATEGIC KEY RESULTS AREA
3.1.1 STRATEGIC KEY RESULT AREA 1: Financial Management
3.1.2 STRATEGIC KEY RESULT AREA 2: Strong Cultural Wellbeing
3.1.3 STRATEGIC KEY RESULT AREA 3: Healthy and Safe Community with strong relationships
3.1.4 STRAEGIC KEY RESULT AREA 4: Skilled and Educated Community
3.1.5 STRATEGIC KEY RESULT AREA 5: Good Governance
3.1.6 STRATEGIC KEY RESULT AREA 6: Economically progressive and prosperous Community
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 3 | P a g e
2. OPERATIONAL PLAN ACTIVITIES
2.1 OFFICE OF THE CHIEF EXECUTIVE OFFICER
Key Result Area
Focus Operational Activities
Success Measure Lead Division
Projects Completion Date
Budget PROGRESS
1 4 5 6 Annual Budget That a comprehensive budget is prepared and reviewed for the organisation including separate budgets for the BAS operation, Aged Care and Child Care operations and for funded projects including capital works to enable Council to adopt its 2020/2021 Budget Budget 2021/22
Budget is developed and reviewed for organisation, division and projects in compliance with statutory requirements
CEO CEO
31 July 2020
30 June 2021
20/21 budget allocation 20/21 Budget allocation
Sept 20 - Completed
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 4 | P a g e
1 5 6 Financial Reporting
A financial reporting regime is established that provides Council and Managers with management reports on at least a monthly basis
Reporting system is established to allow Council and Managers to assess the financial performance of the functions under their control, and allow forecasting to be made of potential financial performance for the remainder of the current financial year
CEO 31 March 2021
20/21 budget allocation
SEPT 2020 – INVESTIGATION STILL TAKING PLACE – MAGIC PEFORMANCE BEING DEVELOPED
1 5 6 Audit Ensure that all steps employed will ensure that the Council prepares its final statutory financial reports ready for audit on time in accordance with the agreed audit plan
Audit plan is followed and that the result of the audit is an unqualified/unmodified report result
CEO As per agreed Audit Plan
20/21 budget allocation
SEPT 2020 - Audit in Progress and on track to be signed off by 12/10/2020.
5 1 Statutory Compliance
Assessment undertaken by the external auditor
The organisation meets its statutory compliance obligations in terms of compliance with the Local Government Act and Regulation
CEO As per agreed Audit Plan
20/21 budget allocation
SEPT 2020 – Audit in Progress – Internal Review undertaken and any documents requiring updating have been identified
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 5 | P a g e
1 5 Asset Registers Oversee a
comprehensive review of the assets will be undertaken including a physical inspection of each asset and an assessment of its condition
Review completed and will be ongoing
CEO 30 June 2021 and ongoing
20/21 budget allocation
SEPT 2020 – No action taken todate.
5 1 Policies Review of all policies is undertaken on a continuous basis throughout the period with a view to completing a review of all existing policies
Balcarra Policies to be adopted by Council Expired Mandatory Policies to be Updated HR Policies to be reviewed and Updated to also include Human Rights Act provisions
CEO 30 June 2021 and ongoing
20/21 budget allocation
SEPT 2020 – Balcarra Policies have been adopted Expired Mandatory Policies have been updated
HR policies still to be reviewed and updated
3 4 5 6 Local Laws A suite of local laws that are relevant are developed to Council’s requirements to enable effective management of its community and responsibilities
Suite to Local Laws to be implemented
CEO 30 June 2021 20/21 budget allocation
SEPT 2020 – Local Laws Officer has been working toward implementation
1 3 4 5 Capital and infrastructure projects
All projects as approved by Council is completed on time and within budget
Approved works each year is completed on time and within approved budgets
CEO 30 June 2021 20/21 budget allocation
SEPT 2020 WIP
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 6 | P a g e
2 3 4 6 Napranum Master Plan
The master plan for the future development of Napranum is developed with extensive community involvement
Continually review and update of the Master Plan
CEO Plan developed ongoing review
31 July 2021
20/21 budget allocation
SEPT 2020 – Council has adopted the updated Master Plan
2 3 4 5 6 Indigenous Land Use Agreement (ILUA)
Negotiate with the Traditional Owners to establish an ILUA for the area of the Napranum township
ILUA completed and implemented
CEO Ongoing 20/21 budget allocation
SEPT 2020 – CEO has investigated where this is at and getting legal advice.
5 6 Statutory Council Meetings
Facilitate all of Council's Statutory
Meetings are conducted and meet statutory compliance
CEO Ongoing 20/21 budget allocation
SEPT 2020 - COMPLIANT
Meetings and provide accurate and timely minutes of meetings
SEPT 2020 – COMPLIANT
Council training is completed
CEO 30 June 2021 20/21 budget allocation
SEPT 2020 – Training to be undertaken on 1 Oct
5 6 Information Technology
Oversight of Purchase and installation of a new accounting and document management system for Council
Oversee the migration of all data to the new system in a timely and accurate manner
CEO 30 June 2021 20/21 budget allocation
SEPT 2020 – Currently reviewing products in the marketplace.
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 7 | P a g e
5 6 Risk Management System
Undertake a review of Risk Management Framework
Review completed and ongoing as per regulatory and operational requirement
CEO 31 March 2021 20/21 budget allocation
SEPT 2020 – Yet to be undertaken
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 8 | P a g e
2.2 FINANCE SERVICE DIVISION
Key Result Area
Focus Operational Activities
Success Measure Lead Division
Project Completion Date
Budget PROGRESS
1 5 6 Financial Sustainability & Planning
Strengthen Council’s long- term financial planning and quantify the long- term requirements for services, service levels and associated costs
Preparation of 2019/20 Financial Statements
Finance 30 August 2020 to align with audit requirements
Existing staff cost
Develop stronger link between Asset Management Plans and Councils budget development
Conduct Council wide budget review 2021/22 original budget estimates and projections
Finance 30 June 2021 Existing staff cost
1 4 5 6 Budget Development
Lead the inclusive development and quarterly review of a comprehensive budget for the Council including separate detailed
Budget is developed for the organisation, division and projects in compliance with statutory requirements that is endorsed by Council
Finance Existing staff cost
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 9 | P a g e
budgets for the
BAS works, Aged Care and Child Care and other significant projects including capital works
Fees and Charges Schedule completed
Statuary policies completed
1 5 6 Budget Review Lead the inclusive Review is inclusive and Finance Quarterly, due Existing staff quarterly budget completed accurately on or before the Cost review consistent and timely manner Council meeting with council consistent with in October, budget organisation policy and January, April development and procedure and June (June review policy and to adopt the procedure next annual budget)
1 5 6 Reporting Provide a suite of financial reports to both Council and Managers in a form that is readily understood by all stakeholders and allows management to assess the financial performance of the functions under their control
Reports developed, relevant and understood
Finance Monthly Existing staff cost
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 10 | P a g e
1 5 6 Information Technology
Purchase and installation of a new information and accounting and document management system for Council
Purchase and installation completed
Finance 30 June 2021 $220,000
Manage the Migration of data is Finance 30 June 2021 Existing staff Cost
migration of all completed data to the new system in a timely and accurate manner ensuring that there are no major problems or issues arising from the installation
Manage and Process and procedural Finance 30 June 2021 Existing staff Cost
address any changes are addressed in consequent timely manner
process and Current
procedural
changes that may
be necessary as a
result of the
installation of the
new system
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 11 | P a g e
Manage all
necessary training of finance and other staff that may be required in order for the installation to be successful
Training of identified staff is completed To commence
Finance 30 June 2021 Existing staff Cost
1 5 6 Debt Recovery To proactively manage the financial debtors of Council through lawful, ethical and culturally sensitive approaches to the recoupment of Council debts.
Allocation of unapplied credits to debtor accounts or transfer to Public Trustee for funds not identifiable and all avenues of identification exhausted.
Finance 30 June 2021 Existing staff costs and associated legal fees budgeted within Corporate and Community Services
Identification and write- off of “statute barred” debts. I.e. greater than 6 years old
Finance
Assignment of Commercial debts to external debt recovery agency.
Finance
Assignment of Housing debts directed to debtors to establish Payment Arrangements
Finance
1 3 4 5 6 Increase revenue to cover all planned activities
Actively lobby, apply for and obtain State and Government funding and grants
Increase in grants received from government and NGO
Finance Ongoing Existing staff Cost
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 12 | P a g e
Increase in State,
Australian Government and NGO funding and grants received
Finance Ongoing
1 5 6 Audit Undertake all steps necessary to ensure that the Council prepares its final statutory financial reports ready for audit on time in accordance with the agreed audit plan
Timelines are met consistent with agreed audit plan and that the result of the audit is an unqualified/unmodified report result
Finance As per signed Audit Plan
$120,000 Includes internal fees and audit committee representation
1 5 6 Asset Registers Lead a comprehensive review of the assets will be undertaken including a physical inspection of each asset and an assessment of its condition
Review completed Finance 30 June 2021 Existing staff cost and 20/21 budget allocation
1 5 6 Dashboard and Traffic Light Reporting
Investigate options for development of Dashboards and Traffic Lights for each Division Manager
Gathered reporting requirements from division managers completed
Finance 30 June 2021 Existing staff Cost
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 13 | P a g e
1 5 6 Insurance Renewal
To achieve renewal of insurance policies of Council in accordance with sound contracting principles
Preparation Market appraisal Assessment Award
Finance 31 March 2021 Completed and ongoing
$450K
2 3 4 6 Napranum school
Feasibility study of reestablishing of P- Year 3 school including Community consultation and final report produced
Community consultation completed with final report to council for endorsement followed by lobbying for funding
Finance * options currently being investigated
30 September 2021
$72K Grant from WCCT
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 14 | P a g e
2.3 CORPORATE AND COMMUNITY SERVICE DIVISION
CORPORATE
Key Result Area
Focus Operational Activities
Success Measure Lead Division Project Completion Date
Budget PROGRESS
1 4 5 6 Budget Provide all Accurate Corporate and 31 May 2021 Existing
assistance necessary to
information is provided on a
Community staff cost
enable the timely basis to 2021/2022 budget allow the finance to be prepared in a department to comprehensive develop a manner that will complete budget provide sufficient for adoption by information for the Council future management of the operations under your control.
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 15 | P a g e
5
Policies
Review of all All policies are Corporate and 30 June 2021 Existing
policies is undertaken on a
updated and are consistent with the
Community staff cost
continuous basis NASC policy and
throughout the period with a view to completing a review of all existing policies
Procedure development guideline
\ This process will
involve review, rewriting and recession of existing policies if necessary
Statutory and administrative compliance conformed and are displayed on the council website
5 Records and Information Management
Change management plan needs to be developed including training to ensure a successful transition to the new system
Plan is developed that incorporates training
Corporate and Community
30 June 2021 As per finance
To bring records Document under control a classification is document completed classification system needs to be devised that is suited to the organisation’s needs
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 16 | P a g e
The proposed Proposed system is
electronic realised and accounting and implemented information management package will provide an opportunity for records management to be introduced and enforced throughout the organisation
1 3 5 6 Commercial Conduct a review Review undertaken Corporate and 30 June 2021 Existing staff Leases of all commercial and completed Community cost premises to determine the best occupancy arrangements and the optimal rental that Council should expect
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 17 | P a g e
COMMUNITY Key Result Area
Focus Operational Activities
Success Measure Lead Division Projects Completion Date
Budget
2 3 4 6 Community A standard project An events Corporate and 1 October 2020 Existing staff Events management management and Community cost framework that can accountability be used to manage framework will be and control each prepared and event is developed implemented
2 3 4 6 Indigenous Empower Program continues Corporate and 30 June 2021 $44,135 per Knowledge communities to be delivered Community 20/21 budget Centre through new consistent with technology and project objectives learning, embrace local knowledge, culture and heritage through use of IKCs
3 4 5 6 Disaster Management
In conjunction with the state government Improve our communities’ resistance to disaster impacts by undertaking a disaster risk management process that is inclusive of training of key personnel
Training is completed
Resources secured to enhance capability of LDMG Get Ready Programs/Funding
Corporate and Community
Ongoing Existing staff cost
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 18 | P a g e
2 3 4 6 Aged and Disability Services
Provide high quality support, at a low intensity on a short- term or on-going basis, or higher intensity services delivered on a short term episodic basis to frail older people (65 years and over or 50 years and over for Aboriginal and Torres Strait Islander people) to maximise their independence at home and in the community for as long as they choose or are able to do so.
Program continues to be delivered consistent with project objectives
Corporate and Community
CHSP Domestic Assistance
CHSP Flexible Respite
CHSP Meals CHSP Personal Care
CHSP Social Support - Group
CHSP Social Support - Individual
CHSP Transport NDIS
30 June 2021 $10,085
$3,960
$54,332
$16,355
$91,472
$27,679
$47,315
Note: Funding subject to referrals from My Aged Care for Home Care Packages based on client needs
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 19 | P a g e
Support frail older
people through the delivery of planned respite activities which allow carers to take a break from their usual caring responsibilities
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 20 | P a g e
2 3 4 6 Child Care Operate a long day Program continues Corporate and * License is 30 June 2021 No budget
care centre that is to be delivered Community currently allocation culturally safe and consistent with suspended at this time secure for primary project objectives and options service users investigated
2 3 4 6 Preschool Negotiate with key Preschool is Corporate and 30 June 2021 $600,000 state government delivered in Community entities and community with community to an increase in continue the numbers enrolled delivery of this and retained service including aggressive promoting and marketing to increase participation
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 21 | P a g e
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 22 | P a g e
3 4 5 6 Fire Safety To undertake
comprehensive and regular assessment of fire safety equipment within Council’s assets (excluding Community Buildings) to ensure operational and compliant with industry/statutory standards
6 & 12 monthly services undertaken and completed All rectification works carried out for compliance
Identification and mapping of firehose inlets around community
Corporate and Community
30 June 2021 Existing staff cost
1 3 6 Air-conditioning Servicing
Undertake comprehensive and regular servicing of Air-conditioning units within Council Corporate buildings to ensure operational and compliance with industry/statutory standards
12 monthly servicing Undertaken and completed
All rectification works carried out for compliance
Corporate and Community
30 June 2021 20/21 budget allocation
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 23 | P a g e
1 3 6 Leased Corporate Buildings Repairs
Undertake repairs to Council’s Corporate Buildings to maintain quiet enjoyment/safe standard/fitness for purpose for occupants in accordance with lease/license agreements
Work Requests received
Quotations obtained from Operations Division
Budget reviewed
Works undertaken
Corporate and Community
30 June 2021 $90,000 plus allowance for insurance & replacements
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 24 | P a g e
3 4 5 6 Corporate
Training Online Training WHS training Corporate Induction Short courses (non accredited)
Source courses Approval Courses loaded online Launch
Corporate and Community
30 June 2021 $36,000 plus existing staff costs and incidentals
New Telephone System
Installation of new telephone / communication system
Installation of effective communication service meeting needs of all users within Civic Centre
Corporate and Community Services
30 June, 2021 $30,000 plus existing staff costs and incidentals
WHS & HR Systems
Research, Review, recommend and implement effective platform/app that meets the needs of the relevant departments and functions of Council
Effective implementation and use of system
Corporate and Community Services
30 Dec 2020 Will be allocated from information systems and document management
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 25 | P a g e
2.4 OPERATIONS SERVICE DIVISION
Key
Result
Area
Focus Operational
Activities
Success Measure Lead
Division
Project Completion
Date
Budget PROGRESS
1 4 5 6 Budget Provide all Accurate Operations 31 May, 2021 Existing staff assistance information is cost necessary to provided on a
enable the timely basis to
2021/22 budget allow the finance
to be prepared in department to
a comprehensive develop a
manner that will complete budget
provide sufficient
information for
for adoption by
Council
the future
management of
the operations
under your
control.
1 4 5 6 Procurement
and Contracting
A comprehensive
review of all
procurement
processes is
The review and
implementation of
new procedures
completed
Operations 30 September 2020
Existing staff
cost
required with
appropriate
procurement Standard contracts
arrangements developed,
including
preferred supplier
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 26 | P a g e
arrangements, endorsed and
and contracts, to implemented
be instituted for
purchase of goods
and services
including the
development of
appropriate
standard contracts
for the purchase
of goods or
services
1 5 6 Fleet
Management –
rationalisation
Review the
current plant fleet
with a view to
retiring and
removing all un-
roadworthy and
redundant
vehicles
Review completed Operations 31 December
2020
Existing staff
cost
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 27 | P a g e
1 5 6 Fleet and Plant
Replacements
[Various]
To purchase/lease
new fleet and/or
plant as
necessitated
through Asset
Management
planning
Assessment of
need
Quote
Procurement
Operations 31 December
2020
$150,000
1 3 4 6 BAS Works BAS managed on a
business-like basis
generating a
return on
expenditure
BAS work including
maintenance,
upgrades and
construction work
are completed at
high standards and
generates the
agreed financial
return to council
Operations Maintenance
Upgrades
Construction
30 June 2021 $1.2M $1.2M $2.1M
1 3 4 6 Works Program All civil
maintenance and
construction and
projects as approved by Council is completed on time and within budget
Approved works
each year will be
delivered on time
and within
approved
budgets
Operations NDRRA:
Bouchat Road
Red Beach Road
Twenty mile Outstation Road
Pennefather Road
Billys’ Lagoon Road
Stones crossing access road
Stones crossing road
Ongoing $3.85M
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 28 | P a g e
1 3 4 6 Works for All projects as Approved works Operations 30 June 2021
Queensland
Projects (W4Q)
approved by
Council is completed on
time and within
budget
each year is
completed on time within approved budgets
Drainage Solutions
Farm Development (stage 2)
Workshop Modernisation (State 2)
Takeaway Refit (stage 2)
Keeping Place
$300,00 $500,00 $150,000 $250,000 $110,000
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 29 | P a g e
W4Q Covid
Upgrade to Aged
Care carpark
facility
Community
Footpath and
Lighting
Community
Playgrounds
Upgrade to Child
and Youth Services
Facility
30/06/2021 $125,000 $359,500 $355,500 $400,000
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 30 | P a g e
DLGRMA All projects as approved by Council is completed on time and within budget
Approved works each year is completed on time within approved budgets
ICCIP
Water Treatment
electrical
upgrade
PH plant
switchboard and
probes
WTP security and
alarm
Upgrades to
Tapping bands,
valves and
hydrants
Survey and
condition report
for existing
water
reticulation
Survey and
condition report
for sewerage
system
Upgrade to
Chemical Storage
Facility
Sodium
hypochlorite
dosing system
Wastewater
SCADA and
macerator
30/06/2021 $100,000 $66,000 $22,000 $50,000 $49,500 $45,000 $45,000 $75,000 $100,000
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 31 | P a g e
installation PS2
Wastewater and
Scada
Pump
replacements
Back up
Generator PS2
Manhole Repairs
Solar powered
surface aerator
paddles
Solid Waste
Facility
remediation
works
Survey &
Condition Report
for Sewerage
System
$64,000 $50,000 $150,000 $60,000 $225,000 $450,000 $85,000
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 32 | P a g e
Department of Housing & Public Works 2019 Interim Capital Works Program
All projects as approved by Council is completed on time and within budget
Approved works each year is completed on time within approved budgets
Construction of
two X 2B
duplexes at 258
and 259
Kwokkunum
Street
30 June 2021 $2.1M
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 33 | P a g e
QRA Resilience and Risk Reduction Fund 2019-20
All projects as approved by Council is completed on time and within budget
Approved works each year is completed on time within approved budgets
Purchase of
Disaster
Management
equipment
$162,400
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 34 | P a g e
Department of Infrastructure, Transport, Regional Development & Communications LRCI program
All projects as approved by Council is completed on time and within budget
Approved works each year is completed on time within approved budgets
$41,000 $25,000 $15,455
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 35 | P a g e
1 3 4 6 Community Hall Project is scoped Works approved Operations Post fire 30 September $800,000
and construction and underway renovation 2020 (approx.) Underway
Official Opening Issues with flooring to be rectified
1 3 4 6 Public Health
Program
Deliver an
Environmental
Health Program to
the community
Program continues
to be delivered
and in compliance
with the program
objectives and
reporting
Operations 30 June 2021 $167,228
requirements
1 3 4 6 Parks, gardens Undertake Annual community Operations 30 June 2021 $304,588 and public
spaces
maintenance of
community parks
parks and gardens
program is
and gardens
including
developed and
implemented
attending to
maintenance
matters
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 36 | P a g e
1 3 4 6 Animal
Management
Undertake
regulatory and
advisory
inspection
programmes to
maintain and
improve health &
environmental
standards within
the community
such as animal
control and vector
control
programmes
Enforce Animal
Control Local Law
once introduced
and promote
responsible animal
ownership
Operations Ongoing
Existing staff
cost
1 3 4 6 Water and
Sewerage
Promote
sustainable land
and water
management
practices
Submit annual
report to
government
agency for the
operation and
environmental
compliance of
water and
sewerage systems
Operations Ongoing Existing staff
cost
1 2 3 4 6 Ranger Program Promote and
supports
Indigenous people
to combine
traditional
knowledge with
conservation
training to protect
Program continues
to be delivered
and in compliance
with the program
objectives and
reporting
requirements
Operations Ongoing $579,379
NAPRANUM ABORIGINAL SHIRE COUNCIL_OPERATIONAL PLAN 2020-21 37 | P a g e
and manage their
land, sea and
culture
3 4 6 Local Laws Facilitate the Identification, Operations 30 July 2021 Existing
process of adopting a suite of Local Laws to enable the Council to manage more effectively activities within the boundaries of the local government area
recruitment of the officers who will be authorised under the local laws Local Laws to be revised where necessary.
staff cost
Manage the Suitable training Operations Ongoing Existing
implementation of the laws to enable
and support provided to enable
staff cost
their effective the operation of enforcement the local laws to be within the implemented community