Top Banner
NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006
25

NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Dec 25, 2015

Download

Documents

Deborah Rogers
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission

Mission Planning Update

Mike GaunceNASA ESPO

June 5, 2006

Page 2: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Presentation Overview

• Mission Schedule• PI Requirements Summary• Cape Verde Site Survey• Cape Verde Info• Travel & Logistics Info• Open Issues

CAVEAT: This planning info is subject to change!CAVEAT: This planning info is subject to change!

Page 3: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Current Mission ScheduleJune 2006

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2 3

Holiday

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30

Telecon

Site Survey - Cape Verde

Hotel & Travel Info to S. Tolley

NAMMA Science Planning Meeting

NAMMA web site on-line

Page 4: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Current Mission ScheduleJuly 2006

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1

2 3 4 5 6 7 8

Holiday

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23 24 25 26 27 28 29

30 31

Telecon

Telecon

Integration

Integration

Integration

Page 5: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Current Mission ScheduleAugust 2006

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

Science Flights

Science Flights

Pack

DC-8 TransitUND-SAL

Science Flights

AirliftUND-SAL

Start TOGA, Balloon, & SMART-COMMIT Ops

MRR?

Check Flt Test Flt #1

ESPO Deploy

ORR

Test Flt #2

Gnd Containers Arr(TOGA, Bal, SC)

Telecon

MRR = Mission Readiness ReviewMRR = Mission Readiness Review

ORR = Operations Readiness ReviewORR = Operations Readiness Review

UND = Univ. North DakotaUND = Univ. North Dakota

SAL = Sal, Cape VerdeSAL = Sal, Cape Verde

Airlift = C5 aircraftAirlift = C5 aircraft

ESPO = Earth Science Project OfficeESPO = Earth Science Project Office

Page 6: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Current Mission ScheduleSeptember 2006

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

1 2

3 4 5 6 7 8 9

Holiday

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

Science Flights

Science Flights Pack DC-8 TransitSAL-UND

Science Flights

De-IntegrationAirliftSAL-UND

Comp TOGA Ops

Comp SMART-COMMIT Ops

Page 7: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

• A request went out 5/25/06 requesting PI input by 5/31.• Received responses (16) from all PI/Instrument groups.

• Summary of Requirements:• No wet lab, dry ice, or dedicated instrument lab space requirements.• Various shipping requirements provided.• Sal: LN2, compressed gases, and chemicals required.• Praia: No LN2 required. Gases (e.g., helium) and chemicals to be shipped via surface.

• If you have additional support requirements (e.g., IT, shipping), please let ESPO know ASAP.

PI Requirements Summary

Page 8: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Cape Verde Site SurveyMay 29-Jun 3 2006

• Conducted site survey of Sal and Praia airports, hotels, and ops center, and local area.

• Assessed basing sites for radiosonde balloons and SMART-COMMIT trailers.

• Held meetings with INMG, airport management, AGE providers, transportation, communications, etc.

• Approval granted by Cape Verdean government to conduct mission.

• Site survey report to be prepared.

Page 9: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Where on Earth……

Page 10: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Cape Verde IslandsGeneral Info

• Republic of Cape Verde. Nine principal islands located 300 miles W of Senegal. Capital, Praia.

• Official Language: Portuguese.• Currency: Escudo ($1 USD= 86 CV Escudos)• Visas: Required for all visitors.• Telecommunications: DSL and mobile phones available

through national monopoly (Cabo Verde telecom). Phones are GSM (900) with SIM and phone cards available for purchase. Country code for Cape Verde is 238.

• Time: Cape Verde standard time is UTC/GMT -1 hour.• Power: 220 V, 50 Hz. • USG Per diem: $109/80 for Sal Island, $112/74 for Praia

Page 11: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Sal Island

• DC-8 Ops: Amilcar Cabral Airport• 16.4˚ N latitude, 22.6˚ W longitude, about 20 km• 12 miles north of the city of Santa Maria• 2 km from the island capital, Espargos• Santiago Island (Praia) 125 miles to the south.

Page 12: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Sal Airport

Page 13: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Travel & Accommodations

• Hotels• Hotel Riu Funana, Santa Maria, 238-242-9064.• Full service, inclusive resort.• Wireless available in lobby (cost and bandwidth in work).• 12 mi south of A/P, 2 mi to town center.• Payment: Visa credit card, cash, or wire transfer.• Rate: 80 Euros/night ($103)• ESPO (Sue Tolley) submitting room reservations.

• Need names/dates by June 12, 2006.

• Transportation.• Shuttle bus from hotel to airport (starting Aug 12th).• Rental cars very limited and very expensive ($100/day).• Taxi:

• From Hotel to A/P - 1000 CVE.• From Hotel to town - 200-300 CVE.

Page 14: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Riu Funana Hotel

Page 15: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Travel & Accommodations - 2• Air travel.

• Some seats available on DC-8 and C-5.• Provide request to Sue Tolley.

• Commercial Air• Currently, there are no U.S. carriers flying directly to Sal.

• South African Airways currently has a direct flight from Atlanta.

• TACV, the Cape Verdean airline, has weekly service from Boston.

• There are connections from Dakar (through Praia).

• Best (cost) connection via Lisbon (TAP or TACV to Sal).

• Visas.

• Sue Tolley can submit for visa on arrival for U.S. citizens.• Will need passport info, etc.

• Visa can also be obtained through CV Embassy in Washington.

• Health and Safety• Do not drink tap water; buy bottled water.• Take whatever prescription and OTC medications you might need with you.• The sun is hot!

Page 16: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Lab Description & Support

• Lab Space• Identified for all locations.

• Layouts to be provided.

• Please bring any required power adapters, transformers, etc.

• Network• Labs have 0.5? MB minimum shared connection.

• Ethernet connection plus wireless.

• DHCP to be provided (details still in work).

• Please be sure to have virus protection SW on your computer.

• Administration & support provided by ESPO.

• In-field data archive provided by MSFC.

Page 17: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Security & Access

• Badging• Badging required for lab and ramp access.• Sue Tolley collecting required info for badge request.

• Name, DOB, PPN, etc.

• Copy of passport.

• Electronic photo (jpeg).

• Security briefing required upon arrival.• Badges must be displayed.

• 24/7 access.• Reflective vest required while on ramp.

Page 18: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Shipping

• All gasses, cryogens, and chemicals will need to be shipped.• Dry ice availability TBD.

• ESPO will ship DC-8 instrument & aircraft support equipment from UND to deployment site via airlift and will return the equipment to UND at the end of the project.

• Not handling surface shipments.

• ESPO (Q. Allison) will be contacting you regarding your shipment.

Page 19: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Communications

• Meetings & Briefings• On science flight days: Pre-flight briefing 2 hours prior to T/O.

• On non-flight days:• Flight Planning team mtgs• Science team mtgs

• Public Affairs, Education, and Outreach• Press release & info in work.

• Local tours.

• NAMMA mission web site.

• In the field……• Phone lists provided after site arrival.

• News, schedules, & activities posted in office areas and web site.

Page 20: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Other Misc Information

• NAMMA web site:• TBD

• U.S. State Department Consular Information Sheets:• http://travel.state.gov/travel/cis_pa_tw/cis/cis_1083.html

• Cape Verde portal:• http://virtualcapeverde.net/news2/index.php

• Cabo Verde 24:• http://www.caboverde24.com/

Page 21: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Deployment Contact Info

• ESPO Contact Info• Mike Gaunce Project Manager

[email protected] 650-604-1266 C: 650-575-9415

• Marilyn Vasques Dep Project Manager

[email protected] 650-604-6120 C: 408-431-7560

• Sue Tolley Project Coordinator

[email protected] 650-604-6033 C: 650-455-4963

• Quincy Allison Shipping & Logistics

[email protected] 650-604-3493 C: 650-455-4964

• Dan Chirica Network & IT

[email protected] 650-604-0463

• DC-8• Rick Shetter NSERC Director

[email protected] 701-777-6040 C: 701-330-2126 

• Brenda Mulac Mission Manager

[email protected] 757-824-2454

Page 22: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Open Issues

• Secure military airlift.• Confirm and install required communications

infrastructure in Sal and Praia.

Note: Please provide hotel, travel, visa, and badging info to ESPO ASAP.

Page 23: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.
Page 24: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

Back-up Charts

Page 25: NAMMA - NASA African Monsoon Multidisciplinary Analysis Mission Mission Planning Update Mike Gaunce NASA ESPO June 5, 2006.

MODISW. Saharan

Dust5-19-05