Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

May 27, 2018

Download

Documents

lamdieu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

TTS Ind.Co.,Ltd 27, Mieumsandan-ro 199beon-gil,

Gangseo-gu, Busan, Korea Tel. +82-51-832-9977~9

Fax. +82-51-832-9988 [email protected]

www.ttsi.co.kr

Page 2: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

COMPANY INFORMATION

COMPANY HISTORY

ORGANIZATION

MAIN PRODUCT

LIST OF MACHINERY & EQUIPMENT

CERTIFICATE & APPROVAL

MAJOR REFERENCE

www.ttsi.co.kr

Page 3: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

•Name of company : TTS Ind.Co.,Ltd.

• Address : 27, Mieumsandan-ro 199beon-gil, Gangseo-gu, Busan, Korea

• Establishment : 1974

• Representative : J. H. Seok

• Capital fund : $1,000,000

•Area and employees 1) 7,260M2 2) Workforce : 40 Person

www.ttsi.co.kr

Page 4: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

1974 Feb.

We Born 2000 Jan.

Established Daeyung Metal Ind.Co.,Ltd at Sinpyung-dong , Saha-gu, Busan, Korea. (The first CuNi 90/10 Fitting & Flange Manufacturer in Korea)

Established TTS International Corp. at Sinpyung-dong , Saha-gu, Busan, Korea. Start its business as a trading company supplying non-ferrous piping materials to U.S.A, Europe, China, Singapore, etc.

We 2007 Feb. Begin

Takeover of production facilities, succession of employment for CuNi piping materials form Daeyung Metal Ind. Co., Ltd

2007 Apr.

ISO 9001:2008 Approval

2007 May. Designated as a Venture Enterprise by Kibo Technology Fund.

2009 Sep. Open own office & factory for CuNi Fitting & Flanges at Gangdong-dong, Gangseo-gu, Busan, Korea.

We 2008 Aug. ABS Approval

Thrive Vendor Approval from Larsen & Toubro Limited India

2009 Dec. Open 2nd factory for CuNi Pipes at Singman-dong, Gangseo-gu, Busan, Korea.

2010 Jul. DNV Approval BV Approval

2010 Aug. ISO 14001:2004 Approval

2010 Sep. Lloyd's Approval

www.ttsi.co.kr

Page 5: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

2012 Jan. RINA Approval

2012 Jun. Vendor Approval from Drydocks World Dubai

2013 Apr. Vendor Approval from Petrobras Brazil (Certificate of Registry and Cadastral Classification – CRCC)

2013 May CCS Approval

2013 Jul. RMRS Approval

2013 Nov. TÜV Approval(Pressure Equipment Directive 97/23/EC)

2014 Dec. Vendor Approval from Oil and Natural Gas Corporation (ONGC) India

Vendor Approval from Mazagon Dock Limited(MDL) India

2015 May Vendor Approval from Abu Dhabi Polymers Co Ltd (BOROUGE)

Vendor Approval from Abu Dhabi Oil Refining Company (TAKREER) Vendor Approval from National Petroleum Construction Company (NPCC) Abu Dhabi

2015 Jun. Vendor Approval from Abu Dhabi Company for Onshore Oil Operations (ADCO)

We 2015 Jul. Challenge

Moved to New Factory at 27, Mieumsandan-ro 199beon-gil,Gangseo-gu, Busan, Korea (Consolidating 1st and 2nd Factory into one Factory expending production facilities)

Vendor Approval from Abu Dhabi Marine Operating Company (ADMA-OPCO)

Vendor Approval from Zakum Development Company (ZADCO) Abu Dhabi

2015 Sep. Vendor Approval from Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)

2016 Jan. Name change to TTS Ind.Co.,Ltd.

www.ttsi.co.kr

Page 7: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

SMLS PIPE

WELDED PIPE

• Material

www.ttsi.co.kr

EEMUA 144 UNS 7060X ASTM B466 C70600 BS 2871 CN102 DIN 86019 CuNi10Fe1,6Mn

• Working Range ½” ~ 14”

• Material EEMUA 144 UNS 7060X ASTM B467 C70600 BS 2871 CN102 DIN 86019 CuNi10Fe1,6Mn

• Working Range 16” ~ 36”

Page 8: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

BW FITTING

MACHINED FITTING

• Material

www.ttsi.co.kr

EEMUA 146 UNS 7060X ASTM B466 C70600 BS 2871 CN102 DIN 86019 CuNi10Fe1,6Mn

• Working Range SMLS : ½” ~ 12” WELDED : 14” ~ 36”

• Material EEMUA 146 UNS 7060X ASTM B151 C70600 BS 2871 CN102 DIN 86019 CuNi10Fe1,6Mn

• Working Range ½” ~ 2”

Page 9: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

SOLID FLANGE

COMPOSITE FLANGE

• Material EEMUA 145 UNS 7060X ASTM B151 C70600 BS 2871 CN102 DIN 86019 CuNi10Fe1,6Mn

• Working Range : ½” ~ 20“

• Type : Welding Neck, Slip On, Blind

www.ttsi.co.kr

• Material EEMUA 145 UNS 7060X ASTM B151 C70600 BS 2871 CN102 DIN 86019 CuNi10Fe1,6Mn

• Working Range : ½” ~ 20“

• Type : Welding Neck, Slip On, Blind

Page 10: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

Drawing Machine • Chain Drive Type 300HP • Q’ty : 1 Set

Pointing Machine • 550ton • Q’ty : 1 Set

Expansion Machine • 380Φ/60ton • Q’ty : 2 Set

Straightening Machine • Max. 300A • Q’ty : 1 Set

Heat Treatment Machine • 280,000kcal • Q’ty : 1 Set

Bend Saw Cutting Machine • 5HP • Q’ty : 1 Set

Marking Machine • Max. 17mm • Q’ty : 2 Set

Beveling Machine • Q’ty : 1 Set

www.ttsi.co.kr

Page 11: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

Machine Hydraulic Forming

• Horizontal • 270 & 800 TON

Hydraulic Forming Machine

• Vertical • 70, 150, 270 & 500 Ton

Drilling Machine •DUA 560 •Q’ty : 3 Set

Milling Machine •10HP-4P •Q’ty : 3 Set

Precision Lathe • 1500 x 1500G • Q’ty : 3 Set

Beveling Machine • 300A • Q’ty : 3 Set

Bend Saw Cutting Machine • 5HP • Q’ty : 1 Set

Marking Machine • Max. 17mm • Q’ty : 2 Set

Blast Machine • Q’ty : 2 Set

www.ttsi.co.kr

Page 12: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

Chemical Composition

• Spectrometer

Mechanical Property

• Universal Test Machine

Pressure

• Hydro Test Machine

Chemical Composition

• PMI Test Machine

Mechanical Property

• Rockwell Hardness Tester

Pressure

• Eddy Current Test Machine

www.ttsi.co.kr

Page 13: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

ABS American Bureau of

Shipping

BV Bureau Veritas

Lloyd’s DNV Det Norske Veritas

CCS China Classification

Society

RINA Registro NavaleItaliano

TUV Nord RMRS Russia Marine Regi

ster of Shipping

www.ttsi.co.kr

Page 14: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

ISO 9001 ISO 14001 PED

www.ttsi.co.kr

Page 15: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

CRCC

TAKREER

LARSEN & TUBRO ONGC MDL

DRYDOCKS WORLD DUBAI

ADAMA OPCO BOROUGE NPCC

ADCO

ADGAS

www.ttsi.co.kr

Page 16: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

PROJECT : BOROUGE 3 XLPE

OWNER : BOROUGE

EPC : Hyundai Engineering & Construction Co., Ltd.

YEAR OF SUPPLY : 2014

SUPPLIED ITEMS : CUNI 90/10 FIT & FLG

PROJECT : EXPORT GAS COMPRESSION FACLITIES UPGRADE

www.ttsi.co.kr

OWNER : Dolphin Energy Limited

EPC : Larsen & Toubro Limited(L&T)

YEAR OF SUPPLY : 2014

SUPPLIED ITEMS : CUNI 90/10 FIT

Page 17: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

PROJECT : New GC-16 in West Kuwait

OWNER : Kuwait Oil Company(KOC)

EPC : Alkhorayef Group of Company(AGC)

YEAR OF SUPPLY : 2013 ~2014

SUPPLIED ITEMS : COPPER PIPE, FIT & FLG

PROJECT : Foroozan Field Development (FZA & FYA)

www.ttsi.co.kr

OWNER : Iranian Offshore Oil Company (IOOC)

EPC : Iranian Offshore Engineering and Construction Company (IOEC)

YEAR OF SUPPLY : 2014~2016

SUPPLIED ITEMS : CUNI 90/10 PIPE, FIT & FLG

Page 18: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

PROJECT : ZADCO Umm Al Dalkh Facilities Installation

OWNER : Zakum Development Company(ZADCO)

EPC : Adyard Abu Dhabi LLC

YEAR OF SUPPLY : 2015

SUPPLIED ITEMS : CUNI 90/10 FIT & FLG

PROJECT : DEEN DAYAL FIELD DEVELOPMENT PROJECT

www.ttsi.co.kr

OWNER : Gujarat State Petroleum Corporation (GSPC)

EPC : Larsen & Toubro Limited(L&T)

YEAR OF SUPPLY : 2011~2013

SUPPLIED ITEMS : COPPER & CUNI 90/10 PIPE, FIT & FLG

Page 19: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

PROJECT : ZADCO Umm Al Dalkh Facilities Installation

OWNER : Zakum Development Company(ZADCO)

EPC : Adyard Abu Dhabi LLC

YEAR OF SUPPLY : 2015

SUPPLIED ITEMS : CUNI 90/10 FIT & FLG

PROJECT : DEEN DAYAL FIELD DEVELOPMENT PROJECT

www.ttsi.co.kr

OWNER : Gujarat State Petroleum Corporation (GSPC)

EPC : Larsen & Toubro Limited(L&T)

YEAR OF SUPPLY : 2011~2013

SUPPLIED ITEMS : COPPER & CUNI 90/10 PIPE, FIT & FLG

Page 20: Name of company : TTS Ind.Co.,Ltd. 27, Mieumsandan … prequalification.pdf27, Mieumsandan-ro 199beon-gil, Gangseo-gu, ... Vendor Approval from Larsen & Toubro ... (ZADCO) Abu Dhabi:

PROJECT : Indian Indigenous Aircraft Carrier (Project-71)

OWNER : INDIAN NAVY

EPC : Cochin Ship Yard Limited(CSL)

YEAR OF SUPPLY : 2011~2015

SUPPLIED ITEMS : CUNI 90/10 PIPE, FIT & FLG

PROJECT : Visakhapatnam-class destroyer(P15B)

www.ttsi.co.kr

OWNER : INDIAN NAVY

EPC : Mazagon Dock Limited(MDL)

YEAR OF SUPPLY : 2013~2015

SUPPLIED ITEMS : CUNI 90/10 FIT & FLG