Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February 24 th and 26 th , 2016 Mitsubishi Corporation
70

Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Jan 19, 2018

Download

Documents

Proprietary & Confidential3 Index: 1Company’s general Introduction a)Company’s general Introduction for MC b)Company’s general Introduction for TSB / THPC c)Company’s general Introduction for HC 2Project organization(TSB) / Site Organization (HC) 3Project Execution Plan 4Turbine 5Generator 6Balance Of Plant a)Mechanical BOP b)Electrical BOP c)Control System Configuration d)Protection Scheme e)Single Line Diagram f)Vendor List Explanation 8Construction / Installation a)Construction / Installation Execution Plan b)Site organization c)Construction / Installation Schedule d)Interface management Plan with other contractors e)Site Equipment / Tool f)Erection Bay Schedule g)Manpower Schedule
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Nam Theun 1 Tender Clarification MeetingContract B, Electro Mechanical Works and Switchyards

February 24th and 26th , 2016Mitsubishi Corporation

Page 2: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 2

Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC

2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant

a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 3: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 3

Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC

2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant

a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 4: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Company’s General IntroductionMitsubishi Corporation

Page 5: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 5

To be prepared by Mitsubishi Corp

Page 6: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Company’s General IntroductionToshiba Corporation

Page 7: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 7

To be prepared by Toshiba/THPC

Page 8: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Company’s General IntroductionHydroChina

Page 9: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

SINOHYDRO BUREAU 14 中国水利水电第十四工程局有限公司

Page 10: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

水电站机电设备安装业绩时段 投产发电机组台数(台) 投产发电机组容量( MW)

1957年 -2006年 271 8386.4

2007年 1 700

2008年 7 1120

2009年 8 3200

2010年 13 3488

2011年 3 750

2012年 6 2800

2013年 23 5198.4

截止 2013年底累计 332 25642.8

Page 11: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

根据合同工程范围、工作内容、工程量及工期要求,设置现场管理机构,设决策层、管理层和作业层。明确各层级单位、个人的工作任务分工和管理职能分工。根据进度计划充分考虑各阶段的施工强度及工作内容,合理配置资源,进行人力资源计划及设备进场计划。 项目班子成员由分公司任命,根据需要由分公司抽调人员组成项目管理团队,组织专业队伍完成项目施工任务。 由分公司人力资源部按项目需求调配人力资源分期进场。 由分公司设备物资管理部门按项目需求调配或采购施工设备分期进场。

项目施工组织

Page 12: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

典型项目施工组织机构图

Page 13: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

用 P3EC编制进度计划,编制过程中加载工作面移交、设备到货、节点目标等限制条件,并按设备安装调试流程、工位占用、工装配置等要求设置逻辑关系,保证总进度计划的合理和科学。 采取科学合理的施工强度指标和人性化管理模式排定施工日程,注意维护职工身心健康,实现均衡生产和文明施工,确保工程的施工质量和安全生产。 分公司技术管理部门为项目总进度计划监控责任部门。

项目总进度计划编制

Page 14: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

逐年、月、周分解进度计划,按计划配置资源,完成技术准备,安排生产任务。 在任何一个限制条件发生变化时及时更新,重新计算进度,及时调整,保证计划的真实。 每月在根据进度完成情况进行计划进展对比,根据对比结果确认进度是否受控,必要时采取措施进行调整,以保证总目标工期。

项目进度控制

Page 15: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

根据合同约定的技术标准规范要求、设计要求、制造厂要求编制施工方案并经过相关审批。 常用的标准系列有: GB、 DL、 GBJ、 SD、 SDJ、 JB、 AISI、 ANSI、

ASME、 ASTM、 IEEE、 IEC、 ISO、 OSHA、 NEMA、 NFPA、 DIN等。

项目技术管理

Page 16: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

按照 GB/T 19001-2008、 GB/T 24001-2004、 GB/T 28001-2011和 GB/T 50430-2007标准及过程模式建立质量、环境与职业健康安全管理体系,形成质量、环境与职业健康安全管理手册及其程序文件,加以实施和保持,并通过日常监测、内部审核和管理评审,确保管理体系持续适用和持续改进。

按业主要求及企业要求确定项目质量目标。 明确各级、各岗位人员质量职责,实行全面质量管理。 实体工程施工过程实行“三检制”,保证产品质量。 提前策划,改进外观质量。 对定子下线、 GIS安装调试、机组回装等区域实行封闭管理。执行出许可审批制度进、进出登记制度、进入封闭区域作业人员特殊劳保配置制度,封闭区域监控管理制度。 机组起动前,在业主、监理、设计联合检查前,由分公司组织专家组进行专项检查。

项目质量管理

Page 17: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 17

To be prepared by HydroChina

Page 18: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 18

Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC

2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant

a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 19: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Project Organization

Page 20: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 20

To be prepared by Toshiba/THPC

Page 21: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Site Organization

Page 22: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 22

To be prepared by HydroChina

Page 23: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 23

Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC

2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant

a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 24: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Project Execution Plan

Page 25: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 25

Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC

2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant

a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 26: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Turbine

Page 27: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 27

To be prepared by Toshiba/THPC

Page 28: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 28

Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC

2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant

a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 29: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Generator

Page 30: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 30

To be prepared by Toshiba/THPC

Page 31: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 31

Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC

2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant

a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 32: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

Page 33: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

Page 34: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 34

To be prepared by HydroChina

Page 35: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

Page 36: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 36

To be prepared by HydroChina

Page 37: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

Page 38: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 38

To be prepared by HydroChina

Page 39: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

Page 40: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 40

To be prepared by HydroChina

Page 41: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

Page 42: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 42

To be prepared by HydroChina

Page 43: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Balance Of Planta) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

Page 44: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 44

To be prepared by HydroChina

Page 45: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 45

Index: 1 Company’s general Introductiona) Company’s general Introduction for MCb) Company’s general Introduction for TSB / THPCc) Company’s general Introduction for HC

2 Project organization(TSB) / Site Organization (HC)3 Project Execution Plan4 Turbine5 Generator6 Balance Of Plant

a) Mechanical BOPb) Electrical BOPc) Control System Configurationd) Protection Schemee) Single Line Diagramf) Vendor List Explanation

8 Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 46: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 46

To be prepared by HydroChina

Page 47: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Construction / Installationa) Construction / Installation Execution Planb) Site organization 工地 (现场 )管理组织c) Construction / Installation Scheduled) Interface management 接口管理Plan with other contractorse) Site Equipment 工地施工机械 / Toolf) Erection Bay Schedule 安装附表 Manpower Schedule 人力资源调度

Page 48: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 48

To be prepared by HydroChina

Page 49: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 50: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

水轮机安装流程

Nam Theun 1 Hydropower Project

Turbine Installation Procedure

Page 51: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

发电机安装流程Generator Installation Procedure

Nam Theun 1 Hydropower Project

Page 52: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Nam Theun 1 Hydropower Project

现场组织机构Site Organiation

Page 53: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Nam Theun 1 Hydropower Project主要设备安装进度计划

Main Equipment Installation Programme NO. Project Name

Unit 3# Unit 1# Unit 2#Start Time End Time Start

Time End Time Start Time End Time

1 桥机安装 bridge crane installation 2018-7-16 2018-11-12        2 尾水管安装 draft tube installation 2018-2-10 2018-3-18 2018-3-24 2018-5-12 2018-5-13 2018-7-21

4 座环蜗壳安装 stay ring and spiral case installation 2018-5-1 2018-8-20 2018-8-1 2019-1-8 2018-10-2 2019-2-24

5 混凝土浇筑至发电机层 pouring the concrete to generator layer

  2019-1-12   2019-7-7   2019-8-8

6 导水机构预装 water distributor pre-assembly 2019-2-27 2019-4-2 2019-8-11 2019-9-9 2019-9-18 2019-10-17

7 转轮大轴吊入机坑 lift the runner main shaft to generator pit

2019-5-3 2019-5-12 2019-10-10 2019-10-19 2019-11-17 2019-12-1

8 定子组装、下线 stator winding installation and stator assembly

2019-1-11 2019-7-19 2019-4-11 2019-10-27 2019-10-28 2020-5-4

9 转子组装、磁极挂装 rotor assembly,magnetic pole suspending

2019-2-10 2019-6-9 2019-5-11 2019-9-7 2019-11-27 2020-3-25

10 下机架安装 lower bearing bracket installation 2019-7-30 2019-8-5 2019-7-18 2019-8-1 2019-8-26 2019-9-10

11 转子吊入机坑 lift the rotor to generator pit 2019-9-13 2019-9-19 2020-1-13 2020-1-19 2020-7-8 2020-7-14

12 上机架安装 upper bracket installation 2019-9-27 2019-10-3 2020-1-27 2020-2-5 2020-7-22 2020-7-31

13 机组盘车 turning gear 2019-10-4 2019-10-24 2020-2-6 2020-3-6 2020-8-1 2020-8-21

14 水轮发电机设备安装完成 completion of water turbine generator installation

  2019-12-6   2020-4-24   2020-10-9

15 蜗壳进口蝶阀安装 installation of spiral case inlet butterfly valve

2018-4-23 2018-9-26 2019-7-8 2019-10-5 2019-8-9 2019-12-26

16 机组静态调试 static debug 2020-6-20 2020-7-4 2020-7-25 2020-8-23 2020-10-3 2020-10-31

17 机组动态调试 dynamic debug 2020-7-5 2020-7-14 2020-8-24 2020-9-7 2020-11-1 2020-11-15

18 机组投产发电 unit put into operation   2020-7-24   2020-9-22   2020-12-1

Page 54: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Nam Theun 1 Hydropower Project安装主要设备及工具(二)

Main Equipment and Tools of Installation(2)

No. Equipment Name Type and specification quantity

四、焊接设备 welding equipment

1远红外线自控两用焊条烤箱far-infrared ray automatic control dual purpose welding rod oven

YZH2—151型 4 sets

2 温控仪 Temperature Controller LWK—360 4 sets3 逆变焊机 Inverter welding machine YD-400AT 60 sets4 逆变焊机 Inverter welding machine ZX7-630S 10 sets6 氩弧焊机 argon arc welding machine AX7-500 6 sets7 气刨机 Gouging Machine 800A 4 sets8 气体保护焊机 gas shielded welding machine KEMPPIMIG500 10 sets9 铝母线焊机 Aluminum bus bar welding machine   2 sets

五、弯管及加工设备 elbow and processing equipment1 牛头刨床 Shaper/ shaping machine B650 1 set2 普通车床 common lathe CW6110V 1 set3 管子套丝机 pipe diehead threading machine EIT80 0.75kW 1 set4 弯管机 pipe bending machine DWG 1 set5 手动弯管机 hand bender   2 sets6 弓锯床 hacksaw machine   1 set7 摇臂钻床 radial drilling machine Z3080HX25 1 set8 自动液压弯管机 Automatic Hydraulic pipe bender DWQJ-G108 3 sets9 空压机 air compressor V-1.2/12.5 3 sets

10 空压机 air compressor UP5-22-10 3 sets11 磁座钻 magnetic drill press 32mm 2 sets12 磁座钻 magnetic drill press 49mm 1 set13 电动试压泵 Motor-driven pressure test pump DSY-35 3 sets

Page 55: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Nam Theun 1 Hydropower Project安装主要设备及工具(一)

Main Equipment and Tools of Installation(1)No. Equipment Name Type and specification quantity

一、测量设备 measure equipment1 水准仪 level DSZ2 1 set2 电子水平仪 electronic level DEG-1 1 set3 全站仪 total station TCR1201 1 set4 内径千分尺 inside micrometer 150~3000mm 1 hand5 外径千分尺 outside micrometer 150-6000mm 2 hand6 框式水平仪 Frame leveler 0.02mm/m 8 PCS7 百分表 dial gage 0-10mm 30 PCS

二、探伤、特殊工器具 flaw detection, Special instruments

1便 携 式 声 定 位 超 声 波 C 扫 描 探 伤 系 统(TOFD)Portable Acoustic positioning ultrasonic C Scan detection system

ISionic STAR 1 set

2 便携式磁力探伤仪 Portable magnetic flaw detector BT-910PA 1 set三、起重运输设备 Hoisting and transport equipment

1 卷扬机 winch 20t 1 set2 卷扬机 winch 10t 2 sets3 卸扣 Shackle 55t 2 pc4 卸扣 Shackle 35t 6 pcs5 卸扣 Shackle 10t 10 pcs6 千斤顶 jack 50t、 32t、 16t 各 6 pcs7 汽车吊 truck crane 300t、 120t 各 1 pc8 汽车吊 truck crane 50t 1 vehicle9 汽车吊 truck crane 16t 1 vehicle10 平板拖车组 platform trailer 120t 1 vehicle11 平板拖车组 platform trailer 60t 1 vehicle12 平板拖车组 platform trailer 40t CWA54HTIZ 1 vehicle13 载重汽车 heavy truck  18t 2 vehicles14 液压叉车 Hydraulic Fork Lift 10t、 3t 2 vehicles15 手动叉车 hand fork lifter 2t、 3t、 5t 2 vehicles16 客车 car 45 SET 1 vehicle17 金龙小客车 Kinglong passenger car KLQ6601E 1 vehicle18 小型客车 minibus 17 SET 3 vehicles19 重庆五十铃 Chongqing Isuzu NHR55ELWXS 1 vehicle20 皮卡车 pickup   2 vehicles

Page 56: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Nam Theun 1 Hydropower Project

人力资源计划Human Resouce Planning

年Year

季度quarter

水轮机工turbine worker

发电机工generator

worker

辅机工auxiliary worker

电工Electrici

an铆工

riveter焊工

Welder起重工

craneman

无损检测NDT

试验test

驾驶员operator

机加工machining

半熟练工semiskilled

worker

合计total

20163 0 0 2 3 6 2 2 1 0 2 0 10 284 5 0 2 3 6 4 2 1 0 2 0 20 45

2017

1 8 0 4 4 6 4 3 1 0 3 0 30 63

2 10 0 4 4 10 6 3 1 0 5 0 30 73

3 10 4 6 4 10 6 3 2 2 6 0 30 83

4 10 8 4 5 10 16 3 2 2 6 0 30 96

2018

1 16 10 2 5 10 16 3 2 3 6 2 40 115

2 16 16 4 12 8 16 3 2 3 6 2 50 138

3 20 16 8 15 8 16 3 2 3 8 2 50 151

4 20 16 10 15 8 12 5 2 4 8 2 70 172

2019

1 20 20 10 20 3 6 9 2 6 8 2 70 176

2 20 24 10 20 3 6 9 2 6 8 2 70 180

3 20 24 10 25 3 6 9 2 6 8 2 70 185

4 20 24 10 30 3 6 9 2 6 8 2 70 190

2020

1 20 24 10 30 3 6 9 2 10 8 2 70 194

2 20 24 10 30 3 6 9 2 10 8 2 70 194

3 16 20 10 24 2 6 9 1 10 8 2 60 168

4 14 16 6 13 2 4 5 1 10 6 2 50 129

Total 265 246 122 262 104 144 98 30 81 114 24 890 2380

Page 57: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 57

To be prepared by HydroChina

Page 58: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Construction / Installationa) Construction / Installation Execution Planb) Site organization(现场 )管理组织c) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 59: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 59

To be prepared by HydroChina

Page 60: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 61: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 61

To be prepared by HydroChina

Page 62: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 63: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 63

To be prepared by HydroChina

Page 64: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 65: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 65

To be prepared by HydroChina

Page 66: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule

Page 67: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 67

To be prepared by HydroChina

Page 68: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Construction / Installationa) Construction / Installation Execution Planb) Site organizationc) Construction / Installation Scheduled) Interface management Plan with other contractorse) Site Equipment / Toolf) Erection Bay Scheduleg) Manpower Schedule 人力资源调度

Page 69: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Proprietary & Confidential 69

To be prepared by HydroChina

Page 70: Nam Theun 1 Tender Clarification Meeting Contract B, Electro Mechanical Works and Switchyards February…

Thank you