N E W O F F I C E S F O R Electricity Headquarters Jelf Taylor Crescent Old Fort Complex Excerpts from Presentation 1: 15 March 2010
Apr 01, 2015
N E W O F F I C E S F O R
Electricity HeadquartersJelf Taylor Crescent Old Fort Complex
Excerpts from Presentation 1:
15 March 2010
C o n t e x t M a p
S i t e A n a l y s i s
O F M P r e c i n c t F r a m e w o r k P l a n - U P O P S - Derek White
O F M P r e c i n c t F r a m e w o r k P l a n - Derek White
O F M P r e c i n c t F r a m e w o r k P l a n - Derek White
Option 1 - Control Centre : 2 storey addition
3000sq.m over two additional floors, added at 5th and 6th level.New parking in 2 storey parking structure, Lower Ground level as semi-basement with canopy covered Upper Ground deck (150 bays net gain).Service Costs - Extra lift shaft required.
Advantages – maximises existing infrastructure; no increase in travel distances, potential to revitalise existing CC image.Disadvantages – relatively high infrastructure cost; poor orientation; significant internal office re-shuffle required.
Masabalala Yengwa Ave
Masa
balala
Yengwa A
ve
Archie Gumede Pl
Arch
ie G
umed
e Pl
Potential to cover site extents
Jelf
Tayl
or P
l
Jelf Taylor Pl
Option 2 – HQ : single storey additions with South tower
1100sq.m over 2 single storey extensions to existing low wings. 1900sq.m over 3 floors in a tower to the south, arranged to form new central Atrium for HQ link ups.New parking in 2 storey parking structure, Lower Ground level as semi-basement with canopy covered Upper Ground deck (150 bays net gain).Service Costs - New lift required; Bridge & /or Atrium for HQ connections.Potential for office & court module to continue in phases (as roll-out Option).
Advantages – maximises existing infrastructure; creates new Southern face; potential to revitallise existing HQ image; good inter-building circulation.Disadvantages – relatively high infrastructure cost, poor orientation on low wings.
Masabalala Yengwa Ave
Masa
balala
Yengwa A
veArchie Gumede Pl
Arch
ie G
umed
e Pl
Potential to cover site extents
Jelf
Tayl
or P
l
Jelf Taylor Pl
C O N T R O L C E N T R E A D D I T I O N S Electricity Headquarters
Jelf Taylor Crescent Old Fort Complex
Excerpts from Presentation 2:
19 April 2010
B r i e f O v e r v i e w
Agreement arising out of Presentation 1:
1st phase development of additional floor area on top of Control Centre 2nd phase pursuit of a new office block link south of the existing
Headquarters Building
Need for long term plans plus quick wins to fix shortage ofoffice accommodation and parking.
C o n c e p t : M a s s i n g
Dynamic play of a glass box on top of a solid
element Estudio Campo Baeza; De Blas House; Spain; 2000
Additions could be a lightweight counterpoint to the existing solid structure
Control Centre Building
R e s p o n s e t o O r i e n t a t i o n
Proposal - Envelop both new and the existing building
elements in solar protection screens
Morphosis SF Federal Building; San Francisco; 2007
Control Centre Building
S o l a r S c r e e n s
StudioMAS; Circa-on-Jellico
Use of decorative solar screens to shade external structure – facebrick & glass. Shading reduces direct heat load on the building which in turn reduces load on Air Conditioning system’s electricity consumption, particularly during peak load times.
This passive cooling, is an important retrofit on the poorly orientated Control Centre building.
Reducing and delaying temperature peaks
Dogen Media House; Istanbul; Turkey
D e s i g n C o n c e r n s
Move away from long passage arrangement with cellular offices to either side Improve views across the width of the structure Radically improve quality of work environment Optimise solar control while increasing day lighting into spaces/passageway Create better integration between floors
C o n t r o l R o o m C o n c e p t
Architecture Department – Refurbishment of former Materials Workshops into workspaces connected around a central double volume atrium, with mezzanine levels around. OFMP, Durban, 2007
Double volume work spaces – functional connectivity /
staff interaction
C o n t r o l C e n t r e F i t t i n g s
Contemporary control consoles and projection display walls
Existing Control Room’s manual display walls
F o r m
2nd Phase
V e r t i c a l A d d i t i o n s Section
View north over roof
Roof designed to be jacked up
Interior roof space and column grid
F o r m
T h e w a y f o r w a r d
Discussion• Parking provision and redevelopment of the area to the North West and West of Control Centre is
dependent on the adoption of a Framework plan (currently being developed by Derek White of Architecture Department).
• Network Control Brief to be developed, and supply of available office area strategised.
Agreement• Architectural concepts agreed.
• Phasing agreed as:Phase I - 2 storey additions to the Control Centre building and sun control to existing facades. Phase II - refurbishment of portions of the existing CC building that have been vacated by functions moving to the new levels Phase III - new build office to the South of Elec. HQ building, built on a parking structure.
• Internal office redistribution & rationalisation – Architects / consultant responsibility.
• Agreed that parking arrangements should be finalised once Control Centre extensions underway.
C O N T R O L C E N T R E A D D I T I O N S Electricity Headquarters
Jelf Taylor Crescent Old Fort Complex
BRIEF DEVELOPMENT PHASE
P l a n n i n g R e q u i r e m e n t s
V e r t i c a l A d d i t i o n s
5th & 6th Floor Plan: Mezzanine level interaction with 5th floor
I n t e r n a l R e f u r b i s h m e n t s
3rd & 4th Floor Plan: Mezzanine level interaction with 3rd floor
T h e w a y f o r w a r d
Agreement• Expanded Network Control utilises all available space on 5th & 6th floors. • Remaining Network Control & expanded ICT, along with Call Centre (relocated from rented
accommodation at SmartExchange on Dr A B Xuma Rd) utilises all available space on 3rd & 4th floors.
• New centrally located lift desirable – costings to be confirmed.
• New entrance ‘face’ along with foyer upgrade - in line with new image.
• Agreed that parking arrangements should be finalised once Control Centre extensions underway.
C O N T R O L C E N T R E A D D I T I O N S Electricity Headquarters
Jelf Taylor Crescent Old Fort Complex
Design Review 16 July 2010
Design Precepts
P a r a m e t e r s - C o n t r o l l e r D e s k
P a r a m e t e r s - C o n t r o l R o o m s
D e t a i l i n g – S u n L o u v r e s
Equinox - 3pm – 400mm louvre at 300ccs spacing
P l a n n i n g P a r a m e t e r s
P r o p o s e d C i r c u l a t i o n
P l a n n i n g P a r a m e t e r s
C o n t r o l R o o m V o l u m e t r i c P a r a m e t e r s
M a s s i n g P a r a m e t e r s
S o l a r P r o t e c t i o n P a r a m e t e r s
D e s i g n P r e c e d e n t
Morphosis SF Federal Building; San Francisco; 2007
Control Centre Building
C O N T R O L C E N T R E A D D I T I O N S Electricity Headquarters
Jelf Taylor Crescent Old Fort Complex