Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

IMPROVED STANDARD METHOD OF MEASUREMENT FOR CIVIL ENGINEERING WORKS

IR. SOH KOK ENG

SMHB SDN BHD

5th April 2011

Page 2: My Cesmm2 Wm2011 5apr11

  INTRODUCTION   History of CESMM & Bills of Quantities   Basic differences between the 3 SMMs

 ISSUES AND CHALLENGES IN USING SMM   JKR 203A Conditions of Contract   Issues in using SMM

 FRAMEWORK OF MY-CESMM2   Two documents, MY-CESMM2, Guide & Std Library of BQ   Structure of MY-CESMM2   Three Divisions of MY-CESMM2 and Rules

  IMPROVEMENTS IN MY-CESMM2   GUIDELINES WITH TECHNICAL NOTES   STANDARD LIBRARY OF BQ

  Format of Standard Library   How to use the Standard Library of BQ   How to build up the BQ

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 3: My Cesmm2 Wm2011 5apr11

INTRODUCTION

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 4: My Cesmm2 Wm2011 5apr11

HISTORY OF CESMM & BQ  1859 Ö Formal BQ introduced  1933 Ö ICE introduced standard procedure for BQ  1953 Ö SMM for Civil Engineering Quantities (ICE)  1967 Ö CIRIA report 34  1968 Ö SMM for Civil Engg Quantities (metric) (ICE)  1976 Ö 1st Edition of CESMM-UK  1985 Ö 2nd Edition of CESMM-UK  1991 Ö 3rd Edition of CESMM-UK

SMM IN MALAYSIA  CESMM3 Ö UK - 1991  CESMM(M) - 2003  SMM2 Ö ISM Ö 2001

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 5: My Cesmm2 Wm2011 5apr11

SOME BASIC DIFFERENCES BETWEEN THE 3 SMMs

 SMM2-ISM covers mainly building works and does not cover civil engineering works

 CESMM(M) covers mainly civil engineering works and does not cover building works

 CESMM(M) in tabulated format whereas SMM2-ISM in descriptive format

 CESMM3-UK has separate items for supply and lay whereas CESMM(M) has supply and lay under 1 item

 e.g. concreting works

 CESMM3-UK Ö supply (1), lay (2)

 CESMM(M) Ö supply and lay (1)

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 6: My Cesmm2 Wm2011 5apr11

SOME DEFINITIONS OF BQ  The Bill of Quantities (BQ) is the agreed statement of the

prices which will be paid for work done by the Contractor for the Client and it shares with the drawings, specifications and schedules the responsibility for defining what has been agreed shall be done

 The essential functions of the BQ is to limit the difficulty the Client has in forecasting and defining to a Contractor what is required to do.

 On the other hand it limits the difficulty the Contractor has in forecasting precisely what the work will cost.

KEY WORD IS SPREADING THE RISKS

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 7: My Cesmm2 Wm2011 5apr11

ISSUES AND CHALLENGES IN USING SMM

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 8: My Cesmm2 Wm2011 5apr11

JKR 203A CONDITIONS OF CONTRACT

  JKR 203A (Rev. 10/83) •  Clause 26(b) requires the BQ to be prepared in accordance with the

SMM for Building Works prepared by Institute of Surveyors,

Malaysia

 JKR 203A (2007) •  Clause 26.4 in the new form allows SMM for preparation of BQ to

be also based on CESMM by ICE or any Method of Measurement as

set out in the BQ in addition to the SMM for Building Works by

ISM.  Contractor says he uses CESMM3-UK to price it but the

Engineer says he is using SM-ISM?

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 9: My Cesmm2 Wm2011 5apr11

SOME ISSUES IN USING SMM

  Although the Civil Engineering Standard Method of Measurement (CESMM) by ICE UK is often used for works of a civil engineering nature but there are many occasions particularly for, water supply, wastewater, etc, Consultants utilise their own Standard Method of Measurement.

Ö  Under 1 Item - Supply, lay, including excavation, valves, thrust blocks, etc

Ö  Under 4 Items - Excavation (I), Supply & Lay including joints (2), Valve (3), Thrust blocks (4)

Ö  Under 7 Items - Excavation (I), Supply (2), Lay (3), Cutting of Pipes (4), Joints (5), Valve (6), Thrust blocks (7)

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 10: My Cesmm2 Wm2011 5apr11

SOME ISSUES IN USING SMM   Trench excavation

Payment based on this

width?? Or this width??

If this width, what angle to

use??

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 11: My Cesmm2 Wm2011 5apr11

SOME ISSUES IN USING SMM

3 m

7 m

SOME SAY OTHERS

  Piling works

Pay 10m for supply and 7 m for driving

Pay 7m for supply and 7 m for driving

Who can say exactly what depth of pile to be driven??

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 12: My Cesmm2 Wm2011 5apr11

FRAMEWORK OF MY-CESMM2

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 13: My Cesmm2 Wm2011 5apr11

FRAMEWORK OF MY-CESMM2

  MY-CESMM2  Guide to MY-CESMM2 with Technical Notes  Standard Library of BQ

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 14: My Cesmm2 Wm2011 5apr11

STRUCTURE OF MY-CESMM2

Process Approach

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 15: My Cesmm2 Wm2011 5apr11

THREE DIVISIONS OF MY-CESMM2 AND RULES

 Each division only 8 items (max), WHY???

 3 digit code number, B358, B3510???

 B359.1 Ö Manganese, B359.2 - Iron

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 16: My Cesmm2 Wm2011 5apr11

FRAMEWORK OF MY-CESMM2

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 17: My Cesmm2 Wm2011 5apr11

IMPROVEMENTS IN MY-CESMM2

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 18: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 19: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 20: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 21: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 22: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 23: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 24: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 25: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 26: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 27: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 28: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 29: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 30: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 31: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 32: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 33: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 34: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 35: My Cesmm2 Wm2011 5apr11

  Rule C2 - Item for general clearance shall be deemed to include the removal of trees and stumps (unless otherwise stated in item descriptions), undergrowth, shrubs, roots and the likes.

  Rule M2 - Where measurement for trees are expressly required, it shall be measured under item for trees.

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 36: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 37: My Cesmm2 Wm2011 5apr11

  Excavate to fill measured as 2 items but excavate to dispose measured for only cut

  Rule D5 - Excavation to form a profile expressly required shall be classed as cut.

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 38: My Cesmm2 Wm2011 5apr11

  Rule M19 - All filling shall be measured nett. Excavation in fill shall only be measured where it is expressly required.

OGL

FILL

STRUCTURE

OGL

FILL

STRUCTURES

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 39: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 40: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 41: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 42: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 43: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 44: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 45: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 46: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 47: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 48: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 49: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 50: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 51: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 52: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 53: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 54: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 55: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 56: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 57: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 58: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 59: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

  Rule C1 - Items for painting shall be deemed to include preparation of surfaces before painting including all necessary Temporary Staging.

  Rule C2 - Items for painting shall state and include the application of base primer/ sealer required before painting the subsequent coats.

Page 60: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 61: My Cesmm2 Wm2011 5apr11

Malaysian Standard Method of Measurement for Civil Engineering Works (MY-CESMM2)

Feedback on MY-CESMM2

1.5m

2.0m

2.5m

3.0m

3.5m

150m

50m 50m 25m 25m

Page 62: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 63: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 64: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 65: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 66: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 67: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 68: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 69: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 70: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 71: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 72: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 73: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 74: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 75: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 76: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 77: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 78: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 79: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

Page 80: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

GUIDELINES WITH TECHNICAL NOTES

Page 81: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

GUIDELINES WITH TECHNICAL NOTES   Each class arranged with a section numbering system which corresponds

with the First and Second Division

  A210 Ö Facilities for the Engineer/S.O./PD’s representative, where, • A - Class A: General Items • 2 - Second item in the First Division • 1 - First Item in the Second Division

Page 82: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

GUIDELINES WITH TECHNICAL NOTES

Page 83: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

GUIDELINES WITH TECHNICAL NOTES

Page 84: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

GUIDELINES WITH TECHNICAL NOTES

Page 85: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

GUIDELINES WITH TECHNICAL NOTES

Page 86: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

STANDARD LIBRARY OF BQ

Page 87: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

STANDARD LIBRARY

  Code numbers are important feature in CESMM but it is the most difficult to use and therefore not widely used

  Standard Library with code numbers

  Format in Excel as it is widely used

  Used as a checklist and copy items to BQ as required

Page 88: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

STANDARD LIBRARY

  How to use the Standard Library of BQ

  One spreadsheet file contains multiple sheets

  Open up a standard spreadsheet file and format to Std BQ format

  Click on relevant class of work and scroll down until the desired item

  Copy the required item in the user spreadsheet file

  The item description as guide only and are with á[…….]à or á(…..)à

  After the editing is done, the á[…….]à or á(…..)à should be removed

Page 89: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

STANDARD LIBRARY

  How to use the Standard Library of BQ

  Multiple items with the same code numbers

  if only [100mm square] direct shear box test is required, the code

number shall be changed to D525 only and NOT D525.1

Page 90: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

STANDARD LIBRARY

  How to build up the BQ

75mm thick Grade C20 lean concrete

Grade C35A concrete for base and wall

Page 91: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011

STANDARD LIBRARY

  How to build up the BQ

Page 92: My Cesmm2 Wm2011 5apr11

Improved Standard Method of Measurement for Civil Engineering Works

Water Malaysia 2011