MW- Sonet project presentation J. Kasperiuniene Baltic education technology institute Szeged meeting, Hungary 2010/09/27
Apr 01, 2015
MW- Sonet project presentation
J. KasperiunieneBaltic education technology
institute
Szeged meeting, Hungary2010/09/27
Agenda
1. Welcome and partners presentations 2. MW- Sonet project in few sentences3. Partners reports on works already done and the new challenges
• needs analysis study (EL);• methodology and preparations to e- learning (DK + IS);• development of training modules (LT);• testing the courses (HU).
4. Lunch break
5. Partners reports on works already done and the new challenges (continuation)
• SNT – adaptation and improvements (BG)• videoconference with BETI• MW- Sonet community building (DK); discussions (ALL)• practical trainings “How to use ELGG for partner networking” (ALL)
General information
1. Partners presentations;
2. Changes in partnership
Contractor: Lithuanian University of Agriculture www.lzuu.lt
Partner: ICT Development, Bulgaria
MW- Sonet in one sentence ;-)))
To transfer the BB model to project partner countries and to involve and stimulate women to become active participants of local community life, to become mentors for other rural women and all the rural community.
WORK PACKAGES
WPs
• WP1 – needs analysis study - DONE;
• WP2 – methodological preparation to e-learning courses transfer - DONE;
• WP3 – development of training modules – IN PROGRESS;
• WP4 – piloting e-learning courses – AFTER WP4– We need to develop piloting plan;
• WP5 – adaptation and improvement of BB social networking tools – IN PROGRESS;– All the partners need to chose SNT;
• WP6 – MW- Sonet community – TOGETHER WITH WP5;– WP6 needs brainstorming – how to attract target participants to use
new technologies (SNT)?
MW-Sonet WORK PLAN
7
2009 2010 2011
P0 P1 P2 P3 P4 P5 P6 P7 P8 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9
LT1 LT2 BG DK EL HU IS LT3 TR
ZUI BETI ZUM
Block1
WP1 Needs analysis study + + P4 + + +
WP2
Methodological preparation to e-learning courses transfer + + P6 +
WP3Development of training modules P1 + + + +
WP4
Piloting – implementation and trials + + + + P5 + +
Block2
WP5
Adaptation and improvements of Building Bridges social networking tools + P2 + + + + +
WP6MW-Sonet community + + + P3 + + + + +
Rodoula MakriWP1 – needs analysis study
Jolande Leinenbach + Ragnhildur Sigurðardóttir
WP2 – Methodology for course transfer
WP leader - Ragnhildur
Judita KasperiunieneWP3 – Development of Training Modules
WP3 – development of training modules - 1
Works already done:1. Planning the courses:
• LT (P0, P1, P7) – Agricultural issues;• BG (P2) – Agro tourism;• ICCS (EL) – Communication skills;• HTA (P5) – Digital backpack;• GU (TR) – Introduction to e-learning.
2. Translated, adapted, new materials added• LT (P0, P1, P7) – Agricultural issues (1/3)
http://distance.ktu.lt/cdk/courses/5417 • BG (P2) – Agro tourism
http://distance.ktu.lt/cdk/courses/5411 ;• ICCS (EL) – Communication skills - ???;• HTA (P5) – Digital backpack - translated;• GU (TR) – Introduction to e-learning – translated, could
be uploaded to the Moodle.
WP3 – development of training modules - 2
Works already done:3. E-learning environment adaptations:
WP3 - results
WP3 – development of training modules
• Participant institutions:– P1 (Baltic Education Technology Institute) WP leader;– P2, P4, P5, P8 partners involved
Building Bridges e-learning courses in Moodle
www.building-bridges.is/courses
WP4 - pilots
WP4 - pilots
WP4 - results
WP5 – adaptation and improvement of BB social
networking tools
WP5 – adaptation and improvement of BB social
networking tools
WP5 - results
• R5 – Study “Internet tools for social networking”;
• R6 – Handbook “How to use social networking tools”
Building Bridges MENTORING HANDBOOK
WP5 - results
WP5 - results
WP6 – MW- Sonet community
WP6 – MW- Sonet community
WP6 - results
Website
www.mwsonet.eu
WP7 – Dissemination and valorization – ALL the PARTNERS
– Start 10/2009; Finish 09/2011– Aims:
• To increase awareness about the “to date” status of the MW-Sonet courses and other project results and about its ultimate objectives towards user groups and the rural community in the local regions involved, in the countries involved, and across Europe;
• To establish ways of communication with local, regional, national and international rural communities, with organizations of which take part in local and regional development and finally with the public that consist the end users of the providing services.
• The e- learning courses and other products developed in the project will be integrated into existing portals. The core partners are committed to exploit and disseminate the products at least five years after the end of the project.
– WP leader - P0 (Institute of Agriculture Engineering, LT); – Results:
• R8 – proceedings of International Valorization Conference;• R9 - leaflets and posters (in all project partner languages);• R13 – sustainability and valorization plan.
31
Virtual meetings
• Suggestion-– Once a month; – Next date Dec. 14 (18, Friday);– Subject of the next virtual meeting
Social networking.
32
Posters
WP8 – Coordination, management and monitoring – ALL the PARTNERS
– Start 10/2009; Finish 09/2011– Aims:
• Establishing working relationships among the partners;• To manage project efficiency, ensure that the communication and
collaboration in the partnership runs smoothly; • to allocate the payments;• To ensure that the works are carried out according to the contracts and that
the project objectives and milestones are met.
– WP leader - P1 (Baltic Education Technology Institute, LT); – Results:
• R10 – Interim and Final reports;• R11 - Cost statement and project activities monitoring report;• R15 – Audit.
34
WP9 – Evaluation and quality assurance– ALL the PARTNERS
– Start 10/2009; Finish 09/2011– Aims:
• Establishing working relationships among the partners;• To manage project efficiency, ensure that the communication and
collaboration in the partnership runs smoothly; • to allocate the payments;• To ensure that the works are carried out according to the contracts and that
the project objectives and milestones are met.
– WP leader - P0 (Institute of Agriculture Engineering, LT); – Results:
• R12 – Internal evaluation questionnaire and evaluation reports;• R14 - External evaluation of products and activities.
35