MVD ASSEMBLY TWO HALF FRAME DONE – DIMENSION TESTED ANCILLARIES FOR FRAMES DONE – DIMENSION TESTED FRAME ASSEMBLY & FINAL MACHINING – MUST BE DONE SPECIAL & PRECISION SCREWS - MUST BE DONE FIXING POINT OF THE SUB-STRUCTURES – DEFINED FIXING POINT FOR STRIP DISK MUST BE DEFINED MVD ASSEMBLY SEQUENCE – DEFINED OPEN ITEMS: SERVICES ROUTING, PATCH PANELS
14
Embed
MVD Assembly Two half frame done – Dimension Tested
MVD Assembly Two half frame done – Dimension Tested Ancillaries for Frames done – Dimension Tested Frame Assembly & Final Machining – must be done Special & Precision Screws - must be done Fixing Point of the Sub-Structures – Defined Fixing Point for Strip Disk must be defined - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
TO BE DONEA) Assembly sequence.B) Assembly tools.C) End stave electronics boards support definition.D) Mechanical integration with strip parts (barrel & disks)
MVD PIXEL-COOLINGCARBON FOAM TESTED
DISKS COOLING DEFINED & TESTED, SMALL DISKS TO BE OPTIMIZED
BARREL COOLING DEFINED &TESTED, TO BE OPTIMIZED
OPEN ITEM: TEST WITH MASTER BOND GLUE
CFD SIMULATION
COOLING PLANT-FIRST DRAFS OF PIXEL PARTS
Cooling TDR
DONE & WRITTEN1) Pixel cooling system:
• Pixel power• Thermal request• Working condition
2) Test on carbon foam (Young modulus and thermal conductivity at different radiation fields)3) Disks cooling system:
• Description• Fem analyses and test results on prototype• Pressure drop
4) Barrel cooling system:• Description• Fem analyses and test results on prototype
5) CFD simulation6) Cooling plant:
• Description• Pixel modularity• First drafts
TO BE DONEA) Tests with Master Bond glueB) Cooling for the End stave electronics boardsC) Strip part integration in the cooling plantD) Final design of the cooling plant