FPSO Cidade de Itaguaí MV26 Integration @ BrasFels Shipyard 12 Modules Lifting Campaign Jan 12 – 28, 2015
23
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO Cidade de Itaguaí MV26Integration @ BrasFels Shipyard

12 Modules Lifting Campaign

Jan 12 – 28, 2015

Page 2: MV26-Cidade de ItaguaiFPSO Module Installation

Arrival of MV26 @ BrasFels on 07 Jan 2015

Page 3: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

1st Lifting dated 12 Jan 2015 => 3P- 4 MODULE @Port-side

3

Page 4: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

2nd Lifting dated 13 Jan 2015 => 1P MODULE @Port-side

4

Page 5: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

3rd Lifting dated 14 Jan 2015 => 1C MODULE @Stbd-side

Page 6: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

4th Lifting dated 15 Jan 2015 => 0C MODULE @Port-side

6

Page 7: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

5th Lifting dated 16 Jan 2015 => 4P- 2 MODULE @Port-side

7

Page 8: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

6th Lifting dated 22 Jan 2015 => 3P- 3B MODULE @Port-side

8

Page 9: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)Lifting dated 23 Jan 2015 => 5P-2 MODULE Transfer from Yard to

Barge After welding completion of 4-additional Pad-eyes

9

Page 10: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

7th Lifting dated 24 Jan 2015 (AM) => 5P- 2 MODULE @Port-side

10

Page 11: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

Module Delivery dated 24 Jan 2015 (AM) => 3P-1 & 2P-1 MODULES

11

Page 12: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

8th Lifting dated 24 Jan 2015 (PM) => 3P-1 MODULE @Port-side

12

Page 13: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

9th Lifting dated 25 Jan 2015 (AM) => 2P-1 MODULE @Port-side

13

Page 14: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

10th Arrival & Lifting dated 25 Jan 2015 (Noon) => 2P-2 MODULE

14

Page 15: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

Bird’s Eye-view => Lifting of Module & Start of Vessel Turning

15

Page 16: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

Vessel Turning with Port-side along Finger Pier dated: 26-Jan-15

16

Page 17: MV26-Cidade de ItaguaiFPSO Module Installation
Page 18: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)Shifting of Fwd Crane Boom for access of last 2-modules 2S-3 &

2S-4 11th Lifting dated 27 Jan 2015 => 2S- 3 MODULE @Stbd-side

18

Page 19: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

Replacing Lifting Bars and Gears from 2S-3 to 2S-4 Module lifting Started the last lifting, Module 2S-4 from

Temporary Holding Area

19

Page 20: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

12th and Last Module Lifting dated 28-Jan-15 => 2S-4 MODULE

20

Page 21: MV26-Cidade de ItaguaiFPSO Module Installation

FPSO CIDADE de ITAGUAÍ MV26 (Pilot-6)

12th and Last Module Lifting dated 28-Jan-15 => 2S-4 MODULE