1C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Selection:The most critical part of maintenance
N. Hampton & J. Perkel
7/31/2019 MV Reliability Hampton & Perkel 110507
2/35
2
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Acknowledgements This material is based upon work supported by the
Department of Energy under Award No DE-FC02-
04CH1237 and CDFI.
Any opinions, findings, conclusions or recommendationsexpressed in this material are those of the author(s) and donot necessarily reflect the views of the Department ofEnergy.
7/31/2019 MV Reliability Hampton & Perkel 110507
3/35
3
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Outline Motivation
SAGE
Selection
Choice of when to start
Choice of location
Choice of action
Choice of diagnostic
Impact of Selection on Benefits / Value
7/31/2019 MV Reliability Hampton & Perkel 110507
4/35
7/31/2019 MV Reliability Hampton & Perkel 110507
5/35
5C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
SAGE
7/31/2019 MV Reliability Hampton & Perkel 110507
6/35
6
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
A Useful Way to Visualize thisSAGE
Selection of circuits Actions that might be taken
Generation of data including Diagnostics
Evaluation of the outcome
The name of the herb Sage comes fromthe Latin salvere or salvation meaning 'to
be in good health, to cure, to save.'
7/31/2019 MV Reliability Hampton & Perkel 110507
7/35
7
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Expectations
No.ofF
ailures
Failures Increasing
Failures Decreasing
Selection
Action
Generation
Evaluation
Failures increasingas time passes since test
7/31/2019 MV Reliability Hampton & Perkel 110507
8/35
8C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Selection
Choice of when to start
Choice of location
Choice of actionChoice of diagnostic
7/31/2019 MV Reliability Hampton & Perkel 110507
9/35
9C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
When to start?
How to spot the trend
How late can you leave it before it is too late
7/31/2019 MV Reliability Hampton & Perkel 110507
10/35
10
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Falling Reliability
Year
Failur
es
2015201320112009200720052003
800
700
600
500
400
300
200
100
0
Whenshould we
start aprogram?
7/31/2019 MV Reliability Hampton & Perkel 110507
11/35
11
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Bathtub Curve for Failures
0
2
4
6
8
10
12
14
16
18
20
0 50 100 150 200 250 300
Time
Tot
alNum
berofFailur
es
Early FailuresWeibull Shape 1TBF decreases
Time Between Failures
7/31/2019 MV Reliability Hampton & Perkel 110507
12/35
12
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Too Soon
7/31/2019 MV Reliability Hampton & Perkel 110507
13/35
13
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Too Late
Aging
7/31/2019 MV Reliability Hampton & Perkel 110507
14/35
14
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Just Right...
7/31/2019 MV Reliability Hampton & Perkel 110507
15/35
7/31/2019 MV Reliability Hampton & Perkel 110507
16/35
7/31/2019 MV Reliability Hampton & Perkel 110507
17/35
17C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Location
The failure rate is not the same everywhere
7/31/2019 MV Reliability Hampton & Perkel 110507
18/35
18
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Selecting from the Whole Population
7/31/2019 MV Reliability Hampton & Perkel 110507
19/35
19
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Local Failure Rates
Port ion of t he Syst em
LocalFailureRate-relto
overalla
verage(%
)
250
200
150
100
50
0
100
7/31/2019 MV Reliability Hampton & Perkel 110507
20/35
20
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Local Failure Rates - Importance
Importance
RelativeFailureRate
(%
ofaverage)
HighMediumLow
200
150
100
50
0
100
7/31/2019 MV Reliability Hampton & Perkel 110507
21/35
21C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Action
How the circuits fail will determine how they are fixed
Age and Type will also determine actions
7/31/2019 MV Reliability Hampton & Perkel 110507
22/35
22
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Failures by Equipment Type
Perce
ntage
ofserv
icefailures(%
)
AccessoriesUnknown SourceCable
100
80
60
40
20
0
7/31/2019 MV Reliability Hampton & Perkel 110507
23/35
23
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Length adjusted MV system
InstalledCapacity(%)
UNKNOWNTRXLPEEPRXLPEHMWPEPILC
100
90
80
70
60
50
40
30
20
10
0
25
50
75
7/31/2019 MV Reliability Hampton & Perkel 110507
24/35
24C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Diagnostic
What diagnostic to use for which actions andequipment
7/31/2019 MV Reliability Hampton & Perkel 110507
25/35
25
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Selection of Diagnostic
Diagnostic technologies are available that provide eitherlocalized or global assessments of circuits.
These techniques should fit with the actions that will betaken.
Diagnostic should be sensitive to the prevalent failuremechanism.
7/31/2019 MV Reliability Hampton & Perkel 110507
26/35
26
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Failure by Equipment Type
Perce
ntage
ofserv
icefailures(%
)
AccessoriesUnknown SourceCable
100
80
60
40
20
0
7/31/2019 MV Reliability Hampton & Perkel 110507
27/35
27C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Economic Benefit
7/31/2019 MV Reliability Hampton & Perkel 110507
28/35
28
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Data for Economics Calculations
Different data are needed before one can begin tocompute the economics for diagnostic programs
System Diagnostic
7/31/2019 MV Reliability Hampton & Perkel 110507
29/35
29
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Consequence
Diagnostic Program CostsCost [$]
Selection
Diagnostic
Maintenance Total DiagnosticProgram Cost
7/31/2019 MV Reliability Hampton & Perkel 110507
30/35
30
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
System Data
Failure Rate
Global
Local Maintenance/Replacement costs
repair
rejuvenation replacement
Cost of Poor Reliability
Reliability indices Customer, regulator, or media intervention
Emergency restoration cost
7/31/2019 MV Reliability Hampton & Perkel 110507
31/35
31
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Diagnostic Data
Selection
Testing
Diagnostic vender or equipment Switching crew
Pilot Study data from testing in other areas
Percent of tested population requiring each level ofmaintenance (i.e. percent of segments that needed to bereplaced according to diagnostic)
Percent of tested segments failing on test Accuracy (i.e. how often do segments perform as
diagnosed?)
7/31/2019 MV Reliability Hampton & Perkel 110507
32/35
32
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Consequence
Diagnostic Program CostsCost [$]
Selection
Diagnostic
Maintenance Total DiagnosticProgram Cost
7/31/2019 MV Reliability Hampton & Perkel 110507
33/35
33
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Program Savings
b
7/31/2019 MV Reliability Hampton & Perkel 110507
34/35
34
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Population Composition
7/31/2019 MV Reliability Hampton & Perkel 110507
35/35
35
C26D Medium Voltage Underground Cable Reliability - Fall 2007 ICC Meeting Scottsdale, AZ
Summary
Selecting the right segments to test is key to achievinggood performance from the diagnostic program
Selection should focus on failure rates and importance ofcircuits.
System cannot be either too good or too bad.
Chosen diagnostic technique should match the systemcharacteristics (i.e. failure mechanism) and possible
maintenance actions
A diagnostic program requires substantial planning to beeffective.