Westinghouse Non-Proprietary Class 3 1 © 2017 Westinghouse Electric Company LLC. All Rights Reserved. Rick Easterling Vice President, Technical Services & Licensing Multinational Regulatory Influence on New Nuclear Construction Projects
11

Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

Jul 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

Westinghouse Non-Proprietary Class 3

1

© 2017 Westinghouse Electric Company LLC. All Rights Reserved.

Rick Easterling

Vice President, Technical Services & Licensing

Multinational Regulatory Influence on New

Nuclear Construction Projects

Page 2: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

2

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

Westinghouse’s Worldwide Presence

Westinghouse’s operations and its new

plant project opportunities span five

continents

Hutchinson, MN*

Shoreview, MN

Lake Bluff, IL

Burr Ridge, IL

Richland, WA

Ogden, UT

Goodyear, AZ

Dallas, TX

Glen Rose, TX

Chattanooga, TN

Waynesboro, GA

Jenkinsville, SC

Columbia, SC

Rock Hill, SC

Cranberry Twp, PA

Churchill, PA

Blairsville, PA

Madison, PA

New Stanton, PA Washington, DC

Canton, MA

Newington, NH

Toronto, Canada

Metz, France

Orsay, France Marseille, France

Mannheim, Germany

Nivelles, Belgium

Brussels, Belgium

Springfields, United Kingdom

Chorley, United Kingdom

Västerås, Sweden

Täby, Sweden

Prague, Czech Republic

Temelín, Czech Republic

Kiev, Ukraine

Kharkov, Ukraine*

Krško, Slovenia

Sofia, Bulgaria

Baden, Switzerland

Tarragona, Spain

Madrid, Spain

Beijing, China

Haiyang, China

Nantong, China*

Shanghai, China Sanmen, China

Mumbai, India

Seoul, South Korea

Daejeon, South Korea*

Tokyo, Japan

Kobe, Japan

Tokai, Japan

Kumatori, Japan

Taipei, Taiwan

Rio de Janeiro, Brazil Pretoria, Republic of South Africa

Cape Town, Republic of South Africa

Windsor, CT

Charlotte, NC

Page 3: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

3

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

AP1000™ Project Update: China / Sanmen

Recent Milestones:

Sanmen Unit 1: Hot Supplemental Testing completed 30 June 2017

Sanmen Unit 2: Containment Integrated Leak Rate Test completed 31 May 2017

Next Milestone:

NNSA Permission to Load Fuel in Sanmen 1 AP1000 is a trademark or registered trademark of Westinghouse Electric

Company LLC, its affiliates and/or its subsidiaries in the United States of

America and may be registered in other countries throughout the world. All

rights reserved. Unauthorized use is strictly prohibited. Other names may

be trademarks of their respective owners.

Page 4: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

4

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

AP1000 Project Update: China / Haiyang

Recent Milestones:

Haiyang Unit 1: Hot Supplemental Testing completed 13 July 2017

Haiyang Unit 2: Containment Integrated Leak Rate Test completed 23 July 2017

Next Milestone:

NNSA Permission to Load Fuel in Haiyang 1

Page 5: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

5

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

AP1000 Project Update – Vogtle 3 & 4

• Southern Company has

assumed responsibility for

plant construction

• Construction of both units

proceeding without interruption Unit 3

Unit 4

Unit 3 Unit 4

Transformers

DG Fuel Oil

Storage Tanks

Natural Draft

Cooling Towers

Unit 3 CV

Unit 3

Turbine Building

Page 6: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

6

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

AP1000 Project Update – Vogtle 3

Unit 3 Containment

& Shield Building

Unit 3

Turbine Building

View inside Unit 3 Containment Vessel

1st of 2 Steam Generators being prepared for installation View inside Unit 3 Turbine Building

Units 1 &2

MSR

Page 7: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

7

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

AP1000 Project Update – Vogtle 4

View inside Unit 4 Containment Vessel

View inside Unit 4 CA20 Module

CA20 Module

CA01 Module

Unit 4 Turbine Building

CV

Unit 4 Containment

& Shield Building

Unit 4

Turbine Building Unit 3

Page 8: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

8

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

Future AP1000 Projects

• United Kingdom – AP1000 GDA completion achieved in March 2017 – Toshiba currently evaluating options for NuGen ownership and

Moorside project

• India – NPCIL plan for six AP1000 units at Kovvada site – Preliminary contract favorably concluded technical feasibility of the

AP1000 plant design as adapted for India, with key priority areas/development work identified for the early licensing phase

– Technical and commercial offer being negotiated with NPCIL, Department of Atomic Energy, and Government of India

• Turkey – Continuing to discuss potential Nuclear Project applying AP1000

and CAP1400 plant designs – Preliminary site investigations anticipated to begin in 2017

Page 9: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

9

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

Observations regarding MDEP and Member

Regulatory Authorities

• Wide differences in regulatory approach – Prescriptive vs. non-prescriptive approach

– Vendor interaction with regulator (direct vs. non-direct)

– Scope of review (separation of vendor vs. utility scope)

– Codes & standards, and demonstration of equivalence vs.

redesign (e.g. IEC vs. IEEE)

• Differences in timing and stages of review

– One-step vs multi-step licensing processes

– Regulatory reviews are at different stages due to differing

project implementation schedules

Despite differences in approach among members,

the MDEP AP1000 Working Group provides a

valuable vehicle for sharing perspectives and

bases for regulatory decision-making

Page 10: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

10

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

Observations regarding MDEP AP1000 Working

Group

• Working Group provides means to discuss differences in regulatory philosophy and approach – Understanding of the basis of the country-of-origin regulator’s

design certification – Ability to achieve alignment on acceptability of resolution of common

issues – Understanding of the basis for exemptions (e.g., Operating Basis

Earthquake)

• Working Group provides means for informal discussion of topics important to plant safety and of issues associated with first-of-a-kind components

• Provides regulatory personnel with opportunity to obtain prompt response to critical questions – assuring plant safety while potentially minimizing construction or startup impacts

Page 11: Multinational Regulatory Influence on New Nuclear Construction … · 2017-09-19 · Tarragona, Spain Tokai, Japan Madrid, Spain Kumatori Beijing, China Haiyang, China Shanghai, China

11

Westinghouse Non-Proprietary Class 3 © 2017 Westinghouse Electric Company LLC. All Rights Reserved.

Observations regarding MDEP AP1000 Working

Group

• Promotes design standardization and plant safety – Publishing common MDEP position papers is important to

achieve a standard regulatory approach (e.g., paper

addressing Fukushima-related issues)

– MDEP initiatives contribute to improve plant safety, including

through information-sharing

– MDEP initiatives facilitate design standardization and

common design approach to key issues

AP1000 Working Group is expected to continue playing an important supporting role in the startup of Sanmen & Haiyang in the near term and in the

future licensing of AP1000 in India and Turkey