AFRICAN DEVELOPMENT BANK GROUP
PROJECT : CÔTE D’IVOIRE, LIBERIA, SIERRA LEONE AND GUINEA
NETWORKS INTERCONNECTION (CLSG)
COUNTRY : MULTINATIONAL (Côte d’Ivoire, Liberia, Sierra Leone, Guinea)
PROJECT APPRAISAL REPORT
ONEC DEPARTMENT
October 2013
TABLE OF CONTENTS
I. STRATEGIC THRUST AND OBJECTIVES ....................................................................... 1 1.1 Project Linkages with Country Strategy and Objectives ............................................ 1 1.2 Rationale for Bank Involvement ................................................................................. 1 1.3 Donor Coordination..................................................................................................... 2
II. PROJECT DESCRIPTION ................................................................................................... 3 2.1 Project Description and Components .......................................................................... 3 2.2 Technical Solution Adopted and Alternatives Explored ............................................. 4 2.3 Project Type ................................................................................................................ 5 2.4 Project Cost and Financing Arrangements .................................................................. 5 2.5 Project Areas and Beneficiaries .................................................................................. 6 2.6 Participatory Approach for Project Identification, Design and Implementation,
inlcuding Active Participation of the Private Sector and Civil Society ...................... 7 2.7 Bank Group Experience and Lessons Reflected in Project Design ............................ 7 2.8 Key Performance Indicators ........................................................................................ 8
III. PROJECT FEASIBILITY ................................................................................................... 8 3.1 Economic and Financial Performance. ............................................................................ 8 3.2 Environmental and Social Impacts .............................................................................. 9
V. LEGAL FRAMEWORK..................................................................................................... 17 5.1 Legal Instrument ....................................................................................................... 19 5.2 Conditions Associated with Bank Intervention ......................................................... 19 5.3 Compliance with Bank Policies ................................................................................ 21
VI. RECOMMENDATIONS ................................................................................................... 21
ANNEX I: Comparative socio-economic indicators in Côte d'Ivoire, Liberia, Sierra
Leone and Guinea
ANNEX II: Table of Bank Portfolio in Cote d'Ivoire, Liberia, Sierra Leone and Guinea
ANNEX III: Major related projects financed by the Bank and other development
partners in Côte d'Ivoire, Liberia, Sierra Leone and Guinea
ANNEX IV: Map of Project Area
i
Currency Equivalences April 2013
1 UA = USD 1.49920
1 UA = EUR 1.16987
1 UA = GNF 10 590.1
1 UA = SLL 6 546.156
1 UA = LRD 111.6904
1 UA = XOF 767.3844
Fiscal Year
1 January - 31 December
Weights and Measures
Km Kilometre = 1 000 meters
kV Kilovolt = 1 000 volts
kW Kilowatt = 1 000 watts
MW Megawatt = 1 000 000 watts or 1 000 kW)
kWh Kilowatt-hour = 1 000 watt-hours
Acronyms and Abbreviations
ADF
:
African Development Fund
AfP : Agenda for Prosperity
AfT : Agenda for Transformation
CI-ENERGIES : Société des Énergies de Côte d’Ivoire (Cote d’Ivoire Electricity
Corporation)
CO2 : Carbon Dioxide
ECOWAS : Economic Community of West African States
EDG : Electricité de Guinée (Guinea Electricity Corporation)
ERR : Economic Rate of Return
ESIA : Environmental and Social Impact Assessment
ESMP : Environmental and Social Management Plan
EU : European Union
FIRR : Financial Internal Rate of Return
FSF : Fragile States Facility
GDP : Gross Domestic Product
GHG : Greenhouse Gas
IDA : International Development Agency
LEC : Liberia Electricity Corporation
NDP : National Development Plan
NELSAP : Nile Equatorial Lakes Subsidiary Action Program
NPA : National Power Authority
NPC : National Power Corporation
NPV : Net Present Value
NTF : Nigeria Trust Fund
OMVS : Senegal River Development Organization
PAP : Project-Affected Person
PRSP : Poverty Reduction Strategy Paper
RAP : Resettlement Action Plan
ii
RBCSP : Results-Based Country Strategy Paper
SCADA : Supervisory Control and Data Acquisition System
SOFRO : Strategic and Operational Framework for Regional Operations
SPC : Special Purpose Company
TOR : Terms of Reference
UA : Unit of Account
WAPP : West Africa Power Pool
WAPP JIC : West African Power Pool Joint Implementation Committee
iii
PROJECT INFORMATION SHEET
CLIENT INFORMATION SHEET
GRANTEES/BORROWERS Republic of Cote d'Ivoire
Republic of Liberia
Republic of Sierra Leone
Republic of Guinea
EXECUTING BODIES Special Purpose Company, known as Regional Electricity Transmission Company for CLSG (TRANSCO CLSG)
Related Activities:
Ministry of Mines, Petroleum and Energy of Côte d'Ivoire
Ministry of Lands, Mines and Energy of Liberia
Ministry of Energy of Sierra Leone
Ministry of State for Energy and the Environment of Guinea
EXECUTING AGENCIES Regional Electricity Transmission Company for CLSG (TRANSCO
Republic of Cote d’Ivoire 2.87 2.87 Investment budget
Republic of Liberia 8.62 8.62 Investment budget
Republic of Sierra Leone 3.67 3.67 Investment budget
Republic of Guinea 2.83 2.83 Investment budget
TOTAL COST 35.87 149.52 102.49 43.63 331.51
iv
IMPORTANT FINANCIAL INFORMATION ON BANK GROUP LOANS AND GRANTS
ADF loan to Liberia,
Sierra Leone and Guinea
ADF grant to Cote
d'Ivoire, Sierra Leone
and Guinea – FSF
grant to Liberia
NTF loan to Sierra Leone
Loan/Grant Currency Unit of Account (UA) Unit of Account (UA) United States Dollar (USD)
Type of Interest N/A N/A N/A
Interest Rate Margin
N/A N/A N/A
Service charge on
ADF loans
0.75% per year on the
disbursed portion of the loan
outstanding.
N/A 0.75% per year on the disbursed portion
of the loan outstanding.
Commitment charge
on ADF loans
0.5 % on the undisbursed
portion of the loan with effect
from 120 days after the signing
of the Loan Agreement
N/A
0.5 % on the undisbursed portion of the
loan with effect from 120 days after the
signing of the Loan Agreement
Loan maturity 50 years N/A 20 years
Grace period and
ADF loan repayment 10 years N/A 7 years
FIRR 12.0 % NPV UA 55.47 million
ERR 26.5 % ENPV UA 697.51 million
TIMEFRAME – MAIN MILESTONES (EXPECTED)
Concept note approval 23 May 2012
Project approval November 2013
Effectiveness of grants and loans May 2014
Completion report February 2018
Last disbursement December 2017
Last repayment December 2064
v
PROJECT SUMMARY
1. Project Overview
1.1. The Côte d'Ivoire, Liberia, Sierra Leone and Guinea (CLSG) electricity networks
interconnection project involves the construction of a 1,357-km-long double circuit high
voltage (225 kV) line to connect the national networks of the four countries. The construction
of this line is part of the backbone of the Mano River Union countries and the priority projects
of the West African Power Pool (WAPP) Master Plan. The project will help establish a
dynamic electric power market in the West African sub-region and secure power supply for
participating countries which have a comparative advantage in importing power rather than
producing it at high costs using their national systems. The project, estimated at an overall
cost of UA 331.51 million, net of taxes, will be implemented over the 2014-2017 period. The
contribution of the Bank Group (ADF, FSF and NTF) amounts to UA 128.15 million (or
38.66% of the total cost).
1.2. The direct beneficiaries of the project are the residents of its impact area (24 million
inhabitants) who will have reliable electric power at competitive cost. The project will raise
the average electricity access rate in the four countries from 28% in 2012 to 33% by 2017.
The increased electricity access will generally contribute to improving the welfare of the
beneficiaries and lead to the development of social and income-generating activities. More
particularly, the project will electrify about 115 communities located along the power line and
supply electric power to 70 schools, 30 health centres, and approximately 1,500 small
handicrafts, commercial and industrial businesses, 25% of which are operated by women.
These achievements will help improve the performance of schools and health’s services, as
well as increase the incomes of the people. The project will have direct spin-offs on national
power corporations whose financial situation will improve as a result of the savings on
production costs and the increased income generated by exporting countries.
2. Needs Assessment: The socio-political crises in Liberia and Sierra Leone led to the
destruction of the public electric power infrastructure of these countries. Owing to the low
levels of investment in the sector in recent years, the power infrastructure has become
obsolete with the attendant outcome of extremely poor quality of service. The cost of electric
power production per kWh remains very high in these countries whose energy mix is
predominantly thermal (62% on average) and where the electricity access rate is among the
lowest in the world (2% in Liberia and Sierra Leone, 10% in Guinea). The unavailability of
electric power and its high cost are among the main obstacles to economic development and
poverty reduction in these countries. Of all the Mano River Union countries, Côte d’Ivoire
enjoys a more favourable situation with an electrification rate of 34% and a low-cost
production capacity. The CLSG project is a structuring project which, in its first phase, will
enable Liberia, Sierra Leone and Guinea to import electricity from Côte d’Ivoire. The
construction of the power line will also foster development of the huge hydroelectric potential
of the sub-region (by the States and/or the private sector) by offering the possibility of electric
power trade between the countries within the WAPP larger market.
3. Bank’s Added Value: The Bank has a good knowledge of the electricity sector in
West Africa and rich experience in the definition and implementation of regional projects. On
account of its involvement right from the feasibility study stage, it was able to guide the
technical choices and take into account all aspects of the project, especially the environmental
and social aspects. Drawing on its experience, the Bank ensured all appropriate measures
would be taken for effective mitigation of the project’s environmental and social impacts.
vi
Indeed, the complexity of the project and the important basic legal documents necessary for
its success required the Bank’s involvement. In this regard, the Bank contributed to the
preparation of such important documents as the International Project Agreement, the Treaty
establishing the Project Company, and the Power Purchase Agreement. In addition, the
Bank’s intervention facilitated the mobilization of huge resources from other donors for the
financing of the project.
4. Knowledge Management: The preparation of the above documents and the
establishment of a Specific Purpose Company (SPC) for the construction and operation of the
interconnection are innovations in the appraisal and management of the regional project. The
experience gained during the project preparation and the assessment of the SPC performance
will be used for the design and improvement of the regional project management mechanism
at the Bank. The project will include a capacity building component to ensure the transfer of
knowledge to national structures so as to improve the management of future interconnections
in West Africa. This project will also provide an opportunity to improve knowledge in the
area of regional infrastructure, especially through joint project supervision missions by
donors, close monitoring by the Bank’s field offices, the consulting engineer responsible for
works control and project accounts auditors, all of whose reports will constitute sources of
information on the achievement of project objectives.
vii
Results-Based Logical Framework of the Project
Country and Project Name: Multinational – Côte d’Ivoire, Liberia, Sierra Leone and Guinea Electricity Networks Interconnection Project
Project Goal: Facilitate sustainable energy trade between Côte d’Ivoire, Liberia, Sierra Leone and Guinea
RESULTS CHAIN
PERFORMANCE INDICATORS
MEANS OF VERIFICATION RISKS/MITIGATION MEASURES
Indicator
(including CSI) Baseline Situation Target
IMP
AC
T
A sustainable energy market is established and
strengthened between the countries involved and at
regional level
Energy consumption per
capita (kWh)
In 2012:
Cote d’Ivoire: 290
Liberia: 83
Sierra Leone: 24
Guinea: 97
In 2017:
Côte d’Ivoire: 305
Liberia: 120
Sierra Leone: 30
Guinea: 110
Annual reports of national
electricity corporations
RISKS
1. Risk of delays by governments in
ratifying the Treaty on the establishment of
the SPC;
2. Risk of difficulties and/or delays in mobilizing national counterpart funds and
risks of delays in the release of the right-of-
way due to delays in the payment of compensation by the governments of the
four countries;
3- Risk of poor performance by the SPC; 4- Risk of inadequacy of national grid sub-
stations to sustain effective consumption of
the energy traded; 5- Risk of significant procurement delays;
6- Risk of shortage of energy in Côte
d'Ivoire for its own consumption needs and for export to other countries;
7- Commercial risk related to the inability
of national power corporations to pay their
SPC bills;
8- Risk related to coordination and State
intervention;
9- Risk related to the fragile nature of the
four countries.
MITIGATION MEASURES
1- WAPP and the Joint Implementation
Committee strive to adhere to the project
preparation and implementation schedule;
2- The countries' counterpart funds are not
substantial and represent less than 10% of the project cost. Furthermore, the Ministries
of Finance of the four countries are
informed well in advance so that they may take necessary steps in terms of budgeting.
- Confirmation by the four countries of the
budgeting of resources required to compensate affected persons prior to the
start-up of works;
- Strengthening of the capacity of national
Electrification rate
28% on average in 2012
CI: 34%, Liberia: 2%
SL: 2%, Guinea:12%
33% on average in 2016
Côte d’Ivoire: 40%, Liberia: 6%
Sierra Leone: 6%, Guinea: 20%
EX
PE
CT
ED
OU
TC
OM
ES
Volume of energy trade N/A More than 590 GWh from
2016
Reports of ADB
supervision missions
Quarterly progress reports
Project completion reports
Reports of Ministries of
Trade
Reports of Ministries of
Energy and the Economy
and Finance
Average electricity
production cost per
kilowatt/hour
More than 20 cents USD
in 2012
15 cents USD as from 2020
Outage times Guinea, Sierra Leone: 1/3
coverage
Liberia: no load-shedding
CI: 55 hours of outage
per year/no load-
shedding
100% coverage during peak
periods in participating
countries
Number of jobs
N/A
Creation of 5,000 direct jobs
and 2,000 indirect jobs during
the implementation phase, and
450 permanent jobs at the end
of the project
Women's access to
electricity
Income generated for women
by access to electricity
0% electricity along the
corridor
70% of women have
incomes below the
poverty line
- 70% rate of electrification of
localities along the corridor,
50% of whose population are
women
- 30% of women have incomes
below the poverty line
viii
Reduction in carbon dioxide
(CO2) emissions
N/A
3.36 million tonnes avoided
from 2016
institutions responsible for implementing
the compensation plan and establishment of
a Grievance Committee; 3. Establishment of an Executive Committee
and a Steering Committee to monitor the
SPC’s performance; and recruitment of an
Internal Auditor;
4. The rural electrification component of the project;
5. The executing body will be supported by
a Procurement Expert; 6. Côte d’Ivoire is already taking steps to
balance the country’s energy supply and
demand (implementation of a project to generate 1,097 MW of reserves in Côte
d'Ivoire in 2016);
7. Setting up of reimbursement accounts for
the SPC;
8. Under the Treaty signed by the Heads of
State, the SPC will own the line.
9. Intensification of regional dialogue
among Mano River Union countries - the
Heads of State of participating countries has
signed the Treaty.
Increased availability and reliability of
telecommunications (ICT) in the four countries
Length of optical fibre lines
N/A
1,357 km of backbone line from
2016
OU
ITP
UT
S
1. Construction of high voltage lines;
2. Construction of sub-stations and high- and medium-voltage reactive power
compensation banks;
3. Construction and modernization of the regional SCADA;
4. Rural electrification;
5. Institutional support to WAPP and the countries;
6. Compensation of affected persons and
mitigation of adverse impacts; 7. Audit reports and quarterly reports.
Length of high-voltage line
constructed;
Number of sub-stations
constructed;
Logistical and operations
equipment installed;
Number of connected
localities;
Training program
implemented;
Adverse impact mitigation
measures;
Timely submission of audit
and quarterly reports.
N/A
1,357 km of 225-kV power line
constructed in 2016;
12 sub-stations constructed by
2016;
Construction of the SCADA in
Guinea;
Logistical and operations
equipment procured;
115 localities connected (CI:
29; Liberia: 28; SL: 26; Guinea:
32);
Training program implemented
in 2014;
RAP fully implemented by
2015.
ADB supervision mission
reports;
Progress reports produced
by implementation agency;
Project completion report.
COMPONENTS
KE
Y A
CT
IVIT
IES
-
I. Infrastructure (UA 233.51 million)
Construction of the line;
Construction of sub-stations;
Installation of the supervisory control and data acquisition system (SCADA);
Static VAR compensators (SVC);
Frequency compensation equipment.
II. Studies, supervision & control (UA 56.51 million)
Audit;
Project Implementation Unit (SPC/Management Unit/Consulting Engineer);
Capacity building for WAPP and the countries;
Interim interests during the construction;
Environmental and social impact mitigation measures.
III. Rural electrification (UA 41.49 million)
Total: UA 329.88 million
INPUTS
Bank Group UA 128.15 million (38.66%)
World Bank UA 88.57 million (26.70%)
EIB UA 61.98 million (18.70%)
KfW UA 26.27 million (7.90%)
EU/Africa UA 8.55 million (2.6%)
Governments (IDC +
ESIA)
UA 17.99 million (5.4%)
TOTAL UA 331.51
ix
CLSG Project Implementation Schedule
1
MANAGEMENT’S REPORT AND RECOMMENDATION
Management hereby submits the present report and recommendations concerning (i) an
exceptional waiver of the Application of the Rule of Origin for the Procurement of Goods, Works and
Services financed by the Nigeria Trust Fund; and (ii) the following proposals for (a) a Fragile State
Facility (FSF) grant of UA 1.12 million to Liberia; (b) Nigeria Trust Fund (NTF) loan of USD 10
million to Sierra Leone; (c) African Development Fund (ADF) loan of UA 24.94 million to Liberia;
(d) ADF loan of UA 14.50 million to Sierra Leone; (e) ADF loan of UA 28.91 million to Guinea; (f)
ADF grant of UA 33.00 million to Côte d’Ivoire; (g) ADF grant of UA 7.12 million to Sierra Leone;
and (h) ADF grant of UA 11.89 million to Guinea.
I. STRATEGIC THRUST AND OBJECTIVES
1.1 Project linkages with country strategies and objectives
1.1.1 This project is in line with the development strategies of the participating countries. Indeed, it
is consistent with: (i) the fifth pillar of the National Development Plan (NDP) 2012-2015 for Côte
d’Ivoire: Repositioning of Côte d'Ivoire on the regional scene; (ii) the second strategic pillar of
Liberia’s Agenda for Transformation 2012-2020: Improving infrastructure and basic services; (iii) the
first pillar of Sierra Leone’s Agenda for Prosperity (AfP) 2013-2017: Diversifying the economy to
promote inclusive growth; and (iv) the third and fourth pillars of Guinea’s PRSP 2013-2015, namely:
Development of infrastructure to support growth and Reinforced access to basic social services and
resilience of households.
1.1.2 At regional level, the project is consistent with the energy development strategy of the
Economic Community of West African States (ECOWAS) as reflected in the West African Power
Pool (WAPP)1. As such, the project is one of the five priority sub-programmes of the WAPP Master
Plan, and represents a segment of the backbone of Mano River Union countries.
1.1.3 As regards the country strategies at the Bank, the project is consistent with: (i) Pillar 1 of
Côte d'Ivoire’s CSP 2013-2017 on support for revitalization of production; (ii ) Pillar 1 of Liberia's
CSP 2013-2017: “Promotion of inclusive economic growth through transformative infrastructure
investments”; (iii) Pillar 2 of Sierra Leone’s CSP 2013-2017: “Support for Transformational and
Sustainable Infrastructure Development”; (iv) Pillar 2 of Guinea’s RBCSP 2012-2016 relating to the
development of basic infrastructure. The project is consistent with the Bank’s Strategic and
Operational Framework for Regional Operations (SOFRO) which states that “The Bank Group will
continue to support the WAPP during the ADF 12 period by funding several interconnection projects
in the existing reserve.” Moreover, the project will also contribute to the implementation of the
priority infrastructure identified in the Bank’s Regional Integration Strategy Paper (RISP 2011-2015)
for West Africa and in the Program for Infrastructure Development in Africa (PIDA).
1.2 Rationale for Bank Involvement
1.2.1 The four Mano River Union countries are fragile and have just emerged from long socio-
political crises. The damage caused by these crises make this region one of the poorest in Africa. The
Bank Group, following the visit of Senior Management to the countries in 2012, intends to offer
1 WAPP: The West African Power Pool was established in 2006. It seeks to pool energy resources of the countries of the sub-region through the integration of national power grids for the creation of a unified regional electricity market.
2
assistance to Côte d'Ivoire, Liberia, Sierra Leone and Guinea so as to boost regional cooperation in the
area of infrastructure, including electricity.
1.2.2 The electricity sector in the Mano River Union countries is facing major constraints, namely:
(i) low electricity access rate (28% on average in 2010 and 2% for Liberia); (ii) a structural deficit in
electric power supply which meets no more than 30% of demand that is growing at an average annual
rate of about 7%; (iii) predominance of thermal energy production (62%) in the sub-region’s energy
mix which, on account of the soaring oil prices, contributes substantially to the rising cost of
electricity and increases greenhouse gas emissions; and (iv) limited financial and institutional
capacities of national electricity corporations.
1.2.3 These countries have significant energy resources, located mainly in Guinea and Côte
d'Ivoire, both of which are endowed with water resources. The project will help put in place structural
infrastructure in the regional electricity sector and a regional electricity market through the gradual
integration of isolated and small-scale national grids into a unified interconnection system.
Furthermore, the infrastructure will promote the development of hydroelectric sites (clean and low-
cost electric power) along the route of the power lines by facilitating transmission of the energy
produced. By easing transmission, the project will help overcome the structural weaknesses caused by
the small size of national economies and create a favourable and attractive environment for the private
sector which would be able to invest in major electricity-producing infrastructure, thereby achieving
economies of scale.
1.2.4 The Bank's involvement is justified by: (i) the project's alignment with the Bank's long-term
strategy (LTS) for the 2013-2022 period, which advocates transformation towards an inclusive and
green growth, particularly through regional integration; (ii) the consistency of the project with the
Bank's energy policy which aims to support the efforts of regional member countries to provide their
entire populations and production sectors with access to modern, reliable and low-cost energy
infrastructure and services; (iii) the fact that the CLSG project is a segment of the backbone of the
Mano River Union countries and one of WAPP's priority sub-programmes, thus acting as a driving
force in the economic development of the Mano River Union and, by extension, of ECOWAS; (iv) the
leading role of the CLSG project in the implementation of the Action Plan of the Program on
Infrastructure Development in Africa (PIDA); and (v) the crucial experience that this project will
provide in the area of regional project implementation.
1.3 Donor Coordination
1.3.1 Table 1.3 below and Annex 3 provide a list of technical and financial partners, and their
respective amounts of financing for the beneficiary countries of this project. These interventions are
coordinated within thematic working groups, of which the Bank is a member, formed in Cote d'Ivoire,
Liberia and in Guinea. Such groups have not yet been set up in Sierra Leone. However, this project
was jointly prepared and appraised by the various donors involved, under WAPP coordination. In
addition, consultations were held to prepare the various legal documents.
3
Table 1.3
Donor Coordination
Electricity Sub-sector
Amount
GDP Exports Labour
Côte d’Ivoire 2% 4% 3% Liberia 0.5% 0% 1%
Sierra Leone 0.7% 0% 0.2%
Guinea 0.58% 0% 1.0%
Stakeholders
Government Donors
CI: UA 150 million
(24.5%) UA 460 m (75.5%) EU (7%), IDA (7%), BOAD (21%), Eximbank China (67%), other donors (2%)
LR (3.8%) UA 265 million WB (40%), USAID (20%), EU (17%), Germany (14%), others (7%)
SL UA 167 million WB (88%), UE (6%), JICA (6%) GU: UA 139.6 million
(29%) 336.7 (71%) ADF (6.01%), IDA (5.74%), Eximbank China (65.58%), other donors (22.67%)
Aid coordination level
CI LB SL GU
Existence of thematic working groups in the sub-sector Yes Yes No Yes
Existence of an overall sector-based program Yes No No Yes
ADB’s role in aid coordination Member Member N/A Member
II. PROJECT DESCRIPTION
2.1 Project Description and Components
2.1.1 The project consists mainly in the construction of a high voltage interconnection network
linking Côte d’Ivoire, Liberia, Sierra Leone and Guinea. Other activities related to the construction of
infrastructure are also envisaged, including the electrification of localities situated along the power
line, capacity building for WAPP and the countries, conduct of studies on the planning and feasibility
of hydroelectric power stations to strengthen energy trade and the project management. The project
implementation will help complete the WAPP interconnection network and enhance power supply
security by 290 MW.
Table 2.1
Project Components
Name of
Component
Total
Project
Cost (UA
million)
Bank
Financing
(UA
million)
% Description
Infrastructure 233.51 86.32 36.97
* Construction of a 1,357 km-long 225-kV power line; a
54 km-long 66-kV power line; eleven 225/33-kV
transformer stations and strengthening of a 225/33-kV
transformer station;
*Construction of a control centre in Guinea and
strengthening of a control centre Côte d’Ivoire;
* Static VAR compensators (SVC) in CI;
* Frequency regulation equipment (Static VAR
compensator - SVC)
Rural
Electrification 41.49 32.94 79.39
* Services (implementation study, audit, control and
works supervision);
* Construction of networks and sub-stations for 115
communities;
* Operating costs: Executing agencies of the rural
electrification component.
4
Project Studies
and Management 56.51 8.89 15.73
* Audit;
* Operating costs of the SPC and WAPP;
* Control and supervision of the high voltage construction
works;
* Capacity building (WAPP + countries);
*Implementation and monitoring of the ESMP and RAP;
*Various studies (feasibility of dams in Côte d’Ivoire and
Sierra Leone, study on the Linsan Fomi power line, study
on Liberia’s Master Plan);
*Compensations.
Total 331.51 128.15 38.66
2.2 Technical Solution Adopted and Alternatives Explored
2.2.1 The project involves the construction of a 1,357-km-long high voltage (225 kV) transmission
network, with a transit capacity of 290 MW, 12 sub-stations and two control centres. The technical
solution adopted consists in constructing a line equipped with double circuit towers for the installation
of two power transmission circuits. However, in the first phase, a single circuit will be installed to
allow transit of 83 to 145 MW of power for the pool by the end of the project. The installation of the
second circuit provided for in a second phase will allow the network to operate at full capacity of 290
MW, which will be achieved after the commissioning of the new plants (including Yiben, Bikongor in
Sierra Leone, Kassa B in Guinea and Mano in Liberia). This phased installation of the transmission
network is a common practice in the electrical industry. It offers better supply security and optimizes
investment costs. The alternatives explored include: continuation of the development of national grids
without considering energy pooling possibilities and the immediate construction of a double circuit
transmission line and the construction of two single circuit transmission lines. The reasons for their
rejection are summarized in the table below.
Table2.2
Alternative solutions explored and causes of rejection
Alternative
Solution
Brief Description Cause of Rejection
Continuation of the
development of
national systems
No electricity network
interconnection between
countries: each country will
continue on its own to cope with
the increasing demand,
depending on the type of energy
sources
The respective countries alone
cannot, for the time being,
absorb all the power generated
by the huge dams, nor can they
export the surplus for want of
interconnection infrastructure
Higher average cost of production per kWh;
Lower supply security;
Cost of investment in hydroelectric plants extremely
high and difficult to be borne by each country;
Not consistent with the regional development plan
and does not allow for optimization of production
plans;
For the time being, the respective countries alone
cannot absorb all the power generated by the huge
dams, nor can they export the surplus for want of
interconnection infrastructure.
Construction of a
double circuit 22-
kV power line with
the installation of
two circuits
A two-circuit interconnection
power line with immediate
installation of the two circuits.
High immediate investment;
Capacity too huge for the countries’ current needs;
Inadequacy of available production.
Construction of two
single-circuit 225-
kV power lines
Two parallel 225-kV power
lines, with each line having a
single circuit.
Very expensive solution in terms of investment,
requiring a larger power line corridor;
Impossibility of achieving optimal integration of the
power grids of the four countries into the WAPP.
5
2.3 Project Type
2.3.1 The project is a multinational investment operation. The proposed financing instruments are
loans and grants from ADF, NTF, FSF and EU-Africa Infrastructure Trust Fund resources.
2.4 Project Cost and Financing Arrangements
2.4.1 The total project cost, net of taxes and customs duties, was estimated by the project studies
and updated at appraisal at UA 331.51 million. It includes a 5% provision for physical contingencies
and a 5% provision for price escalation.
Table 2.3
Cost Estimate by Component
Components UA Million
% Foreign Exchange Foreign Exchange Local Currency Total
Infrastructure 180.03 31.77 211.80 63.9%
Rural electrification 31.99 5.64 37.63 11.4%
Project studies and management 36.19 15.51 51.70 15.6%
BASE COST 248.21 52.93 301.14 90.8%
Physical Contingencies 12.24 2.57 14.82 4.5%
Provision for price escalation 12.85 2.70 15.56 4.7%
TOTAL PROJECT COST 273.31 58.20 331.51 100.0%
Percentage 82.4% 17.6% 100.0%
2.4.2 The project will be financed by: (a) the Bank Group (ADF - national allocations of the four
countries, resources earmarked for regional operations, the FSF and NTF under the conditions
specified in the project information sheet on page iv that were negotiated and accepted by the
governments of the four countries [the exchange rates used are those on page i]; (b) the World Bank
and KfW in Liberia; (c) the EIB and the EU/Africa Trust Fund in Sierra Leone; and (d) the
governments of Côte d'Ivoire, Liberia, Sierra Leone and Guinea as shown in Tables 2.4 and 2.5 below.
2.4.3 The Bank is engaged in parallel co-financing with the World Bank, the EIB and KfW, and
joint financing with the EU/Africa Trust Fund, all of which approved the project in 2012. The EIB
loans will be enhanced by additional funding from the EU/Africa Trust Fund to make them
concessional and, in particular, to settle the interests during the grace period of the repayment of the
principal.
2.4.4 Given that the four countries are in principle eligible for Bank financing for the project up to
more than 90%, their counterpart funding for Bank-financed components was limited to payment of
compensations to project affected persons (PAPs) (see Technical Annex B.2 Table 2 for details) and
bank interests incurred during the power line construction.
Table 2.4
Cost Estimate by Source of Financing
Sources of Financing UA million
% total Foreign Exchange Local Currency Total
ADF (grant) 43.04 8.97 52.01 15.7%
ADF (loan) 58.10 10.25 68.35 20.6%
Nigeria Trust Fund (NTF) 5.67 1.00 6.67 2.0%
Fragile States Facility (FSF) 0.78 0.34 1.12 0.3%
EU/Africa Trust Fund 7.27 1.28 8.55 2.6%
World Bank 70.84 17.73 88.57 26.7%
European Investment Bank 52.69 9.30 61.98 18.7%
KFW 22.33 3.94 26.27 7.9%
Governments 12.60 5.40 17.99 5.4%
Total 273.31 58.20 331.51 100.0%
Percentage 82.4% 17.6% 100.0%
6
Table 2.5
Costs by Category of Project Expenditure
Expenditure Category Total Financing (UA million)
Foreign Exchange Local Currency Total % of Foreign Exchange
Works 226.80 40.02 266.82 80.5%
Goods 1.62 0.34 1.966 0.6%
Services 22.09 8.36 30.450 9.2%
Recurrent 9.70 3.87 13.57 4.1%
Others 13.09 5.61 18.69 5.6%
Total 273.31 58.20 331.51 100.0%
Percentage 82.4% 17.6% 100%
2.4.5 Bank Group resources will be used to finance the entire infrastructure in Guinea and Côte
d'Ivoire, the segment from the Côte d'Ivoire-Liberia border to the Liberia-Guinea border, the section
of the line from the Guinean border to Yiben in Sierra Leone, including the Kamakwi and Yiben sub-
stations; the partial financing of capacity building for WAPP and executing agencies within the States,
as well as full financing of rural electrification (see details in technical Annex Table B2.1).
2.5.1 The interconnection line runs from Man in Côte d’Ivoire through Liberia and Sierra Leone to
Linsan and Nzérékoré in Guinea. However, considering its regional character, the extended impact
area covers large part of the ECOWAS region that extends from Guinea to Nigeria. The incidence of
poverty is fairly high in the project area (PA), with a prevalence rate of 23.8% in Côte d’Ivoire, 35.2%
in Liberia, and unknown for Guinea and Sierra Leone.
2.5.2 The project will benefit the populations, especially those living in the direct project impact
area and the various sectors of the economy of the four countries. These populations are estimated at
24 million and comprise mostly women (51%) and youths under 30 years of age (70%). These people
are severely affected by unemployment and under-employment. Thus, the project will have a
significant positive impact on the activities of the PA inhabitants in general, and on those of women
and young people in particular, in terms of new employment opportunities, increased business
activities, improved access to socio-economic infrastructure, reduced load-shedding times and the
lower electricity rates that it will engender. The most significant positive impacts expected are: (i)
7
increased productivity of socioeconomic development sectors, including school performance; (ii)
increased value added of national economies; (iii) increased incomes for young people and women
thanks to training and the creation of job opportunities; and (iv) sharp decline in poverty levels among
the populations.
2.6 Participatory approach for project identification, design and implementation, including
active participation of the private sector and civil society
2.6.1 The stakeholders held more than 30 meetings, including Ministerial meetings, during the
project appraisal and feasibility studies, and in the course of the environmental and social impact
assessment (ESIA). Consultations were also organized in Abidjan, Monrovia, Freetown, Conakry and
in the areas crossed by the power line, in an effort to address the needs and concerns of the project
beneficiaries. The meetings were held under the auspices of WAPP, the services of the Ministries and
agencies involved in the energy sector in the four countries, the local population, civil society, donors
and development partners involved in the sector and the Secretariat of the Mano River Union. All
these meetings made it possible to: (i) collect information and available data required to analyse the
situation in the sector; (ii) establish the project institutional framework and prepare the draft legal
documents; (iii) strengthen project ownership by the countries and donor coordination; (iii) define
project components on the basis of the needs, strategies and priorities expressed by key stakeholders,
including the local population; and (iv) share proposed solutions with the populations to address the
needs or avert the adverse impacts identified. During the project implementation phase, this
collaboration will continue and include the implementation of the Environmental and Social
Management Plan (ESMP), the Resettlement Action Plan (RAP), and the infrastructure component
prior to the establishment of the SPC.
2.7 Bank Group Experience and Lessons Reflected in Project Design
2.7.1 The project drew on the Bank's rich experience in the financing of multinational
infrastructure projects, including the Ghana, Togo and Benin interconnection project in West Africa,
the Senegal River Development Organization (OMVS) project and the NELSAP interconnection
project. The project design incorporated the lessons learned from these projects and detailed in
Technical Annex B1, the recommendations of the analysis of regional project completion reports
carried out by the Bank's Operations Evaluation Department (OPEV), and governance-related
recommendations expressed in the Outliers and Exceptions Report.
2.7.2 The main problems mainly concern: (i) the plethora of project stakeholders who usually have
different technical and operational capacities; (ii) lack of harmonization and coordination of project
activities in the various countries; (iii) inadequacies of the countries and national electricity
corporations in procurement, mobilization of financial compensation and performance monitoring;
(iv) inadequacy of the resources proposed in the project design and supervision, and significant delays
in the project completion; (v) delays in fulfilling the disbursement conditions due to long delays in the
preparation and signing of project agreements; (vi) delays in mobilizing government counterpart funds
which in turn delay the compensation of project-affected persons (PAPs)
2.7.3 To address these shortcomings, this project envisages: the establishment of an SPC to
coordinate project activities in the four countries; the development of a series of agreements, including
an international project agreement, an electric power purchase agreement and a transmission service
agreement; support for national public services and WAPP through the project's capacity building sub-
component; the inclusion of the detailed project design in the bidding documents to limit
contingencies during project implementation; budgeting of the project counterpart funds by the
countries for 2014; and donor and WAPP assistance in preparing the project and all documents
required for its smooth implementation.
8
2.8 Key Performance Indicators
2.8.1 The major expected outcomes and means of verification are detailed in the project matrix.
The impact measurement indicators are: (i) electricity access rate; and (ii) the number of direct and
indirect jobs created. The baseline for these indicators as defined in the logical framework will be
verified and an evaluation conducted at mid-term and at the end of the project by the relevant national
electricity corporations, namely CI-ÉNERGIES, LEC, NPA, EDG, and by the SPC.
2.8.2 Project implementation performance indicators will also be monitored. They were selected on
the basis of the Bank's institutional performance indicators. These mainly include: (i) the timeframe
for implementation and fulfilment of the conditions precedent to first the disbursement; (ii) the
procurement timeframes; and (iii) changes in the disbursement rate depending on expenditure
schedules. These indicators will be monitored during supervision missions and in the day-to-day
project management.
III. PROJECT FEASIBILITY
3.1 Economic and Financial Performance
The following are the key financial and economic performance indicators of the project:
Table 3.1
Key financial and economic performance indicators of the project
Baseline scenario FIRR: 12.0% NPV: UA 55.47 million
ERR: 26.5% Eco NPV: UA 697.51 million
NB: Detailed assumptions and calculations are presented in Technical Annex B.7
3.1.1 Financial Performance
3.1.1.1 The financial internal rate of return (FIRR) and the net present value (NPV) were calculated
on the basis of the cost-benefit method for the implementation and commissioning of the project. The
financial benefits taken into account consist of revenue from the transit of energy through the line and
the share, attributable to the line, of profits accruing from the sale of imported energy by the
participating countries. These are project costs, excluding the provision for price escalation, and the
costs of management, operation and maintenance of the structures. The analysis covers a period of 30
years, comprising 4 years of project implementation and 26 years of operation of project structures,
covering the medium-term repayment of the SPC’s financial commitments (see Technical Annex
B.7.1).
3.1.1.2 The tariffs for energy transit through the line will be set at levels that cover the operating
expenses of the SPC and ensures its capacity to repay debts with an average coverage ratio of 1.5 per
annum, while remaining accessible to the importer who will always have an interest in using the line.
Furthermore, the present average cost of energy production in importing countries (Liberia, Sierra
Leone and Guinea) during the first year of operation of the power line will still be higher than the cost
of imported energy from Côte d’Ivoire (purchase cost and transit fees), which shows the advantage of
constructing the power line.
3.1.2 Economic and Financial Performance
3.1.2.1 The economic costs used to calculate the economic rate of return (ERR) and the economic
net present value (ENPV) are project costs net of taxes and net of provision for price escalation,
adjusted for appropriate conversion factors for equipment, works, services and labour. Maintenance
costs and other operating expenses are subject to the same process. The economic benefits derived
from the project comprise, in addition to the rights to use the line, savings realized on the cost of
production by the energy-importing countries, compared to a situation without project where they
9
would generate their own electricity at a higher cost. The project will reduce CO₂ emission by 5.6
million tons, compared to a situation without project. The value of this carbon reduction by
hydroelectric power-importing countries would further enhance the project's economic performance
(see Technical Annex Table B.7.2).
3.2 Environmental and Social Impacts
Environment
3.2.1 The project is classified in Category 1 based on the scope of works and especially the adverse
environmental and social impacts identified. The detailed Environmental and Social Impact
Assessment (ESIA), the Environmental and Social Management Plan (ESMP) and the Resettlement
Action Plan (RAP) were completed in 2011 and updated in 2013. The respective summaries of the
ESIA and RAP were posted on the Bank's website and distributed to the Board of Directors on 3 July
2013. Considering that the project is classified in Category 1, summaries will be posted for 120 days
prior to the date of the Board meeting.
3.2.2 The main negative environmental impacts of the project were clearly identified in the ESIA.
These impacts will be mitigated by implementing the appropriate measures contained in the ESMP.
For more details, see the ESIA summary published on the Bank's website. Furthermore, the main
constraints on implementing the ESMP in the four countries have been assessed, and appropriate
measures incorporated into the project framework (see Annex B.8.1 for more details). The main
positive impact concerns the reduction of emission of greenhouse gases such as CO₂. The total cost of
ESMP implementation (excluding the RAP cost) is estimated at USD 3,263,234 comprising: (i) USD
874,561 for Côte d'Ivoire; (ii) USD 1,060,000 for Liberia; (iii) USD 892,160 for Sierra Leone; and
(iv) USD 436,513 for Guinea. A portion of these costs will be financed by ADF, particularly those
related to capacity building and monitoring of ESMP implementation and the rest will be borne by the
countries. In addition, the electrification of communities along the power line constitutes an
enhancement measure for the populations.
Climate Change
3.2.3 Climate-related risks and vulnerabilities identified in the project area are: (i) increased
frequency and intensity of floods and storms; (ii) rising sea levels, which could lead to coastal erosion;
and (iii) prolonged flooding and high exposure to corrosion, specifically for Liberia where a segment
of the power grid runs close to the coast between the Monrovia and Mano sub-stations. The
transmission line will be designed and constructed according to the best international engineering
standards to ensure physical resistance to the major climate risks identified. This will entail taking into
account such factors as: (i) the speed of high winds/wind storms; (ii) water levels; (iii) geotechnical
conditions; and (iv) corrosion safeguards. The project will contribute to the mitigation of climate
change by avoiding the emission of approximately 5.6 million tons of CO2 when the countries resort
to hydroelectric energy imports.
Gender
3.2.4 The project beneficiaries are diverse and include young people and women. The project will
have impacts on gender issues in its impact area. By allowing household access to electricity services,
improved livelihoods and better social services, the project will improve the lives of children,
adolescents, youths, men and women, in particular. The project will help reduce electricity
expenditure for households that already have electricity access, thus enabling them to save and
reallocate the saved resources to other priority needs such as food, health and education, or use them
to meet the needs of children, the elderly and people with disabilities. Social and economic
vulnerability prevails throughout the project area. In addition, the project will reduce the time spent in
search of energy sources, especially for girls and women who may use the time saved for productive,
10
educational or recreational activities. Rural electrification will help to: (i) strengthen existing activities
carried out by women, particularly in the processing and marketing of agro-pastoral products; (ii)
create new income-generating activities for women; and (iii) improve safety for women and children.
Social
3.2.5 The project will have positive and negative social impacts. The main positive impacts are
related to rural electrification of over 115 communities, 70 schools, 30 health centres, 50 carpenters’
workshop and mills, and the creation of income-generating activities in the villages concerned,
development of small and micro-enterprises, and the creation of 5,000 direct jobs and 2,000 indirect
jobs, during the implementation phase, and 450 permanent jobs at the end of the project. Finally, the
project will improve the living conditions and well-being of the populations. The negative social
impacts include the loss of land, crops and incomes related thereto, and the destruction of residential
structures and buildings; land ownership problems; conflicts related to land use; spread of
communicable diseases such as sexually transmitted infections (STIs) and HIV/AIDS due to the high
number of temporary jobs, risks of electrocution and falling of pylons. These negative impacts will be
mitigated by appropriate ESMP measures such as provision of personal protection gear during
construction, carrying out STI/HIV/AIDS awareness campaigns targeted at workers and communities,
educating the public about the risks of wildfire and encouraging contractors to recruit local labour.
Forced Resettlement
3.2.6 The project will cause the physical displacement and/or economic displacement of a total of
5,267 people in the four countries, comprising 112 in Guinea, 3,312 in Sierra Leone, 1,151 in Liberia,
and 692 in Côte d'Ivoire. The project will result in loss of business, the total or partial loss of crops
and farmland, loss of access to community infrastructure, and loss of residential structures.
3.2.7 Resettlement Action Plans (RAPs) have been prepared for each country. These plans have
identified the project-affected persons (PAPs), the affected property and its value, as well as measures
to compensate and/or assist PAPs and restore livelihoods. Resettlement costs will be funded by the
four governments. The resettlement process is scheduled to last a year. The RAP and ESMP will be
implemented by the four governments in collaboration with the SPC. Monitoring and evaluation of
PAPs and the communities will be conducted through concrete mechanisms in the four countries,
including qualitative and quantitative indicators and with the participation of civil society.
3.2.8 The total cost of the RAPs stands at USD 15,579,647, broken down as follows: (i) 1,680 138
for Côte d'Ivoire; (ii) 9,108,286 for Liberia; (iii) 2,924,854.80 for Sierra Leone; and (iv) 1,866,368 for
Guinea. Each country must, in accordance with the RAP, provide evidence of having compensated the
PAPs prior to the start-up of works. That will be a condition precedent to the first disbursement of the
Bank’s financial assistance.
IV. IMPLEMENTATION
4.1 Implementation Arrangements
Executing Agency
4.1.1 The project implementation will be entrusted to the Special Purpose Company (SPC) and that
related activities associated with the project will be carried out by the five executing agencies, namely
WAPP and the four National Power Corporations.
4.1.2 Cote d'Ivoire, Liberia, Sierra Leone and Guinea have agreed, jointly and severally, to
establish, by treaty, a supranational SPC for the financing, construction, operation, development and
ownership of the electric interconnection line (CLSG). The share capital will be owned equally by the
national power corporations of the four countries. Pending the establishment of the SPC, expected by
11
end-2013, preliminary procurement and recruitment operations will be implemented by the Joint
Implementation Committee referred to as WAPP-JIC2, established in 2008 and comprising WAPP
Secretary-General and country representatives. The Treaty, By-laws and Shareholders' Agreement
have been drawn up by the four governments with the assistance of donors' lawyers. An International
Project Agreement is being finalized. Evidence of the establishment of the SPC is a condition
precedent to first disbursement of Bank financing.
4.1.3 The SPC will comprise a Project Manager, a Financial Officer, an Accounting Officer, a
Technical Coordinator, an Environmental and Social Management Coordinator, a Procurement
Expert, an Internal Auditor, a Legal Counsel and heads of the three project implementation units. It
will be assisted and controlled by three supervisory bodies, namely the Management Committee, the
Steering Committee, and the Treaty Secretariat.
4.1.4 Given that the related activity - capacity building - is one that transcends individual States, it
will be carried out by WAPP. The four countries have agreed to transfer the allocations for this
component to WAPP.
4.1.5 The related activity titled “Rural Electrification” will be performed by national entities on
behalf of each State. The four countries have agreed to delegate the overall coordination of this
component to WAPP. The project envisages supply of equipment and operating resources to national
project implementation units and the payment of monthly allowances to unit staff.
4.5.1.1 In Côte d’Ivoire, the executing agency is the Ministry of Petroleum and Energy. The
executing agency tasked with implementing the “Rural Electrification” component will be located
within the CI-Energy Corporation (CI-ÉNERGIES). A unit will be established under the responsibility
of the Project Coordinator, consisting of two engineers, an environmental expert, an administrative
and financial officer, an accountant, a procurement expert, an assistant and a driver.
4.5.1.2 In Liberia, the executing agency is the Ministry of Lands, Mines and Energy. The executing
agency of the “Rural Electrification” component will be located within the Liberia Electricity
Corporation (LEC). A unit will be established under the responsibility of the Deputy Director-General
of Planning and will consist of two Engineers, an Environmental Expert, an Administrative and
Financial Officer, an Accounting Officer, a Procurement Expert, an Assistant and two drivers. The
project will also support the unit through technical assistance consisting of a Procurement Expert who
will, in the course of the activities, transfer skills and build capacities, and an expert who will handle
the organization of the procurement unit.
4.5.1.3 In Sierra Leone, the executing agency is the Ministry of Energy. The executing agency will
be located within the National Power Authority (NPA). The current project implementation unit will
be strengthened by an Engineer, an Environmental Expert, an Accounting Officer, an Assistant and
two drivers. Due to the limited capacity of NPA’s procurement unit, the project will also support the
unit by way of technical assistance consisting of a Procurement Expert who will, as the activities
unfold, transfer skills and build capacities.
4.5.1.4 In Guinea, the executing agency is the Ministry of State for Energy. It was decided that the
Guinea Electricity Corporation (Electricité de Guinée - EDG) should be the executing agency acting
as the Coordination Unit for ADB projects within the EDG Directorate of Studies and Planning.
Under the responsibility of the Project Coordinator, the unit will be strengthened by two Engineers, an
Accounting Officer, a Procurement Expert and two drivers.
4.1.6 Implementation of the CLSG project will cover the 2014-2017 period, and the power line is
expected to begin operating in 2017.
2 WAPP JIC: West African Power Pool - Joint Implementation Committee
12
Procurement Arrangements
4.1.7 The procurement of goods, works and services financed by the ADF and the EU/Africa Trust
Fund under this project, will be in accordance with the Bank’s Rules and Procedures for the
Procurement of Goods and Services or, as appropriate, the Rules and Procedures for the Use of
Consultants (May 2008 Edition, revised in 2012), using appropriate standard bidding documents of
the Bank.
4.1.8 Works on the construction of power lines and Regional Control Centres (SCADA) and goods
(IT equipment and vehicles) for the SPC will be procured by the SPC and WAPP. The latter will act on
behalf of the SPC or on behalf of the project's Steering Committee pending the effective setting up of the
SPC.
4.1.9 Procurement relating to capacity building for WAPP and the countries, as well as the purchase
of goods (IT equipment and vehicles) for capacity building purposes will be undertaken by WAPP.
4.1.10 Procurement activities in respect of the rural electrification component of the project will be
undertaken by CI-Energy Corporation (CI-ÉNERGIES) in Côte d'Ivoire, Liberia Electricity Corporation
(LEC) in Liberia, the National Power Authority (NPA) in Sierra Leone and the Guinea Electricity
Corporation (Électricité de Guinée - EDG) for Guinea.
4.1.11 Apart from funding from ADF resources, the Republic of Sierra Leone has access to financing
from the resources of the Nigeria Trust Fund (NTF) for high voltage infrastructure and the EU-Africa
Infrastructure Trust Fund for the rural electrification component. In compliance with the Bank's
procurement rules and procedures, the proceeds of any loan, investment or other financing undertaken as
part of the NTF operations will be used for procurement of goods and works, including the related
services, provided by bidders from eligible member countries. As such, and considering that this project
is funded almost entirely from ADF resources for which the rule of eligibility and origin has been
cancelled, a waiver for non-application of the Bank’s criteria of eligibility and origin is requested
from the Board of Directors, in accordance with Article 4.1 of the Agreement establishing the NTF. Regarding operations of the EU-Africa Infrastructure Trust under which the rural electrification
component is being financed, pursuant to Board of Directors Resolution No. B/BD/2010/15 of
20/07/2010, the Bank agreed to extend procurement eligibility for operations financed from the
resources of the EU-Africa Trust Fund to: (i) members of the European Union that are not members of
the Bank; and (ii) member States of the African, Caribbean and Pacific Community (ACP) which are
not members of the Bank. Accordingly, under this extension and considering that the rule of origin
was waived with regard to ADF funding, the same treatment will be applied to procurement financed
by NTF and the EU-Africa Fund.
4.1.12 Following assessment of the procurement systems of the four countries, the use of national
procedures is recommended for national competitive bidding initiated by the project implementation
unit for the case of Côte d'Ivoire, subject to addressing the disparities that were identified and
summarized in the overall Action Plan presented in Annex B5. However, given that the use of national
procedures is not recommended for Liberia, Sierra Leone and Guinea, the ADF rules and procedures
will be used in the national competitive bidding process initiated by the respective project
implementation units of these countries.
Disbursement
4.1.13 With regard to the SPC, which will be known as the CLSG Regional Electricity Transmission
Company (TRANSCO), the four methods of disbursement recommended in the Bank's Disbursement
Handbook may be used for withdrawals. For the funding of each CSLG Member State, this company
will open, where applicable, a special account with the Central Bank and an advance account with a
commercial bank. These accounts, which will revert to the Company, must be managed separately,
13
according to the Bank's disbursement rules and procedures and, where appropriate, in collaboration
with the structures in charge of the debt of the borrower/grantee Member States and in accordance
with the disbursement rules and procedures.
4.1.14 Concerning the other executing agencies, the direct payment and special account methods
will be used for withdrawals. For the funding of CSLG Member States, the executing agencies will
also open, where applicable, a special account with the Central Bank and an imprest account with a
commercial bank. These accounts, which will revert to the executing agencies, will be managed
separately, according to the Bank's disbursement rules and procedures and, where appropriate, in
collaboration with the structures in charge of the debt of borrower/grantee Member States.
Financial Management
4.1.15 The financial management of CLSG Interconnection Project will be conducted within the six
executing agencies: (i) the CLSG Regional Electricity Transmission Company, as concerns the
Transmission Infrastructure; (ii) the four National Power Corporations (NPCs) of the CSLG Member
States, as concerns the Rural Electrification and Studies component; and (iii) WAPP, as concerns the
management of capacity building activities.
4.1.16 The funding allocated by the Bank to this project will be on-lent to each executing agency by
the beneficiary governments under the same terms and conditions as specified in the project
information sheet on page iv, which were negotiated and accepted by the governments of the said
countries.
Table 4.1
Onlending between the governments and the executing agencies (in UA million)
NTF Loan, EU-Africa Infrastructure Trust Fund Grant) and Guinea (ADF Loan, ADF Grant) to
support the implementation of the project and will act as executing agency within the framework of
the grant provided to Sierra Leone by EU- Africa Infrastructure Trust Fund.
5.2 Conditions associated with Bank intervention
A. Conditions precedent to effectiveness of the ADF grants to Côte d'Ivoire, Sierra Leone and
Guinea, the ADF loans to Liberia, Sierra Leone and Guinea, the NTF loan to Sierra Leone,
and the FSF Pillar 1 grant to Liberia
(i) Effectiveness of the ADF and FSF grants shall be subject to the signing of the
respective Protocol Agreements by the parties; and
(ii) Effectiveness of the ADF loans and NTF loan shall be subject to fulfilment, by the
borrowers, of the conditions set forth in Section 12.01 of the General Conditions.
18
B. Conditions precedent to the first disbursement of the ADF grants to Côte d'Ivoire, Sierra
Leone and Guinea, the ADF loans to Liberia, Sierra Leone and Guinea, the NTF loan to
Sierra Leone, and the FSF Pillar 1 grant to Liberia.
In addition to fulfilling the conditions relating to the effectiveness of the above-mentioned grant and
loan agreements, the borrowers/recipients should fulfil the following the conditions precedent to the
first disbursement:
1. Conditions precedent to first disbursement of the ADF grants, ADF loans, and the NTF loan
on-lent/ on-granted to the Special Purpose Company (SPC) for the construction, operation
and maintenance of the CLSG transmission line and substations
(i) Each State shall provide the Bank/ Fund with evidence of signing an on-lending/
on-granting agreement with the SPC, upon terms and conditions acceptable to the
Fund/Bank ;
(ii) Where applicable, the concerned State shall provide the Bank/Fund with evidence
of the opening, by the SPC, of a special account with a bank acceptable to the
Bank/Fund to receive the funds on-lent/ on granted to the SPC ; and
(iii) The State hosting the SPC Headquarters shall provide the Bank/ Fund with
evidence of: (1) ratification of the Treaty by the CLSG Member States; (2)
evidence that the share capital for the SPC has been paid in full; and (3)
appointment of the manager and of the accountant for the SPC, whose skills and
qualifications are acceptable to the Fund.
2. Conditions precedent to the first disbursement of the ADF grants, the FSF Pillar 1 grant and
the ADF loans on-lent/ on-granted to the national electricity corporations (NECs) for
management of the rural electrification component
(i) Each State shall provide the Bank/ Fund with evidence of signing an on-lending/on-
granting agreement with the relevant NEC upon terms and conditions acceptable to
the Fund/Bank ; and
(ii) Each State shall provide the Bank/ Fund with evidence of opening of a special
account with a bank acceptable to the Bank/ Fund to receive the portion of the
Loan/ Grant to be on-lent/ on-granted to the relevant NEC.
3. Conditions precedent to the first disbursement of the ADF grants on granted to WAPP for the
management of capacity building activities
(i) Côte d'Ivoire, Sierra Leone and Guinea shall provide the Fund with evidence of signing
an on-granting agreement with WAPP upon terms and conditions acceptable to the
Fund ; and
(ii) The above-mentioned three States shall provide the Fund with evidence of the opening
by WAPP of a special account in a bank acceptable to the Fund to receive the on-
granted resources.
C. Other conditions relating to the ADF grants and loans, and the NTF loan
(i) Liberia shall submit to the Bank, not later than 20 June 2014, the agreements on the
funding of the Project by the World Bank and KfW;
19
(ii) Sierra Leone shall submit to the Bank, not later than 30 June 2014, the agreement on
the funding of the Project by the EIB;
(iii) Each State shall, prior to commencement of works on its territory, provide evidence of:
(i) acquisition of land and/ or compensation of the Project Affected Persons (PAPs) in
each concerned lot, in compliance with the Bank rules and procedures and of the
ESMP; and / or (ii) provide evidence of having an escrow account and deposited
resources earmarked for the compensation of the PAPs that have not yet been
compensated, in accordance with the Environmental and Social Management Plan and
the Compensation Payment Schedule;
(iv) The State hosting the SPC Headquarters shall: (i) submit to the Bank/Fund a copy of
the International Project Agreement signed between the CLSG Member States and the
SPC, whose terms and conditions are acceptable to the Bank/Fund; (ii) a copy of the
Shareholders’ Agreement signed between the NECs; and (iii) preparation of the SPC
organization chart and adoption of the Project Implementation Manual and financial
manual by the SPC, within six months from the date of first disbursement; and
(v) Each state shall provide evidence of appointment of an accountant and an assistant
account at the Project Implementation Unit (PIU) of the relevant NEC, whose
qualifications are acceptable to the Bank/Fund.
D. Undertakings. Each State undertakes to:
(i) Implement and report on implementation of the Environmental and Social Management
Plan (ESMP) and the updated RAP on a semi-annual basis, no later than 30 days at the
end of each reporting period, in a form acceptable to the Fund/ Bank; and
(ii) Prior to commencement of works, submit an Environmental and Social Management
Framework for the rural electrification component of the Project.
5.3 Compliance with Bank policies
This project complies with all the applicable Bank policies.
VI. RECOMMENDATIONS
Management recommends that the Board of Directors approve:
i. A waiver to the application of Article 17 (1) (d) of the Agreement Establishing the
Bank and Article 4.3 of the Agreement Between the Federal Republic of Nigeria and
the African Development Bank for the Establishment of the Nigeria Trust Fund, to
permit procurement of goods, works and services, using the resources of the NTF, to
be open to countries that are not member countries of the Bank, provided however, that
other than as provided in this paragraph, the Rules and Procedures for the Procurement
of Goods and Works and the Rules of Procedures for the Use of Consultants shall
remain applicable and
20
ii. The proposed financing of the Project, under the conditions set forth in this report, and
as follows:
(a) a FSF Pillar 1 grant amounting to UA 1.12 million to the Republic of Liberia,
(b) a NTF loan amounting to USD 10 million to the Republic of Sierra Leone
(c) an ADF loan amounting to UA 14.50 million to the Republic of Sierra Leone;
(d) an ADF loan amounting to UA 24.94 million to the Republic of Liberia;
(e) an ADF loan amounting to UA 28.91 million to the Republic of Guinea;
(f) an ADF grant amounting to UA 33 million to the Republic of Côte d'Ivoire;
(g) an ADF grant amounting to UA 7.12 million to the Republic of Sierra Leone;
(h) an ADF grant amounting to UA 11.89 million to the Republic of Guinea;
ANNEX I
Page 1/4
YearCôte
d'IvoireAfrica
Develo-
ping
Countries
Develo-
ped
Countries
Basic Indicators
Area ( '000 Km²) 2011 322 30 323 98 458 35 811Total Population (millions) 2012 20,6 1 070,1 5 807,6 1 244,6Urban Population (% of Total) 2012 52,1 40,8 46,0 75,7Population Density (per Km²) 2012 62,5 34,5 70,0 23,4GNI per Capita (US $) 2011 1 100 1 609 3 304 38 657Labor Force Participation - Total (%) 2012 37,8 37,8 68,7 71,7Labor Force Participation - Female (%) 2012 38,2 42,5 39,1 43,9Gender -Related Dev elopment Index Value 2007-2011 0,468 0,502 0,694 0,911Human Dev elop. Index (Rank among 186 countries) 2012 168 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2008-2011 23,8 40,0 22,4 ...
Demographic Indicators
Population Grow th Rate - Total (%) 2012 2,2 2,3 1,3 0,3Population Grow th Rate - Urban (%) 2012 3,6 3,4 2,3 0,7Population < 15 y ears (%) 2012 40,3 40,0 28,5 16,6Population >= 65 y ears (%) 2012 3,9 3,6 6,0 16,5Dependency Ratio (%) 2012 79,3 77,3 52,5 49,3Sex Ratio (per 100 female) 2012 103,5 100,0 103,4 94,7Female Population 15-49 y ears (% of total population) 2012 23,6 49,8 53,2 45,5Life Ex pectancy at Birth - Total (y ears) 2012 56,0 58,1 67,3 77,9Life Ex pectancy at Birth - Female (y ears) 2012 57,3 59,1 69,2 81,2Crude Birth Rate (per 1,000) 2012 33,2 33,3 20,9 11,4Crude Death Rate (per 1,000) 2012 11,4 10,9 7,8 10,1Infant Mortality Rate (per 1,000) 2012 69,7 71,4 46,4 6,0Child Mortality Rate (per 1,000) 2012 108,7 111,3 66,7 7,8Total Fertility Rate (per w oman) 2012 4,3 4,2 2,6 1,7Maternal Mortality Rate (per 100,000) 2010 400,0 417,8 230,0 13,7Women Using Contraception (%) 2012 21,0 31,6 62,4 71,4
Health & Nutrition Indicators
Phy sicians (per 100,000 people) 2004-2010 14,4 49,2 112,2 276,2Nurses (per 100,000 people)* 2004-2009 48,3 134,7 187,6 730,7Births attended by Trained Health Personnel (%) 2006-2010 56,8 53,7 65,4 ...Access to Safe Water (% of Population) 2010 80,0 67,3 86,4 99,5Access to Health Serv ices (% of Population) 1988 60,0 65,2 80,0 100,0Access to Sanitation (% of Population) 2010 24,0 39,8 56,2 99,9Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2011 3,0 4,6 0,9 0,4Incidence of Tuberculosis (per 100,000) 2011 327,0 234,6 146,0 14,0Child Immunization Against Tuberculosis (%) 2011 74,0 81,6 83,9 95,4Child Immunization Against Measles (%) 2011 49,0 76,5 83,7 93,0Underw eight Children (% of children under 5 y ears) 2007-2011 29,4 19,8 17,4 1,7Daily Calorie Supply per Capita 2009 2 670 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2010 4,7 5,9 2,9 8,2
Education Indicators
Gross Enrolment Ratio (%)
Primary School - Total 2010-2012 88,0 101,9 103,1 106,6 Primary School - Female 2010-2012 80,0 98,4 105,1 102,8 Secondary School - Total 2002-2012 27,1 42,3 66,3 101,5 Secondary School - Female 2002-2012 19,4 38,5 65,0 101,4Primary School Female Teaching Staff (% of Total) 2011 27,0 43,2 58,6 80,0Adult literacy Rate - Total (%) 2010 56,2 67,0 80,8 98,3Adult literacy Rate - Male (%) 2010 65,2 75,8 86,4 98,7Adult literacy Rate - Female (%) 2010 46,6 58,4 75,5 97,9Percentage of GDP Spent on Education 2008-2011 4,6 5,3 3,9 5,2
Environmental Indicators
Land Use (Arable Land as % of Total Land Area) 2011 9,1 7,6 10,7 10,8Annual Rate of Deforestation (%) 2000-2009 3,1 0,6 0,4 -0,2Forest (As % of Land Area) 2011 32,7 23,0 28,7 40,4Per Capita CO2 Emissions (metric tons) 2009 0,3 1,2 3,1 11,4
Sources : AfDB Statistics Department Databases; World Bank: World Development Indicators; last update :
UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.
Note : n.a. : Not Applicable ; … : Data Not Available.
COMPARATIVE SOCIO-ECONOMIC INDICATORS
Côte d'Ivoire
May 2013
60
65
70
75
80
85
2004
2005
2006
2007
2008
2009
2010
2011
2012
Infant Mortality Rate( Per 1000 )
Côte d'Ivoire Africa
0
200
400
600
800
1000
1200
1400
1600
1800
2003
2004
2005
2006
2007
2008
2009
2010
2011
GNI Per Capita US $
Côte d'Ivoire Africa
0,0
0,5
1,0
1,5
2,0
2,5
2004
2005
2006
2007
2008
2009
2010
2011
2012
Population Growth Rate (%)
Côte d'Ivoire Africa
1
11
21
31
41
51
61
71
2004
2005
2006
2007
2008
2009
2010
2011
2012
Life Expectancy at Birth (years)
Côte d'Ivoire
Africa
ANNEX I
Page 2/4
Year Liberia Africa
Develo-
ping
Countries
Develo-
ped
Countries
Basic Indicators
Area ( '000 Km²) 2011 111 30 323 98 458 35 811Total Population (millions) 2012 4,2 1 070,1 5 807,6 1 244,6Urban Population (% of Total) 2012 48,6 40,8 46,0 75,7Population Density (per Km²) 2012 37,1 34,5 70,0 23,4GNI per Capita (US $) 2011 240 1 609 3 304 38 657Labor Force Participation - Total (%) 2012 33,4 37,8 68,7 71,7Labor Force Participation - Female (%) 2012 47,6 42,5 39,1 43,9Gender -Related Dev elopment Index Value 2007-2011 0,430 0,502 0,694 0,911Human Dev elop. Index (Rank among 186 countries) 2012 174 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2007-2011 83,8 40,0 22,4 ...
Demographic Indicators
Population Grow th Rate - Total (%) 2012 2,8 2,3 1,3 0,3Population Grow th Rate - Urban (%) 2012 3,6 3,4 2,3 0,7Population < 15 y ears (%) 2012 43,5 40,0 28,5 16,6Population >= 65 y ears (%) 2012 2,8 3,6 6,0 16,5Dependency Ratio (%) 2012 86,0 77,3 52,5 49,3Sex Ratio (per 100 female) 2012 101,2 100,0 103,4 94,7Female Population 15-49 y ears (% of total population) 2012 23,4 49,8 53,2 45,5Life Ex pectancy at Birth - Total (y ears) 2012 57,3 58,1 67,3 77,9Life Ex pectancy at Birth - Female (y ears) 2012 58,4 59,1 69,2 81,2Crude Birth Rate (per 1,000) 2012 37,9 33,3 20,9 11,4Crude Death Rate (per 1,000) 2012 10,3 10,9 7,8 10,1Infant Mortality Rate (per 1,000) 2012 77,2 71,4 46,4 6,0Child Mortality Rate (per 1,000) 2012 108,0 111,3 66,7 7,8Total Fertility Rate (per w oman) 2012 5,1 4,2 2,6 1,7Maternal Mortality Rate (per 100,000) 2010 770,0 417,8 230,0 13,7Women Using Contraception (%) 2012 14,2 31,6 62,4 71,4
Health & Nutrition Indicators
Phy sicians (per 100,000 people) 2004-2010 1,4 49,2 112,2 276,2Nurses (per 100,000 people)* 2004-2009 27,4 134,7 187,6 730,7Births attended by Trained Health Personnel (%) 2007-2010 46,3 53,7 65,4 ...Access to Safe Water (% of Population) 2010 73,0 67,3 86,4 99,5Access to Health Serv ices (% of Population) 2000 39,0 65,2 80,0 100,0Access to Sanitation (% of Population) 2010 18,0 39,8 56,2 99,9Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2011 1,0 4,6 0,9 0,4Incidence of Tuberculosis (per 100,000) 2011 299,0 234,6 146,0 14,0Child Immunization Against Tuberculosis (%) 2011 73,0 81,6 83,9 95,4Child Immunization Against Measles (%) 2011 40,0 76,5 83,7 93,0Underw eight Children (% of children under 5 y ears) 2007-2011 20,4 19,8 17,4 1,7Daily Calorie Supply per Capita 2009 2 261 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2010 3,9 5,9 2,9 8,2
Education Indicators
Gross Enrolment Ratio (%)
Primary School - Total 2010-2012 103,0 101,9 103,1 106,6 Primary School - Female 2010-2012 98,2 98,4 105,1 102,8 Secondary School - Total 2010-2012 44,8 42,3 66,3 101,5 Secondary School - Female 2010-2012 40,2 38,5 65,0 101,4Primary School Female Teaching Staff (% of Total) 2011 13,9 43,2 58,6 80,0Adult literacy Rate - Total (%) 2010 60,8 67,0 80,8 98,3Adult literacy Rate - Male (%) 2010 64,8 75,8 86,4 98,7Adult literacy Rate - Female (%) 2010 56,8 58,4 75,5 97,9Percentage of GDP Spent on Education 2008 2,7 5,3 3,9 5,2
Environmental Indicators
Land Use (Arable Land as % of Total Land Area) 2011 4,7 7,6 10,7 10,8Annual Rate of Deforestation (%) 2000-2009 2,0 0,6 0,4 -0,2Forest (As % of Land Area) 2011 44,6 23,0 28,7 40,4Per Capita CO2 Emissions (metric tons) 2009 0,1 1,2 3,1 11,4
Sources : AfDB Statistics Department Databases; World Bank: World Development Indicators; last update :
UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.
Note : n.a. : Not Applicable ; … : Data Not Available.
COMPARATIVE SOCIO-ECONOMIC INDICATORS
Liberia
May 2013
0
20
40
60
80
100
120
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
Infant Mortality Rate( Per 1000 )
Liberia Africa
0
200
400
600
800
1000
1200
1400
1600
1800
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
GNI Per Capita US $
Liberia Africa
0,0
1,0
2,0
3,0
4,0
5,0
6,0
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
Population Growth Rate (%)
Liberia Africa
1
11
21
31
41
51
61
71
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
Life Expectancy at Birth (years)
Liberia Africa
ANNEX I
Page 3/4
YearSierra
LeoneAfrica
Develo-
ping
Countries
Develo-
ped
Countries
Basic Indicators
Area ( '000 Km²) 2011 72 30 323 98 458 35 811Total Population (millions) 2012 6,1 1 070,1 5 807,6 1 244,6Urban Population (% of Total) 2012 39,1 40,8 46,0 75,7Population Density (per Km²) 2012 83,6 34,5 70,0 23,4GNI per Capita (US $) 2011 340 1 609 3 304 38 657Labor Force Participation - Total (%) 2012 38,0 37,8 68,7 71,7Labor Force Participation - Female (%) 2012 50,9 42,5 39,1 43,9Gender -Related Dev elopment Index Value 2007-2011 0,354 0,502 0,694 0,911Human Dev elop. Index (Rank among 186 countries) 2012 177 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2003-2011 53,4 40,0 22,4 ...
Demographic Indicators
Population Grow th Rate - Total (%) 2012 2,1 2,3 1,3 0,3Population Grow th Rate - Urban (%) 2012 3,1 3,4 2,3 0,7Population < 15 y ears (%) 2012 42,8 40,0 28,5 16,6Population >= 65 y ears (%) 2012 1,9 3,6 6,0 16,5Dependency Ratio (%) 2012 80,8 77,3 52,5 49,3Sex Ratio (per 100 female) 2012 95,7 100,0 103,4 94,7Female Population 15-49 y ears (% of total population) 2012 24,8 49,8 53,2 45,5Life Ex pectancy at Birth - Total (y ears) 2012 48,1 58,1 67,3 77,9Life Ex pectancy at Birth - Female (y ears) 2012 48,8 59,1 69,2 81,2Crude Birth Rate (per 1,000) 2012 37,0 33,3 20,9 11,4Crude Death Rate (per 1,000) 2012 15,0 10,9 7,8 10,1Infant Mortality Rate (per 1,000) 2012 104,0 71,4 46,4 6,0Child Mortality Rate (per 1,000) 2012 157,9 111,3 66,7 7,8Total Fertility Rate (per w oman) 2012 4,8 4,2 2,6 1,7Maternal Mortality Rate (per 100,000) 2010 890,0 417,8 230,0 13,7Women Using Contraception (%) 2012 21,5 31,6 62,4 71,4
Health & Nutrition Indicators
Phy sicians (per 100,000 people) 2004-2010 1,6 49,2 112,2 276,2Nurses (per 100,000 people)* 2004-2009 16,8 134,7 187,6 730,7Births attended by Trained Health Personnel (%) 2008-2010 42,4 53,7 65,4 ...Access to Safe Water (% of Population) 2010 55,0 67,3 86,4 99,5Access to Health Serv ices (% of Population) 2000 38,0 65,2 80,0 100,0Access to Sanitation (% of Population) 2010 13,0 39,8 56,2 99,9Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2011 1,6 4,6 0,9 0,4Incidence of Tuberculosis (per 100,000) 2011 723,0 234,6 146,0 14,0Child Immunization Against Tuberculosis (%) 2011 96,0 81,6 83,9 95,4Child Immunization Against Measles (%) 2011 80,0 76,5 83,7 93,0Underw eight Children (% of children under 5 y ears) 2008-2011 21,3 19,8 17,4 1,7Daily Calorie Supply per Capita 2009 2 162 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2010 13,1 5,9 2,9 8,2
Education Indicators
Gross Enrolment Ratio (%)
Primary School - Total 2010-2012 124,7 101,9 103,1 106,6 Primary School - Female 2010-2012 120,1 98,4 105,1 102,8 Secondary School - Total 2001-2012 27,6 42,3 66,3 101,5 Secondary School - Female 2001-2012 22,5 38,5 65,0 101,4Primary School Female Teaching Staff (% of Total) 2011 25,1 43,2 58,6 80,0Adult literacy Rate - Total (%) 2010 42,1 67,0 80,8 98,3Adult literacy Rate - Male (%) 2010 53,6 75,8 86,4 98,7Adult literacy Rate - Female (%) 2010 31,4 58,4 75,5 97,9Percentage of GDP Spent on Education 2008-2011 3,6 5,3 3,9 5,2
Environmental Indicators
Land Use (Arable Land as % of Total Land Area) 2011 15,4 7,6 10,7 10,8Annual Rate of Deforestation (%) 2000-2009 2,9 0,6 0,4 -0,2Forest (As % of Land Area) 2011 37,8 23,0 28,7 40,4Per Capita CO2 Emissions (metric tons) 2009 0,2 1,2 3,1 11,4
Sources : AfDB Statistics Department Databases; World Bank: World Development Indicators; last update :
UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.
Note : n.a. : Not Applicable ; … : Data Not Available.
COMPARATIVE SOCIO-ECONOMIC INDICATORS
Sierra Leone
May 2013
0
20
40
60
80
100
120
140
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
Infant Mortality Rate( Per 1000 )
Sierra Leone Africa
0
200
400
600
800
1000
1200
1400
1600
1800
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
GNI Per Capita US $
Sierra Leone Africa
0,00,51,01,52,02,53,03,54,04,55,0
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
Population Growth Rate (%)
Sierra Leone Africa
1
11
21
31
41
51
61
71
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
Life Expectancy at Birth (years)
Sierra Leone
Africa
ANNEX I
Page 4/4
Year Guinea Africa
Develo-
ping
Countries
Develo-
ped
Countries
Basic Indicators
Area ( '000 Km²) 2011 246 30 323 98 458 35 811Total Population (millions) 2012 10,5 1 070,1 5 807,6 1 244,6Urban Population (% of Total) 2012 36,4 40,8 46,0 75,7Population Density (per Km²) 2012 41,6 34,5 70,0 23,4GNI per Capita (US $) 2011 440 1 609 3 304 38 657Labor Force Participation - Total (%) 2012 39,7 37,8 68,7 71,7Labor Force Participation - Female (%) 2012 45,2 42,5 39,1 43,9Gender -Related Dev elopment Index Value 2007-2011 0,425 0,502 0,694 0,911Human Dev elop. Index (Rank among 186 countries) 2012 178 ... ... ...Popul. Liv ing Below $ 1.25 a Day (% of Population)2007-2011 43,3 40,0 22,4 ...
Demographic Indicators
Population Grow th Rate - Total (%) 2012 2,5 2,3 1,3 0,3Population Grow th Rate - Urban (%) 2012 4,0 3,4 2,3 0,7Population < 15 y ears (%) 2012 42,6 40,0 28,5 16,6Population >= 65 y ears (%) 2012 3,3 3,6 6,0 16,5Dependency Ratio (%) 2012 85,0 77,3 52,5 49,3Sex Ratio (per 100 female) 2012 102,2 100,0 103,4 94,7Female Population 15-49 y ears (% of total population) 2012 23,1 49,8 53,2 45,5Life Ex pectancy at Birth - Total (y ears) 2012 54,5 58,1 67,3 77,9Life Ex pectancy at Birth - Female (y ears) 2012 56,2 59,1 69,2 81,2Crude Birth Rate (per 1,000) 2012 37,9 33,3 20,9 11,4Crude Death Rate (per 1,000) 2012 12,5 10,9 7,8 10,1Infant Mortality Rate (per 1,000) 2012 85,0 71,4 46,4 6,0Child Mortality Rate (per 1,000) 2012 135,4 111,3 66,7 7,8Total Fertility Rate (per w oman) 2012 5,1 4,2 2,6 1,7Maternal Mortality Rate (per 100,000) 2010 610,0 417,8 230,0 13,7Women Using Contraception (%) 2012 12,2 31,6 62,4 71,4
Health & Nutrition Indicators
Phy sicians (per 100,000 people) 2004-2010 10,0 49,2 112,2 276,2Nurses (per 100,000 people)* 2004-2009 4,3 134,7 187,6 730,7Births attended by Trained Health Personnel (%) 2007-2010 46,1 53,7 65,4 ...Access to Safe Water (% of Population) 2010 74,0 67,3 86,4 99,5Access to Health Serv ices (% of Population) 2000 80,0 65,2 80,0 100,0Access to Sanitation (% of Population) 2010 18,0 39,8 56,2 99,9Percent. of Adults (aged 15-49) Liv ing w ith HIV/AIDS 2011 1,4 4,6 0,9 0,4Incidence of Tuberculosis (per 100,000) 2011 183,0 234,6 146,0 14,0Child Immunization Against Tuberculosis (%) 2011 93,0 81,6 83,9 95,4Child Immunization Against Measles (%) 2011 58,0 76,5 83,7 93,0Underw eight Children (% of children under 5 y ears) 2008-2011 20,8 19,8 17,4 1,7Daily Calorie Supply per Capita 2009 2 652 2 481 2 675 3 285Public Ex penditure on Health (as % of GDP) 2010 4,8 5,9 2,9 8,2
Education Indicators
Gross Enrolment Ratio (%)
Primary School - Total 2010-2012 98,0 101,9 103,1 106,6 Primary School - Female 2010-2012 90,9 98,4 105,1 102,8 Secondary School - Total 2010-2012 41,7 42,3 66,3 101,5 Secondary School - Female 2010-2012 32,4 38,5 65,0 101,4Primary School Female Teaching Staff (% of Total) 2011 29,2 43,2 58,6 80,0Adult literacy Rate - Total (%) 2010 41,0 67,0 80,8 98,3Adult literacy Rate - Male (%) 2010 52,0 75,8 86,4 98,7Adult literacy Rate - Female (%) 2010 30,0 58,4 75,5 97,9Percentage of GDP Spent on Education 2008-2011 3,1 5,3 3,9 5,2
Environmental Indicators
Land Use (Arable Land as % of Total Land Area) 2011 11,6 7,6 10,7 10,8Annual Rate of Deforestation (%) 2000-2009 0,5 0,6 0,4 -0,2Forest (As % of Land Area) 2011 26,5 23,0 28,7 40,4Per Capita CO2 Emissions (metric tons) 2009 0,1 1,2 3,1 11,4
Sources : AfDB Statistics Department Databases; World Bank: World Development Indicators; last update :
UNAIDS; UNSD; WHO, UNICEF, WRI, UNDP; Country Reports.
Note : n.a. : Not Applicable ; … : Data Not Available.