AASHTOWare BrDR 6.8.2 Multicell Box Tutorial MCB4 - RC MCB Integral with Pier Example
46

Multicell Box Tutorial - AASHTOWare Bridge

Nov 15, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Multicell Box Tutorial - AASHTOWare Bridge

AASHTOWare BrDR 6.8.2

Multicell Box Tutorial MCB4 - RC MCB Integral with Pier Example

Page 2: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 1

Topics Covered

• Analysis Methods

• Comments and Assumptions

• Data Entry

• Structure Typical Section

• Structure Framing Plan Details

• Slab Reinforcement Data Entry

• Vertical Shear Reinforcement Data Entry

• Bridge Alternatives

• Pier Data Entry

• Foundation Alternatives

• LRFR analysis and results

Analysis Methods

Reinforced concrete multicell box (MCB) superstructures can be analyzed in the following manners:

• LRFD, LRFR and LFR

• Full box section including each individual webline

• Single webline

Comments and Assumptions

• Based on the year built, 1963, information contained in the design plans, and the AASHTO Manual for Bridge

Evaluation:

o Concrete compressive strength = 3 ksi (fc = 1.2 ksi)

o Reinforcing steel yield strength = 40 ksi (fs = 20 ksi)

o Structural Steel Yield Strength = 36 ksi

o Pile size = 10BP42

• ADTT = 500

• Integral wearing surface = 0.0 in.

• Use approximate longitudinal deck rebar spacing.

• Use the following section to determine pier cap straight flexural reinforcement:

Page 3: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 2

• Web shear reinforcement (S1 – S3 bars) are #5 bars.

• Top of footing elevation = 332.96 ft. for all piers.

• Finished ground line elevation = 335.00 ft. for all piers.

• Bottom of footing elevation = 328.71 ft. for all piers

• 30’-0” long piles with 1’-0” embedment

• Assume pile fixity elevation = 318.71 ft.

• Assume pile downdrag force = 0 kip

• Use the maximum shaft height for all piers (27 ft.)

• Soil density = 120 kcf

• Factored bearing resistance of soil = 15 ksf

Page 4: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 3

Data Entry

To add a new structural steel material, click on Structural Steel in the tree and select File/New from the menu (or

right mouse click on Structural Steel and select New). Click on Copy from Library.

Select the After 1963 material and click OK. The selected material properties are copied to the Bridge Materials –

Structural Steel window as shown below.

To add a new concrete material, click on Materials, Concrete in the tree and select File/New from the menu (or right

mouse click on Concrete and select New). The window shown below will open. Enter the values shown.

Page 5: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 4

Do the same for the Reinforcing Steel.

Define the generic barrier as shown below.

Page 6: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 5

Define substructure design settings by double clicking LRFD Substructure Design Settings and click Copy from

Library. Select Final Design Setting (US) and click OK.

Page 7: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 6

Create a new concrete multicell box superstructure definition by double clicking the SUPERSTRUCTURE

DEFINITIONS folder.

Page 8: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 7

Be sure to leave make the superstructure integral with substructure and that the ‘Post-tensioned’ box is unchecked.

Page 9: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 8

Uncheck the LRFR Ignore shear checkboxes in the Control Options tab. Click OK.

Double click Load Case Descriptions and create default load cases by clicking the ‘Add Default Load Case

Descriptions’. Click OK.

Page 10: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 9

Double click the ‘Structure Cross Section’ folder and create the following cross section by entering the values shown.

Page 11: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 10

A schematic can be viewed by right clicking the section and selecting ‘Schematic’.

Page 12: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 11

Assign the cross section to the length of the superstructure. Enter the values shown.

Page 13: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 12

Structure Typical Section

Locate the superstructure definition reference line in the center of the structure.

Define the sacrificial wearing surface.

Page 14: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 13

Locate the barriers.

Use the Compute button to create the lane positions. Click OK to close the window.

Page 15: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 14

Structure Framing Plan Details

Enter the skew at each support in the Layout tab.

Enter the Interior Diaphragm locations.

Page 16: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 15

A schematic of the framing plan can be viewed like the typical section.

Page 17: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 16

Slab Reinforcement Data Entry

Slab reinforcement can be located within the structure in several ways for multi-cell boxes. For this example, the

reinforcement is defined from the supports and Transverse Reference Lines. User also has the option to locate rebar

about the midspan. Enter Transverse Reference Lines as shown below. Each reference line corresponds to a

construction joint.

Page 18: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 17

The data entry for the top slab is shown below.

The data entry for the bottom slab is shown below.

Page 19: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 18

The data entry for the overhangs is shown below.

Vertical Shear Reinforcement Data Entry

Create the following shear stirrups by double clicking the ‘Vertical Shear Reinforcement Definitions’. Enter the data

shown.

Page 20: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 19

Open the Web1 Shear Reinforcement Ranges window and select Input Reference Type to Centerline Bearings. Enter

the data for Span 1 and repeat for Spans 2-4.

The stirrup ranges are created as follows.

Page 21: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 20

Page 22: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 21

Click OK to accept and close the Shear Reinforcement Ranges for WEB1. Double click the Shear Reinforcement

Ranges for WEB2 and enter the following data for Spans 1-4.

Page 23: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 22

Page 24: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 23

Once the shear reinforcement for Web 1 and Web 2 are entered, Web 3 though Web 5 can be linked to them since

Web 5 is identical Web 1 and Webs 3 and 4 are identical to Web 2.

To link Web 3 with Web 2, open the Web Shear Reinforcement Ranges window and select Web 2 from the dropdown

menu. The ranges will then populate the window. Click OK to accept and close. Repeat this process for the remaining

webs.

Page 25: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 24

Bridge Alternatives

Double click the BRIDGE ALTERNATIVES folder and enter in the information shown below:

In the Substructures tab, define substructure locations as shown below and click OK.

Page 26: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 25

Double click the SUPERSTRUCTURES folder and enter the name “AS-BUILT”. Move to the Substructures tab and

assign substructures at each support. Click new to Click OK to close.

Double click the SUPERSTRUCTURE ALTERNATIVES folder. Enter the name “AS-BUILT” and select “AS-

BUILT Spans 1-4” from the dropdown box. Click OK to close.

Page 27: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 26

The following reminder will appear when you click OK to close the Superstructure Alternative window. Click OK

to close this reminder.

Pier Data Entry

Now open the Pier window, enter the data for the finished groundline and the soil density and click OK. For this

example, we are assuming that the finished ground elevation is the same for each pier.

Page 28: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 27

Now create a solid shaft pier alternative. Select ‘Solid Shaft Pier’ and click Next.

Enter the values shown and click Finish.

Page 29: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 28

No data needs to be changed on the resulting Pier Alternative window so click OK to close it.

Enter the geometry by editing the blue dimensions. Click OK.

Page 30: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 29

Open the Cap window and verify the correct cap concrete material is selected.

Enter the following for the pier cap geometry by editing the blue dimensions. Click OK.

Page 31: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 30

Open the Reinforcement window to enter the flexural and shear reinforcement. A section taken at mid-cap is shown

below (Note that the section and elevation view are CADD drawings and were not generated by the program).

Pier cap elevations shown below with bent M Bar locations:

Page 32: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 31

Page 33: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 32

Based on the section and elevations above, enter the data shown below.

Page 34: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 33

The assumed shear reinforcement spacing is shown below. Enter the data and click OK.

Open the Column Components window and select the following concrete material.

Page 35: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 34

Open the Column Geometry window and enter the following data by editing the blue dimensions. The maximum

shaft height of 27’-0” is used for all piers.

The pier is now sufficiently defined to be considered in the superstructure analysis. The column will be considered

fixed at the base of the column. This percent fixity can be adjusted on the Pier Model Settings window if desired.

The FE model created during the superstructure analysis will include an element modeling the column length and

stiffness. For this example, we will continue with entering the reinforcement and foundations.

Page 36: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 35

Open the Reinforcement Definition window to enter the flexural reinforcement pattern. Click the Generate Pattern

button and enter the following input.

Click Apply and all rebar locations will be generated.

Page 37: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 36

Open the Reinforcement window to enter the flexural and shear reinforcement.

Page 38: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 37

Foundation Alternatives

Open the Foundation Alternatives window, highlight the Pile Footing option, and click Next.

Enter the data shown below and click Finish.

Page 39: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 38

Click the Soil tab and enter the Factored bearing resistance.

Edit the Pile Batter columns to the following:

Page 40: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 39

Open the Footing Geometry. Verify the dimensions and click OK.

Open the Foundation Reinforcement window and enter the data as shown:

Page 41: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 40

The input for the Bent 2 is complete. A 3D model of the pier can be viewed by right clicking on the PIER

ALTERNATIVE and selecting 3D Schematic.

Page 42: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 41

Bent 4 is identical to Bent 2. Therefore, a copy of Bent 2 can be created for Bent 4. Right click on the Bent 2 Pier

Alternative and select Copy.

Expand Bent 4, right click on the Pier Alternative and select Paste. Change the name from Copy of Bent 2 to Bent 4.

The input for Bent 4 is now complete.

Page 43: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 42

Follow the same procedure for Bent 3. However, additional input will need to be modified as shown below.

Pile Layout:

Page 44: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 43

Foundation Geometry:

Foundation Reinforcement:

Page 45: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 44

Analysis and Results

The structure is ready for analysis. Note that a design review of substructures for integral box girders cannot be

performed at this time.

Superstructure LRFR ratings are shown below:

Page 46: Multicell Box Tutorial - AASHTOWare Bridge

MCB4 – RC MCB Integral with Pier Example

Last Modified: 3/13/2018 45

The user also has the option to analyze individual web lines. LFR ratings for Web 1 are shown below: