MULTI-MODAL TRANSPORTATION MITIGATION PROGRAM (MMTM). MULTI-MODAL TRANSPORTATION MITIGATION PROGRAM (MMTM). What is it? Where does it apply? Who pays it? When is it assessed? When does it get paid? Where does it get spent? What does it get spent on?. WHAT IT IS?. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

MULTI-MODAL TRANSPORTATION

MITIGATION PROGRAM (MMTM)

Page 2: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

MULTI-MODAL TRANSPORTATION

MITIGATION PROGRAM (MMTM)

What is it?

Where does it apply?

Who pays it?

When is it assessed?

When does it get paid?

Where does it get spent?

What does it get spent on?

Page 3: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

WHAT IT IS?

• Last required component of Mobility Plan to be adopted

• Streamlined alternative to traditional concurrency

• One time payment to mitigate impact • Eliminate transportation concurrency uncertainly

• Fair and equitable for all new development

• Dramatic reduction in proportionate share

Page 4: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

WHERE DOES IT APPLY?

Page 5: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

WHO PAYS IT?• New development without CLSC

• Approved development whose CLSC expires

• CLSC = Concurrency level of service compliance Approved development with a valid CLSC will continue to pay the existing transportation impact fee

Page 6: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

APPROVED DEVELOPMENT

• Extending CLSC & Phases for 2 Years – transportation only

• Vesting for concurrency and impact fees for following:

• Projects with 25% of infrastructure built by July 31st, 2011 Vested from concurrency Vested to pay current impact fee

• Projects with 50% of infrastructure built by CLSC expiration Vested from concurrency Vested to pay impact fee

Page 7: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

WHEN IS IT ASSESSED?

• Determined during final development plan review • Rate locked in with final development plan approval

• Valid as long as final development plans valid • Verified at Building Permit

• Paid prior to final inspection

Page 8: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

PRE-PAYMENT INCENTIVE

• Pay at final development plan 15% Reduction

• Pay at building permit application 7.5% Reduction

• Pay prior to final inspection No Reduction

Page 9: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

WHERE DOES IT GET SPENT?

Page 10: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

WHAT DOES IT GET SPENT ON?

Consistent with Capital Improvements Element

Page 11: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

PHASING SCHEDULE

Phasing based on current reduced impact fee

Phased in over a 3 year period

April 15th is the date that the phasing will occur

YEAR Single Use

TND TOD

2011 $2,433 $2,212 $1,704

2012 $2,793 $2,352 $1,777

2013 $3,164 $2,494 $1,851

Based on residential dwelling per 1,000 sq ft

Page 12: MULTI-MODAL  TRANSPORTATION  MITIGATION PROGRAM (MMTM)

STAFF RECOMMENDATION

Adopt Ordinance 11-XXMulti-Modal Transportation

Mitigation Program