Albright Valley Point Cuzzart Orr Glade Run Fickey Run Mar<n Cr MUDDY CREEK Muddy Creek is 15.6 miles long. The lower 3.4 miles (below Mar<n Creek) are severely degraded from the effects of AMD. 12.2 miles supports a cold water fishery. Cheat River Basin
11

MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

Aug 02, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

Albright

ValleyPoint

Cuzzart

Orr

GladeRu

n

FickeyRun

Mar<nCr

MUDDYCREEK

MuddyCreekis15.6mileslong.

Thelower3.4miles(belowMar<nCreek)areseverelydegradedfromtheeffectsofAMD.

12.2milessupportsacoldwaterfishery.

CheatRiverBasin

Page 2: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

ROCKVILLEMINING

ROCKVILLEMINING

ROCKVILLEMINING

CraneCoalLoboCapital

T&TFUELS

PrestonEnergyT&TFUELS

VIKINGCOAL

BONDFORFEITURESITES

Thereare9bondforfeituresitesintheMuddyCreekwatershedthatrequirewatertreatment,mostarelocatedintheheadwatersofMar<nCreekanditstributaries.

Page 3: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

TheOfficeofSpecialReclama<on(OSR)hasbeentrea<ngAMDintheMuddyCreekWatershedasearlyas1995whenOSRinheritedT&TFuelsfollowingadevasta<ngmineblowout.

Althoughamajorityofthetreatmentsiteswereconstructedbetween2004and2006.

TodateOSRhasspentover$3.4Minconstruc<oncostandnearly$10MinO&M.

OSRcurrentlyhas:

•  3yettobeconstructed

•  9ac<vetreatmentsites

•  1passivetreatmentsystem

OSRnowhas10NPDESoutletswithintheMuddyCreekwatershed.

MUDDYCREEKTODAY

TomeetthemorestringentWQBELsOSRisscheduledtospendanaddi<onal$1.5M.

Page 4: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

MUDDYCREEKTODAY

YetMuddyCreekremains“DEAD”.

Page 5: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

MUDDYCREEKTODAY

WHY?

Page 6: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

AN OVERWHELMING NUMBER OF PRE LAW AMD DISCHARGES

Page 7: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

ContribuConofAMDtoMarCnCreekbyBondForfeitureSites

92.49

11,802.42

AcidityLoading(lbs/day)

SpecRecAverageTotals Mar<nCreekWithoutSpecRecContribu<ons

AcidLoading(lbs/day)

Page 8: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

NPDES

In-streamdosersinstalledandOperatedinpartnershipw/AMLNPDES

pH6–9s.u.FeAl

PERMITTINGSTRATEGY

Page 9: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

T&T Combined Treatment Facility

T&TFuels

PrestonEnergy

Viking&Pre-lawdrainagefromFickey

Run

LimeSlurry

2-80footClarifiers

Page 10: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

7.2.d.8.2.Avariancepursuantto46CSR6,SecCon5.1,basedonhuman-causedcondiConswhichprohibitthefulla[ainmentofanydesignateduseandcannotbeimmediatelyremedied,shallapplytoWVDEPDivisionofLandRestoraCon’sOfficeofSpecialReclamaCon’sdischargesintoMarCnCreekofPrestonCountyanditstributaries,includingGladeRun,FickeyRun,andtheirunnamedtributaries.ThefollowingexisCngcondiConswillserveasinstreaminterimcriteriawhilethisvarianceisinplace:pHrangeof3.2-9.0,10mg/Ltotaliron,and15mg/Ldissolvedaluminum.AlternaCverestoraConmeasures,asdescribedinthevarianceapplicaConsubmi[edbyWVDEPDivisionofLandRestoraCon’sOfficeofSpecialReclamaCon,shallbeusedtoachievesignificantimprovementstoexisCngcondiConsinthesewatersduringthevarianceperiod.CondiConswillbeevaluatedduringeachtriennialreviewthroughoutthevarianceperiod.ThisvarianceshallremainineffectunClacConbytheSecretarytorevisethevarianceorunClJuly1,2025,whichevercomesfirst.

VARIANCE

Page 11: MUDDY CREEK - West Virginia Mine Drainage Task Force · The Office of Special Reclamaon (OSR) has been treang AMD in the Muddy Creek Watershed as early as 1995 when OSR inherited

WatershedScaleApproachestoAMDRemediaCon:MarCnCreekandSandyCreekProject:WV342

ThepurposeofthisstudyistoprovidetheWestVirginiaDepartmentofEnvironmentalProtecCon(WVDEP)–OfficeofSpecialReclamaCon(OSR)withdatatoguidefuturemanagementdecisionsontheplacementofdoserstotreatMarCnCreekandSandyCreekonawatershedlevel.