Page 1
MTI
ENGINEERING ORGANISATIONAL
PROFILE
12020/02/19 Revision 01 (Template Revision Date: 2017/12/01)
Address:
16 & 18 Kleim street,
Carletonville,
South Africa, 2500
Tel: +27 (0)18 786 1210
Email: [email protected]
GPS co-ordinates:
SOUTH 26º 20, 917
EAST 27º 24, 975
Vat.No.: 4200105429
Reg.No.: 1988/05995/07
Page 2
Our Vision:To be the preferred partner of choice for turnkey projects in the mining and
construction industry through the provision of world class metal and engineering services.
Our Mission:
We will achieve our vision through continuous interaction with our customers providing safe and high quality products and services.
Values:
• Honesty
• Trustworthiness
• Commitment
• Customer satisfaction
• Teamwork
• Employee wellbeing
2
VISION & MISSION
Page 3
MTI Engineering, trading as Mine-Tech Industries was established in 1988 to offer its clients
reliable, high quality and cost effective mechanical, electrical and civil products and services.
Over the years MTI Engineering has established itself as the preferred supplier of structural and
civil engineering services to the mining industry.
MTI Engineering offers its clients structural and civil design services and detailing, steel
fabrication, site erection and project management.
MTI Engineering is devoted to the continuous development and growth of its employees,
products and services and a culture of quality, is engendered through leadership, training and
communication.
Company Overview
3
Page 4
4
Management Structure
Operations Director
Johan SchoemanCorporate Services
Director
Jacel Visagie
HR &
Training
Director
Jonas Maxolo (& Workers Trustee)
Health
& Safety
& Quality
Area Manager
Tommy Palmer
Site
Manager
Ettiene
Fourie
Financial
Supervisor
Elisme
Schoeman
Site
Manager
Kobus
Oberholzer
Workshop ,
Procurement
Estimating &
Quality
Control
Page 5
5
Accident Analysis
Page 6
6
Injury Frequency Rates
Page 7
MTI Engineering is a Level 4 Empowering Supplier in terms of the
government gazetted code of good practice on B-BBEE.
The Company is committed to the empowerment of HDI and is
committed to all the elements of the B-BBEE Act. MTI Engineering
has a 26% HDI employee trust.
BBBEE certificate available on request.
7
BEE
Page 8
MTI Engineering is an ISO 9001: 2015 Quality Management System
accredited company.
Certificate is available on request.
8
ISO 9001:2015
Page 9
9
Photo Gallery
AngloGold Ashanti – Ice Plant Structure
Anglo Platinum – Vent Ducting
Page 10
10
Photo Gallery
South Deep – Backfill Plant South Deep – Backfill Plant
Page 11
11
Photo Gallery
Ekurhuleni Municipality – Pedestrian Bridge Letseng Diamonds – Conveyor System
South Deep – Cip Tank Gold Fields – 800nb Pipe Line
Page 12
12
Photo Gallery
Xstrata Rhovan – 3CR12 Barren Tank
Technicrete – Brick Plant (Witbank)
Sibanye Gold Kloof - Overland Conveyor Head
Pulleys
Page 13
13
Photo GalleryXstrata Rhoven - MC7 Conveyor and Feed Chute
System
Sibanye Gold Kloof - Overland Conveyor
Page 14
14
Photo Gallery
Driefontein – 1.5 Megaliter Water Tank Driefontein - CSP Project.
Page 15
15
Photo GallerySibanye Gold Kloof -
Growth Project & Growth Plant Upgrade for Gold Recovery from Rock Dump
Page 16
16
Photo Gallery
Growth Project & Growth
Plant Upgrade for Gold
Recovery from Rock Dump
Sibanye Gold Kloof -
Page 17
17
Photo Gallery
Piping - various
Page 18
18
Photo Gallery
Rhovan mine - Ducting
Page 19
19
Photo GalleryStorm Mountain Diamonds – Kao Mine Plant Upgrade Project
Page 20
20
Photo GalleryRhovan mine – Cable Gantry & Launder
Page 21
21
Photo GallerySteel Services & Allied Industries Pty Ltd – Slimes Holding Tank
Page 22
22
Photo Gallery
Vehicle Fleet
Vehicle Fleet:
MTI Engineering’s fleet
consist of one JCB Loadall
540-170, a Toyota HINO 13-
237F truck, Maxus V80,
Datsun Go & Go+ and five
Toyota Hilux bakkies.
Workshop Facilities:
Combined workspace in excess of
1790m² equipped with a 10 ton, 5
ton and 2 ton overhead crane and
two 3 ton electric crawls. Other
equipment includes plate rollers,
bending brake, punch and shears,
magnetic base drill, milling
machines, vertical boring mill,
pedestal drill and grinder, plasma
cutter etc.
Page 23
23
Project History-Milestones
Project: Underground Workshop Facilities
Client: South Deep mine – Gold Fields
Project Value: R 8 008 762,22 (Eight million rand)
Execution Date: August 2019 – Current
Project: Kiln Off Gas System & Ducting
Client: Rhovan Vanadium mine
Project Value: R 4 823 437,25 (Four million rand)
Execution Date: July 2019 – Current
Project: Belt Filter Replacement Project
Client: LogiProc
Project Value: R 2 453 206,70 (Two million rand)
Execution Date: August 2019 – February 2020
Project: Supply, Manufacture & Erecting of Workshop Building
Client: Santana Crane Hire
Project Value: R 2 567 776,24 (Two million rand)
Execution Date: February 2019 – May 2019
Page 24
24
Project History-Milestones
Project: Leach Vats Stainless Steel Plate Lining
Client: Rhovan Vanadium mine
Project Value: R 10 834 030.74 (Ten million rand)
Execution Date: September 2018 – February 2020
Project: New Tailings Storage Tanks (SMPP)
Client: South Deep mine – Gold Fields
Project Value: R 11 562 302.64 (Eleven million rand)
Execution Date: October 2018 – February 2020
Project: XRT Project
Client: Venetia Mine – De Beers
Project Value: R 5 705 465.24 (Five million rand)
Execution Date: June 2018 - October 2018
Project: Kao Mine Plant Upgrade Project
Client: Storm Mountain Diamonds - Lesotho
Project Value: R 46 595 124.87 (Forty six million rand)
Execution Date: 2016
Project: New Coarse Final Recovery Plant
Client: Letseng Diamonds - Lesotho
Project Value: R 7 000 000.00 (Seven million rand)
Execution Date: March 2015 – September 2015
Project: Refrigeration Plant
Client: BBE Projects - Driefontein
Project Value: R 6 000 000.00 (Six million rand)
Execution Date: April 2015 – October 2015
Project: 1.5 Megaliter Water Tank
Client: Sibanye Gold - Driefontein
Project Value: R 4000 000.00 (Four million rand)
Execution Date: March 2015 – Sept 2015
Project: Brick Plant
Client: Technicrete - Witbank
Project Value: R2 000 000.00 (Two million rand)
Execution Date: January 2014 – March 2014
Page 25
2020/02/19 25
Project History-Milestones
Project: Overland Conveyor – Manufacturing & installation
Client: Sibanye Gold - Kloof
Project Value: R20 000 000.00 (Twenty million rand)
Execution Date: October 2012 – March 2014
Project: Solid Ice Plant
Client: Mponeng – Anglo Gold
Project Value: R 7 000 000.00 (Seven million rand)
Execution Date: April 2013 – January 2014
Project: Merensky Upgrade – Structural steel, tanks and
pipework
Client: Impala - Rustenburg
Project Value: R10 000 000.00 (Ten million rand)
Execution Date: February 2013 – July 2013
Project: MC7 Conveyor – Conveyor and feed chute system
Client: Xstrata - Rhovan Rustenburg
Project Value: R10 000 000.00 (Ten million rand)
Execution Date: November 2012 – August 2013
Project: Growth Plant Upgrade (“upstage” gold recovery
from rock dump)
Client: Sibanye Gold - Kloof
Project Value: R10 000 000.00 (Ten million rand)
Execution Date: February 2012 – Jun 2012
Project: Growth Project (gold recovery from rock dump)
Client: Sibanye Gold - Kloof
Project Value: R5 000 000.00 (Five million rand)
Execution Date: September 2011 – January 2012
Project: Conveyor System – Conveyor and feed chute
system
Client: Letseng Diamonds - Lesotho
Project Value: R7 000 000.00 (Seven million rand)
Execution Date: December 2009 – October 2010
Project: Filter Building – Structural steel and sheeting
Client: Vametco - Brits
Project Value: R4 000 000.00 (Four million rand)
Execution Date: February 2009 – August 2009
Project: Waste Loading Station–Conveyor, feed chute &
pumping system
Client: Harmony Mine - Randfontein
Project Value: R15 000 000.00 (Fifteen million rand)
Execution Date: March 2008 – February 2009
Page 26
MTI Engineering Contact Details
PO BOX 306 Tel: (018) 786-1210
Carletonville, Email: [email protected]
2500
16 Kleim Street,
Industrial Area,
Carletonville
Work done for:
• Sibanye Stillwater Xstrata Rhovan
• ADP Projects (Pty) Ltd Thyssenkrupp/ Polysius
• Corobrick Aveng Grinaker
• Concor Technicrete MDM Engineering
• Impala Platinum Evraz Vametco
• Howden Process Compressor Lonmin Platinum
• Nola De Beers
• Anglogold Zinc Corp – Kumba Resources
• Harmony Master Drilling
• Pilanesberg Platinum Mines Gold Fields
• LogiProc
2020/02/19 26
Contact Us / List of Vendors