MT. ROSE COMMERCE PARKCONDITIONAL USE PERMIT

PLANNING COMMISSION

Page 2: Mt. Rose Commerce Park Conditional Use Permit

Vicinity Map

Page 3: Mt. Rose Commerce Park Conditional Use Permit

Project Request

Page 4: Mt. Rose Commerce Park Conditional Use Permit

Project Summary

Site Area: 88.68± acres

Request: Conditional Use Permit

Project Concept:

Mixed use development, anticipated to include businesspark, residential, and commercial/retail uses.

Page 5: Mt. Rose Commerce Park Conditional Use Permit

Master Plan

Page 6: Mt. Rose Commerce Park Conditional Use Permit

Zoning

Page 7: Mt. Rose Commerce Park Conditional Use Permit

Conditional Use Permit – 24 hour use

Page 8: Mt. Rose Commerce Park Conditional Use Permit

Conditional Use Permit – 24 hour use

Page 9: Mt. Rose Commerce Park Conditional Use Permit

Conditional Use Permit– Major Drainageway

Page 10: Mt. Rose Commerce Park Conditional Use Permit

Conditional Use Permit– Cuts/Fills

Page 11: Mt. Rose Commerce Park Conditional Use Permit

Steamboat Buckwheat

• Biological survey of the entiresite was conducted to identifypotential Steamboat Buckwheatplans and habitat.

• Habitat areas that wereidentified have been avoidedand will be protected.

• Conditional approval by NDF

Protected habitat areas

Page 12: Mt. Rose Commerce Park Conditional Use Permit

Traffic Improvements

Page 13: Mt. Rose Commerce Park Conditional Use Permit

Project Benefits

• Provides appropriate land use transition and buffer to existing 24-hour power plants

• 24-hour uses limited to business park at this time• Enhanced drainageway provides for higher water

quality outflow to Steamboat Creek• Cuts/Fills are mitigated by site and building design• Surrounding freeway/highways provide ample traffic

capacity• Endangered Steamboat Buckwheat is protected• Approval allows for future mixed use development

Page 14: Mt. Rose Commerce Park Conditional Use Permit

Questions?