Page 1: Mt Arthur coal - BHP

Mt Arthur Coal

Investor/Analyst PresentationSeptember 2003

Page 2: Mt Arthur coal - BHP

Agenda

Energy Coal Overview David Lamont, Chief Financial Officer – BHPB Billiton Energy Coal

Mt Arthur Coal Project Stephen David, General Manager – Mt Arthur Coal

Q&A David Lamont, Chief Financial Officer – BHPB Billiton Energy Coal Derek Nightingale, Chief Operating Officer – Hunter Valley Energy CoalStephen David, General Manager – Mt Arthur Coal

Page 3: Mt Arthur coal - BHP

BHP Billiton Energy Coal• One of the world’s largest producers and marketers of export thermal coal

• Major supplier to domestic markets

• Diverse operations and markets along with multi-source supply capability• Key assets in South Africa, USA, Colombia and Australia

• Focus on enhancing our world class assets via selective acquisitions, progressing approved capital projects and sustaining business improvement init iatives across our exist ing assets

• We will continue to build our marketing capabilities in order to deliver enhanced service to our customers and extract greater than commodity value from our product

Page 4: Mt Arthur coal - BHP

Business overview

≈2 Mtpa

33 Mtpa

12 Mtpa

BHBP seaborne trade

Export Supply

Domestic Supply

Operated

Ingwe 55 MtpaIngwe

55 MtpaHunter Valley

5 MtpaHunter Valley

5 Mtpa

New Mexico14 Mtpa

New Mexico14 Mtpa

Non operated

Colombia7 Mtpa

Colombia7 Mtpa QLD/NSW Coal

4 MtpaQLD/NSW Coal

4 Mtpa

Marketed

Kalimantan9 Mtpa

Kalimantan9 Mtpa

Traded2 Mtpa

Traded2 Mtpa

Page 5: Mt Arthur coal - BHP

World class asset portfolio

Operated production* 74 mtpaNon-operated production* 11 mtpaAgency marketing 11 mtpaReserves** 3 bt

* 100% production for operated assets, equity production for non-operated assets** Reserves for producing assets only

Page 6: Mt Arthur coal - BHP

FY 2003 FY 2002• Attributable production (million tonnes) 82 83

US$ million US$ million• Turnover $2 089 $1 919• EBITDA $367 $712• EBIT $190 $536• Net operating assets $2 193 $2 092• Capital and investment expenditure $ 300 $295

Energy Coal – Facts & Figures

Page 7: Mt Arthur coal - BHP

• All assets undergoing performance improvement projects

• South Africa and Colombia major focus

• Setting performance targets for assets in face of adverse external environment

Moving asset performance to the next level

Page 8: Mt Arthur coal - BHP

Profits resilient to materially adverse external environment

AND

Attributes• Low delivered cost – quality adjusted• High margin• Positive margin throughout commodity cycle• Long life, sustainable position• Meets customer needs

• Healthy and safe for workers and community• Minimised impact on environment• Integrated with local community• Contributes to social and economic development

What are world class assets?A portfolio of world class assets

Page 9: Mt Arthur coal - BHP

Current market conditions

Pacific•AUD appreciating against USD•USD prices slowly recovering•Freight rates high

$35

$40

$45

$50

$55

$60

$65

$70

$75

Jul-00 Jan-01 Jul-01 Jan-02 Jul-02 Jan-03 Jul-03

Real

AUD

Price

- FOB

Newc

.Competitor response•C&A – production cuts•Xstrata – production cuts

Why no cut at MAN•Need to reach minimum efficient volume•We are not the market leader in Asia

Page 10: Mt Arthur coal - BHP
Page 11: Mt Arthur coal - BHP

Regional Locality Plan

Page 12: Mt Arthur coal - BHP

Mining and Exploration Lease Areas

Page 13: Mt Arthur coal - BHP

BACKGROUND• Bayswater Colliery commenced open cut mining in 1968

– Purchased by Billiton in 1996

• In 1998 won the tender to develop Mt Arthur North lease area

– Supplying 3 Mtpa domestic thermal coal for 5 years; and

– Committing the company to develop an export mine of at least 2 Mtpa

• From 1998 to 2001 exploration and planning proceeded through Environmental Impact Statement, Pre-feasibility and Final Feasibility phases to rapidly bring the Mt Arthur North lease into production

Page 14: Mt Arthur coal - BHP

BACKGROUND• The company sought and obtained Development Consent to mine up to

15 Mtpa (Run of Mine) from the MAN mining lease over 21 yrs.

• A mining lease was granted in June 2001. “Brownfields” construction commenced in mid 2001. First coal was mined in Apr 2002.

• Bayswater & Mt Arthur North coal resources will be managed and operated as one, having combined Development Consent of 20Mt Saleable Product pa.

• Currently also exploring contiguous coal resources for possible future underground development.

Page 15: Mt Arthur coal - BHP

Mt ARTHUR COAL ATTRIBUTES• Estimated Resource for Mt Arthur Coal 3,690 Mt as at 30 June 2003

• Estimated Marketable reserves for Mt Arthur Coal are 472 Mt as at 30 June 2003

• Rail access to Port of Newcastle via new rail loop

• Conveyor access to local power station – MacGen

• Relatively constant waste to ROM coal strip ratio of around 4.5:1 over the life of Mt Arthur North

• State-of-the-art coal processing facilities (being commissioned)

Page 16: Mt Arthur coal - BHP

Mt Arthur Coal – Estimated Coal Resources & Reserves

Resources - 1,420 MtMarketable Reserves – 34 Mt

Resources - 1,396 MtMarketable Reserves – 35 Mt

Resources - 875 MtMarketable Reserves – 408 Mt

Estimated as at 30 June 03

As received basis

Page 17: Mt Arthur coal - BHP

Social Context

22227

27 42

Muswellbrook Population

15000

Page 18: Mt Arthur coal - BHP

Licence to Operate

• Commitment to Zero Harm

• ISO 14,001 accreditation

• Comprehensive Environmental Monitoring System

• Integrated Community Plan

Page 19: Mt Arthur coal - BHP

Monitoring: From Reactive to ProactiveOur innovative monitoring system includes:

4 real time directional noise monitors

4 real time fine dust samplers

8 PM10 dust samplers

21 dust deposition gauges

26 ground water sites

16 surface water sites

5 real time weather stations

2 weather recording stations

11 blast monitoring sites

Page 20: Mt Arthur coal - BHP

Real Time Noise Monitoring Systemavailable to Supervisors

Page 21: Mt Arthur coal - BHP

The World’s quietest haul trucks

Page 22: Mt Arthur coal - BHP

Mine Operations

Page 23: Mt Arthur coal - BHP

Mt Arthur Coal Development Consent Production Capabilities

ROM Production Processing Rail Capacity

MAN 15mtpaBCC 4.8mtpa

MAN 20mtpaBCC 4.8mtpa

Up to 20mtpa13mtpa ex MAC

7mtpa ex Drayton

Page 24: Mt Arthur coal - BHP

Mining Equipment List

15Graders

14Water Carts

13Wheel Dozer

212Cat D11R Dozers

14Overburden Dr ills

27Cat 789 172t haul trucks

320Cat 793 / Liebherr T282240t/327t Rear Dump Trucks

12Hitachi EX3500

12Liebherr R996 Excavators

-2P&H 4100 Rope Shovels

Ramp UpUnits

CurrentUnits

EquipmentFleet

Page 25: Mt Arthur coal - BHP

21 Seams

Typical Stratigraphic Column (MAN Lease Area)

Page 26: Mt Arthur coal - BHP

BackgroundEast-West Geological Section Mt Arthur North

Direction of Mining (Down Dip)

Page 27: Mt Arthur coal - BHP

MINING OPERATIONS - GENERAL SCHEMATIC

Page 28: Mt Arthur coal - BHP

YEAR 2 MINE LAYOUT

Rehabilitated OverburdenEmplacement

Active OverburdenEmplacement

Active Pit

Page 29: Mt Arthur coal - BHP

YEAR 5 MINE LAYOUT

Rehabilitated OverburdenEmplacement

Active OverburdenEmplacement

Active Pit

Page 30: Mt Arthur coal - BHP

YEAR 10 MINE LAYOUT

Rehabilitated OverburdenEmplacement

Active OverburdenEmplacement

Active Pit

Page 31: Mt Arthur coal - BHP

YEAR 15 MINE LAYOUT

Rehabilitated OverburdenEmplacement

Active OverburdenEmplacement

Active Pit

Page 32: Mt Arthur coal - BHP

YEAR 21 MINE LAYOUT

Rehabilitated OverburdenEmplacement

Active OverburdenEmplacement

Active Pit

Page 33: Mt Arthur coal - BHP

GENERAL INFRASTRUCTURE LAYOUT

2 x 500t Raw Coal Receival Hoppers And

Primary Crushers

120,000 t Raw Coal Circular Stockpile

1,200 tph Two Module CPP

(expandable to 1,800 tph with 3rd module)

750,000 t Export Stockpile

Overland Conveyor

4,500 tph train load-out rate

New Offices, Workshop & Stores

300,000 t Domestic Stockpile

Page 34: Mt Arthur coal - BHP

Construction

Page 35: Mt Arthur coal - BHP

MAN Project Safety

• ~2 million Man-hours worked

• >2900 Inducted contractors

• Construction peaked at 510 contractors on site

• Project LTIFR 1.5 vs NSW Construction Industry average 15.7*

* Source Workcover 2001

Page 36: Mt Arthur coal - BHP

MAN Project – Salient Points

• Project approved capital US$411M

• Final Forecast Costs below budget

• 81% committed

• Project completion 2006

Page 37: Mt Arthur coal - BHP

Stage 1 BCC Rail Loading Facility (Planned 2/02 - Actual 11/01)

Stage 2 Civil and Bulk Earthworks (Planned 12/02 - Actual 12/02)

Stage 3 Domestic Coal Facilit ies (Planned 12/02 – Actual 12/02)

Stage 4 Export Coal Facilities (Planned 12/03 – Actual 10/03)

First Coal Mined (Planned 3/02 - Actual 3/02)

MAN Project Execution : Project Stages and Milestones

Page 38: Mt Arthur coal - BHP

From This…..

Page 39: Mt Arthur coal - BHP

To this……..

in less than two years

Page 40: Mt Arthur coal - BHP

The Ramp Up

Page 41: Mt Arthur coal - BHP

Labour Numbers (average annual)

0

100

200

300

400

500

600

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08

Prior Year Actual

Plan

Page 42: Mt Arthur coal - BHP

3500 applicants

CapacitySkills & Experience

Willingness

Sourcing

ScreeningPhone Interviewing

Assessing

Face-to-face Interview

Reference checks

Meeting with GM

Temperament capabilities

Ability to learn (abstract reasoning)

Spatial/Mechanical aptitudeRisk Awareness

Behaviourally basedinterviews

Criteria aligned with cultural

strategy

Using existing operators and supervisors as

“recruiters”

Motivational fit

Selecting the right people

InitiativeSafety

TeamworkTechnical

Page 43: Mt Arthur coal - BHP

Run of Mine Coal - MAN Lease area

0

2

4

6

8

10

12

14

M tonnes

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08

Prior Year Actual

Plan

Page 44: Mt Arthur coal - BHP

Saleable Product Coal - MAN Lease area

0

2

4

6

8

10

12

14

M tonnes

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08

Prior Year Actual

Plan

Page 45: Mt Arthur coal - BHP

Run of Mine Tonnes/Employee

0

5000

10000

15000

20000

25000

30000

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08

Prior Year Actual

Plan

Page 46: Mt Arthur coal - BHP

Mine Gate Cash Costs Split by Expense TypeFY2004 Budget

39%

21%

7%

23%

10%

LabourMaintenanceEnergyStoresOther Mining Costs

Page 47: Mt Arthur coal - BHP

FOB Cash Costs Split by Expense TypeFY2004 Budget

65%

16%

11%

8%

MiningRailagePort ChargesRoyalty/ACARP

Page 48: Mt Arthur coal - BHP

Mt Arthur CoalMine Gate Cash Costs (AUD Real)

FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08

Page 49: Mt Arthur coal - BHP

Operating Excellence Six Sigma Plus

Page 50: Mt Arthur coal - BHP

Operating ExcellenceFY02 – Start upQ3 & Q4: Roll out of Operating Excellence programRecruitment and training of coaches: 2 full time, 1 part time

FY03 – 6 Projects Completed •Increase truck/shovel productivity, •Increased Coal wash plant production, •Improve Cat 793 Haul truck availability, •Reduce Cat 793 Haul truck tyre down time, •Reduce mobile equipment related injuries, •Upgrade Fleet management system (stage 1)Savings/Revenue Increase: US $2.07M

Six Sigma Plus

Page 51: Mt Arthur coal - BHP

Operating ExcellenceFY04 – Currently 4 Active Projects•GSAP implementation•Upgrade Fleet management system (stage 2)•Fatigue risk management•Reducing cam shaft inspection time on Cat 3500 series engines

Projected Savings/Revenue increase: US $1.29M (on going)

•Major focus on enabling (mission critical) projects in Q1 & Q2.

Six Sigma Plus

Page 52: Mt Arthur coal - BHP

Looking Forward

• Full employment by June 2004

• Further expenditure on Mobile Equipment to meet full production– MAN Project complete 2006

• Growth Opportunities– BCC approved capacity– Mt Ogilvie

Page 53: Mt Arthur coal - BHP

Our Vision……..

Mt Arthur Coal -

Innovative and Caring.

A mine of excellence continuously striving

for improvement.

Page 54: Mt Arthur coal - BHP

End