Page 1: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 1

Chapter 5

Transportation, Assignment, and Transshipment

Page 2: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 2

Network Flow Problems Transportation Assignment Transshipment Production and Inventory

Page 3: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 3

Network Flow Problems - Transportation

Building Brick Company (BBC) manufactures bricks. One of BBC’s main concerns is transportation costs which are a very significant percentage of total costs. BBC has orders for 80 tons of bricks at three suburban locations as follows: Northwood – 25 tons Westwood – 45 tons Eastwood – 10 tons

BBC has two plants, each of which can produce 50 tons per week. BBC would like to minimize transportation costs. How should end of week

shipments be made to fill the above orders given the following delivery cost per ton?

$/ton Northwood Westwood Eastwood

Plant 1 24 30 40

Plan 2 30 40 42

Page 4: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 4

Network Representation - BBC

1Northwood

2Westwood

3Eastwood

1Plant 1

2Plant 2

50

50

25

45

10

Plants(Origin Nodes)

DestinationsTransportationCost per Unit

Distribution Routes - arcs DemandSupply

$24

$30

$40

$30

$40

$42

Page 5: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 5

Define Variables - BBC

Let:

xij = # of units shipped from Plant i to Destination j

Page 6: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 6

General Form - BBC

Min

24x11+30x12+40x13+30x21+40x22+42x23

s.t.

x11 +x12 +x13 <= 50

x21 +x22+ x23 <= 50

x11 + x21 = 25

x12 + x22 = 45

x13 + x23 = 10

xij >= 0 for i = 1, 2 and j = 1, 2, 3

Plant 1 Supply

Plant 2 Supply

North Demand

West Demand

East Demand

Page 7: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 7

Page 8: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 8

Page 9: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 9

Page 10: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 10

Page 11: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 11

Network Flow Problems Transportation Problem Variations

Total supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand

Maximization/ minimization Change from max to min or vice versa

Route capacities or route minimums Unacceptable routes

Page 12: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 12

Network Flow Problems - Transportation

Building Brick Company (BBC) manufactures bricks. One of BBC’s main concerns is transportation costs which are a very significant percentage of total costs. BBC has orders for 80 tons of bricks at three suburban locations as follows: Northwood – 25 tons Westwood – 45 tons Eastwood – 10 tons

BBC has two plants, each of which can produce 50 tons per week. BBC would like to minimize transportation costs. How should end of week

shipments be made to fill the above orders given the following delivery cost per ton?

Suppose demand at Eastwood grows to 50 tons.$/ton Northwood Westwood Eastwood

Plant 1 24 30 40

Plan 2 30 40 42

Page 13: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 13

Network Representation - BBC

1Northwood

2Westwood

3Eastwood

1Plant 1

2Plant 2

50

50

25

45

10

Plants(Origin Nodes)

DestinationsTransportationCost per Unit

Distribution Routes - arcs DemandSupply

$24

$30

$40

$30

$40

$42

50

Page 14: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 14

General Form - BBC

Min

24x11+30x12+40x13+30x21+40x22+42x23

s.t.

x11 +x12 +x13 <= 50

x21 +x22+ x23 <= 50

x11 + x21 = 25

x12 + x22 = 45

x13 + x23 = 10

xij >= 0 for i = 1, 2 and j = 1, 2, 3

Plant 1 Supply

Plant 2 Supply

North Demand

West Demand

East Demand

Min

24x11+30x12+40x13+30x21+40x22+42x23

s.t.

x11 +x12 +x13 = 50

x21 +x22+ x23 = 50

x11 + x21 <= 25

x12 + x22 <= 45

x13 + x23 <= 50

xij >= 0 for i = 1, 2 and j = 1, 2, 3

Page 15: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 15

Page 16: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 16

Page 17: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 17

Page 18: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 18

Page 19: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 19

Network Flow Problems Transportation Problem Variations

Total supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand

Maximization/ minimization Change from max to min or vice versa

Route capacities or route minimums Unacceptable routes

Page 20: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 20

Network Flow Problems - Transportation

Building Brick Company (BBC) manufactures bricks. BBC has orders for 80 tons of bricks at three suburban locations as follows: Northwood – 25 tons Westwood – 45 tons Eastwood – 10 tons

BBC has two plants, each of which can produce 50 tons per week. BBC would like to maximize profit. How should end of week shipments be

made to fill the above orders given the following profit per ton?

$/ton Northwood Westwood Eastwood

Plant 1 24 30 40

Plan 2 30 40 42

Page 21: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 21

Network Representation - BBC

1Northwood

2Westwood

3Eastwood

1Plant 1

2Plant 2

50

50

25

45

10

Plants(Origin Nodes)

DestinationsTransportationCost per Unit

Distribution Routes - arcs DemandSupply

$24

$30

$40

$30

$40

$42

Profitper Unit

Page 22: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 22

General Form - BBC

Min

24x11+30x12+40x13+30x21+40x22+42x23

s.t.

x11 +x12 +x13 <= 50

x21 +x22+ x23 <= 50

x11 + x21 = 25

x12 + x22 = 45

x13 + x23 = 10

xij >= 0 for i = 1, 2 and j = 1, 2, 3

Plant 1 Supply

Plant 2 Supply

North Demand

West Demand

East Demand

Max

Page 23: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 23

Page 24: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 24

Page 25: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 25

Page 26: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 26

Page 27: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 27

Network Flow Problems Transportation Problem Variations

Total supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand

Maximization/ minimization Change from max to min or vice versa

Route capacities or route minimums Unacceptable routes

Page 28: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 28

Network Flow Problems - Transportation

Building Brick Company (BBC) manufactures bricks. One of BBC’s main concerns is transportation costs which are a very significant percentage of total costs. BBC has orders for 80 tons of bricks at three suburban locations as follows: Northwood – 25 tons Westwood – 45 tons Eastwood – 10 tons

BBC has two plants, each of which can produce 50 tons per week. BBC would like to minimize transportation costs. How should end of week

shipments be made to fill the above orders given the following delivery cost per ton?

BBC has just been instructed to deliver at most 5 tons of bricks to Eastwood from Plant 2.

$/ton Northwood Westwood Eastwood

Plant 1 24 30 40

Plan 2 30 40 42

Page 29: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 29

Network Representation - BBC

1Northwood

2Westwood

3Eastwood

1Plant 1

2Plant 2

50

50

25

45

10

Plants(Origin Nodes)

DestinationsTransportationCost per Unit

Distribution Routes - arcs DemandSupply

$24

$30

$40

$30

$40

$42

At most 5 tons Delivered from Plant 2

Page 30: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 30

General Form - BBCMin24x11+30x12+40x13+30x21+40x22+42x23

s.t. x11 +x12 +x13 <= 50

x21 +x22+ x23 <= 50 x11 + x21 = 30 x12 + x22 = 45 x13 + x23 = 10

x23 <= 5

xij >= 0 for i = 1, 2 and j = 1, 2, 3

Plant 1 Supply

Plant 2 Supply

North Demand

West Demand

East Demand

Route Max

Page 31: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 31

Page 32: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 32

Page 33: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 33

Page 34: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 34

Page 35: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 35

Network Flow Problems Transportation Problem Variations

Total supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand

Maximization/ minimization Change from max to min or vice versa

Route capacities or route minimums Unacceptable routes

Page 36: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 36

Network Flow Problems - Transportation

Building Brick Company (BBC) manufactures bricks. One of BBC’s main concerns is transportation costs which are a very significant percentage of total costs. BBC has orders for 80 tons of bricks at three suburban locations as follows: Northwood – 25 tons Westwood – 45 tons Eastwood – 10 tons

BBC has two plants, each of which can produce 50 tons per week. BBC would like to minimize transportation costs. How should end of week

shipments be made to fill the above orders given the following delivery cost per ton?

BBC has just learned the route from Plant 2 to Eastwood is no longer acceptable.

$/ton Northwood Westwood Eastwood

Plant 1 24 30 40

Plan 2 30 40 42

Page 37: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 37

Network Representation - BBC

1Northwood

2Westwood

3Eastwood

1Plant 1

2Plant 2

50

50

25

45

10

Plants(Origin Nodes)

DestinationsTransportationCost per Unit

Distribution Routes - arcs DemandSupply

$24

$30

$40

$30

$40

$42

Route no longeracceptable

Page 38: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 38

General Form - BBC

Min

24x11+30x12+40x13+30x21+40x22+42x23

s.t.

x11 +x12 +x13 <= 50

x21 +x22+ x23 <= 50

x11 + x21 = 30

x12 + x22 = 45

x13 + x23 = 10

xij >= 0 for i = 1, 2 and j = 1, 2, 3

Plant 1 Supply

Plant 2 Supply

North Demand

West Demand

East Demandx13 = 10

24x11+30x12+40x13+30x21+40x22

x21 +x22 <= 50

Page 39: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 39

Page 40: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 40

Page 41: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 41

Page 42: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 42

Page 43: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 43

Network Flow Problems Transportation Assignment Transshipment Production and Inventory

Page 44: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 44

Network Flow Problems - Assignment

ABC Inc. General Contractor pays their subcontractors a fixed fee plus mileage for work performed. On a given day the contractor is faced with three electrical jobs associated with various projects. Given below are the distances between the subcontractors and the projects. How should the contractors be assigned to minimize total distance (and total cost)?

  Project

Subcontractors A B C

Westside 50 36 16

Federated 28 30 18

Goliath 35 32 20

Universal 25 25 14

Page 45: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 45

Network Representation - ABC

1A

2B

3C

1West

2Fed

1

1

1

1

1

Contractors(Origin Nodes)

Electrical Jobs(Destination Nodes)

TransportationDistance

Possible Assignments - arcsDemandSupply

50

36

1628

3018

3Goliath

4Univ.

1

1

3532

2025

25

14

Page 46: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 46

Define Variables - ABC

Let:

xij = 1 if contractor i is assigned to Project j and equals zero if not assigned

Page 47: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 47

General Form - ABC

Min50x11+36x12+16x13+28x21+30x22+18x23+35x31+32x32+20x33+25x41+25x42+14x43

s.t. x11 +x12 +x13 <=1

x21 +x22 +x23 <=1

x31 +x32 +x33 <=1

x41 +x42 +x43 <=1

x11 +x21 +x31 +x41 =1 x12 +x22 +x32 +x42 =1 x13 +x23 +x33 +x43 =1

xij >= 0 for i = 1, 2, 3, 4 and j = 1, 2, 3

Page 48: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 48

Network Flow Problems Assignment Problem Variations

Total number of agents (supply) not equal to total number of tasks (demand)

Total supply greater than or equal to total demand Total supply less than or equal to total demand

Maximization/ minimization Change from max to min or vice versa

Unacceptable assignments

Page 49: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 49

Page 50: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 50

Page 51: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 51

Page 52: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 52

Page 53: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 53

Network Flow Problems Transportation Assignment Transshipment Production and Inventory

Page 54: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 54

Network Flow Problems - Transshipment Thomas Industries and Washburn Corporation supply three firms (Zrox, Hewes, Rockwright) with

customized shelving for its offices. Thomas and Washburn both order shelving from the same two manufacturers, Arnold Manufacturers and Supershelf, Inc.

Currently weekly demands by the users are: 50 for Zrox, 60 for Hewes, 40 for Rockwright.

Both Arnold and Supershelf can supply at most 75 units to its customers. Because of long standing contracts based on past orders, unit shipping costs from the manufacturers

to the suppliers are:

  Thomas Washburn

Arnold 5 8

Supershelf 7 4

The costs (per unit) to ship the shelving from the suppliers to the final destinations are:

  Zrox Hewes Rockwright

Thomas 1 5 8

Washburn 3 4 4

Formulate a linear programming model which will minimize total shipping costs for all parties.

Page 55: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 55

Network Representation - Transshipment

5Zrox

6Hewes

7Rockwright

3Thomas

4Washburn

75

75

50

60

40

Warehouses(Transshipment Nodes)

Retail Outlets(Destinations Nodes)

TransportationCost per Unit

Distribution Routes - arcs DemandSupply

$1

$5

$8

$3$4

$4

TransportationCost per Unit

1Arnold

2Super S.

$5

$8

$7

$4

Plants(Origin Nodes)

Flow In150

Flow Out150

Resembles Transportation Problem

Page 56: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 56

Define Variables - Transshipment

Let:

xij = # of units shipped from node i to node j

Page 57: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 57

General Form - Transshipment

Min5x13+8x14+7x23+4x24+1x35+5x36+8x37+3x45+4x46+4x47

s.t. x13 +x14 <= 75

x23 +x24 <= 75

x35 +x36 +x37 = x13 +x23

x45 +x46 +x47 = x14 +x24

+x35 +x45 = 50 +x36 +x46 = 60 +x37 +x47 = 40

xij >= 0 for all i and j

Flow In150

Flow Out150

Page 58: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 58

Network Flow Problems Transshipment Problem Variations

Total supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand

Maximization/ minimization Change from max to min or vice versa

Route capacities or route minimums Unacceptable routes

Page 59: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 59

Page 60: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 60

Page 61: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 61

Page 62: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 62

Page 63: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 63

Network Flow Problems Transportation Assignment Transshipment Production and Inventory

Page 64: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 64

Network Flow Problems – Production & Inventory A producer of building bricks has firm orders for the next four weeks.

Because of the changing cost of fuel oil which is used to fire the brick kilns, the cost of producing bricks varies week to week and the maximum capacity varies each week due to varying demand for other products. They can carry inventory from week to week at the cost of $0.03 per brick (for handling and storage). There are no finished bricks on hand in Week 1 and no finished inventory is required in Week 4. The goal is to meet demand at minimum total cost. Assume delivery requirements are for the end of the week, and assume carrying

cost is for the end-of-the-week inventory.

(Units in thousands) Week 1 Week 2 Week 3 Week 4

Delivery Requirements 58 36 52 70

Production Capacity 60 62 64 66

Unit Production Cost ($/unit) $28 $27 $26 $29

Page 65: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 65

Network Representation – Production and Inventory

1Week 1

62

Production Nodes Demand NodesProduction Costs

Production - arcs

DemandProductionCapacity

2Week 2

3Week 3

4Week 4

64

66

605

Week 1

6Week 2

7Week 3

8Week 4

36

52

70

58$28

$27

$26

$29

$0.03

$0.03

$0.03

InventoryCosts

Page 66: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 66

Define Variables - Inventory

Let:

xij = # of units flowing from node i to node j

Page 67: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 67

General Form - Production and Inventory

Min28x15+27x26+26x37+29x48+.03x56+.03x67+.03x78

s.t.

x15 <= 60

x26 <= 62

x37 <= 64

x48 <= 66

x15 = 58+x56

x26 +x56 = 36+x67

x37 +x67 = 52+x78

x48 +x78 = 70

xij >= 0 for all i and j

Page 68: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 68

Page 69: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 69

Page 70: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 70

Page 71: MT 2351 Chapter 5 Transportation, Assignment, and Transshipment.

MT 235 71